November,2012 S.NO. 1. 2 3 4 5 6. 7. 8. 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 CONTENT CAPACITY ADDITION BY PLAN YEARWISE CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 11TH PLAN LIST OF PROJECTS COMMISSIONED DURING 11TH PLAN (YEAR-WISE) LIST OF PROJECTS COMMISSIONED DURING 11TH PLAN (STATE-WISE) SUMMARY OF CAPACITY ADDITION LIKELY DURING 12TH PLAN (MW) LIST OF PROJECTS COMMISSIONED DURING 2012-2013 (12TH PLAN) AS ON 30.04.2011 ALL INDIA POWER SCENERIO AT A GLANCE POWER SCENERIO - ALL REGIONS INSTALLED CAPACITY OF STATES NORTHERN REGION CHANDIGARH DELHI HARYANA HIMACHAL PRADESH JAMMU & KASHMIR PUNJAB RAJASTHAN UTTAR PRADESH UTTARAKHAND WESTERN REGION CHHATISGARH GUJARAT MADHYA PRADESH MAHARASHTRA GOA DAMAN AND DIU DADRA AND NAGAR HAVELI SOUTHERN REGION ANDHRA PRADESH KARNATAKA KERALA TAMIL NADU PUDDUCHERRY EASTERN REGION BIHAR DVC JHARKHAND ODISHA SIKKIM WEST BENGAL NORTH-EASTERN REGION ARUNACHAL PRADESH ASSAM MANIPUR MEGHALAYA MIZORAM NAGALAND TRIPURA ANDAMAN & NIKOBAR ISLANDS LAKSHADWEEP 1 PAGE NO. 2 3-4 5-9 10-13 14 15 17-19 21 22 23 24 26 29 32 35 37 40 43 46 48 49 52 55 58 61 63 65 67 68 71 73 75 77 79 80 82 84 86 88 90 92 93 95 97 99 101 103 105 107 109 PLANWISE CAPACITY ADDITION PLAN STATE- SECTOR TARGET PRIVATE- SECTOR CENTRAL SECTOR TOTAL ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL 7TH PLAN % ACHIEVEMENT 12925 11867.14 92 0 0 9320 9534.5 102 22245 21401.64 96 8TH PLAN % ACHIEVEMENT 14869.7 6835.2 46 2810 1430.4 50.9 12858 8157 63.4 30537.7 16422.6 53.8 9TH PLAN % ACHIEVEMENT 10747.7 9352.8 87 17588.5 5262.2 29.9 11909 4504 37.8 40245.2 19119 47.5 10TH PLAN % ACHIEVEMENT 11156.84 6244.64 56 7121 1930.6 27.1 22832 13005 57 41109.84 21180.24 51.5 11TH PLAN % ACHIEVEMENT 21355.4 16732.4 77.2 19796.5 23012.5 117.5 21222 15220 71.7 62373.9 54963.9 88.1 2 YEARWISE CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 11TH PLAN 1.CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 2007-08(IN MW) SECTOR CENTRAL STATE PRIVATE TOTAL HYDRO THERMAL NUCLEAR TOTAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL 690 1030 3490 1990 660 220 4840 3240 1682 1393 4767 3880 0 0 6449 5273 0 0 750 750 0 0 750 750 2372 2423 9007 6620 660 220 12039 9263 2. CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 2008-09 (IN MW) SECTOR CENTRAL STATE PRIVATE TOTAL HYDRO THERMAL NUCLEAR TOTAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL 0 0 1750 750 660 0 2410 750 1097 969 1262 852.2 0 0 2359 1821.2 0 0 2761 882.5 0 0 2761 882.5 1097 969 5773 2484.7 660 0 7530 3453.7 3. CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 2009-10 (IN MW) SECTOR HYDRO THERMAL NUCLEAR TOTAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL CENTRAL 252 0 2490 1740 660 440 3402 2180 STATE 301 39 4679 3079 0 0 4980 3118 PRIVATE 292 0 5833 4287 0 0 6125 4287 TOTAL 845 39 13002 9106 660 440 14507 9585 4. CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 2010-11 (IN MW) SECTOR HYDRO THERMAL NUCLEAR TOTAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL CENTRAL 529 320 5365 3740 1220 220 7114 4280 STATE 356 178 6012 2581 0 0 6368 2759 PRIVATE 461 192 6416 4930 0 0 6877 5122 1346 690 17793 11251 1220 220 20359 12161 TOTAL 3 5. CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 2011-12 (IN MW) SECTOR HYDRO THERMAL NUCLEAR TOTAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL CENTRAL 655 200 3070 4570 2000 0 5725 4770 STATE 165 123 4101 3638 0 0 4266 3761 PRIVATE 1170 1100 6440 10871 0 0 7610 11971 TOTAL 1990 1423 13611 19079 2000 0 17601 20502 6. TOTAL CAPACITY COMMISSIONED DURING 11TH PLAN (IN MW) SECTOR HYDRO THERMAL GAS LIGNITE 740 500 NUCLEAR TOTAL TOTAL 12790 880 15220 CENTRAL 1550 COAL 11550 STATE 2702 11695 1885.4 450 14030 0 16732.4 PRIVATE 1292 18649 2530.5 540 21720 0 23012.5 TOTAL 5544 41894 5155.9 1490 48540 880 54963.9 4 LIST OF PROJECTS COMMISSIONED DURING 2007-2008 Sl.No. 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 NAME OF PROJECT HYDRO OMKARESHWARB HEP U 1-8 TEESTA-V HEP U-1,2,3 JURALA PRIYA HEP U1 MANERI BHALI HEP U:1-4 PURLIA PSS HEP U 1-4 BALIMELA ST-II HEP U 7-8 TOTAL HYDRO THERMAL FUEL TYPE CAPACITY (MW) NHDC NHPC APGENCO UJVNL WBSEB OHPC HYDRO 520 510 39 304 900 150 2423 C C C NTPC NTPC DVC COAL C S S S S S S S S S S S S S P NTPC PSEB CSEB MPPGCL MSPGCL APGENCO KPCL WBPDCL WBPDCL WBPDCL DPL HPGCL RRVUNL GSECL JIN. POWER GAS/LNG C NPC NUCLEAR STATE SECTOR DEVELOPER MP SIKKIM AP UKND WB ORISSA C C S S S S SIPAT STPP-II U-4 CHG KAHALGAON TPP-II U 6 BIHAR MEJIA TPP U-6 WB RATNAGIRI (DHABOL) JV BLOCK III MAH GH TPP-II U-3 PUNJAB KORBA EAST TPPEXT U 2 CHG BIRSINGHPUR TPP EXT U 5 MP PARAS TPP EXT U-1 MAH RAYALSEEMA TPP U 4 AP BELLARY TPP U 1 KARN SANTALDIH TPP U 5 WB BAKRESHWAR TPP U 4 WB SAGARDIGHI TPP U 1 WB DURGAPUR TPP U 7 WB YAMUNA NAGAR TPS U-1,2 HAR DHOLPUR CCGT GT 2 + ST RAJASTHAN DHUVARAN CCGT (ST) GUJ RAIGARH TPP- PH-I U:1-3 CHG TOTAL THERMAL NUCLEAR KAIGA NPP U 3 KAR TOTAL NUCLEAR TOTAL (2007-08) C: Central Sector, S: State Sector, P: Private Sector 5 HYDRO HYDRO HYDRO HYDRO HYDRO COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL GAS/LNG GAS/LNG COAL 500 500 250 740 250 250 500 250 210 500 250 210 300 300 600 220 40 750 6620 220 220 9263 LIST OF PROJECTS COMMISSIONING DURING 2008-09 Sl.No. 1 2 3 4 1 2 3 4 5 6 7 8 9 PLANT NAME HYDRO BAGLIHAR-I U1,2,3 GHATGHAR PSS U1,2 JURALA PRIYADARSHNI U2 VARAHI EXT TOTAL HYDRO THERMAL SIPAT-II U 5 BHILAI JV U-1 GH TPP-II AMARKANTAK TPS U-5 VALUTHUR CCPP GT+ST SAGARDIGHI U 2 RAIGARH TPP PH-II U 4 SUGEN TORRENT BLOCK-I TROMBAY TPS U-8 CAPACITY (MW) STATE SECTOR DEVELOPER FUEL TYPE J&K MAH S S JKPDC GOMID HYDRO HYDRO 450 250 AP S APGENCO HYDRO 39 KAR S KPCL HYDRO 230 969 CHG CHG PUN MP TN WB CHG C C S S S S P NTPC NTPC PSEB MPGENCO TNEB WBPDCL JIN. POWER COAL COAL COAL COAL GAS/LNG COAL COAL 500 250 250 210 92.2 300 250 GUJ P TORRENT GAS/LNG 382.5 MAH P TATA POWER COAL 250 TOTAL THERMAL 2484.7 TOTAL 2008-09 3453.7 C: Central Sector, S: State Sector, P: Private Sector 6 LIST OF PROJECTS COMMISSIONED DURING 2009-2010 Sl.No. 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 PLANT NAME HYDRO JURALA PRIYA U 3 TOTAL HYDRO THERMAL CHANDRAPUR U-7,8 KAHALGAON II U7 BHILAI JV U 2 DADRI EXT U-5 VIJAYWADA TPP ST-IV, U1 RAJIV GANDHI TPS (HISSAR) U-1 NEW PARLI EXT U-2 PARAS EXT U2 CHHABRA TPS U-1 KOTA TPP U7 SURATGARH EXT U6 BAKRESHWAR U 5 UTRAN CCPP-GT+ST KUTCH LIGNITE TPS GIRAL U-2 LANCO AMARKANTAK U1,2 MUNDRA TPP PH-I, U 1,2 TORANGALLU U1,2 STATE SECTOR DEVELOPER FUEL TYPE AP S APGENCO HYDRO 39 39 JHAR BIH CHG UP AP C C C C S DVC NTPC NTPC NTPC APGENCO COAL COAL COAL COAL COAL 500 500 250 490 500 HAR MAH MAH RAJ RAJ RAJ WB GUJ GUJ RAJ CHG GUJ KAR S S S S S S S S S S P P P HPGCL MSPGCL MSPGCL RRVUNL RRVUNL RRVUNL WBPDCL GSECL GSECL RRVUNL LANCO ADANI POWER JSW ENERGY RELIANCE POWER CESC KONASEEMA POWER GAUTAMI POWER LANCO COAL COAL COAL COAL COAL COAL COAL GAS/LNG LIGNITE LIGNITE COAL COAL COAL 600 250 250 250 195 250 210 374 75 125 600 660 600 COAL COAL 300 250 GAS/LNG 280 GAS/LNG GAS/LNG 464 233 GAS/LNG 765 LIGNITE 135 9106 NUCLEAR 440 440 20 ROSA ST-I U1 BUDGE-BUDGE EXT UP WB P P 21 KONASEEMA GT AP P 22 GAUTAMI KONDAPALLI CCPP PH-II GT SUGEN TORRENT BLOCK-II & III AP AP P P GUJ P RAJ P TORRENT RAJ WEST POWER RAJ C NPC 23 24 25 1 JALLIPA LIGNITE U 1 TOTAL THERMAL NUCLEAR PROJECTS RAPP U-5,6 TOTAL NUCLEAR TOTAL 2009-10 CAPACITY (MW) 9585 C: Central Sector; S: State Sector; P: Private Sector 7 LIST OF PROJECTS COMMISSIONED DURING 2010-2011 Sl.No. 1 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1 PLANT NAME HYDRO SEWA-II U1,2,3 KOTESHWAR U1,2 JURALA PRIYA U 4,5 KUTIYADI ADDL. EXT U1,2 ALLAIN DUHANGAN TOTAL HYDRO THERMAL MEJIA PH II U7,8 SIMHADRI-EXT U-3 KORBA III U-7 INDIRA GANDHI TPP (JHAJJAR) JV U1 DADRI EXT U-6 FARAKKA STAGE-III U-6 BARSINGSAR LIG U1,2 KAKATIYA TPP RAYALSEEMA ST-III, U5 RAJIV GANDHI TPS (HISSAR) U-2 RAICHUR U 8 CHHABRA TPS U-2 PRAGATI-III (BAWANA) GT-1,2 BARAMURA GT SURAT LIGNITE EXT U3,4 MUNDRA TPP PH-I, U 3,4 MUNDRA TPP PH-II, U 1 UDUPI TPP (LANCO NAGARJUNA) U1 JSW ENERGY, RATNAGIRI U1,2 TPS AT WARORA U1-3 STERLITE TPP U 2,1 ROSA ST-I U2 KONASEEMA ST KONDAPALLI CCPP PH-II ST RITHALA CCPP GT JALLIPA LIGNITE U2 TOTAL THERMAL NUCLEAR KAIGA U-4 TOTAL NUCLEAR STATE SECTOR DEVELOPER FUEL TYPE CAPACITY (MW) J&K C C S S P NHPC HYDRO THDC HYDRO APGENCO HYDRO KSEB HYDRO ADHPL HYDRO 120 200 78 100 192 690 C C C DVC COAL NTPC COAL NTPC COAL NTPC COAL NTPC COAL UKND AP KERL HP WB AP CHG C C C C S S S S S S S S P P HAR UP WB RAJ AP AP HAR KAR RAJ DELHI TRI GUJ GUJ GUJ P P KAR MAH MAH P P P ORS UP NTPC COAL NLC LIGNITE APGENCO COAL APGENCO COAL HPGCL COAL KPCL COAL RRVUNL COAL PPCL GAS/LNG GAS/LNG GIPCL LIGNITE ADANI POWER COAL ADANI POWER COAL NPCL COAL JSW WARDHA POWER CO. COAL COAL STERLITE ENERGY COAL RELIANCE POWER KONASEEMA POWER COAL GAS/LNG LANCO GAS/LNG NDPL GAS/LNG RAJ P P P P RAJ WEST POWER LIGNITE KAR C NPC NUCLEAR AP AP DELHI TOTAL 2010-11 C: Central Sector; S: State Sector; P: Private Sector 1000 500 500 500 490 500 250 500 210 600 250 250 500 21 250 660 660 600 600 405 1200 300 165 133 71.5 135 11250.5 220 220 12160.5 8 LIST OF PROJECTS COMMISSIONED DURING 2011-2012 SL. NO. PLANT NAME STATE DEVELOPER SECTOR FUEL TYPE CAPACITY (MW) UKND AP MEGH HP HP THDC APGENCO MESEB EVREST POWER JPKHCL C S S P P HYDRO HYDRO HYDRO HYDRO HYDRO 200 39 84 100 1000 1423 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 HYDRO KOTESHWAR U3,4 JURALA PRIYA U 6 MYNTDU ST-I U1,2 MALANA II U1,2 KARCHAM WANGTOO U 1-4 TOTAL (HYDRO) THERMAL KODARMA U1 DURGAPUR STEEL U1,2 SIPAT-I U1,2 SIMHADRI TPP U4 VALLUR TPP PH-1 U1 INDIRA GANDHI TPP (JHAJJAR) JV U2 NEYVELI - II LIG U1 KOTHAGUDEM ST-VI BELLARI TPP U2 KHAPER KHEDA EXT BHUSAWAL TPP U4,5 HARDUAGANJ EXT U-8 SANTALDIH EXT-U 6 LAKWA WH PRAGATI-III (BAWANA) GT-3 GSEG HAZIRA EXT MUNDRA TPP PH-II U 2 MAITHAN RBC JV U1,2 UDUPI TPP (LANCO NAGARJUNA) U2 JSW ENERGY, RATNAGIRI U3-4 JHAR WB CHG AP TN HAR TN AP KAR MAH MAH UP WB ASSAM DELHI GUJ GUJ JHAR KAR MAH C C C C C C C S S S S S S S S S P P P P COAL COAL COAL COAL COAL COAL LIGNITE COAL COAL COAL COAL COAL COAL GAS GAS/LNG GAS/LNG COAL COAL COAL COAL 500 1000 1320 500 500 500 250 500 500 500 1000 250 250 37.2 250 351 660 1050 600 600 21 TPS AT WARORA U4 MAH P COAL 135 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 STERLITE TPP U3 MUNDRA TPP-III U1-3 KHAMBRKHERA U 1,2 MAQSOODPUR U 1,2 BARKHERA TPP U 1,2 KUNDARKI TPP U1,2 UTRALA TPP U1,2 ANPARA-C U1,2 ROSA TPP PH-II U3,4 MAHATMA GANDHI (JHAJAR)TPP U1 KASAIPALLI TPP S. V. POWER TPP ULTRA MEGA MUNDRA U1 MIHAN TPP KATGHODA TPP U1 ORS GUJARAT UP UP UP UP UP UP UP HARYANA CHG CHG GUJ MAH CHG P P P P P P P P P P P P P P P COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL 600 1980 90 90 90 90 90 1200 600 660 135 63 800 246 35 37 SIMHAPURI ENERGY PVT LTD U1 AP P COAL 150 38 39 40 SALAYA TPP U 1 RITHALA ST JALIPA LIGNITE U 3,4 TOTAL (THERMAL) TOTAL 2011-12 GUJ DELHI RAJ DVC DVC NTPC NTPC NTPC NTPC NLC APGENCO KPCL MSPGCL MSPGCL UPRVUNL WBPDCL ASGENCO PPCL GSECL ADANI POWER IPP LANCO JSW ENERGY WARDHA POWER CO. STERLITE ENERGY ADANI POWER HINDUSTAN BAJAJ BAJAJ ENERGY BAJAJ ENERGY BAJAJ ENERGY BAJAJ ENERGY LANCO RELIANCE POWER CLP ACB INDIA S. V. POWER TATA POWER ABHIJEET ENERGY ACB INDIA MADHUCAN PROJECTS ESSAR POWER NDPL RAJ WEST POWER P P P COAL GAS LIGNITE 1 2 3 4 5 C: Central Sector; S: State Sector; P: Private Sector 9 600 36.5 270 19079 20501.7 STATE-WISE LIST OF PROJECTS COMMISSIONED DURING 11TH PLAN PROJECT NAME REGION SECTOR TYPE CAPACITY (MW) SR SR SR SR SR SR SR SR SR SR SR C.S P.S P.S. P.S. S.S S.S. S.S. S.S. S.S. S.S P.S COAL GAS GAS GAS COAL COAL HYDRO COAL COAL COAL COAL 1000 464 445 366 500 210 234 500 210 500 150 4579 NER S.S GAS 37.2 37.2 ER C.S. COAL 1000 1000 CHATTISGARH BHILAI U-1,2 SIPAT-II UNIT-4,5 KORBA STPP ST III U-7 RAIGARH (JINDAL) U-I-4 LANCO AMARKANTAK U-1,2 KORBA EAST EXT. U-2 SIPAT-I U 1,2 KASAIPALLI TPP U-1 SVPL TPP U-1 KATGHORA TPP U-1 TOTAL(CHATTISGARH) WR WR WR WR WR WR WR WR WR WR C.S C.S. C.S. P.S. P.S. S.S. C.S. P.S P.S P.S COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL 500 1000 500 1000 600 250 1320 135 63 35 5403 DELHI RITHALA CCPP PRAGATI (BAWANA) CCPP STAGE -III TOTAL(DELHI) NR NR P.S. S.S GAS GAS 108 750 858 GUJARAT SUGEN –BLOCK-I,2,3 MUNDRA TPP PH-II U-I,2 MUNDRA PH-I, U-I,2,3,4 MUNDRA UMPP U-1 MUNDRA TPP PH-III U-1,2,3 SURAT LIGNITE EXP TPP U-3,4 WR WR WR WR WR WR P.S. P.S P.S. P.S P.S S.S GAS COAL COAL COAL COAL LIGNITE 1147.5 1320 1320 800 1980 250 UTRAN CCPP-II KUTCH LIGNITE U-4 DHUVRAN ST HAZIRA CCPP EXPN SALAYA TPP U-1 WR WR WR WR WR S.S. S.S. S.S. S.S P.S GAS LIGNITE GAS GAS COAL 374 75 40 351 600 ANDHRA PRADESH SIMHADRI U-34 GAUTAMI KONASEEMA LANCO KONDAPALLI ST-II VIJAYWADA ST.IV U-I RAYALSEEMA U-4 JURALA PRIYA U-1-6 KAKATIYA ST-I U-1 RAYALSEEMA TPP ST.III U5 KOTHAGUDEM IV U-I SIMHAPURI TPP U-1 TOTAL (A.P.) ASSAM LAKWA W.H TOTAL(ASSAM) BIHAR KAHALGAON UNIT-6,7 TOTAL (BIHAR) 10 TOTAL(GUJARAT) PROJECT NAME H.P. ALLAIN DUHANGAN U-I,2 KARCHAM WANGTOO U-I-4 MALANA II U-I,2 TOTAL(H.P.) 8257.5 REGION SECTOR TYPE CAPACITY (MW) NR NR NR P.S. P.S. P.S HYDRO HYDRO HYDRO 192 1000 100 1292 HARYANA INDRA GANDHI STPP (JHAJJAR) U-I,2 RAJIV GANDHI(HISSAR) U-1-2 YAMUNA NAGAR U-1,2 MAHATMA GANDHI TPP U-1 TOTAL(HARYANA) NR NR NR NR C.S. S.S S.S. P.S COAL COAL COAL COAL 1000 1200 600 660 3460 J&K SEWA II U 1-3 BAGLIHAR U 1-3 TOTAL(J&k) NR NR C.S. S.S. HYDRO HYDRO 120 450 570 JHARKHAND CHANDRAPUR U-7,8 MAITHON RB U-I,2 KODERMA U-I TOTAL(JHARKHAND) ER ER ER C.S. P.S C.S. COAL COAL COAL 500 1050 500 2050 SR SR SR SR SR SR C.S. P.S. P.S. S.S. S.S. S.S. NUCLEAR COAL COAL HYDRO COAL COAL 440 600 1200 230 1000 250 3720 SR S.S. HYDRO 100 KARNATAKA. KAIGA UNIT-3,4 TORANGALLU U-1,2 UDUPI U I,2 VARAHI EXT.UNIT 1,2 BELLARY UNIT-I,2 RAICHUR TPS U-8 TOTAL(KARNATAKA) KERALA KUTTIYADI ADDITIONAL EXTN. H.E. U-1,2 TOTAL(KERALA) M.P. OMKARESWAR UNIT-1-8 BIRSINGPUR UNIT-5 AMARKANTAK U-5 TOTAL(M.P.) MAHARASHTRA RATNAGIRI GAS TROMBAY Extn. JSW ENERGY RATNAGIRI U-1-4 WARDHA WARORA TPP U-1-4 PARAS UNIT-1 GHATGHAR PSS NEW PARLI EXT U2 PARAS TPS EXT. U2 KHAPERKHEDA TPS U-5 MIHAN TPP U-1TO 4 100 WR WR WR C.S. S.S. S.S. HYDRO COAL COAL 520 500 210 1230 WR WR WR WR WR WR WR WR WR WR C.S. P.S. P.S. P.S. S.S. S.S. S.S. S.S. S.S P.S GAS COAL COAL COAL COAL HYDRO COAL COAL COAL COAL 740 250 1200 540 250 250 250 250 500 246 11 BHUSWAL TPS U-4,5 TOTAL(MAHARASHTRA) PROJECT NAME MEGHALAYA MYNTDU(LESHKA) TOTAL(MEGHALAYA) WR S.S COAL REGION SECTOR TYPE NER S.S HYDRO 84 84 ORISSA STERLITE (JHARSUGUDA) U-1-3 BALIMELA UNIT-7,8 TOTAL(ORISSA) ER ER P.S. S.S. COAL HYDRO 1800 150 1950 PUNJAB GHTPP-II (LEH MOH) TOTAL(PUNJAB) NR S.S. COAL 500 500 RAJASTHAN RAPP U-5,6 BARSINGHSAR LIGNITE U-1,2 JALIPA LIGNITE U I-4 CHHABRA U-I,2 SURATGARH U-6 KOTA U-7 GIRAL LIGNITE U-2 DHOLPUR CCGT TOTAL(RAJASTHAN) NR NR NR NR NR NR NR NR C.S. C.S. P.S. S.S S.S. S.S. S.S. S.S. NUCLEAR LIGNITE LIGNITE COAL COAL COAL LIGNITE GAS 440 250 540 500 250 195 125 220 2520 SIKKIM TEESTA -V UNIT - 1-3 TOTAL(SIKKIM) ER C.S HYDRO 510 510 TAMILNADU VALUTHUR PH-II NLC TPP-2 EXTN VALLUR ST-1 PH-1 TPP U-1 TOTAL( TAMILNADU) SR SR SR S.S. C.S C.S GAS LIGNITE COAL 92.2 250 500 842.2 NER S.S NR NR NR NR NR NR NR NR NR NR C.S P.S. S.S. P.S. P.S. P.S. P.S. P.S P.S P.S COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL 980 1200 250 90 1200 45 90 90 45 90 4080 NR NR S.S. C.S. HYDRO HYDRO 304 400 TRIPURA BARAMURA GT EXTN. TOTAL(TRIPURA) U.P. NCTPP DADRI U 5,6 ROSA PH-I U 1-4 HARDUAGANJ U-8 KHAMBRKHERA U-I,2 LANCO ANPARA ( C ) U-1,2 BARKHERA TPP U-I MAQSOODPUR IPP U-1,2 KUNDARKI IPP U-1,2 BARKHERA TPP U-2 UTRAULA IPP U-1,2 TOTAL(U.P.) UTTRAKHAND MANERI BHALI U 1-4 KOTESHWAR U-1-4 12 GAS 1000 5476 CAPACITY (MW) 21 21 TOTAL(UTTARAKHAND) PROJECT NAME WEST BENGAL MEJIA UNIT-6 MEJIA TPS PH II , U-7,8 FARAKKA ST III ,U-6 BUDGE-BUDGE-EX DURGAPUR DPL U-7 SAGARDIGHI U-1,2 BAKRESHWAR U-4,5 PURLIA PSS UNIT-1-4 (JV) SANTALDIH ST-II U-5,6 DURGAPUR STEEL TPP U-I,2 TOTAL(WEST BENGAL) 704 REGION SECTOR TYPE CAPACITY (MW) ER ER ER ER ER ER ER ER ER ER C.S. C.S. C.S. P.S. S.S. S.S. S.S. S.S. S.S. C.S. COAL COAL COAL COAL COAL COAL COAL HYDRO COAL COAL 250 1000 500 250 300 600 420 900 500 1000 5720 TOTAL 11TH PLAN 54963.9 13 DETAILS OF PROJECTS FOR LIKELY BENEFITS DURING 12th PLAN (FIGURES IN MW) HYDRO THERMAL BREAKUP COAL LIGNITE GAS/LNG TOTAL THERMAL NUCLEAR TOTAL CENTRAL SECTOR 6004 13800 250 827.6 14878 5300 26182 STATE SECTOR 1608 12210 0 1712.0 13922 0 15530 PRIVATE SECTOR 3285 43270 270 0.0 43540 0 46825 ALL-INDIA 10897 69280 520 2539.6 72340 5300 88537 14 LIST OF PROJECTS COMMISSIONED DURING 2012-2013 (12TH PLAN) AS ON 31.10.2012 PROJECT NAME THERMAL PROJECTS REGION SECTOR STATE TYPE MAHATMA GANDHI TPP U2 MOUDA TPP U-1 STERLITE (JHARSUGUDA) TPP U-4 GEPL TPP PH-1, UNIT2 RIHAND STPP ST-III UNIT 5 PARICHHA TPP UNIT-5 HARDUGANJ TPP EXT. UNIT-9 SIPATST-I STPP UNIT 3 SALAYA TPS UNIT 2 VINDHYACHAL STPP ST-IV KASAIPALLI TPS UNIT 2 PRAGATI III GT-3 SIMHAPURI TPP PH-1 U2 UMPP-MUNDRA UNIT2 BINA TPP U-1 BUTIBORI TPP U-1 GEPL TPP U1 THAMMINAPATNAM TPP I U 1 TIRORA TPP PH I UT-1 METTUR TPP EXT U1 UMPP-MUNDRA U 3 NR WR ER WR NR NR NR WR WR WR WR NR SR WR WR WR WR SR WR SR WR P.S. C.S. P.S. P.S. C.S. S.S. S.S. C.S. P.S. C.S. P.S. S.S P.S. P.S. P.S. P.S. P.S. P.S. P.S. S.S. P.S. HAR MAHA ODISHA MAHA UP UP UP CHAT GUJ MP CHAT DEL AP GUJ MP MAHA MAHA AP MAHA TN GUJ COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL COAL GAS COAL COAL COAL COAL COAL COAL COAL COAL COAL HYDRO PROJECTS BUDHIL UNIT-1 BUDHIL UNIT-2 CHAMERA III UNIT 3 CHAMERA III UNIT 2 CHAMERA III UNIT 1 NR NR NR NR NR P.S. P.S. C.S. C.S. C.S. HP HP HP HP HP HYDRO HYDRO HYDRO HYDRO HYDRO 15 COMMISSIONING DETAILS COMMISSIONING CAPACITY DATE (MW) 11.04.2012 660 19.04.2012 500 25.04.2012 600 28.04.2012 60 25.05.2012 500 24.05.2012 250 25.05.2012 250 02.06.2012 660 13.06.2012 600 14.06.2012 500 21.06.2012 135 27.06.2012 250 02.07.2012 150 17.07.2012 800 12.08.2012 250 17.08.2012 300 08.09.2012 60 09.09.2012 150 11.09.2012 660 11.10.2012 600 16.10.2012 800 TOTAL 8735 30.5.2012 26.5.2012 07.06.2012 12.06.2012 28.06.2012 TOTAL GRAND TOTAL 35 35 77 77 77 301 9036 16 ALL INDIA POWER SCENERIO AT A GLANCE 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012)) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 27380 2525 9085.4 38990.4 19.51 COAL 49457 23450.38 39115 112022.4 56.05 THERMAL GAS 4965.32 6713.5 6702.23 18381.05 9.20 (FIGURES IN MW) NUCLEAR DIESEL 602.61 597.14 0 1199.75 0.60 TOTAL 55024.93 30761.02 45817.23 131603.18 65.84 0 0 4780 4780 2.39 R.E.S (MNRE) 3513.72 20989.73 0 24503.45 12.26 . TOTAL 85918.65 54275.75 59682.63 199877.03 100.00 2. CAPACITY ADDITION ACHIEVED DURING 11TH PLAN (EXCLUDING RES) (FIGURES IN MW) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL 1550 2702 1292 5544 COAL 11550 11695 18649 41894 THERMAL GAS LIGNITE 740 500 1885.4 450 2530.5 540 5155.9 1490 3. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 27380.00 2595.00 9316.40 39291.40 18.77 COAL 50153.00 28675.38 41275.00 120103.38 57.39 NUCLEAR TOTAL 880 0 0 880 15220 16732.4 23012.5 54963.9 TOTAL 12790 14030 21720 48540 (FIGURES IN MW) THERMAL GAS 5215.32 6985.50 6702.23 18903.05 9.03 NUCLEAR DIESEL 602.61 597.14 0.00 1199.75 0.57 TOTAL 55970.93 36258.02 47977.23 140206.18 67.00 0.00 0.00 4780.00 4780.00 2.28 R.E.S (MNRE) 3530.20 21468.26 0.00 24998.46 11.95 TOTAL 86881.13 60321.28 62073.63 209276.03 100.00 NOTE:-I ) I.C. DOES NOT INCLUDE BENEFITS FROM PROJECTS IN BHUTAN. II) R.E.S. INCLUDES SHP - SMALL HYDRO POWER, B.P. - BIOMASS POWER, B.G.- BIOMASS GASIFIER, U&I – URBAN & INDUSTRIAL WASTE 4. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 78441 100715 108866 109809 119,166 122,287 130,006 135,453 131,889 135,453 132,977 69189 86818 90793 96785 104,009 110,256 116,191 123,294 118,643 123,294 121,304 PEAK DEFICIT/ SURPLUS (MW) (- / +) -9252 -13897 -18073 -13024 -15,157 -12,031 -13,815 -12,159 -13,246 -12,159 -11,673 PEAK DEFICIT/ SURPLUS ( % ) (- / +) -11.8 -13.8 -16.6 -11.9 -12.7 -9.8 -10.6 -9.0 -10.0 -9.0 -8.8 ENERGY REQUIRMENT (MU) 522537 690587 739345 777039 830,594 861,591 937,199 499,727 81,296 583,821 84,094 ENERGY AVAILABILITY (MU) 483350 624495 666007 691038 746,644 788,355 857,886 457,319 74,297 533,759 76,440 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -39187 -66092 -73338 -86001 -83,950 -73,236 -79,313 -42,408 -6,999 -50,062 -7,654 NOTE : 1. LAKSHDEEP AND NICOBAR ISLAND ARE STAND ALONE SYSTEM, POWER SUPPLY OF THESE, DOES NOT FORM PART OF REGIONAL REQUIREMENT AND AVAILABILITY. 2. BOTH PEAK MET AND ENERGY AVAILABILITY AT BUS BAR. * PROVISIONAL 5. