Elementary Facilities Update Overview of Facilities Lack of space • Each building has modular classrooms to accommodate needed space. • Not enough bulk and classroom storage spaces 2 Overview of Facilities Building envelope – roofs, brick work, exterior doors and windows: • Last major roof update across the district occurred in 1996 with replacement to Holly Lane, Hilliard, and Parkside. • All buildings need exterior door and window upgrades throughout most of the facilities. • Exterior brick work needs tuck pointing and waterproofing 3 Overview of Facilities Mechanical Systems & Equipment • All elementary buildings have boilers over 25 years old that require constant repairs. • Building temperature control systems are all over 18 years with replacement parts no longer available. • Only Bassett has air conditioning throughout most of the facility. The vast majority of the AC equipment is over 25 years old. *Parkside building has AC that is 25 years old. 4 Overview of Facilities 21st Century Learning Environment • Data infrastructure is lacking in all the elementary buildings. • Electrical service is just adequate to provide the service currently requested in the facilities. • Any additions to classroom load (computers, air conditioning, smart boards, etc.) will require an increase to the main electrical service and added wiring/cabling throughout the facilities. 5 Holly Lane Elementary Features • Roofing: Built up asphalt w/ ballasted gravel top. Replaced in 1996 • HVAC: 25+ yr. old gas fired hot water boilers with classroom unit ventilators & fin tube heating. No AC. Antiquated temp control. • Electrical: One 600 amp, 120/240 volt, 3-phase four wire system. Inadequate for required loads. • Traffic: Sufficient parking in main lot. Bus loop co-mingled with car traffic. • Site: Playground, ball field, 2 soccer/football fields Building Size: 35,488 SF Max. Student Capacity: 368 Current Enrollment: 251 Year Built: 1961 Additions: 1998 No. of full classrooms: 16 Avg. Classroom size: 755 SF Modular: 1 Lot size: 12.12 acres 6 Classroom Heating Ventilator 7 Exterior Door Inefficiencies Steel doors lack weather stripping and have shifted out of alignment over time. 8 Restroom Wall-Floor Disrepair Waste pipes in poor condition 9 Holly Lane Elementary Heating • No energy recovery Safety & Security • Unsecured Entrance - Office Located away from main entrance Plumbing/Fixtures • Waste pipes in poor condition Electrical • Distribution system/wiring in poor condition Walls/Chimney • Curtain wall separated from masonry in library Life Safety • No fire suppression system General Finishes • Some floor tiles with asbestos 10 Hilliard Elementary Features • Roofing: Built up asphalt w/ ballasted gravel top. Reinstalled in 1996. • HVAC: 25+ yr. old gas fired hot water boilers with classroom unit ventilators & fin tube heating. No AC. antiquated temp control. • Electrical: Main panels upgraded in 1990’s • Traffic: Insufficient parking. Bus loop comingled with car traffic. • Site: Playground and ball field Building Size: 40,937 SF Max. Student Capacity: 437 Current Enrollment: 330 Year Built: 1954 Additions: 1998 No. of full classrooms: 19 Avg. Classroom size: 750 SF Modular: 1 Lot size: 11.48 acres 11 Water Infiltrated Library Serious erosion of joints in sills and lower courses of brickwork, allowing moisture intrusion 12 Water Infiltration 13 Hilliard Elementary Heating • Temp. controls in poor condition Safety & Security • Unsecured Entrance - Office Located away from main entrance Walls/Chimney • Serious erosion of joints in sills and lower courses of brickwork, allowing moisture intrusion Interior/Lighting • Well below code Life Safety • No fire suppression system General Finishes • Some floor tiles with asbestos 14 Dover Elementary Features • Roofing: Combo built up asphalt w/ ballasted gravel and aluminized coating. All out of warranty. • HVAC: 25+ yr. old gas fired hot