Status of implementation of progress of reforms

advertisement
Status of implementation of progress of reforms
under National Electricity Policy 2005
(as per information received up to 31st March, 2015 in CEA)
1/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Andhra Pradesh
Status; For the Quarter Apr-Jun 2013
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from Andhra Pradesh TRANSCO Lr. No.JMD/ED/F.Reforms/D.No.39/13 dated 10.09.2013
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
5.13.4
SERCs
2/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Arunachal Pradesh
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from Arunachal Pradesh Ref.No.APSERC/RA-1/FOR/2014-15/157 dated 5.6.2014 (No useful information furnished)
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
5.13.4
SERCs
3/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Assam
Status; For 2013-14
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from Assam Lr. No.CGM (RE)/Tech-154/11/16 dated 7.6.2014
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open access
(1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
Progress
5.1.1
REC
100% rural
households
90.22%
5.2.1
Central,
State Govts.
Remarks
State Govts.
5.3.4
SERCs
State Govts.
Under STU
5.4.5
SERCs
a) 3 (2013-14)
b) 1
5.13.4
SERCs
a) four other requests without
application.
b)Others in process
Consumer Advocacy Cell initiated.
4/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Bihar
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
5.13.4
SERCs
5/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Chhattisgarh
Status; For the Quarter ending Dec.2013
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from Chhattisgarh Lr. No.02-02/SE-III/AE-Rev/1/Vol-1/662 dated 30.5.2014
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
Progress
5.1.1
REC
100% rural
households
73.8%
5.2.1
Central, State Govts.
Remarks
b) 1065 (2002-12)
State Govts.
5.3.4
5.4.5
a) 3038
b) 3024
c) 99.5%
SERCs
State Govts.
Under STU
SERCs
Nil
100% incl. agriculture
5.13.4
SERCs
6/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Delhi
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
5.13.4
SERCs
7/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Goa
Status; For the FY 2013-14
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from JERC (Goa &UTs) Lr.No.32/4/2011-JERC dt. 22.7.2014
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
Progress
5.1.1
REC
100% rural
households
100%
5.2.1
Central, State Govts.
5.3.4
5.4.5
State Govts.
a)517 MW
b)467 MW
c) 89%
SERCs
a) 12.5 KM
State Govts.
Under ED
SERCs
None received
Remarks
100% HT; 95% LT
5.13.4
SERCs
Representation in State
Advisory Commission
8/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Gujarat
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from GERC – Tech No: 292 dt 6.2.15 (no report in revised format)
St
at
us
A
Items
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including
agriculture and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer
groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
5.1.1
REC
100% rural HHs
5.2.1
Central, State Govts.
Progress
Remarks
RURAL ELECTRIFICATION
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
100% except
agriculature
5.13.4
SERCs
Consumer groups participation in public
hearing.
9/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Haryana
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
5.13.4
SERCs
10/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Himachal Pradesh
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
5.13.4
SERCs
11/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Jammu & Kashmir
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
5.13.4
SERCs
12/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Jharkhand
Status; For 2013-14
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from Jharkhand lr. No.1/Board-01-Urja-11/13/1226 dated 6.6.14
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
No application received.
5.13.4
SERCs
7 consumer group
licensed.
13/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Karnataka
Status; For the Quarter ending Dec.2013 & March 2014
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from Karnataka Lr. No.EN 44 PSR 2014 dated 5.12.2014
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
Progress
5.1.1
REC
100% rural
households
63.25% (9/2014), BPL
HH- 93.14%
5.2.1
Central, State Govts.
a) 0
b)117 MW
c) 290 MW
State Govts.
a) 11258 MW
b) 8137 MW
c) 72.27%
SERCs
a) 141.5 CKM
b) Nil
Total 266.8
State Govts.
Under STU
SERCs
a) 46
b) 43
5.3.4
5.4.5
Remarks
91.%
5.13.4
SERCs
0.63 cr spent on
consumer groups.
14/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Kerala
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
5.13.4
SERCs
15/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Madhya Pradesh
Status; For the Quarter ending
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from Madhya Pradesh Lr. No.3364/2014/13 dated 11.6.2014 GOMP, Energy Department
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
b) 4664 (2002-12)
State Govts.
a) 9155
b)9758
c) 100%
5.3.4
Progress
Remarks
SERCs
State Govts.
5.4.5
SERCs
5.13.4
SERCs
Under STU; separate
ARR filed.
16/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Maharashtra
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from Maharashtra
Sl. Items
NEP clauses
Action by
Target
Progress
N0
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
3
C
4
5
D
6
7
E
8
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
Remarks
5.1.1
REC
5.2.1
Central, State Govts.
