HARTNELL COMMUNITY COLLEGE DISTRICT REGULAR MEETING OF THE BOARD OF TRUSTEES AGENDA June 22, 2010 TIME/PLACE: 411 Central Avenue, Salinas Board Room (CAB-112) 5:00 p.m. – PUBLIC SESSION – Board Room (CAB-112) 5:05 p.m. – CLOSED SESSION 6:00 p.m. – RECONVENE PUBLIC SESSION - Board Room (CAB-112) Board of Trustees Patricia Donohue, President Kevin Healy, Vice President Candi DePauw, Bill Freeman, Elia Gonzalez-Castro Ray Montemayor, Erica Padilla-Chavez Shaundra Taylor, Student Trustee Dr. Phoebe Helm, Superintendent/President, Secretary to the Board The Board of Trustees welcomes you to its meetings, scheduled on the first Tuesday of each month, unless otherwise noted. The agenda and accompanying documents are on the college’s website at www.hartnell.edu/board. Contracts requiring approval of the Board on this agenda are available to view in the President’s Office. Typically, the agenda consists of the following: A. CONSENT AGENDA: These matters include routine administrative and financial actions and normally approved by a single majority vote. B. REGULAR AGENDA: Action Items: These items include significant administrative and financial actions classified by departmental areas and approved by majority vote for each item. Information Items: These items include presentations to the Board and items for discussion prior to Board action, normally taken at the next meeting. C. CLOSED SESSION: In accordance with Government Code Sections, 3549.1, 54956.9, 54957 and/or 54957.6, the Board of Trustees may meet in Closed Session to consider legal, personnel, labor, and/or contract matters. INDIVIDUALS DESIRING TO ADDRESS THE BOARD: Any member of the audience desiring to address the Board should complete and submit to the Superintendent prior to the meeting, if possible, a Speaker Request Form, available at the door. When the item PUBLIC COMMENTS is taken, the Board President will recognize those who have filled out a Speaker Request Form in the order in which they are received. The Board President may limit the time of presentation to three minutes per speaker, and a maximum of fifteen minutes. Following public comment, the Board President will limit discussion to the Board only. MISSION STATEMENT: Hartnell College provides the leadership and resources to ensure that all students shall have equal access to a quality education and the opportunity to pursue and achieve their goals. We are responsive to the learning needs of our community and dedicated to a diverse educational and cultural campus environment that prepares our students for productive participation in a changing world. HCCD –REGULAR MEETING – JUNE 22, 2010 Page 1 of 5 I. OPEN SESSION, CALL TO ORDER – 5:00 P.M. A. ROLL CALL B. ADOPT AGENDA C. DISCLOSURE OF ITEMS DISCUSSED IN CLOSED SESSION, AS FOLLOWS: Items discussed in Closed Session will include, legal, personnel, labor, and/or contract matters authorized for Closed Session per Government Code Sections, 3549.1, 54956.9, 54957, and/or 54957.6. 1. Side Letter Agreement – California Schools Employees Association 2. Non-Bargaining Groups (Confidentials, Supervisors, and Administration) 3 Hartnell College Faculty Association 4. L-39, International Union of Operating Engineers D. PUBLIC COMMENT PERIOD REGARDING CLOSED SESSION ITEMS Fifteen minutes set aside for public comment on closed session items. Maximum three minutes each. II. MOVE TO CLOSED SESSION III. RECONVENE PUBLIC SESSION Pledge of Allegiance A. REPORT OUT FROM CLOSED SESSION B. PUBLIC COMMENTS ON PUBLIC SESSION ITEMS AND ITEMS NOT ON THE AGENDA Fifteen minutes (three-minute maximum per person) set aside to receive public comments on public session agenda items or items not on the public session agenda, but within the jurisdiction of the Board. 1. Receive public comments on items on the public session agenda 2. Receive public comments on items not on the public session agenda C. SWEARING IN OF 2010-2011 STUDENT TRUSTEE IV. PRESENTATIONS V. A. 2009-2010 STUDENT SENATE RECOGNITION Dr. Greg Peterson and Mercedes Quintero B. CONSTRUCTION PROGRAM Mike Thomas and Firehawk C. BOND OVERSIGHT COMMITTEE UPDATE Damon Felice CONSENT ACTION ITEMS A. MINUTES Adopt minutes of Regular Meeting of May 4, 2010 and Special Meeting of May 18, 2010. HCCD –REGULAR MEETING – JUNE 22, 2010 Page 2 of 5 B. RATIFY DISBURSEMENTS Ratify the disbursements from any or all of the following funds: general; debt service; bookstore; child development; capital outlay projects; scheduled maintenance; property