S.NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 CONTENT CAPACITY ADDITION BY PLAN YEARWISE CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 11TH PLAN CAPACITY ADDITION TARGET DURING 12TH PLAN LIST OF PROJECTS COMMISSIONED DURING 2012-2013 12TH PLAN AS ON 31.03.2013 LIST OF PROJECTS COMMISSIONED DURING 2013-2014 12TH PLAN AS ON 31.03.2014 LIST OF PROJECTS COMMISSIONED DURING 2014-2015 (12TH PLAN) AS ON 31.08.2014 SUMMARY OF STATE WISE TYPE WISE CAPACITY ADDITION DURING 12TH PLAN AS ON 31.08.2013 ALL INDIA POWER SCENERIO AT A GLANCE POWER SCENERIO - ALL REGIONS INSTALLED CAPACITY OF STATES NORTHERN REGION CHANDIGARH DELHI HARYANA HIMACHAL PRADESH JAMMU & KASHMIR PUNJAB RAJASTHAN UTTAR PRADESH UTTARAKHAND WESTERN REGION CHHATISGARH GUJARAT MADHYA PRADESH MAHARASHTRA GOA DAMAN AND DIU DADRA AND NAGAR HAVELI SOUTHERN REGION ANDHRA PRADESH KARNATAKA KERALA TAMIL NADU PUDDUCHERRY EASTERN REGION BIHAR DVC JHARKHAND ODISHA SIKKIM WEST BENGAL NORTH-EASTERN REGION ARUNACHAL PRADESH ASSAM MANIPUR MEGHALAYA MIZORAM NAGALAND TRIPURA ANDAMAN & NIKOBAR ISLANDS LAKSHADWEEP 1 PAGE NO. 2 3 5 6 8 10 11 12 15 16 17 19 21 24 27 29 32 35 38 41 44 46 49 52 55 58 60 62 64 66 69 71 73 75 77 79 81 83 85 87 89 91 93 95 97 99 101 103 105 107 109 PLANWISE CAPACITY ADDITION PLAN STATE- SECTOR TARGET PRIVATE- SECTOR CENTRAL SECTOR TOTAL ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL 7TH PLAN % ACHIEVEMENT 12925 11867.14 92 0 0 9320 9534.5 102 22245 21401.64 96 8TH PLAN % ACHIEVEMENT 14869.7 6835.2 46 2810 1430.4 50.9 12858 8157 63.4 30537.7 16422.6 53.8 9TH PLAN % ACHIEVEMENT 10747.7 9352.8 87 17588.5 5262.2 29.9 11909 4504 37.8 40245.2 19119 47.5 10TH PLAN % ACHIEVEMENT 11156.84 6244.64 56 7121 1930.6 27.1 22832 13005 57 41109.84 21180.24 51.5 11TH PLAN % ACHIEVEMENT 26783 16732.4 62.5 15043 23012.5 152.9 36874 15220 41.3 78700 54963.9 69.8 2 YEARWISE CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 11TH PLAN 1.CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 2007-08(IN MW) SECTOR CENTRAL STATE PRIVATE TOTAL HYDRO THERMAL NUCLEAR TOTAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL 690 1030 3490 1990 660 220 4840 3240 1682 1393 4767 3880 0 0 6449 5273 0 0 750 750 0 0 750 750 2372 2423 9007 6620 660 220 12039 9263 2. CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 2008-09 (IN MW) SECTOR CENTRAL STATE PRIVATE TOTAL HYDRO THERMAL NUCLEAR TOTAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL 0 0 1750 750 660 0 2410 750 1097 969 1262 852.2 0 0 2359 1821.2 0 0 2761 882.5 0 0 2761 882.5 1097 969 5773 2484.7 660 0 7530 3453.7 3. CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 2009-10 (IN MW) SECTOR HYDRO THERMAL NUCLEAR TOTAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL CENTRAL 252 0 2490 1740 660 440 3402 2180 STATE 301 39 4679 3079 0 0 4980 3118 PRIVATE 292 0 5833 4287 0 0 6125 4287 TOTAL 845 39 13002 9106 660 440 14507 9585 4. CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 2010-11 (IN MW) SECTOR HYDRO THERMAL NUCLEAR TOTAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL CENTRAL 529 320 5365 3740 1220 220 7114 4280 STATE 356 178 6012 2581 0 0 6368 2759 PRIVATE 461 192 6416 4930 0 0 6877 5122 1346 690 17793 11251 1220 220 20359 12161 TOTAL 3 5. CAPACITY ADDITION TARGET/ACHIEVEMENT DURING 2011-12 (IN MW) SECTOR HYDRO THERMAL NUCLEAR TOTAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL TARGET ACTUAL CENTRAL 655 200 3070 4570 2000 0 5725 4770 STATE 165 123 4101 3638 0 0 4266 3761 PRIVATE 1170 1100 6440 10871 0 0 7610 11971 TOTAL 1990 1423 13611 19079 2000 0 17601 20502 6. TOTAL CAPACITY COMMISSIONED DURING 11TH PLAN (IN MW) SECTOR HYDRO THERMAL GAS LIGNITE 740 500 NUCLEAR TOTAL TOTAL 12790 880 15220 CENTRAL 1550 COAL 11550 STATE 2702 11695 1885.4 450 14030 0 16732.4 PRIVATE 1292 18649 2530.5 540 21720 0 23011.5 TOTAL 5544 41894 5155.9 1490 48540 880 54963.9 4 1. CAPACITY ADDITION TARGET DURING 12th PLAN (FIGURES IN MW) HYDRO THERMAL BREAKUP COAL LIGNITE GAS/LNG TOTAL THERMAL NUCLEAR TOTAL CENTRAL SECTOR 6004 13800 250 827.6 14878 5300 26182 STATE SECTOR 1608 12210 0 1712.0 13922 0 15530 PRIVATE SECTOR 3285 43270 270 0.0 43540 0 46825 ALL-INDIA 10897 69280 520 2539.6 72340 5300 88537 2. CAPACITY ADDITION DURING 2012-13 SECTOR CENTRAL STATE PRIVATE TOTAL HYDRO 374 57 70 501 THERMAL GAS 363.3 711 382.5 1456.8 COAL 4660 3200 10805 18665 NUCLEAR TOTAL 5023.3 3911 11187.5 20121.8 TOTAL 0 0 0 0 5397.3 3968 11257.5 20622.8 3. CAPACITY ADDITION DURING 2013-14 SECTOR CENTRAL STATE PRIVATE TOTAL HYDRO 914.01 45 99 1058.01 COAL 1660 2450 10985 15095 THERMAL GAS TOTAL 0 1660 872 3322 800 11785 1672 16767 NUCLEAR 0 0 0 0 TOTAL 2574.01 3367 11884 17825.01 4. CAPACITY ADDITION DURING 2014-15 (AS ON 31.08.2014) SECTOR CENTRAL STATE PRIVATE TOTAL HYDRO 267.34 0 0 267.34 THERMAL COAL GAS 600 0 1650.00 426.10 4975.00 400.00 7225.00 826.10 NUCLEAR TOTAL 600 2076.10 5375.00 8051.10 TOTAL 0 0 0 0 867.34 2076.10 5375.00 8318.44 5. CAPACITY ADDITION ACHIEVED DURING 12TH PLAN (as on 31.08.2014) SECTOR HYDRO COAL CENTRAL STATE PRIVATE TOTAL THERMAL GAS NUCLEAR TOTAL TOTAL 1555.35 102.00 6920.00 7300.00 363.30 2009.10 7283.30 9309.10 0 0 8838.65 9411.10 169.00 1826.35 26765.00 40985.00 1582.50 3954.90 28347.50 44939.90 0 0 28516.50 46766.25 5 LIST OF PROJECTS COMMISSIONED DURING 2012-2013 (12TH PLAN) AS ON 31.03.2013 PROJECT NAME REGI SEC STATE DEVELOPER TYPE COMMISSIONING DETAILS ON TOR THERMAL PROJECTS COMMISSIONING CAPACITY DATE (MW) MAHATMA GANDHI TPP U 2 NR P HAR CHINA LIGHT COAL 11.04.2012 660 POWER MAUDA TPP U 1 WR C MAHA NTPC COAL 19.04.2012 500 STERLITE (JHARSUGUDA) TPP U 4 ER P ODISHA STERLITE ENERGY COAL 25.04.2012 600 GEPL TPP PH-1, U2 WR P MAHA GUPTA ENERGY COAL 28.04.2012 60 PVT. LTD. RIHAND STPP ST-III U 5 NR C UP NTPC COAL 25.05.2012 500 PARICHHA TPP U 5 NR S UP UPRVUNL COAL 24.05.2012 250 HARDUGANJ TPP EXT. U 9 NR S UP UPRVUNL COAL 25.05.2012 250 SIPAT ST-I STPP U 3 WR C CHAT NTPC COAL 02.06.2012 660 SALAYA TPS U 2 WR P GUJ ESSAR POWER COAL 13.06.2012 600 SALAYA LTD. VINDHYACHAL STPP ST-IV U 11 WR C MP NTPC COAL 14.06.2012 500 KASAIPALLI TPS UNIT 2 WR P CHAT ACB INDIA COAL 21.06.2012 135 PRAGATI III GT-3 NR S DEL PPCL GAS 27.06.2012 250 SIMHAPURI TPP PH-1 U 2 SR P AP SIMHAPURI COAL 02.07.2012 150 ENERGY PVT LTD. UMPP-MUNDRA U 2 WR P GUJ TATA POWER COAL 17.07.2012 800 COMPANT LTD. BINA TPP U 1 WR P MP BINA POWER COAL 12.08.2012 250 SUPPLY COMP. LTD (JAYPEE GROUP) BUTIBORI TPP U 1 WR P MAHA VIDARBHA COAL 17.08.2012 300 INDUSTRIES POWER LTD GEPL TPP U 1 WR P MAHA GUPTA ENERGY COAL 08.09.2012 60 PVT LTD THAMMINAPATNAM TPP I U 1 SR P AP MEENAKSHI ENERGY PVT. LTD., COAL 09.09.2012 150 TIRODA TPP PH I U 1 METTUR TPP EXT U 1 UMPP-MUNDRA U 3 WR SR WR P S P MAHA TN GUJ COAL COAL COAL 11.09.2012 11.10.2012 16.10.2012 660 600 800 INDIRA GANDHI (JHAJJAR) STPP U 3 MAHADEV PRASAD STPP U 1(ADHUNIK POWER NATURAL RESOURCES LTD.) NR C HAR ADANI POWER LTD TNEB TATA POWER COMPANT LTD. NTPC COAL 07.11.2012 500 ER P JHAR ADHUNIK POWER & NATURAL RESOURCES LTD. COAL 19.11.2012 270 TRIPURA CCGT NER C TRI ONGC JV GAS 03.01.2013 363.3 UNOSUGEN CCPP MODULE 1 UMPP-MUNDRA U 4 WR WR P P GUJ GUJ GAS COAL 20.01.2013 16.01.2013 382.5 800 RATIJA TPP U 1 JALIPA KAPURDI U 5 WR NR P P CHAT RAJ TORRENT POWER TATA POWER COMPANT LTD. ACB INDIA RAJ WEST POWER LTD COAL LIG 04.02.2013 5.02.2013 50 135 EMCO WARORA TPP U 1 WR P MAHA COAL 07.02.2013 300 KODERMA TPP U 2 MAHAN TPP U 1 VALLUR TPP PH I U 2 ER WR SR C P C JHAR MP TN GMR EMCO ENERGY LTD DVC ESSAR POWER NTPC/TNEB JV COAL COAL COAL 15.02.2013 24.02.2013 28.02.2013 500 600 500 6 PROJECT NAME REGI ON SEC TOR STATE DEVELOPER TYPE THERMAL PROJECTS JALIPA KAPURDI U 8 NR P RAJ JALIPA KAPURDI U 6 NR P RAJ UKAI TPP EXT U 6 NORTH CHENNAI EXT U 2 PARICHHA EXTN U 6 IND BARATH TUTICORIN U 1 WR SR NR SR S S S P GUJ TN UP TN JALIPA KAPURDI U 7 NR P RAJ UMPP-MUNDRA U 5 WR P GUJ RAMGARH GT BELA TPP U 1 NR WR S P RAJ MAHA SATPURA TPS EXTN U 10 KORBA WEST ST.III U 5 PIPAVA CCPP VINDHYACHAL STPP ST-IV U 12 TIRODA TPP PH I U 2 AMARAVATI U 1 WR WR WR WR WR WR S S S C P P MP CHAT GUJ MP MAHA MAHA MAUDA TPP U 2 KAMALANGA TPP U 1 WR ER C P MAHA ORI ER P JHAR WR P MP MAHADEV PRASAD 2(ADHUNIK POWER RESOURCES LTD.) BINA TPP U 2 STPP U NATURAL COMMISSIONING DETAILS COMMISSIONING DATE CAPACITY (MW) LIG 28.02.2013 135 LIG 03.03.2013 135 COAL COAL COAL COAL 05.03.2013 09.03.2013 11.03.2013 11.03.2013 500 600 250 150 LIG 16.03.2013 135 TATA POWER COMPANT LTD. RRVUNL IDEAL ENERGY PROJECTS LTD MPGENCO CSEB GSECL NTPC ADANI POWER LTD INDIA BULLS POWER LIMITED NTPC GMR ENERGY COAL 18.03.2013 800 GAS COAL 20.03.2013 20.03.2013 110 270 COAL COAL GAS COAL COAL COAL 22.03.2013 22.03.2013 27.03.2013 25.03.2013 25.03.2013 25.03.2013 250 500 351 500 660 270 COAL COAL 29.03.2013 28.03.2013 500 350 ADHUNIK POWER & NATURAL RESOURCES LTD. BINA POWER SUPPLY COMP. LTD (JAYPEE GROUP) COAL 29.03.2013 270 COAL 31.03.2013 250 RAJ WEST POWER LTD RAJ WEST POWER LTD GSECL TNEB UPRVUNL IND BHARAT POWER LTD RAJ WEST POWER LTD TOTAL (THERMAL) 20121.8 HYDRO PROJECTS BUDHIL U 1 BUDHIL U 2 CHAMERA III U 3 CHAMERA III U 2 CHAMERA III U 1 CHUTAK HEP U 2 CHUTAK HEP U 3 CHUTAK HEP U 1 BHAWANI KATTLAI BARRAGE-III U 1 TEESTA LOW DAM-III U 2 CHUTAK HEP U 4 TEESTA LOW DAM-III U 1 TEESTA LOW DAM-III U 3 MYNTDU U 3 NR P HP NR P HP NR NR NR NR NR NR C C C C C C HP HP HP J&K J&K J&K SR S TN ER NR ER ER NER C C C C S WB J&K WB WB MEGH LANCO GREEN POWER PVT LTD LANCO GREEN POWER PVT LTD NHPC NHPC NHPC NHPC NHPC NHPC TNEB HYDRO 30.5.2012 35 HYDRO 26.5.2012 35 HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO 07.06.2012 12.06.2012 28.062012 08.11.2012 11.11.2012 22.11.2012 77 77 77 11 11 11 HYDRO 08.12.2012 15 NHPC NHPC NHPC NHPC MEGHALAYA SEB HYDRO HYDRO HYDRO HYDRO HYDRO 20.01.2013 28.01.2013 30.01.2013 24.02.2013 06.03.2013 TOTAL (HYDRO) GRAND TOTAL 33 11 33 33 42 501 7 20622.8 LIST OF PROJECTS COMMISSIONED DURING 2013-2014 (12TH PLAN) AS ON 31.03.2014 PROJECT NAME REGI SECT STATE DEVELOPER TYPE COMMISSIONING ON OR DETAILS COMMISSIONI CAPACI NG TY DATE (MW) THERMAL PROJECTS THAMMINAPATNAM TPP U2 SR P AP MEENAKSHI COAL 17.04.2013 150 ENERGY PVT. LTD., PRAGATI III GT-4 NR S DELHI PPCL GAS 07.05.2013 250 KAWAI TPP U1 NR P RAJASTHAN ADANI POWER COAL 28.05.2013 660 LTD SASAN UMPP U1 WR P. MP RELIANCE COAL 30.05.2013 660 POWER LTD. TIRODA TPP PH-II U-1 WR P MAHA ADANI POWER COAL 10.06.2013 660 LTD EMCO WARORA TPP U2 WR P MAHA GMR EMCO COAL 27.08.2013 300 ENERGY LTD AKALTARA NARIYARA TPP U1 WR P CHHATT KSK MAHANADI COAL 13.08.2013 600 POWER COMPANY LIMITED ROKHIA GT NER S TRIPURA GOVT. OF GAS 31.08.2013 21 TRIPURA NORTH CHENNAI TPS ST-II U1 SR S TN TNEB COAL 13.09.2013 600 CHHABRA TPP EXT U3 NR S RAJASTHAN RRVUNL COAL 14.09.2013 250 KAMALANGA TPP U 2 ER P ODISHA GMR ENERGY COAL 28.09.2013 350 RIHAND STPS ST-III U6 DHARIWAL TPP, U1 NR WR C P UP MAHA COAL COAL 07.10.2013 03.11.2013 500 300 SHREE SINGHAJI TPP U-1 WR S MP NTPC DHARIWAL INFRASTRUCT URE MPGENCO COAL 18.11.2013 600 BARH STPP II U2 SASAN UMPP U2 ER WR C P BIHAR MP COAL COAL 20.11.2013 18.12.2013 660 660 KAWAI TPP U2 NR P RAJASTHAN COAL 24.12.2013 660 SATPURA TPP U11 IND BARATH TUTICORIN U 2 WR SR S P MP TN COAL COAL 25.12.2013 30.12.2013 250 150 NIWARI TPP U1 RAJPURA TPP U1 WR NR P P MP PUNJAB COAL COAL 10.12.2013 24.01.2014 45 700 DGEN MEGA CCPP, MODULE 1 WR P GUJ GAS 12.01.2014 400 PIPAVAV CCPP BLK-1 WR S GUJ GAS 05.02.2014 351 AMRAVATI TPP, PH-1, UNIT 2 WR P MAHA COAL 17.02.2014 270 SIMHAPURI TPP UNIT 3 SR P A.P. COAL 21.02.2014 150 BARADHRA TPP UNIT 1 WR P COAL 23.02.2014 600 NASIK TPP, PH-I, UNIT 1 WR P CHHATTISG ARH MAHA NTPC RELIANCE POWER LTD ADANI POWER LTD MPPGCL IND BHARAT POWER LTD BLA PVT LTD L&T POWER DEVELOPMENT LTD M/S TORRENT ENERGY GSPC PIPAVAV POWER COR.LTD. INDIABULLS POWER LIMITED SIMHAPURI ENERGY PVT. LTD., DB POWER LTD INDIABULLS POWER LIMITED COAL 25.02.2014 270 8 PRAGATI III ST 2 VALLUR TPP UNIT 3 DGEN MEGA CCPP MODIULE 2 NR SR WR S C P DELHI TAMIL NADU GUJARAT TAMNAR TPP U 1 (RAIGARH) WR P KAMALANGA TPP U 3 TIRODA TPP PH-II U 2 ER WR P P CHHATTISG ARH ODISHA MAHA SASAN UMPP U 4 WR P MP CHAKABURA TPP WR P MARWA TPP U 1 WR S AVANTHA BHANDAR TPP U 1 WR P CHHATTISG ARH CHHATTISG ARH CHHATTISG ARH TAMNAR TPP U 2 (RAIGARH) WR P DURGAPUR TPP EXT. U 1 ER S CHHATTISG ARH WB BUTIBORI TPP PH-II U 2 WR P MAHA HYDRO PROJECTS TEESTA LOW DAM-III HEP U4 CHUJACHEN HEP U1 ER ER C P WB SIKKIM CHUJACHEN HEP U2 ER P SIKKIM BHAWANI KATTALAI BARRAGEII U 1 BHAWANI KATTALAI BARRAGEII U 2 BHAWANI KATTALAI BARRAGEIII U 2 URI-II U1 URI-II U3 NIMMO BAZGO U 2 NIMMO BAZGO U 3 NIMMO BAZGO U 1 URI-II U 2 URI II U 4 PARBATI-III U 1 PARBATI –III U 2 PARBATI –III U 3 RAMPUR HEP U 2 RAMPUR HEP U 1 RAMPUR HEP U 5 SR S SR PPCL N.T.E.C LTD. M/S TORRENT ENERGY JINDAL POWER LTD. GMR ENERGY ADANI POWER LTD RELIANCE POWER LTD ACB INDIA LTD. GAS COAL GAS 26.02.2014 28.02.2014 09.03.2014 250 500 400 COAL 10.03.2014 600 COAL COAL 21.03.2014 23.03.2014 350 660 COAL 25.03.2014 660 COAL 28.03.2014 30 CSEB COAL 30.03.2014 500 KORABA WEST POWER CO. LTD. JINDAL POWER LTD. DURGAPUR PROJECTS LTD. VIDARBHA INDUSTRIES LTD. COAL 31.03.2014 600 COAL 30.03.2014 600 COAL 31.03.2014 250 COAL 31.03.2014 300 TOTAL 16767 HYDRO HYDRO 01.04.2013 21.04.2013 33 49.5 HYDRO 20.04.2013 49.5 TN NHPC GATI INFRASTRUCT URE LTD. GATI INFRASTRUCT URE LTD. TNEB HYDRO 27.08.2013 15 S TN TNEB HYDRO 06.09.2013 15 SR S TN TNEB HYDRO 25.09.2013 15 NR NR NR NR NR NR NR NR NR NR NR NR NR C C C C C C C C C C C C C J&K J&K J&K J&K J&K J&K J&K HP HP HP HP HP HP NHPC NHPC NHPC NHPC NHPC NHPC NHPC NHPC NHPC NHPC SJVNL SJVNL SJVNL HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO HYDRO 25.09.2013 27.09.2013 30.10.2013 31.10.2013 02.11.2013 16.11.2013 02.02.2014 18.02.2014 27.02.2014 15.03.2014 21.03.2014 23.03.2014 29.03.2014 TOTAL GRAND TOTAL 60 60 15 15 15 60 60 130 130 130 68.67 68.67 68.67 1058.01 9 17825 LIST OF PROJECTS COMMISSIONED DURING 2014-15 (12TH PLAN) AS ON 31.08.2014 PROJECT NAME REGI SECT STATE DEVELOPER TYPE COMMISSIONING ON OR DETAILS COMMISSIONI CAPACI NG TY DATE (MW) THERMAL PROJECTS SALORA TPP U1 WR P CHHATTISG VANDANA COAL 10.04.2014 135 ARH VIDYUT LTD., DGEN MEGA CCPP MODULE 3 WR P GUJARAT TORRENT GAS 23.04.2014 400 ENERGY LTD. RAMGARH ST NR S RAJASTHAN RRVUNL GAS 01.05.2014 50 KALISINDH TPP U1 NR S RAJASTHAN RRVUNL COAL 02.05.2014 600 DHUVRAN CCPP-III WR S GUJARAT GSECL GAS 21.05.2014 376.1 DERANG TPP U1 ER P ODISHA JIPL COAL 10.05.2014 600 SASAN UMPP U3 WR P MP RELIANCE COAL 21.05.2014 660 POWER DHARIWAL TPP U2 WR P MAHARASTR DHARIWAL COAL 28.05.2014 300 A INFRS LTD. TALWANDI SABO TPP U1 NR P PUNJAB VEDANATA COAL 17.06.2014 660 CHHABRA TPP EXT U4 NR S RAJASTHAN RRVUNL COAL 30.06.2014 250 RAJPURA TPP U2 RAGHUNATHPUR TPP, PH-I DAMODARAM SANJEEVAIAH TPS ER C WB L&T POWER DEVELOPMENT LTD DVC SR S AP APPDCL AKALTARA (NAITARA)TPP WR P CHATTISGA RH SASAN UMPP U5 WR P MP NIGRI TPP WR P MP HYDRO PROJECTS PARBATI III HEP U4 RAMPUR HEP U 4 RAMPUR HEP U 3 NR NR NR NR P PUNJAB C C C HP HP HP KSK MAHANADI POWER COMY. LTD RELIANCE POWER JAIPRAKASH POWER VENTURES LTD NHPC SJVNL SJVNL 10 COAL 06.07.2014 700 COAL 24.08.2014 600 COAL 28.08.2014 800 COAL 22.08.2014 600 COAL 24.08.2014 660 COAL 29.08.2014 660 TOTAL 8051.1 22.05.2014 12.06.2014 31.07.2014 TOTAL GRAND TOTAL 130 68.67 68.67 267.34 8318.44 HYDRO HYDRO HYDRO SUMMARY OF STATE-WISE TYPE WISE CAPACITY ADDITION DURING 12TH PLAN (AS ON 31.08.2014) Sl. No. STATE/ UTs HYDRO TARGET 1 2 3 4 5 6 7 8 9 DELHI HARYANA HIMACHAL PRADESH JAMMU & KASHMIR PUNJAB RAJASTHAN UTTAR PRADESH UTTARAKHAND CHANDIGARH SUB TOTAL NR 10 11 12 13 14 15 16 CHHATTISGARH GUJARAT MAHARASHTRA MADHYA PRADESH GOA DAMAN & DIU DADRA & NAGAR HAVELI SUB TOTAL WR 17 18 19 20 21 ANDHRA PRADESH KARNATAKA KERALA TAMIL NADU PUDUCHERRY SUB TOTAL SR THERMAL ACHIEVE TARGET NUCLEAR ACHIEVE TARGET TOTAL ACHIEVE TARGET ACHIEVE 0 0 750 750 0 0 750 750 0 0 1160 1160 0 0 1160 1160 3583 1164 0 0 0 0 3583 1164 1109 329 0 0 0 0 1109 329 0 0 3920 2060 0 0 3920 2060 0 0 1530 3120 1400 0 2930 3120 0 0 4730 1750 0 0 4730 1750 1025 0 0 0 0 0 1025 0 0 0 0 0 0 0 0 0 5717 5717 1493 12090 8840 1400 0 19207 0 0 12840 5610 0 0 12840 5610 0 0 2852 6961 1400 0 4252 6961 0 0 10300 6640 0 0 10300 6640 400 0 6980 7205 0 0 7380 7205 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 400 400 0 32972 26416 1400 0 34772 410 0 8360 1400 0 0 8770 1400 0 0 0 0 0 0 0 0 100 0 0 0 0 0 100 0 60 60 4710 3100 2500 0 7270 3160 0 0 0 0 0 0 0 0 570 570 60 13070 4500 2500 0 16140 22 BIHAR 0 0 4690 660 0 0 4690 660 23 24 25 26 JHARKHAND ODISHA SIKKIM WEST BENGAL 0 0 2080 1040 0 0 2080 1040 0 0 3960 2250 0 0 3960 2250 SUB TOTAL ER 27 ARUNACHAL PRADESH 28 29 30 31 32 33 ASSAM MANIPUR MIZORAM MEGHALAYA NAGALAND TRIPURA SUB TOTAL NER 34 35 ANDMAN & NICOBAR LAKSHDWEEP TOTAL 2066 99 0 0 0 0 2066 99 292 132 1800 850 0 0 2092 982 2358 2358 231 12530 4800 0 0 14888 1710 0 0 0 0 0 1710 0 0 0 850 0 0 0 850 0 0 0 0 0 0 0 0 0 60 0 0 0 0 0 60 0 82 42 0 0 0 0 82 42 0 0 0 0 0 0 0 0 0 0 828 384 0 0 828 384 1852 1852 42 1678 384 0 0 3530 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10897 1826 72340 44940 5300 0 88537 46766 11 ALL INDIA POWER SCENERIO AT A GLANCE 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 27380 2525 9085.4 38990.4 19.51 COAL 49457 23450.38 39115 112022.4 56.05 THERMAL GAS 4965.32 6713.5 6702.23 18381.05 9.20 (FIGURES IN MW) NUCLEAR DIESEL 602.61 597.14 0 1199.75 0.60 TOTAL 55024.93 30761.02 45817.23 131603.18 65.84 R.E.S (MNRE) 3513.72 20989.73 0 24503.45 12.26 0 0 4780 4780 2.39 . TOTAL 85918.65 54275.75 59682.63 199877.03 100.00 2. CAPACITY ADDITION ACHIEVED DURING 11TH PLAN (EXCLUDING RES) (FIGURES IN MW) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL COAL 11695 18649 11550 41894 2702 1292 1550 5544 THERMAL GAS LIGNITE 1885.4 450 2530.5 540 740 500 5155.9 1490 3. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO 27482.00 2694.00 10622.76 40798.76 16.1 COAL 55290.50 50495.38 46525.01 152310.89 60.1 NUCLEAR TOTAL 0 0 880 880 16732.4 23011.5 15220 54963.9 TOTAL 14030 21720 12790 48540 (FIGURES IN MW) THERMAL GAS DIESEL 6974.42 602.61 8568.00 597.14 7065.53 0.00 22607.95 1199.75 8.9 0.5 NUCLEAR TOTAL 63055.03 59660.52 53590.54 176118.59 69.5 0.00 0.00 4780.00 4780.00 1.9 R.E.S (MNRE) 3803.67 27888.47 0.00 31692.14 12.5 TOTAL 93540.70 88322.99 68393.30 253389.48 100 NOTE:-I ) I.C. DOES NOT INCLUDE BENEFITS FROM PROJECTS IN BHUTAN. II) R.E.S. INCLUDES SHP – SMALL HYDRO POWER, B.P. – BIOMASS POWER, B.G.- BIOMASS GASIFIER, U&I – URBAN & INDUSTRIAL WASTE 4. ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) PEAK MET (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 78441 100715 130,006 135,453 69189 86818 116,191 123,294 PEAK DEFICIT/ SURPLUS (MW) (- / +) -9252 -13897 -13,815 -12,159 135,918 129,815 -6,103 APR,14-JULY,14 JULY,14 APR,14-AUG,14 * AUG,14 * 148,166 146,229 148,166 145,642 141,160 141,160 141,160 136,936 -7,006 -5069 -7006 -8706 PEAK DEFICIT/ SURPLU S( % ) (- / +) -11.8 -13.8 -10.6 -9.0 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) ENERGY DEFICIT/ SURPLUS (MU) (- / +) ENERGY DEFICIT/ SURPLUS ( % ) (- / +) 522537 690587 937,199 998,114 483350 624495 857,886 911,209 -39187 -66092 -79,313 -86,905 -7.5 -9.6 -8.5 -8.7 -4.5 1,002,257 959,829 -42,428 -4.2 -4.7 -3.5 -4.7 -6.0 368,838 94,637 463933 95095 354,500 91,204 445547 91047 -14,338 -3,433 -18386 -4048 -3.9 -3.6 -4.0 -4.3 NOTE : 1. LAKSHDEEP AND NICOBAR ISLAND ARE STAND ALONE SYSTEM, POWER SUPPLY OF THESE, DOES NOT FORM PART OF REGIONAL REQUIREMENT AND AVAILABILITY. 2. BOTH PEAK MET AND ENERGY AVAILABILITY AT BUS BAR. * PROVISIONAL 12 5. ANTICIPATED POWER SUPPLY POSITION DURING 2104-15 AS PER THE LGBR PEAK DEMAND (MW) 47,570 PEAK MET (MW) 46,899 PEAK DEFICIT/ SURPLUS (MW) (- / +) -671 PEAK DEFICIT/ SURPLUS ( % ) (- / +) -1.4 ENERGY REQUIRMENT (MU) 328,944 ENERGY AVAILABILITY (MU) 318,837 6. ALL INDIA ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 592.0 612.5 631.5 671.9 717.1 733.54 778.63 2010-11 818.80 2011-12 883.64 2012-13 917.18* *PROVISIONAL 7.ALL INDIA T&D AND AT&C LOSSES: YEAR T&D LOSSES (SOURCE :DMLF CEA) AT&C LOSSES (SOURCE:PFC) 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 32.53 31.25 30.42 28.65 27.20 25.47 34.78 34.33 33.02 30.62 29.45 27.37 2009-10 25.39 26.58 2010-11 23.97 26.15 2011-12 23.65 27.00 8. ALL INDIA VILLAGE ELECTRIFICATION (AS ON 31.05.2014): 571428 9. ALL INDIA COAL CONSUMPTION FOR POWER GENERATION (UTILITIES) YEAR 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 COAL CONSUMPTION (MT) 302.54 330.63 355.38 367.36 386.6 417.56 454.60 487.90 13 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -10,107 ENERGY DEFICIT/ SURPLUS ( % ) (- / +) -3.1 10. ALL INDIA THERMAL PLF (%) 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 73.6 76.8 78.6 77.2 77.48 75.07 73.32 69.93 65.55 2014-15* Up to AUG,14 66.3 *PROVISIONAL 11. Details of category wise actual generation (All- India) Category Thermal Nuclear Hydro Bhutan Import All India (Total) 2010-11 2011-12 2012-13 2013-14 Target (MU) Actual Generation (MU) Target (MU) Actual Generation (MU) Target (MU) Actual Generation (MU) Target (MU) Actual Generation (MU) 690857 22000 111352 6548 830757 665008.1 26266.4 114257.4 5610.9 811142.8 712234 25130 112050 5586 855000 708805.9 32286.6 130509.5 5284.5 876886.5 767275 35200 122045 5480 930000 760675.8 32866.11 113720 4794.5 912056.7 812737 35200 122263 4800 975000 792477 34228 134847 5598 967150 Growth rate(%) 5.6 8.1 4.0 12. PROGRAMME AND ACHIEVEMENT OF ENERGY GENERATION (MU) GEN SCH. CATEGORY THERMAL HYDRO NUCLEAR BHUTAN IMPORT ALL INDIA TOTAL TARGET (2014-15) AUGUST,2014 ACHIEVEMENT % ACH. * 66767.00 68944.11 103.2 16113.12 17072.20 105.95 3219.00 2880.46 89.48 767.00 1004.71 130.99 PROGRAMME 858603.00 124297.00 35300.00 4800.00 1023000.00 86866.12 89901.48 * Provisional based on actual-cum-Assesment 13. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 1084610 1167731 1257589 1354874 PEAK DEMAND(MW) 156208 169491 183902 199540 14 103.49 APRIL,2014- AUGUST,2014 PROGRAMME ACHIEVEMENT* %ACH. 346589.00 61457.27 14049.00 2547.00 364237.59 64661.2 14041.91 2918.45 105.09 105.21 99.95 114.58 424642.27 445859.2 105.00 POWER SCENERIO AT A GLANCE FOR ALL REGIONS 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) REGION HYDRO NORTHERN WESTERN SOUTHERN EASTERN N.EASTERN ISLANDS ALL-INDIA % THERMAL GAS DIESEL 4421.26 12.99 8254.81 17.48 4690.78 939.32 190 17.2 824.2 142.74 0 70.02 18381.05 1199.75 9.20 0.60 COAL 28357.5 38924.5 22882.5 21797.88 60 0 112022.38 56.05 15122.75 7447.5 11338.03 3882.12 1200 0 38990.4 19.51 (FIGURES IN MW) NUCLEAR TOTAL 32791.75 47196.79 28512.6 22005.08 1026.94 70.02 131603.18 65.84 R.E.S. (MNRE) 4391.4 7909.95 11569.3 398.71 228 6.1 24503.46 12.26 1620 1840 1320 0 0 0 4780 2.39 TOTAL 53925.9 64394.24 52739.93 26285.91 2454.94 76.12 199877.04 100 NOTE :- I.C. DOES NOT INCLUDE BENEFITS FROM PROJECTS IN BHUTAN 2. CAPACITY ADDITION ACHIEVED DURING 11TH PLAN (EXCLUDING RES) (FIGURES IN MW) REGION HYDRO NORTHERN WESTERN SOUTHERN EASTERN N.EASTERN ISLANDS ALL-INDIA THERMAL GAS DIESEL 1078 0 2652.5 0 1367.2 0 0 0 58.2 0 0 5155.9 0 COAL 9900 16944 6870 9670 0 0 43384 2566 770 564 1560 84 0 5544 3. INSTALLED CAPACITY AS ON 31.08.2014 REGION HYDRO NORTHERN WESTERN SOUTHERN EASTERN N.EASTERN ISLANDS ALL-INDIA % 16598.11 7447.50 11398.03 4113.12 1242.00 0.00 40798.76 16.1 TOTAL 440 0 440 0 0 0 880 13984 20366.5 8801.2 11230 142.2 0 54963.9 (FIGURES IN MW) THERMAL GAS DIESEL 5331.26 12.99 10915.41 17.48 4962.78 939.32 190.00 17.20 1208.50 142.74 0.00 70.02 22607.95 1199.75 8.9 0.5 COAL 39481.00 58859.51 27382.50 26527.88 60.00 0.00 152310.89 60.1 NUCLEAR TOTAL 10978 19596.5 8237.2 9670 58.2 0 48539.9 NUCLEAR TOTAL 44825.25 69792.40 33284.60 26735.08 1411.24 70.02 176118.59 69.5 R.E.S. (MNRE) 5935.77 11271.07 13784.67 432.86 256.67 11.10 31692.14 12.5 1620.00 1840.00 1320.00 0.00 0.00 0.00 4780.00 1.9 TOTAL 68979.13 90350.97 59787.30 31281.06 2909.91 81.12 253389.48 100 NOTE :- I.C. DOES NOT INCLUDE BENEFITS FROM PROJECTS IN BHUTAN 4. ACTUAL POWER SUPPLY POSITION* REGION PERIOD NORTHERN AUG,14* WESTERN AUG,14* SOUTHERN AUG,14* EASTERN AUG,14* NORTHAUG,14* EASTERN *PROVISIONAL PEAK DEMAND PEAK MET (MW) (MW) PEAK DEFICIT SURPLUS (MW) PEAK /DEFICIT SURPLUS (%) ENERGY /REQUIRMENT (MU) ENERGY AVAILABILITY (MU) ENERGY DEFICIT SURPLUS (MU) ENERGY /DEFICIT/ SURPLUS (%) 50,999 40,750 35,492 16,045 46,681 38,269 34,165 15,768 -4318 -2481 -1327 -277 -8.5 -6.1 -3.7 -1.7 33,774 25,354 23,586 11,124 31,137 24,984 22,757 11,013 -2,637 -370 -829 -111 -7.8 -1.5 -3.5 -1.0 2,356 2,053 -303 -12.9 1,257 1,156 -101 -8.0 15 5. INSTALLED CAPACITY OF STATES INCLUDING CENTRAL SECTOR SHARES (AS ON 31.08.2014) (FIGURES IN MW) STATES 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 7 1 2 CHANDIGARH DELHI HARYANA H.P. J&K PUNJAB RAJASTHAN U.P. UTTRAKHAND NR UNALLOCATED CHHATTISGARH GUJARAT M.P. MAHARASHTRA GOA D&D D&N HAVELI WR UNALLOCATED A.P. KARNATAKA KERALA T.N PUDUCHERRY NLC SR UNALLOCATED D.V.C BIHAR JHARKHAND ODISHA SIKKIM W.BENGAL ER UNALLOCATED ARUNACHAL P. ASSAM MANIPUR MEGHALYA MIZORAM NAGALAND TRIPURA NER UNALLOCATED A&N ISLAND LAKSHADWEEP ALL INDIA HYDRO 56.4 762.64 1413.29 3177.76 1730.56 3086.22 1638.39 2024.1 2066.32 642.43 120.0 772.0 3223.66 3331.84 0.0 0.0 0.0 0.0 3734.53 3599.80 1881.50 2182.20 0.00 0.00 0.00 193.26 129.43 200.93 2166.93 174.27 1248.30 0.00 97.57 429.72 80.98 356.58 34.31 53.32 62.37 127.15 0.00 0.00 40798.76 COAL 32.5 4927.62 6453.28 152.02 329.32 6345.8 8784.72 11095.45 383 977.19 10083.49 15738.27 8968.89 22039.27 326.17 36.71 44.37 1622.35 9583.08 6195.56 931.19 8973.10 232.32 100.17 1367.08 7155.60 1954.70 2358.88 6055.06 82.61 7466.87 1454.16 0.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 152310.89 THERMAL GAS DIESEL 15.3 0.0 2366.01 0.0 560.29 3.92 61.88 0.13 304.14 8.94 288.9 0.0 825.03 0.0 549.97 0.0 69.35 0.0 290.35 0.0 0.0 0.0 6906.09 17.48 257.18 0.0 3475.93 0.0 48.0 0.0 4.2 0.0 27.1 0.0 196.91 0.0 3370.40 36.80 0.00 234.42 533.58 256.44 1026.30 411.66 32.50 0.00 0.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 100.00 12.20 0.00 0.00 32.05 15.88 598.52 20.69 46.96 45.41 65.61 2.05 27.28 51.86 32.84 2.00 349.84 4.85 55.40 0.00 0.00 60.05 0.00 9.97 22607.95 1199.75 16 NUCLEAR TOTAL 47.9 7293.63 7017.49 214.03 642.40 6634.8 9609.75 11645.42 452.35 1267.54 10083.49 22661.84 9226.07 25515.20 374.17 40.91 71.47 1819.26 12990.28 6429.98 1721.21 10411.06 264.82 100.17 1367.08 7245.60 1954.70 2358.88 6055.06 87.61 7579.07 1454.16 47.93 679.21 92.37 67.66 79.14 34.84 354.69 55.40 60.05 9.97 176118.59 8.8 122.08 109.16 34.08 77.0 208.04 573.0 335.72 22.3 129.8 47.52 559.32 273.24 690.14 25.8 7.38 8.46 228.14 275.78 254.86 95.60 524.00 19.28 0.00 150.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4780.00 R.E.S TOTAL 2.0 21.14 125.7 638.91 147.50 322.80 3640.15 827.68 209.86 0.0 324.0 4430.2 886.63 5630.19 0.05 0.0 0.0 0.0 1530.48 3985.13 193.65 8075.38 0.03 0.00 0.00 0.00 114.12 20.05 115.13 52.11 131.45 0.00 103.93 34.11 5.45 31.03 36.47 29.67 16.01 0.00 10.35 0.75 31692.14 115.1 8199.49 8665.64 4064.78 2597.49 10251.86 15461.29 14832.92 2750.81 2039.77 10575.01 28423.36 13609.60 35167.37 400.02 48.29 79.93 2047.4 18531.07 14269.77 3891.96 21192.64 284.13 100.17 1517.56 7438.86 2198.25 2579.86 8337.12 313.99 8958.82 1454.16 249.43 1143.04 178.80 455.27 149.92 117.83 433.07 182.55 70.40 10.72 253389.48 NORTHERN REGION 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR COAL GAS DIESEL TOTAL STATE 7052.55 13807 1969.20 12.99 15789.19 0 PRIVATE 2078 4050 108 0 4158 0 CENTRAL 5992.2 10500.5 2344.06 0 12844.56 1620 TOTAL 15122.75 28357.5 4421.26 12.99 32791.75 1620 % 28.04 52.59 8.20 0.02 60.81 3.00 R.E.S. (MNRE) 1198.96 3192.44 0 4391.4 8.14 TOTAL 2404.70 9428.44 20456.76 53925.90 100 CAPACITY ACHIEVED DURING 11TH PLAN (EXCULDING RES) (FIGURES IN MW) 2. NORTHERN REGION STATE PRIVATE CENTRAL TOTAL 3. HYDRO COAL 754 1292 520 2566 3620 4050 2230 9900 THERMAL GAS 970 108 0 1078 DIESEL 0 0 0 0 INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO STATE 7052.55 PRIVATE 2148.00 CENTRAL TOTAL 7397.56 16598.1 1 24.06 % COAL 15488.0 0 11992.5 0 12000.5 0 39481.0 0 57.24 NUCLEAR TOTAL 0 0 440 440 5344 5450 3190 13984 TOTAL 4590 4158 2230 10978 (FIGURES IN MW) THERMAL GAS DIESEL 2879.2 12.99 0 108.00 0.00 2344.0 6 5331.2 6 7.73 0.00 12.99 0.02 NUCLEAR TOTAL 18380.1 9 12100.5 0 14344.5 6 44825.2 5 64.98 0.00 0.00 R.E.S. (MNRE) 1236.5 0 4699.2 7 1620.00 1620.00 2.35 0.00 5935.7 7 8.61 TOTAL 26669.2 4 18947.7 7 23362.1 2 68979.1 3 100.00 NOTE:- I.C. DOES NOT INCLUDE BENEFITS FROM PROJECTS IN BHUTAN. 4. PERIOD ACTUAL POWER SUPPLY POSITION PEAK PEAK PEAK DEMAND MET DEFICIT/ (MW) (MW) SURPLUS (MW) (- / +) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 23200 31516 40,248 45,860 45,934 51,112 50,392 51112 50,999 21346 26644 37,117 41,790 42,774 47,367 47,367 47367 46,681 -1854 -4872 -3,131 -4,070 -3,160 -3,745 -3,025 -3745 -4,318 PEAK DEFICIT/ SURPLUS ( % ) (- / +) -8 -15.5 -7.8 -8.9 -6.9 -7.3 -6.0 -7.3 -8.5 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 150383 202125 276,121 300,774 309,463 117,725 33,787 151,499 51,112 142410 179986 258,382 273,240 290,880 110,938 31,618 142,075 47,367 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -7973 -22139 -17,739 -27,534 -18,583 -6,787 -2,169 -9,424 -3,745 *PROVISIONAL 5. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15 AS PER THE LGBR PEAK DEMAND (MW) 47,570 PEAK MET (MW) 46,899 PEAK DEFICIT/ SURPLUS (MW) (- / +) -671 PEAK DEFICIT/ SURPLUS ( % ) (- / +) -1.4 ENERGY REQUIRMENT (MU) 328,944 17 ENERGY AVAILABILITY (MU) 318,837 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -10,107 ENERGY DEFICIT/ SURPLUS ( % ) (- / +) -3.1 ENERGY DEFICIT/ SURPLUS ( % ) (- / +) -5.3 -11.0 -6.4 -9.2 -6.0 -5.8 -6.4 -6.2 -7.3 6. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 2010-11 2011-12 739.44 776.37 833.19 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 330497 358565 389153 422498 PEAK DEMAND(MW) 47758 51799 56181 60934 18 CHANDIGARH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % THERMAL GAS DIESEL 0 0 0 0 15.32 0 15.32 0 14.49 0.00 COAL 0 0 29.81 29.81 28.20 0 0 51.74 51.74 48.95 (FIGURES IN MW) NUCLEAR TOTAL 0 0 45.13 45.13 42.69 0 0 8.84 8.84 8.36 2.INSTALLED CAPACITY AS ON 31.08.2014 SECTOR THERMAL GAS DIESEL 0.00 0.00 0.00 0.00 15.32 0.00 15.32 0.00 13.31 0.00 COAL 0.00 0.00 32.54 32.54 28.27 0.00 0.00 56.40 56.40 49.00 TOTAL 0 0 105.71 105.71 100 (FIGURES IN MW) HYDRO STATE PRIVATE CENTRAL TOTAL % R.E.S. (MNRE) 0 0 0 0 0.00 NUCLEAR TOTAL 0.00 0.00 47.86 47.86 41.58 R.E.S. (MNRE) 0.00 2.00 0.00 2.00 1.74 0.00 0.00 8.84 8.84 7.68 TOTAL 0.00 2.00 113.10 115.10 100.00 3.ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* PEAK MET (MW) 180 264 263 340 345 367 367 367 295 PEAK DEFICIT/ SURPLUS (MW) (- / +) 180 247 263 340 345 367 367 367 295 PEAK DEFICIT/ SURPLUS (%) (- / +) 0 -6.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 -17 0 0 0 0 0 0 0 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 1110 1343 1,568 1,637 1,574 626 182 809 183 1108 1341 1,564 1,637 1,574 626 182 809 183 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -2 -2 -4 0 0 0 0 0 0 ENERGY DEFICIT/ SURPLUS (%) (- / +) -0.2 -0.1 -0.3 0.0 0.0 0.0 0.0 0.0 0.0 * PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) 350 324 Peak Deficit/ Surplus (MW) (- / +) -26 Peak Deficit/ Surplus ( % ) (- / +) -7.4 Energy Requirment (MU) 1,635 Energy Availability (MU) 1,791 Energy Deficit/ Surplus (MU) (- / +) 156 Energy Deficit/ Surplus ( % ) (- / +) 9.6 BENEFITS SHARES OF STATE UNIT WISE 5. LIKELY BENEFIT TO THE STATE OF CHANDIGARH DURING 12TH PLAN PROJECTS TYPE STATU S STATE PROJECT LOCATION SE CT O R IC (MW) COMMISSIONING DATE (CAPACITY) (MW RIHAND-III U-5,6 T COMM UP C RAPP U7& 8 KOLDAM * N H UC UC RAJ HP C C CHAMERA III H COMM HP C 19 2X500=1000 2X700=1400 4X200=800 3X77=231 5 20.05.2012(500MW) 07.10.2013(500MW) 5 6 1 07.06.2012 (77MW) 12.06.2012(77MW) 4X130=520 PARBATI III H COMM HP C PARBATI II * KISHANGANGA * H H UC UC HP J&K C C URI II H COMM TAPOVAN VISNUGARH * H UC J&K 4X200=800 3X110=330 4X60=240 C UTTARAKHAN D AR.PR AR.PR KAMENG H UC LOWER SUBANSHRI H UC TOTAL CENTRAL SECTOR SHARE GRAND TOTAL (CHANDIGARH) 3.12 C C C 6 3 1.6 4X130=520 4X150=600 4X250=1000 28.06.2012(77MW) 18.02.2014(130MW) 27.02.2014(130MW) 15.03.2014(130MW) 22.05.2014(130MW) 25.09.2013(60MW) 27.09.2013(60MW) 16.11.2013(60MW) 02.02.2014(60MW) 4 1 2.5 38.22 38.22 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 39.06333 T&D LOSSES % 39.06 30.37 31.64 25.13 23.77 22.36 23.19 20.25 23.67 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 1859 1956 2058 2165 PEAK DEMAND(MW) 370 387 406 426 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 1238.51 2010-11 1282.86 2011-12 1217.37 20 DELHI 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 0 135 1300.4 0 1435.40 0 0 PRIVATE 0 0 108 0 108 0 18.53 CENTRAL 637.12 4058.46 207.61 0 4266.07 122.08 0 TOTAL 637.12 4193.46 1616.01 0 5809.47 122.08 18.53 % 9.67 63.66 24.53 0.00 88.19 1.85 0.28 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO THERMAL COAL GAS DIESEL STATE 2050.4 0.00 135.00 0.00 0 PRIVATE 0.00 371.25 108.00 0.00 CENTRAL 4421.3 762.64 207.61 0.00 7 TOTAL 4927.6 2366.0 762.64 0.00 2 1 % 9.30 60.10 28.86 0.00 3.ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 3118 4000 5,031 5,942 6,035 6,006 6,006 6,006 5,589 2879 3736 5,028 5,642 5,653 5,925 5,925 5,925 5,507 PEAK DEFICIT/ SURPLUS (MW) (- / +) -239 -264 -3 -300 -382 -81 -81 -81 -82 PEAK DEFICIT/ SURPLUS (%) (- / +) -7.7 -6.6 -0.1 -5.0 -6.3 -1.3 -1.3 -1.3 -1.5 ENERGY REQUIRMENT (MU) 0.00 0.00 122.08 122.08 1.49 ENERGY AVAILABILITY (MU) 19350 22397 26,751 26,088 26,867 11,481 3,321 14,664 3,183 1435.40 126.53 5025.27 6587.20 100.00 (FIGURES IN MW) R.E.S. TOTAL (MNRE) 2185.4 0.00 0 21.14 500.39 5513.7 0.00 0 8199.4 21.14 9 0.26 100.00 NUCLEAR TOTAL 2185.4 0 479.25 4628.9 8 7293.6 3 88.95 TOTAL 18741 22012 26,674 25,950 26,791 11,400 3,310 14,571 3,171 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -609 -385 -77 -138 -76 -81 -11 -93 -12 ENERGY DEFICIT/ SURPLUS (%) (- / +) -3.1 -1.7 -0.3 -0.5 -0.3 -0.7 -0.3 -0.6 -0.4 * PROVISIONAL 4.ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) Peak Met (MW) 6,100 Peak Deficit/ Surplus (MW) (- / +) -372 5,728 Peak Deficit/ Surplus ( % ) (- / +) -6.1 Energy Requirment (MU) 29,050 Energy Availability (MU) 34,959 Energy Deficit/ Surplus (MU) (- / +) 5,909 Energy Deficit/ Surplus ( % ) (- / +) 20.3 5.LIKELY BENEFIT TO THE STATE OF DELHI DURING 12TH PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SEC TOR IC (MW) RIHAND-III U-5,6 T COMM UP C 2X500=1000 BENEFITS SHARES OF STATE (MW) 132 INDIRA GANDHI TPP (JHAJJAR) JV U-3 KODERMA U2 T COMM HAR C 1X500=500 231 20.05.2012(500MW) 07.10.2013(500MW) 7.11.2012(500MW) T UC JHAR C 500 15.02.2013(500MW) 21 1X500=500 UNIT WISE COMMISSIONING DATE (CAPACITY) RAPP U7& 8 KOLDAM * CHAMERA III N H H UC UC COMM RAJ HP HP C C C 2X700=1400 4X200=800 3X77=231 101 81 29 PARBATI III H COMM HP C 4X130=520 66.22 PARBATI II * KISHANGANGA * URI II H H H UC UC COMM HP J&K J&K C C C 4X200=800 3X110=330 4X60=240 81 34 32.2 UTTARAKHAND AR.PR AR.PR C C C 4X130=520 4X150=600 4X250=1000 DEL S 53 34 56.5 1430.92 750 TAPOVAN VISNUGARH * H UC KAMENG H UC LOWER SUBANSHRI H UC TOTAL CENTRAL SECTOR SHARE PRAGATI-III T COMM (BAWANA)GT 3,4 ST 2 3X250=750 STATE SECTOR 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) 18.02.2014(130MW) 27.02.2014(130MW) 15.03.2014(130MW) 22.05.2014(130MW) 25.09.2013(60MW) 27.09.2013(60MW) 16.11.2013(60MW) 02.02.2014(60MW) 27.06.2012(250MW) 07.05.2013(250MW) 26.02.2014(250MW) 750 SASAN UMPP U1,2 T COMM MP P 2X660=1320 149 SASAN UMPP U3&4,5# T COMM MP P 3X660=1980 223.5 PRIVATE SECTOR GRAND TOTAL (DELHI) 30.05.2013(660MW) 18.12.2013(660MW) 25.03.2014(660 MW) 21.05.2014 (660 MW) 24.08.2014 (600MW) 442.5 2478.92 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE, # OUTSIDE 88537 MW 6.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 T&D LOSSES % 43.66 45.40 48.61 33.00 28.65 22.22 22.09 20.04 19.32 7.PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 31011 33047 35217 37529 PEAK DEMAND(MW) 5547 5818 6101 6398 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 1447.72 2010-11 1530.43 22 2011-12 1586.73 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 8637.67 2012-13 % PLF 61.51 Actual Gen (MU) 10740.93 2011-12 % PLF 72.68 Actual Gen (MU) 9970.69 23 % PLF 75.81 HARYANA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % COAL 3160 660 914.99 4734.99 68.80 884.51 0 466.67 1351.18 19.63 THERMAL GAS DIESEL 25 3.92 0 0 535.29 0 560.29 3.92 8.14 0.06 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR PRIVATE 0.00 CENTRAL 528.78 TOTAL 1413.2 9 16.31 % 3. THERMAL GAS DIESEL COAL 3160.0 0 2091.2 5 1202.0 3 6453.2 8 74.47 884.51 NUCLEAR TOTAL 3188.92 660 1450.28 5299.2 77.00 0 0 109.16 109.16 1.59 R.E.S. (MNRE) 70.1 52.6 0 122.7 1.78 TOTAL 4143.53 712.6 2026.11 6882.24 100 (FIGURES IN MW) HYDRO STATE (FIGURES IN MW) 25.00 3.92 0.00 0.00 535.29 0.00 560.29 3.92 6.47 0.05 NUCLEAR TOTAL 3188.9 2 2091.2 5 1737.3 2 7017.4 9 80.98 R.E.S. (MNRE) 0.00 70.10 0.00 55.60 109.16 0.00 109.16 125.70 1.26 1.45 TOTAL 4143.5 3 2146.8 5 2375.2 6 8665.6 4 100.00 ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10THPLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14 AUG,14 3000 4837 6,533 7,432 8,114 8,752 8,752 9,152 9,152 PEAK MET (MW) 2900 4201 6,259 6,725 8,114 8,752 8,752 9,152 9,152 PEAK DEFICIT/ SURPLUS (MW) (- / +) -100 -636 -274 -707 0 0 0 0 0 PEAK DEFICIT/ SURPLUS (%) (- / +) -3.3 -13.1 -4.2 -9.5 0.0 0.0 0.0 0.0 0.0 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 18138 26249 36,874 41,407 43,463 16,417 5,349 21,922 5,505 17839 23132 35,541 38,209 43,213 16,356 5,333 21,854 5,498 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -299 -3117 -1,333 -3,198 -250 -61 -16 -68 -7 ENERGY DEFICIT/ SURPLUS (%) (- / +) -1.6 -11.9 -3.6 -7.7 -0.6 -0.4 -0.3 -0.3 -0.1 *PROVISIONAL 4.ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) Peak Met (MW) 8,500 9,264 Peak Deficit/ Surplus (MW) (- / +) 764 Peak Deficit/ Surplus ( % ) (- / +) 9.0 Energy Requirment (MU) 45,950 Energy Availability (MU) 52,363 Energy Deficit/ Surplus (MU) (- / +) 6,413 Energy Deficit/ Surplus ( % ) (- / +) 14.0 5.LIKELY BENEFIT TO THE STATE OF HARYANA DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SECTOR IC (MW) RIHAND-III U-5,6 T COMM UP C 2X500=1000 24 BENEFITS SHARES OF STATE (MW 56 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 20.05.2012(500MW) 07.10.2013(500MW) RAPP U7& 8 RAMPUR N H UC COMM/UC RAJ HP C C 2X700=1400 6X68.67=412 44 17.11 KOLDAM * CHAMERA III H H UC COMM HP HP C C 4X200=800 3X77=231 45 12 PARBATI III H COMM HP C 4X130=520 27.99 PARBATI II * INDIRA GANDHI TPP (JHAJJAR) JV U-3 URI II H T UC COMM HP HAR C C 4X200=800 1X500=500 45 231 H COMM J&K C 4X60=240 13.4 KISHANGANGA * H UC TAPOVAN VISNUGARH * H UC KAMENG H UC LOWER SUBANSHRI H UC TOTAL CENTRAL SECTOR SHARE J&K UTTARAKHAND AR.PR AR.PR C C C C 3X110=330 4X130=520 4X150=600 4X250=1000 19 30 13 21.5 575 SASAN UMPP U1,2 T COMM MP P 2X660=1320 148 SASAN UMPP U3&4,5# T COMM MP P 3X660=1980 222 MUNDRA UMPP, U 2 MUNDRA UMPP, U3# MUNDRA UMPP, U4# MUNDRA UMPP, U5# MAHATMI GANDHI JHAJJAR STPP U2 PRIVATE SECTOR GRAND TOTAL (HARYANA) T T T T T COMM COMM COMM COMM COMM GUJ GUJ GUJ GUJ HAR P P P P P 1X800=800 1X800=800 1X800=800 1X800=800 1X660=660 80 80 80 80 660 21.03.2014(68.67MW) 23.03.2014(68.67MW) 29.03.2014(68.67MW) 12.06.2014(68.67MW) 31.07.2014(68.67MW) 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) 18.02.2014(130MW) 27.02.2014(130MW) 15.03.2014(130MW) 22.05.2014(130MW) 7.11.2012(500MW) 25.09.2013(60MW) 27.09.2013(60MW) 16.11.2013(60MW) 02.02.2014(60MW) 30.05.2013(660MW) 18.12.2013(660MW) 25.03.2014(660 MW) 21.05.2014 (660 MW) 24.08.2014 (660 MW) 17.07.2012(800MW) 16.10.2012(800MW) 16.01.2013(800MW) 18.03.2013(800MW) 11.04.2012(660MW) 1350 1925 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE, # - OUT SIDE 88537MW 6.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 T&D LOSSES % 32.07 32.11 30.51 33.35 32.83 30.74 31.00 29.66 28.58 25 7.PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 40750 44254 48060 52193 56681 2012-13 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 7291 7944 8655 9429 10273 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 1491.37 2010-11 1485.07 2011-12 1628.31 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 26374.22 2012-13 % PLF 47.2 Actual Gen (MU) 25416.04 2011-12 % PLF 49.51 Actual Gen (MU) 24046.48 26 % PLF 70.63 HIMACHAL PRADESH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % THERMAL GAS DIESEL 0 0.13 0 0 61.88 0 61.88 0.13 1.73 0.00 COAL 0 0 118.3 118.3 3.30 393.6 1678 771.34 2842.94 79.30 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO COAL STATE 393.60 0.00 PRIVATE 1748.0 0 1036.1 6 3177.7 6 78.18 CENTRAL TOTAL % (FIGURES IN MW) NUCLEAR TOTAL 0.13 0 180.18 180.31 5.03 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL R.E.S. (MNRE) 527.66 0 0 527.66 14.72 0 0 34.08 34.08 0.95 NUCLEAR R.E.S. (MNRE) 0.00 0.13 0.13 0.00 638.91 0.00 0.00 0.00 0.00 0.00 0.00 152.02 61.88 0.00 213.90 34.08 0.00 152.02 61.88 0.13 214.03 34.08 638.91 3.74 1.52 0.00 5.27 0.84 15.72 PEAK DEFICIT/ SURPLUS (%) (- / +) 0.0 0.0 -7.1 -21.0 -10.8 -1.6 0.0 -0.2 0.0 ENERGY REQUIRMENT (MU) TOTAL 921.39 1678 985.6 3584.99 100 TOTAL 1032.6 4 1748.0 0 1284.1 4 4064.7 8 100.00 3.ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* PEAK MET (MW) 562 873 1,397 2,116 1,561 1,316 1,248 1,316 1,313 562 873 1,298 1,672 1,392 1,295 1,248 1,313 1,313 PEAK DEFICIT/ SURPLUS (MW) (- / +) 0 0 -99 -444 -169 -21 0 -3 0 ENERGY AVAILABILITY (MU) 3293 5136 8,161 8,992 9,089 2,991 775 3,762 771 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -87 -140 -54 -248 -206 -29 -7 -48 -19 3206 4996 8,107 8,744 8,883 2,962 768 3,714 752 ENERGY DEFICIT/ SURPLUS (%) (- / +) -2.6 -2.7 -0.7 -2.8 -2.3 -1.0 -0.9 -1.3 -2.5 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) Peak Met (MW) 1,600 2,104 Peak Deficit/ Surplus (MW) (- / +) 504 Peak Deficit/ Surplus ( % ) (- / +) 31.5 Energy Requirment (MU) 9,575 Energy Availability (MU) 11,276 Energy Deficit/ Surplus (MU) (- / +) 1,700 Energy Deficit/ Surplus ( % ) (- / +) 17.8 5.LIKELY BENEFIT TO THE STATE OF HIMACHAL PRADESH DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) RIHAND-III U-5,6 T COMM UP C 2X500=1000 BENEFITS SHARES OF STATE (MW 34 RAPP U7& 8 RAMPUR N H UC COMM/UC RAJ HP C C 2X700=1400 6X68.67=412 27 172.66 27 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 20.05.2012(500MW) 07.10.2013(500MW) 21.03.2014(68.67MW) 23.03.2014(68.67MW) 29.03.2014(68.67MW) 12.06.2014(68.67MW) 31.07.2014(68.67MW) KOLDAM * CHAMERA III H H UC COMM HP HP C C 4X200=800 3X77=231 131 38 PARBATI III H COMM HP C 4X130=520 85.05 PARBATI II * KISHANGANGA * TAPOVAN VISNUGARH * H H H UC UC UC HP J&K UTTARA KHAND C C C 4X200=800 3X110=330 4X130=520 131 12 19 HP HP HP HP HP S S S S S 65 100 111 130 100 HP HP HP HP P P P P 100 100 44 2X35=70 TOTAL CENTRAL SECTOR SHARE KASHANG – I HEP H UC UHL-III HEP H UC SAWARA KUDDU HEP H UC KASHANG II & III HEP H UC SAINJ HEP H UC TOTAL STATE SECTOR TIDONG-I HEP H UC SORANG HEP H UC TANGNU ROMAI-I HEP H UC BUDHIL H COMM TOTAL PRIVATE SECTOR GRAND TOTAL (HP) 649.71 65 100 111 130 100 506 100 100 44 70 07.06.2012(77MW) 12.06.2012(77MW) 28.06.2012(77MW) 18.02.2014(130MW) 27.02.2014(130MW) 15.03.2014(130MW) 22.05.2014(130MW) 30.05.2012(35MW) 26.05.2012(35MW) 314 1469.71 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 T&D LOSSES % 22.76 28.90 23.55 19.77 16.98 15.51 20.52 22.22 61.78 7.PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 9421 9891 10384 10901 PEAK DEMAND(MW) 1558 1665 1778 1900 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 1144.94 28 2010-11 1250.93 2011-12 1289.39 JAMMU & KASHMIR 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 780 0 743.03 COAL 0 0 263.7 THERMAL GAS DIESEL 175 8.94 0 0 129.14 0 TOTAL 183.94 0 392.84 1523.03 66.01 263.7 11.43 304.14 13.18 576.78 25.00 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR TOTAL 3. 0 0 77 R.E.S. (MNRE) 130.59 0 0 1094.53 0 1212.87 77 3.34 130.59 5.66 2307.4 100 NUCLEAR TOTAL R.E.S. (MNRE) TOTAL TOTAL 780.00 0.00 175.00 8.94 183.94 0.00 147.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 950.56 329.32 129.14 0.00 458.46 77.00 0.00 329.32 304.14 8.94 642.40 77.00 147.53 12.68 11.71 0.34 24.73 2.96 5.68 PEAK DEFICIT/ SURPLUS (MW) (- / +) -210 -221 -596 -605 -502 -484 -482 -484 -456 PEAK DEFICIT/ SURPLUS (%) (- / +) -17.4 -14.4 -25.0 -25.0 -20.1 -20.0 -20.0 -20.0 -20.0 1730.5 6 66.62 % 8.94 0.39 THERMAL GAS DIESEL COAL PRIVATE CENTRAL NUCLEAR (FIGURES IN MW) HYDRO STATE (FIGURES IN MW) 1111.4 7 0.00 1486.0 2 2597.4 9 100.00 ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 1209 1530 2,385 2,422 2,500 2,422 2,413 2,422 2,282 PEAK MET (MW) 999 1309 1,789 1,817 1,998 1,938 1,931 1,938 1,826 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 6635 11725 14,250 15,410 15,613 5,317 1,315 2,422 2,413 5899 7983 10,889 11,558 12,187 4,255 1,052 1,938 1,931 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -736 -3742 -3,361 -3,852 -3,426 -1,062 -263 -484 -482 ENERGY DEFICIT/ SURPLUS (%) (- / +) -11.1 -31.9 -23.6 -25.0 -21.9 -20.0 -20.0 -20.0 -20.0 *PROVISIONAL 4.ANTICIPATED POWER SUPPLY POSITION DURING 2014-15 AS PER THE LGBR Peak Demand (MW) 2,550 Peak Met (MW) Peak Deficit/ Surplus (MW) (- / +) -292 2,258 Peak Deficit/ Surplus ( % ) (- / +) -11.5 Energy Requirment (MU) 16,130 5.LIKELY BENEFIT TO THE STATE OF J&K DURING 12TH PLAN PROJECTS T ST STATE SE Y AT PROJECT CT P US LOCATION OR E RIHAND-III U-5,6 T COMM UP C 29 Energy Availability (MU) 11,355 Energy Deficit/ Surplus (MU) (- / +) -4,775 IC (MW) 2X500=1000 BENEFITS SHARES OF STATE (MW) 66 Energy Deficit/ Surplus ( % ) (- / +) -29.6 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 25.05.2012(500MW) 07.10.2013(500MW) RAPP U7& 8 RAMPUR N H UC/COMM COMM/UC RAJ HP C C 2X700=1400 6X68.67=412 KOLDAM * CHAMERA III H H UC COMM HP HP C C 4X200=800 3X77=231 72 16 PARBATI III H COMM HP C 4X130=520 35.89 PARBATI II * KISHANGANGA * NIMOO BAZGO H H H UC UC COMM HP J&K J&K C C C 4X200=800 3X110=330 45 72 73 39 CHUTAK H COMM J&K C URI II H COMM J&K C 4X60=240 48.8 UTTARAKHAND C 4X130=520 J&K S 47 590.04 450 450 1040.04 TAPOVAN VISNUGARH * H UC TOTAL CENTRAL SECTOR SHARE BAGLIHAR-II HEP H UC TOTAL STATE SECTOR GRAND TOTAL (J&K) 44 450 54 29.35 37 21.03.2014(68.67MW) 23.03.2014(68.67MW) 29.03.2014(68.67MW) 12.06.2014(68.67MW) 31.07.2014(68.67MW) 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) 18.02.2014(130MW) 27.02.2014(130MW) 15.03.2014(130MW) 22.05.2014(130MW) 31.10.2013(15MW) 31.10.2013(15MW) 02.11.2013(15MW) 22.11.2012(11MW) 08.11.2012(11MW) 11.11.2012(11MW) 28.01.2013 (11MW) 25.09.2013(60MW) 27.09.2013(60MW) 16.11.2013(60MW) 02.02.2014(60MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 T&D LOSSES % 45.54 41.08 44.93 51.98 55.71 58.02 67.35 63.27 61.78 7.PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 14872 15333 15808 16298 PEAK DEMAND(MW) 2523 2577 2631 2687 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 30 2009-10 968.47 2010-11 988.30 2011-12 1015.19 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 2012-13 % PLF 0 Actual Gen (MU) 0 % PLF 0 2011-12 Actual Gen (MU) 5.41 31 % PLF PUNJAB 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL 2230.23 0 766.66 COAL 2630 0 578.19 TOTAL % 2996.89 42.48 3208.19 45.47 THERMAL GAS DIESEL 25 0 0 0 263.92 0 TOTAL 2655 0 842.11 288.92 4.09 3497.11 49.56 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO STATE COAL 2630.0 0 3055.0 0 660.88 6345.8 8 61.90 2230.2 3 PRIVATE 0.00 CENTRAL TOTAL % 855.99 3086.2 2 30.10 (FIGURES IN MW) 0 0.00 NUCLEAR 0 0 208.04 R.E.S. (MNRE) 244.5 109.08 0 TOTAL 5129.73 109.08 1816.81 208.04 2.95 353.58 5.01 7055.62 100 (FIGURES IN MW) THERMAL GAS DIESEL NUCLEAR TOTAL 2655.0 0 3055.0 0 924.80 6634.8 0 64.72 25.00 0.00 0.00 0.00 263.92 0.00 288.92 0.00 2.82 0.00 PEAK DEFICIT/ SURPLUS (MW) (- / +) -484 -2413 -1,770 -2,769 -1,356 -1,511 -1,835 -1,511 -500 PEAK DEFICIT/ SURPLUS (%) (- / +) -8.9 -26.9 -16.9 -24.0 -13.4 -13.1 -15.9 -13.1 -5.0 R.E.S. (MNRE) TOTAL 0.00 156.20 5041.43 0.00 166.60 3221.60 208.04 0.00 208.04 322.80 2.03 3.15 1988.83 10251.8 6 100.00 3.ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14 * PEAK MET (MW) 5420 8971 10,471 11,520 10,089 11,534 11,534 11,534 10,091 4936 6558 8,701 8,751 8,733 10,023 9,699 10,023 9,591 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 28780 38641 45,191 48,724 47,821 19,265 6,639 25,740 6,475 27577 34839 43,792 46,119 47,084 19,001 6,422 25,379 6,378 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -1203 -3802 -1,399 -2,605 -737 -264 -217 -361 -97 ENERGY DEFICIT/ SURPLUS (%) (- / +) -4.2 -9.8 -3.1 -5.3 -1.5 -1.4 -3.3 -1.4 -1.5 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 12,000 Peak Met (MW) 10,209 Peak Deficit/ Surplus (MW) (- / +) -1,791 Peak Deficit/ Surplus ( % ) (- / +) -14.9 Energy Requirment (MU) 49,020 Energy Availability (MU) 49,259 Energy Deficit/ Surplus (MU) (- / +) 239 Energy Deficit/ Surplus ( % ) (- / +) 0.5 5.LIKELY BENEFIT TO THE STATE OF PUNJAB DURING 12TH PLAN PROJECTS T Y ST AT STATE PROJECT 32 SE CT IC (MW) BENEFITS SHARES UNIT WISE COMMISSIONING P E US LOCATION OR RIHAND-III U-5,6 T COMM UP C 2X500=1000 OF STATE (MW) 83 RAPP U7& 8 RAMPUR N H UC UC/COMM RAJ HP C C 2X700=1400 6X68.67=412 65 23.16 KOLDAM * CHAMERA III H H UC COMM HP HP C C 4X200=800 3X77=231 62 18 PARBATI III H COMM HP C 4X130=520 40.85 PARBATI II * KISHANGANGA * URI II H H H UC UC COMM HP J&K J&K C C C 4X200=800 3X110=330 4X60=240 62 26 19.5 TAPOVAN VISNUGARH * KAMENG LOWER SUBANSHRI TOTAL CENTRAL SECTOR SHARE H UC UTTARAKHAND C 4X130=520 41 H H UC UC AR.PR AR.PR C C 4X150=600 4X250=2000 19 32 491.51 TALWANDI SABO TPP U1,2 GOINDWAL SAHIB TPP U1,2 NABHA TPP U-1,2 T UC/COMM PUN P 3X660=1980 1980 T UC PUN P 2X270=270 540 T COMM PUN P 2X700=1400 1400 SASAN UMPP U1,2 T COMM MP P 2X660=1320 198 SASAN UMPP U3&4,5# T COMM MP P 3X660=1980 297 MUNDRA UMPP, U 2 MUNDRA UMPP, U 3# MUNDRA UMPP, U4# MUNDRA UMPP, U5# PRIVATE SECTOR GRAND TOTAL (PUNJAB) T T T T COMM COMM COMM COMM GUJ GUJ GUJ GUJ P P P P 1X800=800 1X800=800 1X800=800 1X800=800 100 100 100 100 4815 5306.51 DATE (CAPACITY MW) 20.05.2012(500MW) 07.10.2013(500MW) 21.03.2014(68.67MW) 23.03.2014(68.67MW) 29.03.2014(68.67MW) 12.06.2014(68.67MW) 31.07.2014(68.67MW) 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) 18.02.2014(130MW) 27.02.2014(130MW) 15.03.2014(130MW) 22.05.2014(130MW) 25.09.2013(60MW) 27.09.2013(60MW) 16.11.2013(60MW) 02.02.2014(60MW) 17.06.2014(66MW) 24.01.2014(700MW) 06.07.2014(700MW) 30.05.2013(660MW) 18.12.2013(660MW) 25.03.2014(660 MW) 21.05.2014 (660 MW) 24.08.2014 (660MW) 17.07.2012(800MW) 16.10.2012(800MW) 16.01.2013(800MW) 18.03.2013(800MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE, # - OUT SIDE 88537MW 6.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 T&D LOSSES % 25.42 25.42 27.56 26.61 22.82 23.08 33 2009-10 2010-11 2011-12 23.39 25.10 23.08 7.PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 55567 59844 64450 69410 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 10770 11271 11794 12342 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 1663.01 2010-11 1735.51 2011-12 1799.01 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 16817.97 2012-13 % PLF 69.69 Actual Gen (MU) 18012.31 2011-12 % PLF 78.48 Actual Gen (MU) 19068.43 34 % PLF 82.86 RAJASTHAN 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 987.96 0 514.84 1502.8 14.79 THERMAL GAS DIESEL 443.8 0 0 0 221.23 0 665.03 0 6.55 0.00 COAL 3615 540 899.48 5054.48 49.74 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR STATE HYDRO 987.96 PRIVATE CENTRAL TOTAL 0.00 650.43 1638.3 9 10.60 % NUCLEAR TOTAL 4058.8 540 1120.71 5719.51 56.29 0 0 573 573 5.64 R.E.S. (MNRE) 30.25 2335.3 0 2365.55 23.28 TOTAL 5077.01 2875.3 2208.55 10160.86 100 (FIGURES IN MW) THERMAL GAS DIESEL COAL 4640.0 0 3130.0 0 1014.7 2 8784.7 2 56.82 (FIGURES IN MW) 603.80 0.00 0.00 0.00 221.23 0.00 825.03 0.00 5.34 0.00 NUCLEAR TOTAL 5243.8 0 3130.0 0 1235.9 5 9609.7 5 62.15 R.E.S. (MNRE) TOTAL 0.00 23.85 6255.61 0.00 3616.3 0 6746.30 573.00 0.00 2459.38 3640.1 5 23.54 15461.2 9 100.00 573.00 3.71 3.ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAN D (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 3700 5794 8,188 8,940 10,047 9,403 9,403 10,087 10,087 PEAK MET (MW) 3657 4946 7,605 8,515 10,038 9,403 9,403 10,077 10,077 PEAK DEFICIT/ SURPLUS (MW) (- / +) -43 -848 -583 -425 -9 0 0 -10 -10 PEAK DEFICIT/ SURPLUS (%) (- / +) -1.2 -14.6 -7.1 -4.8 -0.1 0.0 0.0 -0.1 -0.1 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 24745 33236 51,474 55,538 58,202 21,008 5,548 26,381 5,373 24495 31715 49,491 53,868 58,042 20,869 5,464 26,088 5,219 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -250 -1521 -1,983 -1,670 -160 -139 -84 -293 -154 ENERGY DEFICIT/ SURPLUS (%) (- / +) -1.0 -4.6 -3.9 -3.0 -0.3 -0.7 -1.5 -1.1 -2.9 *PROVISIONAL 4.ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 11,000 Peak Met (MW) 10,271 Peak Deficit/ Surplus (MW) (- / +) -729 Peak Deficit/ Surplus ( % ) (- / +) -6.6 Energy Requirment (MU) 62,540 5. LIKELY BENEFIT TO THE STATE OF RAJASTHAN DURING 12TH PLAN 35 Energy Availability (MU) 57,197 Energy Deficit/ Surplus (MU) (- / +) -5,343 Energy Deficit/ Surplus ( % ) (- / +) -8.5 PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) RIHAND-III U-5,6 T COMM UP C 2X500=1000 BENEFITS SHARES OF STATE (MW 115 RAPP U7& 8 RAMPUR N H UC COMM/UC RAJ HP C C 2X700=1400 6X68.67=412 700 31.81 KOLDAM * CHAMERA III H H UC COMM HP HP C C 4X200=800 3X77=231 86 25 PARBATI III H COMM HP C 4X130=520 56.75 PARBATI II * KISHANGANGA * URI II H H H UC UC COMM HP J&K J&K C C C 4X200=800 3X110=330 4X60=240 86 36 27.4 TAPOVAN VISNUGARH * H UC KAMENG H UC LOWER SUBANSHRI H UC TOTAL CENTRAL SECTOR SHARE KALISINDH TPS U1 T COMM CHHABRA TPS EXTN U3,4 T COMM UTTARAKHAND AR.PR AR.PR C C C 4X130=520 4X150=600 4X250=1000 RAJ RAJ S S 1X600=600 2X250=500 56 28 46.5 1294.46 600 500 RAMGARH GT RAMGARH ST TOTAL STATE SECTOR T T COMM COMM RAJ RAJ S S 110 50 110 50 1260 JALLIPA KAPURDI U 5,6 T COMM RAJ P 2X135=270 270 JALLIPA KAPURDI U 7,8# T COMM RAJ P 2X135=270 270 SASAN UMPP U1,2 T COMM MP P 2X660=1320 132 SASAN UMPP U3&4,5# T COMM MP P 3X660=1980 198 MUNDRA UMPP, U 2 MUNDRA UMPP, U3# MUNDRA UMPP, U4# MUNDRA UMPP, U5# KAWAI TPP U1,2# T T T T T COMM COMM COMM COMM COMM GUJ GUJ GUJ GUJ RAJ P P P P P 1X800=800 1X800=800 1X800=800 1X800=800 2X660=660 80 80 80 80 1320 TOTAL PRIVATE SECTOR GRAND TOTAL (RAJASTHAN) UNIT WISE COMMISSIONING DATE (CAPACITY MW) 20.05.2012(500MW) 07.10.2013(500MW) 21.03.2014(68.67MW) 23.03.2014(68.67MW) 29.03.2014(68.67MW) 12.06.2014(68.67MW) 31.07.2014(68.67MW) 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) 18.02.2014(130MW) 27.02.2014(130MW) 15.03.2014(130MW) 22.05.2014(130MW) 25.09.2013(60MW) 27.09.2013(60MW) 16.11.2013(60MW) 02.02.2014(60MW) 02.05.2014(600MW) 14.09.2013(250MW) 30.06.2014(250MW) 20.03.2013(110MW) 01.05.2014(50MW) 05.02.2013(135MW) 31.03.2013(135MW) 03.03.2013(135MW) 16.03.2013(135MW) 30.05.2013(660MW) 18.12.2013(660MW) 25.03.2014(660 MW) 21.05.2014 (660 MW) 24.08.2014 (660 MW) 17.07.2012(800MW) 16.10.2012(800MW) 16.01.2013(800MW) 18.03.2013(800MW) 28.05.2013(660MW) 24.12.2013(660MW) 2510 5064.46 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE , # - OUT SIDE 88537MW 6. T&D LOSSES YEAR 2003- 04 2004-05 T&D LOSSES % 43.74 44.68 36 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 39.92 35.60 34.71 31.47 29.99 27.87 27.94 7.PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 59382 65007 71166 77907 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 10360 11422 12594 13886 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 811.12 2010-11 843.75 2011-12 927.36 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 35558.25 2012-13 % PLF 64.78 Actual Gen (MU) 32673.61 2011-12 % PLF 75.94 Actual Gen (MU) 31531.45 37 % PLF 77.43 UTTAR PRADESH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO THERMAL GAS DIESEL 0 0 0 0 549.97 0 549.97 0 4.21 0.00 COAL 4267 2850 2589.84 9706.84 74.36 524.1 0 1250.32 1774.42 13.59 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO 524.10 0.00 1500.0 0 2024.1 0 13.65 NUCLEAR TOTAL 4267 2850 3139.81 10256.81 78.57 2909.95 11095.4 5 74.80 0 0 335.72 335.72 2.57 R.E.S. (MNRE) 25.1 661.88 0 686.98 5.26 TOTAL 4816.2 3511.88 4725.85 13053.93 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 0.00 0.00 0.00 COAL 4923.00 3262.50 (FIGURES IN MW) 549.97 0.00 549.97 0.00 3.71 0.00 NUCLEAR TOTAL 4923.00 3262.50 3459.92 11645.4 2 78.51 0.00 0.00 R.E.S. (MNRE) 25.10 802.58 TOTAL 5472.20 4065.08 335.72 0.00 5295.64 335.72 827.68 2.26 5.58 14832.9 2 100.00 3.ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* PEAK MET (MW) 7584 11104 12,038 13,940 13,089 15,670 15,323 15,670 15,162 6887 8568 11,767 12,048 12,327 11,968 11,968 11,968 10,512 PEAK DEFICIT/ SURPLUS (MW) (- / +) -697 -2536 -271 -1,892 -762 -3,702 -3,355 -3,702 -4,650 PEAK DEFICIT/ SURPLUS (%) (- / +) -9.2 -22.8 -2.3 -13.6 -5.8 -23.6 -21.9 -23.6 -30.7 ENERGY REQUIRMENT (MU) 48332 62628 81,339 91,647 94,890 36,406 9,567 46,282 9,876 ENERGY AVAILABILITY (MU) 43545 51335 72,116 76,446 81,613 31,353 8,033 39,188 7,835 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -4787 -11293 -9,223 -15,201 -13,277 -5,053 -1,534 -7,094 -2,041 ENERGY DEFICIT/ SURPLUS (%) (- / +) -9.9 -18.0 -11.3 -16.6 -14.0 -13.9 -16.0 -15.3 -20.7 *PROVISIONAL 4.ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 14,500 Peak Met (MW) 13,104 Peak Deficit/ Surplus (MW) (- / +) -1,396 Peak Deficit/ Surplus ( % ) (- / +) -9.6 Energy Requirment (MU) 101,905 38 Energy Availability (MU) 86,863 Energy Deficit/ Surplus (MU) (- / +) -15,042 Energy Deficit/ Surplus ( % ) (- / +) -14.8 5.LIKELY BENEFIT TO THE STATE OF UTTAR PRADESH DURING 12TH PLAN T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) RIHAND-III U-5,6 T COMM UP C 2X500=1000 BENEFITS SHARES OF STATE (MW) 320 RAPP U7& 8 RAMPUR N H UC UC/COMM RAJ HP C C 2X700=1400 6X68.67=412 162 56.68 KOLDAM * CHAMERA III H H UC COMM HP HP C C 4X200=800 3X77=231 155 47 PARBATI III H COMM HP C 4X130=520 104.75 PARBATI II * KISHANGANGA * URI II H H H UC UC COMM HP J&K J&K C C C 4X200=800 3X110=330 4X60=240 155 64 50.7 TAPOVAN VISNUGARH * H KAMENG H LOWER SUBANSHRI H CENTRAL SECTOR SHARE ANPARA-D -1,2 T PARICHHA EXT 5,6 T UC UC UC UTTARAKHAND AR.PR AR.PR C C C 4X130=520 4X150=600 4X250=1000 UC COMM UP UP S S 2X500=1000 2X250=500 101 55 91 1362.13 1000 500 HARDUAGANJ EXT U9 SECTOR SECTOR T COMM UP S 1X250=250 250 1750 BARA U-1-3 T UC UP P 3X660=1980 1980 SASAN UMPP U1,2 T COMM MP P 2X660=1320 165 SASAN UMPP U3&4,5# T COMM MP P 3X660=1980 247.5 PROJECTS PRIVATE SECTOR UNIT WISE COMMISSIONING DATE (CAPACITY MW) 20.05.2012(500MW) 07.10.2013(500MW) 21.03.2014(68.67MW) 23.03.2014(68.67MW) 29.03.2014(68.67MW) 12.06.2014(68.67MW) 31.07.2014(68.67MW) 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) 18.02.2014(130MW) 27.02.2014(130MW) 15.03.2014(130MW) 22.05.2014(130MW) 25.09.2013(60MW) 27.09.2013(60MW) 16.11.2013(60MW) 02.02.2014(60MW) 24.05.2012(250MW) 11.03.2013(250MW) 25.05.2012(250MW) 30.05.2013(660MW) 18.12.2013(660MW) 25.03.2014(660 MW) 21.05.2014 (660 MW) 24.08.2014 (660 MW) 2392.5 5504.63 GRAND TOTAL (UP) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE, # - OUT SIDE 88537MW 6.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 T&D LOSSES % 35.17 34.39 32.63 33.49 28.60 30.94 33.15 34.01 39 7.PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 102924 113727 125664 138854 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 15993 18073 20424 23081 8.ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 386.93 2010-11 411.94 2011-12 449.89 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 107897.78 2012-13 % PLF 75.41 Actual Gen (MU) 100227.66 2011-12 % PLF 72.01 Actual Gen (MU) 93620.04 40 % PLF 78.63 UTTARAKHAND 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO COAL STATE PRIVATE CENTRAL TOTAL % 1252.15 400 346.03 1998.18 78.04 THERMAL DIESEL 0 0 0 0 69.35 0 69.35 0 2.71 0.00 GAS 0 0 280.88 280.88 10.97 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO COAL STATE PRIVATE CENTRAL TOTAL % 3. 1252.1 5 400.00 414.17 2066.3 2 75.12 (FIGURES IN MW) NUCLEAR TOTAL 0 0 350.23 350.23 13.68 0 0 22.28 22.28 0.87 R.E.S. (MNRE) 174.82 15.05 0 189.87 7.42 TOTAL R.E.S. (MNRE) TOTAL 1426.97 415.05 718.54 2560.56 100 (FIGURES IN MW) THERMAL GAS DIESEL NUCLEAR TOTAL 0.00 0.00 0.00 0.00 0.00 174.81 82.50 300.50 0.00 69.35 0.00 0.00 82.50 369.85 0.00 22.28 35.05 0.00 383.00 69.35 0.00 452.35 22.28 209.86 13.92 2.52 0.00 16.44 0.81 7.63 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 1426.9 6 517.55 806.30 2750.8 1 100.00 ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 1108 1,612 1,759 1,826 1,833 1,780 1,833 1,801 PEAK MET (MW) 991 1,600 1,674 1,826 1,833 1,780 1,833 1,761 PEAK DEFICIT/ SURPLUS (MW) (- / +) -117 -12 -85 0 0 0 0 -40 PEAK DEFICIT/ SURPLUS (%) (- / +) -10.6 -0.7 -4.8 0.0 0.0 0.0 0.0 -2.2 5957 10,513 11,331 11,944 4,214 1,091 5,354 1,140 5599 10,208 10,709 11,493 4,116 1,054 5,202 1,086 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -358 -305 -622 -451 -98 -37 -152 -54 ENERGY DEFICIT/ SURPLUS (%) (- / +) -6.0 -2.9 -5.5 -3.8 -2.3 -3.4 -2.8 -4.7 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 1,900 Peak Met (MW) 1,941 Peak Deficit/ Surplus (MW) (- / +) 41 Peak Deficit/ Surplus ( % ) (- / +) 2.2 Energy Requirment (MU) 12,785 41 Energy Availability (MU) 13,390 Energy Deficit/ Surplus (MU) (- / +) 605 Energy Deficit/ Surplus ( % ) (- / +) 4.7 5.LIKELY BENEFIT TO THE STATE OF UTTRAKHAND DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) RIHAND-III U-5,6 T COMM UP C 2X500=1000 BENEFITS SHARES OF STATE (MW) 39 RAPP U7& 8 RAMPUR N H UC UC/COMM RAJ HP C C 2X700=1400 6X68.67=412 33 43.59 KOLDAM * CHAMERA III H H UC COMM HP HP C C 4X200=800 3X77=231 39 9 PARBATI III H COMM HP C 4X130=520 21.38 PARBATI II * KISHANGANGA * URI II H H H UC UC COMM HP J&K J&K C C C 4X200=800 3X110=330 4X60=240 39 16 10.4 TAPOVAN VISNUGARH * H TOTAL CENTER SECTOR SHARE SINGOLI BHATWARI HEP H PHATA BYUNG HEP H SRINAGAR HEP H UC UTTARAKHAND C 4X130=520 UC UC UC UTTARAKHAND UTTARAKHAND UTTRAKHAND P P P 99 76 330 93 343.37 99 76 330 SASAN UMPP U1,2 T COMM MP P 2X660=1320 33 SASAN UMPP U3&4,5# T COMM MP P 3X660=1980 49.5 PRIVATE SECTOR GRAND TOTAL (UTTRAKHAND) UNIT WISE COMMISSIONING DATE (CAPACITY MW) 20.05.2012(500MW) 07.10.2013(500MW) 21.03.2014(68.67MW) 23.03.2014(68.67MW) 29.03.2014(68.67MW) 12.06.2014(68.67MW) 31.07.2014(68.67MW) 07.06.2012 (77MW) 12.06.2012(77MW) 28.06.2012(77MW) 18.02.2014(130MW) 27.02.2014(130MW) 15.03.2014(130MW) 22.05.2014(130MW) 25.09.2013(60MW) 27.09.2013(60MW) 16.11.2013(60MW) 02.02.2014(60MW) 30.05.2013(660MW) 18.12.2013(660MW) 25.03.2014(660 MW) 21.05.2014 (660 MW) 24.08.2014( 660MW) 587.5 930.87 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE 2013. SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE, # OUTSIDE 88,537 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 T&D LOSSES % 49.23 39.30 35.96 34.48 35.66 41.79 25.27 29.97 28.67 42 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 11207 11700 12214 12751 PEAK DEMAND(MW) 1824 1938 2060 2189 8.ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 930.41 2010-11 1143.61 2011-12 1232.17 43 WESTERN REGION 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL 5480.5 447 1520 COAL 17737.5 12389 8798 TOTAL % 7447.5 11.57 38924.5 60.45 (FIGURES IN MW) THERMAL GAS DIESEL 1915.72 17.28 2805.5 0.2 3533.59 0 TOTAL 19670.5 15194.7 12331.59 NUCLEAR 8254.81 12.82 47196.79 73.29 17.48 0.03 0 0 1840 R.E.S. (MNRE) 426.69 7483.26 0 TOTAL 25577.69 23124.96 15691.59 1840 2.86 7909.95 12.28 64394.24 100 2.CAPACITY ACHIEVED DURING 11TH PLAN (EXCULDING RES) (FIGURES IN MW) SECTOR STATE PRIVATE CENTRAL TOTAL HYDRO 250 0 520 770 COAL 3535 10089 3320 16944 THERMAL GAS DIESEL 765 0 1147.5 0 740 0 2652.5 0 3. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO 5480.5 0 447.00 1520.0 0 7447.5 0 8.24 COAL 19320.0 0 27801.5 0 11738.0 1 58859.5 1 65.15 NUCLEAR TOTAL TOTAL 4300 11236.5 4060 19596.5 0 0 0 0 4550 11236.5 4580 20366.5 (FIGURES IN MW) THERMAL GAS DIESEL 2993.82 17.28 4388.00 0.20 3533.59 0.00 10915.4 1 12.08 17.48 0.02 NUCLEAR TOTAL 22331.1 0 32189.7 0 15271.6 0 69792.4 0 77.25 R.E.S. (MNRE) 11271.0 7 12.47 28292.8 4 43426.5 3 18631.6 0 90350.9 7 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -18223 -36274 -33,018 -9,792 -2,803 -1,139 ENERGY DEFICIT/ SURPLUS (%) (- / +) -10.4 -15.6 -11.4 -3.3 -1.0 -1.1 0.00 481.24 0.00 10789.8 3 1840.00 0.00 1840.00 2.04 TOTAL 4.ACTUAL POWER SUPPLY POSITION PERIOD 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 PEAK DEMA ND (MW) 26510 36453 42,352 40,075 41,335 43,170 PEAK MET (MW) 22024 27463 36,509 39,486 40,331 42,365 PEAK DEFICIT/ SURPLUS (MW) (- / +) -4486 -8990 -5,843 -589 -1,004 -805 PEAK DEFICIT/ SURPLUS (%) (- / +) -16.9 -24.7 -13.8 -1.5 -2.4 -1.9 44 ENERGY REQUIRMENT (MU) 175016 232391 290,421 296,475 294,659 107,308 ENERGY AVAILABILITY (MU) 156793 196117 257,403 286,683 291,856 106,169 JULY,14 APR,14-AUG,14* AUG,14* 41,555 43,170 40,750 41,170 42,365 38,269 -385 -805 -2,481 -0.9 -1.9 -6.1 24,995 132,662 25,354 24,847 131,153 24,984 -148 -1,509 -370 * PROVISIONAL 5. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) 45,980 52,652 Peak Deficit/ Surplus (MW) (- / +) 6,672 Peak Deficit/ Surplus ( % ) (- / +) 14.5 Energy Requirment (MU) 288,062 6.ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 1061.41 2010-11 1104.44 2011-12 1201.15 7.PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 327917 348597 370655 394188 PEAK DEMAND(MW) 50300 53936 57835 62015 45 Energy Availability (MU) 289,029 Energy Deficit/ Surplus (MU) (- / +) 967 Energy Deficit/ Surplus ( % ) (- / +) 0.3 -0.6 -1.1 -1.5 CHHATTISGARH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL 120 0 0 COAL 2060 1833 1012.66 THERMAL GAS DIESEL 0 0 0 0 0 0 TOTAL % 120 2.24 4905.66 91.74 0 0.00 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR STATE PRIVATE CENTRAL TOTAL HYDRO 120.00 0.00 0.00 120.00 % 1.13 COAL 2780.00 5813.00 1490.49 10083.4 9 95.35 0 0.00 (FIGURES IN MW) NUCLEAR TOTAL 2060 1833 1012.66 4905.66 91.74 0 0 47.52 R.E.S. (MNRE) 20.25 253.9 0 TOTAL 2200.25 2086.9 1060.18 47.52 0.89 274.15 5.13 5347.33 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NUCLEAR TOTAL 2780.00 5813.00 1490.49 10083.4 9 95.35 0.00 0.00 47.52 R.E.S. (MNRE) 52.00 272.00 0.00 TOTAL 47.52 324.00 0.45 3.06 2952.00 6085.00 1538.01 10575.0 1 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -894 -398 -299 -132 -91 -36 -132 -41 ENERGY DEFICIT/ SURPLUS (%) (- / +) -6.4 -2.7 -1.7 -0.7 -1.3 -2.1 -1.5 -2.2 3.ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 2631 3,239 3,271 3,365 3,450 3,274 3,450 3,360 PEAK MET (MW) 1907 3,093 3,134 3,320 3,350 2,978 3,350 3,195 PEAK DEFICIT/ SURPLUS (MW) (- / +) -724 -146 -137 -45 -100 -296 -100 -165 PEAK DEFICIT/ SURPLUS (%) (- / +) -27.5 -4.5 -4.2 -1.3 -2.9 -9.0 -2.9 -4.9 ENERGY REQUIRMENT (MU) 14063 15,013 17,302 18,932 7,048 1,738 8,895 1,847 ENERGY AVAILABILITY (MU) 13169 14,615 17,003 18,800 6,957 1,702 8,763 1,806 * PROVISIONAL 4.ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Deficit/ Surplus Peak Deficit/ Surplus Energy Requirment 46 Energy Availability Energy Deficit/ Surplus Energy Deficit/ Surplus 3,197 3,682 (MW) (- / +) 485 ( % ) (- / +) 15.2 (MU) 23,691 (MU) 33,378 5.LIKELY BENEFIT TO THE STATE OF CHHATTISGARH DURING 12TH PROJECTS T ST STATE SE Y AT PROJECT CT P US LOCATION OR E (MU) (- / +) 9,687 IC (MW) ( % ) (- / +) 40.9 SIPAT-I U 3 KAPP U-3 & 4 VINDHYACHAL STPP ST-IV U11,12 MAUDA TPP U1-2 T N T COMM UC COMM CHHATT GUJ MP C C C 1X660=660 2X700=1400 2X500=1000 BENEFITS SHARES OF STATE (MW 104 88 63 T COMM MAHA C 2X500=1000 63 KAMENG SUBANSHRI LOWER CENTRAL SECTOR SHARE KORBA WEST ST.III U5 MARWAH TPP U1,2 SECTOR SECTOR H H UC UC AR.PR AR.PR C C 4X150=600 4X250=1000 T T COMM UC CHHATT CHHATT S S 1X500=500 2X500=1000 13 21 352 500 1000 1500 AVANTHA BHANDAR TPP U1 MAURTI CLEAN COAL & POWER LTD. U1 LANCO AMARKANTAK U- 3,4 UCHPANDA TPP U1-3 VINJKOTE (DARRAMPURA) TPP U1-3 AKALTARA (NARIYARA) TPP U1-3 T T UC UC CHHATT CHHATT P P 1X600=600 1X300=300 600 300 T T T UC UC UC CHHATT CHHATT CHHATT P P P 2X660=1320 3X360=1080 3X300=900 1320 1080 900 T UC/COMM CHHATT P 3X600=1800 1800 KASAIPALLI TPP U 2 SWASTIK KORBA U 1 VANDANA VIDYUT TPP U 1-2 BALCO TPP U-1,2 ATHENA SINGHTARAI TPP U-1 D B POWER TPP U-1,2 TRN ENERGY TPP U-1,2 RATIJA TPP RAIGARH TPP U1,2 PRIVATE SECTOR SUB TOTAL (CHHATTISGARH) T T T T T T T T T COMM UC UC/COMM UC UC UC/COMM UC UC UC CHHATT CHHATT CHHATT CHHATT CHHATT CHHATT CHHATT CHHATT CHHATT P P P P P P P P P 1X135=135 1X25=25 1X135=270 2X300=600 1X600=600 2X600=600 2X300=600 1X50=50 2X600=1200 135 25 270 600 600 1200 600 50 1200 10680 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 25.03.2013(500MW) 19.04.2012(500MW) 29.03.2013(500MW) 22.03.2013(500MW) 13.08.2013(600MW) 22.08.2014(600MW) 21.06.2012(135MW) 10.04.2014(135MW) 23.02.2014(600MW) 04.02.2013(50MW) 12532 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 44444444 T&D LOSSES % 42.55 28.06 31.06 31.71 29.79 26.38 18.62 15.06 7.PEAK & ENERGY TABLE (As per 18th EPS Report ) 47 YEAR ENERGY DEMAND(MU) 19146 20707 22396 24222 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 3792 4070 4367 4687 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 921.14 2010-11 1117.53 2011-12 1319.56 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 70678.61 2012-13 % PLF 76.41 Actual Gen (MU) 67814.26 2011-12 % PLF 80.54 Actual Gen (MU) 59061.24 48 % PLF 84.72 GUJARAT 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 772 4220 1243.72 17.28 5481 0 32.9 PRIVATE 0 6670 2577.5 0.2 9247.7 0 3465.74 CENTRAL 0 1988.89 424.27 0 2413.16 559.32 0 6285.9 12713.44 2972.48 TOTAL % 21971.82 100 772 3.51 12878.89 58.62 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO COAL STATE PRIVATE CENTRAL TOTAL % 772.00 4470.00 0.00 8620.00 0.00 2648.27 15738.2 7 55.37 772.00 2.72 3.ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 8005 11619 10,951 11,999 12,201 13,603 13,603 13,603 12,472 6700 8110 10,759 11,960 12,201 13,499 13,467 13,499 12,410 4245.49 19.32 17.48 0.08 17141.86 78.02 559.32 2.55 3498.64 15.92 TOTAL (FIGURES IN MW) THERMAL GAS DIESEL 2321.8 17.28 2 4160.0 0.20 0 424.27 0.00 6906.0 17.48 9 24.30 0.06 PEAK DEFICIT/ SURPLUS (MW) (- / +) -1305 -3509 -192 -39 0 -104 -136 -104 -62 49 PEAK DEFICIT/ SURPLUS (%) (- / +) -16.3 -30.2 -1.8 -0.3 0.0 -0.8 -1.0 -0.8 -0.5 NUCLEAR TOTAL 6809.10 12780.2 0 3072.54 22661.8 4 79.73 ENERGY REQUIRMENT (MU) 53693 62464 74,696 93,662 88,497 32,958 7,425 40,325 7,367 R.E.S. (MNRE) 0.00 0.00 559.32 559.32 1.97 ENERGY AVAILABILITY (MU) 47530 54083 74,429 93,513 88,488 32,940 7,413 40,303 7,363 15.60 4414.6 0 0.00 4430.2 0 15.59 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -6163 -8381 -267 -149 -9 -18 -12 -22 -4 TOTAL 7596.70 17194.8 0 3631.86 28423.3 6 100.00 ENERGY DEFICIT/ SURPLUS (%) (- / +) -11.5 -13.4 -0.4 -0.2 0.0 -0.1 -0.2 -0.1 -0.1 *PROVISIONAL 4.ANTICIPATED POWER SUPPLY POSITION DURING 2014-15 AS PER THE LGBR Peak Demand (MW) 11,580 Peak Met (MW) 13,407 Peak Deficit/ Surplus (MW) (- / +) 1,827 Peak Deficit/ Surplus ( % ) (- / +) 15.8 Energy Requirment (MU) 78,632 Energy Availability (MU) 81,850 Energy Deficit/ Surplus (MU) (- / +) 3,218 Energy Deficit/ Surplus ( % ) (- / +) 4.1 5.LIKELY BENEFIT TO THE STATE OF GUJARAT DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR SIPAT-I U 3 KAPP U-3 & 4 VINDHYACHAL STPP ST-IV U11,12 MAUDA TPP U1-2 T N T IC (MW) COMM UC COMM CHHATT GUJ MP C C C 1X660=660 2X700=1400 2X500=1000 BENEFITS SHARES OF STATE (MW) 180 476 240 T COMM MAHA C 2X500=1000 240 KAMENG SUBANSHRI LOWER CENTRAL SECTOR SHARE H H UC UC AR.PR AR.PR C C 4X150=600 4X250=1000 48 81 1265 SIKKA TPP EXTN. U3 UKAI EXT U6 PIPAVAV JV CCGT T T T UC COMM COMM GUJ GUJ GUJ S S S 1X250=250 1X500=500 2X351=702 250 500 702 DHUVARAN CCPP-III# SECTOR SECTOR T COMM GUJ S 1X376.1=376.1 MUNDRA UMPP, U 2 MUNDRA UMPP, U 3# MUNDRA UMPP, U 4# MUNDRA UMPP, U 5# SALAYA TPP U 2 UNOSUGEN CCPP MODULE 1# T T T T T T COMM COMM COMM COMM COMM COMM GUJ GUJ GUJ GUJ GUJ GUJ P P P P P P DGEN MEGA CCPP MODULE 1# DGEN MEGA CCPP MODULE 2# DGEN MEGA CCPP MODULE 3# PRIVATE SECTOR GRAND TOTAL (GUJARAT) T T T COMM COMM COMM GUJ GUJ GUJ P P P 1X800=800 1X800=800 1X800=800 1X800=800 1X600=600 1X382.5 =382.5 1X400=400 1X400=400 1X400=400 376.1 1828.1 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 25.03.2013(500MW) 9.04.2012(500MW) 29.03.2013(500MW) 05.03.2013(500MW) 22.03.2013(351MW) 05.02.2014(351MW) 21.05.2014(376.1MW) 380 380 380 380 600 382.5 17.07.2012(800MW) 16.10.2012(800MW) 16.01.2013(800MW) 18.03.2013(800MW) 13.06.2012(600MW) 20.01.201(382.5MW) 400 400 400 3702.5 6795.6 12.01.2014(400MW) 09.03.2014(400MW) 23.04..2014(400MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE , # - OUT SIDE 88537MW 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2422222 T&D LOSSES % 24.20 30.43 27.91 24.87 26.13 24.07 22.77 19.24 21.81 50 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 88254 94603 101409 108704 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 14350 15782 17358 19091 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 1558.58 2010-11 1508.14 2011-12 1663.23 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 86339.97 2012-13 % PLF 60.69 Actual Gen (MU) 82942.69 2011-12 % PLF 62.74 Actual Gen (MU) 69678.47 51 % PLF 66.96 MADHYA PRADESH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO 1703.66 0 1520 3223.66 36.72 THERMAL GAS DIESEL 0 0 0 0 257.18 0 257.18 0 2.93 0.00 COAL 2807.5 0 1741.26 4548.76 51.81 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO 1703.6 6 0.00 1520.0 0 3223.6 6 23.69 COAL 3670.0 0 3042.5 0 2256.3 9 8968.8 9 65.90 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAN MET D (MW) (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 5683 8090 9,151 10,077 9,716 7,388 4457 6404 8,505 9,462 9,716 7,033 (FIGURES IN MW) NUCLEAR TOTAL 2807.5 0 1998.44 4805.94 54.74 0 0 273.24 273.24 3.11 R.E.S. (MNRE) 86.76 390.3 0 477.06 5.43 TOTAL 4597.92 390.3 3791.68 8779.9 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 0.00 0.00 0.00 257.18 0.00 257.18 0.00 1.89 0.00 PEAK DEFICIT/ SURPLUS (MW) (- / +) -1226 -1686 -646 -615 0 -355 PEAK DEFICIT/ SURPLUS (%) (- / +) -21.6 -20.8 -7.1 -6.1 0.0 -4.8 52 NUCLEAR TOTAL 3670.0 0 3042.5 0 2513.5 7 9226.0 7 67.79 ENERGY REQUIRMENT (MU) 31013 38710 49,785 51,783 49,410 16,742 0.00 0.00 R.E.S. (MNRE) 86.16 800.47 273.24 0.00 273.24 886.63 2.01 6.51 ENERGY AVAILABILITY (MU) 26233 32834 41,392 46,829 49,385 16,647 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -4780 -5876 -8,393 -4,954 -25 -95 TOTAL 5459.82 3842.97 4306.81 13609.6 0 100.00 ENERGY DEFICIT/ SURPLUS (%) (- / +) -15.4 -15.2 -16.9 -9.6 -0.1 -0.6 JULY,14 APR,14-AUG,14* AUG,14* 6,882 7,995 7,995 6,851 7,438 7,438 -31 -557 -557 -0.5 -7.0 -7.0 4,163 21,287 4,545 4,123 21,003 4,356 -40 -284 -189 -1.0 -1.3 -4.2 * PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) 10,703 12,457 Peak Deficit/ Surplus (MW) (- / +) 1,754 Peak Deficit/ Surplus ( % ) (- / +) 16.4 Energy Requirment (MU) 59,776 Energy Availability (MU) 62,814 Energy Deficit/ Surplus (MU) (- / +) 3,038 Energy Deficit/ Surplus ( % ) (- / +) 5.1 5.LIKELY BENEFIT TO THE STATE OF MADHYA PRADESH DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) SIPAT-I U 3 KAPP U-3 & 4 VINDHYACHAL STPP ST-IV U-11,12 MAUDA TPP U1-2 T N T COMM UC COMM CHHATT GUJ MP C C C 1X660=660 2X700=1400 2X500=1000 BENEFITS SHARES OF STATE (MW 94 219 256 T COMM MAHA C 2X500=1000 156 KAMENG SUBANSHRI LOWER CENTRAL SECTOR SHARE H H UC UC AR.PR AR.PR C C 4X150=600 4X250=1000 32 52.5 809.5 SATPURA TPP EXT U-10,11 T COMM MP S 2X250=500 500 SHREE SINGAJI TPP U1,2 SECTOR SECTOR T UC/COMM UC MP S 2X600=1200 1200 1700 ANNUPUR TPP PH-I U1,2 BINA TPP U 1, 2 T T UC COMM MP MP P P 2X600=1200 2X250=500 1200 500 SASAN UMPP,U 1,2 T COMM MP P 2X660=1320 495 MAHESHWAR HEP U1-10 D B POWER TPP, SIDHI U-1 JHABUA TPP U1 MAHAN TPP UNIT 1# NIWARI TPP U1# SASAN UMPP U 3,4,5# H T T T T T UC UC UC COMM COMM COMM MP MP MP MP MP MP P P P P P P 4X100=400 1X660=660 1X600=600 1X600=600 1X45 3X660=1980 400 660 600 600 45 742.5 NIGRI TPP PRIVATE SECTOR GRAND TOTAL (MP) T COMM MP P 1X660=660 660 5902.5 8412 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 25.03.2013(500MW) 19.04.2012(500MW) 29.03.2013(500MW) 22.03.2013(250MW) 25.12.2013(250MW) 18.11.2013(600MW) 12.08.2012(250MW) 31.03.2013(250MW) 30.05.2013(660MW) 18.12.2013(660MW) 25.02.2013(600MW) 10.12.2013(45MW) 25.03.2014(660MW) 21.05.2014(660MW) 24.08.2014(660MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE, # - OUT SIDE 88537MW 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 33333333 T&D LOSSES % 41.44 41.30 40.07 39.24 53 2007-08 2008-09 2009-10 2010-11 2011-12 35.64 38.46 38.32 37.62 34.47 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 61448 66519 72010 77953 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 11102 11967 12899 13904 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 618.10 2010-11 674.48 2011-12 671.54 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 50430.94 2012-13 % PLF 67.75 Actual Gen (MU) 43467.82 2011-12 % PLF 77.76 Actual Gen (MU) 41696.32 54 % PLF 76.07 MAHARASHTRA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 2884.84 8650 672 0 9322 0 286.73 PRIVATE 447 3886 180 0 4066 0 3343.32 CENTRAL 0 2478.05 2623.93 0 5101.98 690.14 0 TOTAL 3331.84 15014.05 3475.93 0 18489.98 690.14 3630.05 % 12.75 57.43 13.30 0.00 70.73 2.64 13.89 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO COAL STATE PRIVATE CENTRAL TOTAL % PLAN END 10TH PLAN END 11TH PLAN END 12493.57 7856.32 5792.12 26142.01 100 (FIGURES IN MW) THERMAL GAS DIESEL NUCLEAR TOTAL R.E.S. (MNRE) TOTAL 2884.8 4 8400.00 672.00 0.00 9072.00 0.00 327.43 447.00 10326.0 0 180.00 0.00 10506.0 0 0.00 5302.7 6 12284.2 7 16255.7 6 0.00 3313.27 0.00 5937.20 690.14 0.00 6627.34 3331.8 4 9.47 22039.2 7 62.67 5630.1 9 16.01 35167.3 7 100.