Total 11237 MW
b) 500 MW (Bhusawal)
State Govts.
a)19856 MW (morning)
b) 18969 MW (morning)
SERCs
a) 1187.7 CKM
b) 390 CKM
1577.7 CKM
c) 24%
State Govts.
b) Still under STU
5.4.5
SERCs
a) 458 applications
received
b) 404 applications
granted
7.2% unmetered
5.13.4
SERCs
Yes, involvement through public notice,
annual conferences, notification of
Authorized Consumer Representative
Regulation 2012, authorization of individuals
5.3.4
100% rural
households
17/ 36
to represent consumer interests on case by
case basis
18/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Manipur
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
3
C
4
5
D
6
7
E
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
19/ 36
8
Facilitating capacity building of consumer groups.
5.13.4
SERCs
REFORMS MONITORING UNIT PROFORMA
Name of the State: Meghalaya
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
3
C
4
5
D
6
7
E
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
20/ 36
8
Facilitating capacity building of consumer groups.
5.13.4
SERCs
REFORMS MONITORING UNIT PROFORMA
Name of the State: Mizoram
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
3
C
4
5
D
6
7
E
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
21/ 36
8
Facilitating capacity building of consumer groups.
5.13.4
SERCs
REFORMS MONITORING UNIT PROFORMA
Name of the State: Nagaland
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
3
C
4
5
D
6
7
E
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
22/ 36
8
Facilitating capacity building of consumer groups.
5.13.4
SERCs
REFORMS MONITORING UNIT PROFORMA
Name of the State: Orissa
Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status; For the Quarter Progress of Reform Measures as per the Electricity
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
GENERATION
2
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
E
8
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
5.13.4
SERCs
23/ 36
REFORMS MONITORING UNIT PROFORMA
Name of the State: Punjab
Status; For the Quarter ending June 2014
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received Government of Punjab, Dept. of Power Lr.No.1/24/03-EB (PR--/680) dated 31.12.2014
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
3
C
4
5
D
6
7
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
a)
b)
c) 1400 MW
5.3.4
Progress
State Govts.
a)9702 MW
b) 8783 MW
c) 91%
SERCs
a) 133.85 Ckt.KM
b) 15.77 Ckt.KM
149.62 Ckt.K
c) 10.53
Remarks
State Govts.
5.4.5
SERCs
a) 87
b) 87
100% except AP
category
24/ 36
E
8
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
5.13.4
SERCs
Participation in public hearing for
tarrif.
REFORMS MONITORING UNIT PROFORMA
Name of the State: Rajasthan
Status; For the Quarter ending March 2014
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from Rajasthan lr. No.RVPN/CE (NPP&R)/SE(NPP&R)/NPP-3/F.657/D. 387 dated 14.7.2014
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
GENERATION
2
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
3
C
4
5
D
6
7
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
a) 139.65 MW
b) 0
c) 0 (103.2 RE)
State Govts.
a) 10047
b) 10038
c) 99.9%
SERCs
a) 949.05 (CKT.KM)
b) Nil
c) 0%
State Govts.
Under STU
SERCs
a) 14
b) 9
5.3.4
5.4.5
Progress
Remarks
98.2 - 100% for 3
discoms
25/ 36
E
8
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
5.13.4
SERCs
Representation in SAC
REFORMS MONITORING UNIT PROFORMA
Name of the State: Sikkim
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
GENERATION
2
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
3
C
4
5
D
6
7
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
26/ 36
E
8
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
5.13.4
SERCs
REFORMS MONITORING UNIT PROFORMA
Name of the State: Tamil Nadu
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
St
at
us
A
Items
1
% of rural households electrified
B
GENERATION
2
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
3
C
4
5
D
6
7
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
RURAL ELECTRIFICATION
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
27/ 36
E
8
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
5.13.4
SERCs
REFORMS MONITORING UNIT PROFORMA
Name of the State: Telengana
Status; For the Quarter : Jul-Sep 2013
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
NPDCL, Warangal – No: 263/14 dt. 6-11.14
St
at
us
A
Items
1
% of rural households electrified
B
GENERATION
2
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
3
C
4
5
D
6
7
NEP clauses
Action by
Target
Progress
5.1.1
REC
100% rural
households
93 ^
5.2.1
Central, State Govts.
Remarks
RURAL ELECTRIFICATION
State Govts.
5.3.4
5.4.5
a) 2969 MW
b) 2200 MW
c) 74.1%
SERCs
State Govts.
b)STU
SERCs
100% except agri
28/ 36
E
8
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
5.13.4
SERCs
REFORMS MONITORING UNIT PROFORMA
Name of the State: Tripura
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
St
at
us
A
Items
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
3
C
4
5
D
6
7
E
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
RURAL ELECTRIFICATION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
29/ 36
8
Facilitating capacity building of consumer groups.
