Minutes 2012 Bond Project Advisory Team (PAT) Meeting Wilson Montessori School MEETING #: 005 LOCATION: Wilson Montessori School DATE / TIME: January 12, 2015 at 5:00pm ATTENDEES: (those marked with a check were present) Beth Bonnette Principal Patsy Cavazos School Support Officer Jodi Aserkoff Elem. Teacher Melissa Bohls Lower Elem. Teacher Deborah Cogley Teacher Wendy Freed Early Childhood Teacher Debra Loewenstein Teacher R. Robbins Teacher June Spencer Friends of Cherryhurst Park Ernesto Alfaro Parent Elizabeth Eriksen Parent David Jans Parent Amber Moncla Parent Ken Smart Parent PURPOSE: David Funk Brian Alling Parra Camilo Michelle Dudley Meredith Reed Terry Smith HISD Fac. Design HISD Project Manager Neighborhood citizen Pfluger Architects Smith & Company Architects Smith & Company Architects The purpose of the meeting was to update attendees on project progress. AGENDA: • Introduce the project architect team. • Review slide images of recent tours of Cy-Fair ISD schools. • Review what to expect at the next PAT Meeting. DISCUSSION: 1. Mr. Brian Alling, HISD Project Manager, welcomed the Project Advisory Team (PAT) members and thanked them for attending the meeting. 2. Mr. Alling introduced Terry Smith, architect with Smith and Company Architects who introduced his interior designer Meredith Reed of Smith and Company and also Ms. Michelle Dudley of Pfluger Architects. Mr. Smith indicated Pfluger Architects submitted with Smith and Company for the project and he has brought them on board to assist with front-end planning and design phase and for the breadth of experience their firm can provide as a resource for the project. 3. Mr. Alling presented photographs taken during HISD tours through Anthony Middle School and Pope Elementary of Cypress-Fairbanks ISD in December. Some comments from meeting attendees noted were: a. Though the toured buildings were nice, the spaces created and the design of those buildings may not be within the Wilson Montessori project budget. b. The learning courtyard at Anthony MS has some interesting elements which may be good to consider implementing at Wilson: i. Sun dial on the wall ii. Vertical imperial and metric scale indicators on another wall iii. Story-telling pergola that serves as a large protractor iv. Solar panels that power fans for air circulation v. Rain-water cistern connected to adjacent concrete trough for science experiments with water vi. Flower/herb/plant beds which include plants which produce color dyes – these plants and dyes are used for art, science, biology/nature instruction vii. Concrete pavement with joint patterns scaled/spaced to specific proportions to teach measurements and scale viii. Compass rose c. The Pope classrooms are a little smaller than HISD standard classrooms by approximately fifty square feet. The classrooms shown in CFISD buildings appeared to be a little ‘cramped’. d. Glass in corridor walls viewing into/out of classrooms was something attendees thought was interesting for consideration at Wilson. e. Pope Elementary has a space on the second floor intended to be a reading area for students; however, due to budget issues this room was built as a ‘shell’ space to be built out in the future. This was noted as a possibility for Wilson if budget becomes an issue. Spaces could be constructed with minimal finish-out or as empty shells to allow future district or campus funded build-out in the future. 4. Mr. Alling and Mr. David Funk, HISD Facilities Planner, discussed conducting other tours of area schools with the PAT and campus administration. Ms. Bonnette and PAT members noted they would like to visit the School of the Woods and Daily Elementary in HISD as possible designs and campus operational use similar to what the Wilson staff and PAT are looking for. Principal Bonnette indicated she would coordinate with her contacts at those campuses to schedule a tour of them for PAT members and the architect team. 5. Mr. Smith and Ms. Dudley agreed to bring photo slides of a couple of their firms’ Houston ISD projects to offer other visual ideas for the Wilson project. 6. Mr. Funk indicated he would be finalizing the draft of the Educational Specifications to be issued to the campus and architect by the end of January. QUESTIONS/ANSWERS: 1. None ACTION ITEMS: 5.01 Smith & Company and Pfluger Architect teams will present images of several of their other Houston ISD projects completed in the past for additional visual ideas of possible future design solutions for Wilson Montessori’s project. WHAT TO EXPECT AT THE NEXT PAT MEETING: 1. The PAT will be presented with a final Education Specification document. 2. The PAT will review photo slides of other Smith & Company and Pfluger Architects’ projects. NEXT PAT MEETING: Monday, February 9, 2015 at 5:00 pm at Wilson Montessori Library. Please review the meeting minutes and submit any changes or corrections to the author. After five (5) days, the minutes will be assumed to be accurate. Sincerely, Brian S. Alling Project Manager HISD – Construction & Facility Services 3200 Center Street, Houston, TX 77007 Direct Phone: (713) 556-9250 Mobile Phone: (713) 498-5417 Email: balling@houstonisd.org