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) TH TOTAL 12265 17455 21,069 10726 12679 16,417 2623.9 3 3475.9 3 9.88 0.00 0.00 PEAK DEFICIT/ SURPLUS (MW) (- / +) -1539 -4776 -4,652 55 PEAK DEFICIT/ SURPLUS (%) (- / +) -12.5 -27.4 -22.1 25515.2 0 72.55 ENERGY REQUIRMENT (MU) 80489 110005 141,382 690.14 1.96 ENERGY AVAILABILITY (MU) 73438 89138 117,722 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -7051 -20867 -23660 ENERGY DEFICIT/ SURPLUS (%) (- / +) -8.8 -19.0 -16.7 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 17,934 19,276 19,749 18,586 19,749 17,624 16,765 17,621 18,658 18,483 18,658 16,938 -1,169 -1,655 -1,091 -103 -1,091 -686 -6.5 -8.6 -5.5 -0.6 -5.5 -3.9 123,984 126,288 46,584 10,713 57,197 10,613 119,972 123,672 45,652 10,653 56,129 10,477 -4,012 -2,616 -932 -60 -1,068 -136 -3.2 -2.1 -2.0 -0.6 -1.9 -1.3 *Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) 21,414 22,459 Peak Deficit/ Surplus (MW) (- / +) 1,045 Peak Deficit/ Surplus ( % ) (- / +) 4.9 Energy Requirment (MU) 115,373 Energy Availability (MU) 100,802 Energy Deficit/ Surplus (MU) (- / +) -14,571 Energy Deficit/ Surplus ( % ) (- / +) -12.6 5.LIKELY BENEFIT TO THE STATE OF MAHARASHTRA DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) SIPAT-I U 3 KAPP U-3 & 4 VINDHYACHAL STPP ST-IV U11,12 T N COMM UC CHHATT GUJ C C 1X660=660 2X700=1400 BENEFITS SHARES OF STATE (MW 170 379 T COMM MP C 2X500=1000 270 T COMM MAHA C 2X500=1000 370 KAMENG H SUBANSHRI LOWER H TOTAL CENTRAL SECTOR SHARE UC UC AR.PR AR.PR C C 4X150=600 4X250=1000 55 91.5 1335.5 CHANDRAPUR EXT. U8 T UC MAHA S 1X500=500 500 KORADI TPP EXT U8 PARLI UNIT-8 TOTAL SECTOR SECTOR T T UC UC UC MAHA MAHA S S 1X660=660 1X250=250 660 250 1410 T UC/COMM MAHA P 5X270=1350 1350 25.03.2013(270MW) 17.02.2014(270MW) T UC/COMM MAHA P 5X270=1350 1350 25.02.2014(270MW) T UC/COMM MAHA P 1X600=600 600 EMCO WARORA U1,2 T COMM 600 T UC P P 2X300=600 BUTIBORI TPP PH -II U-1 LANCO MAHANADI, VIDARBHA TPP U1,2 MAHA MAHA 1X300=300 300 T UC MAHA P 2X660=1320 1320 TIRODA TPP PH-I U1,2 T COMM TIRODA TPP PH-II, U1 T COMM MAHA MAHA P P 2X660=660 1X660=660 1320 660 GEPL TPP U-1,2 T COMM MUNDRA UMPP, U 2 MUNDRA UMPP, U 3# MUNDRA UMPP, U 4# MUNDRA UMPP, U 5# BELA TPP U 1 PRIVATE SECTOR TOTAL GRAND TOTAL (MAHARASHTRA) T T T T T COMM COMM COMM COMM COMM MAHA GUJ GUJ GUJ GUJ MAHA P P P P P P 2X60=120 1X800=800 1X800=800 1X800=800 1X800=800 1X270=270 120 160 160 160 160 270 8530 11275.5 MAUDA TPP U1-2 INDIA BULLS- AMARAVATI TPP PH-I,U1-5 INDIA BULLS - NASIK TPP PHI,U1-5 DHARIWAL INFRASTRUCTURE (P) LTD TPP U1,2 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 25.03.2013(500MW) 19.04.2012(500MW) 29.03.2013(500MW) 03.11.2013(300MW) 07.03.2013(300MW) 27.08.2013 (300MW) 11.09.2012(660MW) 25.03.2013(660MW) 10.06.2013(660MW) 28.04.2012(60MW) 08.09.2012(60MW) 17.07.2012(800MW) 16.10.2012(800MW) 16.01.2013(800MW) 18.03.2013(800MW) 20.03.2013(270MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE 56 * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE, # - OUT SIDE 88537MW 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 T&D LOSSES % 34.12 32.40 31.60 31.64 29.79 23.88 25.16 20.68 19.99 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 147402 154383 161695 169353 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 23795 25313 26928 28645 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 1054.10 2010-11 1095.99 2011-12 1204.38 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 78560.37 2012-13 % PLF 52.43 Actual Gen (MU) 76753.13 2011-12 % PLF 62.73 Actual Gen (MU) 77338.85 57 % PLF 64.66 GOA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 0 0 0 0 0 0 0.05 PRIVATE 0 0 48 0 48 0 30 CENTRAL 0 296.37 0 0 296.37 25.8 0 TOTAL 0 296.37 48 0 344.37 25.8 30.05 % 0.00 74.05 11.99 0.00 86.05 6.45 7.51 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO COAL STATE 0.00 0.00 PRIVATE 0.00 0.00 CENTRAL 0.00 326.17 TOTAL 0.00 326.17 % 0.00 81.54 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 316 459 527 524 529 501 316 419 471 475 529 489 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 0.00 0.00 48.00 0.00 48.00 0.00 0.00 326.17 48.00 0.00 374.17 12.00 0.00 93.54 PEAK DEFICIT/ SURPLUS (MW) (- / +) 0 -40 -56 -49 0 -12 PEAK DEFICIT/ SURPLUS (%) (- / +) 0.0 -8.7 -10.6 -9.4 0.0 -2.4 58 ENERGY REQUIRMENT (MU) 1767 2624 3,024 3,181 3,890 1,453 NUCLEAR 0.00 0.00 25.80 25.80 6.45 ENERGY AVAILABILITY (MU) 1767 2606 2,981 3,107 3,871 1,450 TOTAL 0.05 78 322.17 400.22 100 R.E.S. (MNRE) 0.05 0.00 0.00 0.05 0.01 TOTAL ENERGY DEFICIT/ SURPLUS (MU) (- / +) 0 -18 -43 -74 -19 -3 ENERGY DEFICIT/ SURPLUS (%) (- / +) 0.0 -0.7 -1.4 -2.3 -0.5 -0.2 0.05 48.00 351.97 400.02 100.00 JULY,14 APR,14-AUG,14* AUG,14* 464 501 459 459 489 459 -5 -12 0 -1.1 -2.4 0.0 343 1,802 349 343 1,799 349 0 -3 0 0.0 -0.2 0.0 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15 AS PER THE LGBR Peak Peak Peak Peak Energy Energy Energy Demand Met Deficit/ Deficit/ RequiAvailDeficit/ (MW) (MW) Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 468 465 -3 -0.6 3,272 5. LIKELY BENEFIT TO THE STATE OF GOA DURING 12TH PLAN PROJECTS T ST STATE SE Y AT PROJECT CT P US LOCATION OR E 3,042 T N COMM UC CHHATT GUJ C C 1X660=660 2X700=1400 BENEFITS SHARES OF STATE (MW 7 16 T COMM MP C 2X500=1000 11 MAUDA TPP U1-2 T COMM MAHA C 2X500=1000 11 KAMENG SUBANSHRI LOWER CENTRAL SECTOR SHARE SUB TOTAL (GOA) H H UC UC AR.PR AR.PR C C 4X150=600 4X250=1000 2 4 51 51 SIPAT-I U 3 KAPP U-3 & 4 VINDHYACHAL STPP ST-IV U-11,12 IC (MW) -230 Energy Deficit/ Surplus ( % ) (- / +) -7.0 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 25.03.2013(500MW) 19.04.2012(500MW) 29.03.2013(500MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 T&D LOSSES % 45.05 35.97 19.68 20.90 21.18 17.12 16.99 15.27 12.43 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 3912 4204 4517 4853 PEAK DEMAND(MW) 666 712 762 815 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 2004.77 2010-11 2060.65 2011-12 2025.46 59 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) % PLF 241.32 2012-13 Actual Gen (MU) 2011-12 % PLF Actual Gen (MU) 245.41 % PLF 277.09 DAMAN & DIU 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO THERMAL COAL GAS DIESEL TOTAL STATE 0 0 0 0 0 PRIVATE 0 0 0 0 0 CENTRAL 0 26.38 4.2 0 30.58 TOTAL 0 26.38 4.2 0 30.58 % 0.00 69.49 11.06 0.00 80.56 2. INSTALLED CAPACITY AS ON 31.08.2014 (FIGURES IN MW) SECTOR HYDRO THERMAL COAL GAS DIESEL TOTAL STATE 0.00 0.00 0.00 0.00 0.00 PRIVATE 0.00 0.00 0.00 0.00 0.00 CENTRAL 0.00 36.71 4.20 0.00 40.91 TOTAL 0.00 36.71 4.20 0.00 40.91 % 0.00 76.02 8.70 0.00 84.72 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 210 301 311 322 297 297 189 276 286 297 297 297 PEAK DEFICIT/ SURPLUS (MW) (- / +) -21 -25 -25 -25 0 0 PEAK DEFICIT/ SURPLUS (%) (- / +) -10.0 -8.3 -8.0 -7.8 0.0 0.0 60 (FIGURES IN MW) NUCLEAR R.E.S. (MNRE) 0 0 0 0 7.38 0 7.38 0 19.44 0.00 NUCLEAR 0.00 0.00 7.38 7.38 15.28 ENERGY REQUIRMENT (MU) 1602 2,141 1,991 2,252 729 175 R.E.S. (MNRE) 0.00 0.00 0.00 0.00 0.00 ENERGY AVAILABILITY (MU) 1408 1,915 1,860 2,252 729 175 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -194 -226 -131 0 0 0 TOTAL 0 0 37.96 37.96 100 TOTAL 0.00 0.00 48.29 48.29 100.00 ENERGY DEFICIT/ SURPLUS (%) (- / +) -12.1 -10.6 -6.6 0.0 0.0 0.0 APR,14-AUG,14* AUG,14* 297 297 297 297 0 0 0.0 0.0 904 175 904 175 0 0 0.0 0.0 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) Peak Met (MW) 291 Peak Deficit/ Surplus (MW) (- / +) 287 Peak Deficit/ Surplus ( % ) (- / +) -4 Energy Requirment (MU) -1.4 Energy Availability (MU) 1,838 Energy Deficit/ Surplus (MU) (- / +) Energy Deficit/ Surplus ( % ) (- / +) 1,783 -55 IC (MW) -3.0 5. LIKELY BENEFIT TO THE UT OF DAMAN & DIU DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR SIPAT-I U 3 KAPP U-3 & 4 VINDHYACHAL STPP ST-IV U11,12 T N COMM UC CHHATT GUJ C C 1X660=660 2X700=1400 BENEFITS SHARES OF STATE (MW 3 5 T COMM MP C 2X500=1000 4 T COMM MAHA C 2X500=1000 4 MAUDA TPP U1-2 CENTRAL SECTOR SHARE SUB TOTAL (DAMAN &DIU) UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 25.03.2013(500MW) 19.04.2012(500MW) 29.03.2013(500MW) 16 16 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 T&D LOSSES % 16.88 15.56 21.58 22.09 23.29 20.06 17.19 16.83 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 2479 2587 2700 2817 PEAK DEMAND(MW) 394 409 425 441 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 7201.84 2010-11 7810.22 2011-12 7785.22 61 DADRA AND NAGAR HAVELI 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO 0 0 0 0 0.00 THERMAL GAS DIESEL 0 0 0 0 27.1 0 27.1 0 40.69 0.00 COAL 0 0 31.04 31.04 46.61 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO COAL STATE 0.00 0.00 PRIVATE 0.00 0.00 CENTRAL 0.00 44.37 TOTAL 0.00 44.37 % 0.00 55.51 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 10TH PLAN END 11TH PLAN END 2012-13 2013-14 415 615 629 661 388 605 629 661 (FIGURES IN MW) NUCLEAR TOTAL 0 0 58.14 58.14 87.30 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 0.00 0.00 0.00 0.00 0.00 27.10 0.00 71.47 27.10 0.00 71.47 33.91 0.00 89.42 PEAK DEFICIT/ SURPLUS (MW) (- / +) -27 -10 0 0 PEAK DEFICIT/ SURPLUS (%) (- / +) -6.5 -1.6 0.0 0.0 62 ENERGY REQUIRMENT (MU) 2923 4,380 4,572 5,390 0 0 8.46 8.46 12.70 NUCLEAR 0.00 0.00 8.46 8.46 10.58 ENERGY AVAILABILITY (MU) 2879 4,349 4,399 5,388 R.E.S. (MNRE) 0 0 0 0 0.00 TOTAL R.E.S. (MNRE) 0.00 0.00 0.00 0.00 0.00 TOTAL ENERGY DEFICIT/ SURPLUS (MU) (- / +) -44 -31 -173 -2 ENERGY DEFICIT/ SURPLUS (%) (- / +) -1.5 -0.7 -3.8 0.0 0 0 66.6 66.6 100 0.00 0.00 79.93 79.93 100.00 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 679 672 679 673 679 672 679 673 0 0 0 0 0.0 0.0 0.0 0.0 1,794 438 2,252 458 1,794 438 2,252 458 0 0 0 0 0.0 0.0 0.0 0.0 *PROVISIONAL 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) Peak Met (MW) 652 Peak Deficit/ Surplus (MW) (- / +) 652 Peak Deficit/ Surplus ( % ) (- / +) 0 0 Energy Requirment (MU) 5,479 Energy Availability (MU) 5,361 Energy Deficit/ Surplus (MU) (- / +) -119 Energy Deficit/ Surplus ( % ) (- / +) -2.2 5. LIKELY BENEFIT TO THE UT DADRA AND NAGAR HAVELI DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) SIPAT-I U 3 KAPP U-3 & 4 VINDHYACHAL STPP ST-IV U-11,12 T N COMM UC CHHATT GUJ C C 1X660=660 2X700=1400 BENEFITS SHARES OF STATE (MW 3 8 T COMM MP C 2X500=1000 6 T COMM MAHA C 2X500=1000 6 MAUDA TPP U1-2 CENTRAL SECTOR SHARE SUB TOTAL (DADRA &NAGAR HAVELI) UNIT WISE COMMISSIONING DATE (CAPACITY MW) 02.06.2012(660MW) 14.06.2012(500MW) 25.03.2013(500MW) 19.04.2012(500MW) 29.03.2013(500MW) 23 23 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 T&D LOSSES % 15.10 16.00 19.94 11.22 18.10 15.57 11.21 10.14 12.07 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 5276 5593 5930 6286 PEAK DEMAND(MW) 749 809 874 944 8 ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 11708.59 2010-11 13366.50 63 2011-12 13766.56 SOUTHERN REGION 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO 11338.03 0 0 11338.03 21.50 THERMAL GAS DIESEL 555.7 362.52 3775.5 576.8 359.58 0 4690.78 939.32 8.89 1.78 COAL 10782.5 2460 9640 22882.5 43.39 (FIGURES IN MW) NUCLEAR TOTAL 11700.72 6812.3 9999.58 28512.6 54.06 0 0 1320 1320 2.50 R.E.S. (MNRE) 1326.69 10242.61 0 11569.3 21.94 TOTAL 24365.44 17054.91 11319.58 52739.93 100 2.CAPACITY ACHIEVED DURING 11TH PLAN (EXCULDING RES) (FIGURES IN MW) SECTOR STATE PRIVATE CENTRAL TOTAL HYDRO 564 0 0 564 COAL 3170 1950 1750 6870 THERMAL GAS DIESEL 92.2 0 1275 0 0 0 1367.2 0 3. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR STATE PRIVATE CENTRAL HYDRO 11398.0 3 COAL 13382.5 0 0.00 0.00 NUCLEAR TOTAL 3262.2 3225 1750 8237.2 TOTAL 0 0 440 440 3826.2 3225 1750 9241.2 (FIGURES IN MW) THERMAL GAS DIESEL 555.70 362.52 3360.00 4047.5 0 576.80 10640.0 0 359.58 0.00 64 NUCLEAR TOTAL 14300.7 2 R.E.S. (MNRE) 0.00 1534.15 7984.30 0.00 12250.5 2 10999.5 8 1320.00 0.00 TOTAL 27232.9 0 20234.8 2 12319.5 8 TOTAL 11398.0 3 19.06 % 27382.5 0 45.80 4962.7 8 8.30 939.32 1.57 33284.6 0 55.67 1320.00 2.21 13784.6 7 23.06 59787.3 0 100.00 4.ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* PEAK MET (MW) 22757 26176 37,599 38,767 39,015 39,094 35,686 39,094 35,492 19201 24350 32,188 31,586 36,048 35,698 34,541 35,698 34,165 PEAK DEFICIT/ SURPLUS (MW) (- / +) -3556 -1826 -5,411 -7,181 -2,967 -3,396 -1,145 -3,396 -1,327 PEAK DEFICIT/ SURPLUS (%) (- / +) -15.6 -7.0 -14.4 -18.5 -7.6 -8.7 -3.2 -8.7 -3.7 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 140516 180091 260,302 281,842 277,245 97,934 24,076 121,520 23,586 128095 175197 237,480 238,058 258,444 92,371 23,177 115,128 22,757 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -12421 -4894 -22,822 -43,784 -18,801 -5,563 -899 -6,392 -829 ENERGY DEFICIT/ SURPLUS (%) (- / +) -8.8 -2.7 -8.8 -15.5 -6.8 -5.7 -3.7 -5.3 -3.5 *Provisional 5. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15 AS PER THE LGBR Peak Demand (MW) Peak Met (MW) 41,677 32,423 Peak Deficit/ Surplus (MW) (- / +) -9,254 Peak Deficit/ Surplus ( % ) (- / +) -22.2 Energy Requirment (MU) 298,180 6.ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 971.55 2010-11 1009.63 2011-12 1098.01 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 287141 308977 332495 357826 PEAK DEMAND(MW) 43623 47752 52273 57221 65 Energy Availability (MU) 260,366 Energy Deficit/ Surplus (MU) (- / +) -37,814 Energy Deficit/ Surplus ( % ) (- / +) -12.7 UNITED ANDHRA PRADESH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO 3734.53 0 0 3734.53 23.20 COAL 5092.5 150 2821.38 8063.88 50.10 THERMAL GAS DIESEL 0 0 3098.4 36.8 0 0 3098.4 36.8 19.25 0.23 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO 3734.5 3 COAL 5892.5 0 0.00 750.00 0.00 3734.5 3 20.15 2940.5 8 9583.0 8 51.71 (FIGURES IN MW) NUCLEAR TOTAL 5092.5 3285.2 2821.38 11199.08 69.58 0 0 275.78 275.78 1.71 R.E.S. (MNRE) 221.83 663.51 0 885.34 5.50 TOTAL 9048.86 3948.71 3097.16 16094.73 100 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 0.00 5892.50 0.00 221.03 9848.06 3370.4 0 36.80 4157.20 0.00 1309.4 5 5466.65 0.00 0.00 2940.58 275.78 3370.4 0 18.19 36.80 0.20 3. ACTUAL POWER SUPPLY POSITION 66 NUCLEAR 12990.2 8 70.10 275.78 1.49 R.E.S. (MNRE) 0.00 1530.4 8 8.26 TOTAL 3216.36 18531.0 7 100.00 PERIOD PEAK DEMAN D (MW) PEAK MET (MW) PEAK DEFICIT/ SURPLUS (MW) (- / +) PEAK DEFICIT/ SURPLUS (%) (- / +) ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) ENERGY DEFICIT/ SURPLUS (MU) (- / +) ENERGY DEFICIT/ SURPLUS (%) (- / +) UNITED AP 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 8585 10208 14,054 14,582 14,072 6873 8641 11,972 11,630 13,162 -1712 -1567 -2,082 -2,952 -910 -19.9 -15.4 -14.8 -20.2 -6.5 48394 60964 91,730 99,692 95,662 44302 58280 85,149 82,171 89,036 -4092 -2684 -6,581 -17,521 -6,626 -8.5 -4.4 -7.2 -17.6 -6.9 7,144 6,548 7,144 6,739 6,158 6,072 6,525 6,525 -986 -476 -619 -214 -13.8 -7.3 -8.7 -3.2 25,784 4,213 30,136 4,352 23,464 4,023 27,734 4,270 -2,320 -190 -2,402 -82 -9.0 -4.5 -8.0 -1.9 7,121 7,121 7,329 7,329 5,949 5,949 6,630 6,630 -1,172 -1,172 -699 -699 -16.5 -16.5 -9.5 -9.5 8,184 4,354 12,835 4,651 7,493 3,879 11,641 4,148 -691 -475 -1,194 -503 -8.4 -10.9 -9.3 -10.8 AP APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* TELENAGANA APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* *Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15 AS PER THE LGBR Peak Demand (MW) 14,993 Peak Met (MW) 11,791 Peak Deficit/ Surplus (MW) (- / +) -3,202 Peak Deficit/ Surplus ( % ) (- / +) -21.4 Energy Requirment (MU) 103,732 Energy Availability (MU) 87,901 Energy Deficit/ Surplus (MU) (- / +) -15,831 5. LIKELY BENEFIT TO THE STATE OF ANDHRA PRADESH DURING 12TH PLAN PROJECTS T ST STATE SE IC (MW) Y AT PROJECT CT P US LOCATION OR E VALLUR TPP U2, 3 BENEFITS SHARES OF STATE (MW) COMM TN C 2X500=1000 119 PFBR(KALAPAKKAM) * N TUTICORIN TPP JV U1,2 T TOTAL CENTRAL SECTOR SHARE UC UC TN TN C C 1X500=500 2X500=1000 92 255 466 LOWER JURALA HEP PULICHINTALA HEP NAGARJUNA SAGAR SRI DAMODARAM SANJEEVAIAH TPP (KRISHNAPATTAM TPP) U1,2 H H H UC UC UC AP AP AP S S S 6X40=240 4X30=120 2X25=50 240 120 50 T UC/COMM AP S 2X800=1600 RAYAL SEEMA TPP U6 T Energy Deficit/ Surplus ( % ) (- / +) -15.3 28.2.2013(500MW) 28.02.2014(500MW) 1600 28.08.2014(800 MW) T UC AP S 1X600=600 TOTAL SECTOR SECTOR NAGARJUNA CONSTRUCTION COMPANY LTD PH-I U-1,2 PAINAMPURAM TPP U1,2 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 600 2610 T UC AP P T UC AP P 67 1320 2X660=1320 1320 BHAVANAPADDU TPP U-1,2 THAMMINAPATNAM TPP I U 12 THAMMINAPATNAM TPP U 3-4 SIMHAPURI TPP PH-I, U 2 HINDUJA TPP,U-2 SIMHAPURI TPP PH-II, U1 2X660=1320 T COMM AP P 2X150=300 T T T T UC COMM UC COMM AP AP AP AP P P P P 2X350=700 1X150=150 2X525=1050 1X150=150 1320 300 700 150 1050 150 TOTAL PRIVATE SECTOR 6310 GRAND TOTAL (ANDHRA PRADESH) 9386 09.09.2012(150MW) 17.04.2013(150MW) 02.07.2012(150MW) 21.02.2014(150MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 22222222 T&D LOSSES % 27.73 23.96 20.06 18.65 22.41 19.56 18.37 16.59 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 101231 109968 119458 129767 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 17044 18681 20476 22445 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 1013.74 2010-11 1065.46 2011-12 1156.52 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 78150.99 2012-13 % PLF 80.8 Actual Gen (MU) 83710.5 2011-12 % PLF 85.7 Actual Gen (MU) 85697.85 68 % PLF 87.91 KARNATAKA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % THERMAL GAS DIESEL 0 127.92 0 106.5 0 0 0 234.42 0.00 1.75 COAL 2720 2060 1341.23 6121.23 45.70 3599.8 0 0 3599.8 26.88 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO STATE PRIVATE 0.00 CENTRAL TOTAL 0.00 3599.8 0 25.23 % NUCLEAR TOTAL 2847.92 2166.5 1341.23 6355.65 47.45 0 0 254.86 254.86 1.90 R.E.S. (MNRE) 823.65 2359.58 0 3183.23 23.77 TOTAL 7271.37 4526.08 1596.09 13393.54 100 (FIGURES IN MW) THERMAL GAS DIESEL COAL 2720.0 0 2060.0 0 1415.5 6 6195.5 6 43.42 3599.8 0 (FIGURES IN MW) 0.00 127.92 0.00 106.50 0.00 0.00 0.00 234.42 0.00 1.64 NUCLEAR TOTAL 2847.9 2 2166.5 0 1415.5 6 6429.9 8 45.06 0.00 0.00 R.E.S. (MNRE) 1031.6 6 2953.4 8 254.86 254.86 1.79 0.00 3985.1 3 27.93 TOTAL 7479.38 5119.98 1670.42 14269.7 7 100.