Special Meeting of the Board of Education followed immediately by the Regular Meeting of the Committee of the Whole December 6, 2012 – 6:15 p.m. Lake Zurich High School Library 300 Church Street, Lake Zurich, IL Special Board Meeting *Public Comments – Please sign in before 6:15 pm 1. Call to Order and Roll Call 2. *Lighting Grant Bid Approval 3. Adjournment Regular Committee of the Whole Board Work Session – Discussions/Collaboration/Presentations 1. FY 2011-2012 Audit Report (Presentation) 2. SEL Survey Results(Presentation) 3. Chartering of Boy Scout Troops (Discussion) 4. Administrator Benefits (Discussion) 5. FY 2013-2014 Budget Preview Timeline (Discussion) 6. Registration Fees (Action 12/20/12) 7. Fund Transfer (Action 12/20/12) 8. Vendor Contract Approval (Action 12/20/12) 9. Five Year Facility Review (Information) 10. Cash Flow (Information) 11. Closed Session – to discuss personnel and pending litigation matters. *Public comments are limited to 5 minutes per individual, 30 minutes total time for any one topic In accordance with the Americans with Disabilities Act, individuals with disabilities who plan to attend this meeting or any other activity or program and who require certain accommodations so that they can observe and participate, or who have questions regarding the accessibility of the meeting room or the District’s facilities, should contact the Superintendent’s office (847-540-4963) promptly to allow the District to make reasonable accommodations for those persons. Dr. Michael J. Egan, Superintendent of Schools District 95 Administration Center - 400 South Old Rand Road - Lake Zurich IL 60047-2459 Phone: (847) 438-2831 Website: lz95.org Fax: (847) 438-6702 Agenda FROM THE OFFICE OF Lyle Erstad DIRECTOR OF FACILITIES To: Board of Education From: Lyle S. Erstad Re: Lighting Retrofit Project at MSS/IF Date: November 30, 2012 Background: On October 31, 2012 District 95 had the first bid opening for the project of “Lighting Retrofit at Middle School South and Isaac Fox Elementary School”. At that time the apparent low bidder (See Appendix A) had not followed bidding specifications by making substitutions that had not been reviewed prior to the submittal of the bid as required in the bid specifications. The remaining bidders bid the project as specified. As such we could not compare them to the next lowest bidder or consider awarding the bid to them. At the Committee of the Whole meeting on November 1, we informed the Board of Education that it was our intent to retain these bids but not take action on them, allowing us the opportunity to go out for bid a second time with revised specifications. A second bid opening was held on November 27, 2012 (See Appendix B). A total of nine (9) bids were received. One bid will not be considered as it was for materials only. The apparent low bidder is Argon Electric Company, Inc. of Buffalo Grove, IL and Imperial Lighting Maintenance Co. being the next lowest bidder. We have compared, with Michael Stanch of 360 Energy, lamps, ballasts and fixtures of each of these bids. Both are in compliance with DCEO requirements. Recommendation: It is the recommendation of the administration of District 95 to reject all bids from the bid opening on October 31, 2012. We will contact references of the two lowest bidders from the November 27, 2012 bid opening and make the final recommendation for your approval at the Board of Education meeting on December 6, 2012. Motion: To reject the lighting bids from October 31, 2012. Award the lighting retrofit bid to _______ in amount of _________. District 95 Professional Development Center – 66 Church Street - Lake Zurich IL 60047-2459 Phone: (847) 438-2380 FAX: (847) 438-2385 LIGHTING RETROFIT INCLUDING ALL MATERIALS AND LABOR FOR INSTALLATION 10/31/12 3:30 pm BID OPENING Addendum A BIDDER PROJECT TOTAL ADDEN. 