Program Planning and Assessment (PPA) for Academic Programs Comprehensive Review, Annual Review & Action Plan Spring 2014 The purpose of Program Planning and Assessment at Hartnell College is to obtain an honest and authentic view of a program and to assess its strengths, opportunities, needs, and connection to the mission and goals of the college. The process is based on the premise that each academic program reviews assessment data and uses these data to plan for improvement. The results of these annual cycles provide data for a periodic (every five years) comprehensive review that shows evidence of improvement and outlines long-range goals. The Program Planning and Assessment process will improve and increase the flow of information about student learning, student success and student behavior at Hartnell College. The result of the process will also improve institutional effectiveness. Program/ Discipline Theatre Arts / Western Stage Date Completed (must be in final form by 3/31/14)* 5/15/2014 Date Submitted to Dean Not applicable *Please note that you should work with your colleagues and dean to ensure that this report is completed, revised as needed, in its final form and submitted no later than the end of March. List of Contributors, including Title/Position Stephanie Low, Dean of Academic Affairs Jon Selover, Artistic Director, Western Stage Susanne Burns, Young Company Coordinator, Western Stage Jeff McGrath, Production & Facilities Manager, Western Stage This PPA report is organized in 3 sections and 11 subsections as follows: I. II. III. Comprehensive Review – a. Overall Program Effectiveness, b. Instructional Staffing, c. CTE Programs – Labor Market & Achievement, and d. Program Goals. Annual Review – a. Course Data & Trends, b. Teaching Modality, c. Curriculum, d. Outcomes, and e. Previously Scheduled Activities. Annual Action Plan – a. New Activities and b. Resource Requests. INSTRUCTIONS For programs/disciplines scheduled for comprehensive review in spring 2014, please complete Sections I, II, and III. For programs/disciplines scheduled for annual review, please complete Sections II and III. I. COMPREHENSIVE REVIEW Please complete this section for programs/disciplines scheduled for comprehensive review in spring 2014. Go to Section II for programs/disciplines scheduled for annual review in spring 2014. A. OVERALL PROGRAM EFFECTIVENESS 1. Describe your program in terms of its overall effectiveness over the past several years. Please consider the questions below in describing your program/discipline/area. • • • • • • • • • • How are students/employees served by the program? What are the unique aspects of the program? How does the program relate to the needs of the community? How does the program interface/collaborate with other programs on campus?) What is working well in the program/discipline? If there is a sequence of courses in your program, what process or framework is used to ensure alignment? How is consistency maintained between/among multiple sections of a single course? Has the program explored alternative scheduling approaches? Do prerequisites, co-requisites and strongly recommended skills continue to meet program needs? Are there special considerations regarding capabilities of incoming students? What professional activities have faculty recently (last three years) participated in? [Begin response here] 2|Page B. INSTRUCTIONAL STAFFING 1. In the table below enter the number of sections offered and the number of full time and adjunct faculty in your program/discipline by term over the past several years. Term No. of Active Sections Full-time Faculty Adjunct Faculty 2. What staffing factors/challenges have influenced the effectiveness of the program? [Begin response here] 3|Page C. CTE PROGRAMS – LABOR MARKET & ACHIEVEMENT Please complete this section if the program is Career Technical Education (CTE). Go to subsection D if the program is not CTE. 1. Describe the demonstrated effectiveness on the program over the past several years with levels and trends of achievement data, including degree/certificate completions (awards) and employment statistics. [Begin response here] 2. Describe the number of, activities of, and recommendations resulting from advisory committee meetings that have occurred over the past two years. What information and/or data were presented that required or currently require changes to be made to your program? (Please attach copies of meeting minutes over the past two years and a list of committee members and their respective industries/areas.) [Begin response here] 3. Does labor market data and/or the need for additional education indicate that changes should be made to your program? Does the program (continue to) meet a labor market demand and/or fulfill an important step toward higher/additional education? [Begin response here] 4|Page D. PROGRAM GOALS 1. List and describe program/disciplinary goals for the next comprehensive review cycle—Fall 2014 through Fall 2018. Be sure to highlight innovative, unique, or other especially noteworthy aspects. A new