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR ENERGY REQUIRMENT (MU) 985,317 ENERGY AVAILABILITY (MU) 893,371 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -91,946 ENERGY DEFICIT/ SURPLUS ( % ) (- / +) -9.3 PEAK DEMAND (MW) 140,090 17 PEAK MET (MW) 125,234 PEAK DEFICIT/ SURPLUS (MW) (- / +) -14,856 PEAK DEFICIT/ SURPLUS ( % ) (- / +) -10.6 ENERGY DEFICIT/ SURPLUS ( % ) (- / +) -7.5 -9.6 -9.9 -11.1 -10.1 -8.5 -8.5 -8.5 -8.6 -8.6 -9.1 6. ALL INDIA ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 592.0 612.5 631.5 671.9 717.1 733.54 778.63 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 813.29* *PROVISIONAL 7.ALL INDIA T&D AND AT&C LOSSES: YEAR T&D LOSSES (SOURCE:DMLF CEA) AT&C LOSSES (SOURCE:PFC) 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 32.53 31.25 30.42 28.65 27.20 25.47 34.78 34.33 33.02 30.62 29.45 27.74 2009-10 25.39 27.15 8. ALL INDIA VILLAGE ELECTRIFICATION (AS ON 30.07.2012): 558229 9. ALL INDIA COAL CONSUMPTION FOR POWER GENERATION (UTILITIES) YEAR COAL CONSUMPTION (MT) 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12* *provisional 253.07 263.60 278.74 280.34 302.54 330.63 355.38 367.36 386.6 415.7 10. ALL INDIA THERMAL PLF (%) 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 72.7 74.8 73.6 76.8 78.6 77.2 77.48 75.07 73.32 *PROVISIONAL 18 2012-13* UPTO OCTOBER, 2012 68.51 11. PROGRAMME AND ACHIEVEMENT OF ENERGY GENERATION (MU) GEN SCH. CATEGORY THERMAL HYDRO NUCLEAR BHUTAN IMPORT ALL INDIA TOTAL TARGET (2012-13) 767275 122045 35200 5480 930000 MONTH- OCTOBER,2012 PROGRAMME ACHIEVEMENT * % ACH. PERIOD- APRIL-OCTOBER,2012 PROGRAMME ACHIEVEMENT* %ACH. 58432.00 14022.00 2676.00 841.00 54986.55 14504.64 2657.92 928.80 94.10 103.44 99.32 110.44 359890.00 73079.00 15615.00 3750.00 365239.37 70012.65 16390.17 3901.77 101.49 95.80 104.96 104.05 75971.00 73077.91 96.19 452334.00 455543.96 100.71 * Provisional based on actual-cum-Assesment 19 20 POWER SCENERIO AT A GLANCE FOR ALL REGIONS 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) REGION NORTHERN WESTERN SOUTHERN EASTERN N.EASTERN ISLANDS ALL-INDIA % HYDRO 15122.75 7447.5 11338.03 3882.12 1200 0 38990.4 19.51 THERMAL GAS DIESEL 4421.26 12.99 8254.81 17.48 4690.78 939.32 190 17.2 824.2 142.74 0 70.02 18381.05 1199.75 9.20 0.60 COAL 28357.5 38924.5 22882.5 21797.88 60 0 112022.38 56.05 (FIGURES IN MW) NUCLEAR TOTAL 32791.75 47196.79 28512.6 22005.08 1026.94 70.02 131603.18 65.84 R.E.S. (MNRE) 4391.4 7909.95 11569.3 398.71 228 6.1 24503.46 12.26 1620 1840 1320 0 0 0 4780 2.39 TOTAL 53925.9 64394.24 52739.93 26285.91 2454.94 76.12 199877.04 100 NOTE :- I.C. DOES NOT INCLUDE BENEFITS FROM PROJECTS IN BHUTAN 2. CAPACITY ADDITION ACHIEVED DURING 11TH PLAN (EXCLUDING RES) (FIGURES IN MW) REGION NORTHERN WESTERN SOUTHERN EASTERN N.EASTERN ISLANDS ALL-INDIA HYDRO THERMAL GAS DIESEL 1078 0 2652.5 0 1367.2 0 0 0 58.2 0 0 5155.9 0 COAL 9900 16944 6870 9670 0 0 43384 2566 770 564 1560 84 0 5544 3. INSTALLED CAPACITY AS ON 31.10.2012 REGION NORTHERN WESTERN SOUTHERN EASTERN N.EASTERN ISLANDS ALL-INDIA % HYDRO 15423.75 7447.50 11338.03 3882.12 1200 0 39291.40 18.90 TOTAL 440 0 440 0 0 0 880 13984 20366.5 8801.2 11230 142.2 0 54963.9 (FIGURES IN MW) THERMAL GAS DIESEL 4671.26 12.99 8254.81 17.48 4962.78 939.32 190 17.2 824.2 142.74 0 70.02 18903.05 1199.75 9.09 0.58 COAL 30823.50 43099.50 23782.50 22337.88 60 0 120103.38 57.10 NUCLEAR TOTAL 10978 19596.5 8237.2 9670 58.2 0 48539.9 NUCLEAR TOTAL 35507.75 51371.79 29684.60 22545.08 1026.94 70.02 140206.18 66.77 R.E.S. (MNRE) 4437.65 8146.69 11769.32 410.71 228 6.1 24998.46 12.03 1620.00 1840.00 1320.00 0 0 0 4780.00 2.30 TOTAL 56989.15 68805.98 54111.95 26837.91 2454.94 76.12 209276.03 100 NOTE :- I.C. DOES NOT INCLUDE BENEFITS FROM PROJECTS IN BHUTAN 4. ACTUAL POWER SUPPLY POSITION* REGION NORTHERN WESTERN SOUTHERN EASTERN NORTHEASTERN *PROVISIONAL PERIOD OCT,2012* OCT,2012* OCT,2012* OCT,2012* OCT,2012* PEAK DEMAND PEAK MET (MW) (MW) PEAK DEFICIT SURPLUS (MW) PEAK /DEFICIT SURPLUS (%) ENERGY /REQUIRMENT (MU) ENERGY AVAILABILITY (MU) ENERGY DEFICIT SURPLUS (MU) ENERGY /DEFICIT/ SURPLUS (%) 40,856 40,075 35,127 14,992 36,518 39,486 29,281 14,155 -4,338 -589 -5,846 -837 -10.6 -1.5 -16.6 -5.6 25,063 25,611 22,906 9,484 22,603 24,896 18,840 9,132 -2,460 -715 -4,066 -352 -9.8 -2.8 -17.8 -3.7 1,927 1,864 -63 -3.3 1,030 969 -61 -5.9 21 5. INSTALLED CAPACITY OF STATES INCLUDING CENTRAL SECTOR SHARES (AS ON 31.10.2012) (FIGURES IN MW) STATES 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 7 1 2 CHANDIGARH DELHI HARYANA H.P. J&K PUNJAB RAJASTHAN U.P. UTTRAKHAND NR UNALLOCATED CHHATTISGHAR GUJARAT M.P. MAHARASHTRA GOA D&D D&N HAVELI WR UNALLOCATED A.P. KARNATAKA KERALA T.N PUDUCHERRY NLC SR UNALLOCATED D.V.C BIHAR JHARKHAND ODISHA SIKKIM W.BENGAL ER UNALLOCATED ARUNACHAL P. ASSAM MANIPUR MEGHALYA MIZORAM NAGALAND TRIPURA NER UNALLOCATED A&N ISLAND LAKSHADWEEP ALL INDIA HYDRO 51.74 666.12 1363.18 2950.94 1539.03 3014.89 1527.80 1821.42 1998.18 490.45 120.00 772.00 3223.66 3331.84 0.00 0.00 0.00 0.00 3734.53 3599.80 1881.50 2122.20 0.00 0.00 0.00 193.26 129.43 200.93 2166.93 75.27 1116.30 0.00 97.57 429.72 80.98 314.58 34.31 53.32 62.37 127.15 0.00 0.00 39291.40 COAL 29.81 4259.41 5648.00 135.16 296.51 3519.54 5337.10 10452.90 280.88 864.19 5207.44 14208.85 5098.97 16724.29 314.47 33.32 39.82 1472.35 8363.88 6121.23 897.92 6779.37 227.85 100.17 1292.08 5005.60 1624.70 2828.88 4332.10 74.10 7117.34 1355.16 0.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120103.38 THERMAL GAS DIESEL 15.32 0.00 1866.01 0.00 560.29 3.92 61.88 0.13 304.14 8.94 288.92 0.00 665.03 0.00 549.97 0.00 69.35 0.00 290.35 0.00 0.00 0.00 4245.49 17.48 257.18 0.00 3475.93 0.00 48.00 0.00 4.20 0.00 27.10 0.00 196.91 0.00 3370.40 36.80 0.00 234.42 533.58 256.44 1026.30 411.66 32.50 0.00 0.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 100.00 12.20 0.00 0.00 21.05 15.88 478.52 20.69 25.96 45.41 25.96 2.05 16.28 51.86 19.19 2.00 181.84 4.85 55.40 0.00 0.00 60.05 0.00 9.97 18903.05 1199.75 22 NUCLEAR TOTAL 45.13 6125.42 6212.21 197.17 609.59 3808.46 6002.13 11002.87 350.23 1154.54 5207.44 18471.82 5356.15 20200.22 362.47 37.52 66.92 1669.26 11771.08 6355.65 1687.94 8217.33 260.35 100.17 1292.08 5095.60 1624.70 2828.88 4332.10 79.10 7229.54 1355.16 36.93 559.21 71.37 28.01 68.14 21.19 186.69 55.40 60.05 9.97 140206.18 8.84 122.08 109.16 34.08 77.00 208.04 573.00 335.72 22.28 129.80 47.52 559.32 273.24 690.14 25.80 7.38 8.46 228.14 275.78 254.86 95.60 524.00 19.28 0.00 150.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4780.00 R.E.S TOTAL 0.00 18.53 113.70 531.91 130.53 381.58 2372.55 702.98 185.87 0.00 274.15 3633.90 482.31 3726.28 30.05 0.00 0.00 0.00 903.44 3280.32 162.69 7422.84 0.03 0.00 0.00 0.00 79.80 20.05 97.30 52.11 161.45 0.00 79.26 31.11 5.45 31.03 36.47 28.67 16.01 0.00 5.35 0.75 24998.46 105.71 6932.15 7798.25 3714.10 2356.15 7412.97 10475.48 13862.99 2556.56 1774.79 5649.11 23437.04 9335.36 27948.48 418.32 44.90 75.38 1897.40 16684.83 13490.63 3827.73 18286.37 279.66 100.17 1442.56 5288.86 1833.93 3049.86 6596.33 206.48 8507.29 1355.16 213.76 1020.04 157.80 373.62 138.92 103.18 265.07 182.55 65.40 10.72 209276.03 NORTHERN REGION 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 7052.55 13807 1969.20 12.99 15789.19 0 1198.96 PRIVATE 2078 4050 108 0 4158 0 3192.44 CENTRAL 5992.2 10500.5 2344.06 0 12844.56 1620 0 TOTAL 15122.75 28357.5 4421.26 12.99 32791.75 1620 4391.4 % 28.04 52.59 8.20 0.02 60.81 3.00 8.14 2. 2404.70 9428.44 20456.76 53925.90 100 CAPACITY ACHIEVED DURING 11TH PLAN (EXCULDING RES) (FIGURES IN MW) NORTHERN Region STATE PRIVATE CENTRAL TOTAL 3. TOTAL Hydro Coal 754 1292 520 2566 3620 4050 2230 9900 Thermal Gas 970 108 0 1078 Nuclear Diesel 0 0 0 0 INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 7052.55 2148.00 6223.20 15423.75 27.06 COAL 14213.00 5610.00 11000.50 30823.50 54.09 Total Total 4590 4158 2230 10978 0 0 440 440 5344 5450 3190 13984 (FIGURES IN MW) THERMAL GAS DIESEL 2219.20 12.99 108.00 0.00 2344.06 0.00 4671.26 12.99 8.20 0.02 NUCLEAR 0.00 0.00 1620.00 1620.00 2.84 R.E.S. (MNRE) 1203.21 3234.44 0.00 4437.65 7.79 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) ENERGY DEFICIT/ SURPLUS (MU) (- / +) 150383 202125 219797 227104 254,231 258,780 276,121 158,911 25,458 183,974 25,063 142410 179986 196147 201951 224,661 237,985 258,382 143,796 23,333 166,399 22,603 TOTAL 16445.19 5718.00 13344.56 35507.75 62.31 TOTAL 24700.95 11100.44 21187.76 56989.15 100.00 NOTE:- I.C. DOES NOT INCLUDE BENEFITS FROM PROJECTS IN BHUTAN. 4. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 23200 31516 32462 33034 37,159 37,431 40,248 45,860 42,070 45,860 40,856 21346 26644 29495 29504 31,439 34,101 37,117 41,790 37,174 41,790 36,518 PEAK DEFICIT/ SURPLUS (MW) (- / +) PEAK DEFICIT/ SURPLUS ( % ) (- / +) -1854 -4872 -2967 -3530 -5,720 -3,330 -3,131 -4,070 -4,896 -4,070 -4,338 -8 -15.5 -9.1 -10.7 -15.4 -8.9 -7.8 -8.9 -11.6 -8.9 -10.6 -7973 -22139 -23650 -25153 -29,570 -20,795 -17,739 -15,115 -2,125 -17,575 -2,460 *PROVISIONAL 5. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR ENERGY REQUIRMENT (MU) 299,166 ENERGY AVAILABILITY (MU) 267,495 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -31,671 ENERGY DEFICIT/ SURPLUS ( % ) (- / +) -10.6 PEAK DEMAND (MW) 44,953 23 PEAK MET (MW) 39,429 PEAK DEFICIT/ SURPLUS (MW) (- / +) -5,524 PEAK DEFICIT/ SURPLUS ( % ) (- / +) -12.3 ENERGY DEFICIT/ SURPLUS ( % ) (- / +) -5.3 -11.0 -10.8 -11.1 -11.6 -8.0 -6.4 -9.5 -8.3 -9.6 -9.8 6. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 739.44 24 CHANDIGARH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) Sector Hydro STATE PRIVATE CENTRAL TOTAL % Coal 0 0 27.09 27.09 26.56 0 0 50.74 50.74 49.75 Thermal Gas Diesel 0 0 0 0 15.32 0 15.32 0 15.02 0.00 (FIGURES IN MW) Nuclear Total 0 0 42.41 42.41 41.58 R.E.S. (MNRE) 0 0 0 0 0.00 0 0 8.84 8.84 8.67 Total 0 0 101.99 101.99 100 2.INSTALLED CAPACITY AS ON 31.10.2012 (FIGURES IN MW) Sector Hydro STATE PRIVATE CENTRAL TOTAL % Coal 0.00 0.00 29.81 29.81 28.20 0.00 0.00 51.74 51.74 48.95 Thermal Gas Diesel 0.00 0.00 0.00 0.00 15.32 0.00 15.32 0.00 14.49 0.00 Nuclear Total 0.00 0.00 45.13 45.13 42.69 0.00 0.00 8.84 8.84 8.36 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) R.E.S. (MNRE) 0.00 0.00 0.00 0.00 0.00 Total 0.00 0.00 105.71 105.71 100.00 3.ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 180 264 275 279 308 301 263 340 286 340 242 PEAK MET (MW) 180 247 275 279 308 301 263 340 286 340 242 PEAK DEFICIT/ SURPLUS (MW) (- / +) 0 -17 0 0 0 0 0 0 0 0 0 PEAK DEFICIT/ SURPLUS (%) (- / +) 0 -6.4 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1110 1343 1446 1414 1,576 1,519 1,568 985 148 1,102 117 1108 1341 1446 1414 1,528 1,519 1,564 985 148 1,102 117 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -2 -2 0 0 -48 0 -4 0 0 0 0 ENERGY DEFICIT/ SURPLUS (%) (- / +) -0.2 -0.1 0.0 0.0 -3.0 0.0 -0.3 0.0 0.0 0.0 0.0 * PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) 300 291 Peak Deficit/ Surplus (MW) (- / +) -9 Peak Deficit/ Surplus ( % ) (- / +) -3.0 Energy Requirment (MU) 1,628 Energy Availability (MU) 1,749 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE UT OF CHANDIGARH: CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: NIL NIL NIL 25 Energy Deficit/ Surplus (MU) (- / +) 121 Energy Deficit/ Surplus ( % ) (- / +) 7.4 6.BENEFIT TO THE UT OF CHANDIGARH WITH THE CAPACITY ADDITION DURING 11TH PLAN PROJECT NAME TYPE CENTRAL-SECTOR SEWA ST.II, H U-1,2 & 3 KOTESHWAR H RAPP U-5& 6 N KAHALGAON U-6,7 TOTAL T INSTALLED CAPACITY (MW) CAPACITY ADDITION DURING XITH PLAN (MW) 3X40=120.00 120.00 1 4X100= 400.00 400.00 2 UTTRAKHAND 440.00 3 RAJASTHAN 1000.00 2 BIHAR 2X220= 440.00 2X500= 1000.00 BENEFI TS/ SHARE S OF STATE (MW) STATE PROJECT LOCATION J&K UNIT WISE COMMISSIONING DATE (CAPACITY) 22.06.2010 (40MW) 23.07.2010 (40MW) 23.07.2010( 40MW) 28.03.2011 (100MW) 31.03.2111 (100MW) 25.01.2012(100MW0 22.03.2012 (100MW) 4.02.2010 (220MW) 31.03.2010 (220MW) 16.3.2008 (500MW) 31.07.2009 (500MW) 8 8 GRAND-TOTAL:- 7. LIKELY BENEFIT TO THE STATE OF CHANDIGARH DURING 12TH PLAN PROJECTS TYPE STATU S STATE PROJECT LOCATION SE CT O R IC (MW) BENEFITS SHARES OF STATE UNIT WISE COMMISSIONING DATE (CAPACITY) (MW RIHAND-III U-5,6 T RAPP U7& 8 RAMPUR * KOLDAM * N H H UC/CO MM UC UC UC CHAMERA III H PARBATI III * PARBATI II * KISHANGANGA * URI II * TAPOVAN VISNUGARH * UP C RAJ HP HP C C C COMM HP C H H H H UC UC UC UC C C C C H UC HP HP J&K J&K UTTARAKHAN D AR.PR AR.PR KAMENG H UC LOWER SUBANSHRI H UC TOTAL CENTRAL SECTOR SHARE GRAND TOTAL (CHANDIGARH) C C C 2X500=1000 2X700=1400 6X68.67=412 4X200=800 3X77=231 5 20.05.2012(500MW) 5 3 6 1 4X130=520 4X200=800 3X110=330 4X60=240 4X130=520 4 6 3 2 4X150=600 4X250=1000 1 2.5 42.5 42.5 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) 4 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 26 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 39.06333 T&D LOSSES % 39.06 30.37 31.64 25.13 23.77 22.36 23.19 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 1767 1859 1956 2058 2165 PEAK DEMAND(MW) 352 370 387 406 426 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 1238.51 27 DELHI 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) Sector Hydro Thermal Nuclear R.E.S. Coal Gas Diesel Total (MNRE) STATE 0 135 1300.4 0 1435.40 0 0 PRIVATE 0 0 108 0 108 0 18.53 CENTRAL 637.12 4058.46 207.61 0 4266.07 122.08 0 TOTAL 637.12 4193.46 1616.01 0 5809.47 122.08 18.53 % 9.67 63.66 24.53 0.00 88.19 1.85 0.28 2. INSTALLED CAPACITY AS ON 31.10.2012 (FIGURES IN MW) Sector Hydro Thermal Coal Gas Diesel STATE 0.00 135.00 1550.40 0.00 PRIVATE 0.00 0.00 108.00 0.00 CENTRAL 666.12 4124.41 207.61 0.00 TOTAL 666.12 4259.41 1866.01 0.00 % 9.61 61.44 26.92 0.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAN MET D (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 3118 4000 4075 4036 4,502 4,810 5,031 5,942 4,636 5,942 3,995 2879 3736 4030 4034 4,408 4,739 5,028 5,642 4,621 5,642 3,995 PEAK DEFICIT/ SURPLUS (MW) (- / +) -239 -264 -45 -2 -94 -71 -3 -300 -15 -300 0 PEAK DEFICIT/ SURPLUS (%) (- / +) -7.7 -6.6 -1.1 0.0 -2.1 -1.5 -0.1 -5.0 -0.3 -5.0 0.0 Nuclear Total 1685.40 108.00 4332.02 6125.42 88.36 0.00 0.00 122.08 122.08 1.76 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 19350 22397 22439 22398 24,277 25,625 26,751 15,587 2,412 17,551 1,964 R.E.S. (MNRE) 0.00 18.53 0.00 18.53 0.27 18741 22012 22301 22273 24,094 25,559 26,674 15,494 2,409 17,455 1,961 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -609 -385 -138 -125 -183 -66 -77 -93 -3 -96 -3 Total 1435.40 126.53 5025.27 6587.20 100.00 Total 1685.40 126.53 5120.22 6932.15 100.00 ENERGY DEFICIT/ SURPLUS (%) (- / +) -3.1 -1.7 -0.6 -0.6 -0.8 -0.3 -0.3 -0.6 -0.1 -0.5 -0.2 * PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) 5,500 Peak Met (MW) 5,486 Peak Deficit/ Surplus (MW) (- / +) -14 Peak Deficit/ Surplus ( % ) (- / +) -0.3 Energy Requirment (MU) 28,604 Energy Availability (MU) 34,394 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF DELHI: (MW) CENTRAL SECTOR: NIL STATE SECTOR: 750 PRIVATE SECTOR: 108 28 Energy Deficit/ Surplus (MU) (- / +) 5,790 Energy Deficit/ Surplus ( % ) (- / +) 20.2 6. BENEFIT TO THE STATE OF DELHI WITH THE CAPACITY ADDITION DURING 11TH PLAN PROJECT NAME T Y P E INSTALLED CAPACITY (MW) CAPACITY ADDITION DURING XITH PLAN (MW) BENEFITS/ SHARES OF STATE (MW) 3X40=120 120 16 STATE PROJECT LOCATION UNIT WISE COMMISSIONING DATE (CAPACITY) CENTRAL-SECTOR SEWA ST.II, U-1,2 & 3 H DADRI EXT.U-5&6 T 2X490= 980 980 735 UP INDRA GANDHI (JHAJJAR) U1,2 *KOTESHWAR T 3X500= 1500 1000 462 HARYANA H 4X100= 400 400 39 UTTARAKH AND RAPP U-5,6 N 2X220= 440 440.00 56 RAJASTHAN KAHALGAON U-6,7 T 2X500= 1000 1000.00 60 BIHAR MEJIA PH-II U-7,8 T 2X500= 1000 1000 835 WB DURGAPUR (STEEL) U1,2 KODARMA U-1, T 2X500=1000 1000 500 WB T 1X500=500 500.00 500 JHARKHAN D CENTRAL-SECTOR TOTAL:- 3203 STATE-SECTOR PRAGATI(BAWANA) GTI,2 T PRIVATE-SECTOR RITHALA CCPP GT 1,2 6X250= 1500 T 750.00 J&K 750.00 STATE - SECTOR TOTAL:- 750 2X37.5+ 108.00 1X36.5= 108.00 PRIVATE-SECTOR TOTAL:GRAND TOTAL:- 108 22.06.2010 (40MW) 23.07.2010 (40MW 23.07.2010 (40MW 29.01.2010 (490MW) 30.07.2010(490 MW) 31.10.2010(500 MW) 5.11.2011 (500 MW) 28.03.2011 (100MW) 31.03.2111 (100MW) 25.01.2012(100MW) 22.03.2012 (100MW) 4.02.2010 (220MW) 31.03.2010 (220MW) 16.3.2008 (500MW0 31.07.2009 (500 MW) 30.09.2010 (500MW) 26.03.2011(500MW) 29.7.2011 (500MW) 23.3.2012 (500MW) 20.07.2011(500 MW) DELHI 24.10.2010 (250MW) 16.02.2011 (250MW) .03.2012 (250 MW) DELHI 04.10.2010(35.75MW) 09.12.2010(35.75MW) 04.09.2011(36.5MW) 108 4061 7. LIKELY BENEFIT TO THE STATE OF DELHI DURING 12TH PROJECTS T ST STATE SECTOR Y AT PROJECT P US LOCATION E RIHAND-III U-5,6 INDIRA GANDHI TPP (JHAJJAR) JV U-3 KODARMA U2 RAPP U7& 8 RAMPUR * KOLDAM * CHAMERA III T T UC/COMM UC UP HAR C C 2X500=1000 1X500=500 BENEFITS SHARES OF STATE (MW 132 231 T N H H H UC UC UC UC COMM JHAR RAJ HP HP HP C C C C C 1X500=500 2X700=1400 6X68.67=412 4X200=800 3X77=231 500 101 42 81 29 PARBATI III * PARBATI II * KISHANGANGA * URI II * TAPOVAN VISNUGARH H H H H H UC UC UC UC UC HP HP J&K J&K UTTARAKHAND C C C C C 4X130=520 4X200=800 3X110=330 4X60=240 4X130=520 53 81 34 24 53 29 IC (MW) UNIT WISE COMMISSIONING DATE (CAPACITY) 20.05.2012(500MW) 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) * KAMENG H UC LOWER SUBANSHRI H UC TOTAL CENTRAL SECTOR SHARE PRAGATI-III (BAWANA) T UC/COMM STATE SECTOR SASAN UMPP U1,2 T UC PRIVATE SECTOR GRAND TOTAL (DELHI) AR.PR AR.PR C C 4X150=600 4X250=1000 DEL S 3X250=750 MP P 2X660=1320 34 56.5 1451.5 750 750 165 165 2366.5 27.06.2012(250MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 43.66 45.40 48.61 33.00 28.65 22.22 22.09 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 29100 31011 33047 35217 37529 PEAK DEMAND(MW) 5290 5547 5818 6101 6398 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 1447.72 30 HARYANA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) Sector Hydro STATE PRIVATE CENTRAL TOTAL % 884.51 0 466.67 1351.18 19.63 Thermal Gas Diesel 25 3.92 0 0 535.29 0 560.29 3.92 8.14 0.06 Coal 3160 660 914.99 4734.99 68.80 2. INSTALLED CAPACITY AS ON 31.10.2012 Sector Hydro STATE PRIVATE CENTRAL TOTAL % 3. 884.51 0.00 478.67 1363.18 17.48 Coal 3160.00 1545.00 943.00 5648.00 72.43 (FIGURES IN MW) Nuclear Total 3188.92 660 1450.28 5299.2 77.00 0 0 109.16 109.16 1.59 R.E.S. (MNRE) 70.1 52.6 0 122.7 1.78 Total 4143.53 712.6 2026.11 6882.24 100 (FIGURES IN MW) Thermal Gas Diesel 25.00 3.92 0.00 0.00 535.29 0.00 560.29 3.92 7.18 0.05 Nuclear Total 3188.92 1545.00 1478.29 6212.21 79.66 0.00 0.00 109.16 109.16 1.40 R.E.S. (MNRE) 70.10 43.60 0.00 113.70 1.46 Total 4143.53 1588.60 2066.12 7798.25 100.00 ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10THPLAN END 2007-08 2008-2009 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 3000 4837 4956 5511 6,133 6,142 6,533 7,432 6,470 7,432 5,989 PEAK MET (MW) 2900 4201 4821 4791 5,678 5,574 6,259 6,725 6,174 6,725 5,989 PEAK DEFICIT/ SURPLUS (MW) (- / +) -100 -636 -135 -720 -455 -568 -274 -707 -296 -707 0 PEAK DEFICIT/ SURPLUS (%) (- / +) -3.3 -13.1 -2.7 -13.1 -7.4 -9.2 -4.2 -9.5 -4.6 -9.5 0.0 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 18138 26249 29353 29085 33,441 34,552 36,874 22,763 3,835 26,278 3,515 17839 23132 25652 26625 32,023 32,626 35,541 20,541 3,516 23,836 3,295 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -299 -3117 -3701 -2460 -1,418 -1,926 -1,333 -2,222 -319 -2,442 -220 ENERGY DEFICIT/ SURPLUS (%) (- / +) -1.6 -11.9 -12.6 -8.5 -4.2 -5.6 -3.6 -9.8 -8.3 -9.3 -6.3 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) 7,200 Peak Met (MW) 7,000 Peak Deficit/ Surplus (MW) (- / +) -200 Peak Deficit/ Surplus ( % ) (- / +) -2.8 Energy Requirment (MU) 40,296 Energy Availability (MU) 41,373 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF HARYANA: (MW) CENTRAL SECTOR: 1000 STATE SECTOR: 1800 PRIVATE SECTOR: 660 31 Energy Deficit/ Surplus (MU) (- / +) 1,077 Energy Deficit/ Surplus ( % ) (- / +) 2.7 6. BENEFIT TO THE STATE OF HARYANA WITH THE CAPACITY ADDITION DURING 11TH PLAN PROJECT NAME TYP INSTALLED CAPACITY BENEFITS STATE UNIT WISE COMMISSIONING DATE E CAPACITY ADDITION SHARES PROJECT (MW) DURING OF LOCATION (CAPACITY MW) XITH PLAN STATE (MW) (MW) CENTRAL-SECTOR SEWA ST.II, U-1,2 & 3 H 3X40= 120.00 120.00 7 INDAR GANDHI (JHAJJAR) T 3X500= 1500.00 2X500= 1000.00 462 HARYANA KOTESHWAR H 4X100= 400.00 400.00 17 UTTARAK HAND RAPP U-5& 6 N 25 KAHALGAON U-6,7 T UTTARAK HAND BIHAR MEZIA PH II U-7 T 2X220= 440.00 440.00 2X500= 1000.00 1000.00 2X500= 500.00 1000.00 CENTRAL-SECTOR TOTAL:- STATE-SECTOR YAMUNA NAGAR U1,2 RAJIV GANDHI (HISSAR) U-1,2 UMPP *ULTRA MEGA MUNDRA U-1 UMPP- TOTAL PRIVATE-SECTOR MAHATMA GANDHI TPP U-1 T 23 100 T 5X800= 4000.00 WB 22.06.2010 (40MW) 23.07.2010 (40MW 23.07.2010 (40MW 31.10.2010(500 MW) 5.11.2011 (500 MW) 28.03.2011 (100MW) 31.03.2011 (100MW) 25.01.2012(100MW) 22.03.2012 (100MW) 4.02.2010 (220MW) 31.03.2010 (220MW)) 16.3.2008 (500MW0 31.07.2009 (500 MW)) 30.09.2010(500 MW)) 634 2X300= 600.00 600.00 2X600= 1200.00 1200.00 STATE – SECTOR TOTAL:- T J&K 600 HARYANA 1200 HARYANA HARYANA 1.11.2007 (300MW) 29.03.2008 (300MW) 31.03.2010,(600MW) 1.10.2010 (600MW) 1800 800.00 75 GUJ 25.02.2012(800MW) 75 T 2X660= 1320 1320 660 PRIVATE-SECTOR TOTAL GRAND-TOTAL:- 660 3169 HARAYAN A 7 LIKELY BENEFIT TO THE STATE OF HARYANA DURING 12TH PLAN PROJECTS T ST STATE SECTOR IC (MW) Y AT PROJECT P US LOCATION E 12.01.2012(600MW) RIHAND-III U-5,6 RAPP U7& 8 RAMPUR * KOLDAM * CHAMERA III T N H H H UC/COMM UC UC UC COMM UP RAJ HP HP HP C C C C C 2X500=1000 2X700=1400 6X68.67=412 4X200=800 3X77=231 BENEFITS SHARES OF STATE (MW 56 44 23 45 12 PARBATI III * PARBATI II * INDIRA GANDHI TPP (JHAJJAR) JV U-3 URI II * KISHANGANGA * TAPOVAN VISNUGARH * KAMENG H H T UC UC UC HP HP HAR C C C 4X130=520 4X200=800 1X500=500 30 45 231 H H H H UC UC UC UC J&K J&K UTTARAKHAND AR.PR C C C C 4X60=240 3X110=330 4X130=520 4X150=600 14 19 30 13 32 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 20.05.2012(500MW) 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) LOWER SUBANSHRI H UC TOTAL CENTRAL SECTOR SHARE SASAN UMPP U1,2 T UC MUNDRA UMPP, U 2 T COMM MAHATMI GANDHI T C JHAJJAR STPP U2 PRIVATE SECTOR GRAND TOTAL (HARYANA) AR.PR C 4X250=1000 MP GUJ HAR P P P 2X660=1320 1X800=800 1X660=660 21.5 583.5 148.5 75 660 17.07.2012(800MW) 883.5 1467 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 32.07 32.11 30.51 33.35 32.83 30.74 31.00 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 40750 44254 48060 52193 56681 PEAK DEMAND(MW) 7291 7944 8655 9429 10273 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 