water boilers with classroom unit ventilators & fin tube heating. Partial AC. Antiquated temp control. • Electrical: three, -1200 amp, 208Y/120v, and 3 phase 4 wire system. One -1000 amp 208Y/120v, 3 phase 4 wire system • Traffic: Ample parking in main lot. Bus drop separated from car traffic. • Site: Playground Building Size: 43,671 SF Max. Student Capacity: 437 Current Enrollment: 339 Year Built: 1949 Additions: 1970 No. of full classrooms: 19 Avg. Classroom size: 650 SF Modular: 1 Lot size: 14.18 acres 15 Storage Issues 16 Exterior Disrepairs 17 Dover Elementary Heating • Temp. controls in poor condition • No energy recovery Safety & Security • Unsecured Entrance - Office Located away from main entrance Electrical • Main switch in poor condition Walls/Chimney • Masonry joints poor Interior Lighting • Well below code Life Safety • No fire suppression system • Stairs/guardrails/walls not code compliant 18 Bassett Elementary Features • Roofing: Combination build-up and shingled. Library roof applied in 2015, all others out of warranty. • HVAC: 25+ yr. old gas fired hot water boilers with rooftop units and AC. Antiquated temp. control. • Electrical: One 800 amp, 120/208 volt, 3 phase four wire system. Incoming service is undersized with little spare capacity. • Traffic: Sufficient parking in main lot, 2nd exit through neighborhood is problematic • Site: Playground, ball field, soccer/football field Building Size: 41,880 SF Max. Student Capacity: 460 Current Enrollment: 414 Year Built: 1967 Additions: 1987, 1998 No. of full classrooms: 20 Avg. Classroom size: 755 SF Modular: 2 Lot size: 15.82 acres 19 Asbestos Asbestos Floor Tile Asbestos Pipe insulation 20 Roof Leaks Roof in poor condition. 21 Bassett Elementary Heating • Temp. controls in poor condition • No energy recover Safety & Security • Unsecured Entrance - Office Located away from main entrance Ventilation/Exhaust • Below code Electrical • Wiring in poor condition Floors/Roof • 1987 slab floors rising and in poor condition Interior Lighting • Well below code Life Safety • No fire suppression system 22 Parkside Building Features: • Roofing: Built up asphalt w/ballasted gravel top. All areas out of warranty. • HVAC: 25 + yr. old gas fired hot water boilers with rooftop HVAC units. Antiquated temperature control system. • Electrical: One -1600 amp, 120/240 volt, and 3-phase four wire system and one - 1200 amp, 120/240 volt, and 3phase four wire system. The 1600 amp system is inadequate for required loads. • Traffic: Sufficient parking in main lot. Bus loop is comingled with car traffic. • Site: Playground, Ball Field, and 1 Soccer/football Fields Building Size: 72,521 SF Max. Student Capacity: 552 Year Built: 1966 Additions: 1966, 1998 No. of full classrooms: 24 Avg. Classroom size: Old – 750 SF, New – 900 SF Modular: 1 Lot size: 13.79 acres 23 Wall Cracks & Foundation Masonry cracks in gym and classrooms. Foundation movement in s. wall of gym. 24 Poor Security Wiring Poor communication and security wiring. 25 Parkside Building Heating • Temp. controls in poor condition Safety & Security • Unsecured Entrance - Office Located away from main entrance Life Safety • No fire suppression system Exterior Doors • 1966 steel doors/aluminum doors in poor condition Interior Lighting • Lighting/controls well below code Windows • Curtain wall in poor condition Plumbing/Fixtures • Waste pipes in poor condition 26 Overall Facility Assessments Similar issues for all older buildings • Condition of structures • Age infrastructure • Educational space issues • Health, safety and security considerations New Construction vs Renovation/Addition • 2/3 Guideline – sets the replacement vs renovate standard for school facilities in Ohio at two thirds the cost of a new building. • Bassett Elementary – 79% • Dover Elementary – 83% • Hilliard Elementary – 81% • Holly Lane Elementary – 84% • Parkside – 70% 27 Question & Answer 28