School Assessment Report Type: School: Date: Final FOR OFFICIAL USE ONLY High Schools Sam Houston High School Jul 16, 2012 School Assessment Report - High Schools, Sam Houston High School Table of Contents Executive Summary 4 Condition Budget Summary 4 Site 6 Site Summary 6 Deficiency Condition Budget Summary: Site 7 Site Deficiencies Budget Detail 8 Site Deficiency Priority 8 Site Condition Deficiencies 9 Site Deficiencies Budget Narrative 10 Buildings 14 Building: Building 2 - B 14 Building Condition Budget Summary 14 Building Condition Budget Detail 14 Building Deficiency Priority 15 Building Condition Deficiencies 16 Building Condition Deficiencies Narrative 17 Building: Building 3 - C 24 Building Deficiency Condition Budget Summary 24 Building Deficiency Condition Budget Detail 24 Building Deficiency Priority 25 Building Deficiencies Budget Detail 26 Building Deficiencies Budget Narrative 27 Building: Building 5 - E 34 Building Deficiency Condition Budget Summary 34 Building Deficiency Condition Budget Detail 35 Building Deficiency Priority 36 Building Deficiencies Budget Detail 37 Building Deficiencies Budget Narrative 38 Building: Cosmetology Building 4 - D 46 Building Deficiency Condition Budget Summary 46 Building Deficiency Condition Budget Detail 46 Building Deficiency Priority 47 Building Deficiencies Budget Detail 49 Building Deficiencies Budget Narrative 50 Building: Main Building 1 - A Final FOR OFFICIAL USE ONLY 57 School Assessment Report - High Schools, Sam Houston High School Building Deficiency Condition Budget Summary 57 Building Deficiency Priority 59 Building Deficiencies Budget Detail 60 Building Deficiencies Budget Narrative 61 Building: Mechanical Building 6 - F 69 Building Deficiency Priority 70 Building Deficiencies Budget Detail 71 Building Deficiencies Budget Narrative 72 Building: ROTC building 8 77 Building Deficiency Priority 79 Building Deficiencies Budget Detail 80 Building Deficiencies Budget Narrative 81 Glossary 88 Final FOR OFFICIAL USE ONLY School Assessment Report - High Schools, Sam Houston High School Executive Summary School Name: Sam Houston High School Number of Buildings: Gross Area (SF): Replacement Value: Condition Budget: Total FCI: Total RSLI: 7 292,277 $82,563,633 $6,433,760 7.79% 46% Total CFI: 7.8% Condition Score: 92.21 Suitability, Educational Score: 69.89 Suitability, Tech Read Score: 90 Suitability, Total Score: 73.91 School Score: 83.06 Summary: The Sam Houston High School Main Building is a 3-story building. Originally built in 1954,there are 7 permanent structures. campus has had additions in 1978, 2004, with minor renovations in 1986, 1997, 2003, 2005 and 2007. This report contains condition and adequacy data collected during the 2012 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report Condition Budget Summary Building condition is evaluated based on the functional elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these elements is known as a building cost model. Models are developed for similar building types and function. Systems are evaluated based on their costs, design life, installation date and next renewal. Systems that are within their design life are further evaluated to identify current deficient conditions which may have a significant impact on the System’s remaining service life. The system value is based on RS Means Commercial Cost Data. Following are the Systems detail for this facility. Uniformat Classification A10 Foundations B10 Superstructure B20 Exterior Enclosure B30 Roofing C10 Interior Construction C20 Stairs C30 Interior Finishes D10 Conveying D20 Plumbing D30 HVAC D40 Fire Protection D50 Electrical E10 Equipment E20 Furnishings G20 Site Improvements G30 Site Mechanical Utilities G40 Site Electrical Utilities Final FOR OFFICIAL USE ONLY RSLI 0% 0% 8% 74% 39% 18% 28% 37% 56% 77% 69% 68% 47% 40% 41% 0% 59% SCI 0.00% 0.00% 8.64% 0.00% 5.46% 0.00% 13.05% 0.00% 40.42% 0.32% 0.00% 3.74% 0.00% 10.18% 4.83% 105.00% 0.00% Condition Budget $0 $0 $818,590 $0 $270,892 $0 $1,899,243 $0 $1,609,051 $30,377 $0 $402,150 $0 $101,559 $228,853 $1,073,044 $0 4 School Assessment Report - High Schools, Sam Houston High School Uniformat Classification RSLI SCI Total: Condition Budget $6,433,759 Condition Deficiency Priority Building /Site Building 2 - B Building 3 - C Building 5 - E Cosmetology Building 4 - D Main Building 1 - A Mechanical Building 6-F ROTC building 8 FCI 15.1% 25.1% 45.4% Priority 1 $0 $0 $0 Priority 2 $0 $0 $0 1,651 34.3% $0 $0 $144,922 240,731 4,388 3.8% 3.7% $0 $0 $0 $0 5,700 0.0% $0 292,277 19.6% 7.8% $0 $0 Site Total: Condition Budget Priority 3 Priority 4 $735,073 $0 $774,101 $0 $1,027,806 $0 GSF 18,980 12,000 8,827 Priority 5 $0 $0 $0 Total $735,073 $774,101 $1,027,806 $0 $0 $144,922 $2,373,704 $76,257 $0 $0 $0 $0 $2,373,704 $76,257 $0 $0 $0 $0 $0 $0 $0 $1,301,897 $6,433,759 $0 $0 $0 $0 $1,301,897 $6,433,759 3 - Short Term Conditions (2-3 Years) $6,433,759 School Condition Budget: $6,433,759 Final FOR OFFICIAL USE ONLY 5 School Assessment Report - High Schools, Sam Houston High School, Site Site Site Summary Site condition is evaluated based on the functional elements of a site and organized according to the UNIFORMAT II Elemental Classification. The grouping of these elements is known as a cost model. Models are developed for similar building types and function. Systems are evaluated based on their costs, design life, installation date and next renewal. Systems that are within their design life are further evaluated to identify current deficient conditions which may have a significant impact on the System’s remaining service life. The system value is based on RS Means Commercial Cost Data. Following are the Systems detail for this facility. Site Acreage Replacement Value: Condition Budget: Total FCI: Total RSLI: $6,656,463 $1,301,897 19.56% 37% Site: The Sam Houston High School original site was originally constructed in 1954. The site is occupied by 7 permanent structures. Campus site features include; paved driveways and parking lots, pedestrian pavement, flag pole, landscaping, fencing, track, practice baseball and practice football field. Site mechanical and electrical features include water, sewer, natural gas, and site lighting. This report contains condition and adequacy data collected during the 2012 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report for the site features. Final FOR OFFICIAL USE ONLY 6 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Condition Budget Summary: Site Site condition is evaluated based on the functional elements of a site and organized according to the UNIFORMAT II Elemental Classification. The grouping of these elements is known as a cost model. Models are developed for similar building types and function. Systems are evaluated based on their costs, design life, installation date and next renewal. Systems that are within their design life are further evaluated to identify current deficient conditions which may have a significant impact on the System’s remaining service life. The system value is based on RS Means Commercial Cost Data. Following are the Systems detail for this site. Uniformat Classification G20 Site Improvements G30 Site Mechanical Utilities G40 Site Electrical Utilities RSLI 41% 0% 59% SCI 4.83% 105.00% 0.00% Total: Condition Budget $228,853 $1,073,044 $0 $1,301,897 Final FOR OFFICIAL USE ONLY 7 School Assessment Report - High Schools, Sam Houston High School, Site Site Deficiencies Budget Detail Site condition is evaluated based on the functional elements of a site and organized according to the UNIFORMAT II Elemental Classification. The grouping of these elements is known as a cost model. Models are developed for similar building types and function. Systems are evaluated based on their costs, design life, installation date and next renewal. Systems that are within their design life are further evaluated to identify current deficient conditions which may have a significant impact on the System’s remaining service life. The system value is based on RS Means Commercial Cost Data. Following are the Systems detail for this site. Uniformat G2010 G2020 G2020 G2040 G2040 G2040 G2040 G2040 G2040 G2040 G2050 G3010 G3020 G3030 G4020 Total System Description Roadways Parking Lots Pedestrian Paving sidewalks, etc Baseball Field Basketball / hard court play area Canopy Football Field Natural Turf Site Development Softball Field Track Synthetic Surface Resurface only Landscaping Water Supply Sanitary Sewer Storm Sewer Site Lighting Unit Price $1.56 $4.01 Life 25 25 Install Year 2000 2000 Calc Next Renewal 2025 2025 Replacement $615,535 $1,582,242 RSLI 52% 52% SCI 0.00% 0.00% Condition Budget $0 $0 $0.76 $0.19 30 30 2000 1990 2030 2020 $299,876 $74,969 60% 27% 0.00% 0.00% $0 $0 $0.48 $1.75 $0.07 $1.15 $0.10 10 30 10 30 10 1954 1954 2003 2000 2000 1964 1984 2013 2030 2010 $189,395 $690,504 $27,620 $453,760 $39,457 0% 0% 10% 60% 0% 100% 0.00% 0.00% 0.00% 100% $189,395 $0 $0 $0 $39,457 $0.45 $1.49 $0.45 $1.25 $0.89 $2.27 $16.87 10 10 50 50 50 30 2008 2005 1954 1954 1954 2000 2018 2015 2004 2004 2004 2030 $177,558 $587,915 $177,558 $493,217 $351,171 $895,683 $6,656,463 60% 0% 0% 0% 60% 37% 0.00% 0.00% 105% 105% 105% 0.00% 19.56% $0 $0 $186,436 $517,878 $368,729 $0 $1,301,897 Site Deficiency Priority Site Deficiencies by Priority: 3 - Short Term Conditions (2-3 Years) $1,301,897 Final Site Condition Budget: $1,301,897 FOR OFFICIAL USE ONLY 8 School Assessment Report - High Schools, Sam Houston High School, Site Site Condition Deficiencies Current deficiencies included systems that have reached or exceeded their design life or components of the systems that are in need of repair. Systems that have reached their design life are identified as current deficiencies and assigned the distress 'Beyond Expected Life'. The following chart includes all current deficiencies associated with this site. Softball Field $39,457 Water Supply $186,436 Sanitary Sewer $517,878 Basketball / hard court play a $189,395 Storm Sewer $368,729 Site Condition Budget: $1,301,895 Final FOR OFFICIAL USE ONLY 9 School Assessment Report - High Schools, Sam Houston High School, Site Site Deficiencies Budget Narrative Current deficiencies included systems that have reached or exceeded their design life or components of the systems that are in need of repair. Systems that have reached their design life are identified as current deficiencies and assigned the distress 'Beyond Expected Life'. The following chart includes all current deficiencies associated with this site. System: G2010 - Roadways Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2000. It has a 25-year service life. Based on the assessment, it is expected to expire in 2025. Recommendation: No action is required. System: G2020 - Parking Lots Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2000. It has a 25-year service life. Based on the assessment, it is expected to expire in 2025. Recommendation: No action is required. System: G2020 - Pedestrian Paving - sidewalks, etc Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2000. It has a 30-year service life. Based on the assessment, it is expected to expire in 2030. Recommendation: No action is required. System: G2040 - Baseball Field Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1990. It has a 30-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: G2040 - Basketball / hard court play area Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 10-year service life which expired in 1964. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 10 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Site Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Basketball / hard court, play area beyond useful life. replace Correction: Renew System Qty: 1-Ea. Condition Budget: $189,395 System: G2040 - Canopy Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 30-year service life which expired in 1984. Recommendation: The system should be replaced. System: G2040 - Football Field Natural Turf Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2003. It has a 10-year service life. Based on the assessment, it is expected to expire in 2013. Recommendation: No action is required. System: G2040 - Site Development Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2000. It has a 30-year service life. Based on the assessment, it is expected to expire in 2030. Recommendation: No action is required. System: G2040 - Softball Field Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 2000. It has a 10-year service life which expired in 2010. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 11 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Site Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Softball Field System beyond useful life. Replace Renew System 1-Ea. $39,457 System: G2040 - Track Synthetic Surface - Resurface only Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2008. It has a 10-year service life. Based on the assessment, it is expected to expire in 2018. Recommendation: No action is required. System: G2050 - Landscaping Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 10-year service life. Based on the assessment, it is expected to expire in 2015. Recommendation: No action is required. System: G3010 - Water Supply Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 50-year service life which expired in 2004. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Site Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) water supply System beyond useful life. Replace Renew System 1-Ea. $186,436 Final FOR OFFICIAL USE ONLY 12 School Assessment Report - High Schools, Sam Houston High School, Site System: G3020 - Sanitary Sewer Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 50-year service life which expired in 2004. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Site Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Sanitary Sewer System beyond useful life. Replace Renew System 1-Ea. $517,878 System: G3030 - Storm Sewer Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 50-year service life which expired in 2004. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Site Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Storm Sewer System beyond useful life. Replace Renew System 1-Ea. $368,729 System: G4020 - Site Lighting Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2000. It has a 30-year service life. Based on the assessment, it is expected to expire in 2030. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 13 School Assessment Report - High Schools, Sam Houston High School, Site Buildings Building Name: Building 2 - B Year Built: Gross Area (SF): 1954 18,980 The Sam Houston High School Classroom Building 2 - B is a 1-story building. Originally built in 1954, there have been no additions, with renovations in 1992 and minor upgrades in 2003 and 2005. This report contains condition and adequacy data collected during the 2012 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report. Building Condition Budget Summary Building condition is evaluated based on the functional elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these elements is known as a building cost model. Models are developed for similar building types and function. Systems are evaluated based on their costs, design life, installation date and next renewal. Systems that are within their design life are further evaluated to identify current deficient conditions which may have a significant impact on the System’s remaining service life. The system value is based on RS Means Commercial Cost Data. Following are the Systems detail for this facility. Uniformat Classification A10 Foundations B10 Superstructure B20 Exterior Enclosure B30 Roofing C10 Interior Construction C30 Interior Finishes D20 Plumbing D30 HVAC D40 Fire Protection D50 Electrical E10 Equipment E20 Furnishings RSLI 0% 0% 1% 60% 33% 8% 78% 67% 81% 30% 40% 39% SCI 0.00% 0.00% 42.71% 0.00% 25.13% 62.42% 5.94% 0.00% 0.00% 0.00% 0.00% 0.00% Total: Condition Budget $0 $0 $361,054 $0 $108,513 $250,004 $15,502 $0 $0 $0 $0 $0 $735,073 Building Condition Budget Detail Uniformat A1010 A1030 B1020 B2010 B2020 B2030 B3010105 B3020 C1010 C1020 C1030 C3010 C3020410 C3020410 C3030 D2010 System Description Standard Foundations Slab on Grade Roof Construction Exterior Walls Exterior Windows Exterior Doors Built-Up Roof Openings Partitions Interior Doors Fittings Wall Finishes VCT Wood Ceiling Finishes Plumbing Fixtures Unit Price $10.70 $9.25 $17.35 $19.08 $12.81 $1.10 $16.49 $0.72 $7.85 $5.15 $3.85 $6.76 $3.98 $1.53 $3.36 $9.63 Life 100 100 100 100 30 30 25 30 100 20 15 10 12 30 20 30 Install Year 1954 1954 1954 1954 1954 1992 2002 2002 1954 2002 1992 2004 1954 1954 1954 2007 Calc Next Renewal 2054 2054 2054 2054 1984 2022 2027 2032 2054 2022 2007 2014 1966 1984 1974 2037 Final FOR OFFICIAL USE ONLY Replacement $274,166 $237,013 $444,559 $488,887 $328,231 $28,185 $422,523 $18,449 $201,141 $131,958 $98,649 $173,211 $101,980 $39,203 $86,093 $246,749 RSLI 0% 33% 60% 67% 42% 50% 0% 20% 0% 0% 0% 83% SCI 0.00% 0.00% 0.00% 0.00% 110% 0.00% 0.00% 0.00% 0.00% 0.00% 110% 0.00% 110% 110% 110% 0.00% Condition Budget $0 $0 $0 $0 $361,054 $0 $0 $0 $0 $0 $108,513 $0 $112,177 $43,124 $94,703 $0 14 School Assessment Report - High Schools, Sam Houston High School, Site Uniformat D2040 D3050 D3060 D3070 D4020 D4030 D5010 D5020 D5030310 D5030910 D5030910 D5030920 D5030920 E1020 E1090 E2010 Total System Description Rain Water Drainage Terminal & Package Units Controls & Instrumentation Systems Testing & Balance Standpipes Fire Protection Specialties Electrical Service/Distribution Lighting and Branch Wiring Telephone Systems Fire Alarm System Security System, Camers, Access Control LAN System Public Address / Clock System Institutional Equipment Other Equipment Fixed Furnishings Unit Price $0.55 $14.56 $3.24 $0.94 $0.33 $0.13 Life 30 15 15 30 40 15 Install Year 1954 2007 2007 2007 2007 2007 Calc Next Renewal 1984 2022 2022 2037 2047 2022 Replacement $14,093 $373,071 $83,019 $24,086 $8,456 $3,331 RSLI 0% 67% 67% 83% 88% 67% SCI 110% 0.00% 0.00% 0.00% 0.00% 0.00% Condition Budget $15,502 $0 $0 $0 $0 $0 $4.91 $23.63 $1.31 $1.64 30 30 15 10 1990 1990 2007 2007 2020 2020 2022 2017 $125,809 $605,471 $33,566 $42,022 27% 27% 67% 50% 0.00% 0.00% 0.00% 0.00% $0 $0 $0 $0 $0.86 $0.86 15 15 2007 2007 2022 2022 $22,036 $22,036 67% 67% 0.00% 0.00% $0 $0 $0.86 $1.90 $1.10 $3.54 $189.97 15 20 20 20 2000 2000 2000 2000 2015 2020 2020 2020 $22,036 $48,684 $28,185 $90,705 $4,867,601 20% 40% 40% 40% 39% 0.00% 0.00% 0.00% 0.00% 15.10% $0 $0 $0 $0 $735,073 Building Deficiency Priority Deficiencies by Priority: 3 - Short Term Conditions (2-3 Years) $735,073 Building 2 - B Condition Budget: $735,073 Final FOR OFFICIAL USE ONLY 15 School Assessment Report - High Schools, Sam Houston High School, Site Building Condition Deficiencies Current deficiencies included systems that have reached or exceeded their design life or components of the systems that are in need of repair. Systems that have reached their design life are identified as current deficiencies and assigned the distress 'Beyond Expected Life'. The following chart includes all current deficiencies associated with this facility. Rain Water Drainage $15,502 Wood $43,124 Ceiling Finishes $94,703 Exterior Windows $361,054 Fittings $108,513 VCT $112,177 Building 2 - B Condition Budget: $735,073 Final FOR OFFICIAL USE ONLY 16 School Assessment Report - High Schools, Sam Houston High School, Site Building Condition Deficiencies Narrative System: A1010 - Standard Foundations Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054 and is non-renewable. Recommendation: No action is required. System: A1030 - Slab on Grade Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054 and is non-renewable. Recommendation: No action is required. System: B1020 - Roof Construction Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054 and is non-renewable. Recommendation: No action is required. System: B2010 - Exterior Walls Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054 and is non-renewable. Recommendation: No action is required. System: B2020 - Exterior Windows Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 30-year service life which expired in 1984. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 17 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Building 2 - B Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Exterior Windows System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $361,054 System: B2030 - Exterior Doors Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1992. It has a 30-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: B3010 - Roof Coverings Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: B3010105 - Built-Up Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2002. It has a 25-year service life. Based on the assessment, it is expected to expire in 2027. Recommendation: No action is required. System: B3020 - Roof Openings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2002. It has a 30-year service life. Based on the assessment, it is expected to expire in 2032. Recommendation: No action is required. System: C1010 - Partitions Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 18 School Assessment Report - High Schools, Sam Houston High School, Site System: C1020 - Interior Doors Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2002. It has a 20-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: C1030 - Fittings Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1992. It has a 15-year service life which expired in 2007. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 2 - B Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Fittings System beyond useful life. Replace Renew System 1-Ea. $108,513 System: C3010 - Wall Finishes Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2004. It has a 10-year service life. Based on the assessment, it is expected to expire in 2014. Recommendation: No action is required. System: C3020 - Floor Finishes Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: C3020410 - VCT Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 12-year service life which expired in 1966. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 19 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 2 - B Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) VCT System beyond useful life. Replace Renew System 1-Ea. $112,177 System: C3020410 - Wood Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 30-year service life which expired in 1984. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 2 - B Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Wood System beyond useful life. Replace Renew System 1-Ea. $43,124 System: C3030 - Ceiling Finishes Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 20-year service life which expired in 1974. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 2 - B Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Ceiling Finishes Beyond useful life. replace Renew System 1-Ea. $94,703 Final FOR OFFICIAL USE ONLY 20 School Assessment Report - High Schools, Sam Houston High School, Site System: D2010 - Plumbing Fixtures Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. System: D2040 - Rain Water Drainage Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 30-year service life which expired in 1984. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Building 2 - B Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Rain Water Drainage System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $15,502 System: D3050 - Terminal & Package Units Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D3060 - Controls & Instrumentation Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D3070 - Systems Testing & Balance Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 21 School Assessment Report - High Schools, Sam Houston High School, Site System: D4020 - Standpipes Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 40-year service life. Based on the assessment, it is expected to expire in 2047. Recommendation: No action is required. System: D4030 - Fire Protection Specialties Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D5010 - Electrical Service/Distribution Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1990. It has a 30-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D5020 - Lighting and Branch Wiring Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1990. It has a 30-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D5030 - Communications and Security Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: D5030310 - Telephone Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D5030910 - Fire Alarm System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 10-year service life. Based on the assessment, it is expected to expire in 2017. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 22 School Assessment Report - High Schools, Sam Houston High School, Site System: D5030910 - Security System, Camers, Access Control Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D5030920 - LAN System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D5030920 - Public Address / Clock System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2000. It has a 15-year service life. Based on the assessment, it is expected to expire in 2015. Recommendation: No action is required. System: E1020 - Institutional Equipment Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2000. It has a 20-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: E1090 - Other Equipment Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2000. It has a 20-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: E2010 - Fixed Furnishings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2000. It has a 20-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 23 School Assessment Report - High Schools, Sam Houston High School, Site Building Name: Building 3 - C Year Built: Gross Area (SF): 1978 12,000 The Sam Houston School Classroom/vocational Building 3 – C is a 1-story building. Originally built in 1978, there have been no additions, with renovations in 1992, 1996 and 2005. This report contains condition and adequacy data collected during the 2012 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report. Building Deficiency Condition Budget Summary Uniformat Classification A10 Foundations B10 Superstructure B20 Exterior Enclosure B30 Roofing C10 Interior Construction C20 Stairs C30 Interior Finishes D20 Plumbing D30 HVAC D40 Fire Protection D50 Electrical E20 Furnishings RSLI 0% 0% 0% 80% 44% 14% 0% 0% 74% 66% 78% 0% SCI 0.00% 0.00% 46.38% 0.00% 36.14% 0.00% 110.00% 110.00% 0.00% 0.00% 0.00% 110.00% Total: Condition Budget $0 $0 $235,046 $0 $64,865 $0 $389,723 $24,592 $0 $0 $0 $59,875 $774,101 Building Deficiency Condition Budget Detail Uniformat A1010 A1030 B1020 B2010 B2020 B2030 B3010105 B3020 C1010 C1030 C2010 C3010 C3020410 C3030 D2040 D2090 D3040 D3050 D3060 D3070 D4030 D4090 D5010 System Description Standard Foundations Slab on Grade Roof Construction Exterior Walls Exterior Windows Exterior Doors Built-Up Roof Openings Partitions Fittings Stair Construction Wall Finishes VCT Ceiling Finishes Rain Water Drainage Other Plumbing SystemsNat Gas Distribution Systems Terminal & Package Units Controls & Instrumentation Systems Testing & Balance Fire Protection Specialties Other Fire Protection Systems Electrical Service/Distribution Unit Price $10.15 $8.78 $16.47 $18.09 $12.15 $1.04 $15.64 $0.68 $7.44 $3.64 $4.36 $6.42 $4.04 $11.41 $0.53 Life 100 100 100 100 30 30 25 30 100 20 40 10 12 20 30 Install Year 1978 1978 1978 1978 1978 1978 2007 2007 1978 1978 1978 1978 1985 1985 1978 Calc Next Renewal 2078 2078 2078 2078 2008 2008 2032 2037 2078 1998 2018 1988 1997 2005 2008 0% 0% 80% 83% 66% 0% 15% 0% 0% 0% 0% SCI 0.00% 0.00% 0.00% 0.00% 110% 110% 0.00% 0.00% 0.00% 110% 0.00% 110% 110% 110% 110% Condition Budget $0 $0 $0 $0 $216,513 $18,533 $0 $0 $0 $64,865 $0 $114,404 $71,993 $203,326 $9,445 $0.85 $12.46 $13.81 $3.08 $0.89 $0.12 20 30 15 15 30 15 1978 2007 2007 2007 2007 2007 1998 2037 2022 2022 2037 2022 $13,770 $201,852 $223,722 $49,896 $14,418 $1,944 0% 83% 67% 67% 83% 67% 110% 0.00% 0.00% 0.00% 0.00% 0.00% $15,147 $0 $0 $0 $0 $0 $1.24 15 2007 2022 $20,088 67% 0.00% $0 $4.66 30 2007 2037 $75,492 83% 0.00% $0 Final FOR OFFICIAL USE ONLY Replacement $164,430 $142,236 $266,814 $293,058 $196,830 $16,848 $253,368 $11,016 $120,528 $58,968 $70,632 $104,004 $65,448 $184,842 $8,586 RSLI 24 School Assessment Report - High Schools, Sam Houston High School, Site Uniformat D5020 D5030310 D5030910 D5030910 D5030920 D5030920 D5090 E2010 Total System Description Lighting and Branch Wiring Telephone Systems Fire Alarm System Security System, Camers, Access Control LAN System Public Address / Clock System Other Electrical Systems Fixed Furnishings Unit Price $22.40 $1.24 $1.56 Life 30 15 10 Install Year 2007 2005 2007 Calc Next Renewal 2037 2020 2017 Replacement $362,880 $20,088 $25,272 RSLI 83% 53% 50% SCI 0.00% 0.00% 0.00% Condition Budget $0 $0 $0 $0.82 $0.82 15 15 2005 2005 2020 2020 $13,284 $13,284 53% 53% 0.00% 0.00% $0 $0 $0.82 $1.05 $3.36 $190.02 15 20 20 2005 2005 1985 2020 2025 2005 $13,284 $17,010 $54,432 $3,078,324 53% 65% 0% 50% 0.00% 0.00% 110% 25.15% $0 $0 $59,875 $774,101 Building Deficiency Priority Deficiencies by Priority: 3 - Short Term Conditions (2-3 Years) $774,101 Building 3 - C Condition Budget: $774,101 Final FOR OFFICIAL USE ONLY 25 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiencies Budget Detail Rain Water Drainage $9,445 Other Plumbing Systems-Nat Gas $15,147 Exterior Doors $18,533 Fixed Furnishings $59,875 Exterior Windows $216,513 Fittings $64,865 VCT $71,993 Wall Finishes $114,404 Ceiling Finishes $203,326 Building 3 - C Condition Budget: $774,101 Final FOR OFFICIAL USE ONLY 26 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiencies Budget Narrative System: A1010 - Standard Foundations Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 100-year service life. Based on the assessment, it is expected to expire in 2078 and is non-renewable. Recommendation: No action is required. System: A1030 - Slab on Grade Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 100-year service life. Based on the assessment, it is expected to expire in 2078 and is non-renewable. Recommendation: No action is required. System: B1020 - Roof Construction Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 100-year service life. Based on the assessment, it is expected to expire in 2078 and is non-renewable. Recommendation: No action is required. System: B2010 - Exterior Walls Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 100-year service life. Based on the assessment, it is expected to expire in 2078 and is non-renewable. Recommendation: No action is required. System: B2020 - Exterior Windows Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 27 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Building 3 - C Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Exterior Windows System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $216,513 System: B2030 - Exterior Doors Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 3 - C Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Exterior Doors System beyond useful life. Replace Renew System 1-Ea. $18,533 System: B3010 - Roof Coverings Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: B3010105 - Built-Up Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 25-year service life. Based on the assessment, it is expected to expire in 2032. Recommendation: No action is required. System: B3020 - Roof Openings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 28 School Assessment Report - High Schools, Sam Houston High School, Site System: C1010 - Partitions Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 100-year service life. Based on the assessment, it is expected to expire in 2078. Recommendation: No action is required. System: C1030 - Fittings Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 20-year service life which expired in 1998. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 3 - C Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Fittings System beyond useful life. Replace Renew System 1-Ea. $64,865 System: C2010 - Stair Construction Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 40-year service life. Based on the assessment, it is expected to expire in 2018. Recommendation: No action is required. System: C3010 - Wall Finishes Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 10-year service life which expired in 1988. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 29 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 3 - C Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Wall Finishes System beyond useful life. Replace Renew System 1-Ea. $114,404 System: C3020 - Floor Finishes Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: C3020410 - VCT Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1985. It has a 12-year service life which expired in 1997. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 3 - C Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) VCT System beyond useful life. Replace Renew System 1-Ea. $71,993 System: C3030 - Ceiling Finishes Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1985. It has a 20-year service life which expired in 2005. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 30 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 3 - C Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Ceiling Finishes Beyond useful life. replace Renew System 1-Ea. $203,326 System: D2040 - Rain Water Drainage Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Building 3 - C Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Rain Water Drainage System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $9,445 System: D2090 - Other Plumbing Systems-Nat Gas Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 20-year service life which expired in 1998. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Building 3 - C Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Other Plumbing Systems-Nat Gas beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $15,147 Final FOR OFFICIAL USE ONLY 31 School Assessment Report - High Schools, Sam Houston High School, Site System: D3040 - Distribution Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. System: D3050 - Terminal & Package Units Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D3060 - Controls & Instrumentation Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D3070 - Systems Testing & Balance Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. System: D4030 - Fire Protection Specialties Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D4090 - Other Fire Protection Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 32 School Assessment Report - High Schools, Sam Houston High School, Site System: D5010 - Electrical Service/Distribution Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. System: D5020 - Lighting and Branch Wiring Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. System: D5030 - Communications and Security Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: D5030310 - Telephone Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D5030910 - Fire Alarm System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 10-year service life. Based on the assessment, it is expected to expire in 2017. Recommendation: No action is required. System: D5030910 - Security System, Camers, Access Control Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D5030920 - LAN System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 33 School Assessment Report - High Schools, Sam Houston High School, Site System: D5030920 - Public Address / Clock System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D5090 - Other Electrical Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 20-year service life. Based on the assessment, it is expected to expire in 2025. Recommendation: No action is required. System: E2010 - Fixed Furnishings Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1985. It has a 20-year service life which expired in 2005. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Building 3 - C Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Fixed Furnishings System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $59,875 Building Name: Building 5 - E Year Built: Gross Area (SF): 1978 8,827 The Sam Houston School Classroom Building 5 – E is a 1-story building. Originally built in 1978, there have been no additions, with renovations in 1992, 1996 and 2005. The building is currently being used mainly for storage. This report contains condition and adequacy data collected during the 2012 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report. Building Deficiency Condition Budget Summary Uniformat Classification A10 Foundations B10 Superstructure B20 Exterior Enclosure Final FOR OFFICIAL USE ONLY RSLI 0% 0% 0% SCI 0.00% 0.00% 46.39% Condition Budget $0 $0 $163,851 34 School Assessment Report - High Schools, Sam Houston High School, Site Uniformat Classification B30 Roofing C10 Interior Construction C30 Interior Finishes D20 Plumbing D30 HVAC D40 Fire Protection D50 Electrical E20 Furnishings RSLI 80% 31% 0% 0% 74% 66% 8% 0% SCI 0.00% 25.07% 110.00% 110.00% 0.00% 0.00% 92.18% 110.00% Total: Condition Budget $0 $45,223 $277,236 $163,589 $0 $0 $336,223 $41,684 $1,027,806 Building Deficiency Condition Budget Detail Uniformat A1010 A1030 B1020 B2010 B2020 B2030 B3010105 B3020 C1010 C1020 C1030 C3010 C3020410 C3030 D2010 D2020 D2030 D3040 D3050 D3060 D3070 D4030 D5010 D5020 D5030310 D5030910 D5030910 D5030920 D5030920 E2010 Total System Description Standard Foundations Slab on Grade Roof Construction Exterior Walls Exterior Windows Exterior Doors Built-Up Roof Openings Partitions Interior Doors Fittings Wall Finishes VCT Ceiling Finishes Plumbing Fixtures Domestic Water Distribution Sanitary Waste Distribution Systems Terminal & Package Units Controls & Instrumentation Systems Testing & Balance Fire Protection Specialties Electrical Service/Distribution Lighting and Branch Wiring Telephone Systems Fire Alarm System Security System, Camers, Access Control LAN System Public Address / Clock System Fixed Furnishings Unit Price $9.62 $8.31 $15.61 $17.14 $11.52 $0.98 $14.82 $0.65 $7.06 $4.63 $3.45 $6.76 $3.58 $10.81 $8.65 $0.87 $2.96 $11.81 $13.08 $2.91 $0.85 $0.11 Life 100 