5.13.4
SERCs
REFORMS MONITORING UNIT PROFORMA
Name of the State: Uttarakhand
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
3
C
4
5
D
6
7
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
30/ 36
E
8
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
5.13.4
SERCs
REFORMS MONITORING UNIT PROFORMA
Name of the State: Uttar Pradesh
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
3
C
4
5
D
6
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
31/ 36
7
E
8
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
5.13.4
SERCs
REFORMS MONITORING UNIT PROFORMA
Name of the State: West Bengal
Status; For the Quarter
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
3
C
4
5
D
6
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Progress
Remarks
State Govts.
5.3.4
SERCs
State Govts.
5.4.5
SERCs
32/ 36
7
E
8
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
5.13.4
SERCs
REFORMS MONITORING UNIT PROFORMA
Name of the State: Dadra & Nagar Haveli
Status; For the FY 2013-14
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from JERC (Goa &UTs) Lr.No.32/4/2011-JERC/ 562 dt. 22.8.2014
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
3
C
4
5
D
6
NEP clauses
Action by
Target
Progress
5.1.1
REC
100% rural
households
100%
5.2.1
Central, State Govts.
5.3.4
5.4.5
Remarks
Not applicable
State Govts.
a)660 MW
b)600-660 MW
c) 100%
SERCs
a) 220 KV switching stations
State Govts.
Under STU
SERCs
(a) No application
registered
(b) Not applicable
33/ 36
7
E
8
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
100% except BPL
5.13.4
SERCs
REFORMS MONITORING UNIT PROFORMA
Name of the UT: Chandigarh
Status; For the FY 2013-14
Progress of Reform Measures as per the Electricity Act 2003, National Electricity Policy 2005 & National Tariff Policy 2006
Status received from Chandigarh Lr.No.SEC/OP/S-II/141/05/2500 dated 17.7.2014
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open
access (1 MW and above)
b)No. of applications granted for open Access
3
C
4
5
D
6
NEP clauses
Action by
Target
5.1.1
REC
100% rural
households
5.2.1
Central, State Govts.
Not applicable
State Govts.
Not applicable
5.3.4
Progress
SERCs
State Govts.
5.4.5
Remarks
SERCs
Under SLDC/STU
Still under
constitution
No application received
34/ 36
7
E
8
Metering of consumers in % including agriculture
and rural in the entire State
PROTECTION OF CONSUMER INTEREST
Facilitating capacity building of consumer groups.
100%
5.13.4
SERCs
Status of response to the progress in implementation of NEP, 2005 (As per new format)
Sl.
N0
Items
A
RURAL ELECTRIFICATION
1
% of rural households electrified
B
2
E
GENERATION
Capacity addition by
a) Central sector
b) State sector
c) Private sector
a)Peak demand in the quarter (MW)
b)Peak supply (MW)
c) % of peak demand met
TRANSMISSION
Transmission network added
a) State sector
b) Private sector
Total network added
c) % of private network to total
a) SLDC fully ring fenced
b) SLDC still functioning under STU
c) SLDC partially functioning under STU
DISTRIBUTION
Open access in distribution
a) Total No of applications received for open access (1 MW and above)
b)No. of applications granted for open Access
Metering of consumers in % including agriculture and rural in the entire
State
PROTECTION OF CONSUMER INTEREST
8
Facilitating capacity building of consumer groups.
3
C
4
5
D
6
7
States responding
Assam, Chhattisgarh, Goa, Karnataka, Madhya Pradesh, Dadra &
Nagar Haveli
Chhattisgarh, Karnataka, Madhya Pradesh, Maharashtra*,
Rajasthan
Chhattisgarh, Goa, Karnataka, Madhya Pradesh, Maharashtra*,
Punjab, Rajasthan, Dadra & Nagar Haveli
Goa, Karnataka, Maharashtra*, Punjab, Rajasthan, Dadra & Nagar
Haveli
Assam, Chhattisgarh, Goa, Karnataka, Madhya Pradesh,
Maharashtra*, Rajasthan Dadra & Nagar Haveli
Assam, Goa, Jharkhand, Karnataka, Maharashtra*, Punjab,
Rajasthan, Dadra & Nagar Haveli
Chhattisgarh, Goa, Gujarat, Karnataka, Maharashtra*, Punjab,
Rajasthan, Dadra & Nagar Haveli, Chandigarh
Assam, Goa, Gujarat, Jharkhand, Karnataka, Maharashtra* , Punjab,
35/ 36
Rajasthan, Dadra & Nagar Haveli
*Maharashtra’s report still in the old format
36/ 36
Download