1 BID BOND NON COLLUSION AFFIDAVIT CONTRACTOR CERT ILLINOIS HUMAN RIGHTS STATEMENT OF NON DISCRIN. CRIMINAL BACK GROUND CONTRACT Imperial Lighting DRUG FREE WORK PLACE $137,325.18 X X X X X X X X X Pieper Electric $172,986.00 X X X X X X X X Not signed Associated Electric $187,300.00 X X X X X X X X NO Renaissance Communication $228,151.00 X X X X X X X X X All Tech Energy $173,832.00 X X X X X X X X X LIGHTING RETROFIT INCLUDING ALL MATERIALS AND LABOR FOR INSTALLATION 11/29/12 9:15 AM PM BID OPENING Addendum B BIDDER Renaissance Communication Systems Delta Electrical Industries PROJECT TOTAL BID BOND NON COLLUSION AFFIDAVIT CONTRACTOR CERT ILLINOIS HUMAN RIGHTS STATEMENT OF NON DISCRIN. DRUG FREE WORK PLACE CRIMINAL BACK GROUND CONTRACT $164,160.00 x x x x x x x x $179,555.00 x x x x x x x x x x x x x x Century Electric $47,424.52 Material only All Tech Energy, Inc. $163,728.00 x x x x x x Not signed x Stones River Electric $210,895.39 x x x x x x x x Associated Electrical $171,500.00 x x x x x x x x signed wrong Argon Electrical $129,900.00 x x x x x x x Not signed Imperial Lighting Maintenance Co $161,181.96 x x x x x x x X Pieper Electric $166,147.00 x x x x x x x Agenda MEMORANDUM TO: FROM: DATE: SUBJECT: Board of Education Vicky Cullinan December 6, 2012 Agenda Item – Committee of the Whole Agenda Item: FY12 Audit Report (Informational) Mrs. Shelly Casella of Eder, Casella & Co. will be at the Committee of the Whole meeting to review the FY12 audit. I have attached an electronic version of the audit. I will have the bound reports to bring to the Committee of the Whole meeting. Dr. Michael J. Egan, Superintendent of Schools District 95 Administration Center - 400 South Old Rand Road - Lake Zurich IL 60047-2459 Phone: (847) 438-2831 Website: lz95.org Fax: (847) 438-6702 Agenda MEMORANDUM TO: FROM: DATE: SUBJECT: Board of Education Mike Egan December 6, 2012 Agenda Item – Committee of the Whole Agenda Item: SEL Survey The Board, along with the Superintendent, surveyed all CUSD 95 parents, staff, high school students and middle school students, in an attempt to determine the most significant causes of school related stress in students’ lives (inclusive of school-related extra-curriculars). The Superintendent worked with Bill Foster of School Perceptions to develop the survey which was administered during the month of November. Results of the survey will be shared at the December 6th Committee of the Whole meeting. Dr. Michael J. Egan, Superintendent of Schools District 95 Administration Center - 400 South Old Rand Road - Lake Zurich IL 60047-2459 Phone: (847) 438-2831 Website: lz95.org Fax: (847) 438-6702 Agenda MEMORANDUM TO: FROM: DATE: SUBJECT: Board of Education Kathy Brown December 6, 2012 Agenda Item – Committee of the Whole Agenda Item: Chartering of Boy Scout Troops The Board will continue their discussion from the October 25th Board meeting on the matter of district elementary schools chartering Boy Scout troops. Dr. Michael J. Egan, Superintendent of Schools District 95 Administration Center - 400 South Old Rand Road - Lake Zurich IL 60047-2459 Phone: (847) 438-2831 Website: lz95.org Fax: (847) 438-6702 Agenda MEMORANDUM TO: FROM: DATE: SUBJECT: Board of Education Kathy Brown December 6, 2012 Agenda Item – Committee of the Whole Agenda Item: Administrator Benefits At the October 11, 2012 Committee of the Whole meeting, the Board discussed what options may be available to modify the insurance benefits offered to Administrative staff. A Board subcommittee met on Wednesday, November 28, 2012 to begin dialogue on the matter. Next steps will be discussed at the December 6th Committee of the Whole. Dr. Michael J. Egan, Superintendent of Schools District 95 Administration Center - 400 South Old Rand Road - Lake Zurich IL 60047-2459 Phone: (847) 438-2831 Website: lz95.org Fax: (847) 438-6702 Agenda MEMORANDUM TO: FROM: DATE: SUBJECT: Board of Education Vicky Cullinan December 6, 2012 Agenda Item – Committee of the Whole Agenda Item: Budget Timeline It is the responsibility of the Assistant Superintendent of Business and Operations to prepare the district’s budget. It is appropriate for the Board of Education to officially direct