acquisition; bond projects, cafeteria; self-insurance; retirees health benefits; associated student body; scholarship, loan, and trust; and intercollegiate athletics. C. ACCEPT TRANSFER OF NON-CASH DONATIONS Accept the non-cash donations from the Hartnell College Foundation. D. RATIFY CURRICULUM COMMITTEE ACTIONS Ratify the recommendations from the Curriculum Committee. E. RATIFY AN AGREEMENT TO ACCEPT FUNDS FROM UCSC AS A SUBRECIPIENT Ratify an agreement to accept funds from the University of California, Santa Cruz (UCSC) as a sub-recipient of a grant from the National Science Foundation. The sub-award amount is $50,000 over a period of one year. The purpose of the sub-award is to focus on providing students with an engaging remote laboratory for interactive experiments in renewable energy. F. RATIFY CONTRACT WITH DMC CONSTRUCTION FOR THE CLASSROOM ADMINISTRATION BUILDING (CAB) REFRESH PROJECT, #3 Ratify a contract with DMC Construction for the 2nd and 3rd floors of the Classroom Administration Building (CAB) Refresh Project, #3. The budget for this project is $436,490 and paid by funds from Measure H. G. RATIFY CONTRACT WITH WESTERN WATER FEATURES FOR POOL RENOVATION PROJECT Ratify a contract with Western Water Features for the pool renovation project. The budget for this project is $545,000 and paid by funds from Measure H. H. RATIFY CONTRACT WITH COUNTY OF MONTEREY, PROBATION DEPARTMENT FOR THE COORDINATION OF TRAININGS FOR THE SEVEN CHALLENGES PROGRAM Ratify a contract with the County of Monterey, Probation Department, for the coordination of trainings, training supplies, and use of facilities for the Seven Challenges Program. The contract will reimburse the Foster and Kinship Care Program $31,300 through June 30, 2011. I. APPROVE AND AUTHORIZE THE ADMINISTRATION TO ENTER INTO AN AGREEMENT WITH ALPERT/MCKEE COMPANY, GRANT WRITERS Approve and authorize the administration to enter into an agreement with Alpert/McKee Company, grant writer for the Hispanic Serving Institution, Title V CCRAA Grant. If awarded, the cost for these services will be 6% of the awarded funds in years one and two, 5% in year three, and 4% in years four and five. J. APPROVE AND AUTHORIZE THE ADMINISTRATION TO ENTER INTO AN AGREEMENT WITH THE CITY OF SALINAS FOR A VOLUNTARY FITNESS INCENTIVE PROGRAM Approve and authorize the administration to enter into an agreement with the City of Salinas for a Voluntary Fitness Program for its employees. The term of the agreement is June 25, 2010 to September 1, 2010. HCCD –REGULAR MEETING – JUNE 22, 2010 Page 3 of 5 K. APPROVE AND AUTHORIZE THE ADMINISTRATION TO ENTER INTO AN AGREEMENT WITH THE COUNTY OF MONTEREY, PROBATION DEPARTMENT FOR A VOLUNTARY FITNESS INCENTIVE PROGRAM Approve and authorize the administration to enter into an agreement with the County of Monterey, Probation Department for a Voluntary Fitness Program for its employees. The term of the agreement is June 1, 2010 to September 1, 2010. L. APPROVE AND AUTHORIZE THE ADMINISTRATION TO ENTER INTO A CONTRACT WITH JM ELECTRIC FOR THE CAMPUS LIGHTING PROJECT, PHASE II Approve and authorize the administration to enter into a contract with JM Electric for the Campus Lighting Project, Phase II. The project includes lighting along Central Avenue, Cypress Street, in front of the Learning Resource Center, and Parking Structure. The budget for this project is $86,250 and paid by funds from Measure H. M. APPROVE THE USE OF THE GENERAL SERVICES ADMINISTRATION AGREEMENT Approve the use of the General Services Administration Agreement for the purchase of computer comfort stations for the CAT Building. The projected cost for this purchase is $250,000 and paid by funds from Measure H and the State. N. PERSONNEL ACTION Approve and/or ratify personnel actions (included in packet). VI. ACTION ITEMS Action A. Action B. RATIFY REQUIRED STATE REPORT: QUARTERLY FINANCIAL STATUS REPORT (CCFS-311Q) FOR THE QUARTER ENDED ON MARCH 31, 2010. Ratify required State Report: Quarterly Financial Status Report (CCFS-311Q) for quarter ended March 31, 2010. Roll-call Action APPROVE BUDGET REVISIONS Approve budget revisions numbered 8783 to 8860. C. ADOPT RESOLUTION 10:5, BUDGET REVISIONS, 2009-2010 Adopt Resolution 10:5, Budget Revisions 2009-2010 D. APPROVE TENTATIVE BUDGET 2010-2011, SET DATE AND TIME FOR PUBLIC HEARING AND SET DATE TO ADOPT FINAL BUDGET FOR 2010-2011 California Code of Regulation, Title 5, Section 58305, requires that the District develop a tentative budget and forward to the Monterey County Office of Education for validation on or before July 1 of each year. 1. Approve the 2010-2011 tentative budget, required on or before July 1 of each year. 2. Set September 7, 2010 at 5:00 p.m. as the date and time to conduct a public hearing on the 2010-2011 budget. 