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* PEAK MET (MW) 5338 6253 10,545 10,124 9,940 10,001 8,953 10,001 8,403 4428 5811 8,549 8,761 9,223 9,503 8,137 9,503 8,016 PEAK DEFICIT/ SURPLUS (MW) (- / +) -910 -442 -1,996 -1,363 -717 -498 -816 -498 -387 PEAK DEFICIT/ SURPLUS (%) (- / +) -17.0 -7.1 -18.9 -13.5 -7.2 -5.0 -9.1 -5.0 -4.6 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 19716 40797 60,830 66,274 64,150 21,432 4,895 26,145 4,713 16684 39948 54,023 57,044 58,052 20,110 4,723 24,674 4,564 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -3032 -849 -6,807 -9,230 -6,098 -1,322 -172 -1,471 -149 ENERGY DEFICIT/ SURPLUS (%) (- / +) -15.4 -2.1 -11.2 -13.9 -9.5 -6.2 -3.5 -5.6 -3.2 *Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 213-14 AS PER THE LGBR Peak Demand (MW) 10,772 Peak Met (MW) 8,137 Peak Deficit/ Surplus (MW) (- / +) -2,635 Peak Deficit/ Surplus ( % ) (- / +) -24.5 Energy Requirment (MU) 69,596 Energy Availability (MU) 59,593 Energy Deficit/ Surplus (MU) (- / +) -10,003 Energy Deficit/ Surplus ( % ) (- / +) -14.4 5. LIKELY BENEFIT TO THE STATE OF KARNATAKA DURING 12TH PLAN PROJECTS TUTICORIN TPP JV U1,2 T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) T UC TN C 2X500=1000 69 BENEFITS SHARES OF STATE (MW 158 UNIT WISE COMMISSIONING DATE (CAPACITY MW) VALLUR TPP U 2 3 T COMM TN C 2X500=1000 74 NEYVELI - II LIG U2 KUDANKULAM U 1,2 PFBR(KALAPAKKAM) * TOTAL CENTRAL SECTOR GRAND TOTAL (KARNATAKA) T N N UC UC UC TN TN TN C C C 1X250=250 2X1000=2000 1X500=500 55 442 56 785 785 28.2.2013(500MW) 28.02.2014(500MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 22222222 T&D LOSSES % 23.29 26.08 29.77 25.91 18.87 17.03 18.76 17.34 12.66 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 63001 67833 73036 78637 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 10473 11258 12102 13010 9. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 873.05 2010-11 925.02 2011-12 1081.35 10. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 29798.63 2012-13 % PLF 71.11 Actual Gen (MU) 28334.51 2011-12 % PLF 76.25 Actual Gen (MU) 24112.7 70 % PLF 71.72 KERALA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO THERMAL GAS DIESEL 0 234.6 174 21.84 359.58 0 533.58 256.44 13.94 6.70 COAL 0 0 897.92 897.92 23.46 1881.5 0 0 1881.5 49.15 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO PRIVATE CENTRAL TOTAL 1881.5 0 0.00 0.00 1881.5 0 48.34 % NUCLEAR TOTAL 234.6 195.84 1257.5 1687.94 44.10 0 0 95.6 95.6 2.50 R.E.S. (MNRE) 162.66 0.03 0 162.69 4.25 TOTAL 2278.76 195.87 1353.1 3827.73 100 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 0.00 234.60 234.60 0.00 158.42 0.00 174.00 21.84 0.00 35.23 931.19 359.58 0.00 931.19 533.58 256.44 23.93 13.71 6.59 195.84 1290.7 7 1721.2 1 44.22 PEAK DEFICIT/ SURPLUS (MW) (- / +) -444 -59 -179 -316 -98 -265 -289 -265 -283 PEAK DEFICIT/ SURPLUS (%) (- / +) -16.9 -2.1 -5.1 -8.8 -2.7 -7.0 -8.3 -7.0 -8.2 COAL STATE (FIGURES IN MW) NUCLEAR R.E.S. (MNRE) 95.60 TOTAL 2274.5 2 231.07 1386.3 7 3891.9 6 100.00 0.00 95.60 193.65 2.46 4.98 3.ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 PEAK MET (MW) 2633 2787 3.516 3,578 3,671 3,760 3,499 3,760 3,472 APR,14-AUG,14* AUG,14* 2189 2728 3,337 3,262 3,573 3,495 3,210 3,495 3,189 ENERGY REQUIRMENT (MU) 13334 15023 19,890 21,243 21,577 7,533 1,790 9,267 1,734 ENERGY AVAILABILITY (MU) 12349 14716 19,467 20,391 21,052 7,369 1,757 9,074 1,705 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -985 -307 -423 -852 -525 -164 -33 -193 -29 ENERGY DEFICIT/ SURPLUS (%) (- / +) -7.4 -2.0 -2.1 -4.0 -2.4 -2.2 -1.8 -2.1 -1.7 *Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 3,742 Peak Met (MW) Peak Deficit/ Surplus (MW) (- / +) 2,557 -1,185 Peak Deficit/ Surplus ( % ) (- / +) Energy Requirment (MU) -31.7 Energy Availability (MU) 22,492 16,948 Energy Deficit/ Surplus (MU) (- / +) -5,544 Energy Deficit/ Surplus ( % ) (- / +) -24.7 5.LIKELY BENEFIT TO THE STATE OF KERALA DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION 71 SE CT OR IC (MW) BENEFITS SHARES OF STATE (MW UNIT WISE COMMISSIONING DATE (CAPACITY MW) TUTICORIN TPP JV U1,2 T UC TN C 2X500=1000 73 VALLUR TPP U2 3 T COMM TN C 2X500=1000 33 NEYVELI - II LIG U2 KUDANKULAM U 1,2 PFBR(KALAPAKKAM) * INDRA GANDHI (JHAJJAR) U1,2,3 T N N T UC UC UC COMM TN TN TN HARYANA C C C C 1X250=250 2X1000=2000 1X500=500 3X500= 1500 35 266 25 90 28.2.2013(500MW) 28.02.2014(500MW) (ALLOCATED FOR 1 YEAR FROM 01.06.2014 TO 31.05.2015) SUB TOTAL CENTRAL SECTOR SHARE THOTTIAR HEP H UC PALLIVASAL HEP H UC SUB TOTAL STATE SECTOR GRAND TOTAL (KERALA) KER KER S S 1X30+1X10=40 2X30=60 522 40 60 100 622 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 22222222 T&D LOSSES % 21.63 22.48 23.50 19.11 17.81 13.16 19.59 18.29 17.23 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 21889 23354 24917 26584 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 3922 4157 4405 4669 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 536.78 2010-11 550.80 2011-12 593.77 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 1541.62 % PLF 2012-13 Actual Gen (MU) 2217.58 % PLF 2011-12 Actual Gen (MU) 1045.73 72 % PLF TAMIL NADU 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % THERMAL GAS DIESEL 523.2 0 503.1 411.66 0 0 1026.3 411.66 5.83 2.34 COAL 2970 250 2959.37 6179.37 35.11 2122.2 0 0 2122.2 12.06 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 2182.20 0.00 550.00 3653.1 0 8973.1 0 42.34 0.00 2182.20 10.30 NUCLEAR TOTAL 3493.2 1164.76 2959.37 7617.33 43.28 0 0 524 524 2.98 R.E.S. (MNRE) 118.55 7219.46 0 7338.01 41.69 TOTAL 5733.95 8384.22 3483.37 17601.54 100 (FIGURES IN MW) THERMAL GAS DIESEL COAL 4770.0 0 (FIGURES IN MW) NUCLEAR R.E.S. (MNRE) TOTAL TOTAL 523.20 0.00 5293.20 0.00 123.05 7598.45 503.10 411.66 1464.76 0.00 7952.3 3 9417.09 0.00 0.00 3653.10 524.00 1026.3 0 4.84 411.66 1.94 10411.0 6 49.13 524.00 2.47 4177.10 0.00 8075.3 8 38.10 21192.6 4 100.00 3.ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* PEAK MET (MW) 7158 8860 12,813 12,736 13,522 13,663 13,174 13,663 12,774 PEAK DEFICIT/ SURPLUS (MW) (- / +) -940 -236 -2,247 -1,683 -1,030 -165 -140 -165 -140 6218 8624 10,566 11,053 12,492 13,498 13,034 13,498 12,634 PEAK DEFICIT/ SURPLUS (%) (- / +) -13.1 -2.7 -17.5 -13.2 -7.6 -1.2 -1.1 -1.2 -1.1 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 46232 61499 85,685 92,302 93,508 34,132 8,605 42,071 7,939 42951 60445 76,705 76,161 87,980 33,077 8,581 40,954 7,877 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -3281 -1054 -8,980 -16,141 -5,528 -1,055 -24 -1,117 -62 ENERGY DEFICIT/ SURPLUS (%) (- / +) -7.1 -1.7 -10.5 -17.5 -5.9 -3.1 -0.3 -2.7 -0.8 *Provisional 4.ANTICIPATED POWER SUPPLY POSITION DURING 2014-15 AS PER THE LGBR Peak Demand (MW) 13,773 5. Peak Met (MW) 12,128 Peak Deficit/ Surplus (MW) (- / +) -1,645 Peak Deficit/ Surplus ( % ) (- / +) -11.9 Energy Requirment (MU) 98,822 Energy Availability (MU) 92,132 Energy Deficit/ Surplus (MU) (- / +) -6,690 Energy Deficit/ Surplus ( % ) (- / +) -6.8 LIKELY BENEFIT TO THE STATE OF TAMILNADU DURING 12TH PLAN PROJECTS T Y ST AT STATE PROJECT 73 SE CT IC (MW) BENEFITS SHARES UNIT WISE COMMISSIONING P E US LOCATION OR TUTICORIN TPP JV U1,2 T UC TN C 2X500=1000 387 VALLUR TPP U2, 3 T COMM TN C 2X500=1000 694 TN TN TN C C C 1X250=250 2X1000=2000 1X500=500 115 925 250 2371 NEYVELI - II LIG U2 T UC KUDANKULAM U 1,2 N UC PFBR(KALAPAKKAM) * N UC SUB TOTAL CENTRAL SECTOR SHARE BHAWANI BARRAGE II & III H COMM METTUR EXT U1 T COMM NORTH CHENNAI EXT U1,2 T COMM T UC T COMM SUB TOTAL STATE SECTOR IND BARATH TPP U1 IND BARATH TPP (TUTICORIN)U1,2# SUB TOTAL PRIVATE SECTOR TN S OF STATE (MW 4X15=60 DATE (CAPACITY MW) 60 TN S 1X600=600 600 TN S 2X600=1200 TN P 2X660=660 1200 1860 660 TN P 2X150=150 GRAND TOTAL (TN) 300 960 28.2.2013(500MW) 28.02.2014(500MW) 08.12.2012 (15MW) 27.08.2013(15MW) 06.09.2013(15MW) 25.09.2013(15MW) 11.10.2012 (600MW) 09.03.2013(600MW) 13.09.2013(600MW) 11.03.2013(150MW) 30.12.2013(150MW) 5191 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE, # ADDITIONAL PROJECT OUTSIDE 88537 MW 6. T&D LOSSES YEAR 2003- 04 11111111 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 T&D LOSSES % 17.16 19.28 18.66 19.54 18.71 18.14 18.41 13.47 16.34 9.PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 97865 104529 111648 119251 PEAK DEMAND(MW) 15736 17497 19489 20816 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 1210.81 2010-11 1232.51 2011-12 1276.57 11. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 2012-13 2011-12 74 Actual Gen (MU) % PLF 55100.82 Actual Gen (MU) 75.3 % PLF 48084.49 Actual Gen (MU) 80.41 % PLF 46697.83 80.3 PUDUCHERRY 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % THERMAL GAS DIESEL 32.5 0 0 0 0 0 32.5 0 11.62 0.00 COAL 0 0 227.85 227.85 81.47 0 0 0 0 0.00 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR 3. THERMAL GAS DIESEL 32.50 0.00 0.00 0.00 0.00 0.00 32.50 0.00 11.44 0.00 COAL 0.00 0.00 232.32 232.32 81.77 0.00 0.00 0.00 0.00 0.00 NUCLEAR TOTAL 32.5 0 227.85 260.35 93.10 R.E.S. (MNRE) 0 0.03 0 0.03 0.01 0 0 19.28 19.28 6.89 TOTAL 32.5 0.03 247.13 279.66 100 (FIGURES IN MW) HYDRO STATE PRIVATE CENTRAL TOTAL % (FIGURES IN MW) NUCLEAR TOTAL 32.50 0.00 232.32 264.82 93.20 0.00 0.00 19.28 19.28 6.79 R.E.S. (MNRE) 0.00 0.03 0.00 0.03 0.01 TOTAL ENERGY DEFICIT/ SURPLUS (MU) (- / +) 0 -31 -40 -24 -11 -5 -15 -4 ENERGY DEFICIT/ SURPLUS (%) (- / +) 0.0 -1.4 -1.7 -1.0 -1.3 -2.3 -1.4 -2.0 32.50 0.03 251.60 284.13 100.00 ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* PEAK MET (MW) 265 335 348 351 389 346 389 359 265 320 320 333 348 333 348 325 PEAK DEFICIT/ SURPLUS (MW) (- / +) 0 -15 -28 -18 -41 -13 -41 -34 PEAK DEFICIT/ SURPLUS (%) (- / +) 0.0 -4.5 -8.0 -5.1 -10.5 -3.8 -10.5 -9.5 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 1808 2,167 2,331 2,344 869 219 1,066 197 1808 2,136 2,291 2,320 858 214 1,051 193 *Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 368 Peak Met (MW) Peak Deficit/ Surplus (MW) (- / +) 388 20 Peak Deficit/ Surplus ( % ) (- / +) Energy Requirment (MU) 5.4 2,482 Energy Availability (MU) 2,736 5.LIKELY BENEFIT TO THE UT OF PUDUCHERRY DURING 12TH PLAN PROJECTS T ST STATE SE IC (MW) Y AT PROJECT CT P US LOCATION OR E 75 Energy Deficit/ Surplus (MU) (- / +) 254 BENEFITS SHARES OF STATE (MW Energy Deficit/ Surplus ( % ) (- / +) 10.2 UNIT WISE COMMISSIONING DATE (CAPACITY MW) TUTICORIN TPP JV U1,2 NEYVELI - II LIG U2 T T UC UC TN TN C C 2X500=1000 1X250=250 10 8 VALLUR TPP U2, 3 T COMM TN C 2X500=1000 4 TN TN C C 2X1000=2000 1X500=500 67 3 92 92 KUDANKULAM U 1,2 N UC PFBR(KALAPAKKAM) * N UC SUB TOTAL CENTRAL SECTOR SHARE GRAND TOTAL (PUDDUCHERRY) 28.2.2013(500MW) 28.02.2014(500MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 1111111 1 T&D LOSSES % 1.60 18.15 18.48 18.76 5.89 12.24 11.84 12.41 14.66 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 3155 3293 3436 3586 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 555 579 604 630 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 1864.50 2010-11 1850.47 2011-12 2124.71 9.THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 256.97 % PLF 2012-13 Actual Gen (MU) 230.76 % PLF 2011-12 Actual Gen (MU) 251.46 76 % PLF EASTERN REGION 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 3168.92 0 713.2 3882.12 14.77 THERMAL GAS DIESEL 100 17.06 0 0.14 90 0 190 17.2 0.72 0.07 COAL 7070 4551.38 10176.5 21797.88 82.93 NUCLEAR TOTAL 7187.06 4551.52 10266.5 22005.08 83.71 R.E.S. (MNRE) 328.16 70.55 0 398.71 1.52 0 0 0 0 0.00 TOTAL 10684.14 4622.07 10979.7 26285.91 100 2. CAPACITY ACHIEVED DURING 11TH PLAN (EXCULDING RES) (FIGURES IN MW) SECTOR HYDRO STATE 1050 PRIVATE 0 CENTRAL TOTAL 510 1560 THERMAL GAS DIESEL 0 0 COAL 182 0 310 0 475 0 9670 HYDRO COAL STATE PRIVATE CENTRAL TOTAL 3168.9 2 99.00 845.20 4113.1 2 13.15 % TOTAL 0 2870 0 0 3100 0 3100 0 0 4750 0 5260 0 0 9670 0 11230 3. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR NUCLEAR TOTAL 1820 (FIGURES IN MW) THERMAL GAS DIESEL NUCLEAR TOTAL R.E.S. (MNRE) 7040.00 100.00 17.06 7157.06 0.00 289.89 7341.38 12146.5 0 26527.8 8 84.80 0.00 0.14 0.00 142.97 90.00 0.00 0.00 0.00 190.00 17.20 0.00 432.86 0.61 0.05 7341.52 12236.5 0 26735.0 8 85.47 0.00 1.38 TOTAL 10615.8 7 7583.49 13081.7 0 31281.0 6 100.00 4.ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* PEAK MET (MW) 7940 10491 14,707 16,655 15,888 16,628 16,333 16,628 16,045 7648 10058 13,999 15,415 15,598 16,342 16,086 16,342 15,768 PEAK DEFICIT/ SURPLUS (MW) (- / +) -292 -433 -708 -1,240 -290 -286 -247 -286 -277 PEAK DEFICIT/ SURPLUS (%) (- / +) -3.7 -4.1 -4.8 -7.4 -1.8 -1.7 -1.5 -1.7 -1.7 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 50687 68198 99,344 107,457 108,203 41,334 10,509 52,458 11,124 50197 66183 94,657 102,510 106,783 40,863 10,396 51,876 11,013 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -490 -2015 -4,687 -4,947 -1,420 -471 -113 -582 -111 ENERGY DEFICIT/ SURPLUS (%) (- / +) -1.0 -3.0 -4.7 -4.6 -1.3 -1.1 -1.1 -1.1 -1.0 * Provisional 5. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 17,608 Peak Met (MW) 17,782 Peak Deficit/ Surplus (MW) (- / +) 174 Peak Deficit/ Surplus ( % ) (- / +) 1 Energy Requirment (MU) 118,663 77 Energy Availability (MU) 114,677 Energy Deficit/ Surplus (MU) (- / +) -3,986 Energy Deficit/ Surplus ( % ) (- / +) -3.4 6. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 446.14 2010-11 493.39 2011-12 521.16 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 126063 137515 150018 163790 PEAK DEMAND(MW) 18291 20109 22106 24303 78 BIHAR 1. INSTALLED CAPACITY (AT THE END OF 11 TH PLAN i.e. 31.03.2012) SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO 0 0 129.43 129.43 7.06 THERMAL GAS DIESEL 0 0 0 0 0 0 0 0 0.00 0.00 COAL 430 0 1194.7 1624.7 88.59 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR STATE PRIVATE CENTRAL TOTAL HYDRO 0.00 0.00 129.43 129.43 % 5.89 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 1409 1399 2,031 2,295 2,465 2,620 2,620 2,620 2,401 1288 1162 1,738 1,784 2,312 2,470 2,470 2,470 2,251 NUCLEAR TOTAL 430 0 1194.7 1624.7 88.59 0 0 0 0 0.00 R.E.S. (MNRE) 64.3 15.5 0 79.8 4.35 TOTAL 494.3 15.5 1324.13 1833.93 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 0.00 0.00 0.00 COAL 210.00 0.00 1744.7 0 1954.7 0 88.92 (FIGURES IN MW) 0.00 0.00 0.00 0.00 0.00 0.00 PEAK DEFICIT/ SURPLUS (MW) (- / +) -121 -237 -293 -511 -153 -150 -150 -150 -150 PEAK DEFICIT/ SURPLUS (%) (- / +) -8.6 -16.9 -14.4 -22.3 -6.2 -5.7 -5.7 -5.7 -6.2 NUCLEAR TOTAL 210.00 0.00 1744.7 0 1954.7 0 88.92 ENERGY REQUIRMENT (MU) 0.00 0.00 R.E.S. (MNRE) 70.70 43.42 0.00 0.00 0.00 114.12 0.00 5.19 ENERGY AVAILABILITY (MU) 9370 8425 14,311 15,409 15,391 5,880 1,597 7,437 1,557 8992 7741 11,260 12,835 14,759 5,750 1,564 7,274 1,524 4.ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Peak Peak Peak Energy Energy Demand Met Deficit/ Deficit/ RequiAvail(MW) (MW) Surplus Surplus rment ability (MW) (- / +) ( % ) (- / +) (MU) (MU) Energy Deficit/ Surplus (MU) (- / +) TOTAL 280.70 43.42 1874.1 3 2198.2 5 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -378 -684 -3,051 -2,574 -632 -130 -33 -163 -33 ENERGY DEFICIT/ SURPLUS (%) (- / +) -4.0 -8.1 -21.3 -16.7 -4.1 -2.2 -2.1 -2.2 -2.1 * Provisional 2,750 2,038 -712 -25.9 15,917 5. LIKELY BENEFIT TO THE STATE OF BIHAR DURING 12TH PLAN PROJECTS T ST STATE Y AT PROJECT P US LOCATION E MUZAFFARPUR EXT.(KANTI TPP) U1,2 BARH STPP-I U1-3 T UC BIHAR T UC BIHAR 79 13,477 SE CT OR C C Energy Deficit/ Surplus ( % ) (- / +) -2,440 IC (MW) BENEFITS SHARES OF STATE (MW 2X195=390 264 3X660=1980 1025 -15.3 UNIT WISE COMMISSIONING DATE/ (LIKELY DATE OF COMMISSIONING) BARH STPP-II U1,2 NABINAGAR TPP U1-4* TOTAL CENTRAL SECTOR GRAND TOTAL (BIHAR) T T UC/COMM UC BIHAR BIHAR C C 2X660=1320 4X250=1000 4690 859 0 2148 2148 20.11.2013(660MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * 90% of power from the project is allocated to Railways and 10% power has been kept in the Eastern Region as unallocated 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 T&D LOSSES % 36.66 38.88 43.96 50.67 48.79 46.37 43.58 50.77 50.89 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 19096 22062 25489 29447 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 3277 3777 4354 5018 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 117.48 2010-11 126.75 2011-12 133.61 11. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 14939.36 2012-13 % PLF 61.55 Actual Gen (MU) 14707.45 2011-12 % PLF 60.61 Actual Gen (MU) 13812.29 80 % PLF 54.79 D.V.C. 