mission and vision is currently before the board for approval in February. In considering your program’s future goals, please review the proposed new mission and vision statements. VISION STATEMENT Hartnell College will be nationally recognized for the success of our students by developing leaders who will contribute to the social, cultural, and economic vitality of our region and the global community. MISSION STATEMENT Focusing on the needs of the Salinas Valley, Hartnell College provides educational opportunities for students to reach academic goals in an environment committed to student learning, achievement and success. [List and describe program goals here] 1) 2) 3) 4) 5) 5|Page II. ANNUAL REVIEW This section must be completed for ALL academic programs, including those scheduled for a comprehensive review in spring 2014. A. COURSE DATA & TRENDS 1. Please evaluate the 3-year trend of enrollment and success of courses in your program/discipline. Identify the courses you are choosing to examine this current year in the list below. You do NOT need to evaluate trends for each course every year. Course Number Course Name Does the course have any DE (online or hybrid) sections? Please use the data that have been provided. Analyze trends that you observe with respect to the data for the identified courses and answer the following questions. ENROLLMENT 2. Review the enrollment data. Describe and analyze any patterns or anomalies that you notice. What do you make of these patterns or anomalies? What actions should be taken to ensure continuous improvement? Enrollment in required major courses—THA-1, THA-3, THA-10 and THA-11—has been fairly consistent over the 3-year period. These courses are offered every semester, with the exception of THA-3 that was revised in Spring 2011 and offered in Fall 2011 and subsequent semesters. Enrollment in the other THA classes is not significant because these are students working on ensemble productions. SUCCESS 3. Review the success data. Describe and analyze any patterns or anomalies that you notice. What do you make of these patterns or anomalies? What actions should be taken to ensure continuous improvement? Success rates in THA-11 were significantly lower in Fall 2009 and Spring 2012 than success rates in the other required major courses—THA-1, THA-3, THA-10. It is anticipated that the review of student learning outcomes for this course might provide insight and offer potential solutions. This analysis would be facilitated by the hire of a full-time faculty member to coordinate the analysis of outcomes for theatre arts courses. Success rates in the other THA classes are not significant because these are students working on ensemble productions. Hartnell College has identified the need for a new full-time faculty member who will be assigned 60% to Theatre Arts and 40% to Communication Studies. Recruitment is in progress. 6|Page DEGREES AND CERTIFICATES 4. Describe the demonstrated effectiveness of the program over the past several years with levels and trends of achievement data, such as degree and certificate completions/awards. In 2011-12, three students completed the A.A. in Theatre Arts, and one student completed in 2012-2013. The Associate in Arts in Theatre Arts for Transfer (AA-T) degree was approved in March 2014, and is pending Chancellor’s Office approval. 7|Page B. TEACHING MODALITY 1. Enter the number of Distance Education Courses, both fully online and hybrid sections, along with the number of full-time and adjunct faculty. Term Fall 2013 Spring 2014 No. of DE/ Online Sections 0 0 No of Hybrid Sections 0 0 Fulltime Faculty 0 0 Adjunct Faculty 3.6 2.8 2. Compare student success in the DE teaching environment with success in the faceto-face teaching environment in the same course. Are there differences? To what do you ascribe the differences in your program? Discuss any other relevant factors regarding diverse teaching modalities and environments, such as specific locations. Not applicable. Theatre Arts courses are offered in traditional modalities. 3. Describe the process to change and improve student success in DE courses/sections in your program, and any other relevant factors regarding diverse teaching modalities and environments, such as specific locations. Not applicable. 8|Page C. CURRICULUM Complete the following tables pertaining to courses scheduled for review. Courses scheduled for review during AY 201314 as previously specified All THA courses Courses scheduled for review during AY 201415 THA-91B THA-91C THA-102 THA-122 THA-130B THA-130C THA-136 THA-172 THA-182 9|Page Faculty member(s) responsible for coordinating Jason Hough, Communication Studies Faculty member(s) responsible for coordinating TBD TBD TBD TBD TBD TBD TBD TBD TBD (a) Was the course reviewed and (b) taken through the curriculum process? All courses were reviewed; several were inactivated and others were revised. Date of approval (or anticipated approval) by Curriculum Committee Spring 2014 at several curriculum committee meetings Target semester and year—Fa 2014 or Sp 2015 Fall 