3. Set September 7, 2010 as the date to adopt the 2010-2011 budget. Roll-call E. APPROVE TO DISCONTINUE MEDICAL LABORATORY TECHNICIAN PROGRAM Approve to discontinue the Medical Laboratory Technician (MLT) Program as recommended by the administration. HCCD –REGULAR MEETING – JUNE 22, 2010 Page 4 of 5 Roll-call F. APPROVE TO REINSTATE BOARD BENEFITS Approve to reinstate Board benefits. VII. INFORMATION ITEMS A. BOND OVERSIGHT COMMITTEE REPORT Receive updated report on construction projects. B. FINANCIAL STATEMENT Receive financial statements for period ending April 30, 2010. C. REPORTS FROM STUDENT, CLASSIFIED, AND ACADEMIC SENATES Receive reports from senate on matters of interest to the college. D. PRESIDENT’S REPORT Receive report from the Superintendent/President. VIII. BOARD OF TRUSTEES A. BOARD OF TRUSTEES COMMUNICATION IX. NEXT MEETING July 20, 2010, 5 p.m., 411 Central Avenue, Salinas, CA 93901 X. ADJOURNMENT HCCD –REGULAR MEETING – JUNE 22, 2010 Page 5 of 5 CONSENT ACTION AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Number: Title: Minutes of Regular Meeting of May 4, 2010 and Special Meeting of May 18, 2010 V. A. Area: Status: Superintendent/President Prepared by: Dr. Phoebe Helm Consent Recommendation: That the Board of Trustees reviews, revises as appropriate, and adopts minutes of regular meeting of May 4, 2010 and special meeting of May 18, 2010. Summary: Minutes of the Board of Trustees for are submitted for review and approval as follows: Regular Meeting of May 4, 2010 Special Meeting of May 18, 2010 Unadopted HARTNELL COMMUNITY COLLEGE DISTRICT MINUTES Regular Meeting of the Board of Trustees Hartnell College Board Room – CAB-112 411 Central Avenue Salinas, California May 4, 2010 OPEN SESSION Meeting called to order at 5:00 p.m. ROLL CALL Patricia Donohue, President Kevin Healy, Vice President Candi DePauw Bill Freeman (Arrived at 5:10 p.m.) Elia Gonzalez-Castro Ray Montemayor Erica Padilla Chavez Phoebe K. Helm, Superintendent-President/Board Secretary Shaundra Taylor, Student Trustee – (advisory vote per Board Policy 1030) AGENDA On a motion by Trustee Montemayor, seconded by Trustee Healy, vote of 6-0 (Absent: Freeman), and by advisory vote of Aye (Taylor), the Board approved the agenda. DISCLOSURE OF CLOSED SESSION ITEMS Trustee Donohue disclosed items for Closed Session as authorized per Government Code Sections, 3549.1, 54956.9, 54957 and/or 54957.6: 1. Faculty Association – Update on Negotiations 2. Notice of Intent to Layoff: One classified employee – L-39 PUBLIC COMMENTS REGARDING CLOSED SESSION There were none. MOVED TO CLOSED SESSION The Board of Trustees of Hartnell Community College District, Dr. Phoebe Helm, Superintendent/President, Terri Pyer, Associate Vice President, Human Resources, and Kent Stephens, Vice President, Support Operations, moved to Closed Session at 5:02 p.m. to consider legal, personnel, labor, and/or contract matters authorized for Closed Session per Government Code Sections, 3549.1, 54956.9, 54957 and/or 54957.6. RECONVENED OPEN SESSION The public session reconvened at 5:59 p.m. and Trustee Donohue announced the Board recessed Closed Session and would reconvene after the business portion of the public session. PLEDGE OF ALLEGIANCE The Pledge of Allegiance was led by Trustee DePauw. HCCD –REGULAR MEETING – MAY 4, 2010 Page 1 of 9 BOARD WORKSHOP ON THE BUDGET Kent Stephens, Vice President, Support Operations thanked the Financial Information Sub-Committee for their guidance to help build a budget for next year. Also, he thanked Mr. Munoz and other members of his staff for all of their work and support on the budget. The Board praised Mr. Stephens for the excellent quality of the workshop on the budget. His presentation included the district’s fund structure, the state funding process, an update on where the college stands today, an outlook for next year, based on the limited information currently available from the State, and the budget process and timeline (Appendix A). Beverly Grova, Vice President, Advancement, presented the restricted grant and contract funds and stated that these funds exceed $28 million, of which $11 million is budgeted for this fiscal year. In addition, the restricted