1491.37 33 HIMACHAL PRADESH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) Sector STATE PRIVATE CENTRAL TOTAL % Hydro 393.6 1678 771.34 2842.94 79.30 Thermal Gas Diesel 0 0.13 0 0 61.88 0 61.88 0.13 1.73 0.00 Coal 0 0 118.3 118.3 3.30 2. INSTALLED CAPACITY AS ON 31.10.2012 Sector Hydro Coal STATE 393.60 0.00 PRIVATE 1748.00 0.00 CENTRAL 809.34 135.16 TOTAL 2950.94 135.16 % 79.45 3.64 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 562 873 1061 1055 1,118 1,278 1,397 2,116 1,345 2,116 1,462 562 873 1010 1014 1,158 1,187 1,298 1,672 1,240 1,672 1,380 (FIGURES IN MW) Nuclear Total 0.13 0 180.18 180.31 5.03 (FIGURES IN MW) Thermal Gas Diesel Total 0.00 0.13 0.13 0.00 0.00 0.00 61.88 0.00 197.04 61.88 0.13 197.17 1.67 0.00 5.31 PEAK DEFICIT/ SURPLUS (MW) (- / +) 0 0 -51 -41 40 -91 -99 -444 -105 -444 -82 PEAK DEFICIT/ SURPLUS (%) (- / +) 0.0 0.0 -4.8 -3.9 3.6 -7.1 -7.1 -21.0 -7.8 -21.0 -5.6 ENERGY REQUIRMENT (MU) 3293 5136 5992 6260 7,047 7,626 8,161 4,610 754 5,334 724 0 0 34.08 34.08 0.95 Nuclear 0.00 0.00 34.08 34.08 0.92 R.E.S. (MNRE) 527.66 0 0 527.66 14.72 R.E.S. (MNRE) 531.91 0.00 0.00 531.91 14.32 ENERGY AVAILABILITY (MU) 3206 4996 5814 6241 6,769 7,364 8,107 4,497 737 5,202 705 Total 921.39 1678 985.6 3584.99 100 Total 925.64 1748.00 1040.46 3714.10 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -87 -140 -178 -19 -278 -262 -54 -113 -17 -132 -19 ENERGY DEFICIT/ SURPLUS (%) (- / +) -2.6 -2.7 -3.0 -0.3 -3.9 -3.4 -0.7 -2.5 -2.3 -2.5 -2.6 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Peak Peak Peak Energy Energy Energy Demand Met Deficit/ Deficit/ RequiAvailDeficit/ (MW) (MW) Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 1,420 2,164 744 52.4 8,792 8,675 -117 Energy Deficit/ Surplus ( % ) (- / +) -1.3 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF HIMICHAL PRADESH: CENTRAL SECTOR: NIL STATE SECTOR: NIL PRIVATE SECTOR: 1292 6. BENEFIT TO THE STATE OF HIMACHAL PRADESH WITH THE CAPACITY ADDITION DURING 11TH PLAN PROJECT NAME T INSTALLE CAPACITY BENEFIT STATE UNIT WISE Y D ADDITION S/ PROJECT COMMISSIONING P CAPACITY DURING SHARES LOCATION DATE E (MW) XITH PLAN OF (CAPACITY MW) (MW) STATE (MW) CENTRAL-SECTOR *KOTESHWAR H 400.00 400.00 10 UTTARAKHAND 28.03.2011 (100MW) 31.03.2011 (100MW) 34 RAPP U-5 & 6 2X220= 440.00 440.00 T 2X500= 1000.00 1000.00 CENTRAL-SECTOR TOTAL 15 RAJASTHAN 15 BIHAR PRIVATE-SECTOR KARCHAM WANGTOO UI,2 H 1000.00 1000.00 1000 H.P. ALLAIN DUHANGAN U-1,2 H 192.00 192.00 192 H.P. MALANA-II H 100.00 100.00 100 H.P. KAHALGAON U-6,7 N PRIVATE-SECTOR TOTAL: GRAND-TOTAL : 40 24.05.2011(250MW) 21.06.2011(250MW) 24.05.2011(250MW) 13.09.2011 (250MW) 16.09.10 (96MW) 18.09.2010(96MW) 06.8.2011(50MW) 14.08.2011(50MW) 1292 1332 7. LIKELY BENEFIT TO THE STATE OF HIMACHAL PRADESH DURING 12TH PLAN PROJECTS T ST STATE SE IC (MW) Y AT PROJECT CT P US LOCATION OR E RIHAND-III U-5,6 RAPP U7& 8 RAMPUR * KOLDAM * CHAMERA III T N H H H UC/COMM UC UC UC COMM UP RAJ HP HP HP C C C C C 2X500=1000 2X700=1400 6X68.67=412 4X200=800 3X77=231 BENEFITS SHARES OF STATE (MW 34 27 69 131 38 PARBATI III * PARBATI II * KISHANGANGA * URI II * TAPOVAN VISNUGARH * H H H H H UC UC UC UC UC HP HP J&K J&K UTTARA KHAND C C C C C 4X130=520 4X200=800 3X110=330 4X60=240 4X130=520 87 131 12 9 19 HP HP HP HP HP S S S S S 65 100 111 130 100 HP HP HP HP P P P P 100 100 44 2X35=70 TOTAL CENTRAL SECTOR SHARE KASHANG - I HEP H UC UHL-III HEP H UC SAWARA KUDDU HEP H UC KASHANG II & III HEP H UC SAINJ HEP H UC TOTAL STATE SECTOR TIDONG-I HEP H UC SORANG HEP H UC TANGNU ROMAI-I HEP H UC BUDHIL H COMM TOTAL PRIVATE SECTOR GRAND TOTAL (HP) 25.01.2012(100MW) 22.03.2012 (100MW) 4.02.2010 (220MW) 31.03.2010(220MW) 16.03.2008 (500MW) 31.7.2009 (500MW) 557 65 100 111 130 100 506 100 100 44 70 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 20.05.2012(500MW) 07.06.2012(77MW) 12.06.2012(77MW) 28.06.2012(77MW) 30.05.2012(35MW) 26.05.2012(35MW) 314 1377 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 35 8.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 22.76 28.90 23.55 19.77 16.98 15.51 20.52 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 8974 9421 9891 10384 10901 PEAK DEMAND(MW) 1459 1558 1665 1778 1900 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 1144.94 36 JAMMU & KASHMIR 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) Sector Hydro STATE PRIVATE CENTRAL TOTAL % 780 0 743.03 Coal 0 0 263.7 Thermal Gas Diesel 175 8.94 0 0 129.14 0 Total 183.94 0 392.84 1523.03 66.01 263.7 11.43 304.14 13.18 576.78 25.00 2. INSTALLED CAPACITY AS ON 31.10.2012 Sector Hydro STATE PRIVATE CENTRAL TOTAL % 3. (FIGURES IN MW) 780.00 0.00 759.03 1539.03 65.32 Coal 0.00 0.00 296.51 296.51 12.58 Nuclear 8.94 0.39 0 0 77 R.E.S. (MNRE) 130.59 0 0 Total 1094.53 0 1212.87 77 3.34 130.59 5.66 2307.4 100 Nuclear R.E.S. (MNRE) 130.53 0.00 0.00 130.53 5.54 Total (FIGURES IN MW) Thermal Gas Diesel 175.00 8.94 0.00 0.00 129.14 0.00 304.14 8.94 12.91 0.38 Total 183.94 0.00 425.65 609.59 25.87 0.00 0.00 77.00 77.00 3.27 1094.47 0.00 1261.68 2356.15 100.00 ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 1209 1530 1950 2120 2,247 2,369 2,385 2,284 2,274 2,284 2,248 PEAK MET (MW) 999 1309 1439 1380 1,487 1,571 1,789 1,713 1,705 1,713 1,686 PEAK DEFICIT/ SURPLUS (MW) (- / +) -210 -221 -511 -740 -760 -798 -596 -571 -569 -571 -562 PEAK DEFICIT/ SURPLUS (%) (- / +) -17.4 -14.4 -26.2 -34.9 -33.8 -33.7 -25.0 -25.0 -25.0 -25.0 -25.0 ENERGY REQUIRMENT (MU) 6635 11725 11782 11467 13,200 13,571 14,250 7,154 1,151 8,443 1,289 ENERGY AVAILABILITY (MU) 5899 7983 8362 8698 9,933 10,181 10,889 5,366 864 6,332 966 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -736 -3742 -3420 -2769 -3,267 -3,390 -3,361 -1,788 -287 -2,111 -323 ENERGY DEFICIT/ SURPLUS (%) (- / +) -11.1 -31.9 -29.0 -24.1 -24.8 -25.0 -23.6 -25.0 -24.9 -25.0 -25.1 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Energy Deficit/ Deficit/ RequiAvailDeficit/ Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 2,650 1,996 -654 -24.7 15,353 11,297 -4,056 5. CAPACITY ADDED DURING 11TH PLAN8 LOCATED IN THE STATE OF JAMMU &KASHMIR: (MW) CENTRAL SECTOR: 120 STATE SECTOR: 450 PRIVATE SECTOR: NIL Energy Deficit/ Surplus ( % ) (- / +) -26.4 6.BENEFIT TO THE STATE OF J&K WITH THE CAPACITY ADDITION DURING 11TH PLAN PROJECT NAME T Y P E INSTALLED CAPACITY (MW) CAPACITY ADDITION DURING XITH PLAN (MW) 37 BENEFITS/ SHARES OF STATE (MW) STATE PROJECT LOCATION UNIT WISE COMMISSIONING DATE (CAPACITY MW) CENTRAL-SECTOR SEWA ST.II, U-1,2 & 3 H 3X40= 120.00 120.00 23 *KOTESHWAR H 4X100= 400.00 400.00 21 UTTARAKHAN D KAHALGAON 6,7 T 2X500= 1000.00 CENTRAL-SECTOR TOTAL: STATE-SECTOR BAGLIHAR U-1,2 & 3 H 3X150= 450.00 1000.00 29 BIHAR J&K 22.062010 (40MW) 23.07.2010 (40MW 23.07.2010 (40MW 28.03.2011(100MW) 31.03.2011 (100MW) 25.01.2012(100MW) 22.03.2012 (100MW) 16.03.2008(500MW) 31.07.2009(500MW) 73 450.00 450 TOTAL STATE SECTOR GRAND TOTAL: - J&K 19.09.2008(150MW) 26.10.2008(150MW) 14.11.2008(150MW) 450 523 7. LIKELY BENEFIT TO THE STATE OF J&K DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) T N H H H UC/COMM UC/COMM UC UC COMM UP RAJ HP HP HP C C C C C 2X500=1000 2X700=1400 6X68.67=412 4X200=800 3X77=231 HP HP J&K J&K J&K J&K UTTARAKHAND C C C C C C C 4X130=520 4X200=800 3X110=330 45 44 4X60=240 4X130=520 J&K S BENEFITS SHARES OF STATE UNIT WISE COMMISSIONING DATE (CAPACITY MW) (MW RIHAND-III U-5,6 RAPP U7& 8 RAMPUR * KOLDAM * CHAMERA III PARBATI III * H UC PARBATI II * H UC KISHANGANGA * H UC NIMOO BAZGO H UC CHUTAK H UC URI II * H UC TAPOVAN VISNUGARH * H UC TOTAL CENTRAL SECTOR SHARE BAGLIHAR-II HEP H UC TOTAL STATE SECTOR GRAND TOTAL (J&K) 450 66 54 37 72 16 20.05.2012(500MW) 20.05.2012(500MW) 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) 47 72 73 39 37 52 47 612 450 450 1062 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 45.54 41.08 44.93 51.98 55.71 58.02 67.35 38 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 14425 14872 15333 15808 16298 PEAK DEMAND(MW) 2471 2523 2577 2631 2687 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 968.47 39 PUNJAB 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) Sector Hydro STATE PRIVATE CENTRAL 2230.23 0 766.66 Coal 2630 0 578.19 TOTAL % 2996.89 42.48 3208.19 45.47 Thermal Gas Diesel 25 0 0 0 263.92 0 288.92 4.09 0 0.00 (FIGURES IN MW) Nuclear Total 2655 0 842.11 3497.11 49.56 2. INSTALLED CAPACITY AS ON 31.10.2012 (FIGURES IN MW) Sector Hydro Thermal Coal Gas Diesel Total STATE 2230.23 2630.00 25.00 0.00 2655.00 PRIVATE 0.00 270.00 0.00 0.00 270.00 CENTRAL 784.66 619.54 263.92 0.00 883.46 TOTAL 3014.89 3519.54 288.92 0.00 3808.46 % 40.67 47.48 3.90 0.00 51.38 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 5420 8971 4936 6558 PEAK DEFICIT/ SURPLUS (MW) (- / +) -484 -2413 8672 8690 9,786 9,399 10,471 11,520 8,147 11,520 8,441 7340 7309 7,407 7,938 8,701 8,751 8,147 8,751 6,860 -1332 -1381 -2,379 -1,461 -1,770 -2,769 0 -2,769 -1,581 PEAK DEFICIT/ SURPLUS (%) (- / +) -8.9 -26.9 -15.4 -15.9 -24.3 -15.5 -16.9 -24.0 0.0 -24.0 -18.7 0 0 208.04 R.E.S. (MNRE) 244.5 109.08 0 5129.73 109.08 1816.81 208.04 2.95 353.58 5.01 7055.62 100 Nuclear R.E.S. (MNRE) 244.50 137.08 0.00 381.58 5.15 Total 0.00 0.00 208.04 208.04 2.81 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) Total 5129.73 407.08 1876.16 7412.97 100.00 28780 38641 27577 34839 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -1203 -3802 42372 41635 45,731 44,484 45,191 29,510 4,745 33,153 3,643 38795 37238 39,408 41,799 43,792 27,515 4,622 31,016 3,501 -3577 -4397 -6,323 -2,685 -1,399 -1,995 -123 -2,137 -142 ENERGY DEFICIT/ SURPLUS (%) (- / +) -4.2 -9.8 -8.4 -10.6 -13.8 -6.0 -3.1 -6.8 -2.6 -6.4 -3.9 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Peak Peak Peak Energy Energy Energy Demand Met Deficit/ Deficit/ RequiAvailDeficit/ (MW) (MW) Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 10,890 7,216 -3,674 -33.7 48,881 39,918 -8,963 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF PUNJAB: (MW) CENTRAL SECTOR: NIL STATE SECTOR: 500 PRIVATE SECTOR: NIL Energy Deficit/ Surplus ( % ) (- / +) -18.3 6. BENEFIT TO THE STATE OF PUNJAB WITH THE CAPACITY ADDITION DURING 11TH PLAN INSTALLED CAPACITY (MW) TYPE PROJECT NAME CAPACITY ADDITION DURING XITH PLAN (MW) CENTRAL-SECTOR 40 BENEFITS /SHARES OF STATE (MW) STATE PROJECT LOCATION UNIT WISE COMMISSIONING DATE (CAPACITY MW) SEWA ST.II, U-1,2 & 3 H 3X40= 120.00 120.00 10 KOTESHWAR H 4X100= 400.00 400.00 24 UTTARAKHAND KAHALGAON 6,7 T 1000.00 35 BIHAR 440.00 45 RAJASTHAN 2X500= 1000.00 RAPP U-5&6 N 2X220= 440.00 CENTRAL-SECTOR TOTAL: STATE-SECTOR GHTPP-II U-3,4 T 2X250= 500.00 TOTAL STATE SECTOR UMPP ULTRA MEGA MUNDRA T 5X800= U-1 4000.00 UMPP-TOTAL GRAND J&K 22.062010 (40MW) 23.07.2010 (40MW) 23.07.2010 (40MW) 28.03.2011(100MW) 31.03.2011 (100MW) 25.01.2012 (100MW) 22.03.2012 (100MW) 16.03.2008(500MW) 31.7.2009 (500MW) 4.02.2010, (220MW) 31.03.2010 (220MW) 114 500.00 500 PUNJAB 03.01.2008(250MW) 31.07.2008(250MW) 500 800.00 90 GUJ 25.02.2012 (800MW) 90 TOTAL: - 704 7. LIKELY BENEFIT TO THE STATE OF PUNJAB DURING 12TH PLAN PROJECTS T ST STATE SE IC (MW) Y AT PROJECT CT P US LOCATION OR E BENEFITS SHARES OF STATE (MW 83 65 32 62 18 RIHAND-III U-5,6 RAPP U7& 8 RAMPUR * KOLDAM * CHAMERA III T N H H H UC/COMM UC UC UC COMM UP RAJ HP HP HP C C C C C 2X500=1000 2X700=1400 6X68.67=412 4X200=800 3X77=231 PARBATI III * PARBATI II * KISHANGANGA * URI II * TAPOVAN VISNUGARH * KAMENG LOWER SUBANSHRI TOTAL CENTRAL SECTOR SHARE TALWANDI SABO TPP U1,2 GOINDWAL SAHIB TPP U1,2 NABHA TPP U-1,2 SASAN UMPP U1,2 MUNDRA UMPP, U 2 PRIVATE SECTOR GRAND TOTAL (PUNJAB) H H H H H UC UC UC UC UC HP HP J&K J&K UTTARAKHAND C C C C C 4X130=520 4X200=800 3X110=330 4X60=240 4X130=520 41 62 26 19 41 H H UC UC AR.PR AR.PR C C 4X150=600 4X250=2000 19 32 500 T UC PUN P 3X660=1980 1980 T UC PUN P 2X270=270 540 T T T UC UC COMM PUN MP GUJ P P P 2X700=1400 2X660=1320 1X800=800 1400 198 90 4208 4708 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 20.05.2012(500MW) 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) 17.07.2012(800MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 41 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 25.42 25.42 27.56 26.61 22.82 23.08 23.39 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 51595 55567 59844 64450 69410 PEAK DEMAND(MW) 10292 10770 11271 11794 12342 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 1663.01 42 RAJASTHAN 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) Sector Hydro Thermal Nuclear R.E.S. Coal Gas Diesel Total (MNRE) STATE 987.96 3615 443.8 0 4058.8 0 30.25 PRIVATE 0 540 0 0 540 0 2335.3 CENTRAL 514.84 899.48 221.23 0 1120.71 573 0 TOTAL 1502.8 5054.48 665.03 0 5719.51 573 2365.55 % 14.79 49.74 6.55 0.00 56.29 5.64 23.28 2. INSTALLED CAPACITY AS ON 31.10.2012 (FIGURES IN MW) Sector Hydro Thermal Coal Gas Diesel Total STATE 987.96 3615.00 443.80 0.00 4058.80 PRIVATE 0.00 765.00 0.00 0.00 765.00 CENTRAL 539.84 957.10 221.23 0.00 1178.33 TOTAL 1527.80 5337.10 665.03 0.00 6002.13 % 14.58 50.95 6.35 0.00 57.30 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAN MET D (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 3700 5794 6374 6303 6,859 7,729 8,188 7,765 7,464 7,765 7,454 3657 4946 5564 6101 6,859 7,442 7,605 7,690 7,139 7,690 7,454 PEAK DEFICIT/ SURPLUS (MW) (- / +) -43 -848 -810 -202 0 -287 -583 -75 -325 -75 0 PEAK DEFICIT/ SURPLUS (%) (- / +) -1.2 -14.6 -12.7 -3.2 0.0 -3.7 -7.1 -1.0 -4.4 -1.0 0.0 ENERGY REQUIRMENT (MU) Nuclear 0.00 0.00 573.00 573.00 5.47 ENERGY AVAILABILITY (MU) 24745 33236 36738 37797 44,109 45,261 51,474 25,524 3,881 30,447 4,923 24495 31715 35597 37388 43,062 44,836 49,491 24,206 3,753 28,964 4,758 R.E.S. (MNRE) 30.25 2342.30 0.00 2372.55 22.65 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -250 -1521 -1141 -409 -1,047 -425 -1,983 -1,318 -128 -1,483 -165 Total 5077.01 2875.3 2208.55 10160.86 100 Total 5077.01 3107.30 2291.17 10475.48 100.00 ENERGY DEFICIT/ SURPLUS (%) (- / +) -1.0 -4.6 -3.1 -1.1 -2.4 -0.9 -3.9 -5.2 -3.3 -4.9 -3.4 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Peak Peak Peak Energy Energy Energy Demand Met Deficit/ Deficit/ RequiAvailDeficit/ (MW) (MW) Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 9,200 8,191 -1,009 -11.0 57,139 51,006 -6,133 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF RAJASTHAN: Energy Deficit/ Surplus ( % ) (- / +) -10.7 (MW) CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: 690 1290 540 6. BENEFIT TO THE STATE OF RAJASTHAN WITH THE CAPACITY ADDITION DURING 11TH PLAN TYPE PROJECT NAME CENTRAL-SECTOR SEWA ST.II, U-1,2 & 3 H INSTALLE D CAPACITY (MW) 3x40= 120.00 CAPACITY ADDITION DURING XITH PLAN (MW) 120.00 43 BENEFITS /SHARES OF STATE (MW) 13 STATE PROJECT LOCATION UNIT WISE COMMISSIONING DATE (CAPACITY MW) J&K 22.062010 (40MW) 23.07.2010 (40MW) 23.07.2010 (40MW) BARSINGSAR LIG. U-1,2 *KOTESHWAR T RAPP U-5&6 N KAHALGAON U-6,7 T H 2x125= 250.00 4x100= 400.00 250.00 250 400.00 34 UTTRAKHAND 2x220= 440.00 2x500= 1000.00 440.00 88 RAJJASTHAN 1000.00 49 CENTRAL-SECTOR TOTAL STATE-SECTOR SURATGARH U-6 T 1x250= 250.00 250.00 CHABRA I TPS U,1,2 T 2x250= 500.00 500.00 GIRAL LIGNITE U- 2 T 2x125= 125.00 250.00 DHOLPUR CCGT G 2x110= 220.00 U-2 & ST 220.00 KOTA U-7 T 1x195= 195.00 195.00 STATE – SECTOR TOTAL:PRIVATE-SECTOR JALIPA LIGNITE U-I,2,3 T 3X135= 405.00 405 JALIPA KAPURDI U-3 T 1X135= 135.00 135.00 JALIPA KAPURDI U-4 T 1X135= 135.00 135.00 PRIVATE-SECTOR TOTAL :UMPP *ULTRA MEGA T 5x800= 800.00 MUNDRA U-1 4000.00 UMPP-TOTAL GRAND-TOTAL RAJASTHAN BIHAR 28.06.2010 (125 MW) 25.01.2011( 125 MW) 28.03.2011(100MW) 31.03.2011(100MW) 25.01.2012 (100MW0 22.03.2012 (100MW) 4.02.2010 (220MW) 31.03.2010 (220MW) 16.03.2008 (500MW) 31.7.2009 (500MW) 434 250 RAJASTHAN 500 RAJASTHAN 125 RAJASTHAN 220 RAJASTHAN 195 RAJASTHAN 29.08.2009(250MW) 30.10.2010(250MW) 4.05.2010(250MW) 2009-2010 (125MW) 16.06.2007 (110MW) 27.12.2007(110MW) 30.08.2009 (195MW) 1290 270 RAJASTHAN 135.00 RAJASTHAN 16.10.2009 (135MW) 8.07.2010 (135MW) 02.11.2011(135MW) 135.00 RAJASTHAN 23.11.2011(135MW) 540 75 GUJ 25.02.2012 (800MW) 75 2339 7. LIKELY BENEFIT TO THE STATE OF RAJASTHAN DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) RIHAND-III U-5,6 RAPP U7& 8 RAMPUR * KOLDAM * CHAMERA III T N H H H UC/COMM UC UC UC COMM UP RAJ HP HP HP C C C C C 2X500=1000 2X700=1400 6X68.67=412 4X200=800 3X77=231 HP HP J&K J&K UTTARAKHAND AR.PR AR.PR C C C C C C C 4X130=520 4X200=800 3X110=330 4X60=240 4X130=520 4X150=600 4X250=1000 RAJ RAJ RAJ S S S 1X600=600 2X250=500 160 PARBATI III * H UC PARBATI II * H UC KISHANGANGA * H UC URI II * H UC TAPOVAN VISNUGARH * H UC KAMENG H UC LOWER SUBANSHRI H UC TOTAL CENTRAL SECTOR SHARE KALISINDH TPS U1 T UC CHHABRA TPS EXTN U3,4 T UC RAMGARH T UC 44 BENEFITS SHARES OF STATE (MW 115 700 44 86 25 56 86 36 26 56 28 46.5 1304.5 600 500 160 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 20.05.2012(500MW) 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) TOTAL STATE SECTOR JALLIPA KAPURDI U 5-6 T SASAN UMPP U1,2 T MUNDRA UMPP, U 2 T TOTAL PRIVATE SECTOR GRAND TOTAL (RAJASTHAN) UC UC COMM RAJ MP GUJ P P P 2X135=270 2X660=1320 1X800=800 1260 270 132 75 477 3041.5 17.07.2012(800MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 43.74 44.68 39.92 35.60 34.71 31.47 29.99 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY PEAK DEMAND(MU) DEMAND(MW) 2012-13 54243 9396 2013-14 59382 10360 2014-15 65007 11422 2015-16 71166 12594 2016-17 77907 13886 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 811.12 45 UTTAR PRADESH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) Sector Hydro STATE PRIVATE CENTRAL TOTAL % 524.1 0 1250.32 1774.42 13.59 Thermal Gas Diesel 0 0 0 0 549.97 0 549.97 0 4.21 0.00 Coal 4267 2850 2589.84 9706.84 74.36 2. INSTALLED CAPACITY AS ON 31.10.2012 Sector Hydro STATE PRIVATE CENTRAL TOTAL % 524.10 0.00 1297.32 1821.42 13.14 Coal 4673.00 3030.00 2749.90 10452.90 75.40 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 7584 11104 10587 10,856 11,082 12,038 13,940 12,665 13,940 11,883 6887 8568 8248 8,563 10,672 11,767 12,048 10,958 12,048 10,471 (FIGURES IN MW) Nuclear Total 4267 2850 3139.81 10256.81 78.57 0 0 335.72 335.72 2.57 R.E.S. (MNRE) 25.1 661.88 0 686.98 5.26 Total 4816.2 3511.88 4725.85 13053.93 100 (FIGURES IN MW) Thermal Gas Diesel 0.00 0.00 0.00 0.00 549.97 0.00 549.97 0.00 3.97 0.00 PEAK DEFICIT/ SURPLUS (MW) (- / +) -697 -2536 -2339 -2,293 -410 -271 -1,892 -1,707 -1,892 -1,412 PEAK DEFICIT/ SURPLUS (%) (- / +) -9.2 -22.8 -22.1 -21.1 -3.7 -2.3 -13.6 -13.5 -13.6 -11.9 Nuclear Total 4673.00 3030.00 3299.87 11002.87 79.37 0.00 0.00 335.72 335.72 2.42 ENERGY REQUIRMENT (MU) R.E.S. (MNRE) 25.10 677.88 0.00 702.98 5.07 ENERGY AVAILABILITY (MU) 48332 62628 69207 75,930 76,292 81,339 46,928 7,569 54,882 7,954 43545 51335 54309 59,508 64,846 72,116 39,712 6,358 46,131 6,419 Total 5222.20 3707.88 4932.91 13862.99 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -4787 -11293 -14898 -16,422 -11,446 -9,223 -7,216 -1,211 -8,751 -1,535 ENERGY DEFICIT/ SURPLUS (%) (- / +) -9.9 -18.0 -21.5 -21.6 -15.0 -11.3 -15.4 -16.0 -15.9 -19.3 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Energy Deficit/ Deficit/ RequiAvailDeficit/ Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 12,500 10,377 -2,123 -17.0 87,153 70,509 -16,644 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF UTTAR PRADESH: (MW) CENTRAL SECTOR: 980 STATE SECTOR: 250 PRIVATE SECTOR: 2850 Energy Deficit/ Surplus ( % ) (- / +) -19.1 6. BENEFIT TO THE STATE OF UTTAR PRADESH WITH THE CAPACITY ADDITION DURING 11TH PLAN INSTALLED CAPACITY (MW) TYPE PROJECT NAME CENTRAL-SECTOR SEWA ST.II, U-1,2 & 3 H 3X40=120 CAPACITY ADDITION DURING XITH PLAN (MW) 120.00 46 BENEFITS/ SHARES OF STATE (MW) 27 STATE PROJECT LOCATION UNIT WISE COMMISSIONING DATE (CAPACITY MW) J&K 22.062010 (40MW) DADRI EXT U-5&6 T 2X490= 980 980.00 98 UP *KOTESHWAR H 4X100= 400 400.00 149 UTTRAKH AND RAPP U-5&6 N 2X220= 440 440.00 86 KAHALGAON U-6,7 T 2X500=1000 1000.00 100 RAJASTHA N BIHAR 23.07.2010 (40MW) 23.07.2010 (40MW 29.01.2010 (490MW) 30.07.2010 (490MW) 28.03.2011 (100MW) 31.03.2011 (100MW) 25.01.2012 (100MW) 22.03.2012 (100MW) 4.02.2010 (220MW) 31.03.2010 (220MW) 16.03.2008 (500MW) 31.7.2009 (500MW) 460 CENTRAL-SECTOR TOTAL STATE-SECTOR HARDUAGANJ EXTU- 8, T STATE-SECTOR PRIVATE-SECTOR ROSA PH-I U-1, 2 T 1X250 =250 2X300=600 600.00 ANPARA ‘C’ T 2X600=1200 KHAMBRKHERA U1,2 T MASOODPUR IPP U-1,2 250.00 250 UP 27.09.2011(250MW) 600 U.P 1200.00 1200 U.P. 10.02.2010 (300MW) 26.06.2010 (300MW) 12.11.2011 (600MW) 12.11.2011 (600MW) 2X45= 90 90 90 U.P T 2X45= 90 90 90 U.P BARKHERA TPP U-1,2 T 2X45= 90 90 90 U.P ROSA ST-1 U-3,4 T 2X300=600 600 600 U.P KUNNDAKI IPP U-1,2 T 2X45=90 90 90 U.P UTRAULA IPP U-1,2 T 2X45=90 90 90 U.P 250 PRIVATE SECTOR TOTAL UMPP *ULTRA MEGA MUNDRA U-1 T 5x800= 4000 UMPP-TOTAL 17.10.2011(45MW) 28.11.2011 (45 MW) 03.11.2011(45MW) 21.01.2012(45MW) 06.11.2011(45MW) 28.01.2012(45MW) 28.12.2011(300MW) 28.03.2012 (300MW) 10.01.2012(45MW) 29.02.2012 (45MW) 21.02.2012(45MW) 19.03.2012 (45MW) 2850 800 60 60 GUJ 25.02.2012 (800MW) 3620 GRAND-TOTAL 7. LIKELY BENEFIT TO THE STATE OF UTTAR PRADESH DURING 12TH PLAN T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) RIHAND-III U-5,6 RAPP U7& 8 RAMPUR * KOLDAM * CHAMERA III T N H H H UC/COMM UC UC UC COMM UP RAJ HP HP HP C C C C C 2X500=1000 2X700=1400 6X68.67=412 4X200=800 3X77=231 BENEFITS SHARES OF STATE (MW) 320 162 80 155 47 PARBATI III * PARBATI II * KISHANGANGA * URI II * TAPOVAN VISNUGARH * KAMENG LOWER SUBANSHRI H H H H H H H UC UC UC UC UC UC UC HP HP J&K J&K UTTARAKHAND AR.PR AR.PR C C C C C C C 4X130=520 4X200=800 3X110=330 4X60=240 4X130=520 4X150=600 4X250=1000 101 155 64 47 101 55 91 PROJECTS 47 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 20.05.2012(500MW) 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) CENTRAL SECTOR SHARE ANPARA-D -1,2 T PARICHHA EXT 5,6 T HARDUAGANJ EXT U9 T SECTOR SECTOR BARA U-1-3 T SASAN UMPP U1,2 T MUNDRA UMPP, U 2 T PRIVATE SECTOR UC COMM COMM UP UP UP S S S 2X500=1000 2X250=500 1X250=250 UC UC COMM UP MP GUJ P P P 3X660=1980 2X660=1320 1X800=800 GRAND TOTAL (UP) 1378 1000 500 250 1750 1980 165 60 2205 5333 24.05.2012(250MW) 25.05.2012(250MW) 17.07.2012(800MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 35.17 34.39 32.63 33.49 28.60 30.94 33.15 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 93148 102924 113727 125664 138854 PEAK DEMAND(MW) 14152 15993 18073 20424 23081 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 386.93 48 UTTARAKHAND 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO COAL STATE PRIVATE CENTRAL TOTAL % 1252.15 400 336.03 1988.18 78.68 THERMAL DIESEL 0 0 0 0 69.35 0 69.35 0 2.74 0.00 GAS 0 0 261.26 261.26 10.34 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 3. 