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 0 0 0 0 0 0 0 PRIVATE 0 0 0 0 0 0 0 CENTRAL 193.26 5005.6 90 0 5095.6 0 0 TOTAL 193.26 5005.6 90 0 5095.6 0 0 % 3.65 94.64 1.70 0.00 96.35 0.00 0.00 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR STATE PRIVATE CENTRAL TOTAL % HYDRO 0.00 0.00 193.26 193.26 2.60 TOTAL 0 0 5288.86 5288.86 100 (FIGURES IN MW) THERMAL NUCLEAR COAL GAS DIESEL TOTAL 0.00 1050.0 0 6105.6 0 7155.6 0 96.19 0.00 0.00 0.00 0.00 90.00 0.00 90.00 0.00 1.21 0.00 0.00 1050.0 0 6195.6 0 7245.6 0 97.40 PEAK DEFICIT/ SURPLUS (MW) (- / +) -87 -48 -244 -104 0 -20 -45 -20 -20 PEAK DEFICIT/ SURPLUS (%) (- / +) -6.7 -2.9 -10.5 -4.0 0.0 -0.8 -1.8 -0.8 -0.9 R.E.S. TOTAL (MNRE) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1050.0 0 6388.8 6 7438.8 6 100.00 3. ACTUAL POWER SUPPLY POSITION PERIOD 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* PEAK DEMAND (MW) PEAK MET (MW) 1296 1650 2,318 2,573 2,745 2,610 2,557 2,610 2,109 1209 1602 2,074 2,469 2,745 2,590 2,512 2,590 2,089 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 8319 11542 16,648 17,299 17,407 6,114 1,590 7,645 1,531 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -7 -234 -639 -960 -111 -50 -13 -62 -12 8312 11308 16,009 16,339 17,296 6,064 1,577 7,583 1,519 ENERGY DEFICIT/ SURPLUS (%) (- / +) -0.1 -2.0 -3.8 -5.5 -0.6 -0.8 -0.8 -0.8 -0.8 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15 AS PER THE LGBR Peak Peak Peak Peak Energy Energy Energy Demand Met Deficit/ Deficit/ RequiAvailDeficit/ (MW) (MW) Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 2,815 3,084 269 9.6 19,705 19,189 -516 7. LIKELY BENEFIT TO DVC DURING 12TH PLAN PROJECTS T ST Y AT P US E RAGHUNATHPUR PH-I U1,2 BOKARO TPP A EXP U1 MUZAFFARPUR EXT.(KANTI TPP) U1,2 TOTAL CENTRAL SECTOR SUB TOTAL (DVC) T T UC/COMM UC T UC STATE PROJECT LOCATION WB JHARKHAND BIHAR 81 SE CT OR IC (MW) 2X600=1200 1X500=500 2X195=390 Energy Deficit/ Surplus ( % ) (- / +) -2.6 BENEFITS SHARES OF STATE (MW 1200 500 10 1710 1710 UNIT WISE COMMISSIONING DATE/ (LIKELY DATE OF COMMISSIONING) 24.08.2014(600 MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE 8. PEAK & ENERGY TABLE (As per 18th EPS Report) YEAR ENERGY DEMAND(MU) 18302 19633 21072 22627 24309 2012-13 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 3239 3448 3672 3914 4173 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 27889.66 2012-13 % PLF 56.5 Actual Gen (MU) 26077.88 2011-12 % PLF 64.95 Actual Gen (MU) 19536.57 82 % PLF 65.62 JHARKHAND 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 130 0 70.93 200.93 6.61 THERMAL GAS DIESEL 0 0 0 0 0 0 0 0 0.00 0.00 COAL 1190 1410 228.88 2828.88 93.12 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO STATE 130.00 PRIVATE CENTRAL TOTAL 0.00 70.93 200.93 % 7.79 NUCLEAR TOTAL 1190 1410 228.88 2828.88 93.12 R.E.S. (MNRE) 4.05 4.00 0 8.05 0.27 0 0 0 0 0.00 TOTAL 1324.05 1414.05 299.81 3037.91 100 (FIGURES IN MW) THERMAL GAS DIESEL COAL 1190.0 0 900.00 268.88 2358.8 8 91.43 (FIGURES IN MW) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PEAK DEFICIT/ SURPLUS (MW) (- / +) -16 -162 -91 -42 -23 -15 -23 -30 PEAK DEFICIT/ SURPLUS (%) (- / +) -2.3 -15.7 -7.2 -3.8 -2.2 -1.5 -2.2 -2.9 NUCLEAR R.E.S. (MNRE) 0.00 4.05 0.00 0.00 16.00 0.00 0.00 20.05 0.00 0.78 ENERGY AVAILABILITY (MU) ENERGY DEFICIT/ SURPLUS (MU) (- / +) -215 -250 -277 -136 -23 -6 -29 -6 TOTAL 1190.0 0 900.00 268.88 2358.8 8 91.43 TOTAL 1324.0 5 916.00 339.81 2579.8 6 100.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMA ND (MW) 10THPLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 687 1,030 1,263 1,111 1,060 997 1,060 1,022 PEAK MET (MW) 671 868 1,172 1,069 1,037 982 1,037 992 ENERGY REQUIRMENT (MU) 4369 6,280 7,042 7,143 2,546 616 3,211 665 4154 6,030 6,765 7,007 2,523 610 3,182 659 ENERGY DEFICIT/ SURPLUS (%) (- / +) -4.9 -4.0 -3.9 -1.9 -0.9 -1.0 -0.9 -0.9 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15 AS PER THE LGBR Peak Demand (MW) 1,130 Peak Met (MW) Peak Deficit/ Surplus (MW) (- / +) 1,238 Peak Deficit/ Surplus ( % ) (- / +) 108 Energy Requirment (MU) 9.6 Energy Availability (MU) 8,315 5.LIKELY BENEFIT TO THE STATE OF JHARKHAND DURING 12TH PLAN PROJECTS T ST STATE SE Y AT PROJECT CT P US LOCATION OR E MUZAFFARPUR EXT.(KANTI T TPP) U1,2 BARH STPP-1 U-1,2,3 T BARH STPP-II U-1,2 T FIRM CENTRAL SECTOR SHARE UC BIHAR UC UC/COMM BIHAR BIHAR 83 C C C Energy Deficit/ Surplus (MU) (- / +) 7,393 IC (MW) Energy Deficit/ Surplus ( % ) (- / +) -922 -11.1 BENEFITS SHARES OF STATE (MW UNIT WISE COMMISSIONING DATE/ (LIKELY DATE OF COMMISSIONING) 2X195=390 12 3X660=1980 2X660=1320 202 80 294 20.11.2013(660MW) MAITRISHI USHA TPP PH-I U1,2 ADHUNIK POWER & NATURAL RESOURCES LTD TPP U1,2 PRIVATE SECTOR SUB TOTAL (JHARKHAND) T UC T COMM JHARKHAND P JHARKHAND P 2X270=540 540 2X270=540 540 19.11.2012(270MW) 29.03.2013(270MW) 1080 1374 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE 6. T&D LOSSES YEAR 2003- 04 22222222 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 T&D LOSSES % 25.35 19.62 26.82 26.21 23.16 24.27 22.24 17.07 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY PEAK DEMAND(MU)* DEMAND(MW)* 2013-14 11885 1802 2014-15 12753 1979 2015-16 13596 2157 2016-17 14509 2353 *EXCLUDING DVC 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 750.46 2010-11 749.27 2011-12 790.20 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 14235.65 2012-13 % PLF 51.23 Actual Gen (MU) 11378.09 2011-12 % PLF 56.25 Actual Gen (MU) 6387.24 84 % PLF 47.71 ODISHA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 2061.92 0 105.01 2166.93 36.14 THERMAL GAS DIESEL 0 0 0 0 0 0 0 0 0.00 0.00 COAL 420 1800 1512.1 3732.1 62.24 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO STATE 2061.9 2 PRIVATE 0.00 CENTRAL TOTAL 105.01 2166.9 3 25.99 % (FIGURES IN MW) NUCLEAR TOTAL 420 1800 1512.1 3732.1 62.24 0 0 0 0 0.00 R.E.S. (MNRE) 64.3 33 0 97.3 1.62 TOTAL 2546.22 1833 1617.11 5996.33 100 (FIGURES IN MW) COAL THERMAL GAS DIESEL TOTAL 420.00 0.00 0.00 420.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PEAK DEFICIT/ SURPLUS (MW) (- / +) -155 -87 -63 -274 -5 -50 -30 -50 -30 PEAK DEFICIT/ SURPLUS (%) (- / +) -7.3 -3.2 -1.8 -6.9 -0.1 -1.3 -0.8 -1.3 -0.8 4050.0 0 1585.0 6 6055.0 6 72.63 NUCLEAR 0.00 4050.0 0 1585.0 6 6055.0 6 72.63 0.00 0.00 0.00 0.00 R.E.S. (MNRE) 64.63 50.50 0.00 115.1 3 1.38 TOTAL 2546.5 5 4100.5 0 1690.0 7 8337.1 2 100.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMA ND (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 2132 2695 3,589 3,968 3,727 3,814 3,664 3,814 3,547 PEAK MET (MW) 1977 2608 3,526 3,694 3,722 3,764 3,634 3,764 3,517 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 12328 17101 23,036 25,155 24,958 9,331 2,277 12,197 2,866 12318 16796 22,693 24,320 24,546 9,155 2,233 11,977 2,822 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -10 -305 -343 -835 -412 -176 -44 -220 -44 ENERGY DEFICIT/ SURPLUS (%) (- / +) -0.1 -1.8 -1.5 -3.3 -1.7 -1.9 -1.9 -1.8 -1.5 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 3,900 Peak Met (MW) 4,019 Peak Deficit/ Surplus (MW) (- / +) 119 Peak Deficit/ Surplus ( % ) (- / +) 3.1 Energy Requirment (MU) 27,363 5.LIKELY BENEFIT TO THE STATE OF ODISHA DURING 12TH PLAN PROJECTS T ST STATE Y AT P US PROJECT E LOCATIO N MUZAFFARPUR EXT.(KANTI TPP) U1,2 BARH STPP-I U1-3 T UC BIHAR T UC BIHAR 85 Energy Availability (MU) 27,151 SE CT OR C C Energy Deficit/ Surplus (MU) (- / +) -212 IC (MW) Energy Deficit/ Surplus ( % ) (- / +) -0.8 BENEFIT S/ SHARES OF STATE (MW) 2X195=390 30 3X660=1980 418 UNIT WISE COMMISSIONING DATE (CAPACITY) BARH STPP-II U1,2 UC/COM M T SUB TOTAL CENTRAL SECTOR SHARE DERANG TPP U1 T IND BARATH ENERGY PVT. LTD. T TPP U1,2 LANCO BABANDH - DHENKANAL U-1 T K.V.K. NILACHAL TPP U1 T KAMALANGA TPP U1-3 T STERLITE TPP U 4 SUB TOTAL PRIVATE SECTOR GRAND TOTAL (ODISHA) T BIHAR COMM UC UC UC UC/COM M C C ODISHA P ODISHA ODISHA ODISHA P P P ODISHA ODISHA P P 3X660=1320 166 1X600=600 614 600 2X350=700 700 1X660=660 660 1X350=350 350 3X350=1050 1050 1X600=600 600 3960 4574 20.11.2013(660MW) 10.05.2014(600MW) 29.03.2013(350MW) 28.09.2013(350MW) 25.04.2012(600MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE 6.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 55555555 T&D LOSSES % 57.09 44.02 45.56 40.86 39.44 42.65 37.00 42.47 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 28374 30652 33113 35772 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 4686 4994 5322 5672 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 837.55 2010-11 1070.35 2011-12 1145.79 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 38664.74 2012-13 % PLF 64.15 Actual Gen (MU) 37289.82 2011-12 % PLF 67.38 Actual Gen (MU) 35298.55 86 % PLF 73.45 SIKKIM 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 0 0 0 5 5 0 52.11 PRIVATE 0 0 0 0 0 0 0 CENTRAL 75.27 74.1 0 0 74.1 0 0 TOTAL 75.27 74.1 0 5 79.1 0 52.11 % 36.45 35.89 0.00 2.42 38.31 0.00 25.24 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO COAL STATE 0.00 0.00 PRIVATE 99.00 0.00 CENTRAL 75.27 82.61 TOTAL 174.27 82.61 % 55.50 26.31 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) (WEST BENGAL + SIKKIM) 9TH PLAN END 3614 (SIKKIM ONLY) 10TH PLAN END 45 11TH PLAN END 100 2012-13 95 2013-14 90 APR,14-JULY,14 80 JULY,14 78 APR,14-AUG,14* 80 AUG,14* 75 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 82.61 0.00 5.00 87.61 0.00 1.59 27.90 NUCLEAR PEAK DEFICIT/ SURPLUS (%) (- / +) ENERGY REQUIRMENT (MU) 3414 -200 -5.5 20670 45 95 95 90 80 78 80 75 0 -5 0 0 0 0 0 0 0.0 -5.0 0.0 0.0 0.0 0.0 0.0 0.0 223 390 409 413 131 34 166 35 57.11 0 149.37 206.48 100 R.E.S. (MNRE) 52.11 0.00 0.00 52.11 16.60 0.00 0.00 0.00 0.00 0.00 PEAK DEFICIT/ SURPLUS (MW) (- / +) TOTAL ENERGY AVAILABILITY (MU) TOTAL 57.11 99.00 157.88 313.99 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) ENERGY DEFICIT/ SURPLUS (%) (- / +) 20575 -95 -0.5 218 384 409 413 131 34 166 35 -5.0 -6 0 0 0 0 0 0 -2.2 -1.5 0.0 0.0 0.0 0.0 0.0 0.0 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 131 Peak Met (MW) 149 Peak Deficit/ Surplus (MW) (- / +) 18 Peak Deficit/ Surplus ( % ) (- / +) 13.7 Energy Requirment (MU) 557 Energy Availability (MU) 872 Energy Deficit/ Surplus (MU) (- / +) 315 Energy Deficit/ Surplus ( % ) (- / +) 56.6 5.LIKELY BENEFIT TO THE STATE OF SIKKIM DURING 12TH PLAN PROJECTS MUZAFFARPUR EXT.(KANTI TPP) U1,2 BARH STPP-I U1-3 BARH STPP-II U1,2 TOTAL CENTRAL SECTOR SHARE BHASMEY HEP T Y P E ST AT US STATE PROJECT LOCATION T UC BIHAR T T UC UC/COMM H UC 87 SE CT OR IC (MW) BENEFITS SHARES OF STATE (MW) UNIT WISE COMMISSIONING DATE/ (LIKELY DATE OF COMMISSIONING) 2X195=390 2 BIHAR BIHAR C C C 3X660=1980 3X660=1320 SIKKIM P 3X17=51 38 17 57 51 20.11.2013(660MW) JORETHANG LOOP HEP RANGIT-IV HEP TEESTA-VI HEP TEESTA-III HEP H H H H UC UC UC UC CHUJACHEN UNIT 1,2 H COMM SIKKIM SIKKIM SIKKIM SIKKIM P P P P SIKKIM P TOTAL PRIVATE SECTOR GRAND TOTAL (SIKKIM) 2X48=96 3X40=120 4X125=500 2X200=1200 96 120 500 1200 2X49.5=99 99 20.04.2013(49.5MW) 21.04.2013(49.5MW) 2066 2123 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 55555555 PEAK & ENERGY TABLE (As per 18th EPS Report ) 7. YEAR 2013-14 2014-15 2015-16 2016-17 8. T&D LOSSES % 54.99 50.49 10.73 23.10 36.80 38.80 39.01 33.67 31.12 ENERGY DEMAND(MU) 461 482 504 528 PEAK DEMAND(MW) 123 130 137 144 ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 845.40 2010-11 880.11 2011-12 886.36 88 WEST BENGAL 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 977 5030 100 12.06 5142.06 0 143.4 PRIVATE 0 1341.38 0 0.14 1341.52 0 18.05 CENTRAL 139.3 805.96 0 0 805.96 0 0 TOTAL 1116.3 7177.34 100 12.2 7289.54 0 161.45 % 13.03 83.78 1.17 0.14 85.09 0.00 1.88 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO STATE 977.00 PRIVATE 0.00 CENTRAL TOTAL % 271.30 905.49 1248.3 0 13.93 7466.8 7 83.35 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 3614 4784 6,592 7,322 7,325 7,544 7,151 7,613 7,613 3414 4669 6,532 7,249 7,294 7,524 7,133 7,553 7,553 6262.46 1359.57 945.26 8567.29 100 (FIGURES IN MW) THERMAL GAS DIESEL COAL 5220.0 0 1341.3 8 TOTAL 100.00 12.06 0.00 0.14 0.00 0.00 100.00 12.20 1.12 0.14 PEAK DEFICIT/ SURPLUS (MW) (- / +) -200 -115 -60 -73 -31 -20 -18 -60 -60 PEAK DEFICIT/ SURPLUS (%) (- / +) -5.5 -2.4 -0.9 -1.0 -0.4 -0.3 -0.3 -0.8 -0.8 NUCLEAR R.E.S. (MNRE) 0.00 98.40 0.00 33.05 0.00 0.00 TOTAL 5332.0 6 1341.5 2 905.49 7579.0 7 84.60 0.00 ENERGY AVAILABILITY (MU) 20670 26538 38,679 42,143 42,891 17,332 4,395 21,802 4,470 6407.4 6 1374.5 7 1176.7 9 8958.8 2 100.00 131.4 5 1.47 0.00 ENERGY REQUIRMENT (MU) TOTAL 20575 25966 38,281 41,842 42,762 17,240 4,378 21,694 4,454 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -95 -572 -398 -301 -129 -92 -17 -108 -16 ENERGY DEFICIT/ SURPLUS (%) (- / +) -0.5 -2.2 -1.0 -0.7 -0.3 -0.5 -0.4 -0.5 -0.4 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 7,600 Peak Met (MW) Peak Deficit/ Surplus (MW) (- / +) 7,491 Peak Deficit/ Surplus ( % ) (- / +) -109 Energy Requirment (MU) -1.4 46,801 Energy Availability (MU) Energy Deficit/ Surplus (MU) (- / +) 46,594 Energy Deficit/ Surplus ( % ) (- / +) -207 -0.4 5.LIKELY BENEFIT TO THE STATE OF WEST BENGAL DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION MUZAFFARPUR EXT.(KANTI TPP) U1,2 T UC BIHAR TEESTA LOW DAM-III H UC WB SE CT OR C C 89 IC (MW) BENEFITS SHARES OF STATE (MW 2X195=390 34 4X33=132 132 UNIT WISE COMMISSIONING DATE/ (LIKELY DATE OF COMMISSIONING) 30.01.2013(33MW) 20.01.2013(33MW) 24.2.2013(33MW) 01.04.2013(33MW) TEESTA LOW DAM-IV * TOTAL CENTRAL SECTOR SHARE HALDIA TPP U1-2 TOTAL PRIVATE SECTOR GRAND TOTAL (WB) H UC WB C 4X40=160 T UC WB P 2X300=600 136 302 600 600 902 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 7.T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 33333333 T&D LOSSES % 31.01 28.54 24.84 23.64 21.29 16.79 18.33 22.40 8. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU)* 46614 50494 54690 59225 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW)* 7529 8246 9028 9883 9. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 515.08 2010-11 537.85 2011-12 563.78 10. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 44674.32 2012-13 % PLF 60.79 Actual Gen (MU) 45690.42 2011-12 % PLF 63.13 Actual Gen (MU) 45030.65 90 % PLF 65.79 NORTH-EASTERN REGION 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 340 60 424.7 142.74 627.44 0 227.97 PRIVATE 0 0 24.5 0 24.5 0 0.03 CENTRAL 860 0 375 0 375 0 0 TOTAL 1200 60 824.2 142.74 1026.94 0 228 % 48.88 2.44 33.57 5.81 41.83 0.00 9.29 TOTAL 1195.41 24.53 1235 2454.94 100 2. CAPACITY ADDITION ACHIEVED DURING 11TH PLAN (EXCLUDING RES) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR TOTAL COAL GAS DIESEL TOTAL STATE 84 0 58.2 0 58.2 0 142.2 PRIVATE 0 0 0 0 0 0 0 CENTRAL 0 0 0 0 0 0 0 TOTAL 84 0 58.2 0 58.2 0 142.2 3. INSTALLED CAPACITY AS ON 31.08.2014 (FIGURES IN MW) SECTOR HYDRO THERMAL COAL GAS DIESEL TOTAL STATE 382.00 60.00 445.70 142.74 648.44 PRIVATE CENTRAL TOTAL R.E.S. (MNRE) 0.00 256.64 0.00 0.00 24.50 0.00 24.50 0.00 0.03 860.00 0.00 738.30 0.00 738.30 0.00 0.00 0.00 256.67 0.00 8.82 ENERGY AVAILABILITY (MU) ENERGY DEFICIT/ SURPLU S (MU) (- / +) -80 -770 -1047 -276 -821 -378 -104 -479 -101 1242.0 0 42.68 % NUCLEAR 60.00 2.06 4. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 1148 1477 1,920 1,998 2,164 2,263 2,263 2,356 2,356 1043 1166 1,782 1,864 2,048 2,045 1,996 2,053 2,053 1208.5 0 41.53 142.74 4.91 PEAK DEFICIT/ SURPLUS (MW) (- / +) PEAK DEFICIT/ SURPLUS (%) (- / +) -105 -311 -138 -134 -116 -218 -267 -303 -303 -9.1 -21.1 -7.2 -6.7 -5.4 -9.6 -11.8 -12.9 -12.9 1411.2 4 48.50 ENERGY REQUIRMENT (MU) 5935 7782 11,011 3,007 12,687 4,537 1,270 5,794 1,257 5855 7012 9,964 2,731 11,866 4,159 1,166 5,315 1,156 TOTAL 1287.0 8 24.53 1598.3 0 2909.9 1 100.00 ENERGY DEFICIT/ SURPLUS (%) (- / +) -1.3 -9.9 -9.5 -9.2 -6.5 -8.3 -8.2 -8.3 -8.0 * Provisional . 5. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Peak Peak Peak Energy Energy Energy Demand Met Deficit/ Deficit/ RequiAvailDeficit/ (MW) (MW) Surplus Surplus rment ability Surplus (MW) (- / +) ( % ) (- / +) (MU) (MU) (MU) (- / +) 2,543 2,215 -327 -12.9 91 14,823 12,248 -2,575 Energy Deficit/ Surplus ( % ) (- / +) -17.4 6. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 249.65 2010-11 267.53 2011-12 292.36 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 12609 13684 14862 16154 PEAK DEMAND(MW) 2382 2563 2757 2966 92 ARUNACHAL PRADESH 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO THERMAL COAL GAS DIESEL STATE 0 0 0 15.88 PRIVATE 0 0 0 0 CENTRAL 97.57 0 21.05 0 TOTAL 97.57 0 21.05 15.88 % 45.64 0.00 9.85 7.43 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR THERMAL GAS DIESEL COAL 3. 0.00 0.00 97.57 97.57 39.12 TOTAL 95.11 0.03 118.62 213.76 100 (FIGURES IN MW) HYDRO STATE PRIVATE CENTRAL TOTAL % (FIGURES IN MW) NUCLEAR R.E.S. TOTAL (MNRE) 15.88 0 79.23 0 0 0.03 21.05 0 0 36.93 0 79.26 17.28 0.00 37.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.05 32.05 12.85 NUCLEAR TOTAL 15.88 0.00 0.00 15.88 6.37 15.88 0.00 32.05 47.93 19.22 0.00 0.00 0.00 0.00 0.00 R.E.S. (MNRE) 103.90 0.03 0.00 103.93 41.67 TOTAL 119.78 0.03 129.62 249.43 100.00 ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEM AND (MW) 9TH PLAN END 10THPLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 50 87 121 116 125 118 118 118 118 PEAK MET (MW) 50 76 118 114 124 116 116 116 116 PEAK DEFICIT/ SURPLUS (MW) (- / +) 0 -11 -3 -2 -1 -2 -2 -2 -2 PEAK DEFICIT/ SURPLUS (%) (- / +) 0.0 -12.6 -2.5 -1.7 -0.8 -1.7 -1.7 -1.7 -1.7 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 136 286 600 589 552 196 52 251 55 135 259 553 554 517 188 51 241 53 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -2 -27 -47 -35 -35 -8 -1 -10 -2 ENERGY DEFICIT/ SURPLUS (%) (- / +) -1.2 -9.4 -7.8 -5.9 -6.3 -4.1 -1.9 -4.0 -3.6 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 140 Peak Met (MW) 134 Peak Deficit/ Surplus (MW) (- / +) -6 Peak Deficit/ Surplus ( % ) (- / +) -4.3 Energy Requirment (MU) 793 Energy Availability (MU) 637 Energy Deficit/ Surplus (MU) (- / +) -156 Energy Deficit/ Surplus ( % ) (- / +) -19.7 7. LIKELY BENEFIT TO THE STATE OF ARUNACHAL PRADESH DURING 12TH PLAN PROJECTS T Y P E ST AT US STATE PROJECT LOCATION 93 SE CT OR IC (MW) BENEFITS SHARES OF STATE UNIT WISE COMMISSIONING DATE (CAPACITY MW) (MW) BONGAIGAON TPP U1,2, 3 T UC PARE HEP H UC KAMENG HEP H UC SUBANSIRI LOWER HEP H UC TURIAL * H UC TRIPURA GAS T UC/COMM SUB TOTAL CENTRAL SECTOR SHARE GRAND TOTAL (AR PR) ASS AR.PR AR.PR AR.PR MIZ TRI C C C C C C 3X250=750 2X55=110 4X150=600 4X250=1000 2X30=60 2X363.3=726 37 21 83 147 4 22 314 314 03.01.2013(363.3MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 8. T&D LOSSES YEAR 2003-44444444 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 T&D LOSSES % 47.54 42.96 49.72 57.79 67.20 46.88 48.04 47.12 46.25 9. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 531 538 545 552 PEAK DEMAND(MW) 117 123 129 135 10. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 503.27 2010-11 582.08 2011-12 683.13 94 ASSAM 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 100 0 329.72 429.72 42.13 THERMAL GAS DIESEL 276.2 20.69 24.5 0 177.82 0 478.52 20.69 46.91 2.03 COAL 60 0 0 60 5.88 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL (FIGURES IN MW) NUCLEAR TOTAL 356.89 24.5 177.82 559.21 54.82 0 0 0 0 0.00 R.E.S. (MNRE) 31.11 0 0 31.11 3.05 488 24.5 507.54 1020.04 100 (FIGURES IN MW) 100.00 0.00 329.72 COAL 60.00 0.00 0.00 THERMAL GAS DIESEL 276.20 20.69 24.50 0.00 297.82 0.00 TOTAL 356.89 24.50 297.82 0.00 0.00 0.00 R.E.S. (MNRE) 34.11 0.00 0.00 429.72 60.00 598.52 20.69 679.21 0.00 34.11 37.59 5.25 52.36 1.81 59.42 0.00 2.98 % TOTAL NUCLEAR TOTAL 491.00 24.50 627.54 1143.0 4 100.