budget includes $8 million in financial aid grants for students. Ms. Grova stated that an additional $2 million is funded by private funds through the foundation. These private funds have helped leverage more State and Federal grants. Dr. Helm stated that much of the work involved in obtaining grants could not be done without the hard work and support of grant writers, M. I. S. A., faculty and staff (Appendix B). The Board and assembly applauded Mr. Stephens and Mrs. Grova for their excellent presentation, stating that it was the best they have ever received and the Board expressed their appreciation for all of their work. PUBLIC COMMENTS ON PUBLIC SESSION ITEMS AND ITEMS NOT AGENDA Melissa Stave, faculty, read aloud a letter of resignation on behalf of Ms. LeeAnn Emanuel, Counselor, who has resigned after 8 years of service. In her letter, Ms. Emanuel thanked the college, in particular Ms. Cathy Noble, Counselor, for her support and guidance throughout her career at Hartnell College. Andrew Ausonio, Ausonio Corporate, spoke about his concern over the prequalification package for a current design-build project. While Mr. Ausonio strongly supports the design-build process, he believes the college should have redesigned the scoring process (provided by the State) for smaller entities. Dr. Helm clarified that 24 entities out of 25, pre-qualified and that 6 of those entities were short-listed. Also, she stated that the state requirements for community colleges are different than those for the K-12 system. She then stated that since 2006, 76% of all bond funds from Hartnell College have been spent locally (Appendix C). Dr. Helm said that she looks forward to helping form a better understanding of the bidding process for community colleges through a workshop supported by the college and the Builder’s Exchange. Ron Waddy, faculty, read aloud excerpts from two letters written by a parent, Timothy Amaral. Mr. Amaral’s letters express concern for campus safety and urged the Board to consider keyless entry to campus facilities. BOND OVERSIGHT COMMITTEE UPDATE Mr. Damon Felice provided an oral report on the college’s current construction projects, as well as, the written report which is housed on the college’s website: http://www.hartnell.edu/board/packets/May_2010_Regular_Board_Meeting_Packet.pdf (Page 75). HCCD –REGULAR MEETING – MAY 4, 2010 Page 2 of 9 At the April meeting, Trustee Montemayor requested a representative from Aurum Consulting attend the May meeting to help answer questions regarding the design of keyless entry and close circuit TVs systems. Charlie Denley, Aurum Consulting Engineers, was present, answered questions, and stated that his company’s primary responsibility would be to design a system and to prepare bid documents for keyless entry and close circuit TVs for the main campus and King City Education Center. The cost for this service is $42,150, which is largely driven by the amount of discovery required to determine the most efficient and effective way to install these systems in existing buildings. Joining Mr. Denley, were two representatives from Honeywell who, based on their experience, answered technical questions on how a keyless entry and close circuit TV system would operate. Some questions surrounded the life span of the system, maintenance and frequency of hardware and software updates, estimated total cost of a system, other community colleges using this type of system, activating and deactivating the system remotely, design specification errors, and training of staff. STUDENT SERVICES CATEGORICAL PROGRAM ACHIEVEMENTS Dr. Greg Peterson, Vice President, Student Affairs, and Paul Casey, Director, EOP&S, presented the commendation received from the Chancellor’s Office and provided a brief review of student services categorical program achievements. In particular, EOP&S and CARE. Despite budget and staffing restrictions, their programs are doing well and they continue to help many students reach their goals. The Board and assembly viewed a short presentation of student testimonies. Mr. Casey stated that each year the campus celebrates student accomplishments through a student recognition luncheon and he invited the Board. Dr. Helm thanked Mr. Casey and Dr. Peterson, acknowledging that in only two years they had taken these programs, especially Cal Works, from concern to excellence. CONSENT ACTION On a motion by Trustee Gonzalez-Castro, seconded by Trustee Montemayor, vote of 7-0 and by advisory vote of Aye (Taylor), the Board moved to approve Consent Action items A, B, C, E, F, G, H, I, and J. Consent Action items D (Freeman) and K (Montemayor) were pulled for separate discussion and/or separate vote. A. MINUTES Approved minutes of regular meeting of April 6, 2010 as amended. Dr. Helm asked that the wording construction program direct costs be replaced with bond expenditures as noted on Page 2, Annual Report Bond Oversight, fourth sentence. And, that the documents she referred to during the meeting become Appendix B of the April minutes. B. DISBURSEMENTS Approved disbursements from any or all of the following funds: general; debt service; bookstore; child development; capital outlay projects; scheduled maintenance; property acquisition; bond projects; cafeteria; self-insurance; retirees health benefits; associated student body; scholarship, loan, and trust; and intercollegiate athletics. HCCD –REGULAR MEETING – MAY 4, 2010 Page 3 of 9 C. CURRICULUM COMMITTEE Ratified the recommendations from the Curriculum Committee. Trustee Freeman asked why the industrial technology programs were being moved to inactive status. Dean Neil Ledford explained that this was a result of revisions that placed these programs within the larger context of Agriculture, Construction, etc. D. BOARD POLICY 2346, SAFETY AND SECURITY VIDEO MONITORING On a motion by Trustee Gonzalez-Castro, seconded by Padilla Chavez, by vote of 7-0, and by advisory vote of Aye (Taylor), the Board moved to approve the final reading of Board Policy 2346, Safety and Security Video Monitoring. E. SAINT LOUISE REGIONAL – AGREEMENT AMENDED Approved the amendment to the agreement between Hartnell Community College District and Saint Louise Hospital for clinical experience and for use of clinical facilities. The amendment clarified the termination clause, corporate compliance, and confidentiality. F. Approved the amendment to the 2009-2010 Child Development Training Consortium Instructional Agreement. The amendment increases the amount received by $1,250 for a total of $11,250. The agreement addresses the critical shortage of qualified childcare workers in California by providing student scholarships to cover enrollment fees. CDC TRAINING CONSORTIUM INSTRUCTIONAL AGREEMENT AMENDED G. AGREEMENT – Approved and authorized the administration to enter into a professional services C3 ENGINEERING contract with C3 Engineering for the design of the City sidewalk, bus turnout, and campus infrastructure project. The cost for this service is $8,225 and will be paid with Measure H bond funds. H. AGREEMENT – Approved and authorized the administration to enter into a professional services NTD contract with NTD for the design of the Technical Training Building on the Alisal ARCHITECTURAL Campus. The cost for this service is not to exceed 7% of construction, (7% is estimated at $375,000) and will be paid with Measure H bond funds. I. AGREEMENT – Approved and authorized the administration to enter into a contract with Oskar OSKAR Environmental, Inc. to deliver and install the filtration system, and welding and ENVIRONMENTAL grinding booths for the welding program at the Alisal Campus that will support welding which supports agriculture, auto and diesel mechanics and construction. The budgeted amount is $385,953 and will be paid with Measure H Bond Funds (50%) and State Group 2 funds (50%). J. SUB-RECEIPT AGREEMENT CSUMB FOUNDATION – LUMINA FOUNDATION K. PERSONNEL ACTIONS HCCD –REGULAR MEETING – MAY 4, 2010 Authorized the administration to enter into an agreement to accept funds from the University Corporation (Foundation), California State University, Monterey Bay (CSUMB) as a sub recipient of a grant from the Lumina Foundation. The subaward amount is $98,418 over the next two years, May 5, 2010 through September 30, 2012. The sub-award will focus on improving outcomes for development courses critical to student success in partnership with CSUMB and Monterey Peninsula College. On a motion by Trustee Gonzalez-Castro, seconded by Trustee Healy, by vote of 5-2 (No: Freeman, Montemayor), and by advisory vote of Aye (Taylor), the Board moved to approve and/or ratify personnel actions (Appendix D). Page 4 of 9 PUBLIC HEARING Re-opener between Hartnell Community College District and C. S. E. A. ACTION ITEMS BUDGET REVISIONS PROFESSIONAL SERVICES CONTRACT – AURUM ENGINEERS FOR SURVEY AND DESIGN OF KEYLESS ENTRY AND CLOSED CIRCUIT TV SYSTEM Trustee Donohue opened the public hearing for the contract re-opener proposals