1252.15 400.00 346.03 1998.18 78.16 COAL 0.00 0.00 280.88 280.88 10.99 (FIGURES IN MW) NUCLEAR TOTAL 0 0 330.61 330.61 13.08 0 0 22.28 22.28 0.88 R.E.S. (MNRE) 170.82 15.05 0 185.87 7.36 TOTAL R.E.S. (MNRE) 170.82 15.05 0.00 185.87 7.27 TOTAL 1422.97 415.05 688.92 2526.94 100 (FIGURES IN MW) THERMAL DIESEL 0.00 0.00 0.00 0.00 69.35 0.00 69.35 0.00 2.71 0.00 GAS NUCLEAR TOTAL 0.00 0.00 350.23 350.23 13.70 0.00 0.00 22.28 22.28 0.87 1422.97 415.05 718.54 2556.56 100.00 ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* PEAK MET (MW) 1108 1200 1267 1,397 1,520 1,612 1,757 1,646 1,757 1,672 991 1150 1267 1,313 1,520 1,600 1,646 1,646 1,646 1,592 PEAK DEFICIT/ SURPLUS (MW) (- / +) -117 -50 0 -84 0 -12 -111 0 -111 -80 PEAK DEFICIT/ SURPLUS (%) (- / +) -10.6 -4.2 0.0 -6.0 0.0 -0.7 -6.3 0.0 -6.3 -4.8 ENERGY REQUIRMENT (MU) 5957 7047 7841 8,921 9,850 10,513 5,850 963 6,784 934 ENERGY AVAILABILITY (MU) 5599 6845 7765 8,338 9,255 10,208 5,480 926 6,361 881 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -358 -202 -76 -583 -595 -305 -370 -37 -423 -53 ENERGY DEFICIT/ SURPLUS (%) (- / +) -6.0 -2.9 -1.0 -6.5 -6.0 -2.9 -6.3 -3.8 -6.2 -5.7 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Peak Energy Energy Energy Deficit/ Deficit/ RequiAvailDeficit/ Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 1,692 1,606 -86 -5.1 11,322 8,573 -2,749 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF UTTRAKHAND: (MW) CENTRAL SECTOR: 400 STATE SECTOR: 304 PRIVATE SECTOR: NIL 6. Peak Met (MW) Energy Deficit/ Surplus ( % ) (- / +) -24.3 BENEFIT TO THE STATE OF UTTRAKHAND WITH THE CAPACITY ADDITION DURING 11TH PLAN INSTALLED CAPACITY (MW) TYPE PROJECT NAME CAPACITY ADDITION DURING XITH PLAN (MW) 49 BENEFITS / SHARES OF STATE (MW) STATE PROJECT LOCATION UNIT WISE COMMISSIONING DATE (CAPACITY MW) CENTRAL-SECTOR SEWA ST.II, U-1,2 & 3 H 3X40=120 120.00 5 KAHALGAON II U-6,7 T 2X500=1000 1000.00 19 *KOTESHWAR H 4X100=400 400.00 65 UTTRAKHAND RAPP U-5&6 N 2X220=440 440.00 15 RAJASTHAN 304.00 104 304 CENTRAL SECTOR TOTAL MANERI BHALI H U-1,2,3 & 4 4X76=304 STATE SECTOR TOTAL GRAND TOTAL 7. J&K BIHAR UTTRAKHAND 22.06.2010 (40MW) 23.07.2010 (40MW) 23.07.2010 (40MW) 16.3.2008 (500MW) 31.7.2009 (500MW) 28.03.2011(100MW) 31.03.2011(100MW) 25.01.2012(100MW) 22.03.2012(100MW) 4.02.2010 (220MW) 31.03.2010(220MW) 16.01.2008(76MW) 21.01.2008(76MW) 25.01.2008(76MW) 10.03.2008(76MW) 304 408 LIKELY BENEFIT TO THE STATE OF UTTRAKHAND DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) RIHAND-III U-5,6 RAPP U7& 8 RAMPUR * KOLDAM * CHAMERA III T N H H H UC/COMM UC UC UC COMM UP RAJ HP HP HP C C C C C 2X500=1000 2X700=1400 6X68.67=412 4X200=800 3X77=231 UC UC UC UC UC HP HP UTTARAKHAND J&K J&K C C C C C 4X130=520 4X200=800 3X110=330 4X60=240 4X130=520 UC UC UC UC UTTARAKHAND UTTARAKHAND UTTRAKHAND MP P P P P 99 76 330 2X660=1320 PARBATI III * H PARBATI II * H KISHANGANGA * H URI II * H TAPOVAN VISNUGARH * H TOTAL CENTER SECTOR SHARE SINGOLI BHATWARI HEP H PHATA BYUNG HEP H SRINAGAR HEP H SASAN UMPP U1,2 T PRIVATE SECTOR GRAND TOTAL (UTTRAKHAND) BENEFITS SHARES OF STATE (MW) 39 33 20 39 9 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 20.05.2012(500MW) 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) 25 39 16 12 93 325 99 76 330 33 538 863 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 49.23 39.30 35.96 34.48 35.66 41.79 25.27 50 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 10735 11207 11700 12214 12751 PEAK DEMAND(MW) 1716 1824 1938 2060 2189 10 ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 930.41 51 WESTERN REGION 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) Sector Hydro Thermal Nuclear R.E.S. Coal Gas Diesel Total (MNRE) STATE 5480.5 17737.5 1915.72 17.28 19670.5 0 426.69 PRIVATE 447 12389 2805.5 0.2 15194.7 0 7483.26 CENTRAL 1520 8798 3533.59 0 12331.59 1840 0 25577.69 23124.96 15691.59 TOTAL % 64394.24 100 7447.5 11.57 38924.5 60.45 8254.81 12.82 17.48 0.03 47196.79 73.29 1840 2.86 7909.95 12.28 2.CAPACITY ACHIEVED DURING 11TH PLAN (EXCULDING RES) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR COAL GAS DIESEL TOTAL STATE 250 3535 765 0 4300 0 PRIVATE 0 10089 1147.5 0 11236.5 0 CENTRAL 520 3320 740 0 4060 0 TOTAL 770 16944 2652.5 0 19596.5 0 3. INSTALLED CAPACITY AS ON 31.10.2012 (FIGURES IN MW) Sector Hydro Thermal Coal Gas Diesel Total STATE 5480.50 17487.50 1915.72 17.28 19420.50 PRIVATE 447.00 15154.00 2805.50 0.20 17959.70 CENTRAL 1520.00 10458.00 3533.59 0.00 13991.59 TOTAL 7447.50 43099.50 8254.81 17.48 51371.79 % 10.82 62.64 12.00 0.03 74.66 4.ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMA MET ND (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 26510 36453 38277 37240 39,609 40,798 42,352 38,043 36,025 40,075 40,075 22024 27463 29385 30153 32,586 34,819 36,509 36,247 35,781 39,486 39,486 PEAK DEFICIT/ SURPLUS (MW) (- / +) -4486 -8990 -8892 -7087 -7,023 -5,979 -5,843 -1,796 -244 -589 -589 PEAK DEFICIT/ SURPLUS (%) (- / +) -16.9 -24.7 -23.2 -19.0 -17.7 -14.7 -13.8 -4.7 -0.7 -1.5 -1.5 ENERGY REQUIRMENT (MU) 175016 232391 247173 254475 258,528 268,488 290,421 140,146 22,013 165,757 25,611 Nuclear 0.00 0.00 1840.00 1840.00 2.67 Total TOTAL 4550 11236.5 4580 20366.5 R.E.S. (MNRE) 437.42 7709.27 0.00 8146.69 11.84 ENERGY AVAILABILITY (MU) 156793 196117 208228 213715 223,127 232,871 257,403 135,724 21,691 160,620 24,896 Total 25338.42 26115.97 17351.59 68805.98 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -18223 -36274 -38945 -40760 -35,401 -35,617 -33,018 -4,422 -322 -5,137 -715 * PROVISIONAL 5. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Peak Peak Peak Energy Energy Energy Demand Met Deficit/ Deficit/ RequiAvailDeficit/ (MW) (MW) Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 40,659 39,352 -1,307 -3.2 285,541 286,497 956 6. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 (AS PER U.N. METHODOLOGY ) 1061.41 52 Energy Deficit/ Surplus ( % ) (- / +) 0.3 ENERGY DEFICIT/ SURPLUS (%) (- / +) -10.4 -15.6 -15.8 -16.0 -13.7 -13.3 -11.4 -3.2 -1.5 -3.1 -2.8 CHHATTISGARH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) Sector Hydro STATE PRIVATE CENTRAL 120 0 0 Coal 2060 1833 1012.66 TOTAL % 120 2.24 4905.66 91.74 Thermal Gas Diesel 0 0 0 0 0 0 Total 2060 1833 1012.66 0 0.00 4905.66 91.74 2. INSTALLED CAPACITY AS ON 31.10.2012 Sector Hydro STATE PRIVATE CENTRAL TOTAL % 120.00 0.00 0.00 120.00 2.12 Coal 2060.00 1968.00 1179.44 5207.44 92.18 (FIGURES IN MW) Nuclear 0 0.00 0 0 47.52 R.E.S. (MNRE) 20.25 253.9 0 Total 2200.25 2086.9 1060.18 47.52 0.89 274.15 5.13 5347.33 100 Nuclear R.E.S. (MNRE) 20.25 253.90 0.00 274.15 4.85 Total (FIGURES IN MW) Thermal Gas Diesel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 2060.00 1968.00 1179.44 5207.44 92.18 0.00 0.00 47.52 47.52 0.84 2200.25 2221.90 1226.96 5649.11 100.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 2631 2421 2887 2,819 3,148 3,239 3,271 2,907 3,271 2,971 PEAK MET (MW) 1907 2188 2830 2,703 2,838 3,093 3,134 2,887 3,134 2,860 PEAK DEFICIT/ SURPLUS (MW) (- / +) -724 -233 -57 -116 -310 -146 -137 -20 -137 -111 PEAK DEFICIT/ SURPLUS (%) (- / +) -27.5 -9.6 -2.0 -4.1 -9.8 -4.5 -4.2 -0.7 -4.2 -3.7 ENERGY REQUIRMENT (MU) 14063 14079 14866 11009 10,340 15,013 8,659 1,443 10,121 1,462 ENERGY AVAILABILITY (MU) 13169 13409 14475 10739 10,165 14,615 8,501 1,427 9,951 1,450 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -894 -670 -391 -270 -175 -398 -158 -16 -170 -12 ENERGY DEFICIT/ SURPLUS (%) (- / +) -6.4 -4.8 -2.6 -2.5 -1.7 -2.7 -1.8 -1.1 -1.7 -0.8 * PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Energy Deficit/ Deficit/ RequiAvailDeficit/ Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 3,215 3,169 -46 -1.4 23,992 31,222 7,230 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF CHHATTISGARH : (MW) CENTRAL SECTOR: 3320 STATE SECTOR: 250 PRIVATE SECTOR: 1833 Energy Deficit/ Surplus ( % ) (- / +) 30.1 6. BENEFIT TO THE STATE OF CHHATTISGARH WITH THE CAPACITY ADDITION DURING 11TH PLAN INSTALLED CAPACITY (MW) TYPE PROJECT NAME CAPACITY ADDITION DURING XITH PLAN (MW) 53 BENEFITS/ SHARES OF STATE (MW) STATE PROJECT LOCATION UNIT WISE COMMISSIONING DATE (CAPACITY MW) CENTRAL-SECTOR SIPAT STPS II U-4,5 T 2X500=500 1000.00 158 CHHATTISGARH BHILAI JV U-1,2 T 2X250=500 500.00 50 CHHATTISGARH KORBA ST.-III U-7 KAHALGAON 6,7 T T 1X500=500 2X500=1000 500.00 1000.00 75 20 CHHATTISGARH BIHAR SIPAT STPS I U-1,2 T 2X660=1320 1320.00 209 CHHATTISGARH 250 CHATTISGARH 11.12.2007 (250MW) 04.06.2009.(300MW) 25.03.2010 (300MW) 2.09.2007 (250MW) 10.02.2008 250MW) 6.03.2008 250MW) 17.06.2008 250MW) 13.12.2011(135MW) 07.12.2011(63MW) 14.02.2012 (35 MW) CENTRAL-SECTOR TOTAL:STATE-SECTOR KORBA EAST EXTN U-2 PRIVATE-SECTOR LANCO (AMARKANTAK) U-1,2 RAIGARH TPP-(JINDAL) PH I& II U-1,2,3,4 KASAIPALLI U-1 SVPL TPP U-1 KATGHORA TPP T 1X250=250 250.00 STATE – SECTOR TOTAL:- 512 250 T 2X300=600 600.00 600 CHATTISGARH T 4X250=1000 1000.00 1000 CHATTISGARH 1X135=135 135 1X63=63 63 1X35-35 35 PRIVATE-SECTOR TOTAL:GRAND-TOTAL:- 135 63 35 1833 2595 CHATTISGARH CHATTISGARH CHATTISGARH T T T 7.LIKELY BENEFIT TO THE STATE OF CHHATTISGARH DURING 12TH PROJECTS T ST STATE SE Y AT PROJECT CT P US LOCATION OR E SIPAT-I U 3 KAPP U-3 & 4 VINDHYACHAL STPP ST-IV U11,12 MAUDA TPP U1-2 KAMENG SUBANSHRI LOWER CENTRAL SECTOR SHARE KORBA WEST ST.III U5 MARWAH TPP U1,2 SECTOR SECTOR AVANTHA BHANDAR TPP U1 MAURTI CLEAN COAL & POWER LTD. U1 LANCO AMARKANTAK U- 3,4 UCHPANDA TPP U1-3 VINJKOTE (DARRAMPURA) TPP U1-3 AKALTARA (NARIYARA) TPP U1-4 KASAIPALLI TPP U 2 SWASTIK KORBA U 1 VANDANA VIDYUT TPP U 1-2 BALCO TPP U-1,2 ATHENA SINGHTARAI TPP U-1 D B POWER TPP U-1,2 TRN ENERGY TPP U-1,2 RATIJA TPP RAIGARH TPP U1,2 IC (MW) BENEFITS SHARES OF STATE (MW 104 88 63 T N T COMM UC UC/COMM CHHATT GUJ MP C C C 1X660=660 2X700=1400 2X500=1000 T H H UC/COMM UC UC MAHA AR.PR AR.PR C C C 2X500=1000 4X150=600 4X250=1000 T T UC UC CHHATT CHHATT S S 1X500=500 2X500=1000 T T UC UC CHHATT CHHATT P P 1X600=600 1X300=300 63 13 21 352 500 1000 1500 600 300 T T T UC UC UC CHHATT CHHATT CHHATT P P P 2X660=1320 3X360=1080 3X300=900 1320 1080 900 T T T T T T T T T T UC UC UC UC UC UC UC UC UC UC CHHATT CHHATT CHHATT CHHATT CHHATT CHHATT CHHATT CHHATT CHHATT CHHATT P P P P P P P P P P 3X600=1800 1X135=135 1X25=25 1X135=270 2X300=600 1X600=600 2X600=600 2X300=600 1X50=50 2X600=1200 1800 135 25 270 600 600 1200 600 50 1200 54 27.05.2008 (500MW) 13.08.2008 (500MW) 20.04.2008 (250MW) 12.07.2009 (250MW) 26.12.2010 (500MW) 16.03.2008 (500MW) 31.07.2009 (500MW) 28.06.2011(660 MW) 24.12.2011 (660MW) UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 19.04.2012(500MW) 21.06.2012(135MW) SASAN UMPP U1,2 PRIVATE SECTOR SUB TOTAL (CHHATTISGARH) T UC MP P 2X660=1320 82.5 10762.5 12614.5 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 44444444 T&D LOSSES % 42.55 28.06 31.06 31.71 29.79 26.38 18.62 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY PEAK DEMAND(MU) DEMAND(MW) 2012-13 17703 3534 2013-14 19146 3792 2014-15 20707 4070 2015-16 22396 4367 2016-17 24222 4687 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 921.14 55 GUJARAT 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 772 4220 1243.72 17.28 5481 0 32.9 PRIVATE 0 6670 2577.5 0.2 9247.7 0 3465.74 CENTRAL 0 1988.89 424.27 0 2413.16 559.32 0 6285.9 12713.44 2972.48 TOTAL % 772 3.51 12878.89 58.62 4245.49 19.32 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 772.00 0.00 0.00 772.00 3.29 COAL 4220.00 7580.00 2408.85 14208.85 60.63 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 8005 11619 12119 11841 10,406 10,786 10,951 11,481 10,809 11,999 11,999 6700 8110 8885 8960 9,515 9,947 10,759 11,270 10,762 11,960 11,960 17.48 0.08 17141.86 78.02 TOTAL 559.32 2.55 3498.64 15.92 21971.82 100 NUCLEAR R.E.S. (MNRE) 32.90 3601.00 0.00 3633.90 15.50 TOTAL (FIGURES IN MW) THERMAL GAS DIESEL 1243.72 17.28 2577.50 0.20 424.27 0.00 4245.49 17.48 18.11 0.07 PEAK DEFICIT/ SURPLUS (MW) (- / +) -1305 -3509 -3234 -2881 -891 -839 -192 -211 -47 -39 -39 PEAK DEFICIT/ SURPLUS (%) (- / +) -16.3 -30.2 -26.7 -24.3 -8.6 -7.8 -1.8 -1.8 -0.4 -0.3 -0.3 TOTAL 5481.00 10157.70 2833.12 18471.82 78.81 ENERGY REQUIRMENT (MU) 0.00 0.00 559.32 559.32 2.39 ENERGY AVAILABILITY (MU) 6285.90 13758.70 3392.44 23437.04 100.00 47530 54083 57614 60851 67,220 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -6163 -8381 -11133 -6631 -3,149 71,651 67,534 -4,117 -5.7 74,696 42,225 6,812 51,056 8,831 74,429 42,080 6,810 50,911 8,831 -267 -145 -2 -145 0 -0.4 -0.3 0.0 -0.3 0.0 53693 62464 68747 67482 70,369 ENERGY DEFICIT/ SURPLUS (%) (- / +) -11.5 -13.4 -16.2 -9.8 -4.5 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Deficit/ Deficit/ RequiAvailSurplus Surplus rment ability (MW) (- / +) ( % ) (- / +) (MU) (MU) 11,489 10,760 -729 -6.4 76,752 72,931 5.CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF GUJARAT MW CENTRAL SECTOR: NIL STATE SECTOR: 1090 PRIVATE SECTOR: 6367.5 Energy Deficit/ Surplus (MU) (- / +) -3,821 Energy Deficit/ Surplus ( % ) (- / +) -5.0 TYPE 6. BENEFIT TO THE STATE OF GUJARAT WITH THE CAPACITY ADDITION DURING 11TH PLAN PROJECT NAME INSTALLED CAPACITY BENEFITS STATE UNIT WISE COMMISSIONING DATE CAPACITY ADDITION SHARES PROJECT (CAPACITY MW) (MW) DURING OF STATE LOCATION XITH PLAN (MW) (MW) 56 CENTRAL-SECTOR SIPAT STPS II U-4,5 T 2X500=1000 1000 273 KORBA ST.-III U-7 T 2X250=500 500 96 KAHALGAON U-6,7 T 2X500=1000 1000 94 SIPAT STPS I U-1,2 T 2X500=1000 1320.00 360 CENTRAL-SECTOR TOTAL STATE-SECTOR KUTCH LIGNITE TPS T 1X75=75 U-4 DHUVRAN ST G 1X40=40 SURAT LIGNITE U-3,4 T 2X125=250 UTRAN CCPP HAZIRA GSEG CCGT PRIVATE-SECTOR SUGEN TORRENT BLOCK I, II, III ADANI POWER MUNDRA PH-I U-1,2,3 &4 CHHATTISGAR H CHHATTISGAR H BIHAR CHHATTISGAR H 16.03.2008 (500MW) 31.07.2009 (500MW) 28.06.2011(660MW) 24.12.2011(660MW). 823 75 75 GUJARAT 1.10.2009 (75MW) 40 250 40 250 GUJARAT GUJARAT G 1X240=240 374 1X134=134 G 1X351=351 351.00 STATE - SECTOR TOTAL 374 GUJARAT 351 1090 GUJARAT 13.08.2007 (40MW) 12.04.2010 (125MW) 12.04.2010 (125MW) 8.8.2009 (240MW) 10.10.2009 (134MW) 18.02.2012(351 MW) 1147.50 1147.50 GUJARAT G 3X382.5= 1147.50 T 4X330=1320 1320 1320 GUJARAT MUNDRA TPP PH-II U 1,2T 2X660= 1320 1320 1320 GUJARAT SALAYA TPP U-1 MUNDRA TPP PH-III U1,2,3 2X600=1200 3X660=1980 600 1980 600 1980 GUJARAT GUJRAT T T TOTAL-PRIVATE-SECTOR UMPP *MUNDRA UMPP U-1 27.05.2008 & (500MW) 13.08.2008 (500MW) 26.12.2010 (500MW) T 6367.5 5X800=4000 800 UMPP- TOTAL:GRAND-TOTAL:- 370 370.00 7827.5 7. LIKELY BENEFIT TO THE STATE OF GUJARAT DURING 12TH PLAN PROJECTS T ST STATE SE Y AT PROJECT CT P US LOCATION OR E SIPAT-I U 3 KAPP U-3 & 4 VINDHYACHAL STPP ST-IV U11,12 MAUDA TPP U1-2 KAMENG SUBANSHRI LOWER CENTRAL SECTOR SHARE SIKKA TPP EXTN. U3 UKAI EXT U6 PIPAVAV JV CCGT SECTOR SECTOR MUNDRA UMPP, U 2 SALAYA TPP U 2 PRIVATE SECTOR GRAND TOTAL (GUJARAT) 4.02.2009, (382.5MW) 7.05.2009, (382.5MW 08.06.2009 (382.5MW) 4.08.2009, (330MW) 17.03.2010, (330MW) 2.08.2010 , (330MW) 20.12.2010(330MW) 26.12.2010 (660MW) 20.07.2011(660MW) 22.02.2012 (600MW) 07.11.2011 (660MW) 03.03.2012 (660MW) 09.03.2012 (660MW) GUJARAT IC (MW) T N T COMM UC UC/COMM CHHATT GUJ MP C C C 1X660=660 2X700=1400 2X500=1000 T H H UC UC UC MAHA AR.PR AR.PR C C C 2X500=1000 4X150=600 4X250=1000 T T T UC UC UC GUJ GUJ GUJ S S S 1X250=250 1X500=500 702 T T COMM COMM GUJ GUJ P P 1X800=800 1X600=600 57 25.02.2012 (800MW) BENEFITS SHARES OF STATE (MW) 180 476 240 240 48 81 1265 250 500 702 1452 370 600 970 3687 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 19.04.2012(500MW) 17.07.2012(800MW) 13.06.2012(600MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2422222 T&D LOSSES % 24.20 30.43 27.91 24.87 26.13 24.07 22.77 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 82331 88254 94603 101409 108704 PEAK DEMAND(MW) 13047 14350 15782 17358 19091 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 1558.58 58 MADHYA PRADESH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 1703.66 0 1520 3223.66 36.72 THERMAL GAS DIESEL 0 0 0 0 257.18 0 257.18 0 2.93 0.00 COAL 2807.5 0 1741.26 4548.76 51.81 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 1703.66 0.00 1520.00 3223.66 34.53 COAL 2807.50 250.00 2041.47 5098.97 54.62 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 5683 8090 7200 7564 7,490 8,864 9,151 8,165 6,586 8,920 8,920 4457 6404 6436 6810 6,415 8,093 8,505 6,704 6,585 8,802 8,802 (FIGURES IN MW) NUCLEAR TOTAL 2807.5 0 1998.44 4805.94 54.74 R.E.S. (MNRE) 86.76 390.3 0 477.06 5.43 0 0 273.24 273.24 3.11 TOTAL 4597.92 390.3 3791.68 8779.9 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 0.00 0.00 0.00 257.18 0.00 257.18 0.00 2.75 0.00 PEAK DEFICIT/ SURPLUS (MW) (- / +) -1226 -1686 -764 -754 -1,075 -771 -646 -1,461 -1 -118 -118 PEAK DEFICIT/ SURPLUS (%) (- / +) -21.6 -20.8 -10.6 -10.0 -14.4 -8.7 -7.1 -17.9 0.0 -1.3 -1.3 NUCLEAR TOTAL 2807.50 250.00 2298.65 5356.15 57.37 0.00 0.00 273.24 273.24 2.93 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 31013 38710 41560 42054 43,179 R.E.S. (MNRE) 86.76 395.55 0.00 482.31 5.17 26233 32834 35700 34841 34,973 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -4780 -5876 -5860 -7213 -8,206 TOTAL 4597.92 645.55 4091.89 9335.36 100.00 ENERGY DEFICIT/ SURPLUS (%) (- / +) -15.4 -15.2 -14.1 -17.2 -19.0 48,437 38,644 -9,793 -20.2 49,785 20,647 3,108 24,810 4,163 41,392 19,142 3,095 22,923 3,781 -8,393 -1,505 -13 -1,887 -382 -16.9 -7.3 -0.4 -7.6 -9.2 * PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Energy Energy Deficit/ Deficit/ RequiAvailDeficit/ Deficit/ Surplus Surplus rment ability Surplus Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) ( % ) (- / +) 8,500 7,369 -1,131 -13.3 52,700 44,758 -7,942 -15.1 5.CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF MADHYA PRADESH (MW) CENTRAL SECTOR: 520 STATE SECTOR: 710 PRIVATE SECTOR: NIL 6. BENEFIT TO THE STATE OF MADHYA PRADESH WITH THE CAPACITY ADDITION DURING 11TH PLAN TYPE PROJECT NAME INSTALLE D CAPACITY (MW) CAPACITY ADDITION DURING XITH PLAN (MW) 8X65=520 520.00 BENEFITS/ SHARES OF STATE (MW) STATE PROJECT LOCATIO N UNIT WISE COMMISSIONING DATE (CAPACITY MW) CENTRAL-SECTOR OMKARESHWAR U-1 H 59 520 MP 21.07.2007, (65MW) U-2 U-3 U-4 U-5 U-6 U-7 U-8 SIPAT STPS II U-4,5 T KORBA ST.-III U-7 T KAHALGAON U-6,7 T SIPAT STPS I U-1,2 T STATE-SECTOR BIRSINGPUR EXT. U-5 AMARKANTAK U-5 2X500=50 1000.00 0 2X250=50 500.00 0 1X500=50 1000.00 0 2X660=13 1320.00 20 CENTRAL-SECTOR TOTAL:- T 500.00 T 210.00 STATE – SECTOR TOTAL:- 143 62.5 49 189 CHHATTIS GARH CHHATTIS GARH BIHAR CHHATTI SGARH M.P M.P 18.06.2007 (500MW) 15.06.2008 (210MW) 963.5 500.00 210.00 500 210 710 GRAND-TOTAL:-1673.5 T N T COMM UC UC/COMM CHHATT GUJ MP C C C 1X660=660 2X700=1400 2X500=1000 T H H UC UC UC MAHA AR.PR AR.PR C C C 2X500=1000 4X150=600 4X250=1000 T T UC UC UC UC UC/COMM UC UC UC UC MP MP S S 2X250=500 2X600=1200 MP MP MP MP MP MP P P P P P P 2X600=1200 2X250=500 2X660=1320 4X100=400 1X660=660 1X600=600 T T T H T T 26.12.2010 (500MW) 16.03.2008 (500MW) 31.07.2009 (500MW) 28.06.2011(660MW) 24.12.2011(660MW) 7. LIKELY BENEFIT TO THE STATE OF MADHYA PRADESH DURING 12TH PLAN PROJECTS T ST STATE SE IC (MW) Y AT PROJECT CT P US LOCATION OR E SIPAT-I U 3 KAPP U-3 & 4 VINDHYACHAL STPP ST-IV U-11,12 MAUDA TPP U1-2 KAMENG SUBANSHRI LOWER CENTRAL SECTOR SHARE SATPURA TPP EXT U-10,11 SHREE SINGAJI TPP U1,2 SECTOR SECTOR ANNUPUR TPP PH-I U1,2 BINA TPP U 1, 2 SASAN UMPP,U 1,2 MAHESHWAR 1-10 D B POWER TPP, SIDHI U-1 JHABUA TPP U1 PRIVATE SECTOR GRAND TOTAL (MP) 9.08.2007, (65MW) 29.8.2007, (65MW) 13.09.2007, (65MW) 27.09.2007, (65MW) 18.10.2007, (65MW) 27.10.2007 (65MW) 04.11.2007 (65MW) 27.05.2007 (500MW) 13.08.2008 (500MW) BENEFITS SHARES OF STATE (MW 94 219 256 156 32 52.5 809.5 500 1200 1700 1200 500 396 400 660 600 3756 6265.5 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 19.04.2012(500MW) 12.08.2012(250MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 33333333 T&D LOSSES % 41.44 41.30 40.07 39.24 35.64 38.46 38.32 60 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 56763 61448 66519 72010 77953 PEAK DEMAND(MW) 10299 11102 11967 12899 13904 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 618.10 61 MAHARASHTRA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 2884.84 8650 672 0 9322 0 286.73 PRIVATE 447 3886 180 0 4066 0 3343.32 CENTRAL 0 2478.05 2623.93 0 5101.98 690.14 0 TOTAL 3331.84 15014.05 3475.93 0 18489.98 690.14 3630.05 % 12.75 57.43 13.30 0.00 70.73 2.64 13.89 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 2884.84 447.00 0.00 3331.84 11.92 COAL 8400.00 5356.00 2968.29 16724.29 59.84 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 4. 