Program Planning and Assessment (PPA) for Academic Programs Comprehensive Review, Annual Review & Action Plan Spring 2014 The purpose of Program Planning and Assessment at Hartnell College is to obtain an honest and authentic view of a program and to assess its strengths, opportunities, needs, and connection to the mission and goals of the college. The process is based on the premise that each academic program reviews assessment data and uses these data to plan for improvement. The results of these annual cycles provide data for a periodic (every five years) comprehensive review that shows evidence of improvement and outlines long-range goals. The Program Planning and Assessment process will improve and increase the flow of information about student learning, student success and student behavior at Hartnell College. The result of the process will also improve institutional effectiveness. Program/ Discipline Kinesiology (Physical Education, Health Education, Athletics, and Family and Consumer Studies) Date Completed (must be in final form by 3/31/14)* Date Submitted to Dean *Please note that you should work with your colleagues and dean to ensure that this report is completed, revised as needed, in its final form and submitted no later than the end of March. List of Contributors, including Title/Position David Beymer – Instructor, Daniel Ortega – Instructor, Andy Watt – Instructor, Andy Vasher – Instructor, Larry Mankins – Instructor, Chris Zedpeda – Instructor, Melissa Stave – Instructor, Matt Collins – Instructor, Daniel Teresa – Athletic Director, Joanne Trevino – Program Assistant, Joanne Venegas – Administrative Assistant This PPA report is organized in 3 sections and 11 subsections as follows: I. II. III. Comprehensive Review – a. Overall Program Effectiveness, b. Instructional Staffing, c. CTE Programs – Labor Market & Achievement, and d. Program Goals. Annual Review – a. Course Data & Trends, b. Teaching Modality, c. Curriculum, d. Outcomes, and e. Previously Scheduled Activities. Annual Action Plan – a. New Activities and b. Resource Requests. INSTRUCTIONS è For programs/disciplines scheduled for comprehensive review in spring 2014, please complete Sections I, II, and III. è For programs/disciplines scheduled for annual review, please complete Sections II and III. I. COMPREHENSIVE REVIEW Please complete this section for programs/disciplines scheduled for comprehensive review in spring 2014. Go to Section II for programs/disciplines scheduled for annual review in spring 2014. A. OVERALL PROGRAM EFFECTIVENESS 1. Describe your program in terms of its overall effectiveness over the past several years. Please consider the questions below in describing your program/discipline/area. · · · · · · · · · · How are students/employees served by the program? What are the unique aspects of the program? How does the program relate to the needs of the community? How does the program interface/collaborate with other programs on campus?) What is working well in the program/discipline? If there is a sequence of courses in your program, what process or framework is used to ensure alignment? How is consistency maintained between/among multiple sections of a single course? Has the program explored alternative scheduling approaches? Do prerequisites, co-requisites and strongly recommended skills continue to meet program needs? Are there special considerations regarding capabilities of incoming students? What professional activities have faculty recently (last three years) participated in? [Begin response here] 2|P ag e B. INSTRUCTIONAL STAFFING 1. In the table below enter the number of sections offered and the number of full time and adjunct faculty in your program/discipline by term over the past several years. Term No. of Active Sections Full-time Faculty Adjunct Faculty 2. What staffing factors/challenges have influenced the effectiveness of the program? [Begin response here] 3|P ag e C. CTE PROGRAMS – LABOR MARKET & ACHIEVEMENT Please complete this section if the program is Career Technical Education (CTE). Go to subsection D if the program is not CTE. 1. Describe the demonstrated effectiveness on the program over the past several years with levels and trends of achievement data, including degree/certificate completions (awards) and employment statistics. [Begin response here] 2. Describe the number of, activities of, and recommendations resulting from advisory committee meetings that have occurred over the past two years. What information and/or data were presented that required or currently require changes to be made to your program? (Please attach copies of meeting minutes over the past two years and a list of committee members and their respective industries/areas.) [Begin response here] 3. Does labor market data and/or the need for additional education indicate that changes should be made to your program? Does the program (continue to) meet a labor market demand and/or fulfill an important step toward higher/additional education? [Begin response here] 4|P ag e D. PROGRAM GOALS 1. List and describe program/disciplinary goals for the next comprehensive review cycle—Fall 2014 through Fall 2018. Be sure to highlight innovative, unique, or other especially noteworthy aspects. A new mission and vision is currently under review before the board for approval in February. In considering your program’s future goals, please review the proposed new mission and vision statements. VISION STATEMENT Hartnell College will be nationally recognized for the success of our students by developing leaders who will contribute to the social, cultural, and economic vitality of our region and the global community. MISSION STATEMENT Focusing on the needs of the Salinas Valley, Hartnell College provides educational opportunities for students to reach academic goals in an environment committed to student learning, achievement and success. [List and describe program goals here] 1) 2) 3) 4) 5) 5|P ag e II. ANNUAL REVIEW This section must be completed for ALL academic programs, including those scheduled for a comprehensive review in spring 2014. A. COURSE DATA & TRENDS 1. Please evaluate the 3-year trend of enrollment and success of courses in your program/discipline. Identify the courses you are choosing to examine this current year in the list below. You do NOT need to evaluate trends for each course every year. Course Number FCS 23 HED 6 PEAC 53 PEAC 55 PEIN 17 PEIN 18 PEIN 26 PETH 1 PETH 4 Course Name Nutrition Multicultural Health Beliefs Track and Field Soccer Intercollegiate Basketball For Men Intercollegiate Basketball For Women Intercollegiate Baseball Introduction to Kinesiology Mental Skills for Sports Performance Does the course have any DE (online or hybrid) sections? No Yes No No No No No No No Please use the data that have been provided. Analyze trends that you observe with respect to the data for the identified courses and answer the following questions. ENROLLMENT 2. Review the enrollment data. Describe and analyze any patterns or anomalies that you notice. What do you make of these patterns or anomalies? What actions should be taken to ensure continuous improvement? The courses within our discipline tend to have very steady and consistent enrollment. We experienced a drop in enrollment for the 2012-13 school as a result of reduced section offerings. Two of our newer courses, PETH 1 and PETH 2 are showing an increased number of enrollments for each semester that they are offered, which is normal for new courses. The addition of our new C-ID in Kinesiology-Kinesiology transfer Model Curriculum, AS-T, was completed at the beginning of the spring, 2014 semester. The enthusiasm shown for this transfer model in Kinesiology is evident as shown by the strong enrollment this semester in PETH 1 and HED 55. The enrollment was so strong that there is discussion taking place to provide an additional section of PETH1 for the fall, 2014. The best way for us to continue to improve as educators is to identify how the methods of delivery are being received, so that through self-evaluation, we can better serve our students. SUCCESS 6|P ag e 3. Review the success data. Describe and analyze any patterns or anomalies that you notice. What do you make of these patterns or anomalies? What actions should be taken to ensure continuous improvement? Our courses are also very consistent in regards to student success. There are the “odd” semesters where the numbers are low, but overall we are consistently above average in this category. As a faculty, we need to continue to improve our teaching methodologies and continue to give our students the attention needed to keep them enrolled, engaged and attending. DEGREES AND CERTIFICATES 4. Describe the demonstrated effectiveness of the program over the past several years with levels and trends of achievement data, such as degree and certificate completions/awards. In terms of degrees and certificates, our disciplines have not graduated many (only 1 in the last 3 years) with a degree. This will change now that we have an AS-T degree in Kinesiology offering for our students. We have noticed the number of students with a declared Kinesiology major increase because of this option. Overall though, our students in athletics tend to graduate and transfer at a much higher rate than the average student, although it be through other degree offerings. The new degree and transfer agreements in Kinesiology will aid in transferring our students in a timely manner and, in addition, through a major they have a selected that is directly related to their career choice. 7|P ag e B. TEACHING MODALITY 1. Enter the number of Distance Education Courses, both fully online and hybrid sections, along with the number of full-time and adjunct faculty. Term Fall 2013 Spring 2013 Fall 2012 Spring 2012 Fall 2011 Spring 2011 No. of DE/ Online Sections 3 2 3 4 0 3 No of Hybrid Sections 0 0 0 0 0 0 Fulltime Faculty 1 0 0 0 0 0 Adjunct Faculty 2 2 2 2 0 2 2. Compare student success in the DE teaching environment with success in the faceto-face teaching environment in the same course. Are there differences? To what do you ascribe the differences in your program? Discuss any other relevant factors regarding diverse teaching modalities and environments, such as specific locations. Overall, the success rate in our DE courses is significantly lower than in our face-to-face courses. Looking at the data that we were provided, this seems to be normal. In our case we are doing the same or better than the rest of the college and as the state norms. The only consistent thing with our DE courses was that they were predominantly taught by adjuncts (only 1 section was not taught by an adjunct). Our hope is that the new adjunct evaluation process will help improve the courses which should, in turn, improve success. 3. Describe the process to change and improve student success in DE courses/sections in your program, and any other relevant factors regarding diverse teaching modalities and environments, such as specific locations. As a discipline we have recently completed the evaluation process with our adjunct instructors. This will help our department because there will be consistency between the DE and face-to-face instruction in our courses. Also, during the evaluations we were able to identify and point out to the instructors some gaps in their presentation of the material in terms of teaching methodology. A simple example, on occasion we noticed that a couple of the instructors were not responding to student comments (showing a chance in identified items). By utilizing the feedback properly, there will be a more active learning environment which should keep the students engages. 