2014 Fall 2014 Fall 2014 Fall 2014 Fall 2014 Fall 2014 Fall 2014 Fall 2014 Fall 2014 D. OUTCOMES Use your Program Outcome Maps to assist you in this subsection. As you plan your course assessments, keep the higher level program outcome in mind. While course level assessment serves the purpose of examining the teaching and learning for that particular course, it also provides the data that will be viewed collectively for assessment of the associated program level outcomes. PROGRAM LEVEL OUTCOMES 1. Please complete the following tables. List Program level outcome(s) scheduled for assessment as previously specified None What changes have occurred in the program/discipline as a result of dialogue? List Program level outcome(s) scheduled for assessment in AY 14-15 Have your course level SLOs needed for this program level outcome been assessed or scheduled for assessment? To be determined by new fulltime faculty member Was the Program Outcome Assessment Summary completed? 2. Describe how program level outcomes were specifically addressed by the program/discipline during the past year. For example, were data gathered at the course level? Was there review and analysis of the data? How did the discipline faculty engage in discussion? Were any interventions conducted? Are there any plans to make changes to certificate/degree programs or improvements in teaching and student learning? The Associate in Arts in Theatre Arts for Transfer (AA-T) was approved in Spring 2014 and will be offered for the first time in Fall 2014. 10 | P a g e CORE COMPETENCIES 3. Describe how Core Competencies were specifically addressed by the program/discipline during the past year. For example, were data gathered at the course level? Was there review and analysis of the data? How did the discipline faculty engage in discussion? Were any interventions conducted? Are there any plans to make changes to courses or improvements in teaching and student learning? Not applicable. COURSE LEVEL STUDENT LEARNING OUTCOMES 4. Please complete the following tables. List courses scheduled for SLO assessment as previously specified THA 1, 11,121,122,170, 176 THA 3, 1, 136, 180, 190, 91C In what term was the course assessed? Fall 2013 Fall 2013 List courses scheduled for SLO assessment in AY 2014-15 Faculty member(s) responsible for coordinating Was the Course Assessment Summary Report completed? Yes Yes Target semester and year—Fa 2014 or Sp 2015 5. Describe course level assessments results and how they will influence your plans moving forward. THA 1, 11,121,122,170, 176: Though the SLO Assessment Report did meet the expectations of the plans, it is desired that more direct assessment tools be implemented in the future. THA 3, 1, 136, 180, 190, 91C: Results of the assessments came out with an average result and we will continue to move forward in hope of achieving above average results. 6. Describe assessment activities that need to be strengthened or improved. What are the challenges to achieving these improvements? THA 1, 11,121,122,170, 176: To achieve a more direct assessment of SLO’s the most effective means may be to imbed the assessment tools in the course outline/syllabus. Challenges would be communicating the process to all THA faculty and implementing consistently; though the process is certainly quite achievable. 11 | P a g e THA 3, 1, 136, 180, 190, 91C: We need to reassess how students experience a theatrical event. Students find it hard to attend events and we must find alternatives to accommodate students or not require this activity as an assessment. 12 | P a g e E. PREVIOUSLY SCHEDULED ACTIVITIES This subsection focuses on activities that were previously scheduled. An activity can address many different aspects of your program/discipline, and ultimately is undertaken to improve or enhance your program/discipline, and keep it current. Will activity continue into AY 15-16?* Activity scheduled What success has been achieved to date on this activity? Will activity What challenges existed or continue continue into AY 14-15? to exist? 1. Hire full-time faculty to teach Theatre Arts and to manage the outcomes assessment for the new degree program. Recruitment is in progress. Position is only 60% Theatre Arts. 2. Plan for sound system upgrade. Needs assessment completed. No funding has been secured for this project. Tools and equipment have been purchased for the Scenery and Costume shops. Part-time faculty completed course level assessments in 2013-2014. Funding is tied to community support for the Western Stage. Yes Yes Funding is tied to community support for the Western Stage. Yes Yes 3. Support The Western Stage productions by providing facilities and equipment. 