100 100 100 30 30 25 30 75 40 20 10 12 20 30 30 30 30 15 15 30 15 Install Year 1978 1978 1978 1978 1978 1978 2007 2007 1978 1978 1978 1978 1978 1978 1978 1978 1978 2007 2007 2007 2007 2007 Calc Next Renewal 2078 2078 2078 2078 2008 2008 2032 2037 2053 2018 1998 1988 1990 1998 2008 2008 2008 2037 2022 2022 2037 2022 0% 0% 80% 83% 55% 15% 0% 0% 0% 0% 0% 0% 0% 83% 67% 67% 83% 67% SCI 0.00% 0.00% 0.00% 0.00% 110% 110% 0.00% 0.00% 0.00% 0.00% 110% 110% 110% 110% 110% 110% 110% 0.00% 0.00% 0.00% 0.00% 0.00% Condition Budget $0 $0 $0 $0 $151,005 $12,846 $0 $0 $0 $0 $45,223 $88,611 $46,927 $141,699 $113,385 $11,404 $38,800 $0 $0 $0 $0 $0 $4.42 $21.23 $1.18 $1.47 30 30 15 10 1978 1978 2005 2005 2008 2008 2020 2015 $52,671 $252,986 $14,061 $17,517 0% 0% 53% 30% 110% 110% 0.00% 0.00% $57,938 $278,285 $0 $0 $0.77 $0.77 15 15 2005 2012 2020 2027 $9,176 $9,176 53% 100% 0.00% 0.00% $0 $0 $0.77 $3.18 $189.97 15 20 2005 1978 2020 1998 $9,176 $37,894 $2,263,768 53% 0% 29% 0.00% 110% 45.40% $0 $41,684 $1,027,806 Replacement $114,636 $99,026 $186,016 $204,248 $137,278 $11,678 $176,602 $7,746 $84,130 $55,173 $41,112 $80,555 $42,661 $128,817 $103,077 $10,367 $35,273 $140,733 $155,867 $34,677 $10,129 $1,311 RSLI Final FOR OFFICIAL USE ONLY 35 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiency Priority Deficiencies by Priority: 3 - Short Term Conditions (2-3 Years) $1,027,806 Building 5 - E Condition Budget: $1,027,806 Final FOR OFFICIAL USE ONLY 36 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiencies Budget Detail Domestic Water Distribution $11,404 Exterior Doors $12,846 Sanitary Waste $38,800 Fixed Furnishings $41,684 Fittings $45,223 Lighting and Branch Wiring $278,285 VCT $46,927 Electrical Service/Distribution $57,938 Wall Finishes $88,611 Exterior Windows $151,005 Plumbing Fixtures $113,385 Ceiling Finishes $141,699 Building 5 - E Condition Budget: $1,027,807 Final FOR OFFICIAL USE ONLY 37 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiencies Budget Narrative System: A1010 - Standard Foundations Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 100-year service life. Based on the assessment, it is expected to expire in 2078 and is non-renewable. Recommendation: No action is required. System: A1030 - Slab on Grade Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 100-year service life. Based on the assessment, it is expected to expire in 2078 and is non-renewable. Recommendation: No action is required. System: B1020 - Roof Construction Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 100-year service life. Based on the assessment, it is expected to expire in 2078 and is non-renewable. Recommendation: No action is required. System: B2010 - Exterior Walls Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 100-year service life. Based on the assessment, it is expected to expire in 2078 and is non-renewable. Recommendation: No action is required. System: B2020 - Exterior Windows Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 38 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Building 5 - E Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Exterior Windows System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $151,005 System: B2030 - Exterior Doors Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 5 - E Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Exterior Doors System beyond useful life. Replace Renew System 1-Ea. $12,846 System: B3010 - Roof Coverings Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: B3010105 - Built-Up Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 25-year service life. Based on the assessment, it is expected to expire in 2032. Recommendation: No action is required. System: B3020 - Roof Openings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 39 School Assessment Report - High Schools, Sam Houston High School, Site System: C1010 - Partitions Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 75-year service life. Based on the assessment, it is expected to expire in 2053. Recommendation: No action is required. System: C1020 - Interior Doors Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 40-year service life. Based on the assessment, it is expected to expire in 2018. Recommendation: No action is required. System: C1030 - Fittings Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 20-year service life which expired in 1998. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 5 - E Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Fittings System beyond useful life. Replace Renew System 1-Ea. $45,223 System: C3010 - Wall Finishes Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 10-year service life which expired in 1988. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 40 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 5 - E Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Wall Finishes System beyond useful life. Replace Renew System 1-Ea. $88,611 System: C3020 - Floor Finishes Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: C3020410 - VCT Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 12-year service life which expired in 1990. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 5 - E Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) VCT System beyond useful life. Replace Renew System 1-Ea. $46,927 System: C3030 - Ceiling Finishes Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 20-year service life which expired in 1998. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 41 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 5 - E Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Ceiling Finishes Beyond useful life. replace Renew System 1-Ea. $141,699 System: D2010 - Plumbing Fixtures Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Building 5 - E Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Plumbing Fixtures System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $113,385 System: D2020 - Domestic Water Distribution Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Building 5 - E Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Domestic Water Distribution System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $11,404 Final FOR OFFICIAL USE ONLY 42 School Assessment Report - High Schools, Sam Houston High School, Site System: D2030 - Sanitary Waste Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Building 5 - E Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Sanitary Sewer System beyond useful life. Replace Renew System 1-Ea. $38,800 System: D3040 - Distribution Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. System: D3050 - Terminal & Package Units Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D3060 - Controls & Instrumentation Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D3070 - Systems Testing & Balance Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 43 School Assessment Report - High Schools, Sam Houston High School, Site System: D4030 - Fire Protection Specialties Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D5010 - Electrical Service/Distribution Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Building 5 - E Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Electrical Service/Distribution System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $57,938 System: D5020 - Lighting and Branch Wiring Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Building 5 - E Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Lighting and Branch Wiring System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $278,285 Final FOR OFFICIAL USE ONLY 44 School Assessment Report - High Schools, Sam Houston High School, Site System: D5030 - Communications and Security Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: D5030310 - Telephone Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D5030910 - Fire Alarm System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 10-year service life. Based on the assessment, it is expected to expire in 2015. Recommendation: No action is required. System: D5030910 - Security System, Camers, Access Control Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D5030920 - LAN System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2012. It has a 15-year service life. Based on the assessment, it is expected to expire in 2027. Recommendation: No action is required. System: D5030920 - Public Address / Clock System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 45 School Assessment Report - High Schools, Sam Houston High School, Site System: E2010 - Fixed Furnishings Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 20-year service life which expired in 1998. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Building 5 - E Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Fixed Furnishings System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $41,684 Building Name: Cosmetology Building 4 -D Year Built: Gross Area (SF): 1978 1,651 The Sam Houston School Cosmetology Building 4 – D is a 1-story building. Originally built in 1978, there have been no additions, with renovations in 1987, 1992, 1996 and 2005. This report contains condition and adequacy data collected during the 2012 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report. Building Deficiency Condition Budget Summary Uniformat Classification A10 Foundations B10 Superstructure B20 Exterior Enclosure B30 Roofing C10 Interior Construction C30 Interior Finishes D20 Plumbing D30 HVAC D40 Fire Protection D50 Electrical E20 Furnishings RSLI 0% 0% 0% 80% 11% 64% 73% 17% 93% 9% 74% SCI 0.00% 0.00% 46.40% 0.00% 25.09% 0.00% 26.05% 64.29% 0.00% 92.18% 0.00% Total: Condition Budget $0 $0 $32,142 $0 $8,875 $0 $7,600 $30,377 $0 $65,927 $0 $144,922 Building Deficiency Condition Budget Detail Uniformat System Description Unit Price Final Life Install Year Calc Next Renewal FOR OFFICIAL USE ONLY Replacement RSLI SCI Condition Budget 46 School Assessment Report - High Schools, Sam Houston High School, Site Uniformat A1010 A1030 B1020 B2010 B2020 B2030 B3010105 B3020 C1010 C1020 C1030 C3010 C3020410 C3030 D2010 D2020 D2030 D3010 D3040 D3060 D3070 D4030 D5010 D5020 D5030310 D5030910 D5030910 D5030920 D5030920 E2010 Total System Description Standard Foundations Slab on Grade Roof Construction Exterior Walls Exterior Windows Exterior Doors Built-Up Roof Openings Partitions Interior Doors Fittings Wall Finishes VCT Ceiling Finishes Plumbing Fixtures Domestic Water Distribution Sanitary Waste Energy Supply Distribution Systems Controls & Instrumentation Systems Testing & Balance Fire Protection Specialties Electrical Service/Distribution Lighting and Branch Wiring Telephone Systems Fire Alarm System Security System, Camers, Access Control LAN System Public Address / Clock System Fixed Furnishings Unit Price $10.08 $8.72 $16.36 $17.97 $12.07 $1.04 $15.54 $0.68 $7.40 $4.85 $3.62 $6.38 $3.76 $11.33 $9.08 $0.91 $3.10 $4.87 $12.39 $3.05 $0.89 $0.12 Life 100 100 100 75 30 30 25 30 40 40 20 10 12 20 30 30 30 30 30 15 30 15 Install Year 1978 1978 1978 1978 1978 1978 2007 2007 1978 1978 1978 2007 2007 2007 2011 2011 1978 1978 1978 2011 2011 2011 Calc Next Renewal 2078 2078 2078 2053 2008 2008 2032 2037 2018 2018 1998 2017 2019 2027 2041 2041 2008 2008 2008 2026 2041 2026 0% 0% 80% 83% 15% 15% 0% 50% 58% 75% 97% 97% 0% 0% 93% 97% 93% SCI 0.00% 0.00% 0.00% 0.00% 110% 110% 0.00% 0.00% 0.00% 0.00% 110% 0.00% 0.00% 0.00% 0.00% 0.00% 110% 0.00% 110% 0.00% 0.00% 0.00% Condition Budget $0 $0 $0 $0 $29,592 $2,550 $0 $0 $0 $0 $8,875 $0 $0 $0 $0 $0 $7,600 $0 $30,377 $0 $0 $0 $4.63 $22.26 $1.23 $1.54 30 30 15 10 1978 1978 2005 2007 2008 2008 2020 2017 $10,320 $49,614 $2,741 $3,432 0% 0% 53% 50% 110% 110% 0.00% 0.00% $11,352 $54,576 $0 $0 $0.81 $0.81 15 15 2005 2012 2020 2027 $1,805 $1,805 53% 100% 0.00% 0.00% $0 $0 $0.81 $3.33 $189.63 15 20 2005 2007 2020 2027 $1,805 $7,422 $422,657 53% 75% 36% 0.00% 0.00% 34.29% $0 $0 $144,922 Replacement $22,467 $19,436 $36,464 $40,052 $26,902 $2,318 $34,636 $1,516 $16,493 $10,810 $8,068 $14,220 $8,380 $25,253 $20,238 $2,028 $6,909 $10,854 $27,615 $6,798 $1,984 $267 RSLI Building Deficiency Priority Deficiencies by Priority: Final FOR OFFICIAL USE ONLY 47 School Assessment Report - High Schools, Sam Houston High School, Site Cosmetology Building 4 - D Condition Budget: $144,922 3 - Short Term Conditions (2-3 Years) $144,922 FOR OFFICIAL USE ONLY 48 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiencies Budget Detail Exterior Doors $2,550 Sanitary Waste $7,600 Fittings $8,875 Electrical Service/Distribution $11,352 Lighting and Branch Wiring $54,576 Exterior Windows $29,592 Distribution Systems $30,377 Cosmetology Building 4 - D Condition Budget: $144,922 Final FOR OFFICIAL USE ONLY 49 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiencies Budget Narrative System: A1010 - Standard Foundations Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 