vii TABLE OF CONTENT CHAPTER 1 TITLE PAGE DECLARATION ii DEDICATION iii ACKNOWLEDGMENTS iv ABSTRACT v ABSTRAK vi TABLE OF CONTENT vii LIST OF CASES xii LIST OF FIGURE xvi LIST OF ABBREVIATION xvii INTRODUCTION 1 1.1 Background of the study 1 1.2 Statement of issues 3 1.3 Objective of study 5 viii 2 1.4 Limitation of Study 5 1.5 The significant of research 6 1.6 Research Methodology 6 ARCHITECT AND LIABILITY 9 2.1 Introduction 9 2.2 Definition of Architect 11 2.3 Roles of Architect 12 2.4 Selection of Architect 14 2.5 Appointment of Architect 15 2.5.1 Form of Appointment 2.6 Conditions of Engagement 16 2.7 Duties of Architect 17 2.7.1 18 Duties under Standard Form of Contract 2.7.2 Duties during Construction Stages 2.7.2.1 Supervision and Inspection of Works 2.8 Professional Relationship 2.8.1 Architect and Owner/Clients 19 20 21 21 2.8.1.1 Liability Architect as an Agent 23 2.8.1.2 Voluntary Agreements with Owners 23 2.8.1.3 Termination of Contract between Owner and Architect 24 2.8.1.4 Architect and Client Relation during Inspection 25 ix 2.8.2 Architect and contractor 2.8.2.1 Architect And Contractor Relation During Inspection 3 26 28 2.9 Architect cannot delegate a work 31 2.10 Architect decision is final 32 2.11 Architect decision is not final 34 2.12 Professional liability 34 2.13 Professional liability in contract 37 2.14 The Architect Liability 38 2.14.1 Breach of contract 41 2.14.2 Negligence 42 2.14.2.1 Strict Liability 44 2.14.2.2 Vicarious Liability 45 2.15 Tort Liability 45 2.16 Standard of Care 48 2.17 Conclusion 50 INSPECTION OF WORK 51 3.1 Introduction 51 3.2 Definition of Inspection 52 3.3 Inspection of Contract Form 53 3.3.1 PAM Form 2006 53 x 3.3.2 P.W.D. Form 203 3.4 Inspectors 56 3.4.1 Inspection by the Design Professional or Architect 55 3.4.2 Inspection by the Contractor 57 3.5 Scope if Inspection 59 3.6 Factors on Site Visit 60 3.7 Rules and Proceeding on a Site 61 3.8 Difference Supervision and Inspection 62 3.8.1 4 55 Difference Monitoring and Inspection 64 3.9 Inspection during Practical Completion 65 3.10 Site Preparation for Inspection 66 3.11 Site Information for Inspection 69 3.11.1 Snagging 71 3.11.2 Inspection Data Must Be Recorded 70 3.11.3 Conformance of Plan and Specifications 73 3.12 Visual Inspection 74 3.13 Inspection by Other Parties 75 3.14 Conclusion 76 CASE ANALYSIS: LIABILITY ARCHITECT IN CONNECTION WITH INSPECTION 78 4.1 Introduction 78 4.2 Architect Negligence and Failure to Inspection 79 xi 4.2.1 Brown & Another v. Scott & Another 80 4.2.2 4.2.3 Dr Abdul Hamid Abdul Rashid & Anor v 81 Jurusan Malaysia Consultants (Sued As A Firm) & Ors Chuang Uming (Pte) Ltd v Setron Ltd and another Appeal 82 4.2.4 Lim Teck Kong v Dr Abdul Hamid Abdul Rashid & Anor 83 4.2.5 McGlinn v Waltham Contractors Ltd and others (No 3) 84 4.3 Architect Not Liable On Negligence And Failure To Inspection 85 4.3.1 Sim & Associates v Tan Alfred 85 4.3.2 Tesco Stores Ltd v The Norman Hitchcox Partnership Ltd and others 86 4.3.3 Consarc Design Ltd v. Hutch Investments Ltd 87 4.3.4 PB Malaysia Sdn Bhd v Samudra (M) Sdn Bhd 88 4.4 Conclusion Liability of Architect 89 4.5 Degree of Inspection 90 4.5.1 Inspection Depend On Size of Projects 90 4.5.2 Reasonable Work On Inspection 92 4.5.3 Inspection Depend On Contractor Expertise 93 4.5.4 Inspection On Related Event 94 4.5.5 Inspection Depend On Nature Of The Works 95 4.5.6 Architect Must Inspect All The Works 97 4.6 Conclusion on