4. Discuss with parttime faculty retention and success data, and plan assessment activities in 20142015. The new full-time Yes Yes faculty member will require support while he or she progresses through the tenure review process. * For each activity that will continue into AY 2015-16 and that requires resources, submit a separate resource request in Section III. 1. Evaluate the success of each activity scheduled, including activities completed and those in progress. What measurable outcomes were achieved? Did the activities and subsequent dialogue lead to significant change in student learning or program success? Hartnell College is recruiting for a full-time faculty member in Theatre Arts and Communication Studies. The Western Stage has received grants in support of its operations from the following funders in the past five years: David and Lucile Packard foundation, Sally Hughes Church Foundation, S.T.A.R. Foundation, Community Foundation for Monterey County, National Endowment for the Arts. 13 | P a g e III. ANNUAL ACTION PLAN This section must be completed for ALL academic programs, whether scheduled for annual or comprehensive review in spring 2014. A. NEW ACTIVITIES This subsection addresses new activities for, and continuing new activities into, AY 2015-16. An activity can address many different aspects of your program/discipline, and ultimately is undertaken to improve, enhance, and or keep your program/discipline area current. A new activity may or may not require additional resources. Activities can include but are not limited to: • • • • • • • • • • NEW CURRICULUM FURTHER DEVELOPMENT OF THE PROGRAM OR SERVICE GRANT DEVELOPMENT AND PROPOSALS FACULTY AND STAFF TRAINING MARKETING/OUTREACH ENROLLMENT MANAGEMENT STUDENT SERVICES ADMINISTRATIVE SERVICES SUPPORT OPERATIONS FACILITIES 1. List information concerning new projects or activities planned. Please keep in mind that resources needed, if funded, would not be approved until spring 2015 and provided until FY 2015-16. Ongoing activities involving resources that will no longer be available from grant funds starting FY 2015-16 must be planned for appropriately. Activity 1. Discuss with part-time faculty retention and success data, and plan assessment activities in 20142015. 2. Develop a plan to increase student interest in Theatre Arts Strategic Plan Goal(s) No. & Letter (e.g., 5A)* 1A, 2A, 2B, 3A, 3B Related Courses, SLOs, PLOs, or goals Desired Outcome(s) Resources Needed Person Responsible PLO 4 THA-1 one SLO THA-3 one SLO Assessment data for one program outcome and two course outcomes Compensati on for parttime faculty to meet with fulltime faculty at least once each semester. Funding for student production, national conference & regional student conference To be determined Increased enrollments in academic courses & theatre activities Marnie Glazier * See Appendix A for a list of the 11 goals in the college’s Strategic Plan. 14 | P a g e Estimated Date of Completion (can be more than one year in length) Ongoing 3 years Comments *** Please complete this page for each new activity. *** 2. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. Consider: • Faculty • Other staffing • Facilities • Equipment (non-expendable, greater than $5,000), supplies (expendable, valued at less than $5,000), • Software • Hardware • Outside services • Training • Travel • Library materials • Science laboratory materials a) Describe the new activity or follow-on activity that this resource will support. Discuss with part-time faculty retention and success data, and plan assessment activities in 20142015. b) Describe how this activity supports any of the following: 1) Core Competency 2) Program level Outcome 3) Course level Outcome 4) Program/Discipline Goal 5) Strategic Priority Goal Program level and course level outcomes will be assessed and discussed with part-time faculty. c) Does this activity span multiple academic years? YES NO If yes, describe the action plan for completion of this activity. Yes, it is expected that continuous broad-based discussion about student success in theatre arts will result in many completions of the Associate in Arts in Theatre Arts for Transfer (AA-T). d) What measureable outcomes are expected from this activity? List indicators of success. The number of students awarded the AA-T in Theatre Arts will increase after it is offered for the first time in Fall 2014. e) What are the barriers to achieving success in this activity? The new full-time faculty member will require support of part-time faculty and the District as he or she proceeds through the tenure review process. 15 | P a g e *** Please complete this page for each new activity. *** 2. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. Consider: • Faculty • Other staffing • Facilities • Equipment (non-expendable, greater than $5,000), supplies (expendable, valued at less than $5,000), • Software • Hardware • Outside services • Training • Travel • Library materials • Science laboratory materials a) Describe the new activity or follow-on activity that this resource will support. Plan for Sound System upgrade. Renovation of Mainstage Theater sound system to support THA classes and productions as well as other campus events b) Describe how this activity supports any of the following: 6) Core Competency 7) Program level Outcome 8) Course level Outcome 9) Program/Discipline Goal 10) Strategic Priority Goal Strategic Priorites 4 Effective Utilization of Resources, Goal 4B, 4C and 4D c) Does this activity span multiple academic years? YES NO If yes, describe the action plan for completion of this activity. Some elements of the renovation may be accomplished as part of the larger remodeling of the facility. Hartnell Foundation/Theatre Arts Council may secure funds for some of this project. Should complete entire project over the next two years. d) What measureable outcomes are expected from this activity? List indicators of success. [Begin response here] e) What are the barriers to achieving success in this activity? Available funding 16 | P a g e *** Please complete this page for each new activity. *** 2. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. Consider: • Faculty • Other staffing • Facilities • Equipment (non-expendable, greater than $5,000), supplies (expendable, valued at less than $5,000), • Software • Hardware • Outside services • Training • Travel • Library materials • Science laboratory materials a) Describe the new activity or follow-on activity that this resource will support. Support The Western Stage productions by providing facilities and equipment. b) Describe how this activity supports any of the following: 11) Core Competency 12) Program level Outcome 13) Course level Outcome 14) Program/Discipline Goal 15) Strategic Priority Goal Strategic Priorites 4 Effective Utilization of Resources, Goal 4B, 4C and 4D c) Does this activity span multiple academic years? YES NO If yes, describe the action plan for completion of this activity. Purchase remaining equipment and tools for THA shops and performance spaces to support THA classes and productions. d) What measureable outcomes are expected from this activity? List indicators of success. [Begin response here] e) What are the barriers to achieving success in this activity? Available funding 17 | P a g e *** Please complete this page for each new activity. *** 2. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. Consider: • Faculty • Other staffing • Facilities • Equipment (non-expendable, greater than $5,000), supplies (expendable, valued at less than $5,000), • Software • Hardware • Outside services • Training • Travel • Library materials • Science laboratory materials a) Describe the new activity or follow-on activity that this resource will support. New full-time faculty member will attend national conference of theatre educators annually, support student attendance at regional conference. Student productions will be developed and presented each semester (fall and spring), which will require production rights, contracted production/artist assistance, and equipment/supplies. b) Describe how this activity supports any of the following: 16) Core Competency 17) Program level Outcome 18)Course level Outcome 19) Program/Discipline Goal 20) Strategic Priority Goal Strategic Priority Goals 1A, 2A, 2B, 3D, 4A c) Does this activity span multiple academic years? YES NO If yes, describe the action plan for completion of this activity. These will be annual costs to support the Theatre Arts program. d) What measureable outcomes are expected from this activity? List indicators of success. Student enrollments will increase, and more students will graduate with the AA-T in Theatre Arts. e) What are the barriers to achieving success in this activity? Funding 18 | P a g e B. RESOURCE REQUESTS If new/additional resources are needed for your program/discipline, it is important that you identify them and project their cost, and that these resources and costs be considered through the College’s integrated planning (governance, budget development, funding decision making, and resource allocation) processes. A resource is likely to be something needed to support an activity that you have identified in IIIA. above, in which case you must link the resource with a specific activity number (first column below). ). All resource requests completed in the various columns of a specific row must be linked to the new or continuing activity numbered on the first column of that same row. A resource could also be something necessary for your program/discipline to function properly to improve student learning, such as updated equipment in a classroom; in such case be sure to note that the resource is NOT tied to a specific activity. Activity No. 1. Meet with part-time faculty Personnel Classified Staff/ Faculty (C/F/M)* Supplies/ Equipment (S/E)** Technology Hardware/ Software (H/S)*** Contract Services Training Travel Library Materials Science Labs Yes, compensation for part-time faculty to attend at least one meeting per semester. Projected Costs $500 2.. Plan for See attached Proposal (Appendix B) 3. Support The Western Stage productions by providing facilities and equipment. See attached list of items (Appendix C) $11,500 4. Plan to develop Theatre Arts program $2000 $10,000 sound system upgrade. $4000 $4000 production assistance $2000 production rights * Personnel: Include a C, F, or M after the amount to indicate Classified Staff, Faculty, or Manager. ** S for Supplies, E for Equipment. If additional supplies, for example, are needed for ongoing activities, this should be requested through the budget rollover process. *** H for Hardware, S for Software. 