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 688 771 1,112 1,197 1,329 1,343 1,329 1,379 1,379 PEAK MET (MW) 618 688 1,053 1,148 1,220 1,230 1,187 1,242 1,242 PEAK DEFICIT/ SURPLUS (MW) (- / +) -70 -83 -59 -49 -109 -113 -142 -137 -137 PEAK DEFICIT/ SURPLUS (%) (- / +) -10.2 -10.8 -5.3 -4.1 -8.2 -8.4 -10.7 -9.9 -9.9 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 3450 4297 6,034 6,495 7,544 2,848 820 3,644 796 3425 3984 5,696 6,048 7,062 2,619 756 3,352 733 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -25 -313 -338 -447 -482 -229 -64 -292 -63 ENERGY DEFICIT/ SURPLUS (%) (- / +) -0.7 -7.3 -5.6 -6.9 -6.4 -8.0 -7.8 -8.0 -7.9 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) Peak Met (MW) Peak Peak Energy Deficit/ Deficit/ RequiSurplus Surplus rment (MW) (- / +) ( % ) (- / +) (MU) 1,480 1,001 -480 -32.4 8,765 5.LIKELY BENEFIT TO THE STATE OF ASSAM DURING 12TH PLAN Energy Availability (MU) 5,945 Energy Deficit/ Surplus (MU) (- / +) -2,820 PROJECTS T Y P E ST AT US STATE PROJECT LOCATION SE CT OR IC (MW) BONGAIGAON TPP U1,2, 3 PARE HEP KAMENG HEP SUBANSIRI LOWER HEP TURIAL * T H H H H UC UC UC UC UC ASS AR.PR AR.PR AR.PR MIZO C C C C C 3X250=750 2X55=110 4X150=600 4X250=1000 2X30=60 95 BENEFITS SHARES OF STATE (MW 381 37 65 104 20 Energy Deficit/ Surplus ( % ) (- / +) -32.2 UNIT WISE COMMISSIONING DATE (CAPACITY MW) TRIPURA GAS T TOTAL CENTRAL SECTOR SHARE NAMRUP CCGT TOTAL STATE SECTOR GRAND TOTAL (ASSAM) UC/COMM TRI C 2X363.3=726 ASS S 100 240 847 100 100 947 03.01.2013(363.3MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6. T&D LOSSES YEAR 2003- 04 33333333 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 T&D LOSSES % 39.31 51.76 40.34 33.69 38.60 37.59 32.82 34.17 33.48 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 6953 7562 8225 8947 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 1414 1537 1671 1817 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 209.21 2010-11 222.88 2011-12 249.82 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 3149.27 % PLF 2012-13 Actual Gen (MU) 3099.67 % PLF 2011-12 Actual Gen (MU) 3102.89 96 % PLF MANIPUR 1. INSTALLED CAPACITY (AT THE END OF 10TH PLAN i.e. 31.03.2012) SECTOR HYDRO THERMAL COAL GAS DIESEL STATE 0 0 0 45.41 PRIVATE 0 0 0 0 CENTRAL 80.98 0 25.96 0 TOTAL 80.98 0 25.96 45.41 % 51.32 0.00 16.45 28.78 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO COAL STATE 0.00 0.00 PRIVATE 0.00 0.00 CENTRAL 80.98 0.00 TOTAL 80.98 0.00 % 45.29 0.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 98 106 116 122 134 131 131 141 141 94 101 115 120 133 125 125 138 138 (FIGURES IN MW) NUCLEAR R.E.S. TOTAL (MNRE) 45.41 0 5.45 0 0 0 25.96 0 0 71.37 0 5.45 45.23 0.00 3.45 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 45.41 45.41 0.00 0.00 0.00 46.96 0.00 46.96 46.96 45.41 92.37 26.26 25.40 51.66 PEAK DEFICIT/ SURPLUS (MW) (- / +) -4 -5 -1 -2 -1 -6 -6 -3 -3 PEAK DEFICIT/ SURPLUS (%) (- / +) -4.1 -4.7 -0.9 -1.6 -0.7 -4.6 -4.6 -2.1 -2.1 NUCLEAR ENERGY AVAILABILITY (MU) 456 451 544 574 579 197 52 255 58 50.86 0 106.94 157.8 100 R.E.S. (MNRE) 5.45 0.00 0.00 5.45 3.05 0.00 0.00 0.00 0.00 0.00 ENERGY REQUIRMENT (MU) TOTAL TOTAL 50.86 0.00 127.94 178.80 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -16 -22 -45 -31 -31 -10 -3 -12 -2 441 429 499 543 548 187 49 243 56 ENERGY DEFICIT/ SURPLUS (%) (- / +) -3.5 -4.9 -8.3 -5.4 -5.4 -5.1 -5.8 -4.7 -3.4 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 150 Peak Met (MW) Peak Deficit/ Surplus (MW) (- / +) 136 Peak Deficit/ Surplus ( % ) (- / +) -14 Energy Requirment (MU) -9.3 Energy Availability (MU) 727 Energy Deficit/ Surplus (MU) (- / +) 753 Energy Deficit/ Surplus ( % ) (- / +) 26 3.6 5.LIKELY BENEFIT TO THE STATE OF MANIPUR DURING 12TH PLAN PROJECTS T Y P E ST AT US BONGAIGAON TPP U1,2, 3 T UC PARE HEP H UC KAMENG HEP H UC SUBANSIRI LOWER HEP H UC TURIAL* H UC TRIPURA GAS T UC/COMM SUB TOTAL CENTRAL SECTOR SHARE STATE PROJECT LOCATION SE CT OR IC (MW) ASS AR.PR AR.PR AR.PR MIZO TRI C C C C C C 3X250=750 2X55=110 4X150=600 4X250=1000 2X30=60 2X363.3=726 97 BENEFITS SHARES OF STATE (MW 47 8 14 21.5 4 42 136.5 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 03.01.2013(363.3MW) GRAND TOTAL (MANIPUR) 136.5 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 66666666 T&D LOSSES % 65.18 70.61 63.12 53.47 63.56 63.37 54.66 50.87 40.45 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 840 956 1089 1241 PEAK DEMAND(MW) 212 249 294 346 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 207.15 2010-11 242.30 2011-12 235.86 98 MEGHALAYA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 240 0 0 2.05 2.05 0 31.03 PRIVATE 0 0 0 0 0 0 0 CENTRAL 74.58 0 25.96 0 25.96 0 0 TOTAL 314.58 0 25.96 2.05 28.01 0 31.03 % 84.20 0.00 6.95 0.55 7.50 0.00 8.31 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 282.00 0.00 74.58 356.58 78.32 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 165 402 319 334 343 299 299 299 288 PEAK DEFICIT/ SURPLUS (MW) (- / +) -5 -133 -52 -4 -13 -2 -2 -2 -8 160 269 267 330 330 297 297 297 280 273.08 0 100.54 373.62 100 (FIGURES IN MW) THERMAL GAS DIESEL 0.00 2.05 0.00 0.00 65.61 0.00 65.61 2.05 14.41 0.45 COAL 0.00 0.00 0.00 0.00 0.00 TOTAL PEAK DEFICIT/ SURPLUS (%) (- / +) -3.0 -33.1 -16.3 -1.2 -3.8 -0.7 -0.7 -0.7 -2.8 NUCLEAR TOTAL 2.05 0.00 65.61 67.66 14.86 ENERGY REQUIRMENT (MU) 0.00 0.00 0.00 0.00 0.00 ENERGY AVAILABILITY (MU) 700 1368 1,927 1,828 1,794 576 155 728 152 705 1063 1,450 1,607 1,604 485 131 616 131 R.E.S. (MNRE) 31.03 0.00 0.00 31.03 6.82 TOTAL ENERGY DEFICIT/ SURPLUS (MU) (- / +) 5 -305 -477 -221 -190 -91 -24 -112 -21 ENERGY DEFICIT/ SURPLUS (%) (- / +) 0.7 -22.3 -24.8 -12.1 -10.6 -15.8 -15.5 -15.4 -13.8 315.08 0.00 140.19 455.27 100.00 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 390 Peak Met (MW) 473 Peak Deficit/ Surplus (MW) (- / +) 82 Peak Deficit/ Surplus ( % ) (- / +) 21.1 Energy Requirment (MU) 1,996 Energy Availability (MU) 2,241 Energy Deficit/ Surplus (MU) (- / +) 245 Energy Deficit/ Surplus ( % ) (- / +) 12.3 5. LIKELY BENEFIT TO THE STATE OF MEGHALAYA DURING 12TH PLAN PROJECTS T Y P E ST AT US BONGAIGAON TPP U1,2, 3 T UC PARE HEP H UC KAMENG HEP H UC SUBANSIRI LOWER HEP H UC TURIAL * H UC TRIPURA GAS T UC/COMM SUB TOTAL CENTRAL SECTOR SHARE STATE PROJECT LOCATION ASS AR.PR AR.PR AR.PR MIZO TRI 99 SE CT OR IC (MW) C C C C C C 3X250=750 2X55=110 4X150=600 4X250=1000 2X30=60 2X363.3=726.6 BENEFITS SHARES OF STATE (MW 54 9 15 24.5 5 79 186.5 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 03.01.2013(363.3MW) MYNTDU ST-I ADDL UNIT NEW UMTRU HEP SUB TOTAL STATE SECTOR GRANDTOTAL (MEGHALAYA) MEGH MEGH S S 42 2X20=40 42 40 82 268.5 06.03.2013(42MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6. T&D LOSSES YEAR 2003- 04 11111111 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 T&D LOSSES % 16.73 28.35 40.15 35.34 37.62 37.45 39.06 35.77 30.97 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 1861 1981 2108 2243 PEAK DEMAND(MW) 362 388 415 445 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 613.36 2010-11 654.08 2011-12 657.57 100 MIZORAM 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) HYDRO THERMAL GAS DIESEL (FIGURES IN MW) NUCLEAR R.E.S. (MNRE) TOTAL 51.86 0 16.28 68.14 49.05 0 0 0 0 0.00 36.47 0 0 36.47 26.25 88.33 0 50.59 138.92 100 2. INSTALLED CAPACITY AS ON 31.08.2014 HYDRO COAL (FIGURES IN MW) THERMAL GAS DIESEL TOTAL NUCLEAR R.E.S. (MNRE) TOTAL STATE PRIVATE CENTRAL TOTAL % 0.00 0.00 27.28 27.28 18.20 0.00 0.00 0.00 0.00 0.00 36.47 0.00 0.00 36.47 24.33 88.33 0.00 61.59 149.92 100.00 COAL STATE PRIVATE CENTRAL TOTAL % 0 0 34.31 34.31 24.70 0 0 0 0 0.00 0.00 0.00 34.31 34.31 22.89 0 0 16.28 16.28 11.72 0.00 0.00 0.00 0.00 0.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10TH PLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 75 83 82 75 84 83 83 85 85 73 80 78 73 82 82 82 82 81 TOTAL 51.86 0 0 51.86 37.33 PEAK DEFICIT/ SURPLUS (MW) (- / +) -2 -3 -4 -2 -2 -1 -1 -3 -4 51.86 0.00 0.00 51.86 34.59 51.86 0.00 27.28 79.14 52.79 PEAK DEFICIT/ SURPLUS (%) (- / +) -2.7 -3.6 -4.9 -2.7 -2.4 -1.2 -1.2 -3.5 -4.7 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 284 235 397 406 446 142 38 179 37 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -6 -14 -42 -28 -16 -8 -2 -10 -2 278 221 355 378 430 134 36 169 35 ENERGY DEFICIT/ SURPLUS (%) (- / +) -2.1 -6.0 -10.6 -6.9 -3.6 -5.6 -5.3 -5.6 -5.4 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 90 Peak Met (MW) Peak Deficit/ Surplus (MW) (- / +) 98 Peak Deficit/ Surplus ( % ) (- / +) 7 Energy Requirment (MU) 8.3 Energy Availability (MU) 471 503 5. LIKELY BENEFIT TO THE STATE OF MIZORAM DURING 12TH PLAN PROJECTS T ST STATE SE Y AT PROJECT CT P US LOCATION OR E BONGAIGAON TPP U 3 PARE HEP KAMENG HEP SUBANSIRI LOWER HEP TURIAL * TRIPURA GAS T H H H H T UC UC UC UC UC UC/COMM ASS AR.PR AR.PR AR.PR MIZO TRI 101 Energy Deficit/ Surplus (MU) (- / +) C C C C C C IC (MW) 3X250=750 2X55=110 4X150=600 4X250=1000 2X30=60 2X363.3=726 Energy Deficit/ Surplus ( % ) (- / +) 32 BENEFITS SHARES OF STATE (MW 31 5 9 14 11 22 6.8 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 03.01.2013(363.3MW) FIRM CENTRAL SECTOR SHARE SUB TOTAL (MIZORAM) 92 92 NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 55 T&D LOSSES % 55.54 66.14 39.19 38.18 44.63 52.70 53.80 45.63 47.73 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 588 686 801 936 PEAK DEMAND(MW) 197 223 252 285 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 429.31 2010-11 461.69 2011-12 506.74 102 NAGALAND 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) SECTOR HYDRO THERMAL COAL GAS DIESEL STATE 0 0 0 2 PRIVATE 0 0 0 0 CENTRAL 53.32 0 19.19 0 TOTAL 53.32 0 19.19 2 % 51.68 0.00 18.60 1.94 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO COAL STATE 0.00 0.00 PRIVATE 0.00 0.00 CENTRAL 53.32 0.00 TOTAL 53.32 0.00 % 45.25 0.00 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 9TH PLAN END 10THPLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 61 79 111 110 109 120 120 121 121 58 79 105 109 106 117 117 117 116 (FIGURES IN MW) NUCLEAR R.E.S. TOTAL (MNRE) 2 0 28.67 0 0 0 19.19 0 0 21.19 0 28.67 20.54 0.00 27.79 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 2.00 2.00 0.00 0.00 0.00 32.84 0.00 32.84 32.84 2.00 34.84 27.87 1.70 29.57 PEAK DEFICIT/ SURPLUS (MW) (- / +) -3 0 -6 -1 -3 -3 -3 -4 -5 PEAK DEFICIT/ SURPLUS (%) (- / +) -4.9 0.0 -5.4 -0.9 -2.8 -2.5 -2.5 -3.3 -4.1 NUCLEAR ENERGY AVAILABILITY (MU) 260 343 560 567 577 196 52 251 55 30.67 0 72.51 103.18 100 R.E.S. (MNRE) 29.67 0.00 0.00 29.67 25.18 0.00 0.00 0.00 0.00 0.00 ENERGY REQUIRMENT (MU) TOTAL 258 328 511 535 561 188 50 241 53 TOTAL 31.67 0.00 86.16 117.83 100.00 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -2 -15 -49 -32 -16 -8 -2 -10 -2 ENERGY DEFICIT/ SURPLUS (%) (- / +) -0.7 -4.4 -8.8 -5.6 -2.8 -4.1 -3.8 -4.0 -3.6 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2012-13 AS PER THE Peak Peak Peak Peak Energy Energy Demand Met Deficit/ Deficit/ RequiAvail(MW) (MW) Surplus Surplus rment ability (MW) (- / +) ( % ) (- / +) (MU) (MU) 140 92 -48 -34 681 5. LIKELY BENEFIT TO THE STATE OF NAGALAND DURING 12TH PLAN PROJECTS T ST STATE SE Y AT PROJECT CT P US LOCATION OR E BONGAIGAON TPP U1,2, 3 PARE HEP KAMENG HEP SUBANSIRI LOWER HEP TURIAL* TRIPURA GAS CENTRAL SECTOR SHARE T H H H H T UC UC UC UC UC UC/COMM ASS AR.PR AR.PR AR.PR MIZO TRI GRAND TOTAL (NAGALAND) C C C C C C Energy Deficit/ Surplus (MU) (- / +) Energy Deficit/ Surplus ( % ) (- / +) 504 -177 IC (MW) BENEFITS SHARES OF STATE (MW 32 5 9 14.5 3 27 90.5 3X250=750 2X55=110 4X150=600 4X250=1000 2X30=60 2X363.3=726 90.5 103 -26 UNIT WISE COMMISSIONING DATE (CAPACITY MW) 03.01.2013(363.3MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE 6. T&D LOSSES YEAR 2003- 04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 55555555 T&D LOSSES % 55.00 48.26 58.99 54.79 55.61 58.30 56.91 48.24 41.53 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 725 760 796 834 PEAK DEMAND(MW) 154 164 174 185 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 242.39 2010-11 264.81 2011-12 257.18 104 TRIPURA 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012 ) SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % THERMAL GAS DIESEL 148.5 4.85 0 0 33.34 0 181.84 4.85 68.60 1.83 COAL 0 0 0 0 0.00 0 0 62.37 62.37 23.53 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO STATE PRIVATE CENTRAL TOTAL % 3. NUCLEAR TOTAL 153.35 0 33.34 186.69 70.43 0 0 0 0 0.00 R.E.S. (MNRE) 16.01 0 0 16.01 6.04 TOTAL R.E.S. (MNRE) 16.01 0.00 0.00 16.01 3.70 TOTAL 169.36 0 95.71 265.07 100 (FIGURES IN MW) THERMAL GAS DIESEL 169.50 4.85 0.00 0.00 180.34 0.00 349.84 4.85 80.78 1.12 COAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 62.37 62.37 14.40 (FIGURES IN MW) NUCLEAR TOTAL 174.35 0.00 180.34 354.69 81.90 0.00 0.00 0.00 0.00 0.00 190.36 0.00 242.71 433.07 100.00 ACTUAL POWER SUPPLY POSITION PERIOD PEAK DEMAND (MW) 9TH PLAN END 10THPLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* PEAK MET (MW) 156 169 215 229 254 246 239 246 240 PEAK DEFICIT/ SURPLUS (MW) (- / +) -16 -27 -1 -1 -4 0 -1 0 -5 140 142 214 228 250 246 238 246 235 PEAK DEFICIT/ SURPLUS (%) (- / +) -10.3 -16 -0.5 -0.4 -1.6 0.0 -0.4 0.0 -2.1 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 647 802 949 1,108 1,195 382 101 486 104 613 728 900 1,054 1,144 358 93 453 95 ENERGY DEFICIT/ SURPLUS (MU) (- / +) -34 -74 -49 -54 -51 -24 -8 -33 -9 ENERGY DEFICIT/ SURPLUS (%) (- / +) -5.3 -9.2 -5.2 -4.9 -4.3 -6.3 -7.9 -6.8 -8.7 * Provisional 4. ANTICIPATED POWER SUPPLY POSITION DURING 2014-15AS PER THE LGBR Peak Demand (MW) 310 Peak Met (MW) Peak Deficit/ Surplus (MW) (- / +) 298 Peak Deficit/ Surplus ( % ) (- / +) -12 Energy Requirment (MU) -3.8 Energy Availability (MU) 1,389 1,664 5. LIKELY BENEFIT TO THE STATE OF TRIPURA DURING 12TH PLAN PROJECTS T ST STATE SE Y AT PROJECT CT P US LOCATION OR E BONGAIGAON TPP U1,2, 3 PARE HEP KAMENG HEP SUBANSIRI LOWER HEP T H H H UC UC UC UC ASS AR.PR AR.PR AR.PR 105 Energy Deficit/ Surplus (MU) (- / +) C C C C IC (MW) 3X250=750 2X55=110 4X150=600 4X250=1000 Energy Deficit/ Surplus ( % ) (- / +) 275 BENEFITS SHARES OF STATE (MW 56 8 15 24.5 19.8 UNIT WISE COMMISSIONING DATE (CAPACITY MW) TURIAL * TRIPURA GAS MONARCHAK CCGT * CENTRAL SECTOR SHARE ROKHIA GT# STATE SECTOR SUB TOTAL (TRIPURA) H T T UC UC/COMM UC MIZO TRI TRI C C C 2X30=60 2X363.3=726 101 T COMM TRI S 21 5 196 101 405.5 21 21 426.5 03.01.2013(363.3MW) 31.08.2013(21MW) NOTE: T- THERMAL, H-HYDRO ,N-NUCLEAR , COMM-COMMISSIONED, UC UNDER CONSTRUCTION, C-CENTRE, S-STATE, P-PRIVATE * SHARES FROM CENTRAL SECTOR PROJECTS FOR WHICH M.O.P. ORDERS ARE YET TO BE ISSUED ARE TENTATIVE. # ADDITIONAL PROJECT OUT SIDE 88537MW 6. T&D LOSSES YEAR 2003- 04 44444444 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 T&D LOSSES % 46.44 59.54 41.11 34.75 42.81 35.78 35.55 27.36 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR ENERGY DEMAND(MU) 1112 1201 1297 1401 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 274 294 317 340 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 223.78 2010-11 221.80 2011-12 253.82 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 2366.49 % PLF 2012-13 Actual Gen (MU) 1424.96 % PLF 2011-12 Actual Gen (MU) 1442.84 106 % PLF A&N ISLANDS 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 0 0 0 40.05 40.05 0 5.25 PRIVATE 0 0 0 20 20 0 0.1 CENTRAL 0 0 0 0 0 0 0 TOTAL 0 0 0 60.05 60.05 0 5.35 % 0.00 0.00 0.00 91.82 91.82 0.00 8.18 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO COAL STATE 0.00 0.00 PRIVATE 0.00 0.00 CENTRAL 0.00 0.00 TOTAL 0.00 0.00 % 0.0 0.0 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMA MET ND (MW) (MW) 9TH PLAN END 10THPLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 31 40 48 48 40 40 40 40 40 27 32 48 48 32 32 32 32 32 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 40.05 40.05 0.00 20.00 20.00 0.00 0.00 0.00 0.00 60.05 60.05 0.0 85.3 85.3 PEAK DEFICIT/ SURPLUS (MW) (- / +) -4 -8 0 0 -8 -8 -8 -8 -8 PEAK DEFICIT/ SURPLUS (%) (- / +) -12.9 -20.0 0.0 0.0 -20.0 -20.0 -20.0 -20.0 -20.0 ENERGY REQUIRMENT (MU) 148 240 244 241 240 80 20 100 20 NUCLEAR 0.00 0.00 0.00 0.00 0.0 ENERGY AVAILABILITY (MU) 132 190 204 186 180 60 15 75 15 TOTAL 45.3 20.1 0 65.4 100 R.E.S. (MNRE) 5.25 5.10 0.00 10.35 14.7 TOTAL ENERGY DEFICIT/ SURPLUS (MU) (- / +) -16 -50 -40 -55 -60 -20 -5 -25 -5 ENERGY DEFICIT/ SURPLUS (%) (- / +) -10.8 -20.8 -16.4 -22.8 -25.0 -25.0 -25.0 -25.0 -25.0 45.30 25.10 0.00 70.40 100 * Provisional 5. BENEFIT TO THE UT OF A&N ISLAND WITH THE ESTIMATED CAPACITY ADDITION DURING 12TH PLAN AS PER THE RECOMMENDATION OF THE REPORT OF WORKING GROUP ON POWER NIL 6. T&D LOSSES YEAR T&D LOSSES % 2003- 04 22222222 25.95 2004-05 12.63 2005-06 24.32 2006-07 23.10 2007-08 26.86 2008-09 24.16 2009-10 19.76 2010-11 20.68 7. PEAK & ENERGY TABLE (As per 18th EPS Report ) 107 YEAR ENERGY DEMAND(MU) 337 347 356 366 2013-14 2014-15 2015-16 2016-17 PEAK DEMAND(MW) 61 63 65 67 8. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 506.13 2010-11 499.18 2011-12 501.40 9. THERMAL GENERATION AND PLF FOR LAST THREE YEARS 2013-14 Actual Gen (MU) 171.49 % PLF 2012-13 Actual Gen (MU) 135.81 % PLF 2011-12 Actual Gen (MU) 94.87 108 % PLF LAKSHDWEEP 1. INSTALLED CAPACITY (AT THE END OF 11TH PLAN i.e. 31.03.2012) (FIGURES IN MW) SECTOR HYDRO THERMAL NUCLEAR R.E.S. COAL GAS DIESEL TOTAL (MNRE) STATE 0 0 0 9.97 9.97 0 0 PRIVATE 0 0 0 0 0 0 0.75 CENTRAL 0 0 0 0 0 0 0 TOTAL 0 0 0 9.97 9.97 0 0.75 % 0.00 0.00 0.00 93.00 93.00 0.00 7.00 2. INSTALLED CAPACITY AS ON 31.08.2014 SECTOR HYDRO COAL STATE 0.00 0.00 PRIVATE 0.00 0.00 CENTRAL 0.00 0.00 TOTAL 0.00 0.00 % 0.0 0.0 3. ACTUAL POWER SUPPLY POSITION PERIOD PEAK PEAK DEMAND MET (MW) (MW) 10THPLAN END 11TH PLAN END 2012-13 2013-14 APR,14-JULY,14 JULY,14 APR,14-AUG,14* AUG,14* 6 8 8 9 8 8 8 8 6 8 8 9 8 8 8 8 (FIGURES IN MW) THERMAL GAS DIESEL TOTAL 0.00 9.97 9.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.97 9.97 0.0 93.0 93.0 PEAK DEFICIT/ SURPLUS (MW) (- / +) 0 0 0 0 0 0 0 0 PEAK DEFICIT/ SURPLUS (%) (- / +) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 NUCLEAR 0.00 0.00 0.00 0.00 0.0 ENERGY REQUIRMENT (MU) ENERGY AVAILABILITY (MU) 25 37 36 48 16 4 20 4 25 37 36 48 16 4 20 4 R.E.S. (MNRE) 0.00 0.75 0.00 0.75 7.0 ENERGY DEFICIT/ SURPLUS (MU) (- / +) 0 0 0 0 0 0 0 0 TOTAL 9.97 0.75 0 10.72 100 TOTAL 9.97 0.75 0.00 10.72 100 ENERGY DEFICIT/ SURPLUS (%) (- / +) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 * Provisional 4. BENEFIT TO THE STATE OF LAKSHADWEEP WITH THE ESTIMATED CAPACITY ADDITION DURING 12TH PLAN AS PER THE RECOMMENDATION OF THE REPORT OF WORKING GROUP ON POWER NIL 5. T&D LOSSES YEAR 2003- 04 11111111 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 T&D LOSSES % 11.85 10.20 11.19 12.87 18.05 24.87 11.59 25.65 109 6. PEAK & ENERGY TABLE (As per 18th EPS Report ) YEAR 2013-14 2014-15 2015-16 2016-17 ENERGY DEMAND(MU) 45 47 49 52 PEAK DEMAND(MW) 9 10 10 11 7. ANNUAL PER CAPITA CONSUMPTION OF ELECTRICITY YEAR PER CAPITA CONSUMPTION (KWH) 2009-10 428.81 2010-11 531.63 2011-12 550.25 110