the Assistant Superintendent to begin the budget process. The Board will be asked at the regular December board meeting to officially take this action. Additionally attached is a draft of the FY14 Budget Timeline. I have identified various dates for administration and board discussion and/or action on issues that impact the budget development. This is for your review and feedback. Dr. Michael J. Egan, Superintendent of Schools District 95 Administration Center - 400 South Old Rand Road - Lake Zurich IL 60047-2459 Phone: (847) 438-2831 Website: lz95.org Fax: (847) 438-6702 FY 14 Tentative Budget Calendar Projected Date Activity Responsibility December – 2012 Adopt Tax Levy Board of Education Student Fees Assistant Superintendent Board of Education Facilities Plan Director of Facilities Asst. Superintendent of Business/Operations Long-Term Financial Plan PMA Asst. Superintendent of Business/Operations Bid Capital Projects Director of Facilities School Bus Bid Director of Transportation Asst. Superintendent of Business/Operations Admin/ESP Compensation Board of Education Superintendent Technology Purchase/Plan Review Administration Curriculum Purchase/Plan Review Administration Bid Capital Projects Director of Facilities Asst. Superintendent of Business/Operations Award Capital Projects Director of Facilities Asst. Superintendent of Business/Operations Bid Special Education Transportation Director of Transportation Asst. Superintendent of Business/Operations Staffing Discussions Administration Develop Estimated Revenue Projections Asst. Superintendent of Business/Operations Staffing Plan Board of Education Tentative Building & Department Allocations Asst. Superintendent of Business/Operations Award Capital Projects Board of Education Award Special Education Bid Board of Education January - 2013 February – 2012 March – 2012 April – 2012 Final Levy Received from County Asst. Superintendent of Business/Operations Approve Technology Purchase Board of Education Director of Technology Budget Update to BOE Asst. Superintendent of Business/Operations Insurance Rates Received Director of Human Resources Final Building and Department Allocations Asst. Superintendent of Business/Operations Building Principals Textbook Adoption Board of Education Asst. Superintendent Curriculum/Instruction Tentative Budget Review Board of Education Tentative Budget Placed on Display Asst. Superintendent of Business/Operations Legal Notice Asst. Superintendent of Business/Operations Tentative Budget Approval Board of Education Property/Liability & Worker’s Compensation Asst. Superintendent of Business/Operations August 2012 Budget Update to BOE Asst. Superintendent of Business/Operations September 2012 Public Hearing on Budget Board of Education Adoption of Budget Board of Education May – 2012 June 2012 Agenda MEMORANDUM TO: FROM: DATE: SUBJECT: Board of Education Vicky Cullinan December 6, 2012 Agenda Item – Committee of the Whole Agenda Item: Fund Transfer Accounting rules adopted by the Illinois State Board of Education for FY2009 changed the purpose of Fund 30 from solely the Bond and Interest Fund to a broader purpose of a Debt Service Fund. This required that certain debt payments previously paid out of the Education and O & M Funds should properly be paid from the Debt Installment Fund. Since there is not any revenue source in Fund 30 to pay for nongeneral obligation debt it is appropriate to transfer funds from the Education Fund to the Debt Service Fund in the amount of the debt payment. So far for FY13 the school district has paid $1,874.56 for a building bond payment for the Lake County Tech Campus and $197,656.96 for the 2008 SEDOL building bond. At the December board meeting I will be requesting authorization from the board to transfer $199,531.52 from the Education Fund to the Debt Installment Fund to fund these payments made from the Debt Installment Fund. Dr. Michael J. Egan, Superintendent of Schools District 95 Administration Center - 400 South Old Rand Road - Lake Zurich