19 | P a g e $175,000 APPENDIX A. Strategic Priorities & Goals (from Hartnell College Strategic Plan 2013-2018) Priority 1: Student Access Goal 1A: Hartnell College will provide higher education, workforce development, and lifelong learning opportunities—with seamless pathways—to all of the college’s present and prospective constituent individuals and groups. Priority 2: Student Success Goal 2A: Hartnell College will provide a supportive, innovative, and collaborative learning environment to help students pursue and achieve educational success. Goal 2B: Hartnell College will provide a supportive, innovative, and collaborative learning environment that addresses and meets the diverse learning needs of students. Priority 3: Employee Diversity and Development Goal 3A: Hartnell College is committed to 1) increasing diversity among its employees; 2) providing an environment that is safe for and inviting to diverse persons, groups, and communities; and 3) becoming a model institution of higher education whose respect for diversity is easily seen and is fully integrated throughout its policies, practices, facilities, signage, curricula, and other reflections of life at the college. Goal 3B: To attract and retain highly qualified employees, Hartnell College is committed to providing and supporting relevant, substantial professional development opportunities. Priority 4: Effective Utilization of Resources Goal 4A: To support its mission, Hartnell College is committed to the effective utilization of its human resources. Goal 4B: Hartnell College is committed to having its physical plant, furnishings, and grounds maintained and replaced in a planned and scheduled way to support learning, safety, security, and access. Goal 4C: Hartnell College will maintain a current, user-friendly technological infrastructure that serves the needs of students and employees. Goal 4D: Hartnell College is committed to maximizing the use and value of capital assets, managing financial resources, minimizing costs, and engaging in fiscally sound planning for future maintenance, space, and technology needs. Priority 5: 20 | P a g e Innovation and Relevance for Programs and Services Goal 5A: Hartnell College will provide programs and services that are relevant to the realworld needs of its diverse student population, while also developing and employing a culture of innovation that will lead to improved institutional effectiveness and student learning. Priority 6: Partnership with Industry, Business Agencies and Education Goal 6A: Hartnell College is committed to strengthening and furthering its current partnerships, in order to secure lasting, mutually beneficial relationships between the college and the community that the college serves. 21 | P a g e Appendix B. Preliminary Proposal for Sound System Upgrades For The Western Stage/Hartnell College Prepared by Jeff Mockus Proposed Target Budget: $200,000.00 Priorities: I. Commission a design for this upgrade that prepares the system for further upgrades. II. Hire an install contractor for all permanent wiring for these upgrades. III. Replace the Mixing Board and mix position desk. IV. Replace the Main Speaker System, add fill positions and stage specials. V. Add Permanent Multi-Channel wiring to Stage, Orchestral Pit and Amp Rack. VI. Upgrade the Intercom System to a 4-channel Base station. Add wireless for backstage. VII. Repair/Upgrade the Monitor System. VIII. Add 8 more channels of UHF Wireless microphones IX. Install a dedicated Intel-Based Mac for sound cue creation and playback. X. Hire an audio engineer to maintain all audio resources the theatre. I. Commission a Design: estimate $10,000 I cannot stress enough how much stress, load-in time, tech time, and money this will save you in years to come. Prevent this and future upgrades from being piecemeal additions. A $200,000 budget won’t cover all the priorities to completion, but you will have a plan of how to add them later under seasonal budgets. a. Specify equipment to be purchased under this budget. b. Recommend equipment to realize a planned upgrade path. c. Deliver line diagrams for signal flow, for purchased and planned additions d. Deliver CAD drawings of equipment placement and cable paths as necessary e. Deliver as-installed and planned upgrade drawings. II. Hire an install contractor: (gross) estimate $50,000 This item is difficult to quote specific budget numbers, as any contractor would have to look at the design and do a site survey to bid parts & labor properly, but as one of your biggest priorities for this theatre is permanently installed wiring, including new conduit runs, terminal boxes, etc., this is a necessity. III. Replace the Mixing Board and mix position desk: estimate $25,000 This is you’re #1 equipment need. I have a specific model mixer in mind: a 48 input Yamaha M7CL V3, with several of it’s upgrade options, such as a metering bridge and digital