12265 17455 18441 18049 19,388 19,766 21,069 17,934 15,951 17,934 17,114 10726 12679 13575 13766 14,664 16,192 16,417 16,765 15,563 16,765 16,395 TOTAL 12493.57 7856.32 5792.12 26142.01 100 (FIGURES IN MW) THERMAL GAS DIESEL 672.00 0.00 180.00 0.00 2623.93 0.00 3475.93 0.00 12.44 0.00 PEAK DEFICIT/ SURPLUS (MW) (- / +) -1539 -4776 -4866 -4283 -4,724 -3,574 -4,652 -1,169 -388 -1,169 -719 NUCLEAR TOTAL 9072.00 5536.00 5592.22 20200.22 72.28 PEAK DEFICIT/ SURPLUS (%) (- / +) -12.5 -27.4 -26.4 -23.7 -24.4 -18.1 -22.1 -6.5 -2.4 -6.5 -4.2 0.00 0.00 690.14 690.14 2.47 ENERGY REQUIRMENT (MU) R.E.S. (MNRE) 297.46 3428.82 0.00 3726.28 13.33 ENERGY AVAILABILITY (MU) 80489 110005 114885 121901 124,936 128,296 141,382 63,749 9,802 74,172 10,423 73438 89138 93846 95761 101,512 107,018 117,722 61,450 9,537 71,577 10,127 TOTAL 12254.30 9411.82 6282.36 27948.48 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -7051 -20867 -21039 -26140 -23,424 -21,278 -23660 -2,299 -265 -2,595 -296 ENERGY DEFICIT/ SURPLUS (%) (- / +) -8.8 -19.0 -18.3 -21.4 -18.7 -16.6 -16.7 -3.6 -2.7 -3.5 -2.8 ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Energy Deficit/ Deficit/ RequiAvailDeficit/ Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 18,550 15,798 -2,752 -14.8 121,120 106,497 -14,623 5.CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF MAHARASHTRA (MW) CENTRAL SECTOR: 740 STATE SECTOR: 2500 PRIVATE SECTOR: 2236 Energy Deficit/ Surplus ( % ) (- / +) -12.1 6. BENEFIT TO THE STATE OF MAHARASHTRA WITH THE CAPACITY ADDITION DURING 11TH PLAN INSTALLED CAPACITY (MW) TYPE PROJECT NAME SIPAT STPS I U-1,2 T 3X660=1980 CAPACITY ADDITION DURING XITH PLAN (MW) BENEFITS /SHARES OF STATE (MW) 1320.00 340 62 STATE PROJECT LOCATION UNIT WISE CHHATTISG 28.06.2011(660MW) COMMISSIONING DATE (CAPACITY MW) SIPAT STPS II U-4,5 T 2X500=1000 1000.00 258 DABHOL RATNAGIRI G 740.00 740.00 740 KORBA ST.-III U-7 T 1X500=500 500.00 108 KAHALGAON U-6,7 T 2X500=1000 1000.00 99 CENTRAL-SECTOR TOTAL:- 24.12.2011(660MW) 13.08.2008 (500 MW) 27.05.2008 (500 MW 28.10.2007 (740MW) MAHARASH TRA MAHARASH TRA MAHARASH TRA MAHARASH TRA MAHARASH TRA 13.05.2008 (125 MW) 01.07.2008 (125 MW) (05.08.2011(500 MW) MAHARASH TRA MAHARASH TRA 26.03.2009 (250MW) H 2X125=250 250.00 250 KHAPERKHEDA EXT T 1X500=500 500.00 500 BHUSAWAL TPS U-4,5 T 2X500=1000 1000.00 1000 NEW PARLI EXT U-2 T 1X250=250 250.00 250 PARAS EXT U-1& 2 T 2X250=500 500.00 500 STATE – SECTOR TOTAL:- 16.03.2008 (500MW) 31.07.2009 (500MW 07.03.2012 (500MW) 30.03.2012 (500MW0 10.02.2010 (250 MW) 31.05.2007 (250 MW) 27.03.2010 (250 MW) 2500 T 1X250=250 250.00 250 JSW ENERGY RATNAGIRI U I-4 T 4X300=1200 1200.00 1200 WARDHA WARORA U:1-4 T 4X135=540 540.00 540 MAHARASH TRA MIHAN TPP U-1TO 4 T 1X246=246 246 246 MAHARASH TRA PVT. – SECTOR TOTAL UMPP UMPP-MUNDRA U-1 26.12.2010 (500MW) 1545 STATE-SECTOR GHATGHAR PSS U-1,2 PRIVATE-SECTOR TROMBAY EXTN. ARH CHHATTISG ARH MAHARASH TRA CHHATTISG ARH BIHAR 24.08.2010 (300MW) 09.12.2010 (300MW) 06.05.2011 (300MW) 08.10.2011 (300MW) 05.06.2010 (135MW) 10.10.2010 (135MW) 21.01.2011 (135MW) 30.04.2011 (135 MW) 09.02.2012 (246 MW) 2236 T 5X800=4000 800.00 UMPP –TOTAL GRAND-TOTAL: 130 130 6411 GUJARAT 7. LIKELY BENEFIT TO THE STATE OF MAHARASHTRA DURING 12TH PLAN PROJECTS T ST STATE SE IC (MW) Y AT PROJECT CT P US LOCATION OR E SIPAT-I U 3 T KAPP U-3 & 4 N VINDHYACHAL STPP ST-IV UT 11,12 MAUDA TPP U1-2 T KAMENG H SUBANSHRI LOWER H TOTAL CENTRAL SECTOR SHARE 25.02.2012 (800MW) COMM UC CHHATT GUJ C C 1X660=660 2X700=1400 BENEFITS SHARES OF STATE (MW 170 379 UC/COMM MP C 2X500=1000 270 UC/COMM UC UC MAHA AR.PR AR.PR C C C 2X500=1000 4X150=600 4X250=1000 370 55 91.5 1335.5 CHANDRAPUR EXT. U8 T UC MAHA S 1X500=500 500 KORADI TPP EXT U8 PARLI UNIT-8 TOTAL SECTOR SECTOR INDIA BULLS- AMRAVATI TPP PH-I,U1-5 INDIA BULLS - NASIK TPP PHI,U1-5 T T UC UC UC MAHA MAHA S S 1X660=660 1X250=250 660 250 1410 T UC MAHA P 5X270=1350 1350 T UC MAHA P 5X270=1350 1350 63 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 19.04.2012(500MW) DHARIWAL INFRASTRUCTURE (P) LTD TPP U1,2 EMCO WARORA U1,2 BUTIBORI TPP PH -II U-1 LANCO MAHANADI, VIDARBHA TPP U1,2 TIRODA TPP PH-I U1,2 TIRODA TPP PH-II, U1 T UC T T UC UC T UC T T UC/COMM UC T COMM MUNDRA UMPP, U 2 T BELA TPP U 1 T PRIVATE SECTOR TOTAL GRAND TOTAL (MAHARASHTRA) COMM UC GEPL TPP U-1,2 MAHA MAHA MAHA P P P MAHA MAHA MAHA P P P MAHA GUJ MAHA P P P 1X600=600 600 2X300=600 1X300=300 600 300 2X660=1320 1320 2X660=660 1X660=660 1320 660 2X60=120 1X800=800 1X270=270 120 130 270 8020 10765.5 11.09.2012(660MW) 28.04.2012(60MW) 08.09.2012(60MW) 17.07.2012(800MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 34.12 32.40 31.60 31.64 29.79 23.88 25.16 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 140736 147402 154383 161695 169353 PEAK DEMAND(MW) 22368 23795 25313 26928 28645 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 1054.10 64 GOA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % THERMAL GAS DIESEL 0 0 48 0 0 0 48 0 11.99 0.00 COAL 0 0 296.37 296.37 74.05 0 0 0 0 0.00 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % COAL 0.00 0.00 314.47 314.47 75.17 0.00 0.00 0.00 0.00 0.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-2010 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 316 459 457 466 485 544 527 452 445 452 438 316 419 408 413 453 467 471 452 398 452 389 (FIGURES IN MW) NUCLEAR TOTAL 0 48 296.37 344.37 86.05 0 0 25.8 25.8 6.45 R.E.S. (MNRE) 0.05 30 0 30.05 7.51 TOTAL R.E.S. (MNRE) 0.05 30.00 0.00 30.05 7.18 TOTAL ENERGY DEFICIT/ SURPLUS (MU) (- / +) 0 -18 -33 -47 -66 -65 -43 -51 -6 -56 -5 ENERGY DEFICIT/ SURPLUS (%) (- / +) 0.0 -0.7 -1.2 -1.7 -2.1 -2.1 -1.4 -3.3 -2.3 -3.1 -2.1 0.05 78 322.17 400.22 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 0.00 48.00 0.00 0.00 0.00 48.00 0.00 11.47 0.00 PEAK DEFICIT/ SURPLUS (MW) (- / +) 0 -40 -49 -53 -32 -77 -56 0 -47 0 -49 PEAK DEFICIT/ SURPLUS (%) (- / +) 0.0 -8.7 -10.7 -11.4 -6.6 -14.2 -10.6 0.0 -10.6 0.0 -11.2 NUCLEAR TOTAL 0.00 48.00 314.47 362.47 86.65 0.00 0.00 25.80 25.80 6.17 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 1767 2624 2740 2801 3,092 3,154 3,024 1,557 258 1,794 237 1767 2606 2707 2754 3,026 3,089 2,981 1,506 252 1,738 232 0.05 78.00 340.27 418.32 100.00 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) 480 Peak Met (MW) 418 Peak Deficit/ Surplus (MW) (- / +) -62 Peak Deficit/ Surplus ( % ) (- / +) -12.9 Energy Requirment (MU) 3,426 Energy Availability (MU) 3,075 Energy Deficit/ Surplus (MU) (- / +) -351 Energy Deficit/ Surplus ( % ) (- / +) -10.3 5.CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF GOA CENTRAL SECTOR: NIL STATE SECTOR: NIL PRIVATE SECTOR: NIL UNIT WISE COMMISSIONING DATE (CAPACITY MW) TYPE 6. BENEFIT TO THE STATE OF GOA WITH THE CAPACITY ADDITION DURING 11TH PLAN PROJECT NAME INSTALLED CAPACITY BENEFITS STATE CAPACITY ADDITION /SHARES PROJECT (MW) DURING OF STATE LOCATION XITH PLAN (MW) (MW) CENTRAL-SECTOR SIPAT STPS II U-4,5 T 2X500= 1000.00 10 CHHATTISG 1000.00 ARH 65 27.05.2007 (500MW) 13.08.2008 (500MW) KORBA ST.-III U-7 T SIPAT STPS I U-1,2 T 1X500= 500.00 3X660= 1980.00 500.00 5 1320.00 13 CENTRAL-SECTOR TOTAL:GRAND-TOTAL:- 26.12.2010 (500MW) CHHATTISG ARH 28.06.2011(660MW) 24.12.2011(660MW) 28 28 7. LIKELY BENEFIT TO THE STATE OF GOA DURING 12TH PLAN PROJECTS T ST STATE SE Y AT PROJECT CT P US LOCATION OR E SIPAT-I U 3 KAPP U-3 & 4 VINDHYACHAL STPP ST-IV U-11,12 MAUDA TPP U1-2 KAMENG SUBANSHRI LOWER CENTRAL SECTOR SHARE SUB TOTAL (GOA) BIHAR IC (MW) T N COMM UC CHHATT GUJ C C 1X660=660 2X700=1400 BENEFITS SHARES OF STATE (MW 7 16 T UC/COMM MP C 2X500=1000 11 T H H UC/COMM UC UC MAHA AR.PR AR.PR C C C 2X500=1000 4X150=600 4X250=1000 11 2 4 51 51 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 19.04.2012(500MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 45.05 35.97 19.68 20.90 21.18 17.12 16.99 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 3641 3912 4204 4517 4853 PEAK DEMAND(MW) 622 666 712 762 815 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 2004.77 66 DAMAN & DIU 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO THERMAL COAL GAS DIESEL TOTAL STATE 0 0 0 0 0 PRIVATE 0 0 0 0 0 CENTRAL 0 26.38 4.2 0 30.58 TOTAL 0 26.38 4.2 0 30.58 % 0.00 69.49 11.06 0.00 80.56 (FIGURES IN MW) NUCLEAR R.E.S. (MNRE) 0 0 0 0 7.38 0 7.38 0 19.44 0.00 2. INSTALLED CAPACITY AS ON 31.10.2012 (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR COAL GAS DIESEL TOTAL STATE 0.00 0.00 0.00 0.00 0.00 0.00 PRIVATE 0.00 0.00 0.00 0.00 0.00 0.00 CENTRAL 0.00 33.32 4.20 0.00 37.52 7.38 TOTAL 0.00 33.32 4.20 0.00 37.52 7.38 % 0.00 74.21 9.35 0.00 83.56 16.44 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 210 240 240 280 189 215 215 255 PEAK DEFICIT/ SURPLUS (MW) (- / +) -21 -25 -25 -25 353 301 328 276 -25 -25 311 311 311 299 286 286 286 274 -25 -25 -25 -25 PEAK DEFICIT/ SURPLUS (%) (- / +) -10.0 -10.4 -10.4 -8.9 ENERGY REQUIRMENT (MU) TOTAL 0 0 37.96 37.96 100 R.E.S. (MNRE) 0.00 0.00 0.00 0.00 0.00 ENERGY AVAILABILITY (MU) TOTAL 0.00 0.00 44.90 44.90 100.00 1602 1774 1797 1,934 1408 1580 1576 1,802 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -194 -194 -221 -132 ENERGY DEFICIT/ SURPLUS (%) (- / +) -12.1 -10.9 -12.3 -6.8 -7.1 -8.3 2,181 2,141 1,997 1,915 -184 -226 -8.4 -10.6 -8.0 -8.0 -8.0 -8.4 990 184 1,147 157 894 166 1,033 139 -96 -18 -114 -18 -9.7 -9.8 -9.9 -11.5 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Deficit/ Deficit/ RequiSurplus Surplus rment (MW) (- / +) ( % ) (- / +) (MU) 325 262 -63 -19.4 2,451 5.CAPACITY ADDED DURING 11TH PLAN LOCATED IN DAMAN & DIU CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: Energy Availability (MU) 2,252 Energy Deficit/ Surplus (MU) (- / +) -199 Energy Deficit/ Surplus ( % ) (- / +) -8.1 NIL NIL NIL TYPE 6. BENEFIT TO THE UT OF DAMAN & DIU WITH THE CAPACITY ADDITION DURING 11TH PLAN PROJECT NAME INSTALLED CAPACITY BENEFITS STATE CAPACITY ADDITION /SHARES PROJECT (MW) DURING OF STATE LOCATION XITH PLAN (MW) (MW) UNIT WISE COMMISSIONING DATE (CAPACITY MW) CENTRAL-SECTOR SIPAT STPS II U-4,5 T 2X500=500 1000.00 67 4 CHHATTISGAR H 27.05.2007 (500MW) CHHATTISGAR H CHHATTISGAR H *BHILAI JV U-1& 2 T 2X250=500 500.00 100 KORBA ST.-III U-7 T 1X500=500 500.00 2 KAHALGAON U-6,7 T 2X500=1000 1000.00 1 BIHAR SIPAT STPS I U-1,2 T 2X660=1320 1320.00 5 CHHATTISGA RH CENTRAL-SECTOR TOTAL:GRAND TOTAL:- 13.08.2008 (500MW) 20.04.2008 (250MW) 12.07.2009 (250MW) 26.12.2010 (500MW) 16.03.2008 (500MW) 31.07.2009 (500MW) 28.06.2011(660MW) 24.12.2011(660MW) 112 112 7. LIKELY BENEFIT TO THE UT OF DAMAN & DIU DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) SIPAT-I U 3 KAPP U-3 & 4 VINDHYACHAL STPP ST-IV U11,12 MAUDA TPP U1-2 CENTRAL SECTOR SHARE SUB TOTAL (DAMAN &DIU) T N COMM UC CHHATT GUJ C C 1X660=660 2X700=1400 BENEFITS SHARES OF STATE (MW 3 5 T UC/COMM MP C 2X500=1000 4 T UC/COMM MAHA C 2X500=1000 4 16 16 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 19.04.2012(500MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 16.88 15.56 21.58 22.09 23.29 20.06 17.19 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY PEAK DEMAND(MU) DEMAND(MW) 2012-13 2375 380 2013-14 2479 394 2014-15 2587 409 2015-16 2700 425 2016-17 2817 441 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 7201.84 68 DADRA AND NAGAR HAVELI 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) Sector Hydro STATE PRIVATE CENTRAL TOTAL % 0 0 0 0 0.00 Thermal Gas Diesel 0 0 0 0 27.1 0 27.1 0 40.69 0.00 Coal 0 0 31.04 31.04 46.61 2. INSTALLED CAPACITY AS ON 31.10.2012 Sector Hydro Coal STATE 0.00 0.00 PRIVATE 0.00 0.00 CENTRAL 0.00 39.82 TOTAL 0.00 39.82 % 0.00 52.82 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* (FIGURES IN MW) Nuclear Total 0 0 58.14 58.14 87.30 (FIGURES IN MW) Thermal Gas Diesel Total 0.00 0.00 0.00 0.00 0.00 0.00 27.10 0.00 66.92 27.10 0.00 66.92 35.95 0.00 88.78 PEAK DEFICIT/ SURPLUS (MW) (- / +) -27 -36 -61 -35 0 0 8.46 8.46 12.70 Nuclear 0.00 0.00 8.46 8.46 11.22 PEAK DEFICIT/ SURPLUS (%) (- / +) -6.5 -7.8 -12.1 -6.6 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 2923 3388 3574 4,007 2879 3372 3457 3,853 R.E.S. (MNRE) 0 0 0 0 0.00 Total R.E.S. (MNRE) 0.00 0.00 0.00 0.00 0.00 Total 0 0 66.6 66.6 100 0.00 0.00 75.38 75.38 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -44 -16 -117 -154 ENERGY DEFICIT/ SURPLUS (%) (- / +) -1.5 -0.5 -3.3 -3.8 415 460 504 529 388 424 443 494 594 594 0 0.0 4,429 4,424 -5 -0.1 615 629 629 629 605 605 629 629 629 605 -10 0 0 0 0 -1.6 0.0 0.0 0.0 0.0 4,380 2,319 406 2,657 338 4,349 2,151 404 2,487 336 -31 -168 -2 -170 -2 -0.7 -7.2 -0.5 -6.4 -0.6 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Energy Deficit/ Deficit/ RequiAvailDeficit/ Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 630 621 -9 -1.4 5,100 5,621 521 5.CAPACITY ADDED DURING 11TH PLAN LOCATED IN DADRA AND NAGAR HAVELI CENTRAL SECTOR: NIL STATE SECTOR: NIL PRIVATE SECTOR: NIL Energy Deficit/ Surplus ( % ) (- / +) 10.2 6. BENEFIT TO THE UT DADRA AND NAGAR HAVELI WITH THE CAPACITY ADDITION DURING 11TH PLAN PROJECT NAME INSTALLED CAPACITY BENEFITS STATE UNIT WISE TYPE CAPACITY (MW) ADDITION DURING XITH PLAN (MW) /SHARES OF STATE (MW) PROJECT LOCATIO N COMMISSIONING DATE (CAPACITY MW) CHHATTI SGARH CHHATTI SGARH 27.05.2007 (500MW) 13.08.2008 (500MW) 20.04.2008 (250MW) 12.7.2009 (250MW) 16.03.2008 (500MW) CENTRAL-SECTOR SIPAT STPS II U-4,5 T 2X500=500 1000.00 4 *BHILAI JV T 2X250=500 500.00 70 KAHALGAON U-6,7 T 1X500=500 1000.00 2 69 BIHAR 31.07.2009 (500MW) KORBA ST.-III U-7 T 2X500=1000 500 2 CHHATTI SGARH 26.12.2010 (500MW) SIPAT STPS I U-1,2 T 2X660=1320 1320.00 6 CHHATTI SGARH 28.06.2011(660MW) 24.12.2011(660MW) CENTRAL-SECTOR TOTAL:GRAND-TOTAL:- 84 84 7. LIKELY BENEFIT TO THE UT OF DAMAN & DIU DURING 12TH PLAN PROJECTS T Y P E ST AT US SIPAT-I U 3 T COMM KAPP U-3 & 4 N UC VINDHYACHAL STPP ST-IV T UC/COMM U-11,12 MAUDA TPP U1-2 T UC/COMM CENTRAL SECTOR SHARE SUB TOTAL (DADRA &NAGAR HAVELI) STATE PROJECT LOCATION SE CT OR IC (MW) CHHATT GUJ C C 1X660=660 2X700=1400 BENEFITS SHARES OF STATE (MW 3 8 MP C 2X500=1000 6 MAHA C 2X500=1000 6 23 23 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 19.04.2012(500MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 15.10 16.00 19.94 11.22 18.10 15.57 11.21 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY PEAK DEMAND(MU) DEMAND(MW) 2012-13 4977 693 2013-14 5276 749 2014-15 5593 809 2015-16 5930 874 2016-17 6286 944 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 11708.59 70 SOUTHERN REGION 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) Sector Hydro Thermal Nuclear R.E.S. Coal Gas Diesel Total (MNRE) STATE 11338.03 10782.5 555.7 362.52 11700.72 0 1326.69 PRIVATE 0 2460 3775.5 576.8 6812.3 0 10242.61 CENTRAL 0 9640 359.58 0 9999.58 1320 0 TOTAL 11338.03 22882.5 4690.78 939.32 28512.6 1320 11569.3 % 21.50 43.39 8.89 1.78 54.06 2.50 21.94 2.CAPACITY ACHIEVED DURING 11TH PLAN (EXCULDING RES) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR COAL GAS DIESEL TOTAL STATE 564 3170 92.2 0 3262.2 0 PRIVATE 0 1950 1275 0 3225 0 CENTRAL 0 1750 0 0 1750 440 TOTAL 564 6870 1367.2 0 8237.2 440 3. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO COAL STATE 11338.03 11382.50 PRIVATE 0.00 2760.00 CENTRAL 0.00 9640.00 TOTAL 11338.03 23782.50 % 20.95 43.95 4. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 22757 26176 26777 28958 32,178 33,256 37,599 36,934 36,533 36,934 35,127 19201 24350 24368 26245 29,049 31,121 32,188 31,287 29,595 31,287 29,281 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 555.70 362.52 12300.72 4047.50 576.80 7384.30 359.58 0.00 9999.58 4962.78 939.32 29684.60 9.17 1.74 54.86 PEAK DEFICIT/ SURPLUS (MW) (- / +) -3556 -1826 -2409 -2713 -3,129 -2,135 -5,411 -5,647 -6,938 -5,647 -5,846 PEAK DEFICIT/ SURPLUS (%) (- / +) -15.6 -7.0 -9.0 -9.4 -9.7 -6.4 -14.4 -15.3 -19.0 -15.3 -16.6 NUCLEAR 0.00 0.00 1320.00 1320.00 2.44 ENERGY REQUIRMENT (MU) 24365.44 17054.91 11319.58 52739.93 100 TOTAL 3826.2 3225 1750 9241.2 R.E.S. (MNRE) 1328.19 10441.13 0.00 11769.32 21.75 ENERGY AVAILABILITY (MU) 140516 180091 187743 204012 220,576 229,904 260,302 138,767 23,410 161,673 22,906 Total 128095 175197 181820 188794 206,544 217,981 237,480 119,159 19,278 137,999 18,840 TOTAL 24966.94 17825.43 11319.58 54111.95 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -12421 -4894 -5923 -15218 -14,032 -11,923 -22,822 -19,608 -4,132 -23,674 -4,066 *Provisional 5. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) 39,614 Peak Met (MW) 29,178 Peak Deficit/ Surplus (MW) (- / +) -10,436 Peak Deficit/ Surplus ( % ) (- / +) -26.3 Energy Requirment (MU) 277,480 6. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 (AS PER U.N. METHODOLOGY ) 971.55 71 Energy Availability (MU) 223,271 Energy Deficit/ Surplus (MU) (- / +) -54,209 Energy Deficit/ Surplus ( % ) (- / +) -19.5 ENERGY DEFICIT/ SURPLUS (%) (- / +) -8.8 -2.7 -3.2 -7.5 -6.4 -5.2 -8.8 -14.1 -17.7 -14.6 -17.8 ANDHRA PRADESH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 3734.53 0 0 3734.53 23.20 THERMAL GAS DIESEL 0 0 3098.4 36.8 0 0 3098.4 36.8 19.25 0.23 COAL 5092.5 150 2821.38 8063.88 50.10 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 3. 3734.53 0.00 0.00 3734.53 22.38 COAL 5092.50 450.00 2821.38 8363.88 50.13 (FIGURES IN MW) NUCLEAR TOTAL 5092.5 3285.2 2821.38 11199.08 69.58 0 0 275.78 275.78 1.71 R.E.S. (MNRE) 221.83 663.51 0 885.34 5.50 TOTAL 9048.86 3948.71 3097.16 16094.73 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 0.00 3370.40 36.80 0.00 0.00 3370.40 36.80 20.20 0.22 NUCLEAR TOTAL 5092.50 3857.20 2821.38 11771.08 70.55 0.00 0.00 275.78 275.78 1.65 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) R.E.S. (MNRE) 221.83 681.61 0.00 903.44 5.41 TOTAL 9048.86 4538.81 3097.16 16684.83 100.00 ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 8585 10208 10048 11083 12,168 12,630 14,054 13,974 13,974 13,974 13,720 PEAK MET (MW) 6873 8641 9162 9997 10,880 11,829 11,972 11,335 10,438 11,335 10,901 PEAK DEFICIT/ SURPLUS (MW) (- / +) -1712 -1567 -886 -1086 -1,288 -801 -2,082 -2,639 -3,536 -2,639 -2,819 PEAK DEFICIT/ SURPLUS (%) (- / +) -19.9 -15.4 -8.8 -9.8 -10.6 -6.3 -14.8 -18.9 -25.3 -18.9 -20.5 48394 60964 64139 71511 78,996 78,970 91,730 48,485 8,373 57,089 8,604 44302 58280 61511 66673 73,765 76,450 85,149 40,574 6,531 47,550 6,976 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -4092 -2684 -2628 -4838 -5,231 -2,520 -6,581 -7,911 -1,842 -9,539 -1,628 ENERGY DEFICIT/ SURPLUS (%) (- / +) -8.5 -4.4 -4.1 -6.8 -6.6 -3.2 -7.2 -16.3 -22.0 -16.7 -18.9 *Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) 15,127 5. Peak Met (MW) 10,697 Peak Deficit/ Surplus (MW) (- / +) -4,430 Peak Deficit/ Surplus ( % ) (- / +) -29.3 Energy Requirment (MU) 99,734 Energy Availability (MU) 76,979 Energy Deficit/ Surplus (MU) (- / +) -22,755 CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF ANDHRA PRADESH: CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: (MW) 1000 2154 1425 72 Energy Deficit/ Surplus ( % ) (- / +) -22.8 6.BENEFIT TO THE STATE OF ANDHRA PRADESH WITH THE CAPACITY ADDITION DURING 11TH PLAN INSTALLED CAPACITY (MW) TYPE PROJECT NAME CAPACITY ADDITION DURING XITH PLAN (MW) BENEFITS/ SHARES OF STATE (MW) STATE UNIT WISE PROJECT OCATION COMMISSIONING DATE (CAPACITY MW) CENTRAL-SECTOR SIMHADRI EXT U-3,4 T 2X500=1000 1000.00 384 AP KAIGA U-3 & 4 N 2X220=440 440.00 123 KARNATA KA 31.03.2011 (500MW) 30.03.2012 (500MW) 11.04.2007 (220MW) 19.01.2011 (220MW) VALLUR (ENNORE) JV TPP PH-I U-1,2 T 500 60 TN 28.03.2012 (500MW) CENTRAL-SECTOR TOTAL:- 567 8.10.2009 (500MW) STATE-SECTOR VIJAYWADA ST IV U-1 T KOTHAGUDEM ST-VI JURALA PRIYA U-1 TO6 T H RAYALSEEMA ST III U-4 RAYALSEEMA ST III U-5 KAKTIYA TPP U-1 1000.00 1X500=500 =500.00 1X500=500.00 6X39=234 500.00 500.00 A.P 500.00 234.00 500.00 234.00 A.P T T T 1X210=210 210.00 1X200=210 210.00 1X500=500 500.00 STATE – SECTOR TOTAL:- 210 210 500 2154 A.P A.P A.P KONASEEMA CCGT G 445 A.P GAUTAMI CCGT KONDAPALLI ST. II KONDAPALLI ST. II SIMHAPURI TPP U-1 G G T T GT 1X280=280 445.00 ST 1X165=165 1X464=464.00 464.00 1X233=233.00 233..00 1X133=133.00 133.00 2X150=300 150 PRIVATE-SECTOR TOTAL :GRAND TOTAL 464 233 133 150 1425 4146 A.P A.P A.P 26.06.2011(500MW) 28.03.2008, (39MW) 31.08.2008,( 39MW) 27.06.2009 (39MW) 28.08.2010 (39MW) 09.11.2010 (39MW) 09.06.2011(39MW) 20.11.2007 (210MW) 31.01.2011 (210MW) 27.05.2010 (500MW) PRIVATE-SECTOR A.P 7. LIKELY BENEFIT TO THE STATE OF ANDHRA PRADESH DURING 12TH PLAN PROJECTS T ST STATE SE IC (MW) Y AT PROJECT CT P US LOCATION OR E VALLUR TPP U2, 3 T PFBR(KALAPAKKAM) * N TUTICORIN TPP JV U1,2 T TOTAL CENTRAL SECTOR SHARE LOWER JURALA HEP H PULICHINTALA HEP H NAGARJUNA SAGAR H SRI DAMODARAM SANJEEVAIAH TPP T (KRISHNAPATTAM TPP) U1,2 RAYAL SEEMA TPP U6 T 3.05.2009, (280MW) 30 .06.2010 (165MW) 3.5.2009 (464MW) 5.12.2009 (233MW) 19.07.2010 (133MW) 24.03.2012 (150MW) BENEFITS SHARES OF STATE (MW) 119 92 255 466 240 120 50 UC UC UC TN TN TN C C C 2X500=1000 1X500=500 2X500=1000 UC UC UC AP AP AP S S S 6X40=240 4X30=120 2X25=50 UC AP S 2X800=1600 1600 UC AP S 1X600=600 600 TOTAL SECTOR SECTOR 2610 73 UNIT WISE COMMISSIONING DATE (CAPACITY MW) NAGARJUNA CONSTRUCTION COMPANY LTD PH-I U-1,2 PAINAMPURAM TPP U1,2 BHAVANAPADDU TPP U-1,2 THAMMINAPATNAM TPP I U 12 THAMMINAPATNAM TPP U 3-4 SIMHAPURI TPP PH-I, U 2 HINDUJA TPP,U-2 T UC AP P 1320 T UC AP P 2X660=1320 2X660=1320 T UC/COMM AP P 2X150=300 T T T UC COMM UC AP AP AP P P P 2X350=700 1X150=150 2X525=1050 1320 1320 300 09.09.2012(150MW) 700 150 1050 02.07.2012(150MW) TOTAL PRIVATE SECTOR 6160 GRAND TOTAL (ANDHRA PRADESH) 9236 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 22222222 T&D LOSSES % 27.73 23.96 20.06 18.65 22.41 19.56 18.37 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY PEAK DEMAND(MU) DEMAND(MW) 2012-13 93189 15553 2013-14 101231 17044 2014-15 109968 18681 2015-16 119458 20476 2016-17 129767 22445 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 1013.74 74 KARNATAKA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 3599.8 0 0 3599.8 26.88 COAL 2720 2060 1341.23 6121.23 45.70 THERMAL GAS DIESEL 0 127.92 0 106.5 0 0 0 234.42 0.00 1.75 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 3599.80 0.00 0.00 3599.80 26.68 COAL 2720.00 2060.00 1341.23 6121.23 45.37 (FIGURES IN MW) NUCLEAR TOTAL 2847.92 2166.5 1341.23 6355.65 47.45 0 0 254.86 254.86 1.90 R.E.S. (MNRE) 823.65 2359.58 0 3183.23 23.77 TOTAL 7271.37 4526.08 1596.09 13393.54 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 127.92 0.00 106.50 0.00 0.00 0.00 234.42 0.00 1.74 NUCLEAR TOTAL 2847.92 2166.50 1341.23 6355.65 47.11 0.00 0.00 254.86 254.86 1.89 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) R.E.S. (MNRE) 825.15 2455.17 0.00 3280.32 24.32 TOTAL 7272.87 4621.67 1596.09 13490.63 100.