IL 60047-2459 Phone: (847) 438-2831 Website: lz95.org Fax: (847) 438-6702 Agenda MEMORANDUM TO: FROM: DATE: SUBJECT: Board of Education Vicky Cullinan December 6, 2012 Agenda Item – Committee of the Whole Agenda Item: Vendor Contract Approval In accordance with the School Code, Section 10-20.21 states, all school districts are required to file a report listing ‘vendor contracts’ as an attachment to their budget. In this context, the term "vendor contracts" refers to "all contracts and agreements that pertain to goods and services that were intended to generate additional revenue and other remunerations for the school district in excess of $1,000, including without limitation vending machine contracts, sports and other attire, class rings, and photographic services. The report is to list information regarding such contracts for the fiscal year immediately preceding the fiscal year of the budget. All such contracts ex ecuted on or after July 1, 2007 m ust be approved by the school board . Lake Zurich High School has previously entered into agreements with Royal Publishing. The High School athletic program is given a minimum of $750.00 in compensation for revenue generated from the publishing of programs and pocket schedules for the 2013-2014 sport seasons. The program should result in more than $1,000 in revenue and requires board approval. The agreement with Royal Publishing provides additional funds for the High School athletic program. The agreement is attached. This will be brought to the regular December Board of Education meeting for board approval. Dr. Michael J. Egan, Superintendent of Schools District 95 Administration Center - 400 South Old Rand Road - Lake Zurich IL 60047-2459 Phone: (847) 438-2831 Website: lz95.org Fax: (847) 438-6702 Agenda FROM THE OFFICE OF Lyle Erstad DIRECTOR OF FACILITIES To: Board of Education From: Lyle S. Erstad Re: Long Range Facilities Projects Update Date: November 30, 2012 On an annual basis the Administration of District 95 desires to keep the Board of Education informed on anticipated projects over the next five (5) years. These projects are compiled from surveying the District’s facilities, reviewing the District’s Five Year Roof Maintenance Plan, interviews with Principals of each facility, reviewing each facility’s 10 Year Life Safety Plan, recommendations from RETA (security consultant) and Dr. Egan and Ms. Cullinan. For this next fiscal year, our primary focus will be on: 1. Start the process of creating secure entrances to our facilities. 2. Lighting efficiency upgrades throughout the district with anticipated incentives from the Department of Commerce and Economic Opportunity (DCEO). We will be focusing on high bay areas such as gymnasiums and exterior lighting. 3. Roof replacement and maintenance. 4. Corridor locker replacement at the High School and Seth Paine. 5. Concrete replacement and pavement maintenance throughout the district. 6. Continued improvement to heating and ventilation systems. It should be noted that this document is reviewed regularly and is updated based upon the priorities of the district. District 95 Professional Development Center – 66 Church Street - Lake Zurich IL 60047-2459 Phone: (847) 438-2380 FAX: (847) 438-2385 Isaac Fox Elementary School 2013/2014 Project Heating and Ventilation Upgrades Replace hollow doors now swinging/closing incorrectly Replace vestibule flooring Repair windows with broken seals Roof maintenance/replacement Create secure front entrance wit electronic access Lighting Efficiency Upgrades (Exterior) Total 2014/2015 Room fan coil replacement Re-caulk windows Repair of masonry (tuck pointing) Roof maintenance Pavement replacement at Front entrance Replace flooring in 2 classrooms Install mini-blinds 2015/2016 2016/2017 2017/2018 $192,500 $37,500 $14,800 $17,500 $7,500 $85,000 $10,000 $25,000 Total $197,300 Repair windows with broken seals Replacement of room fan coil units Roof maintenance/replacement $10,000 $37,500 $186,200 Total $233,700 Replacement of room fan