8|P ag e C. CURRICULUM Complete the following tables pertaining to courses scheduled for review. Courses scheduled for review during AY 201314 as previously specified Faculty member(s) responsible for coordinating (a) Was the course reviewed and (b) taken through the curriculum process? Date of approval (or anticipated approval) by Curriculum Committee HED 55 PETH 2 HED 6 David Beymer David Beymer David Beymer, Andy Vasher and Chris Zepeda Watt Watt Vasher Vasher Collins Ortega Zepeda Beymer, Ortega Ortega All Yes, Yes No, No No, No 11-07-2013 Yes, Yes Yes, Yes Yes, Yes Yes, Yes Yes, Yes Yes, Yes Yes, Yes Yes, Yes Yes, Yes Yes, Yes – Deleted/Inactive 11-21-2013 11-21-2013 11-21-2013 11-21-2013 11-21-2013 11-21-2013 11-21-2013 02-06-2014 03-06-2014 10-03-2013 03-20-2014 PEAC 60 PEAC 65 PEAC 72 PEIN 17 PEIN 19 PEIN 22 PEIN 23 PEAC 56 PEAC 68 33 courses Courses scheduled for review during AY 201415 PEAC 32 PEAC 42 PEAC 43 PEAC 44 PEAC 46 PEAC 47 PEAC 49 PEAC 50 PEAC 66 PEAC 67 PEAC 68 PEAC 69 9|P ag e Faculty member(s) responsible for coordinating All All All All All All All All All All All All Target semester and year—Fa 2014 or Sp 2015 FA 2014 FA 2014 FA 2014 FA 2014 FA 2014 FA 2014 FA 2014 FA 2014 FA 2014 FA 2014 FA 2014 FA 2014 D. OUTCOMES Use your Program Outcome Maps to assist you in this subsection. As you plan your course assessments, keep the higher level program outcome in mind. While course level assessment serves the purpose of examining the teaching and learning for that particular course, it also provides the data that will be viewed collectively for assessment of the associated program level outcomes. PROGRAM LEVEL OUTCOMES 1. Please complete the following tables. List Program level outcome(s) scheduled for assessment as previously specified Kinesiology outcome #1 What changes have occurred in the program/discipline as a result of dialogue? We have determined that we need to try to find: 1. A “common thread” that may exist in all of the sports that were assessed (or) 2. Assess different skills on a rotating basis that are similar skills needed for each sport. List Program level outcome(s) scheduled for assessment in AY 14-15 Have your course level SLOs needed for this program level outcome been assessed or scheduled for assessment? Yes (Fall 2013) Kinesiology outcome #2 Was the Program Outcome Assessment Summary completed? Yes 2. Describe how program level outcomes were specifically addressed by the program/discipline during the past year. For example, were data gathered at the course level? Was there review and analysis of the data? How did the discipline faculty engage in discussion? Were any interventions conducted? Are there any plans to make changes to certificate/degree programs or improvements in teaching and student learning? For the assessment, we used data from the course SLO assessments. As a group, we looked at the data from each of the sports that were assessed in Fall 2013 during a department meeting. 10 | P a g e At first we discussed trying to find a common thread among the courses (PEIC or intercollegiate sports courses). This could be done (and we may adopt this method in the future), but there was concern because each sport requires a unique set of physical skills that would skew a common test (a football lineman vs. a distance runner doing a strength test or an endurance test). The instructors (coaches) were intrigued by their results and the most common comment was that the test for each sport needs to be rotated to get a better feel for what is happening. The biggest problem we ran into was that not every sport set up their test so that the results were similar. The next time we assess these SLO’s we will need to have a meeting so that everyone is on the same page. 11 | P a g e CORE COMPETENCIES 3. Describe how Core Competencies were specifically addressed by the program/discipline during the past year. For example, were data gathered at the course level? Was there review and analysis of the data? How did the discipline faculty engage in discussion? Were any interventions conducted? Are there any plans to make changes to courses or improvements in teaching and student learning? Over the past year our division only addressed core competencies in terms of looking at which competency was addressed in each course. Each course was discussed and the discussion also included the mapping to our PLO’s. There was no data gathered at the course level and no interventions were conducted. With the awareness of the Core Competencies, some instructors will consider them when making changes to their courses. COURSE LEVEL STUDENT LEARNING OUTCOMES 4. Please complete the following tables. List courses scheduled for SLO assessment as previously specified HED 2 #1 HED 6 #2 HED 6 #1 HED 8 #1 HED 55 #1, #2, #3 PEAD 84 #1, #2, #3 HED 6#1 HED 8#1 PEAC32 #1 PEAC 33 #1 PEAC 34 #1 PEAC 36 #1 PEAC 40 #1 PEAC 42 #1 PEAC 43 #1 PEAC 44 #1 PEAC 46 #1 PEAC 49 #1 PEAC 50 #1, #2 PEAC 51 #1 PEAC 52 #1 PEAC 55 #1 PEAC 56 #1 #2 PEAC 58 #1 PEAC 59 #1 #2 PEAC 60 #1 #2 PEAC 61 #1 #2 PEAC 62#1 PEAC 63 #1 12 | P a g e In what term was the course assessed? F 13 F13 Sp14 F13 F13 F13 SP14 Sp14 Sp14 F13 Sp14 F13 Sp14 F13 F13 F13 F13 F13 F13 Sp14 Sp14 Sp14 F13 F13 F13 F13 F13 F13 F13 Was the Course Assessment Summary Report completed? Yes Yes In Progress Yes Yes Yes (#3 in progress) In Progress In Progress In Progress Yes In Progress Yes In Progress Yes Yes Yes Yes Yes Yes In Progress In Progress In Progress Yes Yes Yes Yes Yes Yes Yes PEAC 64 #1 PEAC 65 #1 PEAC 66 #1 PEAC 67 #1 PEAC 68 #1 PEAC 70 #1 PEAC 72 #1 PEAC 73 #1 PEAC 74 #1 PEIN 17 #1 #2 PEIN 19 #1 #2 PEIN 20 #1 #2 PEIN 21 #1 #2 PEIN 22 #1 #2 PEIN 23 #1 #2 PEIN 24 #1 #2 PEIN 25 #1 PEIN 26 #1 #2 PETH 1 #1 PETH 10A #1 #2 PETH 10B #1 #2 PETH 10C #1 #2 PETH 10D #1 #2 PETH 2 #1 #2 #3 PETH 4 #1 Su14 Su14 F13 F13 F13 SP14 Sp14 F13 Sp14 F13 F13 F13 Sp14 F13 F13 Sp14 F13 Sp14 Sp14 F13 F13 F13 F13 F13 Sp14 List courses scheduled for SLO assessment in AY 2014-15 HED 2 #1 HED 6 #2 HED 7 #1 PEAC 58 #1 PEAC 59 #2 PEAC 60 #2 PEAC 27 #2 PEAC 29 #2 PEAC52 #2 PEAC 55 #2 PEAC 61 #1 PEAC 62 #1 PEAC 64 #2 PEAC 72 #2 PEAC 74 #2 PETH 1 #2 PETH 2 #1 PETH 4 #2 Faculty member(s) responsible for coordinating Watt, Ortega Vasher Castro UK UK UK UK Ortega Pedroza Ortega Toney Toney Watt Vasher Pedroza Ortega Beymer Collins No No Yes Yes Yes In Progress In Progress Yes In Progress Yes Yes Yes In Progress Yes Yes In Progress Yes In Progress In Progress Yes Yes Yes Yes Yes In Progress Target semester and year—Fa 2014 or Sp 2015 Sp 15 Sp15 Sp15 F14 F14 F14 Su15 Su15 Sp15 Sp15 F14 F14 Su15 Sp15 Sp15 Sp15 F14 Sp15 5. Describe course level assessments results and how they will influence your plans moving forward. 13 | P a g e Overall, we felt that our results were very good. We did find some specific topics within our theory courses that need some work. There was a general understanding after the process that we need to focus more on the SLO’s when teaching. We also found out that some of our SLO’s are very hard to assess and need to be re-written. In the courses with multiple sections, there also needs to be more collaboration to ensure that students are getting the same information. 6. Describe assessment activities that need to be strengthened or improved. What are the challenges to achieving these improvements? We need to have earlier collaboration between instructors for the multiple section courses. The meetings that we had assessing the SLO’s during Fall 2013, started the conversations for future semesters. Because of the nature of a large part of our discipline (PE and Athletics), we are used to constantly assessing our students, but not in a formal manor. For the future, we need to treat assessment, especially SLO assessment, as a part of our teaching protocol just like grading. 14 | P a g e E. PREVIOUSLY SCHEDULED ACTIVITIES This subsection focuses on activities that were previously scheduled. An activity can address many different aspects of your program/discipline, and ultimately is undertaken to improve or enhance your program/discipline, and keep it current. Activity scheduled What success has been achieved to date on this activity? What challenges existed or continue to exist? 1. Change department name formally to Kinesiology We have completed our AS-T in Kinesiology and are in the process of changing our courses from PE to KIN None yet because it will be part of the big curriculum revision that will incorporate the necessary changes to include seminars to our fitness classes in the weight room. None to date. We do have a temporary assignment for our part-time eligibility/admin assistant/technician for 40 hour /week, but this is only temporary. This support has been very helpful to our department, we need it to continue on a full-time basis. The project is finished except for some minor equipment/supply needs. The project is finished. The time and work factor in changing all of our sections within curriculum. 2. Incorporate Seminars back into the fitness center courses 3. Increase staffing around the department 4. Completion of the Field House (P building) 5. Athletic Weight Room 6. Athletic Hall of Fame 15 | P a g e We inducted our first class during the Fall 2013. Will activity continue into AY 1415? Yes Will activity continue into AY 15-16?* We need to change our PE designators to KIN. Staffing hours are subject to change based on future fitness center structure. Yes No Funding. We will not know if any of our positions will be funded for a couple months or more. We still need a fulltime administrative assistant/technician/eligibility employee for the Kinesiology Dept. Yes Yes Funding No No Ventilation and increased height in the ceiling in specified locations to facilitate lifts. We need to establish a permanent “wall site” to honor and display those enshrined. No No Yes Yes (Ongoing but will be selfsustaining) No 7. Update F 136 8. Equipment for athletics (individual sports) 9. Create study hall room for athletes 10. Improve staffing and services in Athletic Training Room 11. Improve all athletic facilities 12. Expand Fitness Center 13. Improve locker room for male staff 14. Equipment for fitness center 15. Equipment for 16 | P a g e The project is completed We have been able to do some small projects over the past year and will not know if others will get funded for another couple of months. Capital outlay disbursements have not been determined for the 2014-15 budget. We requested necessary computers but capital outlay disbursements have not been determined for the 2014-15 budget. We requested an additional position and supplies, but the additional position requested and capital outlay disbursements have not been determined for the 2014-15 budget. Capital outlay disbursements have not been determined for the 2014-15 budget. We would like to expand the fitness center into the hallway to create more room. This priority is low on our requests list, but eventually it needs to be done. Capital outlay disbursements have not been determined for the 2014-15 budget. We need new manikins for HED None No No Funding Yes Yes (continuous) funding Yes Maybe Funding Yes Yes (Continuous) Funding Yes Yes (Continuous) Funding priority was designated toward completing the new athletic weight facility. Yes Yes Funding (long term) Yes Yes Funding Yes Yes (Continuous) Funding Yes Maybe Health Classes 55. Capital outlay disbursements have not been determined for the 2014-15 budget. 