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* PEAK MET (MW) 5338 6253 4428 5811 PEAK DEFICIT/ SURPLUS (MW) (- / +) -910 -442 6583 6892 7,942 8,430 10,545 10,124 9,404 10,124 8,957 5567 6548 6,897 7,815 8,549 8,264 7,863 8,264 7,601 -1016 -344 -1,045 -615 -1,996 -1,860 -1,541 -1,860 -1,356 PEAK DEFICIT/ SURPLUS (%) (- / +) -17.0 -7.1 -15.4 -5.0 -13.2 -7.3 -18.9 -18.4 -16.4 -18.4 -15.1 19716 40797 16684 39948 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -3032 -849 40320 43168 45,550 50,474 60,830 32,406 5,153 37,699 5,293 39230 40578 42,041 46,624 54,023 27,997 4,305 32,607 4,610 -1090 -2590 -3,509 -3,850 -6,807 -4,409 -848 -5,092 -683 *Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Energy Deficit/ Deficit/ RequiAvailDeficit/ Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 8,838 7,535 -1,303 -14.7 62,255 61,422 -833 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF KARNATAKA : CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: (MW) 440 980 1800 75 Energy Deficit/ Surplus ( % ) (- / +) -1.3 ENERGY DEFICIT/ SURPLUS (%) (- / +) -15.4 -2.1 -2.7 -6.0 -7.7 -7.6 -11.2 -13.6 -16.5 -13.5 -12.9 6 . BENEFIT TO THE STATE OF KARNATAKA WITH THE CAPACITY ADDITION DURING 11TH PLAN INSTALLED CAPACITY (MW) TYPE PROJECT NAME CENTRAL-SECTOR SIMHADRI ST EXT T U-3,4 NEYVELI II LIG. U1 T KAIGA U3 & 4 N 2X500=1000 1X250=250 2X220=440.00 VALLUR T 1000.00 (ENNORE) JV TPP PH-I U-1,2 CENTRAL-SECTOR TOTAL:STATE-SECTOR BELLARY U-1 & 2 T 2X500=1000 VARAHI EXT. H 2X115=230.00 RAICHUR U-8 T 1X250=250.00 STATE – SECTOR TOTAL:PRIVATE-SECTOR UDUPI (LANCO) T 2X600=1200 U-1,2 TORANGALLU U-1, T 2X300=600 2 PRIVATE-SECTOR TOTAL:GRAND-TOTAL:- CAPACITY ADDITION DURING XITH PLAN (MW) BENEFITS / SHARES OF STATE (MW) STATE PROJECT LOCATION UNIT WISE 1000.00 176 AP 250.00 440.00 55 119 TN KARNATAKA 500 37 31.03.2011 (500MW) 30.03.2012 (500MW) 04.02.2012 (250MW) 11.04.2007 (220MW) 19.01.2011 (220MW) 28.03.2012 (500MW) TN COMMISSIONING DATE (CAPACITY MW) 387 1000.00 1000.00 KARNATAKA 230.00 230 KARNATAKA 250.00 250 1480 KARNATAKA 1200 1200 KARNATAKA 600.00 600 KARNATAKA 03.12.2007 (500MW) 23.03.2012 (500MW) 11.01.2009 (115MW) 09.02.2009 (115MW 26.06.2010 (250MW) 23.07.2010(600 MW) 16.04.2011(600 MW) 23.04.2009 (300MW) 24.08.2009 300MW) 1800 3667 7. LIKELY BENEFIT TO THE STATE OF KARNATAKA DURING 12TH PLAN PROJECTS TUTICORIN TPP JV U1,2 VALLUR TPP U 2 3 NEYVELI - II LIG U2 KUDANKULAM U 1,2 PFBR(KALAPAKKAM) * TOTAL CENTRAL SECTOR GRAND TOTAL (KARNATAKA) T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) T T T N N UC UC UC UC UC TN TN TN TN TN C C C C C 2X500=1000 2X500=1000 1X250=250 2X1000=2000 1X500=500 BENEFITS SHARES OF STATE (MW 158 74 55 442 56 785 785 UNIT WISE COMMISSIONING DATE (CAPACITY MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 22222222 T&D LOSSES % 23.29 26.08 29.77 25.91 18.87 17.03 18.76 76 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY PEAK DEMAND(MU) DEMAND(MW) 2012-13 58513 9742 2013-14 63001 10473 2014-15 67833 11258 2015-16 73036 12102 2016-17 78637 13010 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 873.05 77 KERALA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 1881.5 0 0 1881.5 49.15 COAL 0 0 897.92 897.92 23.46 THERMAL GAS DIESEL 0 234.6 174 21.84 359.58 0 533.58 256.44 13.94 6.70 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 1881.50 0.00 0.00 1881.50 1881.50 COAL 0.00 0.00 897.92 897.92 0.00 (FIGURES IN MW) NUCLEAR TOTAL 234.6 195.84 1257.5 1687.94 44.10 0 0 95.6 95.6 2.50 R.E.S. (MNRE) 162.66 0.03 0 162.69 4.25 TOTAL 2278.76 195.87 1353.1 3827.73 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 234.60 174.00 21.84 359.58 0.00 533.58 256.44 0.00 234.60 NUCLEAR TOTAL 234.60 195.84 1257.50 1687.94 234.60 0.00 0.00 95.60 95.60 0.00 R.E.S. (MNRE) 162.66 0.03 0.00 162.69 162.66 TOTAL 2278.76 195.87 1353.10 3827.73 2278.76 3.ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 2633 2787 2918 3188 3,109 3,295 3.516 3,578 3,470 3,578 3,414 PEAK MET (MW) 2189 2728 2730 2751 2,982 3,103 3,337 3,262 3,147 3,262 3,024 PEAK DEFICIT/ SURPLUS (MW) (- / +) -444 -59 -188 -437 -127 -192 -179 -316 -323 -316 -390 PEAK DEFICIT/ SURPLUS (%) (- / +) -16.9 -2.1 -6.4 -13.7 -4.1 -5.8 -5.1 -8.8 -9.3 -8.8 -11.4 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 13334 15023 15663 17645 17,619 18,023 19,890 10,548 1,699 12,328 1,780 12349 14716 15284 15562 17,196 17,767 19,467 10,220 1,649 11,907 1,687 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -985 -307 -379 -2083 -423 -256 -423 -328 -50 -421 -93 ENERGY DEFICIT/ SURPLUS (%) (- / +) -7.4 -2.0 -2.4 -11.8 -2.4 -1.4 -2.1 -3.1 -2.9 -3.4 -5.2 *Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) 3,680 Peak Met (MW) 2,998 Peak Deficit/ Surplus (MW) (- / +) -682 Peak Deficit/ Surplus ( % ) (- / +) -18.5 Energy Requirment (MU) 19,865 Energy Availability (MU) 16,876 Energy Deficit/ Surplus (MU) (- / +) -2,989 5.CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF KERALA: CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: (MW) NIL 100 NIL 78 Energy Deficit/ Surplus ( % ) (- / +) -15.1 TYPE 6. BENEFIT TO THE STATE OF KERALA WITH PROJECT NAME INSTALLED CAPACITY (MW) CENTRAL-SECTOR SIMHADRI ST EXT. U-3,4 T NEYVELI II LIG KAIGA U-3 & 4 T N VALLUR (ENNORE) JV TPP PH-I U-1,2 T STATE-SECTOR KUTIYADI ADDITIONAL EXTN.H.E.-U-1 & 2 H THE CAPACITY ADDITION DURING 11TH PLAN CAPACITY BENEFITS STATE UNIT WISE COMMISSIONING ADDITION /SHARES PROJECT DATE DURING OF STATE LOCATION (CAPACITY MW) XITH PLAN (MW) (MW) 2X500 =1000.00 1X500=500 2X220 =440.00 1000.00 1000.00 80 AP 250 440.00 35 35 500 17 TN KARNATAK A TN CENTRAL-SECTOR TOTAL:- 167 2X50=100 100.00 100 STATE – SECTOR TOTAL:GRAND-TOTAL:- 100 267 KERALA 31.03.2011(500MW) 30.03.2012 (500MW) 04.02.2012 (250 MW) 11.04.2007 (220MW) 19.01.2011 (220MW) 28.03.2012 (500MW) 25.05.2010 (50MW) 23.09.2010 (50MW) 7.LIKELY BENEFIT TO THE STATE OF KERALA DURING 12TH PLAN PROJECTS T Y P E ST AT US TUTICORIN TPP JV U1,2 T UC VALLUR TPP U2 3 T UC NEYVELI - II LIG U2 T UC KUDANKULAM U 1,2 N UC PFBR(KALAPAKKAM) * N UC SUB TOTAL CENTRAL SECTOR SHARE THOTTIAR HEP H UC PALLIVASAL HEP H UC SUB TOTAL STATE SECTOR GRAND TOTAL (KERALA) STATE PROJECT LOCATION SE CT OR IC (MW) TN TN TN TN TN C C C C C 2X500=1000 2X500=1000 1X250=250 2X1000=2000 1X500=500 KER KER S S 1X30+1X10=40 2X30=60 BENEFITS SHARES OF STATE (MW 73 33 35 266 25 432 40 60 100 532 UNIT WISE COMMISSIONING DATE (CAPACITY MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 22222222 T&D LOSSES % 21.63 22.48 23.50 19.11 17.81 13.16 19.59 79 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY PEAK DEMAND(MU) DEMAND(MW) 2012-13 20516 3701 2013-14 21889 3922 2014-15 23354 4157 2015-16 24917 4405 2016-17 26584 4669 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 536.78 80 TAMIL NADU 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL 2122.2 0 0 2122.2 12.06 % COAL 2970 250 2959.37 6179.37 35.11 THERMAL GAS DIESEL 523.2 0 503.1 411.66 0 0 1026.3 411.66 5.83 2.34 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL 2122.20 0.00 0.00 2122.20 11.61 % COAL 3570.00 250.00 2959.37 6779.37 37.07 (FIGURES IN MW) NUCLEAR TOTAL 3493.2 1164.76 2959.37 7617.33 43.28 R.E.S. (MNRE) 118.55 7219.46 0 7338.01 41.69 0 0 524 524 2.98 TOTAL 5733.95 8384.22 3483.37 17601.54 100 (FIGURES IN MW) THERMAL GAS DIESEL 523.20 0.00 503.10 411.66 0.00 0.00 1026.30 411.66 5.61 2.25 NUCLEAR TOTAL 4093.20 1164.76 2959.37 8217.33 44.94 R.E.S. (MNRE) 118.55 7304.29 0.00 7422.84 40.59 0.00 0.00 524.00 524.00 2.87 TOTAL 6333.95 8469.05 3483.37 18286.37 100.00 3.ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 7158 8860 10334 9799 11,125 11,728 12,813 12,606 12,606 12,606 12,544 PEAK MET (MW) 6218 8624 8690 9211 9,813 10,436 10,566 11,053 10,348 11,053 10,269 PEAK DEFICIT/ SURPLUS (MW) (- / +) -940 -236 -1644 -588 -1,312 -1,292 -2,247 -1,553 -2,258 -1,553 -2,275 PEAK DEFICIT/ SURPLUS (%) (- / +) -13.1 -2.7 -15.9 -6.0 -11.8 -11.0 -17.5 -12.3 -17.9 -12.3 -18.1 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 46232 61499 65780 69668 76,293 80,314 85,685 46,120 7,990 53,164 7,044 42951 60445 63954 64208 71,568 75,101 76,705 39,193 6,606 44,578 5,385 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -3281 -1054 -1826 -5460 -4,725 -5,213 -8,980 -6,927 -1,384 -8,586 -1,659 *Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) 13,427 Peak Met (MW) 9,299 Peak Deficit/ Surplus (MW) (- / +) -4,128 Peak Deficit/ Surplus ( % ) (- / +) -30.7 Energy Requirment (MU) 92,637 Energy Availability (MU) 65,260 Energy Deficit/ Surplus (MU) (- / +) -27,377 5.CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF TAMIL NADU : CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: (MW) 750 92 NIL 81 Energy Deficit/ Surplus ( % ) (- / +) -29.6 ENERGY DEFICIT/ SURPLUS (%) (- / +) -7.1 -1.7 -2.8 -7.8 -6.2 -6.5 -10.5 -15.0 -17.3 -16.2 -23.6 6. BENEFIT TO THE STATE OF TAMILNADU WITH THE CAPACITY ADDITION DURING 11TH PLAN INSTALLED CAPACITY (MW) CAPACITY ADDITION DURING XITH PLAN (MW) BENEFITS/ SHARES OF STATE (MW) STATE PROJECT LOCATION UNIT WISE 2X250=500 2X500=1000 250 1000.00 115 198 TN AP 500 347 TN 04.02.2012 (250 MW) 31.03.2011(500MW) 30.03.2012 (500MW) 28.03.2012 (500MW) 2X220 440.00 =440.00 CENTRAL-SECTOR TOTAL:- 91 TYPE PROJECT NAME CENTRAL-SECTOR NEYVELI II LIG SIMHADRI ST EXT. U-3,4 VALLUR (ENNORE) JV TPP PH-I U-1,2 KAIGA U-3 & 4 STATE-SECTOR VALUTHUR PH-II GT,ST 7. T T T 1000.00 N T GT 1X59.8 92.20 ST 1X32.4 STATE - SECTOR TOTAL:GRAND-TOTAL:- COMMISSIONING DATE (CAPACITY MW) KARNATAKA 11.04.2007 (220MW) 19.01.2011 (220MW) TN 6.02.2009 ( 59.8 MW) 17.02.2009 (32.4MW) 751 92 92 843 LIKELY BENEFIT TO THE STATE OF TAMILNADU DURING 12TH PLAN PROJECTS T Y P E TUTICORIN TPP JV U1,2 T VALLUR TPP U2, 3 T NEYVELI - II LIG U2 T KUDANKULAM U 1,2 N PFBR(KALAPAKKAM) * N SUB TOTAL CENTRAL SECTOR SHARE BHAWANI BARRAGE II & III H METTUR EXT U1 T NORTH CHENNAI EXT U1,2 T SUB TOTAL STATE SECTOR IND BARATH TPP U1 T ST AT US STATE PROJECT LOCATION SE CT OR UC UC UC UC UC TN TN TN TN TN C C C C C 2X500=1000 2X500=1000 1X250=250 2X1000=2000 1X500=500 UC UC UC TN TN TN S S S 4X15=60 1X600=600 2X600=1200 UC TN P 2X660=660 SUB TOTAL PRIVATE SECTOR GRAND TOTAL (TN) IC (MW) BENEFITS SHARES OF STATE (MW 387 694 115 925 250 2371 60 600 1200 1860 660 660 4891 UNIT WISE COMMISSIONING DATE (CAPACITY MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 11111111 T&D LOSSES % 17.16 19.28 18.66 19.54 18.71 18.14 18.41 82 9.PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 91625 97865 104529 111648 119251 PEAK DEMAND(MW) 14174 15736 17497 19489 20816 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 1210.81 83 PUDUCHERRY 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % THERMAL GAS DIESEL 32.5 0 0 0 0 0 32.5 0 11.62 0.00 COAL 0 0 227.85 227.85 81.47 0 0 0 0 0.00 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR 3. THERMAL GAS DIESEL 32.50 0.00 0.00 0.00 0.00 0.00 32.50 0.00 11.62 0.00 COAL 0.00 0.00 227.85 227.85 81.47 0.00 0.00 0.00 0.00 0.00 NUCLEAR TOTAL 32.5 0 227.85 260.35 93.10 R.E.S. (MNRE) 0 0.03 0 0.03 0.01 0 0 19.28 19.28 6.89 TOTAL 32.5 0.03 247.13 279.66 100 (FIGURES IN MW) HYDRO STATE PRIVATE CENTRAL TOTAL % (FIGURES IN MW) NUCLEAR TOTAL 32.50 0.00 227.85 260.35 93.10 0.00 0.00 19.28 19.28 6.89 R.E.S. (MNRE) 0.00 0.03 0.00 0.03 0.01 TOTAL ENERGY DEFICIT/ SURPLUS (MU) (- / +) 0 0 -247 -144 -84 -31 -33 -8 -36 -3 ENERGY DEFICIT/ SURPLUS (%) (- / +) 0.0 0.0 -12.2 -6.8 -4.0 -1.4 -2.7 -4.1 -2.6 -1.6 32.50 0.03 247.13 279.66 100.00 ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* PEAK MET (MW) 265 276 304 327 319 335 348 340 348 333 265 276 275 294 302 320 320 308 320 315 PEAK DEFICIT/ SURPLUS (MW) (- / +) 0 0 -29 -33 -17 -15 -28 -32 -28 -18 PEAK DEFICIT/ SURPLUS (%) (- / +) 0.0 0.0 -9.5 -10.1 -5.3 -4.5 -8.0 -9.4 -8.0 -5.4 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 1808 1841 2020 2,119 2,123 2,167 1,208 195 1,393 185 1808 1841 1773 1,975 2,039 2,136 1,175 187 1,357 182 *Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) 468 374 Peak Deficit/ Surplus (MW) (- / +) -94 Peak Deficit/ Surplus ( % ) (- / +) -20.1 Energy Requirment (MU) 2,989 Energy Availability (MU) 2,734 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE UT OF PUDUCHERRY: CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: NIL NIL NIL 84 Energy Deficit/ Surplus (MU) (- / +) -255 Energy Deficit/ Surplus ( % ) (- / +) -8.5 TYPE 6.BENEFIT TO THE UT OF PUDUCHERRY WITH THE CAPACITY ADDITION DURING 11TH PLAN PROJECT NAME INSTALLED CAPACITY BENEFITS STATE UNIT WISE COMMISSIONING DATE CAPACITY ADDITION / SHARES PROJECT (CAPACITY MW) (MW) DURING OF STATE LOCATION XITH PLAN (MW) (MW) CENTRAL-SECTOR SIMHADRI ST EXT. T 2X500=1000.00 1000.00 10 AP 31.03.2011(500MW) U-3,4 30.03.2012 (500MW) KAIGA U-3 & 4 N 2X220=440.00 440.00 6 KARNATAK 11.04.2007 (220MW) A 19.01.2011 (220MW) NEYVELI II LIG T 1X500=500 250 8 TN 04.02.2012 (250 MW) VALLUR (ENNORE) T 2X500=1000 500 2 TN 28.03.2012 (500MW) JV TPP PH-I U-1,2 CENTRAL-SECTOR TOTAL:26 GRAND-TOTAL:26 7.LIKELY BENEFIT TO THE UT OF PUDUCHERRY DURING 12TH PLAN PROJECTS T ST STATE SE IC (MW) Y AT PROJECT CT P US LOCATION OR E TUTICORIN TPP JV U1,2 T NEYVELI - II LIG U2 T VALLUR TPP U2, 3 T KUDANKULAM U 1,2 N PFBR(KALAPAKKAM) * N SUB TOTAL CENTRAL SECTOR SHARE GRAND TOTAL (PUDDUCHERRY) UC UC UC UC UC TN TN TN TN TN C C C C C 2X500=1000 1X250=250 2X500=1000 2X1000=2000 1X500=500 BENEFITS SHARES OF STATE (MW 10 8 4 67 3 92 92 UNIT WISE COMMISSIONING DATE (CAPACITY MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 1111111 1 T&D LOSSES % 1.60 18.15 18.48 18.76 5.89 12.24 11.84 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 3024 3155 3293 3436 3586 PEAK DEMAND(MW) 533 555 579 604 630 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 1864.50 85 86 EASTERN REGION 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR COAL GAS DIESEL TOTAL STATE 3168.92 7070 100 17.06 7187.06 0 PRIVATE 0 4551.38 0 0.14 4551.52 0 CENTRAL 713.2 10176.5 90 0 10266.5 0 TOTAL 3882.12 21797.88 190 17.2 22005.08 0 % 14.77 82.93 0.72 0.07 83.71 0.00 2. CAPACITY ACHIEVED DURING 11TH PLAN (EXCULDING RES) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR COAL GAS DIESEL TOTAL STATE 1050 182 0 0 1820 0 0 PRIVATE 0 310 0 0 3100 0 0 CENTRAL 510 475 0 0 4750 0 0 TOTAL 1560 9670 0 0 9670 0 3. INSTALLED CAPACITY AS ON 31.10.2012 (FIGURES IN MW) SECTOR HYDRO THERMAL COAL GAS DIESEL TOTAL STATE 3168.92 7010.00 100.00 17.06 7127.06 PRIVATE 0.00 5151.38 0.00 0.14 5151.52 CENTRAL 713.20 10176.50 90.00 0.00 10266.50 TOTAL 3882.12 22337.88 190.00 17.20 22545.08 % 14.47 83.23 0.71 0.06 84.00 4.ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAKMET DEMAND (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 7940 10491 12031 12901 13,220 13,767 14,707 16,655 15,263 16,655 14,992 7648 10058 10699 11789 12,384 13,085 13,999 15,415 14,288 15,415 14,155 PEAK DEFICIT/ SURPLUS (MW) (- / +) -292 -433 -1332 -1112 -836 -682 -708 -1,240 -975 -1,240 -837 PEAK DEFICIT/ SURPLUS (%) (- / +) -3.7 -4.1 -11.1 -8.6 -6.3 -5.0 -4.8 -7.4 -6.4 -7.4 -5.6 TOTAL 10684.14 4622.07 10979.7 26285.91 100 TOTAL 2870 3100 5260 11230 NUCLEAR ENERGY REQUIRMENT (MU) R.E.S. (MNRE) 328.16 70.55 0 398.71 1.52 0.00 0.00 0.00 0.00 0.00 R.E.S. (MNRE) 328.16 82.55 0.00 410.71 1.53 ENERGY AVAILABILITY (MU) 50687 68198 75831 82041 87,927 94,558 99,344 56,068 9,386 65,552 9,484 50197 66183 72099 78444 84,017 90,526 94,657 53,276 9,033 62,408 9,132 TOTAL 10624.14 5234.07 10979.70 26837.91 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -490 -2015 -3732 -3597 -3,910 -4,032 -4,687 -2,792 -353 -3,144 -352 * Provisional 5. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) 17,922 Peak Met (MW) 17,966 Peak Deficit/ Surplus (MW) (- / +) 44 Peak Deficit/ Surplus ( % ) (- / +) 0.3 Energy Requirment (MU) 111,159 6. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY 87 Energy Availability (MU) 105,831 Energy Deficit/ Surplus (MU) (- / +) -5,328 Energy Deficit/ Surplus ( % ) (- / +) -4.8 ENERGY DEFICIT/ SURPLUS (%) (- / +) -1.0 -3.0 -4.9 -4.4 -4.4 -4.3 -4.7 -5.0 -3.8 -4.8 -3.7 YEAR PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 446.14 2009-10 BIHAR 1. INSTALLED CAPACITY (AT THE END OF 11 TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 0 0 129.43 129.43 7.06 THERMAL GAS DIESEL 0 0 0 0 0 0 0 0 0.00 0.00 COAL 430 0 1194.7 1624.7 88.59 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 0.00 0.00 129.43 129.43 7.06 COAL 430.00 0.00 1194.70 1624.70 88.59 (FIGURES IN MW) NUCLEAR TOTAL 430 0 1194.7 1624.7 88.59 0 0 0 0 0.00 R.E.S. (MNRE) 64.3 15.5 0 79.8 4.35 TOTAL 494.3 15.5 1324.13 1833.93 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NUCLEAR TOTAL 430.00 0.00 1194.70 1624.70 88.59 0.00 0.00 0.00 0.00 0.00 R.E.S. (MNRE) 64.30 15.50 0.00 79.80 4.35 TOTAL 494.30 15.50 1324.13 1833.93 100.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 1409 1399 1882 1842 2,249 2,140 2,031 2,295 2,233 2,295 2,183 PEAK MET (MW) 1288 1162 1243 1333 1,509 1,659 1,738 1,784 1,698 1,784 1,684 PEAK DEFICIT/ SURPLUS (MW) (- / +) -121 -237 -639 -509 -740 -481 -293 -511 -535 -511 -499 PEAK DEFICIT/ SURPLUS (%) (- / +) -8.6 -16.9 -34.0 -27.6 -32.9 -22.5 -14.4 -22.3 -24.0 -22.3 -22.9 ENERGY REQUIRMENT (MU) 9370 8425 9155 10527 11,587 12,384 14,311 7,443 1,260 8,474 1,258 ENERGY AVAILABILITY (MU) 8992 7741 7933 8801 9,914 10,772 11,260 6,521 1,033 7,552 1,031 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -378 -684 -1222 -1726 -1,673 -1,612 -3,051 -922 -227 -922 -227 ENERGY DEFICIT/ SURPLUS (%) (- / +) -4.0 -8.1 -13.3 -16.4 -14.4 -13.0 -21.3 -12.4 -18.0 -10.9 -18.0 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) 2,500 Peak Met (MW) 1,726 Peak Deficit/ Surplus (MW) (- / +) -774 Peak Deficit/ Surplus ( % ) (- / +) -31.0 Energy Requirment (MU) 14,550 Energy Availability (MU) 11,609 5.CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF BIHAR: (MW) CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: 1000 NIL NIL 88 Energy Deficit/ Surplus (MU) (- / +) -2,941 Energy Deficit/ Surplus ( % ) (- / +) -20.2 6. BENEFIT TO THE STATE OF BIHAR WITH THE CAPACITY ADDITION DURING 11TH PLAN INSTALLED CAPACITY (MW) TYPE PROJECT NAME CENTRALSECTOR TEESTA ST.V U-1TO 3 H CAPACITY ADDITION DURING XITH PLAN (MW) 3X170 =510.00 KAHALGAON T 2X500 U-6,7 =1000.00 FARAKKA ST- T 1X500 III U-6 =500.00 CENTRAL-SECTOR TOTAL:GRAND-TOTAL:- BENEFITS / SHARES OF STATE (MW) STATE PROJECT LOCATION 510.00 55 SIKKIM 1000.00 126 BIHAR 500.00 51 WB UNIT WISE COMMISSIONING DATE (CAPACITY) 28.03.2008, (170MW) 06.02.2008, (170MW) 20.03.2008 (170MW) 16.03.2008 (500MW) 31.07.2009 (500MW) 23.03.2011 (500MW) 232 232 7. LIKELY BENEFIT TO THE STATE OF BIHAR DURING 12TH PLAN PROJECTS MUZAFFARPUR EXT.(KANTI TPP) U1,2 BARH STPP-I U1-3 BARH STPP-II U1,2 TOTAL CENTRAL SECTOR GRAND TOTAL (BIHAR) T Y P E ST AT US STATE PROJECT LOCATION T UC BIHAR T T UC UC BIHAR BIHAR SE CT OR C C C IC (MW) BENEFITS SHARES OF STATE (MW 2X195=390 264 3X660=1980 3X660=1320 523 660 1447 1447 UNIT WISE COMMISSIONING DATE/ (LIKELY DATE OF COMMISSIONING) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 36.66 38.88 43.96 50.67 48.79 46.37 43.58 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY PEAK DEMAND(MU) DEMAND(MW) 2012-13 16529 2843 2013-14 19096 3277 2014-15 22062 3777 2015-16 25489 4354 2016-17 29447 5018 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY 89 YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 117.48 90 D.V.C. 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 0 0 0 0 0 0 0 PRIVATE 0 0 0 0 0 0 0 CENTRAL 193.26 5005.6 90 0 5095.6 0 0 TOTAL 193.26 5005.6 90 0 5095.6 0 0 % 3.65 94.64 1.70 0.00 96.35 0.00 0.00 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 0.00 0.00 193.26 193.26 3.65 TOTAL 0 0 5288.86 5288.86 100 (FIGURES IN MW) THERMAL NUCLEAR COAL GAS DIESEL TOTAL 0.00 0.00 5005.60 5005.60 94.64 0.00 0.00 90.00 90.00 1.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5095.60 5095.60 96.35 PEAK DEFICIT/ SURPLUS (MW) (- / +) -87 -48 -49 -39 -28 -13 -244 -104 -99 -104 -82 PEAK DEFICIT/ SURPLUS (%) (- / +) -6.7 -2.9 -2.6 -1.8 -1.4 -0.6 -10.5 -4.0 -4.2 -4.0 -3.5 R.E.S. TOTAL (MNRE) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5288.86 5288.86 100.