coil units Carpet replacement with VCT Roof maintenance/replacement $37,500 $22,500 $182,800 Total $242,800 Roof maintenance/replacement Replacement of room fan coil units Repave hard play surface and bus parking lot $159,200 $37,500 $130,000 Total Summary Est. cost $30,000 $30,000 $20,000 $10,000 $7,500 $75,000 $20,000 $326,700 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 $192,500 $197,300 $233,700 $242,800 $326,700 Grand total $1,193,000 May Whitney Elementary School 2013/2014 Project Electronic Access Roof replacement/maintenance Abandon in place UST’s Asbestos abatement Door 24 Replacement Remove abandoned sidewalk bridge Lighting Efficiency Upgrades Est. cost $30,000 $5,000 $65,000 $75,000 $35,000 $50,000 $25,000 Total $285,000 Roof replacement/maintenance Replace front stoop and approach Upgrade fire alarm system $5,000 $40,000 $100,000 $175,000 Total $320,000 Roof replacement/maintenance Replace stairwell handrails Replace main level floor tile Replace 1929 unit ventilators $110,600 $75,000 $50,000 $136,620 Total $372,220 Roof replacement/maintenance Repave main parking lot Replace floor tile on lower level Replace unit ventilators in 1950 Addition $139,400 $150,000 $50,000 $63,856 Total $403,256 Roof replacement/maintenance Replace domestic water piping Asbestos abatement Replace tile on lower level $42,100 $150,000 $75,000 $50,000 Total $317,100 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 $285,000 $320,000 $372,220 $403,256 $317,100 Grand total $1,697,576 2014/2015 Replace lead water supply line from Church Street 2015/2016 2016/2017 2017/2018 Summary Sarah Adams Elementary School 2013/2014 Project Roof replacement/maintenance Concrete replacement Cooling of front hallway Lighting Efficieny Upgrades Total 2014/2015 Roof replacement/maintenance Parking lot replacement/maintenance Replace clock system Total 2015/2016 Concrete replacement Roof replacement/maintenance Repave walk around perimeter of the building Total 2016/2017 Roof replacement/maintenance Resurface gym and cafeteria floor Total 2017/2018 Est. cost $67,300 $25,000 $40,000 $25,000 $157,300 $81,200 $74,800 $75,000 $231,000 $25,000 $82,600 $17,500 $125,100 $54,200 $65,000 $119,200 Roof replacement/maintenance $116,400 Total $116,400 Summary 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 $157,300 $231,000 $125,100 $119,200 $116,400 Grand total $749,000 Seth Paine Elementary School 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 Project Playground equipment replacement Interior door replacement Replace 100/200 Hallway lockers Roof replacement/maintenance Lighting Efficiency Upgrades Est. cost $50,000 $15,000 $60,000 $5,000 $25,000 Total $155,000 Roof replacement/maintenance Interior door replacement Renovate kitchen and serving area $146,100 $15,000 $50,000 Total $211,100 Roof replacement/maintenance $143,000 Total $143,000 Roof replacement/maintenance $443,100 Total $443,100 Roof replacement/maintenance $5,000 Total $5,000 Summary for Seth Paine 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 $155,000 $211,100 $143,000 $443,100 $5,000 Grand total $957,200 Spencer Loomis Elementary School 2013/2014 Project Roof maintenance Repair of Security Cameras Circle Drive Repair Create secure entrance Lighting Efficiency Upgrades Total 2014/2015 Roof maintenance Mini-blinds for building Vinyl floor repair Concrete replacement Parking lot repair/resealing/restriping Total 2015/2016 2016/2017 2017/2018 Est. cost $5,000 $15,000 $50,000 $25,000 $20,000 $115,000 $5,000 $25,000 $5,000 $25,000 $50,000 $110,000 Roof maintenance Heating and air-conditioning system upgrades $5,000 $40,000 Total $45,000 Roof maintenance Add exterior speakers $5,000 $15,000 Total $20,000 Roof maintenance $5,000 Total $5,000 Summary 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 $115,000 $110,000 $45,000 $20,000 $5,000 Grand Total $295,000 Middle School North 2013/2014 Project Circle Drive Repair Roof maintenance Repair security cameras Create secure entrance Lighting Efficiency Upgrades