100-year service life. Based on the assessment, it is expected to expire in 2078 and is non-renewable. Recommendation: No action is required. System: A1030 - Slab on Grade Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 100-year service life. Based on the assessment, it is expected to expire in 2078 and is non-renewable. Recommendation: No action is required. System: B1020 - Roof Construction Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 100-year service life. Based on the assessment, it is expected to expire in 2078 and is non-renewable. Recommendation: No action is required. System: B2010 - Exterior Walls Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 75-year service life. Based on the assessment, it is expected to expire in 2053 and is non-renewable. Recommendation: No action is required. System: B2020 - Exterior Windows Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 50 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Cosmetology Building 4 - D Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Exterior Windows System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $29,592 System: B2030 - Exterior Doors Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Cosmetology Building 4 - D Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Exterior Doors System beyond useful life. Replace Renew System 1-Ea. $2,550 System: B3010 - Roof Coverings Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: B3010105 - Built-Up Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 25-year service life. Based on the assessment, it is expected to expire in 2032. Recommendation: No action is required. System: B3020 - Roof Openings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 51 School Assessment Report - High Schools, Sam Houston High School, Site System: C1010 - Partitions Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 40-year service life. Based on the assessment, it is expected to expire in 2018. Recommendation: No action is required. System: C1020 - Interior Doors Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1978. It has a 40-year service life. Based on the assessment, it is expected to expire in 2018. Recommendation: No action is required. System: C1030 - Fittings Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 20-year service life which expired in 1998. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Cosmetology Building 4 - D Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Fittings System beyond useful life. Replace Renew System 1-Ea. $8,875 System: C3010 - Wall Finishes Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 10-year service life. Based on the assessment, it is expected to expire in 2017. Recommendation: No action is required. System: C3020 - Floor Finishes Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 52 School Assessment Report - High Schools, Sam Houston High School, Site System: C3020410 - VCT Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 12-year service life. Based on the assessment, it is expected to expire in 2019. Recommendation: No action is required. System: C3030 - Ceiling Finishes Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 20-year service life. Based on the assessment, it is expected to expire in 2027. Recommendation: No action is required. System: D2010 - Plumbing Fixtures Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2011. It has a 30-year service life. Based on the assessment, it is expected to expire in 2041. Recommendation: No action is required. System: D2020 - Domestic Water Distribution Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2011. It has a 30-year service life. Based on the assessment, it is expected to expire in 2041. Recommendation: No action is required. System: D2030 - Sanitary Waste Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 53 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Cosmetology Building 4 - D Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Sanitary Sewer System beyond useful life. Replace Renew System 1-Ea. $7,600 System: D3010 - Energy Supply Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008 and is non-renewable. Recommendation: The system should be replaced. System: D3040 - Distribution Systems Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Cosmetology Building 4 - D Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Distribution Systems Beyond useful life. replace Renew System 1-Ea. $30,377 System: D3060 - Controls & Instrumentation Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2011. It has a 15-year service life. Based on the assessment, it is expected to expire in 2026. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 54 School Assessment Report - High Schools, Sam Houston High School, Site System: D3070 - Systems Testing & Balance Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2011. It has a 30-year service life. Based on the assessment, it is expected to expire in 2041. Recommendation: No action is required. System: D4030 - Fire Protection Specialties Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2011. It has a 15-year service life. Based on the assessment, it is expected to expire in 2026. Recommendation: No action is required. System: D5010 - Electrical Service/Distribution Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Cosmetology Building 4 - D Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Electrical Service/Distribution System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $11,352 System: D5020 - Lighting and Branch Wiring Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1978. It has a 30-year service life which expired in 2008. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 55 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Cosmetology Building 4 - D Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Lighting and Branch Wiring System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $54,576 System: D5030 - Communications and Security Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: D5030310 - Telephone Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D5030910 - Fire Alarm System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 10-year service life. Based on the assessment, it is expected to expire in 2017. Recommendation: No action is required. System: D5030910 - Security System, Camers, Access Control Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D5030920 - LAN System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2012. It has a 15-year service life. Based on the assessment, it is expected to expire in 2027. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 56 School Assessment Report - High Schools, Sam Houston High School, Site System: D5030920 - Public Address / Clock System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: E2010 - Fixed Furnishings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 20-year service life. Based on the assessment, it is expected to expire in 2027. Recommendation: No action is required. Building Name: Main Building 1 - A Year Built: Gross Area (SF): 1954 240,731 The Sam Houston High School Main Building is a 3-story building. Originally built in 1954, there have been additions in 1978, 2004, with renovations in 1986, 1997, 2003, 2005 and 2007. This report contains condition and adequacy data collected during the 2012 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report. Building Deficiency Condition Budget Summary Uniformat Classification A10 Foundations B10 Superstructure B20 Exterior Enclosure B30 Roofing C10 Interior Construction C20 Stairs C30 Interior Finishes D10 Conveying D20 Plumbing D30 HVAC D40 Fire Protection D50 Electrical E10 Equipment E20 Furnishings RSLI 0% 0% 32% 80% 68% 22% 37% 37% 52% 74% 53% 81% 65% 75% SCI 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 7.31% 0.00% 40.96% 0.00% 0.00% 0.00% 0.00% 0.00% Total: Condition Budget $0 $0 $0 $0 $0 $0 $975,936 $0 $1,397,768 $0 $0 $0 $0 $0 $2,373,704 Building Deficiency Condition Budget Detail Uniformat A1010 A1030 B1010 System Description Standard Foundations Slab on Grade Floor Construction Unit Price $7.33 $6.33 $15.74 Life 100 100 100 Install Year 1954 1954 1954 Calc Next Renewal 2054 2054 2054 Final FOR OFFICIAL USE ONLY Replacement $2,382,154 $2,057,167 $5,115,293 RSLI - SCI 0.00% 0.00% 0.00% Condition Budget $0 $0 $0 57 School Assessment Report - High Schools, Sam Houston High School, Site Uniformat B1020 B2010 B2020 B2030 B3010105 B3020 C1010 C1020 C1030 C2010 C3010 C3020210 C3020210 C3020410 C3020410 C3030 D1010 D2010 D2020 D2030 D2040 D2090 D3040 D3050 D3060 D3070 D4030 D5010 D5020 D5030310 D5030910 D5030910 D5030920 D5030920 D5090 E1020 E2010 Total System Description Roof Construction Exterior Walls Exterior Windows Exterior Doors Built-Up Roof Openings Partitions Interior Doors Fittings Stair Construction Wall Finishes Terrazzo Tile & Coverings VCT Wood Ceiling Finishes Elevators and Lifts Plumbing Fixtures Domestic Water Distribution Sanitary Waste Rain Water Drainage Other Plumbing SystemsNat Gas Distribution Systems Terminal & Package Units Controls & Instrumentation Systems Testing & Balance Fire Protection Specialties Electrical Service/Distribution Lighting and Branch Wiring Telephone Systems Fire Alarm System Security System, Camers, Access Control LAN System Public Address / Clock System Other Electrical Systems Institutional Equipment Fixed Furnishings Unit Price $11.88 $13.05 $8.78 $0.76 $6.11 $0.79 $6.10 $3.53 $2.63 $3.15 $4.63 $22.74 $0.24 $2.73 $2.49 $8.23 $2.65 $6.59 $0.67 $2.24 $0.39 20 35 30 30 30 30 Install Year 1954 1954 2005 1992 2007 2007 1954 2012 2012 1954 2007 1954 1954 2004 1954 2007 1990 2007 1954 1954 1980 Calc Next Renewal 2054 2029 2035 2022 2032 2037 2054 2052 2032 2029 2017 2029 1984 2016 1954 2027 2025 2037 1984 1984 2010 $0.61 $8.99 $9.95 $2.22 $0.64 $0.08 20 30 15 15 30 15 1980 2007 2007 2007 2007 2005 2000 2037 2022 2022 2037 2020 $3.36 $16.17 $0.90 $1.12 30 30 15 10 2007 2007 2010 2007 $0.59 $0.59 15 15 $0.59 $0.76 $1.30 $2.42 $190.07 15 20 20 20 Life 100 75 30 30 25 30 100 40 20 75 10 75 30 12 77% 33% 80% 83% 42% 100% 100% 23% 50% 23% 0% 33% 75% 37% 83% 0% 0% 0% SCI 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 110% 0.00% 110% 0.00% 0.00% 0.00% 110% 110% 110% Condition Budget $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $85,797 $0 $890,139 $0 $0 $0 $239,515 $800,768 $139,419 $198,242 $2,921,632 $3,233,619 $721,471 $207,992 $25,999 0% 83% 67% 67% 83% 53% 110% 0.00% 0.00% 0.00% 0.00% 0.00% $218,066 $0 $0 $0 $0 $0 2037 2037 2025 2017 $1,091,956 $5,255,037 $292,488 $363,985 83% 83% 87% 50% 0.00% 0.00% 0.00% 0.00% $0 $0 $0 $0 2007 2012 2022 2027 $191,742 $191,742 67% 100% 0.00% 0.00% $0 $0 2007 2007 2005 2007 2022 2027 2025 2027 $191,742 $246,990 $422,483 $786,468 $61,770,251 67% 75% 65% 75% 61% 0.00% 0.00% 0.00% 0.00% 3.84% $0 $0 $0 $0 $2,373,704 Replacement $3,860,844 $4,241,078 $2,853,385 $246,990 $1,985,670 $256,740 $1,982,420 $1,147,204 $854,715 $1,023,709 $1,504,689 $7,390,201 $77,997 $887,214 $809,217 $2,674,642 $861,215 $2,141,663 $217,741 $727,971 $126,745 RSLI Final FOR OFFICIAL USE ONLY 58 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiency Priority Deficiencies by Priority: 3 - Short Term Conditions (2-3 Years) $2,373,704 Main Building 1 - A Condition Budget: $2,373,704 Final FOR OFFICIAL USE ONLY 59 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiencies Budget Detail Tile & Coverings $85,797 Rain Water Drainage $139,419 Other Plumbing Systems-Nat Gas $218,066 Wood $890,139 Domestic Water Distribution $239,515 Sanitary Waste $800,768 Main Building 1 - A Condition Budget: $2,373,704 Final FOR OFFICIAL USE ONLY 60 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiencies Budget Narrative System: A1010 - Standard Foundations Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054 and is non-renewable. Recommendation: No action is required. System: A1030 - Slab on Grade Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054 and is non-renewable. Recommendation: No action is required. System: B1010 - Floor Construction Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054 and is non-renewable. Recommendation: No action is required. System: B1020 - Roof Construction Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054 and is non-renewable. Recommendation: No action is required. System: B2010 - Exterior Walls Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 75-year service life. Based on the assessment, it is expected to expire in 2029 and is non-renewable. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 61 School Assessment Report - High Schools, Sam Houston High School, Site System: B2020 - Exterior Windows Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035. Recommendation: No action is required. System: B2030 - Exterior Doors Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1992. It has a 30-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: B3010 - Roof Coverings Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: B3010105 - Built-Up Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 25-year service life. Based on the assessment, it is expected to expire in 2032. Recommendation: No action is required. System: B3020 - Roof Openings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. System: C1010 - Partitions Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054. Recommendation: No action is required. System: C1020 - Interior Doors Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2012. It has a 40-year service life. Based on the assessment, it is expected to expire in 2052. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 62 School Assessment Report - High Schools, Sam Houston High School, Site System: C1030 - Fittings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2012. It has a 20-year service life. Based on the assessment, it is expected to expire in 2032. Recommendation: No action is required. System: C2010 - Stair Construction Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 75-year service life. Based on the assessment, it is expected to expire in 2029. Recommendation: No action is required. System: C3010 - Wall Finishes Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 10-year service life. Based on the assessment, it is expected to expire in 2017. Recommendation: No action is required. System: C3020 - Floor Finishes Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: C3020210 - Terrazzo Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 75-year service life. Based on the assessment, it is expected to expire in 2029. Recommendation: No action is required. System: C3020210 - Tile & Coverings Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 30-year service life which expired in 1984. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 63 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Main Building 1 - A Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Tile & Coverings System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $85,797 System: C3020410 - VCT Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2004. It has a 12-year service life. Based on the assessment, it is expected to expire in 2016. Recommendation: No action is required. System: C3020410 - Wood Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 0-year service life which expired in 1954. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Main Building 1 - A Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Wood System beyond useful life. Replace Renew System 1-Ea. $890,139 System: C3030 - Ceiling Finishes Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 20-year service life. Based on the assessment, it is expected to expire in 2027. Recommendation: No action is required. System: D1010 - Elevators and Lifts Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1990. It has a 35-year service life. Based on the assessment, it is expected to expire in 2025. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 64 School Assessment Report - High Schools, Sam Houston High School, Site System: D2010 - Plumbing Fixtures Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. System: D2020 - Domestic Water Distribution Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 30-year service life which expired in 1984. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Main Building 1 - A Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Domestic Water Distribution System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $239,515 System: D2030 - Sanitary Waste Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 30-year service life which expired in 1984. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Main Building 1 - A Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Sanitary Sewer System beyond useful life. Replace Renew System 1-Ea. $800,768 Final FOR OFFICIAL USE ONLY 65 School Assessment Report - High Schools, Sam Houston High School, Site System: D2040 - Rain Water Drainage Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1980. It has a 30-year service life which expired in 2010. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Main Building 1 - A Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Rain Water Drainage System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $139,419 System: D2090 - Other Plumbing Systems-Nat Gas Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1980. It has a 20-year service life which expired in 2000. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Main Building 1 - A Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Other Plumbing Systems-Nat Gas beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $218,066 System: D3040 - Distribution Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 66 School Assessment Report - High Schools, Sam Houston High School, Site System: D3050 - Terminal & Package Units Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D3060 - Controls & Instrumentation Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D3070 - Systems Testing & Balance Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. System: D4030 - Fire Protection Specialties Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D5010 - Electrical Service/Distribution Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. System: D5020 - Lighting and Branch Wiring Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. System: D5030 - Communications and Security Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 67 School Assessment Report - High Schools, Sam Houston High School, Site System: D5030310 - Telephone Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2010. It has a 15-year service life. Based on the assessment, it is expected to expire in 2025. Recommendation: No action is required. System: D5030910 - Fire Alarm System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 10-year service life. Based on the assessment, it is expected to expire in 2017. Recommendation: No action is required. System: D5030910 - Security System, Camers, Access Control Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D5030920 - LAN System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2012. It has a 15-year service life. Based on the assessment, it is expected to expire in 2027. Recommendation: No action is required. System: D5030920 - Public Address / Clock System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 15-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. System: D5090 - Other Electrical Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 20-year service life. Based on the assessment, it is expected to expire in 2027. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 68 School Assessment Report - High Schools, Sam Houston High School, Site System: E1020 - Institutional Equipment Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 20-year service life. Based on the assessment, it is expected to expire in 2025. Recommendation: No action is required. System: E2010 - Fixed Furnishings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 20-year service life. Based on the assessment, it is expected to expire in 2027. Recommendation: No action is required. Building Name: Mechanical Building 6 F Year Built: Gross Area (SF): 1954 4,388 The Sam Houston School Mechanical Building 6 – F is a 1-story building. Originally built in 1954, there has been an addition in 1970, with renovations in 1986, 2003, 2005 and 2012. This report contains condition and adequacy data collected during the 2012 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report. Building Deficiency Condition Budget Summary Uniformat Classification B20 Exterior Enclosure B30 Roofing C10 Interior Construction C30 Interior Finishes D20 Plumbing D30 HVAC D50 Electrical RSLI 0% 75% 4% 25% 100% 99% 100% SCI 16.25% 0.00% 94.69% 41.67% 0.00% 0.00% 0.00% Total: Condition Budget $26,497 $0 $43,416 $6,344 $0 $0 $0 $76,257 Building Deficiency Condition Budget Detail Uniformat A1010 A1020 A1030 B1020 B2010 B2020 B2030 B3010 B3020 System Description Standard Foundations Special Foundations Slab on Grade Roof Construction Exterior Walls Exterior Windows Exterior Doors Roof Coverings Roof Openings Unit Price $5.94 $2.01 $12.03 $11.97 $23.26 $3.00 $1.26 $10.77 $1.23 Life 100 100 100 100 75 30 30 20 30 Install Year 1954 1954 1954 1954 1954 1954 1954 2007 2007 Calc Next Renewal 2054 2054 2054 2054 2029 1984 1984 2027 2037 Final FOR OFFICIAL USE ONLY Replacement $35,187 $11,907 $71,263 $70,908 $137,788 $17,771 $7,464 $63,799 $7,286 RSLI 0% 0% 75% 83% SCI 0.00% 0.00% 0.00% 0.00% 0.00% 105% 105% 0.00% 0.00% Condition Budget $0 $0 $0 $0 $0 $18,660 $7,837 $0 $0 69 School Assessment Report - High Schools, Sam Houston High School, Site Uniformat C1010 C1020 C1030 C3010 C3020 C3030 D2020 D2030 D3020 D3030 D3060 D5010 D5020 D5030 Total System Description Partitions Interior Doors Fittings Wall Finishes Floor Finishes Ceiling Finishes Domestic Water Distribution Sanitary Waste Heat Generating Systems Cooling Generating Systems Controls & Instrumentation Electrical Service/Distribution Lighting and Branch Wiring Communications and Security Unit Price $0.76 $6.44 $0.54 $0.47 $1.55 $0.55 $0.52 $2.25 $6.27 $85.31 $22.00 Life 100 40 20 10 100 20 30 30 30 30 20 Install Year 1954 1954 1954 1954 1954 1954 2012 2012 2012 2012 2012 Calc Next Renewal 2054 1994 1974 1964 2054 1974 2042 2042 2042 2042 2032 Replacement $4,502 $38,149 $3,199 $2,784 $9,182 $3,258 $3,080 $13,329 $37,142 $505,359 $130,324 RSLI 42% 0% 0% 0% 42% 0% 100% 100% 100% 100% 100% SCI 0.00% 105% 105% 105% 0.00% 105% 0.00% 0.00% 0.00% 0.00% 0.00% Condition Budget $0 $40,057 $3,359 $2,923 $0 $3,421 $0 $0 $0 $0 $0 $139 $6.99 30 30 2012 2012 2042 2042 $821,690 $41,407 100% 100% 0.00% 0.00% $0 $0 $0.67 $344.50 10 2012 2022 $3,969 $2,040,749 100% 94% 0.00% 3.74% $0 $76,257 Building Deficiency Priority Deficiencies by Priority: 3 - Short Term Conditions (2-3 Years) $76,257 Mechanical Building 6 - F Condition Budget: $76,257 Final FOR OFFICIAL USE ONLY 70 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiencies Budget Detail Wall Finishes $2,923 Fittings $3,359 Ceiling Finishes $3,421 Exterior Doors $7,837 Interior Doors $40,057 Exterior Windows $18,660 Mechanical Building 6 - F Condition Budget: $76,257 Final FOR OFFICIAL USE ONLY 71 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiencies Budget Narrative System: A1010 - Standard Foundations Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054 and is non-renewable. Recommendation: No action is required. System: A1020 - Special Foundations Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054 and is non-renewable. Recommendation: No action is required. System: A1030 - Slab on Grade Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054 and is non-renewable. Recommendation: No action is required. System: B1020 - Roof Construction Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054 and is non-renewable. Recommendation: No action is required. System: B2010 - Exterior Walls Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 75-year service life. Based on the assessment, it is expected to expire in 2029 and is non-renewable. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 72 School Assessment Report - High Schools, Sam Houston High School, Site System: B2020 - Exterior Windows Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 30-year service life which expired in 1984. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Mechanical Building 6 - F Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Exterior Windows System beyond useful life. Replace Correction: Renew System Qty: 1-Ea. Condition Budget: $18,660 System: B2030 - Exterior Doors Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 30-year service life which expired in 1984. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Mechanical Building 6 - F Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Exterior Doors System beyond useful life. Replace Renew System 1-Ea. $7,837 System: B3010 - Roof Coverings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 20-year service life. Based on the assessment, it is expected to expire in 2027. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 73 School Assessment Report - High Schools, Sam Houston High School, Site System: B3020 - Roof Openings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2007. It has a 30-year service life. Based on the assessment, it is expected to expire in 2037. Recommendation: No action is required. System: C1010 - Partitions Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054. Recommendation: No action is required. System: C1020 - Interior Doors Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 40-year service life which expired in 1994. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Mechanical Building 6 - F Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Interior Doors System beyond useful life. Replace Renew System 1-Ea. $40,057 System: C1030 - Fittings Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 20-year service life which expired in 1974. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 74 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Mechanical Building 6 - F Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Fittings System beyond useful life. Replace Renew System 1-Ea. $3,359 System: C3010 - Wall Finishes Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 10-year service life which expired in 1964. Recommendation: The system should be replaced. Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Mechanical Building 6 - F Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Wall Finishes System beyond useful life. Replace Renew System 1-Ea. $2,923 System: C3020 - Floor Finishes Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 1954. It has a 100-year service life. Based on the assessment, it is expected to expire in 2054. Recommendation: No action is required. System: C3030 - Ceiling Finishes Analysis: The system age is either beyond expected life or does not meet its intended performance under the Guidelines. The system may be in service and functioning but it is recommended to be replaced due to probable increased condition budget needs, the potential failure of its components, or in order to meet the performance Guidelines for this system. The system was installed in 1954. It has a 20-year service life which expired in 1974. Recommendation: The system should be replaced. Final FOR OFFICIAL USE ONLY 75 School Assessment Report - High Schools, Sam Houston High School, Site Deficiency Location: Distress: Category: Priority: Notes: Correction: Qty: Condition Budget: Mechanical Building 6 - F Beyond Expected Life Deferred Maintenance 3 - Short Term Conditions (2-3 Years) Ceiling Finishes Beyond useful life. replace Renew System 1-Ea. $3,421 System: D2020 - Domestic Water Distribution Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2012. It has a 30-year service life. Based on the assessment, it is expected to expire in 2042. Recommendation: No action is required. System: D2030 - Sanitary Waste Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2012. It has a 30-year service life. Based on the assessment, it is expected to expire in 2042. Recommendation: No action is required. System: D3020 - Heat Generating Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2012. It has a 30-year service life. Based on the assessment, it is expected to expire in 2042. Recommendation: No action is required. System: D3030 - Cooling Generating Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2012. It has a 30-year service life. Based on the assessment, it is expected to expire in 2042. Recommendation: No action is required. System: D3060 - Controls & Instrumentation Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2012. It has a 20-year service life. Based on the assessment, it is expected to expire in 2032. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 76 School Assessment Report - High Schools, Sam Houston High School, Site System: D5010 - Electrical Service/Distribution Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2012. It has a 30-year service life. Based on the assessment, it is expected to expire in 2042. Recommendation: No action is required. System: D5020 - Lighting and Branch Wiring Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2012. It has a 30-year service life. Based on the assessment, it is expected to expire in 2042. Recommendation: No action is required. System: D5030 - Communications and Security Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2012. It has a 10-year service life. Based on the assessment, it is expected to expire in 2022. Recommendation: No action is required. Building Name: ROTC building 8 Year Built: Gross Area (SF): 2005 5,700 The Sam Houston School ROTC Building 8 – G is a 1-story building. Originally built in 2005, there has been no additions or renovations. This report contains condition and adequacy data collected during the 2012 Facility Condition Assessment (FCA). The detailed condition and deficiency statements are contained in this report. Building Deficiency Condition Budget Summary Uniformat Classification A10 Foundations B10 Superstructure B20 Exterior Enclosure B30 Roofing C10 Interior Construction C30 Interior Finishes D20 Plumbing D30 HVAC D40 Fire Protection D50 Electrical E20 Furnishings RSLI 0% 0% 34% 72% 78% 50% 75% 59% 68% 71% 64% SCI 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Total: Condition Budget $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Building Deficiency Condition Budget Detail Uniformat System Description Unit Price Final Life Install Year Calc Next Renewal FOR OFFICIAL USE ONLY Replacement RSLI SCI Condition Budget 77 School Assessment Report - High Schools, Sam Houston High School, Site Uniformat A1010 A1030 B1020 B2010 B2020 B2030 B3010105 B3020 C1010 C1020 C1030 C3010 C3020410 C3030 D2010 D2020 D2030 D2040 D2090 D3010 D3020 D3030 D3040 D3050 D3060 D3070 D4010 D4020 D4030 D4090 D5010 D5020 D5030310 D5030910 D5030910 D5030920 D5030920 D5090 E2010 Total System Description Standard Foundations Slab on Grade Roof Construction Exterior Walls Exterior Windows Exterior Doors Built-Up Roof Openings Partitions Interior Doors Fittings Wall Finishes VCT Ceiling Finishes Plumbing Fixtures Domestic Water Distribution Sanitary Waste Rain Water Drainage Other Plumbing SystemsNat Gas Energy Supply Heat Generating Systems Cooling Generating Systems Distribution Systems Terminal & Package Units Controls & Instrumentation Systems Testing & Balance Sprinklers Standpipes Fire Protection Specialties Other Fire Protection Systems Electrical Service/Distribution Lighting and Branch Wiring Telephone Systems Fire Alarm System Security System, Camers, Access Control LAN System Public Address / Clock System Other Electrical Systems Fixed Furnishings Unit Price $8.28 $7.15 $13.42 $14.75 $9.90 $0.85 $12.75 $0.56 $6.07 $3.98 $2.97 $5.23 $3.08 $9.30 $7.44 $0.75 $2.54 $0.43 Life 100 100 100 75 30 30 25 30 40 40 20 10 12 20 30 30 30 30 Install Year 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 Calc Next Renewal 2105 2105 2105 2080 2035 2035 2030 2035 2045 2045 2025 2015 2017 2025 2035 2035 2035 2035 77% 77% 72% 77% 83% 83% 65% 30% 42% 65% 77% 77% 77% 77% SCI 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Condition Budget $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0.70 $3.99 $3.85 $12.83 $10.16 $11.25 $2.51 $0.73 $3.45 $0.26 $0.10 20 30 30 20 30 15 15 30 25 40 15 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2005 2025 2035 2035 2025 2035 2020 2020 2035 2030 2045 2020 $5,387 $30,703 $29,626 $98,727 $78,181 $86,569 $19,314 $5,617 $26,548 $2,001 $770 65% 77% 65% 77% 53% 53% 77% 72% 83% 53% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1.01 15 2005 2020 $7,772 53% 0.00% $0 $3.80 $18.26 $1.01 $1.27 30 30 15 10 2005 2005 2005 2005 2035 2035 2020 2015 $29,241 $140,511 $7,772 $9,773 77% 77% 53% 30% 0.00% 0.00% 0.00% 0.00% $0 $0 $0 $0 $0.67 $0.67 15 15 2005 2005 2020 2020 $5,156 $5,156 53% 53% 0.00% 0.00% $0 $0 $0.67 $0.85 $2.74 $190.23 15 20 20 2005 2005 2005 2020 2025 2025 $5,156 $6,541 $21,084 $1,463,820 53% 65% 65% 68% 0.00% 0.00% 0.00% 0.00% $0 $0 $0 $0 Replacement $63,715 $55,019 $103,267 $113,501 $76,181 $6,541 $98,111 $4,309 $46,709 $30,626 $22,854 $40,245 $23,701 $71,564 $57,251 $5,771 $19,545 $3,309 RSLI Final FOR OFFICIAL USE ONLY 78 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiency Priority Deficiencies by Priority: ROTC building 8 doesn't have any deficiencies to show in the pie chart. Final FOR OFFICIAL USE ONLY 79 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiencies Budget Detail ROTC building 8 doesn't have any deficiencies to show in the pie chart. Final FOR OFFICIAL USE ONLY 80 School Assessment Report - High Schools, Sam Houston High School, Site Building Deficiencies Budget Narrative System: A1010 - Standard Foundations Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 100-year service life. Based on the assessment, it is expected to expire in 2105 and is non-renewable. Recommendation: No action is required. System: A1030 - Slab on Grade Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 100-year service life. Based on the assessment, it is expected to expire in 2105 and is non-renewable. Recommendation: No action is required. System: B1020 - Roof Construction Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 100-year service life. Based on the assessment, it is expected to expire in 2105 and is non-renewable. Recommendation: No action is required. System: B2010 - Exterior Walls Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 75-year service life. Based on the assessment, it is expected to expire in 2080 and is non-renewable. Recommendation: No action is required. System: B2020 - Exterior Windows Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035. Recommendation: No action is required. System: B2030 - Exterior Doors Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 81 School Assessment Report - High Schools, Sam Houston High School, Site System: B3010 - Roof Coverings Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: B3010105 - Built-Up Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 25-year service life. Based on the assessment, it is expected to expire in 2030. Recommendation: No action is required. System: B3020 - Roof Openings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035. Recommendation: No action is required. System: C1010 - Partitions Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 40-year service life. Based on the assessment, it is expected to expire in 2045. Recommendation: No action is required. System: C1020 - Interior Doors Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 40-year service life. Based on the assessment, it is expected to expire in 2045. Recommendation: No action is required. System: C1030 - Fittings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 20-year service life. Based on the assessment, it is expected to expire in 2025. Recommendation: No action is required. System: C3010 - Wall Finishes Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 10-year service life. Based on the assessment, it is expected to expire in 2015. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 82 School Assessment Report - High Schools, Sam Houston High School, Site System: C3020 - Floor Finishes Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: C3020410 - VCT Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 12-year service life. Based on the assessment, it is expected to expire in 2017. Recommendation: No action is required. System: C3030 - Ceiling Finishes Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 20-year service life. Based on the assessment, it is expected to expire in 2025. Recommendation: No action is required. System: D2010 - Plumbing Fixtures Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035. Recommendation: No action is required. System: D2020 - Domestic Water Distribution Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035. Recommendation: No action is required. System: D2030 - Sanitary Waste Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035. Recommendation: No action is required. System: D2040 - Rain Water Drainage Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 83 School Assessment Report - High Schools, Sam Houston High School, Site System: D2090 - Other Plumbing Systems-Nat Gas Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 20-year service life. Based on the assessment, it is expected to expire in 2025. Recommendation: No action is required. System: D3010 - Energy Supply Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035 and is non-renewable. Recommendation: No action is required. System: D3020 - Heat Generating Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035. Recommendation: No action is required. System: D3030 - Cooling Generating Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 20-year service life. Based on the assessment, it is expected to expire in 2025. Recommendation: No action is required. System: D3040 - Distribution Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035. Recommendation: No action is required. System: D3050 - Terminal & Package Units Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 84 School Assessment Report - High Schools, Sam Houston High School, Site System: D3060 - Controls & Instrumentation Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D3070 - Systems