input cards, as well as software upgrades. This board, or one in it’s class, will remove the need for almost all of the outboard gear currently in the desk’s rack. The desk itself will have to be custom built as the current one was built and wired around the old mixing board. To review the features of this board, see http://www.yamahaproaudio.com/products/mixers/m7cl/index.html. IV. Replace Main Speaker System, add fill positions, stage specials Estimate: $80,000+ This is a far-reaching upgrade that will easily go beyond the scope of this budget. However, it can be done in stages, and this is why I have stressed the need for a comprehensive system be designed. You’re first purchase should be a modular line array center cluster of 6-10 individual speakers for vocal reinforcement, and my highest recommendation is Meyer systems’ “M’elodie” or “Mina” self-powered speakers. From my experience designing shows in this performance space, I estimate 8 speakers, in two 4-speaker arrays would provide adequate coverage. Preliminary retail pricing puts such a cluster at about $50k+. Meyer are top of the line, but they often work with educational institutions, providing vastly discounted prices. Next I would address front-fill positions, with 4-8 small speakers on one feed, such as Meyer MM4, along the apron, to provide vocal reinforcement to the center of the front rows, where the band is the loudest, and the main system cannot cover without feedback issues. Then, add balcony and under balcony fills. 6-8 speakers for each, each set on it’s own feed, and delayed to time-align with the main system. Finally, add stereo Line Arrays, with subwoofers to the main system, replacing the EV and JBL speakers currently there. These can all be used in the Studio Theatre or as stage specials as needed. V. Add Permanent Multi-Channel wiring to Stage, Orchestral Pit and Amp Rack. Estimate $20,000. This is higher a priority than completing the main speaker system, as long as wiring for future planned upgrades is put in place. At the very least I would run 24-channels of microphone inputs to stage left, 24 channels to stage right, and 24 channels to the orchestra pit, as well as increase the wiring from mix position to the amplifier rack to 24 lines. Replace the 24channel snake currently in the grid. All this will certainly require a patch-bay, likely in the booth. Add 4-8 more speaker runs from amp rack to stage perhaps 4-8 to strategic locations in the grid. It may seem I have redundant line items, as this could fall under the install contractor’s bid, but this is to ensure you have money set aside for the parts. The design will clarify the specific needs. VI. Upgrade the Intercom System to a 4-channel Base station. Add wireless for backstage. Estimate: $5,000 to $15,000 Clear communications in a tech environment are a matter of everyone’s safety, let alone make it far easier for multiple conversations to go on at once. Common uses of 4 channel Clear-Com are for separating Backstage, Lights, Sound, and Front-of-House, where the Stage Manger can listen and/or talk to any channel from the base station. A future upgrade would be to add a wireless com system to the backstage channel, so crew need not be tethered by cables. This makes for a safer backstage environment as well. VII. Repair/Upgrade the Monitor System. Estimate: $2,000+ Purchase a dedicated shotgun microphone, and a preamp/eq/compressor unit to feed the Monitor system. Replace the currently non-functional Monitor amp, repair the wiring to the band room that was damaged during the last building upgrade. VIII. Add 8 more channels of UHF Wireless microphones Estimate $8,000 - $10,000 This could easily be done as a future upgrade under a season budget. This would complete the 24-channel System we have been striving for. IX. Install a dedicated Intel-Based Mac, with software for sound cue creation and playback. Estimate: $3,000 - $5,000 I Highly, HIGHLY recommend you move to QLab v2 http://figure53.com/qlab for sound cues. I know getting authorized for computer purchases is difficult, so I wanted to include this to start the ball rolling, even if this purchase is a later seasonal expense. X. Hire an audio engineer to maintain all audio resources the theatre. Estimate: Ongoing $$$ OK, this does not fall under the expenses of this upgrade. However, in the 8 years I’ve been designing sound for shows at The Western Stage, you have not replaced the Engineer who installed the current system. What I have witnessed is a slow degradation of your inventory, simply due to lack of simple cleaning, organization, and basic maintenance. At the very least, once this new upgrade is in place, please hire someone seasonally to be the “Sound Master” Appendix C. Theatre Arts/Western Stage Shops equipment and tools Scene Shop tools Finishing machine $1600 Scroll Saw $500 ______________________________________________ Total $2100 Lighting and Rigging one man lift for Mainstage $7500 Costume Shop Equipment Sergers/Overlock machines 2@500 $1000 Dress Forms 3@300 $900 Total Grand Total $1900 $11,500