Total 2014/2015 Roof maintenance Concrete replacement Mini-blinds for the building Pavement restoration and maintenance Total 2015/2016 2016/2017 2017/2018 Est. cost $50,000 $5,000 $15,000 $25,000 $20,000 $115,000 $5,000 $25,000 $25,000 $75,000 $130,000 Add exterior speakers Roof maintenance Replace carpet in first floor hallways and classrooms $15,000 $5,000 $50,000 Total $70,000 Roof maintenance $5,000 Total $5,000 Roof maintenance $5,000 Total $5,000 Summary 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 $115,000 $130,000 $70,000 $5,000 $5,000 Total $325,000 Middle School South 2013/2014 Project Heating and Ventilation Repairs Lighting Efficiency upgrades (exterior) Install mini-blinds Roof maintenance/replacement Replace cracked and sunken concrete Retile 3 science rooms Create secure front entrance with electronic access 2014/2015 2015/2016 2016/2017 2017/2018 Est. cost $30,000 $20,000 $25,000 $7,500 $30,000 $30,000 $75,000 Total $217,500 Roof maintenance/replacement Pavement replacement at Front entrance $172,100 $85,000 Total $257,100 Roof maintenance/replacement Pavement Repair/Patching/Restriping at West Lot Replace rusted toilet partitions Repair window glazing throughout $148,400 $50,000 $20,000 $35,000 Total $253,400 Roof maintenance/replacement Hallway tile replacement $224,300 $125,000 Total $349,300 Roof maintenance/replacement Install water absorbent floor carpet in vestibules Reseal and restripe parking and drive $186,200 $30,000 $15,000 Total $231,200 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 $217,500 $257,100 $253,400 $349,300 $231,200 Summary Grand Total $1,308,500 High School 2013/2014 Project Refinish gym floors Heating and Ventilation Upgrades Lighting Efficiency Upgrades Video Camera Upgrades Replace metal wall panels on main gym Reseal and Restripe Staff parking lot Roof maintenance/replacement Door Replacement Bathroom Upgrades Concrete sidewalk replacement by baseball/softball Replace student lockers Total 2014/2015 Refinish gym floors Bathroom Upgrades Roof maintenance/replacement Stadium upgrades Reseal and Restripe parking lot Heating and air-conditioning upgrades Total 2015/2016 Reseal and Restripe Commuter parking lot Refinish gym floors Roof replacement/maintenance Mansard Panel Replacments on D and E Retile “B” Wing Heating and air-conditioning upgrades Replace various doors Total 2016/2017 Refinish gym floors Replace entrance steps to the Field House Roof replacement/maintenance Coping Replacements Heating and air-conditioning upgrades Replace various doors Locker replacement Tuck pointing/Brick Replacement Hallway floor tile replacement Total 2017/2018 Refinish Gym floors Roof replacement/maintenance Heating and air-conditioning upgrades Replace doors Hallway floor tile replacement Replace water supply line from Church Street Replace Mansard wall panels Est. cost $12,500 $75,000 $60,000 $50,000 $250,000 $25,000 $428,000 $50,000 $50,000 $75,000 $100,000 $1,175,500 $12,500 $50,000 $445,600 $800,000 $25,000 $75,000 $1,408,100 $25,000 $70,000 $529,500 $250,000 $75,000 $75,000 $50,000 $1,074,500 $12,500 $50,000 $265,800 $100,000 $75,000 $50,000 $125,000 $75,000 $50,000 $803,300 $12,500 $388,500 $75,000 $50,000 $50,000 $125,000 $100,000 Total $801,000 Summary 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 $1,175,500 $1,408,100 $1,074,500 $803,300 $801,000 Grand Total $5,262,400 Professional Development Center and Administrative Building 2013/2014 Project Exterior lighting efficiency upgrades Est. cost $50,000 Total $50,000 2014/2015 Roof replacement on Admin Building $75,000 Total $75,000 2015/2016 Parking lot replacement - PDC Total 2016/2017 $125,000 $125,000 Boiler Replacement at Admin $100,000 Total $100,000 2017/2018 Maintenance/storage/receiving building $250,000 Total $250,000 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 $50,000 $75,000 $125,000 $100,000 $250,000 Grand Total $600,000 Summary District Summary 2013/2014 2014/2015 2015/2016 2016/2017 2017/2018 Grand Total IF $192,500 $197,300 $233,700 $242,800 $326,700 MW $285,000 $320,000 $372,220 $403,256 $317,100 SA $157,300 $231,000 $125,100 $119,200 $116,400 SL $115,000 $110,000 $45,000 $20,000 $5,000 SP $155,000 $211,100 $143,000 $443,100 $5,000 MSN $115,000 $130,000 $70,000 $5,000 $5,000 MSS $217,500 $257,100 $253,400 $349,300 $231,200 $1,193,000 $1,697,576 $749,000 $295,000 $957,200 $325,000 $1,308,500 LZHS PDC-Admin $1,175,500 $50,000 $1,408,100 $75,000 $1,074,500 $125,000 $803,300 $100,000 $801,000 $250,000 $5,262,400 $600,000 Total $2,462,800 $2,939,600 $2,441,920 $2,485,956 $2,057,400 $12,387,676 Agenda MEMORANDUM TO: FROM: DATE: SUBJECT: Board of Education Vicky Cullinan December 6, 2012 Agenda Item – Committee of the Whole Agenda Item: FY12 Cash Flow (Informational) Attached is the cash flow projection for FY12. The months of July through October represent actual figures reconciled to the cash at the month end. Projections are provided for November through June. Dr. Michael J. Egan, Superintendent of Schools District 95 Administration Center - 400 South Old Rand Road - Lake Zurich IL 60047-2459 Phone: (847) 438-2831 Website: lz95.org Fax: (847) 438-6702 LAKE ZURICH CUSD 95 CASH FLOW PROJECTIONS FY 2012-2013 CASH BALANCE-BEGINNING Fun# 1000 3000 4000 REVENUE SOURCES LOCAL SOURCES STATE SOURCES FEDERAL SOURCES OTHER SOURCES TRANSFERS BETWEEN FUNDS TOTAL REVENUE BALANCE SHEET CHANGES: RECEIVABLES PAYABLES TOTAL B/S CHANGES Obj # 1000 2000 2000 3000 4000 5000 6000 7000 6000 EXPENDITURES SALARIES EMPLOYEE BENEFITS SEDOL LEVY PURCHASED SERVICES SUPPLIES CAPITAL OUTLAY OTHER OBJECTS NON-CAPITALIZED EQUIP. TRANSFERS BETWEEN FUNDS PRINCIPAL AND INTEREST TOTAL EXPENDITURES CASH BALANCE-ENDING $ 49,700,155 $ 46,390,685 $ 43,655,565 $ 71,308,817 $ 66,924,895 $ 55,802,248 $ 49,809,297 $ 45,548,136 $ 39,954,186 $ 34,903,807 $ 30,740,155 $ 27,753,624 ACTUAL July ACTUAL August ACTUAL September ACTUAL October PROJECTED November PROJECTED December PROJECTED January PROJECTED February PROJECTED March PROJECTED April PROJECTED May PROJECTED June 836,180 878,641 71,210 1,494,529 193,550 305,068 32,651,191 1,376,743 91,604 1,046,009 283,389 288,608 657,722 198,814 64,291 500,000 230,000 94,400 300,000 1,330,000 190,000 293,500 245,000 150,000 500,000 230,000 85,000 600,000 1,340,000 95,000 3,250,000 250,000 190,000 33,400,000 410,000 10,000 1,786,031 1,993,147 34,119,537 1,618,005 920,827 162,547 986,947 1,820,000 688,500 815,000 2,035,000 3,690,000 118,474 33,938,474 (116,424) (116,424) (105,579) (105,579) 80,306 80,306 1,046,771 175,876 249,902 140,777 171,554 2,616,103 521,328 10,312 567,500 172,308 145,232 384,032 205,873 3,672,129 653,052 1,120,183 602,002 249,171 195,526 54,528 4,979,077 4,622,688 $ 46,390,685 $ 43,655,565 2,762,915 431,282 (1,635) (1,635) 6,205 6,205 - - - - - - PROJECTED FY 13 75,529,130 6,966,136 1,635,181 281,021 84,411,468 75,761,387 6,986,346 1,654,215 281,021 84,682,969 43,754,717 7,649,815 10,312 11,217,353 4,815,784 1,882,743 3,939,660 756,654 281,021 8,017,900 82,325,958 $ 2,357,010 - 3,685,766 628,354 3,587,171 639,418 3,623,054 612,441 3,610,398 650,763 3,667,816 625,102 3,707,905 620,285 3,733,442 645,910 3,721,975 623,757 5,212,212 727,249 737,631 431,449 18,013 473,124 24,081 651,418 259,438 7,774 210,773 19,354 800,000 305,000 75,000 550,000 25,000 950,000 305,000 85,000 450,000 30,000 1,050,000 305,000 80,000 325,000 30,000 199,532 805,000 305,000 90,000 295,000 25,000 975,000 305,000 170,000 295,000 25,000 1,000,000 545,000 150,000 315,000 35,000 1,000,000 725,000 200,000 250,000 60,000 81,489 6,546,591 1,873 6,000,292 6,674,332 12,049,678 989,404 6,979,898 6,081,161 6,282,450 17,190 5,865,379 49,300 6,198,651 285,800 6,676,532 8,255,950 43,600,885 7,378,941 10,312 10,703,503 4,436,073 1,520,092 3,884,233 705,390 281,021 8,017,898 80,538,348 $ 71,308,817 $ 66,924,895 $ 55,802,248 $ 49,809,297 $ 45,548,136 $ 39,954,186 $ 34,903,807 $ 30,740,155 $ 27,753,624 $ 53,436,148 $ 3,873,120 Salary as a % of FY 12 Average of July '12 to June '13 106.1% 103.8% 101.6% 103.8% 