Testing & Balance Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035. Recommendation: No action is required. System: D4010 - Sprinklers Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 25-year service life. Based on the assessment, it is expected to expire in 2030. Recommendation: No action is required. System: D4020 - Standpipes Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 40-year service life. Based on the assessment, it is expected to expire in 2045. Recommendation: No action is required. System: D4030 - Fire Protection Specialties Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D4090 - Other Fire Protection Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 85 School Assessment Report - High Schools, Sam Houston High School, Site System: D5010 - Electrical Service/Distribution Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035. Recommendation: No action is required. System: D5020 - Lighting and Branch Wiring Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 30-year service life. Based on the assessment, it is expected to expire in 2035. Recommendation: No action is required. System: D5030 - Communications and Security Analysis: The system Warning: unknown next-renewal year. The system was installed at an unknown date. Recommendation: The system should be replaced. System: D5030310 - Telephone Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D5030910 - Fire Alarm System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 10-year service life. Based on the assessment, it is expected to expire in 2015. Recommendation: No action is required. System: D5030910 - Security System, Camers, Access Control Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D5030920 - LAN System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 86 School Assessment Report - High Schools, Sam Houston High School, Site System: D5030920 - Public Address / Clock System Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 15-year service life. Based on the assessment, it is expected to expire in 2020. Recommendation: No action is required. System: D5090 - Other Electrical Systems Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 20-year service life. Based on the assessment, it is expected to expire in 2025. Recommendation: No action is required. System: E2010 - Fixed Furnishings Analysis: The system is in use and functioning with an estimated remaining service life as indicated in the report section "Condition/Replacement Budget Detail". The system was installed in 2005. It has a 20-year service life. Based on the assessment, it is expected to expire in 2025. Recommendation: No action is required. Final FOR OFFICIAL USE ONLY 87 School Assessment Report - High Schools, Sam Houston High School Glossary Abandoned Building Building addition Calculated Next Renewal Capital Renewal Category Condition Condition Budget Condition Score Correction Criteria Current Period Current Replacement Value (CRV) Deferred maintenance Deficiency Distress Element Extended Facility Condition Index (EFCI) Facility A facility owned by a district that is not occupied and not maintained. See Vacant. A fully enclosed and roofed structure that can be traversed internally without exiting to the exterior. An area, space or component of a building added to a building after the original building's year built date. "Main" is used to designate the original building. Additions built prior to 1980 were included in the Main building area calculations to reflect their predicted system depreciation characteristics and remaining useful life. Calculated Next Renewal refers to the year a system or building element completes its useful life based on its installed date and its expected useful or design life. Capital Renewal refers to physical facility condition work (excluding suitability and technology work) that includes the cyclical replacement of building systems or elements as they become obsolete or beyond their useful life that is not normally included in an annual operating maintenance budget. Category refers to the type or class of a user defined deficiency grouping with shared or similar characteristics. Category descriptions are: Condition refers to the state of physical fitness or readiness of a facility system or system element for its intended use. The Condition Budget, also known as Condition Needs, represents the budgeted contractor installed costs plus owner's soft costs for the repair, replacement or renewal for a component or system level deficiency. It excludes contributing costs for other components or systems that might also be associated with the cortrective actions due to packaging the work. Condition Score is a factor used in the calculation of School Score expressed as Correction refers to an assessor's recommended deficiency repair or replacement action. For any system or element deficiency, there can be multiple and alternative solutions for its repair or replacement. A Correction is user defined and tied to a material defined in a Uniformat II element, or system it is intended to address. It excludes other peripheral costs that may also be included in the pacakaging of repair, replacement or renewal improvements that may also be triggered by the deficiency correction. Criteria refers to the set of requirements, guidelines or standards that are assessed and rated to develop a score. The Current Period is the curent year plus a user defined number of forward years. Current Replacement Value (CRV), also known as Replacement Value represents the hypothetical total cost of rebuilding or replacing an existing facility in current dollars to an optimal state-of-the-art condition under current codes and construction standards and techniques. Deferred maintenance is condition work (excluding suitability and technology readiness needs) deferred on a planned or unplanned basis to a future budget cycle or postponed until funds are available. A deficiency is a repair item that is damaged, missing, inadequate or insufficient for an intended purpose. Distress refers to a user defined root cause of a deficiency. Distress descriptions are: Elements are the major components that comprise building systems as defined by Uniformat. Extended Facility Condition Index (EFCI) is calculated as the condition needs for the current year plus facility system renewal for user defined forward years (the Current Period) divided by Current Replacement Value. A facility refers to site(s), building(s), or building addition(s), or combinations thereof that provide a particular service or support of an educational purpose. Final FOR OFFICIAL USE ONLY 88 School Assessment Report - High Schools, Sam Houston High School Facility Condition Index (FCI) FCI is an industry-standard measurement of facility condition calculated as the ratio of the costs to correct a facility's deficiencies to the facility's Current Replacement Value. It ranges from 0% (new) to 100%(very poor). Forecast Period The Forecast Period refers to a user defined number of years after the Current Period. Gross square feet (GSF) The area of the enclosed floor space of a building or building addition in square feet measured to the outside face of the enclosing wall. Install year The year a system or element was built or the most recent major renovation date where a minimum of 70% of the system's Current Replacement Value (CRV) was replaced. Life cycle Life cycle refers to the period of time that a building or or element exists and can serve its intended function. The cycle includes warranty period, intrinsic period, and run to failure period. (See Useful Life) Next Renewal Next Renewal refers to a manually adjusted expected useful life of a system or element based on on-site inspection either by reducing or extending the Calculated Next Renewal to more accurately current conditions. Order of Magnitude Order of Magnitude refers to a rough approximation made with a degree of knowledge and confidence that the budgeted, projected or estimated cost falls within a reasonable range of cost values. Priority Priority refers to a deficiency's urgency for repair as determined by the assessment team. Remaining Service Life % Remaining Service Life % is a calculated value such that RSL% = RSL divided by its system Design Life (not displayed). Remaining Service Life Remaining service life is a measure of a system's or element's predicted remaining useful (RSL) life calculated as RSL = Next Renewal or Calculated Next Renewal Year minus the Current Year. Remaining Service Life The Remaining Service Life Index (RSLI) also known as the Condition Index (CI) is Index (RSLI) calculated as the sum of a renewable systems Remaining Service Life (RSL) Value divided by the sum of a system's Replacement Value (both values exclude softcost to simplify calculation updates) expressed as a percentage ranging from 100.00% (new) to 0.00% (expired - no remaining life). Remaining Service Life Remaining Service Life Value also known as the RSL Weight is a calculated value used to Value determine the RSLI that is equal to the system Value (Unit Cost * Qty) * RSL (not displayed). Replacement Value See Current Replacement Value. Site A facility's grounds and its utilities, roadways, landscaping, fencing and other typical land improvements needed to support a facility. Soft Costs Soft Costs are a construction industry term that refers to expense items that are not considered direct construction costs. Soft costs are user defined and include architectural, engineering, management, testing, and mitagation fees, and other owner pre- and postconstruction expenses. Suitability Suitability refers to the measure of how well a facility supports the educational program(s) that it houses based on criteria derived from state laws, guidelines and national educational best practices. Suitability Score Suitability Score is a calculated value expressed as System System refers to building and related site work elements as described by ASTM Uniformat II Classification for Building Elements (E1557-97) a format for classifying major facility elements common to most buildings. Elements usually perform a given function regardless of the design specification construction method or materials used. See also Uniformat II. System Condition Index System Condition Index (SCI) is the ratio of a system's current condition deficiency costs (SCI) to its replacement value - also known as "percent used" ranging from 0 percent to 100 percent or greater due to the addition of the system's renewal premium the additional costs to prepare for the system renewal such as demolition costs. Technology Score Technology Score, also known as Technology Readiness Score, is calculated as follows: (Sum of scoring for technology readiness criteria issues) * weighted value. Final FOR OFFICIAL USE ONLY 89 School Assessment Report - High Schools, Sam Houston High School Uniformat Useful Life Utilization Vacant Weight (Weighting Factor) Year built Uniformat, also known as Uniformat II, a publication of the Construction Specification Institute (CSI), is ASTM Uniformat II Classification for Building Elements (E1557-97). UniFormat is a method of arranging construction information based on functional elements or parts of a facility characterized by their functions without regard to the materials and methods used to accomplish them. These elements are often referred to as systems or assemblies. Useful Life refers to the intrinsic period of time a system or element is expected to perform as intended. Useful life is generally provided by manufacturers of materials, systems and elements through their literature, testing and experience. Useful Lives in this project are derived from the Building Owners and Managers (BOMA) organization's guidelines, RSMeans cost data, and from user defined historical experience. Utilization, also known as School Utilization, refers to ratio of students to the school's capacity calculated by dividing the number enrolled at the school by its Program Capacity. Vacant refers to a facility that is not occupied but is a maintained facility by a district. See Abandoned. Weight, also known as Weighting Factor, is a user defined factor used to apply more or less emphasis to system or element attributes such as deficiency category, deficiency priority or functional adequacy standard. For example, $100 of a Priority 1 issue by default has the same cost value (1x) as $100 of a Priority 5 item. Using weighting factors, the user can establish a priority factor so that for ranking or sorting purposes the facility (District, School, Building, Room, etc.) with a greater weighting (say 2x) thereby elevating it in rank order over the facility with Priority 1. The year that a building or addition was originally built based on its date of substantial completion or occupancy. Final FOR OFFICIAL USE ONLY