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-2010 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 1296 1650 1852 2217 1,938 2,059 2,318 2,573 2,332 2,573 2,328 PEAK MET (MW) 1209 1602 1803 2178 1,910 2,046 2,074 2,469 2,233 2,469 2,246 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 8319 11542 13387 14002 15,199 16,590 16,648 8,613 1,489 10,135 1,601 8312 11308 13039 13699 14,577 15,071 16,009 8,135 1,411 9,657 1,522 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -7 -234 -348 -303 -622 -1,519 -639 -478 -78 -478 -79 ENERGY DEFICIT/ SURPLUS (%) (- / +) -0.1 -2.0 -2.6 -2.2 -4.1 -9.2 -3.8 -5.5 -5.2 -4.7 -4.9 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Deficit/ Deficit/ Surplus Surplus (MW) (- / +) ( % ) (- / +) 2,625 3,040 415 15.8 5. CAPACITY ADDED DURING 11TH PLAN BY DVC: (MW) CENTRAL SECTOR: 2750 STATE SECTOR: NIL PRIVATE SECTOR: 1050 Energy Requirment (MU) 18,427 Energy Availability (MU) 18,959 Energy Deficit/ Surplus (MU) (- / +) 532 Energy Deficit/ Surplus ( % ) (- / +) 2.9 6. BENEFIT TO D.V.C WITH THE CAPACITY ADDITION WITH DURING 11TH PLAN INSTALLED CAPACITY (MW) TYPE PROJECT NAME CENTRAL-SECTOR MEJIA U-6 T 1X250 CAPACITY ADDITION DURING XITH PLAN (MW) 250.00 91 BENEFITS /SHARES OF STATE (MW) 250 STATE PROJECT LOCATION UNIT WISE COMMISSIONING DATE (CAPACITY) WB 01.10.2007 (250MW) CHANDRAPURA U-7,8 T DURGAPUR (STEEL) U1,2 TEESTA ST.V U-1 TO 3 T FARAKKA ST-III U-6 T MEJIA PH II,U-7 & 8 T PRIVATE SECTOR MAITHAN RBC JV U-1,2 =250.00 2X250 =500.00 2X500= 1000.00 3X170 =510.00 H T 500.00 500 1000 500 510.00 44 1X500 500.00 =500.00 2X500 500.00 =1000.00 CENTRAL SECTOR TOTAL : 2X525 1050.00 =1050.00 PRIVATE-SECTOR TOTAL:GRAND-TOTAL:- JHARKHA ND WB 32 WB 4.11.2009 (250MW) 31.03.2010 (250MW) 29.7.2011 (500MW) 23.3.2012 (500MW) 28.03.2008 (170MW) 06.02.2008 (170MW) 20.03.2008 (170MW) 23.03.2011 (500MW) 25 WB 30.09.2010 (500MW) SIKKIM 1351 1050 30.06.2011(525MW) MARCH,12 (525MW) 1050 2451 7. LIKELY BENEFIT TO DVC DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION RAGHUNATHPUR PH-I U1,2 BOKARO TPP A EXP U1 MUZAFFARPUR EXT.(KANTI TPP) U1,2 TOTAL CENTRAL SECTOR SUB TOTAL (DVC) T T UC UC WB JHARKHAND T UC BIHAR SE CT OR IC (MW) 2X600=1200 1X500=500 2X195=390 BENEFITS SHARES OF STATE (MW 1200 500 UNIT WISE COMMISSIONING DATE/ (LIKELY DATE OF COMMISSIONING) 10 1710 1710 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE 8. PEAK & ENERGY TABLE (As per 18th EPS Report) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 18302 19633 21072 22627 24309 PEAK DEMAND(MW) 3239 3448 3672 3914 4173 92 JHARKHAND 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 130 1190 0 0 1190 0 4.05 PRIVATE 0 1410 0 0 1410 0 4.00 CENTRAL 70.93 228.88 0 0 228.88 0 0 TOTAL 200.93 2828.88 0 0 2828.88 0 8.05 % 6.61 93.12 0.00 0.00 93.12 0.00 0.27 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 130.00 0.00 70.93 200.93 6.59 COAL 1190.00 1410.00 228.88 2828.88 92.75 TOTAL 1324.05 1414.05 299.81 3037.91 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NUCLEAR TOTAL 1190.00 1410.00 228.88 2828.88 92.75 0.00 0.00 0.00 0.00 0.00 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) R.E.S. (MNRE) 4.05 16.00 0.00 20.05 0.66 TOTAL 1324.05 1426.00 299.81 3049.86 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -215 -681 -251 -460 -210 -250 -110 -17 -110 -15 ENERGY DEFICIT/ SURPLUS (%) (- / +) -4.9 -13.3 -4.7 -7.8 -3.4 -4.0 -3.3 -3.1 -2.8 -2.7 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMA ND (MW) 10THPLAN END 2007-08 2008-09 2009-2010 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 687 865 889 1,088 1,108 1,030 1,106 1,085 1,106 1,071 PEAK MET (MW) 671 787 887 947 1,052 868 1,033 1,007 1,033 989 PEAK DEFICIT/ SURPLUS (MW) (- / +) -16 -78 -2 -141 -56 -162 -73 -78 -73 -82 PEAK DEFICIT/ SURPLUS (%) (- / +) -2.3 -9.0 -0.2 -13.0 -5.1 -15.7 -6.6 -7.2 -6.6 -7.7 4369 5139 5361 5,867 6,195 6,280 3,374 552 3,916 557 4154 4458 5110 5,407 5,985 6,030 3,264 535 3,806 542 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Energy Deficit/ Deficit/ RequiAvailDeficit/ Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 1,260 1,005 -255 -20.2 7,486 6,149 -1,337 5. CAPACITY ADDED DURING 11TH PLAN LOACTED IN THE STATE OF JHARKHAND: (MW) CENTRAL SECTOR: NIL STATE SECTOR: NIL PRIVATE SECTOR: NIL Energy Deficit/ Surplus ( % ) (- / +) -17.9 TYPE 6. BENEFIT TO THE STATE OF JHARKHAND WITH THE CAPACITY ADDITION DURING 11TH PLAN PROJECT NAME INSTALLED CAPACITY BENEFITS STATE UNIT WISE COMMISSIONING DATE CAPACITY ADDITION /SHARES PROJECT (MW) DURING OF STATE LOCATION (CAPACITY) XITH PLAN (MW) (MW) CENTRAL-SECTOR TEESTA ST.V U-1 TO H 3X170=510.00 510.00 40 SIKKIM 28.03.2008 (170MW) 3 06.02.2008 (170MW) 93 KAHALGAON U-6,7 T FARAKKA ST-III U-6 T 2X500=1000.00 500.00 1000.00 19 BIHAR 500.00 TOTAL GRAND-TOTAL:- 33 92 92 WB 20.03.2008 (170MW) 16.03.2008 (500MW) 31.7.2009 (500MW) 23.03.2011 (500MW) 7.LIKELY BENEFIT TO THE STATE OF JHARKHAND DURING 12TH PLAN PROJECTS T Y P E MUZAFFARPUR EXT.(KANTI T TPP) U1,2 BARH STPP-1 U-1,2,3 T BARH STPP-II U-1,2 T FIRM CENTRAL SECTOR SHARE MAITRISHI USHA TPP PH-I U1,2 ADHUNIK POWER & NATURAL RESOURCES LTD TPP U1,2 PRIVATE SECTOR SUB TOTAL (JHARKHAND) ST AT US STATE PROJECT LOCATION UC BIHAR UC UC T UC T UC SE CT OR IC (MW) BENEFITS SHARES OF STATE (MW 2X195=390 12 BIHAR BIHAR C C C 3X660=1980 2X660=1320 202 80 294 JHARKHAND P 2X270=540 540 JHARKHAND P 2X270=540 540 UNIT WISE COMMISSIONING DATE/ (LIKELY DATE OF COMMISSIONING) 1080 1374 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 22222222 T&D LOSSES % 25.35 19.62 26.82 26.21 23.16 24.27 22.24 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU)* 11002 11885 12753 13596 14509 PEAK DEMAND(MW)* 1628 1802 1979 2157 2353 *EXCLUDING DVC 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 750.46 94 ODISHA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 2061.92 0 105.01 2166.93 36.14 THERMAL GAS DIESEL 0 0 0 0 0 0 0 0 0.00 0.00 COAL 420 1800 1512.1 3732.1 62.24 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % COAL 420.00 2400.00 1512.10 4332.10 94.64 2061.92 0.00 105.01 2166.93 3.65 (FIGURES IN MW) NUCLEAR TOTAL 420 1800 1512.1 3732.1 62.24 0 0 0 0 0.00 R.E.S. (MNRE) 64.3 33 0 97.3 1.62 TOTAL 2546.22 1833 1617.11 5996.33 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.70 0.00 NUCLEAR TOTAL 420.00 2400.00 1512.10 4332.10 96.35 0.00 0.00 0.00 0.00 0.00 R.E.S. (MNRE) 64.30 33.00 0.00 97.30 0.00 TOTAL 2546.22 2433.00 1617.11 6596.33 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -10 -305 -346 -305 -181 -57 -343 -690 -13 -690 -13 ENERGY DEFICIT/ SURPLUS (%) (- / +) -0.1 -1.8 -1.8 -1.5 -0.9 -0.3 -1.5 -5.2 -0.6 -4.4 -0.6 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMA ND (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-2010 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* PEAK MET (MW) 2132 2695 3142 3062 3,188 3,872 3,589 3,968 3,674 3,968 3,642 1977 2608 2905 2987 3,120 3,792 3,526 3,694 3,428 3,694 3,447 PEAK DEFICIT/ SURPLUS (MW) (- / +) -155 -87 -237 -75 -68 -80 -63 -274 -246 -274 -195 PEAK DEFICIT/ SURPLUS (%) (- / +) -7.3 -3.2 -7.5 -2.4 -2.1 -2.1 -1.8 -6.9 -6.7 -6.9 -5.4 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 12328 17101 18846 20519 21,136 22,506 23,036 13,334 2,301 15,545 2,224 12318 16796 18500 20214 20,955 22,449 22,693 12,644 2,288 14,855 2,211 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Deficit/ Deficit/ RequiAvailSurplus Surplus rment ability (MW) (- / +) ( % ) (- / +) (MU) (MU) 3,700 4,168 468 12.6 25,798 24,523 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF ODISHA : (MW) CENTRAL SECTOR: NIL STATE SECTOR: 150 PRIVATE SECTOR: 1800 Energy Deficit/ Surplus (MU) (- / +) -1,275 Energy Deficit/ Surplus ( % ) (- / +) -4.9 TYPE 6. BENEFIT TO THE STATE OF ODISHA WITH THE CAPACITY ADDITION DURING 11TH PLAN PROJECT NAME INSTALLE CAPACITY BENEFITS/ STATE UNIT WISE COMMISSIONING DATE D ADDITION SHARES CAPACITY DURING OF STATE PROJECT (CAPACITY) (MW) XITH PLAN (MW) LOCATIO (MW) N CENTRAL-SECTOR TEESTA ST.V U-1 TO 3 H 3X170 510.00 105 SIKKIM 06.02.2008 (170MW) 95 =510.00 KAHALGAON U-6,7 T FARAKKA ST-III U-6 T STATE-SECTOR BALIMELA ST-2 U-7,8 H PRIVATE-SECTOR STERLITE ENERGY U-1,2 T STERLITE ENERGY U-3 T 2X500 1000.00 =1000.00 1X500 500.00 =500.00 CENTRAL-SECTOR TOTAL:- 49 BIHAR 83 WB 237 2X75 150.00 =150.00 STATE – SECTOR TOTAL:- 150 2X600 1200.00 =1200.00 1X600 600.00 =600.00 PRIVATE-SECTOR TOTAL:GRAND-TOTAL:- UC BIHAR UC UC UC UC UC UC UC C ORISSA 05.01.2008 (75 MW) 27.03.2008 (75MW) 1200 ORISSA 600 ORISSA 29.12.2010(600MW) 14.10.2010 (600MW) 16.08.2011(600MW) 150 1800 2187 7.LIKELY BENEFIT TO THE STATE OF ODISHA DURING 12TH PLAN PROJECTS T ST STATE SE Y AT CT P US PROJECT OR E LOCATIO N MUZAFFARPUR EXT.(KANTI TPP) T U1,2 BARH STPP-I U1-3 T BARH STPP-II U1,2 T SUB TOTAL CENTRAL SECTOR SHARE DERANG TPP U1 T IND BARATH ENERGY PVT. LTD. T TPP U1,2 LANCO BABANDH - DHENKANAL U-1 T K.V.K. NILACHAL TPP U1 T KAMALANGA TPP U1-3 T STERLITE TPP U 4 T SUB TOTAL PRIVATE SECTOR GRAND TOTAL (ODISHA) 20.03.2008 (170MW) 28.03.2008 (170MW) 16.03.2008 (500MW) 31.7.2009 (500MW) 23.03.2011 (500MW) IC (MW) BENEFITS/ SHARES OF STATE (MW) 2X195=390 30 BIHAR BIHAR C C C 3X660=1980 3X660=1320 ODISHA P 1X600=600 418 166 614 600 ODISHA ODISHA ODISHA ODISHA ODISHA P P P P P 2X350=700 700 1X660=660 660 1X350=350 350 3X350=1050 1X600=600 1050 600 3960 4574 UNIT WISE COMMISSIONING DATE (CAPACITY) 25.04.2012 (600 MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE 8.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 55555555 T&D LOSSES % 57.09 44.02 45.56 40.86 39.44 42.65 37.00 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 26265 28374 30652 33113 35772 PEAK DEMAND(MW) 4397 4686 4994 5322 5672 96 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 837.55 97 SIKKIM 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 0 0 0 5 5 0 52.11 PRIVATE 0 0 0 0 0 0 0 CENTRAL 75.27 74.1 0 0 74.1 0 0 TOTAL 75.27 74.1 0 5 79.1 0 52.11 % 36.45 35.89 0.00 2.42 38.31 0.00 25.24 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO COAL STATE 0.00 0.00 PRIVATE 0.00 0.00 CENTRAL 75.27 74.10 TOTAL 75.27 74.10 % 36.45 35.89 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) (WEST BENGAL + SIKKIM) 9TH PLAN END 3614 (SIKKIM ONLY) 10TH PLAN END 45 2007-08 69 2008-09 97 2009-10 96 2010-11 106 2011-12 100 APR-SEP,2012 95 SEP,2012 95 APR-OCT,2012* 95 OCT,2012* 95 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 74.10 0.00 5.00 79.10 0.00 2.42 38.31 PEAK DEFICIT/ SURPLUS (MW) (- / +) PEAK DEFICIT/ SURPLUS (%) (- / +) ENERGY REQUIRMENT (MU) 3414 -200 -5.5 20670 45 66 95 94 104 95 95 95 95 95 0 -3 -2 -2 -2 -5 0 0 0 0 0.0 -4.3 -2.1 -2.1 -1.9 -5.0 0.0 0.0 0.0 0.0 223 284 343 388 402 390 198 32 233 34 NUCLEAR 0.00 0.00 0.00 0.00 0.00 TOTAL 57.11 0 149.37 206.48 100 R.E.S. (MNRE) 52.11 0.00 0.00 52.11 25.24 ENERGY AVAILABILITY (MU) TOTAL 57.11 0.00 149.37 206.48 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) ENERGY DEFICIT/ SURPLUS (%) (- / +) 20575 -95 -0.5 218 267 330 345 402 384 198 32 233 35 -5.0 -17.0 -13.0 -43 0 -6 0 0 0 1 -2.2 -6.0 -3.8 -11.1 0.0 -1.5 0.0 0.0 0.0 2.9 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Deficit/ Deficit/ RequiAvailSurplus Surplus rment ability (MW) (- / +) ( % ) (- / +) (MU) (MU) 120 161 41 34.2 489 917 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF SIKKIM : (MW) CENTRAL SECTOR: 510 STATE SECTOR: NIL PRIVATE SECTOR: NIL TYPE 6. BENEFIT TO THE STATE OF SIKKIM WITH PROJECT NAME INSTALLED CAPACITY (MW) CENTRAL-SECTOR TEESTA ST.V U-1 TO 3 H 3X170 Energy Deficit/ Surplus (MU) (- / +) 428 Energy Deficit/ Surplus ( % ) (- / +) 87.5 THE CAPACITY ADDITION DURING 11TH PLAN CAPACITY BENEFITS STATE UNIT WISE COMMISSIONING ADDITION /SHARES PROJECT DATE DURING OF STATE LOCATION (CAPACITY) XITH PLAN (MW) (MW) 510.00 98 67 SIKKIM 06.02.2008 (170MW) =510.00 KAHALGAON U-6,7 T 2X500 =1000.00 FARAKKA ST-III U-6 T 1X500 =500.00 CENTRAL-SECTOR TOTAL:GRAND-TOTAL:- 1000.00 3 BIHAR 500.00 5 WB 20.03.2008 (170MW) 28.03.2008 (170MW) 16.03.2008 (500MW) 31.7.2009 (500MW) 23.03.2011(500MW) 75 75 7.LIKELY BENEFIT TO THE STATE OF SIKKIM DURING 12TH PLAN PROJECTS MUZAFFARPUR EXT.(KANTI TPP) U1,2 BARH STPP-I U1-3 BARH STPP-II U1,2 TOTAL CENTRAL SECTOR SHARE BHASMEY HEP JORETHANG LOOP HEP RANGIT-IV HEP TEESTA-VI HEP TEESTA-III HEP CHUJACHEN TOTAL PRIVATE SECTOR GRAND TOTAL (SIKKIM) T Y P E ST AT US STATE PROJECT LOCATION T UC BIHAR T T UC UC H H H H H H UC UC UC UC UC UC SE CT OR IC (MW) BENEFITS SHARES OF STATE (MW UNIT WISE COMMISSIONING DATE/ (LIKELY DATE OF COMMISSIONING) 2X195=390 2 BIHAR BIHAR C C C 3X660=1980 3X660=1320 SIKKIM SIKKIM SIKKIM SIKKIM SIKKIM SIKKIM P P P P P P 3X17=51 2X48=96 3X40=120 4X125=500 2X200=1200 2X49.5=99 38 17 57 51 96 120 500 1200 99 2066 2123 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE 8. T&D LOSSES YEAR 2003- 04 55555555 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 54.99 50.49 10.73 23.10 36.80 38.80 39.01 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 440 461 482 504 528 PEAK DEMAND(MW) 117 123 130 137 144 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 845.40 99 WEST BENGAL 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 977 5030 100 12.06 5142.06 0 143.4 PRIVATE 0 1341.38 0 0.14 1341.52 0 18.05 CENTRAL 139.3 805.96 0 0 805.96 0 0 TOTAL 1116.3 7177.34 100 12.2 7289.54 0 161.45 % 13.03 83.78 1.17 0.14 85.09 0.00 1.88 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 977.00 0.00 139.30 1116.30 13.12 COAL 4970.00 1341.38 805.96 7117.34 83.66 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-10 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 3614 4784 5283 5387 6,094 6,162 6,592 7,322 6,759 7,322 6,722 3414 4669 4987 5379 5,963 6,112 6,532 7,249 6,684 7,249 6,686 TOTAL 6262.46 1359.57 945.26 8567.29 100 (FIGURES IN MW) THERMAL GAS DIESEL 100.00 12.06 0.00 0.14 0.00 0.00 100.00 12.20 1.18 0.14 PEAK DEFICIT/ SURPLUS (MW) (- / +) -200 -115 -296 -8 -131 -50 -60 -73 -75 -73 -36 PEAK DEFICIT/ SURPLUS (%) (- / +) -5.5 -2.4 -5.6 -0.1 -2.1 -0.8 -0.9 -1.0 -1.1 -1.0 -0.5 NUCLEAR TOTAL 5082.06 1341.52 805.96 7229.54 84.98 0.00 0.00 0.00 0.00 0.00 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 20670 26538 29020 31289 33,750 36,481 38,679 22,753 3,752 26,544 3,810 R.E.S. (MNRE) 143.40 18.05 0.00 161.45 1.90 20575 25966 27902 30290 32,819 35,847 38,281 22,514 3,734 26,305 3,791 TOTAL 6202.46 1359.57 945.26 8507.29 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -95 -572 -1118 -999 -931 -634 -398 -239 -18 -239 -19 ENERGY DEFICIT/ SURPLUS (%) (- / +) -0.5 -2.2 -3.9 -3.2 -2.8 -1.7 -1.0 -1.1 -0.5 -0.9 -0.5 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) 7,194 Peak Met (MW) Peak Deficit/ Surplus (MW) (- / +) -214 6,980 Peak Deficit/ Surplus ( % ) (- / +) -3.0 Energy Requirment (MU) 44,409 Energy Availability (MU) 43,674 Energy Deficit/ Surplus (MU) (- / +) -735 Energy Deficit/ Surplus ( % ) (- / +) -1.7 5.CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF WEST BENGAL : (MW) 500 2720 250 CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: 6. BENEFIT TO THE STATE OF WEST BENGAL WITH THE CAPACITY ADDITION DURING 11TH PLAN TYPE PROJECT NAME INSTALL ED CAPACIT Y (MW) CAPACITY ADDITION DURING XITH PLAN (MW) BENEFITS/ SHARES OF STATE (MW) CENTRAL-SECTOR 100 STATE PROJECT LOCATION UNIT WISE COMMISSIONING DATE (CAPACITY) *TEESTA ST.V U-1 TO 3 H 3x170 =510.00 510.00 122 SIKKIM KAHALGAON 6,7 T 2x500 =1000.00 FARAKKA ST-III U-6 T 1x500 =500.00 CENTRAL-SECTOR TOTAL:STATE-SECTOR BAKRESHWAR U-4 & 5 T 2x210 =420.00 PURLIA PSS JV U-1 H 4x225 U-2 =900.00 U-3 U-4 SAGARDIGHI U-1 & 2 T 2x300 =600.00 SANTALDIH EXT U-5,6 T 2x250 =500.00 DURGAPUR EXT U-7 T 1x300 =300.00 STATE – SECTOR TOTAL:PRIVATE-SECTOR BUDGE-BUDGE EXT T 1x250 =250.00 PRIVATE-SECTOR TOTAL:GRAND-TOTAL:- 1000.00 55 BIHAR 500.0 0 147 WB 06.02.2008 (170MW) 20.03.2008 (170MW) 28.03.2008 (170MW) 16.03.2008 (500MW) 31.7.2009 (500MW) 23.03.2011 (500MW) 324 420.00 420 900.00 900 600.00 600 500.00 500 300.00 300 24.12.2007 ( 210 MW) 07.06.2009 ( 210 MW) 18.07.2007 (225MW) 27.08.2007 (225MW) 23.11.2007 (225MW) 20.01.2008 ( 225MW) 21.12.2007 (300 MW) 20.07.2008 (300 MW) 07.11.2007 (250 MW) 29.06.2011 (250 MW) 24.11.2007 (300 MW) 2720 250.00 250 29.09.2009 (250MW) 250 3294 7.LIKELY BENEFIT TO THE STATE OF WEST BENGAL DURING 12TH PLAN PROJECTS MUZAFFARPUR EXT.(KANTI TPP) U1,2 BARH STPP-I U1-3 BARH STPP-II U1,2 TEESTA LOW DAM-III * TEESTA LOW DAM-IV * TOTAL CENTRAL SECTOR SHARE HALDIA TPP U1-2 TOTAL PRIVATE SECTOR GRAND TOTAL (WB) T Y P E ST AT US STATE PROJECT LOCATION T UC BIHAR T T H H UC UC UC UC T UC SE CT OR IC (MW) BENEFITS SHARES OF STATE (MW 2X195=390 34 BIHAR BIHAR WB WB C C C C C 3X660=1980 3X660=1320 4X33=132 4X40=160 WB P 2X300=600 502 199 112 136 983 600 600 1583 UNIT WISE COMMISSIONING DATE/ (LIKELY DATE OF COMMISSIONING) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8.T&D LOSSES YEAR 2003- 04 33333333 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 31.01 28.54 24.84 23.64 21.29 16.79 18.33 101 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU)* 43026 46614 50494 54690 59225 PEAK DEMAND(MW)* 6874 7529 8246 9028 9883 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 515.08 102 NORTH-EASTERN REGION 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 340 60 424.7 142.74 627.44 0 227.97 PRIVATE 0 0 24.5 0 24.5 0 0.03 CENTRAL 860 0 375 0 375 0 0 TOTAL 1200 60 824.2 142.74 1026.94 0 228 % 48.88 2.44 33.57 5.81 41.83 0.00 9.29 TOTAL 1195.41 24.53 1235 2454.94 100 2. CAPACITY ADDITION ACHIEVED DURING 11TH PLAN (EXCLUDING RES) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR TOTAL COAL GAS DIESEL TOTAL STATE 84 0 58.2 0 58.2 0 142.2 PRIVATE 0 0 0 0 0 0 0 CENTRAL 0 0 0 0 0 0 0 TOTAL 84 0 58.2 0 58.2 0 142.2 3. INSTALLED CAPACITY AS ON 31.10.2012 (FIGURES IN MW) SECTOR HYDRO THERMAL COAL GAS DIESEL TOTAL STATE 340.00 60.00 424.70 142.74 627.44 PRIVATE 0.00 0.00 24.50 0.00 24.50 CENTRAL 860.00 0.00 375.00 0.00 375.00 TOTAL 1200.00 60.00 824.20 142.74 1026.94 % 48.88 2.44 33.57 5.81 41.83 4. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-2010 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 1148 1477 1742 1820 1,760 1,913 1,920 1,998 1,998 1,998 1,927 1043 1166 1347 1358 1,445 1,560 1,782 1,805 1,805 1,864 1,864 PEAK DEFICIT/ SURPLUS (MW) (- / +) PEAK DEFICIT/ SURPLUS (%) (- / +) -105 -311 -395 -462 -315 -353 -138 -193 -193 -134 -63 -9.1 -21.1 -22.7 -25.4 -17.9 -18.5 -7.2 -9.7 -9.7 -6.7 -3.3 NUCLEAR ENERGY REQUIRMENT (MU) 5935 7782 8799 9407 9,332 9,861 11,011 5,835 1,029 6,865 1,030 0.00 0.00 0.00 0.00 0.00 R.E.S. (MNRE) 227.97 0.03 0.00 228.00 9.29 ENERGY AVAILABILITY (MU) 5855 7012 7713 8134 8,296 8,992 9,964 5,364 962 6,333 969 ENERGY DEFICIT/ SURPLU S (MU) (- / +) -80 -770 -1086 -1273 -1,036 -869 -1047 -471 -67 -532 -61 TOTAL 1195.41 24.53 1235.00 2454.94 100.00 ENERGY DEFICIT/ SURPLUS (%) (- / +) * Provisional . 5. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Peak Peak Peak Energy Energy Energy Demand Met Deficit/ Deficit/ RequiAvailDeficit/ (MW) (MW) Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 2,314 1,807 -507 -21.9 11,970 10,277 -1,693 6. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 (AS PER U.N. METHODOLOGY ) 249.65 103 Energy Deficit/ Surplus ( % ) (- / +) -14.1 -1.3 -9.9 -12.3 -13.5 -11.1 -8.8 -9.5 -8.1 -6.5 -7.7 -5.9 ARUNACHAL PRADESH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO THERMAL COAL GAS DIESEL STATE 0 0 0 15.88 PRIVATE 0 0 0 0 CENTRAL 97.57 0 21.05 0 TOTAL 97.57 0 21.05 15.88 % 45.64 0.00 9.85 7.43 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 3. 