101.9% 103.2% 98.0% 101.9% 96.5% 100.8% Benefits as a % of FY 12 Average of July '12 to June '13 As a % of Salary Expense 58.8% 90.8% 15.6% 122.9% 91% 19.9% 107.1% 96% 17.8% 97.0% 96% 17.0% 106.6% 98% 17.8% BUDGET FY 13 CASH BALANCE-BEGINNING 2011-2012 ACTUALS Fun# 1000 3000 4000 REVENUE SOURCES LOCAL SOURCES STATE SOURCES FEDERAL SOURCES OTHER SOURCES TRANSFERS BETWEEN FUNDS TOTAL REVENUE BALANCE SHEET CHANGES: FOOD SERVICE BANK BALANCE RECEIVABLES PAYABLES TOTAL B/S CHANGES Obj # 1000 2000 2000 3000 4000 5000 6000 7000 6000 EXPENDITURES SALARIES EMPLOYEE BENEFITS SEDOL LEVY PURCHASED SERVICES SUPPLIES CAPITAL OUTLAY OTHER OBJECTS NON-CAPITALIZED EQUIP. TRANSFERS BETWEEN FUNDS PRINCIPAL AND INTEREST TOTAL EXPENDITURES CASH BALANCE-ENDING $ 42,249,616 $ 38,542,032 $ 35,545,926 $ 62,077,901 $ 57,592,514 $ 48,313,791 $ 43,222,869 $ 39,060,364 $ 34,025,445 $ 29,506,166 $ 25,481,957 $ 23,908,490 ACTUAL July ACTUAL August ACTUAL September ACTUAL October ACTUAL November ACTUAL December ACTUAL January ACTUAL February ACTUAL March ACTUAL April ACTUAL May ACTUAL June ACTUAL FY 12 77,747,121 7,028,748 1,904,630 4,184,456 279,304 91,144,259 75,480,668 7,450,029 1,600,813 4,184,456 283,264 88,999,230 44,014,691 7,785,044 10,312 11,563,172 4,440,388 7,374,583 4,303,192 908,581 283,264 8,021,426 88,704,653 1,391,222 558,606 26,086 - 1,383,153 733,499 787,574 - 31,470,598 1,286,320 151,655 - 1,310,804 261,779 45,160 4,184,456 2,377,281 230,438 173,948 1,022,536 227,899 - 295,233 1,328,932 306,910 1,975,914 2,904,226 32,908,572 5,802,199 2,781,667 1,250,435 1,931,075 436 8,774 9,210 57,450 136 116,745 174,332 135 8,194 8,329 192 (112,356) (112,164) 2,603,169 733,999 136 (98,582) (98,446) (2,729) 5,218 2,489 1,086 (6,711) (5,625) 260,683 240,036 508,203 225,373 56,575 649,028 1,340,991 6,386 3,733,118 235,084 346,859 33,345,262 359,791 3,478 162,547 663,266 790,151 1,996,405 4,315,061 116,757 33,825,288 551 18,708 19,259 538 5,550 6,088 535 4,110 4,645 3,613,612 284,380 3,653,108 598,731 3,678,268 623,465 3,666,970 602,082 5,135,184 701,978 543,711 273,614 19,123 204,467 5,856 1,032,900 381,478 40,647 198,886 10,410 583,503 541,743 1,035,545 725,506 179,463 231,584 59,607 116,757 507 (10,356) (9,849) 39 151,962 152,001 3,603,723 609,787 3,759,535 647,861 3,717,526 599,732 3,569,511 591,159 3,557,042 628,150 903,453 195,837 1,008,326 112,080 14,468 2,575,913 424,273 10,312 1,404,082 235,341 614,263 427,871 109,831 1,014,751 367,238 240,460 512,737 30,392 857,509 405,324 4,254,238 175,962 5,217 844,251 282,696 159,819 149,423 3,787 763,206 261,449 173,761 600 925,942 313,043 73,228 578,718 11,832 5,571,333 5,801,886 6,379,087 191,150 10,296,796 6,477,488 12,234,721 990,000 6,349,686 6,087,955 5,717,444 16,908 5,315,518 59,205 6,025,259 286,675 5,878,679 8,185,624 43,133,560 7,045,598 10,312 10,973,020 4,288,064 6,521,722 3,301,623 269,360 279,304 8,021,426 83,843,988 $ 38,542,032 $ 35,545,926 $ 62,077,901 $ 57,592,514 $ 48,313,791 $ 43,222,869 $ 39,060,364 $ 34,025,445 $ 29,506,166 $ 25,481,957 $ 23,908,490 $ 49,700,155 $ 7,300,271 1,064,167 304,795 (67,845) 344,969 10,819 162,547 191,165 6,541 Salary as a % of FY 11 Average of July '11 to June '12 105.3% 103.9% 103.7% 104.6% 104.8% 103.6% 104.4% 103.3% 104.0% 103.0% 104.8% 100.6% 104.4% Benefits as a % of FY 11 Average of July '11 to June '12 As a % of Salary Expense 107.7% 103.6% 15.9% 105.5% 103.9% 100.4% 100.9% 103.7% 102.9% 105.5% 103.7% 103.4% 103.3% 101.9% 16.5% 16.9% 17.2% 16.1% 16.6% 17.7% 16.7% 16.4% 16.9% 16.4% 13.7% Notes: February expenditures reflect a reclass entry of $319,200 Workmen's Comp Insurance paid in July, 2011 to Purchase Services from Employee Benefits to align with Illinois Administrative Code February capital outlay is reclassified FY 12 expenditures to purchased services Benefits as a % of FY 11 were recalculated net of Sedol Levy payments and Workmen's Comp adjustment in July and February November 'Food Service Bank Balance' of $57,450 is one time entry to record Chase Food Service account BUDGET FY 12