16. Special fitness Funding Yes Maybe Equipment for machines are Adaptive PE needed. Capital Students outlay disbursements have not been determined for the 2014-15 budget. * For each activity that will continue into AY 2015-16 and that requires resources, submit a separate resource request in Section III. 1. Evaluate the success of each activity scheduled, including activities completed and those in progress. What measurable outcomes were achieved? Did the activities and subsequent dialogue lead to significant change in student learning or program success? For each of the projects that were completed, we can honestly say that they are very successful. The new weight room for the student athletes has significantly increased the opportunity for them to continue developing their fitness without competing with the public for access to the free weights. The new weight room has also solved the overcrowding in the main fitness center, which helps with retention and provides a safer environment. The completion of Building P (Field House) has resolved the issue of classroom availability and space for the department. The measurable results were evident by the success of our athletic programs. Success that was due to the availability of theses meeting spaces. Better equipment, adequate space and the fact that we are centrally located makes it a smoother transition to the practice fields. The Athletic Hall of Fame was also a rousing success. The initial ceremony was very well attended, publicized, and sustaining with continued planning ongoing for future events. We still need to create a “space” to honor the enshrined. The completion of the update to F 136 has provided us with more functional overall class room space and this has helped the instructors improve the quality of their instructional methods, which has led to improved student learning. Physical Education faculty is in the process of updating curriculum and creating new, supportive curriculum for our recently approved transfer degree. The addition of seminars for students enrolled in our fitness center is being completed as well as the fitness center curriculum. In addition, we are in the discussions with the Vice President of Instruction and Director of Athletics regarding the restructuring of classes in the fitness center. Adaptive Physical Education, PEAD-84 needs to prepare for the changes in the Medicare coverage. In the past, patients recovering from a heart attack or heart surgery were referred from SVMH in order to participate in the Adaptive PE program. The data presently shows a tremendous increase in patients suffering from heart-failure. The added benefit of supervised, structured exercise programs, with the additional educational component providing this support, not only improves and prolongs patient’s lives but reduces hospital admissions and readmissions. Therefore, we are expecting an increase in referrals from SVMH. This is where Hartnell Adaptive PE program becomes important to the process. At the end of that intensive program in a hospital rehab clinic, they want to transition the patient to us to become students in the Adaptive program, to continue their fitness program. This is the ideal setting for those 17 | P a g e students and since we are already the preferred referral of Salinas Valley Memorial Hospital Cardiac Rehab Program, continuing in their fitness development is important. Knowing this, we need to be flexible when including the community. The structure that is in place for our students presently allows those students sent on referral to be serviced at the beginning of the semester, but since the program at the hospital could finish in the middle of our 6th week of classes, it would be advantageous to be able to bring students in during the semester. This could be accomplished in a number of ways. One way, would be the change of classes to be short weeks like a compressed calendar, (fast track) and variable units. The program could service more students from the community and provide the Salinas Valley with a teachable moment presented by the Kinesiology’s adaptive program. Goal 1A and 6A, supports this addition. III. ANNUAL ACTION PLAN This section must be completed for ALL academic programs, whether scheduled for annual or comprehensive review in spring 2014. A. NEW ACTIVITIES This subsection addresses new activities for, and continuing new activities into, AY 2015-16. An activity can address many different aspects of your program/discipline, and ultimately is undertaken to improve, enhance, and or keep your program/discipline area current. A new activity may or may not require additional resources. Activities can include but are not limited to: 18 | P a g e · · · · · · · · · · NEW CURRICULUM FURTHER DEVELOPMENT OF THE PROGRAM OR SERVICE GRANT DEVELOPMENT AND PROPOSALS FACULTY AND STAFF TRAINING MARKETING/OUTREACH ENROLLMENT MANAGEMENT STUDENT SERVICES ADMINISTRATIVE SERVICES SUPPORT OPERATIONS FACILITIES 1. List information concerning new projects or activities planned. Please keep in mind that resources needed, if funded, would not be approved until spring 2015 and provided until FY 2015-16. Ongoing activities involving resources that will no longer be available from grant funds starting FY 2015-16 must be planned for appropriately. Activity New Golf Facility Strategic Plan Goal(s) No. & Letter (e.g., 5A)* 1A, 5A Related Courses, SLOs, PLOs, or goals Desired Outcome(s) Resources Needed Person Responsible PLO 1 Location where we can teach golf classes (all aspects of game) on campus without damaging other resources New Facility Dan Theresa, Andy Watt * See Appendix A for a list of the 11 goals in the college’s Strategic Plan. 19 | P a g e Estimated Date of Completion (can be more than one year in length) Fall 2016 Comments *** Please complete this page for each new activity. *** 2. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. Consider: · Faculty · Other staffing · Facilities · Equipment (non-expendable, greater than $5,000), supplies (expendable, valued at less than $5,000), · Software · Hardware · Outside services · Training · Travel · Library materials · Science laboratory materials a) Describe the new activity or follow-on activity that this resource will support. We currently are having a hard time teaching golf because of space. A new facility would allow us to teach all aspects of the game in an enclosed area that wouldn’t damage current grass areas. b) Describe how this activity supports any of the following: 1) Core Competency 2) Program level Outcome 3) Course level Outcome 4) Program/Discipline Goal 5) Strategic Priority Goal The primary factor feeding this is our first PLO which has to do with demonstrating skill related behaviors. With a new golf facility, we will be able to teach all the skills associated with golf. This request also fits under Strategic Priority 1A in that it would provide a lifelong learning opportunity for our students to master the game. c) d) Does this activity span multiple academic years? YES If yes, describe the action plan for completion of this activity. First of all, we need to determine a location for this facility (one has tentatively been determined on our facilities plan for the athletic fields, will it still work?). Secondly, we still need to determine the exact designed layout for the space provided. Finally, we will need the funding to complete the project. e) What measureable outcomes are expected from this activity? List indicators of success. The primary outcome would be an increased number of students enrolled in golf classes. This would be followed by better numbers in our SLO assessments of the golf classes. f) What are the barriers to achieving success in this activity? Space availability and funding. 20 | P a g e 21 | P a g e B. RESOURCE REQUESTS If new/additional resources are needed for your program/discipline, it is important that you identify them and project their cost, and that these resources and costs be considered through the College’s integrated planning (governance, budget development, funding decision making, and resource allocation) processes. A resource is likely to be something needed to support an activity that you have identified in IIIA. above, in which case you must link the resource with a specific activity number (first column below). ). All resource requests completed in the various columns of a specific row must be linked to the new or continuing activity numbered on the first column of that same row. A resource could also be something necessary for your program/discipline to function properly to improve student learning, such as updated equipment in a classroom; in such case be sure to note that the resource is NOT tied to a specific activity. Activity No. 1. Increase Staffing in Division Personnel Classified Staff/ Faculty (C/F/M)* Increase hours on 2 C, 2 new C, 1 new F $250.000 Supplies/ Equipment (S/E)** Technology Hardware/ Software (H/S)*** Enclosed Driving Range, etc. $250,000 3. Study Hall for Athletes 5. Fitness Center and classes 6. Men’s Staff Locker Room 7. Health Education Equipment 8. Adaptive PE Equipment 22 | P a g e Training Travel Library Materials Science Labs Projected Costs $250,000 2. Golf Facility 4. Athletic Training Room Contract Services H – 10 laptops and printer $250,000 $10,000 $10,000 1 new C $90,000 S, E (Tables, carts, ice machine, whirlpool jets) $21,000 E (machines, nets, pads, shelters) $20,000 Equipment Repair $111,500 $500 Expand into hallway $200,000 Expand or Move $220,000 $50,000 $50,000 E (New Manikins, posters) $2,300 E (Eccentron, Step, bike, pool lift) S (cuffs, posters) $20,000 $2,300 $20,000 9. Football 10. Soccer 11. Cross Country and Track 12. Basketball 13. Baseball 14. Softball 15. Volleyball E (tower, helmets, pumpers) $17,000 E (nets, camera, shelters, fence topper, balls) $22,000 E (Steeple, shed) $11,000 E (scoreboards) $15,000 E (cage, fence topper) $10,000 E (cage repair, fence topper) $5,000 E (nets, poles) $5,000 16. Outside Facilities 17. Uniforms Turf on Practice Field $1,000,000 $22,000 $11,000 $15,000 $10,000 $5,000 Sand Court $25,000 $30,000 Lights for Soccer, Baseball and Softball $500,000 $500,000 Uniforms for athletic teams (rotating) $30,000 * Personnel: Include a C, F, or M after the amount to indicate Classified Staff, Faculty, or Manager. ** S for Supplies, E for Equipment. If additional supplies, for example, are needed for ongoing activities, this should be requested through the budget rollover process. *** H for Hardware, S for Software. 23 | P a g e $1,017,000 $30,000 3. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. a) Describe the new activity or follow-on activity that this resource will support. Increase the length of the contract for the Equipment Manager from 10 months to 11 months. b) Describe how this activity supports any of the following: 6) Core Competency 7) Program level Outcome 8) Course level Outcome 9) Program/Discipline Goal 10) Strategic Priority Goal This activity would address the athletic program goal of having all teams be successful through extended services into the summer. With all teams now having a “non-traditional” season, there will more need for equipment and laundry services during the summer. This activity would also address Strategic Priorities 4A, because it would show better utilization of an employee. Additionally, the extended time would better serve the student athletes needs during a time that it’s usually not available. With the addition of a “non-traditional season” there is an increased need for this position. Finally, this activity would address the second Value Statement of “Academic and Service Excellence.” This activity would provide a needed service to students during a time when it is usually not available. c) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. d) What measureable outcomes are expected from this activity? List indicators of success. First would be the extension of the current employee’s contract. Secondly, it would be the availability of services for the athletes/teams prior to the start of their regular seasons. e) What are the barriers to achieving success in this activity? The only barrier to the completion of this request is the additional funding needed to extend the contract. 24 | P a g e 4. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. f) Describe the new activity or follow-on activity that this resource will support. Increase the hours of the departments’ administrative assistant from 30 hours per week to 40 hours per week as a full-time position. g) Describe how this activity supports any of the following: 11) Core Competency 12) Program level Outcome 13) Course level Outcome 14) Program/Discipline Goal 15) Strategic Priority Goal This activity would address Strategic Priority 4A in that it would be a better utilization of a human resource. Currently, our lead person (who is 40 hours a week) is spending over half of her time performing duties for the office of instruction. This has placed an increased work load on our second person who only works 30 hours a week. This activity would also address the second Value Statement of “Academic and Service Excellence.” This activity would provide a needed service to students, staff and the public, during times when it is usually not available. h) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. i) What measureable outcomes are expected from this activity? List indicators of success. First, the extension of the current employee’s contract. Second, an extension of hours that the Kinesiology/Athletics office would be open. j) What are the barriers to achieving success in this activity? The only barrier to doing this activity is funding. 25 | P a g e 5. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. k) Describe the new activity or follow-on activity that this resource will support. This activity would be to hire a new position for the division. This person would spend about half their time as a “sports information director” and the other half maintaining the web site for the athletic department. l) Describe how this activity supports any of the following: 16) Core Competency 17) Program level Outcome 18)Course level Outcome 19) Program/Discipline Goal 20) Strategic Priority Goal This position has been a desire for the athletic department for a long time. It would meet Strategic Priority 5A in that it would be an innovative way to increase the visibility of the athletic department and also greatly assist in the recruitment of students. This activity would also address the Mission Statement because it would create an environment that would publicize our students’ achievement and success. Finally, it would address the “students first” and the “academic and service excellence” value statements because it would provide a service to the students that would assist them in furthering their schooling; advertising their successes, publicizing our degree transfer program and also showcasing our outstanding student athletes and their athletic/academic accomplishments. This would increase their opportunities for scholarships and transfer opportunities. m) Does this activity span multiple academic years? describe the action plan for completion of this activity. YES If yes, This is a long term goal for the division. n) What measureable outcomes are expected from this activity? List indicators of success. First, the position needs to be hired. Secondly, success would be measured by increased publicity of the athletic department in the local media. Finally, a new and constantly maintained web site would be another measure of success. o) What are the barriers to achieving success in this activity? Funding is the only barrier for this activity. 26 | P a g e 6. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. p) Describe the new activity or follow-on activity that this resource will support. This activity would be to hire a new position for the division. This person would part-time and would act as a fund raiser (advancement/development) for athletics. q) Describe how this activity supports any of the following: 21) Core Competency 22) Program level Outcome 23) Course level Outcome 24) Program/Discipline Goal 25) Strategic Priority Goal This position would address the program goal of maintaining our facilities by creating new funding sources/resources that could relive the general fund. This position would also support numerous Strategic Priorities: Student Access and Success (we would be able to better support the students which would lead to more success), Effective Utilization of Resources (able to maintain and improve them) and Partnership with Industry, Business Agencies and Education (we would have someone who could develop and execute a plan to create partnerships that will help fund the department for years to come). The Mission and Vision Statements (Students First, Academic and Service Excellence, Partnerships and Stewardship of Resources) would be addressed for the same reasons. r) Does this activity span multiple academic years? describe the action plan for completion of this activity. YES If yes, After the position is approved, we would have to announce the position and go through the hiring process. s) What measureable outcomes are expected from this activity? List indicators of success. First, the position needs to be hired. Secondly, success would be measured an increase in partnerships within the community and an increase in our holding accounts. t) What are the barriers to achieving success in this activity? Funding is the only barrier for this activity. 27 | P a g e 7. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. u) Describe the new activity or follow-on activity that this resource will support. It has been the goal of the division to add another full-time faculty position for a long time. The person would need to teach either Kinesiology or Health Education and act as a coach in the athletic department. v) Describe how this activity supports any of the following: 26) Core Competency 27)Program level Outcome 28) Course level Outcome 29) Program/Discipline Goal 30) Strategic Priority Goal This position would address all of the Program Level Outcomes for the division because it would allow us to develop and teach more courses. This would also lead to addressing the core competency “personal growth and responsibility.” This position could also address most of the strategic priorities so that we could increase student access and success. It could help with employee diversity and development, and it could lead to a better developed and progressively innovative program. The new position would address the mission statement by creating an environment that would lead to student achievement and success. Finally, it would address the value statements by putting the needs of students first, improving our services to excellent, and providing opportunity for leadership and empowerment. These are all bi-products of having a full time coach available for our athletic department. w) Does this activity span multiple academic years? Maybe If yes, describe the action plan for completion of this activity. This is a long term goal of the division. x) What measureable outcomes are expected from this activity? List indicators of success. First, the hiring of the position. Secondly, stability to recruiting, scheduling and consistency of our curriculum offerings. Thirdly, a more balance Title 9 report. As a result, there would be more students transferring from our division. y) What are the barriers to achieving success in this activity? Funding of the position is the only barrier. 28 | P a g e 8. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. z) Describe the new activity or follow-on activity that this resource will support. We would like a golf teaching facility with a driving range. This project was part of our master plan for the fields. aa) Describe how this activity supports any of the following: 31) Core Competency 32) Program level Outcome 33) Course level Outcome 34) Program/Discipline Goal 35) Strategic Priority Goal This project does address the core competency regarding Personal Growth and Responsibility because golf is an activity that promotes physical and mental well-being. The project also addresses our first PLO, regarding skill related behaviors. The project would also address the course level outcomes for all of our golf classes. It also would create a better teaching environment because we could teach the classes on campus instead of traveling to the local golf courses for a driving range. This project is part of our field master plan and is the last phase. The Strategic Priorities that are addressed are Student Access (lifelong learning), Student Success (learning environment), Effective Utilization of Resources (area not being used now), and Innovation and Relevance for Programs and Services (following through on our plan). Finally, the project will address the Mission Statement (environment for student learning) and the Value Statement Students First (another learning opportunity for our students) and Academic and Service Excellence (developing personal competence). bb) Does this activity span multiple academic years? YES cc) If yes, describe the action plan for completion of this activity. Initially, the project needs to be reviewed by the facilities committees on campus to make sure the space is adequate for what we need. Then we would need to finalize a design. Finally we would have to get the funding to start the building process. dd) What measureable outcomes are expected from this activity? List indicators of success. First of all, we need to complete the project. Secondly would be the teaching of classes at the facility. Finally, needing more classes would indicate the success of the project. ee) What are the barriers to achieving success in this activity? The biggest barriers to the projects will be finding the exact location and funding. 29 | P a g e 9. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. ff) Describe the new activity or follow-on activity that this resource will support. We would like to establish a study hall room for our athletes. The main item that we need is a computer cart with at least 10 lap-top computers for the students to use. gg) Describe how this activity supports any of the following: 36) Core Competency 37)Program level Outcome 38) Course level Outcome 39) Program/Discipline Goal 40) Strategic Priority Goal This project has the potential to address all the Core Competencies because it would allow some of our athletes who do not have computers at home access to them in order to study in a controlled environment. The same rationale could be used for our PLO’s (2-5). This project has also been identified as a goal for our division. This project would also address at least 4 of the Strategic Priorities: Student Access, Student Success, Effective Utilization of Resources, and Innovation and Relevance for Programs and Services. By creating a new learning environment for our special group of students, we would also address the college’s Mission Statement, Vision Statement, and numerous Value Statements (Students First, Academic and Service Excellence, Innovation and Stewardship of Resources). hh) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] ii) What measureable outcomes are expected from this activity? List indicators of success. The first outcome would be setting times for the students to use the space with computers. The overall goal and biggest outcome would be our students earning better grades because of the activity (which would also lead to a better transfer rate). jj) What are the barriers to achieving success in this activity? Funding needed to purchase the computers. 30 | P a g e 10. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. kk) Describe the new activity or follow-on activity that this resource will support. We need to hire a classified athletic trainer to support the athletic department. The current athletic trainer (who is faculty) cannot cover the all the activities (which are expanding) in the athletic department and keep the athletic training room open. Also, a second person would allow rehabilitation of injuries to occur through the department. ll) Describe how this activity supports any of the following: 41) Core Competency 42) Program level Outcome 43) Course level Outcome 44) Program/Discipline Goal 45) Strategic Priority Goal This position has been a priority for our department for a long time. It does address most of the Strategic Priorities: Student Access (training room not always open), Student Success (injured athletes cannot participate), Employee Diversity and Development, Effective Utilization of Resources (safety), and Innovation and Relevance for Programs and Services (we cannot currently service the sports that are in their “non-traditional season”). mm) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] nn) What measureable outcomes are expected from this activity? List indicators of success. This position would allow for expanded hours in the athletic training room, an increase in rehabilitation services, and the ability to treat all athletes. oo) What are the barriers to achieving success in this activity? Funding needed for the position. 31 | P a g e 11. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. pp) Describe the new activity or follow-on activity that this resource will support. This project is to finish stocking the new athletic training room (P building) with 2 new tables. They are needed to be able to treat and tape athletes at the facility (currently only 1 table). qq) Describe how this activity supports any of the following: 46) Core Competency 47) Program level Outcome 48) Course level Outcome 49) Program/Discipline Goal 50) Strategic Priority Goal This project would be completing a division goal of having a functional athletic training room in the P building. It also fits under 3 of the Strategic Priorities: Student Access (needed for facility to be functional), Student Success (will help students stay healthy) and Effective Utilization of Resources (room needs to be functional). Finally, it addresses the Mission Statement and some Value Statements (Students First and Academic and Service Excellence). rr) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] ss) What measureable outcomes are expected from this activity? List indicators of success. Being able to use the room on a daily basis. tt) What are the barriers to achieving success in this activity? Funding for the tables. 32 | P a g e 12. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. uu) Describe the new activity or follow-on activity that this resource will support. The purpose of this project is to purchase carts to move and hold water coolers in the main gymnasium. Currently, the coolers (which when full weigh over 75 pounds each) have to be carried up stairs into the gym from the athletic training room and are placed on boxes for games. vv) Describe how this activity supports any of the following: 51) Core Competency 52) Program level Outcome 53) Course level Outcome 54) Program/Discipline Goal 55) Strategic Priority Goal This is primarily a safety and aesthetics request. It may fit under the Strategic Priority for Effective Utilization of Resources. ww) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] xx)What measureable outcomes are expected from this activity? List indicators of success. Using the carts to transport and hold water coolers during games in the gymnasium. yy) What are the barriers to achieving success in this activity? Funding for the carts. 33 | P a g e 13. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. zz) Describe the new activity or follow-on activity that this resource will support. This project is to replace the ice machine in H 06 (the athletic training room) with a larger model. The current machine does not produce enough ice for use during peak times. aaa) Describe how this activity supports any of the following: 56) Core Competency 57) Program level Outcome 58) Course level Outcome 59) Program/Discipline Goal 60) Strategic Priority Goal This project does fit under the division goal of providing more service in the athletic training room. It also would fit under three Strategic Priorities: Student Access (more students would be able to receive treatment), Student Success (healthy athletes are more likely to succeed), and Effective Utilization of Resources (what we have isn’t enough). These same reasons also allow it to be under the Mission Statement and the first 2 value statements (Students First and Academic and Service Excellence). bbb) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] ccc) What measureable outcomes are expected from this activity? List indicators of success. The measure of success for this project will be when both ice whirlpools can be filled and used at the same time. ddd) What are the barriers to achieving success in this activity? The only barrier to this project is funding. 34 | P a g e 14. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. eee) Describe the new activity or follow-on activity that this resource will support. This project is to replace the jets on the whirlpools in H 06 (athletic training room). fff)Describe how this activity supports any of the following: 61) Core Competency 62) Program level Outcome 63) Course level Outcome 64) Program/Discipline Goal 65) Strategic Priority Goal This is primarily a safety issue because the current jets are both very old. Because of this, it would fit under Strategic Priority 4 (Effective Utilization of Resources) because we need to keep the environment safe for the students. The Value Statement, Academic and Service Excellence may also be relevant because we want to provide the best services for our students. ggg) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] hhh) What measureable outcomes are expected from this activity? List indicators of success. The project will be successful when we can use both whirlpools at the same time. iii) What are the barriers to achieving success in this activity? The only barrier to this project is funding. 35 | P a g e 15. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. jjj) Describe the new activity or follow-on activity that this resource will support. This activity is to enter into a contract with a company that maintains (calibrates) therapeutic modalities. The machines in H 06 (the athletic training room) have not been serviced according to the manufacture’s recommendations. kkk) Describe how this activity supports any of the following: 66) Core Competency 67) Program level Outcome 68) Course level Outcome 69) Program/Discipline Goal 70) Strategic Priority Goal This project does support the Strategic Priorities Effective Utilization of Resources (because we need to maintain what we have), Student Access (student athletes need machines to bet healthy) and Student Success (student athletes need to be healthy to be successful). The Mission Statement is also supported (supporting student success) along with two Vision Statements: Students First (machines needed to treat injured students) and Academic and Service Excellence (machines are needed to be a good facility). lll) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] mmm) What measureable outcomes are expected from this activity? List indicators of success. When all the modalities are calibrated. nnn) What are the barriers to achieving success in this activity? The only barrier to this activity is funding. 36 | P a g e 16. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. ooo) Describe the new activity or follow-on activity that this resource will support. This project is to increase the annual athletic training budget by $5,000. The current budget is less than it was 20 years ago. The increase would restore the buying power that was available 20 years ago. Also, with the athletic department practicing year round (a new non-traditional season), more supplies are needed. ppp) Describe how this activity supports any of the following: 71) Core Competency 72)Program level Outcome 73)Course level Outcome 74) Program/Discipline Goal 75) Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (students can get the treatment that they need), Student Success (increased performance from being healthy) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). qqq) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] rrr) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be when the budget is augmented. An indicator of success would be the athletic trainer not having to ask for more money to purchase necessary supplies during the school year. sss) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 37 | P a g e 17. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. ttt) Describe the new activity or follow-on activity that this resource will support. This project is to purchase/replace equipment in the Fitness Center classroom (F building). uuu) Describe how this activity supports any of the following: 76) Core Competency 77) Program level Outcome 78) Course level Outcome 79) Program/Discipline Goal 80) Strategic Priority Goal This project supports the Personal Growth and Responsibility Core Competency because the facility promotes physical well-being. Maintaining this facility is a discipline goal. Many of the Strategic Priorities would also support this project: Student Access (lifelong learning), Student Success (need functional equipment and latest equipment), and Innovation and Relevance (specific machines are needed for certain student needs). These rationales also cover the Mission Statement and Value Statements (Students First, Academic and Service Excellence and Innovation). vvv) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] www) What measureable outcomes are expected from this activity? List indicators of success. The only outcome and indicator of success would be increased student access and success because of the new machines. xxx) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 38 | P a g e 18. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. yyy) Describe the new activity or follow-on activity that this resource will support. This project is to replace the nets on the tennis courts and PE volleyball sets and replace the selfdefense pads. zzz) Describe how this activity supports any of the following: 81)Core Competency 82) Program level Outcome 83) Course level Outcome 84) Program/Discipline Goal 85) Strategic Priority Goal This activity would support the Core Competency of Personal Growth and Responsibility by providing students a better opportunity to enhance their physical well-being. The replacement of the old equipment would also help the students meet the goals of the Course Level Outcomes and Program Level Outcomes. Under Strategic Priorities and Goals, this project would support Student Access (because the equipment would be functional), Student Success (because they would be using safer equipment) and Effective Utilization of Resources (we need to maintain what we have). For the same reasons, the Mission Statement and Vision Statements (students first and Academic and Service Excellence) would be supported. aaaa) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] bbbb) What measureable outcomes are expected from this activity? List indicators of success. We expect to have a better looking facility after the tennis nets are installed, which would increase the use of the facility. We would also be able to accommodate more students in our self-defense courses with more, newer equipment. Success would be indicated by larger enrollments in our tennis and self-defense courses. cccc) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 39 | P a g e 19. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. dddd) Describe the new activity or follow-on activity that this resource will support. This project is to purchase shelters that can be used for outside activities (to provide shade, wind protection or rain protection) for PE or Athletic activities. eeee) Describe how this activity supports any of the following: 86) Core Competency 87) Program level Outcome 88) Course level Outcome 89) Program/Discipline Goal 90) Strategic Priority Goal This project will contribute to the Core Competencies or Student Access and Student Success by providing a more comfortable environment during bad weather. For the same reasons, the Mission Statement and Value Statements (Students First and Academic and Service Excellence), would be addressed. ffff) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] gggg) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase of the shelters along with their initial use. hhhh) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 40 | P a g e 20. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. iiii) Describe the new activity or follow-on activity that this resource will support. This project is to expand the Fitness Center (F) into the seldom used hallway in the building. jjjj) Describe how this activity supports any of the following: 91) Core Competency 92) Program level Outcome 93) Course level Outcome 94) Program/Discipline Goal 95) Strategic Priority Goal This project would support the Core Competency of Personal Growth and Responsibility by providing a better facility for students to improve their physical well-being. This project is a long term divisional goal of maintaining and expanding the fitness center, allowing for better access and utilization of this instructional environment. Under the Strategic Priorities and Goals, Student Access (better opportunity), Student Success (better facility would lead to more success), Effective Utilization of Resources (maintaining what we have), and Innovation and Relevance for Programs and Services (utilizing wasted instructional space) would be supported. And, for the same reasons as the Strategic Priorities and Goals, the Mission and Vision Statements (Students First, Academic and Service Excellence, Stewardship of Resources and Innovation) would be supported. kkkk) Does this activity span multiple academic years? YES If yes, describe the action plan for completion of this activity. First, the feasibility and logistics of the plan needs to be determined by the college’s architects. Secondly, funding has to be secured. llll) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success for this next year would be the development of a plan to get this done. Overall, it would be the completion of the project which would lead to larger enrollments in the fitness center courses. mmmm) What are the barriers to achieving success in this activity? The first barrier to this project is upper administration support because it is a new idea. The second barrier would be the actual feasibility of the change. The final would be funding. 41 | P a g e 21. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. nnnn) Describe the new activity or follow-on activity that this resource will support. This project would be to expand or move the current men’s staff locker room. More room is needed because some staff members have lockers in the “visiting team/soccer/track” locker room which creates problems with access. oooo) Describe how this activity supports any of the following: 96) Core Competency 97) Program level Outcome 98) Course level Outcome 99) Program/Discipline Goal 100) Strategic Priority Goal This project would address the Strategic Priorities and Goals of Student Access (the students who use the room would not have to compete for space with staff members) and Effective Utilization of Resources (athletes and staff should not have to share a space). The reasons would also support the Mission and Vision Statements (Students First and Stewardship of Resources). pppp) Does this activity span multiple academic years? YES If yes, describe the action plan for completion of this activity. First, the feasibility and logistics of the plan needs to be determined by the college’s architects. Secondly, funding has to be secured. qqqq) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success for this next year would be the development of a plan to get this done. Overall, it would be completion of the project. rrrr) What are the barriers to achieving success in this activity? The first barrier to this project is upper administration support because it is a new idea. The second barrier would be the actual feasibility of the change. The final would be funding. 42 | P a g e 22. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. ssss) Describe the new activity or follow-on activity that this resource will support. This project is to update the posters in F 136 for the Health Education Courses taught is the classroom and to replace the old CPR manikins that are needed to teach HED 55. tttt) Describe how this activity supports any of the following: 101) Core Competency 102) Program level Outcome 103) Course level Outcome 104) Program/Discipline Goal 105) Strategic Priority Goal These projects will support Core Competency Critical Thinking and Problem Solving by providing functional manikins for the students to learn CPR of and provide visual learning opportunities for students in the classroom. These projects will also address the all PLO’s and SLO’s for all the HED classes taught in F 136. Under the Strategic Priorities, Student Access and Success will be addressed because the purchases will give the students more opportunities to learn and a higher chance of success in the classroom. These reasons also support the college’s Mission Statement and Value Statements (Students First and Academic and Service Excellence). uuuu) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] vvvv) What measureable outcomes are expected from this activity? List indicators of success. Once these items are purchased, the students score higher when SLO’s are evaluated. wwww) What are the barriers to achieving success in this activity? Funding is the only barrier for completing these activities. 43 | P a g e 23. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. xxxx) Describe the new activity or follow-on activity that this resource will support. This project is to purchase an Eccentron training machine for the adaptive students in the Fitness Center. yyyy) Describe how this activity supports any of the following: 106) Core Competency 107) Program level Outcome 108) Course level Outcome 109) Program/Discipline Goal 110) Strategic Priority Goal This project will support the Core Competency Personal Growth and Responsibility by providing the adaptive students and student athletes an additional way to increase their physical wellbeing/therapeutic rehabilitation. This machine would also address the SLO’s for the adaptive PE course. Under the Strategic Priorities, Student Access and Student Success are covered because the machine would provide a safer exercise option for the adaptive students and student athletes, allowing them to ability to meet their fitness goals. Innovation and Relevance for Programs and Services would also be supported because the machine requested is a new machine increasing muscular development in half the normal time, meeting the increasing needs of our athletes and assisting our adaptive students to improve their lower leg function. The reasons used for the strategic priorities would also justify comparison to the Mission Statement and Value Statements (Students First, Academic and Service Excellence and Innovation). zzzz) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] aaaaa) What measureable outcomes are expected from this activity? List indicators of success. This project will be successful when the machine is in use and students are showing increased fitness levels. bbbbb) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 44 | P a g e 24. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. ccccc) Describe the new activity or follow-on activity that this resource will support. This project is to purchase a cover for the pool lift for adaptive students. The lift is needed to assist students in and out of the pool when then cannot do it themselves and will have a better life span if it is covered. A new battery is also needed for the lift. ddddd) 111) 112) 113) 114) 115) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support the Core Competency Personal Growth and Responsibility by providing the adaptive students and student athletes an additional way to increase their physical wellbeing/therapeutic rehabilitation. This machine would also address the SLO’s for the adaptive PE course. Under the Strategic Priorities, Student Access and Student Success are covered because the machine would provide a safer exercise option for the adaptive students and student athletes, allowing them to ability to meet their fitness goals. Innovation and Relevance for Programs and Services would also be supported because the machine requested is a new machine increasing muscular development in half the normal time, meeting the increasing needs of our athletes and assisting our adaptive students to improve their lower leg function. The reasons used for the strategic priorities would also justify comparison to the Mission Statement and Value Statements (Students First, Academic and Service Excellence and Innovation). eeeee) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] fffff) What measureable outcomes are expected from this activity? List indicators of success. This project will be successful when the lift is in use again and the adaptive students can use the pool again. ggggg) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 45 | P a g e 25. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. hhhhh) Describe the new activity or follow-on activity that this resource will support. This project is to purchase smaller equipment and supplies for the Adaptive Physical Education Program that cannot be purchased normally. iiiii) Describe how this activity supports any of the following: 116) Core Competency 117) Program level Outcome 118) Course level Outcome 119) Program/Discipline Goal 120) Strategic Priority Goal This project will support the Core Competency Personal Growth and Responsibility by providing the adaptive students ways to improve their physical well-being. This project would also address the SLO’s for the adaptive PE course. Under the Strategic Priorities, Student Access and Student Success are covered because the additional equipment; recumbent bike, blood pressure cuffs and posters would provide a more informed healthier student and providing safer exercise options for the adaptive students further allowing them to meet their fitness goals. Innovation and Relevance for Programs and Services would also be supported because the equipment and supplies requested is a new and better way for these students to exercise. The reasons used for the strategic priorities would also justify comparison to the Mission Statement and Value Statements (Students First, Academic and Service Excellence and Innovation). jjjjj) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] kkkkk) What measureable outcomes are expected from this activity? List indicators of success. This project will be successful when the equipment and supplies are in use and students are showing increased fitness levels. lllll) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 46 | P a g e 26. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. mmmmm) Describe the new activity or follow-on activity that this resource will support. This project is to purchase a new filming tower for the football program. The current tower that is being used is not safe to use and needs to be replaced. nnnnn) 121) 122) 123) 124) 125) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (so students can have film of their activity which is common practice), Student Success (as a teaching tool, the film will increase their performance) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). ooooo) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] ppppp) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase of the tower along with its initial use along with the better production on the field of the student athletes because of the film study. qqqqq) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 47 | P a g e 27. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. rrrrr) Describe the new activity or follow-on activity that this resource will support. This project is to purchase a new football helmets for the football program. Football helmets only have a life of 5 seasons before they must be discarded. The cost of replacement is well above the budget for the sport. sssss) Describe how this activity supports any of the following: 126) Core Competency 127) Program level Outcome 128) Course level Outcome 129) Program/Discipline Goal 130) Strategic Priority Goal This project will support our program goal of maintaining our equipment to the highest level possible. The Strategic Priorities of Student Access (so all students who want to play football will have a helmet), Student Success (students need to practice to get better and succeed) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). ttttt) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] uuuuu) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase of the helmets along with their initial use along with the better production on the field of the student athletes because of the ability for everyone to practice. vvvvv) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 48 | P a g e 28.This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. wwwww) Describe the new activity or follow-on activity that this resource will support. This project is to purchase a water pumpers for the football and track programs. The current pumpers that are being used are over 6 years old and do not work properly. xxxxx) 131) 132) 133) 134) 135) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support our program goal of maintaining our equipment to the highest level possible. The Strategic Priorities of Student Access (so students can have water on the field during practice without walking off the field), Student Success (hydrated athletes perform better) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). yyyyy)Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] zzzzz) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase of the pumpers along with its initial use along with the better production on the field of the student athletes because of normal hydration. aaaaaa) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 49 | P a g e 29. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. bbbbbb) Describe the new activity or follow-on activity that this resource will support. This project is to replace the grass on the inside of the track with field turf. The football team currently plays all their home games on turf and usually most of its road games. The grass is also breaks down each season because of the heavy usage during the football season which makes it hazardous to practice on. cccccc) 136) 137) 138) 139) 140) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (a safe place to practice that is like the game surface), Student Success (if they are used to turf, they will perform better on it) and effective Utilization of Resources (we need to maintain and improve what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). dddddd) Does this activity span multiple academic years? YES If yes, describe the action plan for completion of this activity. Because of the cost, we realize that it will take some time for the funding to be accumulated. eeeeee) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the installation of the turf along with its initial use along with the better production on the field of the student athletes are accustomed to it. ffffff) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 50 | P a g e 30. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. gggggg) Describe the new activity or follow-on activity that this resource will support. This project is to purchase new nets for the soccer field goals. The current nets are left on throughout most of the year and between use and exposure to the elements and use, are starting to break down. hhhhhh) 141) 142) 143) 144) 145) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (so we can have multiple goals going during practice situations), Student Success (increased performance because of increased practice opportunities) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). iiiiii) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] jjjjjj) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase of the nets along with its initial use along with the better production on the field of the student athletes because of the facility. kkkkkk) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 51 | P a g e 31. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. llllll) Describe the new activity or follow-on activity that this resource will support. This project is to purchase a new video camera for the soccer program (which could also be used by other sports). A camera is needed to film practices and games. The coaches are currently using their own equipment (which is old and worn). mmmmmm)Describe how this activity supports any of the following: 146) Core Competency 147) Program level Outcome 148) Course level Outcome 149) Program/Discipline Goal 150) Strategic Priority Goal This project will support one of the course level outcomes for soccer (learning strategies of the game). The Strategic Priorities of Student Access (so students can have film of their activity which is common practice), Student Success (as a teaching tool, the film will increase their performance) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). nnnnnn) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] oooooo) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase of the camera along with its initial use along with the better production on the field of the student athletes because of the film study. pppppp) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 52 | P a g e 32. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. qqqqqq) Describe the new activity or follow-on activity that this resource will support. This project is to purchase a new bench shelters for the soccer program. The current shelters are old and are starting to rust and fall apart. They are needed to protect the athletes from the weather during games. rrrrrr) 151) 152) 153) 154) 155) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (so students can stay warmer and drier during games), Student Success (if healthy, they will succeed) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). ssssss) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] tttttt) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase of the shelters along with its initial use along with the better production on the field of the student athletes because of the shelter. uuuuuu) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 53 | P a g e 33. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. vvvvvv) Describe the new activity or follow-on activity that this resource will support. This project is to place a fence topper around the goal areas of the soccer field. Currently, if a ball hits the fence at the top, the top of the fence will damage the ball. wwwwww) 156) 157) 158) 159) 160) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (maintain the equipment), Student Success (need equipment in order to practice) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). xxxxxx) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] yyyyyy) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase and placement of the topper along with its initial use. zzzzzz) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 54 | P a g e 34.This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. aaaaaaa) Describe the new activity or follow-on activity that this resource will support. This project is to place lights for night play around the soccer, baseball and softball fields. Describe how this activity supports any of the following: 161) Core Competency 162) Program level Outcome 163) Course level Outcome 164) Program/Discipline Goal 165) Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (more opportunity for games and practices), Student Success (because of the opportunities) and effective Utilization of Resources (we could use the facilities more) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). bbbbbbb) Does this activity span multiple academic years? YES If yes, describe the action plan for completion of this activity. The district may need to get approval of the neighbors before placing the lights. Also, because of the cost, it may have to be done in phases. ccccccc) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase and placement of the lights along with its initial use. ddddddd) What are the barriers to achieving success in this activity? Funding and community approval are barriers to the activity. 55 | P a g e 35. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. eeeeeee) Describe the new activity or follow-on activity that this resource will support. This project is to purchase new steeple barriers for the track. The current barriers are extremely old and almost impossible to adjust the height (different for men and women). The wood around the bases is starting to rot (the new ones are made of artificial materials that won’t rot). fffffff) Describe how this activity supports any of the following: 166) Core Competency 167) Program level Outcome 168) Course level Outcome 169) Program/Discipline Goal 170) Strategic Priority Goal This project will support our program goal of maintaining our facilities/equipment to the highest level possible. The Strategic Priorities of Student Access (maintain the facilities/equipment), Student Success (need equipment in order to practice and compete) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). ggggggg) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] hhhhhhh) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase and placement of the barriers along with its initial use. iiiiiii) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 56 | P a g e 36.This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. jjjjjjj) Describe the new activity or follow-on activity that this resource will support. This project is to place storage shed for the throwing events in track and field. Currently, the students must carry their implements from the main shed to the throwing areas. With less transportation, we will be better able to keep control of inventory and prevent loss (potential savings). kkkkkkk) 171) 172) 173) 174) 175) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (to the equipment), Student Success (need equipment in order to practice) and effective Utilization of Resources (improvement of a situation) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). lllllll) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] mmmmmmm) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase and placement of the shed along with its initial use. There would also be a savings due to not having to replace missing equipement. nnnnnnn) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 57 | P a g e 37. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. ooooooo) Describe the new activity or follow-on activity that this resource will support. This project is to replace the scoreboards in the main gymnasium. The current scoreboards are about 20 years old and the wiring is starting to short out on a regular basis. ppppppp) 176) 177) 178) 179) 180) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (need equipment in order to practice and have games), Student Success (need equipment in order to practice and have games) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). qqqqqqq) Does this activity span multiple academic years? YES If yes, describe the action plan for completion of this activity. This project may be able to be funded by an outside sponsor (Pepsi?). We also need to decide on exactly what we want and what will fit in the existing spaces. rrrrrrr) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase and placement of the scoreboards along with their initial use. sssssss) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 58 | P a g e 38.This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. ttttttt) Describe the new activity or follow-on activity that this resource will support. This project is to place a fence topper around the baseball field. Currently, if a ball hits the fence at the top, the top of the fence will damage the ball. And, if a player is trying to catch a ball at the top of the fence, the sharp edges can injure them. uuuuuuu) 181) 182) 183) 184) 185) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (maintain the equipment), Student Success (need equipment in order to practice and safety) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). vvvvvvv) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] wwwwwww) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase and placement of the topper along with its initial use. xxxxxxx) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 59 | P a g e 39.This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. yyyyyyy) Describe the new activity or follow-on activity that this resource will support. This project is to repair or replace the portable batting cage for the baseball field. The current cage is old and doesn’t function as designed any more. zzzzzzz) 186) 187) 188) 189) 190) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (maintain the equipment), Student Success (need equipment in order to practice) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). aaaaaaaa) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] bbbbbbbb) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase/repair of the cage along with its initial use. cccccccc) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 60 | P a g e 40. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. dddddddd) Describe the new activity or follow-on activity that this resource will support. This project is to place a fence topper around the softball field. Currently, if a ball hits the fence at the top, the top of the fence will damage the ball. And, if a player is trying to catch a ball at the top of the fence, the sharp edges can injure them. eeeeeeee) 191) 192) 193) 194) 195) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (maintain the equipment and safety), Student Success (need equipment in order to practice/games and safety) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). ffffffff) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] gggggggg) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase and placement of the topper along with its initial use. hhhhhhhh) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 61 | P a g e 41. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. iiiiiiii) Describe the new activity or follow-on activity that this resource will support. This project is repair the batting cages at the softball field. jjjjjjjj) Describe how this activity supports any of the following: 196) Core Competency 197) Program level Outcome 198) Course level Outcome 199) Program/Discipline Goal 200) Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (maintain the equipment), Student Success (need equipment in order to practice) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). kkkkkkkk) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] llllllll) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the repair of the cages along with its initial use. mmmmmmmm) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 62 | P a g e 42. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. nnnnnnnn) Describe the new activity or follow-on activity that this resource will support. This project is to replace the volleyball standards for the main gymnasium. The current se t is very old and very hard to put up. oooooooo) 201) 202) 203) 204) 205) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (maintain the equipment), Student Success (need equipment in order to practice) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). pppppppp) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] qqqqqqqq) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase and placement of the poles along with their initial use. rrrrrrrr) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 63 | P a g e 43.This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. ssssssss) Describe the new activity or follow-on activity that this resource will support. This project is to replace the volleyball nets for the main gymnasium. The current se t is very old. tttttttt) 206) 207) 208) 209) 210) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (maintain the equipment), Student Success (need equipment in order to practice) and effective Utilization of Resources (we need to maintain what we have) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). uuuuuuuu) Does this activity span multiple academic years? NO If yes, describe the action plan for completion of this activity. [Begin response here] vvvvvvvv) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase and placement of the nets along with their initial use. wwwwwwww) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 64 | P a g e 44.This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. xxxxxxxx) Describe the new activity or follow-on activity that this resource will support. This project is to build a new beach volleyball sand court. Beach volleyball has just been sanctioned as a sport at the NCAA level and is very popular. yyyyyyyy) 211) 212) 213) 214) 215) Describe how this activity supports any of the following: Core Competency Program level Outcome Course level Outcome Program/Discipline Goal Strategic Priority Goal This project would support the first PLO of skill development by offering a new skill to our students. This project will support our program goal of maintaining our facilities to the highest level possible. The Strategic Priorities of Student Access (new activity), Student Success (new activity), Innovation (new sport) and effective Utilization of Resources (this is in our master plans for the fields) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First, Innovation and Academic and Service Excellence). zzzzzzzz) Does this activity span multiple academic years? YES If yes, describe the action plan for completion of this activity. The initial step for this project is to see if our original location (in the plan) is still viable or if we need to find a different location. This project may also have to be combined with another building project (golf). aaaaaaaaa) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success would be the purchase and placement of sand courts along with their initial use. Additionally, the creation of a sand specific volleyball class would indicate success. bbbbbbbbb) What are the barriers to achieving success in this activity? Logistics of location and funding are the barriers to achieving this activity. 65 | P a g e 45. This item is used to describe how the new activity, or continuing new activity, will support the program/discipline. ccccccccc) Describe the new activity or follow-on activity that this resource will support. This project is to create a new budget category for athletic uniforms. It is our intent to create a 4year rotation for our athletic teams (each team would get new uniforms from this fund once every 4 years). Currently teams have to fund raise to purchase their uniforms. ddddddddd) Describe how this activity supports any of the following: 216) Core Competency 217) Program level Outcome 218) Course level Outcome 219) Program/Discipline Goal 220) Strategic Priority Goal This project will support our program goal of maintaining our equipment to the highest level possible. The Strategic Priorities of Student Access (great recruiting tool), Student Success (teams with comfortable uniforms will produce better) and effective Utilization of Resources (we don’t want teams representing the college in shabby uniforms) are all supported. The same reasoning also supports the Mission Statement and Vision Statements (Students First and Academic and Service Excellence). eeeeeeeee) Does this activity span multiple academic years? YES If yes, describe the action plan for completion of this activity. A rotation will be set up so that every team will have the funding to purchase uniforms once every four years. fffffffff) What measureable outcomes are expected from this activity? List indicators of success. The indicator of success will be the implementation of this program. It will be successful once every team has been through a cycle. ggggggggg) What are the barriers to achieving success in this activity? Funding is the only barrier for completing this activity. 66 | P a g e 67 | P a g e APPENDIX A. Strategic Priorities & Goals (from Hartnell College Strategic Plan 2013-2018) Priority 1: Student Access Goal 1A: Hartnell College will provide higher education, workforce development, and lifelong learning opportunities—with seamless pathways—to all of the college’s present and prospective constituent individuals and groups. Priority 2: Student Success Goal 2A: Hartnell College will provide a supportive, innovative, and collaborative learning environment to help students pursue and achieve educational success. Goal 2B: Hartnell College will provide a supportive, innovative, and collaborative learning environment that addresses and meets the diverse learning needs of students. Priority 3: Employee Diversity and Development Goal 3A: Hartnell College is committed to 1) increasing diversity among its employees; 2) providing an environment that is safe for and inviting to diverse persons, groups, and communities; and 3) becoming a model institution of higher education whose respect for diversity is easily seen and is fully integrated throughout its policies, practices, facilities, signage, curricula, and other reflections of life at the college. Goal 3B: To attract and retain highly qualified employees, Hartnell College is committed to providing and supporting relevant, substantial professional development opportunities. Priority 4: Effective Utilization of Resources Goal 4A: To support its mission, Hartnell College is committed to the effective utilization of its human resources. Goal 4B: Hartnell College is committed to having its physical plant, furnishings, and grounds maintained and replaced in a planned and scheduled way to support learning, safety, security, and access. Goal 4C: Hartnell College will maintain a current, user-friendly technological infrastructure that serves the needs of students and employees. Goal 4D: Hartnell College is committed to maximizing the use and value of capital assets, managing financial resources, minimizing costs, and engaging in fiscally sound planning for future maintenance, space, and technology needs. 68 | P a g e Priority 5: Innovation and Relevance for Programs and Services Goal 5A: Hartnell College will provide programs and services that are relevant to the realworld needs of its diverse student population, while also developing and employing a culture of innovation that will lead to improved institutional effectiveness and student learning. Priority 6: Partnership with Industry, Business Agencies and Education Goal 6A: Hartnell College is committed to strengthening and furthering its current partnerships, in order to secure lasting, mutually beneficial relationships between the college and the community that the college serves. 69 | P a g e