0.00 0.00 97.57 97.57 45.65 TOTAL 95.11 0.03 118.62 213.76 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 15.88 0.00 0.00 21.05 0.00 21.05 15.88 9.85 7.43 COAL 0.00 0.00 0.00 0.00 0.00 (FIGURES IN MW) NUCLEAR R.E.S. TOTAL (MNRE) 15.88 0 79.23 0 0 0.03 21.05 0 0 36.93 0 79.26 17.28 0.00 37.08 NUCLEAR TOTAL 15.88 0.00 21.05 36.93 17.28 0.00 0.00 0.00 0.00 0.00 R.E.S. (MNRE) 79.23 0.03 0.00 79.26 37.08 TOTAL 95.11 0.03 118.62 213.76 100.00 ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEM AND (MW) 9TH PLAN END 10THPLAN END 2007-08 2008-09 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 50 87 101 130 101 121 116 115 116 105 PEAK MET (MW) 50 76 75 79 85 118 114 112 114 101 PEAK DEFICIT/ SURPLUS (MW) (- / +) 0 -11 -26 -51 -16 -3 -2 -3 -2 -4 PEAK DEFICIT/ SURPLUS (%) (- / +) 0.0 -12.6 -25.7 -39.2 -15.8 -2.5 -1.7 -2.6 -1.7 -3.8 ENERGY REQUIRMENT (MU) 136 286 391 426 511 600 304 55 355 51 ENERGY AVAILABILITY (MU) 135 259 302 271 436 553 285 51 332 47 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -2 -27 -89 -155 -75 -47 -19 -4 -23 -4 ENERGY DEFICIT/ SURPLUS (%) (- / +) -1.2 -9.4 -22.8 -36.4 -14.7 -7.8 -6.3 -7.3 -6.5 -7.8 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Energy Deficit/ Deficit/ RequiAvailDeficit/ Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 151 120 -31 -20.5 719 532 -187 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF ARUNACHAL PRADESH : (MW) CENTRAL SECTOR: NIL STATE SECTOR: NIL PRIVATE SECTOR: NIL Energy Deficit/ Surplus ( % ) (- / +) -26.0 6. BENEFIT TO THE STATE OF ARUNACHAL PRADESH WITH THE CAPACITY ADDITION DURING 11TH PLAN NIL 104 7. LIKELY BENEFIT TO THE STATE OF ARUNACHAL PRADESH DURING 12TH PLAN PROJECTS T Y P E ST AT US BONGAIGAON TPP U1,2, 3 T UC PARE HEP H UC KAMENG HEP H UC SUBANSIRI LOWER HEP H UC TURIAL * T UC TRIPURA GAS T UC SUB TOTAL CENTRAL SECTOR SHARE GRAND TOTAL (AR PR) STATE PROJECT LOCATION SE CT OR IC (MW) ASS AR.PR AR.PR AR.PR MIZ TRI C C C C C C 3X250=750 2X55=110 4X150=600 4X250=1000 2X30=60 2X363.3=726 BENEFITS SHARES OF STATE (MW) 37 21 83 147 4 22 314 314 UNIT WISE COMMISSIONING DATE (CAPACITY MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 44444444 T&D LOSSES % 47.54 42.96 49.72 57.79 67.20 46.88 48.04 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 524 531 538 545 552 PEAK DEMAND(MW) 111 117 123 129 135 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 503.27 105 ASSAM 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 100 0 329.72 429.72 42.13 THERMAL GAS DIESEL 276.2 20.69 24.5 0 177.82 0 478.52 20.69 46.91 2.03 COAL 60 0 0 60 5.88 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 100.00 0.00 329.72 429.72 42.13 COAL 60.00 0.00 0.00 60.00 5.88 (FIGURES IN MW) NUCLEAR TOTAL 356.89 24.5 177.82 559.21 54.82 0 0 0 0 0.00 R.E.S. (MNRE) 31.11 0 0 31.11 3.05 TOTAL 488 24.5 507.54 1020.04 100 (FIGURES IN MW) THERMAL GAS DIESEL 276.20 20.69 24.50 0.00 177.82 0.00 478.52 20.69 46.91 2.03 NUCLEAR TOTAL 356.89 24.50 177.82 559.21 54.82 0.00 0.00 0.00 0.00 0.00 R.E.S. (MNRE) 31.11 0.00 0.00 31.11 3.05 TOTAL 488.00 24.50 507.54 1020.04 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -25 -313 -404 -540 -434 -340 -338 -250 -37 -270 -20 ENERGY DEFICIT/ SURPLUS (%) (- / +) -0.7 -7.3 -8.4 -10.6 -8.5 -6.3 -5.6 -7.4 -6.2 -6.8 -3.4 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-2010 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 688 771 848 958 920 971 1,112 1,186 1,144 1,186 1,124 PEAK MET (MW) 618 688 766 797 874 937 1,053 1,095 1,073 1,098 1,098 PEAK DEFICIT/ SURPLUS (MW) (- / +) -70 -83 -82 -161 -46 -34 -59 -91 -71 -88 -26 PEAK DEFICIT/ SURPLUS (%) (- / +) -10.2 -10.8 -9.7 -16.8 -5.0 -3.5 -5.3 -7.7 -6.2 -7.4 -2.3 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 3450 4297 4816 5107 5,122 5,403 6,034 3,385 597 3,969 584 3425 3984 4412 4567 4,688 5,063 5,696 3,135 560 3,699 564 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Deficit/ Deficit/ RequiAvailSurplus Surplus rment ability (MW) (- / +) ( % ) (- / +) (MU) (MU) 1,262 987 -275 -21.8 6,490 5,512 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF ASSAM : CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: Energy Deficit/ Surplus (MU) (- / +) -978 Energy Deficit/ Surplus ( % ) (- / +) -15.1 NIL 37.2 NIL TYPE 6. BENEFIT TO THE STATE OF ASSAM WITH THE CAPACITY ADDITION DURING 11TH PLAN PROJECT NAME INSTALLED CAPACITY BENEFITS STATE UNIT WISE COMMISSIONING CAPACITY ADDITION /SHARES PROJECT DATE (MW) DURING OF STATE LOCATION (CAPACITY MW) XITH PLAN (MW) (MW) 106 CENTRAL SECTOR KAHALGAON U 6,7 CENTRAL SECTOR STATE SECTOR LAKWA W.H. T 2X500 =1000.00 1000 83 BIHAR 16.3.2008(500MW) 31.7.2009 500MW) ASSAM 24.12.2011(37.2MW) 83 G 37.20 37.20 STATE SECTOR TOTAL GRAND-TOTAL:- 37 37 121 7.LIKELY BENEFIT TO THE STATE OF ASSAM DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) BONGAIGAON TPP U1,2, 3 T PARE HEP H KAMENG HEP H SUBANSIRI LOWER HEP H TURIAL * T TRIPURA GAS T TOTAL CENTRAL SECTOR SHARE NAMRUP CCGT TOTAL STATE SECTOR GRAND TOTAL (ASSAM) UC UC UC UC UC UC ASS AR.PR AR.PR AR.PR MIZO TRI C C C C C C 3X250=750 2X55=110 4X150=600 4X250=1000 2X30=60 2X363.3=726 ASS S 100 BENEFITS SHARES OF STATE (MW 381 37 65 104 20 240 847 100 100 947 UNIT WISE COMMISSIONING DATE (CAPACITY MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 33333333 T&D LOSSES % 39.31 51.76 40.34 33.69 38.60 37.59 32.82 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY PEAK DEMAND(MU) DEMAND(MW) 2012-13 6392 1300 2013-14 6953 1414 2014-15 7562 1537 2015-16 8225 1671 2016-17 8947 1817 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 209.21 107 MANIPUR 1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN i.e. 31.03.2012) SECTOR HYDRO THERMAL COAL GAS DIESEL STATE 0 0 0 45.41 PRIVATE 0 0 0 0 CENTRAL 80.98 0 25.96 0 TOTAL 80.98 0 25.96 45.41 % 51.32 0.00 16.45 28.78 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO COAL STATE 0.00 0.00 PRIVATE 0.00 0.00 CENTRAL 80.98 0.00 TOTAL 80.98 0.00 % 51.32 0.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-2010 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 98 106 119 128 111 118 116 120 118 120 117 94 101 97 95 99 115 115 119 114 119 110 (FIGURES IN MW) NUCLEAR R.E.S. TOTAL (MNRE) 45.41 0 5.45 0 0 0 25.96 0 0 71.37 0 5.45 45.23 0.00 3.45 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 45.41 45.41 0.00 0.00 0.00 25.96 0.00 25.96 25.96 45.41 71.37 16.45 28.78 45.23 PEAK DEFICIT/ SURPLUS (MW) (- / +) -4 -5 -22 -33 -12 -3 -1 -1 -4 -1 -7 PEAK DEFICIT/ SURPLUS (%) (- / +) -4.1 -4.7 -18.5 -25.8 -10.8 -2.5 -0.9 -0.8 -3.4 -0.8 -6.0 NUCLEAR R.E.S. (MNRE) 5.45 0.00 0.00 5.45 3.45 0.00 0.00 0.00 0.00 0.00 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 456 451 530 556 524 568 544 269 54 324 55 441 429 501 477 430 505 499 255 51 307 52 TOTAL 50.86 0 106.94 157.8 100 TOTAL 50.86 0.00 106.94 157.80 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -16 -22 -29 -79 -94 -63 -45 -14 -3 -17 -3 ENERGY DEFICIT/ SURPLUS (%) (- / +) -3.5 -4.9 -5.5 -14.2 -17.9 -11.1 -8.3 -5.2 -5.6 -5.2 -5.5 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Deficit/ Deficit/ RequiAvailSurplus Surplus rment ability (MW) (- / +) ( % ) (- / +) (MU) (MU) 149 122 -27 -18.1 564 627 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF MANIPUR : (MW) CENTRAL SECTOR: NIL STATE SECTOR: NIL PRIVATE SECTOR: NIL Energy Deficit/ Surplus (MU) (- / +) 63 Energy Deficit/ Surplus ( % ) (- / +) 11.2 6. BENEFIT TO THE STATE OF MANIPUR WITH THE CAPACITY ADDITION DURING 11TH PLAN NIL 7.LIKELY BENEFIT TO THE STATE OF MANIPUR DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION 108 SE CT OR IC (MW) BENEFITS SHARES OF STATE (MW UNIT WISE COMMISSIONING DATE (CAPACITY MW) BONGAIGAON TPP U1,2, 3 T UC PARE HEP H UC KAMENG HEP H UC SUBANSIRI LOWER HEP H UC TURIAL T UC TRIPURA GAS T UC SUB TOTAL CENTRAL SECTOR SHARE GRAND TOTAL (MANIPUR) ASS AR.PR AR.PR AR.PR MIZO TRI C C C C C C 3X250=750 2X55=110 4X150=600 4X250=1000 2X30=60 2X363.3=726 47 8 14 21.5 4 42 136.5 136.5 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 66666666 T&D LOSSES % 65.18 70.61 63.12 53.47 63.56 63.37 54.66 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 737 840 956 1089 1241 PEAK DEMAND(MW) 180 212 249 294 346 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 207.15 109 MEGHALAYA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 240 0 0 2.05 2.05 0 31.03 PRIVATE 0 0 0 0 0 0 0 CENTRAL 74.58 0 25.96 0 25.96 0 0 TOTAL 314.58 0 25.96 2.05 28.01 0 31.03 % 84.20 0.00 6.95 0.55 7.50 0.00 8.31 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 240.00 0.00 74.58 314.58 84.20 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-2010 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 165 402 455 457 280 294 319 287 281 287 263 160 269 279 293 250 284 267 279 278 279 264 273.08 0 100.54 373.62 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 2.05 0.00 0.00 25.96 0.00 25.96 2.05 6.95 0.55 COAL 0.00 0.00 0.00 0.00 0.00 TOTAL PEAK DEFICIT/ SURPLUS (MW) (- / +) -5 -133 -176 -164 -30 -10 -52 -8 -3 -8 1 PEAK DEFICIT/ SURPLUS (%) (- / +) -3.0 -33.1 -38.7 -35.9 -10.7 -3.4 -16.3 -2.8 -1.1 -2.8 0.4 NUCLEAR TOTAL 2.05 0.00 25.96 28.01 7.50 ENERGY REQUIRMENT (MU) R.E.S. (MNRE) 31.03 0.00 0.00 31.03 8.31 TOTAL ENERGY DEFICIT/ SURPLUS (MU) (- / +) 5 -305 -388 -327 -223 -193 -477 -126 -13 -149 -23 ENERGY DEFICIT/ SURPLUS (%) (- / +) 0.7 -22.3 -24.0 -19.1 -14.4 -12.5 -24.8 -14.7 -9.4 -14.7 -14.9 0.00 0.00 0.00 0.00 0.00 ENERGY AVAILABILITY (MU) 700 1368 1620 1713 1,550 1,545 1,927 857 138 1,011 154 705 1063 1232 1386 1,327 1,352 1,450 731 125 862 131 273.08 0.00 100.54 373.62 100.00 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Deficit/ Deficit/ RequiAvailSurplus Surplus rment ability (MW) (- / +) ( % ) (- / +) (MU) (MU) 515 358 -157 -30.5 2,130 1,696 5. CAPACITY ADDED DURING 11TH PLAN IN THE STATE OF MEGHALAYA : CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: Energy Deficit/ Surplus (MU) (- / +) -434 Energy Deficit/ Surplus ( % ) (- / +) -20.4 NIL 84 NIL 6. BENEFIT TO THE STATE OF MEGHALAYA WITH THE CAPACITY ADDITION DURING 11TH PLAN TYPE PROJECT NAME KAHALGAON U-6,7 INSTALLE D CAPACITY (MW) CENTRAL SECTOR T 2X500 CAPACITY ADDITION DURING XITH PLAN (MW) 1000 110 BENEFITS/ SHARES OF STATE (MW) 27 STATE PROJECT LOCATION UNIT WISE BIHAR 16.03.2008 (500MW) COMMISSIONING DATE (CAPACITY MW) =1000.00 TOTAL CENTRAL SECTOR STATE-SECTOR MYNTDU ST-1,2 H 31.7.2009 (500MW) 27 2X42 84.00 =84.00 STATE - SECTOR TOTAL:GRAND-TOTAL:- 84 MEGH 23.11.2011(42 MW) 31.03.2012(42MW) 84 111 7. LIKELY BENEFIT TO THE STATE OF MEGHALAYA DURING 12TH PLAN T Y P E PROJECTS ST AT US BONGAIGAON TPP U1,2, 3 T UC PARE HEP H UC KAMENG HEP H UC SUBANSIRI LOWER HEP H UC TURIAL * T UC TRIPURA GAS T UC SUB TOTAL CENTRAL SECTOR SHARE MYNTDU ST-I ADDL UNIT NEW UMTRU HEP SUB TOTAL STATE SECTOR GRANDTOTAL (MEGHALAYA) STATE PROJECT LOCATION SE CT OR IC (MW) ASS AR.PR AR.PR AR.PR MIZO TRI C C C C C C 3X250=750 2X55=110 4X150=600 4X250=1000 2X30=60 2X363.3=726.6 MEGH MEGH S S 42 2X20=40 BENEFITS SHARES OF STATE (MW 54 9 15 24.5 5 79 186.5 42 40 82 268.5 UNIT WISE COMMISSIONING DATE (CAPACITY MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 11111111 T&D LOSSES % 16.73 28.35 40.15 35.34 37.62 37.45 39.06 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY PEAK DEMAND(MU) DEMAND(MW) 2012-13 1749 338 2013-14 1861 362 2014-15 1981 388 2015-16 2108 415 2016-17 2243 445 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 613.36 111 MIZORAM 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) HYDRO THERMAL GAS DIESEL (FIGURES IN MW) NUCLEAR R.E.S. (MNRE) TOTAL 51.86 0 16.28 68.14 49.05 0 0 0 0 0.00 36.47 0 0 36.47 26.25 88.33 0 50.59 138.92 100 2. INSTALLED CAPACITY AS ON 31.10.2012 HYDRO COAL (FIGURES IN MW) THERMAL GAS DIESEL TOTAL NUCLEAR R.E.S. (MNRE) TOTAL STATE PRIVATE CENTRAL TOTAL % 0.00 0.00 16.28 16.28 11.72 0.00 0.00 0.00 0.00 0.00 36.47 0.00 0.00 36.47 26.25 88.33 0.00 50.59 138.92 100.00 COAL STATE PRIVATE CENTRAL TOTAL % 0 0 34.31 34.31 24.70 0 0 0 0 0.00 0.00 0.00 34.31 34.31 24.70 0 0 16.28 16.28 11.72 0.00 0.00 0.00 0.00 0.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 2007-08 2008-09 2009-2010 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 75 83 97 100 70 76 82 65 65 68 68 73 80 58 64 64 70 78 64 64 65 65 TOTAL 51.86 0 0 51.86 37.33 PEAK DEFICIT/ SURPLUS (MW) (- / +) -2 -3 -39 -36 -6 -6 -4 -1 -1 -3 -3 51.86 0.00 0.00 51.86 37.33 51.86 0.00 16.28 68.14 49.05 PEAK DEFICIT/ SURPLUS (%) (- / +) -2.7 -3.6 -40.2 -36.0 -8.6 -7.9 -4.9 -1.5 -1.5 -4.4 -4.4 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 284 235 288 330 352 369 397 195 34 230 35 278 221 246 269 288 315 355 180 31 212 32 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -6 -14 -42 -61 -64 -54 -42 -15 -3 -18 -3 ENERGY DEFICIT/ SURPLUS (%) (- / +) -2.1 -6.0 -14.6 -18.5 -18.2 -14.6 -10.6 -7.7 -8.8 -7.8 -8.6 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Deficit/ Deficit/ RequiSurplus Surplus rment (MW) (- / +) ( % ) (- / +) (MU) 96 74 -22 -22.9 441 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF CENTRAL SECTOR: NIL STATE SECTOR: NIL PRIVATE SECTOR: NIL Energy Availability (MU) 418 MIZORAM Energy Deficit/ Surplus (MU) (- / +) -23 : 6. BENEFIT TO THE STATE OF MIZORAM WITH THE CAPACITY ADDITION DURING 11TH PLAN NIL 112 Energy Deficit/ Surplus ( % ) (- / +) -5.2 7. LIKELY BENEFIT TO THE STATE OF MIZORAM DURING 12TH PLAN PROJECTS T ST STATE SE Y AT PROJECT CT P US LOCATION OR E BONGAIGAON TPP U 3 PARE HEP KAMENG HEP SUBANSIRI LOWER HEP TURIAL * TRIPURA GAS FIRM CENTRAL SECTOR SHARE SUB TOTAL (MIZORAM) T H H H T T UC UC UC UC UC UC ASS AR.PR AR.PR AR.PR MIZO TRI C C C C C C IC (MW) 3X250=750 2X55=110 4X150=600 4X250=1000 2X30=60 2X363.3=726 BENEFITS SHARES OF STATE (MW 31 5 9 14 11 22 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 92 92 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 55555555 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 55.54 66.14 39.19 38.18 44.63 52.70 53.80 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 503 588 686 801 936 PEAK DEMAND(MW) 174 197 223 252 285 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 429.31 113 NAGALAND 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO THERMAL COAL GAS DIESEL STATE 0 0 0 2 PRIVATE 0 0 0 0 CENTRAL 53.32 0 19.19 0 TOTAL 53.32 0 19.19 2 % 51.68 0.00 18.60 1.94 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO COAL STATE 0.00 0.00 PRIVATE 0.00 0.00 CENTRAL 53.32 0.00 TOTAL 53.32 0.00 % 51.68 0.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10THPLAN END 2007-08 2008-09 2009-2010 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 61 79 91 95 100 118 111 101 100 110 110 58 79 88 86 96 110 105 98 97 109 109 (FIGURES IN MW) NUCLEAR R.E.S. TOTAL (MNRE) 2 0 28.67 0 0 0 19.19 0 0 21.19 0 28.67 20.54 0.00 27.79 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 0.00 19.19 19.19 18.60 2.00 0.00 0.00 2.00 1.94 PEAK DEFICIT/ SURPLUS (MW) (- / +) -3 0 -3 -9 -4 -8 -6 -3 -3 -1 -1 PEAK DEFICIT/ SURPLUS (%) (- / +) -4.9 0.0 -3.3 -9.5 -4.0 -6.8 -5.4 -3.0 -3.0 -0.9 -0.9 NUCLEAR 2.00 0.00 19.19 21.19 20.54 R.E.S. (MNRE) 0.00 0.00 0.00 0.00 0.00 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 260 343 377 475 530 583 560 276 53 326 50 258 328 334 436 466 520 511 259 51 306 47 28.67 0.00 0.00 28.67 27.79 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -2 -15 -43 -39 -64 -63 -49 -17 -2 -20 -3 TOTAL 30.67 0 72.51 103.18 100 TOTAL 30.67 0.00 72.51 103.18 100.00 ENERGY DEFICIT/ SURPLUS (%) (- / +) -0.7 -4.4 -11.4 -8.2 -12.1 -10.8 -8.8 -6.2 -3.8 -6.1 -6.0 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Energy Deficit/ Deficit/ RequiAvailSurplus Surplus rment ability (MW) (- / +) ( % ) (- / +) (MU) (MU) 148 89 -59 -39.9 615 459 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF NAGALAND CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: Energy Deficit/ Surplus (MU) (- / +) -156 : NIL NIL NIL 6. BENEFIT TO THE STATE OF NAGALAND WITH THE CAPACITY ADDITION DURING 11TH PLAN NIL 114 Energy Deficit/ Surplus ( % ) (- / +) -25.4 7. LIKELY BENEFIT TO THE STATE OF NAGALAND DURING 12TH PLAN PROJECTS BONGAIGAON TPP U1,2, 3 PARE HEP KAMENG HEP SUBANSIRI LOWER HEP TURIAL TRIPURA GAS CENTRAL SECTOR SHARE T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) T H H H T T UC UC UC UC UC UC ASS AR.PR AR.PR AR.PR MIZO TRI C C C C C C 3X250=750 2X55=110 4X150=600 4X250=1000 2X30=60 2X363.3=726 GRAND TOTAL (NAGALAND) BENEFITS SHARES OF STATE (MW 32 5 9 14.5 3 27 90.5 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 90.5 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 55555555 T&D LOSSES % 55.00 48.26 58.99 54.79 55.61 58.30 56.91 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 692 725 760 796 834 PEAK DEMAND(MW) 145 154 164 174 185 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 242.39 115 TRIPURA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO THERMAL GAS DIESEL 148.5 4.85 0 0 33.34 0 181.84 4.85 68.60 1.83 COAL 0 0 0 0 0.00 0 0 62.37 62.37 23.53 (FIGURES IN MW) NUCLEAR TOTAL 153.35 0 33.34 186.69 70.43 2. INSTALLED CAPACITY AS ON 31.10.2012 (FIGURES IN MW) SECTOR HYDRO THERMAL COAL GAS DIESEL TOTAL STATE 0.00 0.00 148.50 4.85 153.35 PRIVATE 0.00 0.00 0.00 0.00 0.00 CENTRAL 62.37 0.00 33.34 0.00 33.34 TOTAL 62.37 0.00 181.84 4.85 186.69 % 23.53 0.00 68.60 1.83 70.43 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10THPLAN END 2007-08 2008-09 2009-2010 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 156 169 171 167 176 220 215 211 201 229 229 140 142 141 156 173 197 214 197 197 228 228 PEAK DEFICIT/ SURPLUS (MW) (- / +) -16 -27 -30 -11 -3 -23 -1 -14 -4 -1 -1 PEAK DEFICIT/ SURPLUS (%) (- / +) -10.3 -16 -17.5 -6.6 -1.7 -10.5 -0.5 -6.6 -2.0 -0.4 -0.4 0 0 0 0 0.00 NUCLEAR 0.00 0.00 0.00 0.00 0.00 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 647 802 777 800 855 882 949 549 98 650 101 613 728 686 728 771 801 900 519 93 615 96 R.E.S. (MNRE) 16.01 0 0 16.01 6.04 TOTAL R.E.S. (MNRE) 16.01 0.00 0.00 16.01 6.04 TOTAL ENERGY DEFICIT/ SURPLUS (MU) (- / +) -34 -74 -91 -72 -84 -81 -49 -30 -5 -35 -5 169.36 0 95.71 265.07 100 169.36 0.00 95.71 265.07 100.00 ENERGY DEFICIT/ SURPLUS (%) (- / +) -5.3 -9.2 -11.7 -9.0 -9.8 -9.2 -5.2 -5.5 -5.1 -5.4 -5.0 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE LGBR Peak Peak Peak Peak Energy Energy Energy Demand Met Deficit/ Deficit/ RequiAvailDeficit/ (MW) (MW) Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 263 174 -89 -33.8 1,011 1,033 22 5. CAPACITY ADDED DURING 11TH PLAN LOCATED IN THE STATE OF TRIPURA : (MW) CENTRAL SECTOR: NIL STATE SECTOR: 21 PRIVATE SECTOR: NIL 6. BENEFIT TO THE STATE OF TRIPURA WITH THE CAPACITY ADDITION DURING 11TH PLAN INSTALLED CAPACITY (MW) CAPACITY ADDITION DURING XITH PLAN (MW) BENEFITS/ SHARES OF STATE (MW) 1X21=21.00 21.00 GRAND TOTAL 21 21 TYPE PROJECT NAME STATE SECTOR BARAMURA GT T 116 STATE PROJECT LOCATION TRIPURA Energy Deficit/ Surplus ( % ) (- / +) 2.2 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 03.08.2010 (21MW) 7. LIKELY BENEFIT TO THE STATE OF TRIPURA DURING 12TH PLAN PROJECTS BONGAIGAON TPP U1,2, 3 PARE HEP KAMENG HEP SUBANSIRI LOWER HEP TURIAL * TRIPURA GAS MONARCHAK CCGT * CENTRAL SECTOR SHARE SUB TOTAL (TRIPURA) T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) T H H H T T T UC UC UC UC UC UC UC ASS AR.PR AR.PR AR.PR MIZO TRI TRI C C C C C C C 3X250=750 2X55=110 4X150=600 4X250=1000 2X30=60 2X363.3=726 101 BENEFITS SHARES OF STATE (MW 56 8 15 24.5 5 196 101 405.5 405.5 UNIT WISE COMMISSIONING DATE (CAPACITY MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 44444444 T&D LOSSES % 46.44 59.54 41.11 34.75 42.81 35.78 35.55 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 1029 1112 1201 1297 1401 PEAK DEMAND(MW) 254 274 294 317 340 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 223.78 117 A&N ISLANDS 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 0 0 0 40.05 40.05 0 5.25 PRIVATE 0 0 0 20 20 0 0.1 CENTRAL 0 0 0 0 0 0 0 TOTAL 0 0 0 60.05 60.05 0 5.35 % 0.00 0.00 0.00 91.82 91.82 0.00 8.18 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO COAL STATE 0.00 0.00 PRIVATE 0.00 0.00 CENTRAL 0.00 0.00 TOTAL 0.00 0.00 % 0.00 0.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMA MET ND (MW) (MW) 9TH PLAN END 10THPLAN END 2007-08 2008-09 2009-2010 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 31 40 40 40 40 40 48 48 40 48 40 27 32 32 38 32 32 48 48 32 48 32 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 40.05 40.05 0.00 20.00 20.00 0.00 0.00 0.00 0.00 60.05 60.05 0.00 91.82 91.82 PEAK DEFICIT/ SURPLUS (MW) (- / +) -4 -8 -8 -2 -8 -8 0 0 -8 0 -8 PEAK DEFICIT/ SURPLUS (%) (- / +) -12.9 -20.0 -20.0 -5.0 -20.0 -20.0 0.0 0.0 -20.0 0.0 -20.0 ENERGY REQUIRMENT (MU) 148 240 240 236 240 240 244 121 20 141 20 NUCLEAR 0.00 0.00 0.00 0.00 0.00 ENERGY AVAILABILITY (MU) 132 190 180 184 180 180 204 96 15 111 15 TOTAL 45.3 20.1 0 65.4 100 R.E.S. (MNRE) 5.25 0.10 0.00 5.35 8.18 TOTAL ENERGY DEFICIT/ SURPLUS (MU) (- / +) -16 -50 -60 -52 -60 -60 -40 -25 -5 -30 -5 ENERGY DEFICIT/ SURPLUS (%) (- / +) -10.8 -20.8 -25.0 -22.0 -25.0 -25.0 -16.4 -20.7 -25.0 -21.3 -25.0 45.30 20.10 0.00 65.40 100.00 * Provisional 4. CAPACITY ADDED DURING 11TH PLAN UT IN THE UT OF A &N ISLANDS : CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: NIL NIL NIL 5. BENEFIT TO THE UT OF A&N ISLAND WITH THE CAPACITY ADDITION DURING 11TH PLAN NIL 6. BENEFIT TO THE UT OF A&N ISLAND WITH THE ESTIMATED CAPACITY ADDITION DURING 12TH PLAN AS PER THE RECOMMENDATION OF THE REPORT OF WORKING GROUP ON POWER NIL 7. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 22222222 T&D LOSSES % 25.95 12.63 24.32 23.10 26.86 24.16 19.76 118 8. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 328 337 347 356 366 PEAK DEMAND(MW) 59 61 63 65 67 9. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 506.13 119 LAKSHDWEEP 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 0 0 0 9.97 9.97 0 0 PRIVATE 0 0 0 0 0 0 0.75 CENTRAL 0 0 0 0 0 0 0 TOTAL 0 0 0 9.97 9.97 0 0.75 % 0.00 0.00 0.00 93.00 93.00 0.00 7.00 2. INSTALLED CAPACITY AS ON 31.10.2012 SECTOR HYDRO COAL STATE 0.00 0.00 PRIVATE 0.00 0.00 CENTRAL 0.00 0.00 TOTAL 0.00 0.00 % 0.00 0.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 10THPLAN END 2007-08 2008-09 2009-2010 2010-11 2011-12 APR-SEP,2012 SEP,2012 APR-OCT,2012* OCT,2012* 6 6 6 6 7 8 8 8 8 8 6 6 6 6 7 8 8 8 8 8 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 9.97 9.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.97 9.97 0.00 93.00 93.00 PEAK DEFICIT/ SURPLUS (MW) (- / +) 0 0 0 0 0 0 0 0 0 0 PEAK DEFICIT/ SURPLUS (%) (- / +) 0.0 0.0 0.0 0.0 0.0 0 0 0 0.0 0.0 NUCLEAR 0.00 0.00 0.00 0.00 0.00 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 25 24 24 24 25 37 18 3 21 3 25 24 24 24 25 37 18 3 21 3 R.E.S. (MNRE) 0.00 0.75 0.00 0.75 7.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) 0 0 0 0 0 0 0 0 0 0 TOTAL 9.97 0.75 0 10.72 100 TOTAL 9.97 0.75 0.00 10.72 100.00 ENERGY DEFICIT/ SURPLUS (%) (- / +) 0.0 0.0 0.0 0.0 0.0 0 0 0 0.0 0.0 * Provisional 4. CAPACITY ADDED DURING 11TH PLAN IN THE UT LAKSHDWEEP : CENTRAL SECTOR: STATE SECTOR: PRIVATE SECTOR: NIL NIL NIL 5. BENEFIT TO THE STATE OF LAKSHADWEEP WITH THE CAPACITY ADDITION DURING 11TH PLAN NIL 6. BENEFIT TO THE STATE OF LAKSHADWEEP WITH THE ESTIMATED CAPACITY ADDITION DURING 12TH PLAN AS PER THE RECOMMENDATION OF THE REPORT OF WORKING GROUP ON POWER NIL 7. T&D LOSSES YEAR 2003- 04 11111111 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 T&D LOSSES % 11.85 10.20 11.19 12.87 18.05 24.87 11.59 120 8. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2012-13 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 43 45 47 49 52 PEAK DEMAND(MW) 8 9 10 10 11 9. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR 2009-10 PER CAPITA CONSUMPTION (KWH) (AS PER U.N. METHODOLOGY ) 428.81 121