Degree of Inspection 98 4.7 Conclusion 99 xii 5 CONCLUSION AND RECOMMENDATION 100 5.1 Introduction 100 5.2 Research Finding 100 5.3 Study Constraint 101 5.4 Suggestion for future study 101 5.5 Conclusion 102 REFERENCES 106 xiii LIST OF CASES CASES PAGE Acrecrest Ltd. V W. S. Hattrell & Partners and Another [1983] Qb 260 39,54, 74, 75, 79 42,49 Anns v. Merton London Borough Council[1978] A.C. 728 Bolam v. Friern Hospital Management Committee [1957] 1 WLR 583 37 Blair And Patterson Ltd v. McDermott [2006] ABC.L.R. 05/01, 106 63. 79,80,96 Brown & Another v. Scott & Another Chuang Uming (Pte) Ltd V Setron Ltd And Another 31, 82, 91,95 Appeal[2000]1SLR166 Clay v. A.J. Crump & Sons Ltd[I964] 1 QB 533 Clayton v. Woodman & Son (Builders) Ltd. [1962] 2 Q.B. 533. Consarc Design Ltd. v Hutch Investments Ltd (2002) 84 Con LR 36 Croudace Ltd v London Borough of Lambeth (1986) 6 Con LR 70 70,74 34 87,94 23 xiv Davie v. New Merton Board Mills Ltd. [1959] A.C. 604 Department of National heritage v. Steensen Varming Mulcahy 31 20,61 and others [1998] 60 ConLR 33 Donoghue v Stevenson [I9321 A.C. 562 Dr Abdul Hamid Abdul Rashid & Anor V Jurusan Malaysia 48 81,92 Consultants & Ors [1997] 3 MLJ 546 East Ham Corp v Bernard Sunley & Sons Ltd[1966] AC 406 69,106 Jameson v Simon[1899] 1 F (Ct of Sess) 1211 85,105 Kennedy v Gerard Hamill [2005] NIQB 23. 75 Kensington, Chelsea & Westminster Area Health Authority v. 32 Wettern Composites (1984) 1 CON LR 114 Lim Teck Kong v Dr Abdul Hamid Abdul Rashid & Anor[2006] 3 MLJ 83 213 McGlinn v Waltham Contractors Ltd and others (No 3) [2007] EWHC 4, 33,63, 72, 149 (TCC) 78, 85,93,98 McLoughlin v. O'Brian[1982] 2 W.L.R. 982 PB Malaysia Sdn Bhd v Samudra (M) Sdn Bhd Pembenaan Leow Tuck Chui & Sons Sdn Bhd V Dr Leela's Medical Centre Sdn Bhd[1995] 2 MLJ 57 49 88,92 30,83,100 xv R v. Architects Registration Tribunal, ex p. Jaggar [1945] 2 All E.R. 1, 11 131 RSP Architects Planners & Engineers v Ocean Front Pte Ltd[1996] 1 50 SLR 113 Rylands v. Fletcher [1868] LR 3HL 330 Scrivener & Anor v Pask (1866) LR 1 CP 715. Sim & Associates (Sued As A Firm) V Tan Alfred[1994] 3 SLR 169 Steven Phoa Cheng Loon & Ors v Highland Properties Sdn Bhd & Ors 43 23, 69 17, 67, 85,97 17 [2000] 4 MLJ 200 Sutcliffe v Chippendale & Edmonson (1971) 18 BLR 149 93,100 Sutcliffe v. Thackrah & Ors. [1974] AC 727 17,102 Tesco Stores Ltd v The Norman Hitchcox Partnership Ltd and others 86 Teh Khem On & Anor V Yeoh & Wu Development Sdn Bhd & 84 Ors[1995] 2MLJ663 Victoria University of Manchester V. Hugh Wilson and Lewis 29,82,83 Momersley [1984] 1 Const LJ 162 Voli v Inglewood Shire Council & Anor(1963) 110 CLR 74 White & Anor v Jones & Ors[1995] 1 All ER 691. 30,40,47 80 xvi LIST OF FIGURE FIGURE NO TITLE PAGE 1.1 Research Process and Methodology 8 2.1 Relation with Owner ± Contractor - Architect 27 2.2 Relation with Owner ± Contractor ± Architect with subcontractor 27 2.3 Types of liability 45 3.1 Process on inspection during practical completion 66 3.2 Flow site preparation for inspection 68 3.3 Important information for inspection 71 4.1 Difference Negligent To Inspection and Failure to Inspection 89 4.2 Conclusion Case Analysis 89 4.3 Conclusion on Degree of Inspection 98 xvii 4.4 Chronology of Liability Architect during Inspections of Work LIST OF ABBRIEVATIONS PAM - Pertubuhan Arkitek Malaysia PWD - Public Works Department Malaysia P.D - Project Director S.O. - Superintending Officer C.O.W - Clerk of Work 99