between Hartnell Community College District and California Employee Association, Chapter 470 on wages and benefits. There were no public comments. On a motion by Trustee Healy, seconded by Trustee Gonzalez-Castro, by roll-call vote of 7-0 and by advisory vote of Aye (Taylor), the Board moved to approve budget revisions numbered 8656 to 8775. On a motion by Trustee Padilla Chavez, seconded by Trustee Gonzalez-Castro, roll call vote of 5-1 (No: Freeman), and by advisory vote of Aye (Taylor), the Board moved to approve and authorize the administration to enter into a professional services contract with Aurum Consulting Engineers Monterey Bay, Inc. for survey and design plans for a keyless entry and close circuit TV system for the main campus and King City Education Center. The cost to conduct the survey and design plans is $42,150 and paid with Measure H funds as provided for safety and security. Prior to the vote and due to a possible conflict, stating that he knew one of the vendors who presented this evening, Trustee Healy recused himself from this item. Also, he directed the Superintendent/President to investigate the lighting plan (a board item from the April 2010 meeting) because he believes his vote may need to be stricken, if appropriate. In addition, Trustee Freeman stated, while he appreciates the work of others and while he, too, is concerned about safety he cannot support this item because he believes the majority of violence is happening outside of the campus. Also, he spoke about ALERT, a way to communicate emergency situations to students via text messaging. RESOLUTION 10:4 On a motion by Trustee Padilla Chavez, seconded by Trustee DePauw, roll call vote of 5-0-2 (Abstained: Healy, Montemayor) and by advisory vote of Aye (Taylor), the Board moved to adopt Resolution 10:4, Electing to be Subject to Public Employees’ Medical and Hospital Care Act only with Respect to Members of the Hartnell College Faculty Association and Fixing the Employer’s Contributions for Annuitants at Different Amounts. A discussion ensued and the motion was amended to include the language: Should negotiations take a different direction, the Board has the ability to rescind Resolution 10:4, prior to its effective date, without any legal or fiscal impact to the college. This language is consistent with communication received from Terri McIntyre, CalPERS. INFORMATION ITEMS FINANCIAL The Board received and accepted the financial statements for the month ending STATEMENTS March 31, 2010. Trustee Padilla Chavez asked if this report could be modified to include actual percent to budget. HCCD –REGULAR MEETING – MAY 4, 2010 Page 5 of 9 QUARTERLY REPORT The Quarterly Financial Status Report for the period ended March 31, 2010, was inadvertently left off the agenda for the Board to review and accept. However, the Ad hoc Audit Committee met prior to this meeting and reviewed the report. But, because the report was not on the agenda, the Board could not take action and directed the Superintendent/President to submit the report to the Chancellors Office and bring the report back to the Board for ratification in June. CORRECTION TO FUNDING SOURCE – GRANT WRITER, M. J. JOHNSON At the April meeting, the Board approved to enter into an agreement with M. J. Johnson, grant writer. Dr. Helm explained that the item presented to the Board incorrectly indicated that Mr. Johnson would be paid from a grant. Rather, the funding is from a workforce training contract fund and she wanted to ensure that public and the Board were accurately informed as well as being sure that the college’s record was accurate since grant funds cannot be used to pay for grant writers. SENATE REPORTS Student Senate: Stephanie Blancas reported the Senate has completed its 2010 2011 elections; that they adopted a new constitution; that they, for the second time in a row, participated in the Student Senate for California Community Colleges Spring General Assembly where they discussed issues affecting all campuses and that it’s a great opportunity for networking. Classified Senate: Eric Price reported that Classified Employee Week is May 1622 and shared that campus events are being scheduled and that he would notify the Board when they are finalized. Trustee Donohue stated that she received a request to pass a resolution, but unfortunately the request came too late for this meeting. The Board anointed May 16-22, 2010 as Classified Employees Week. Academic Senate: Nancy Shur reported that she and Dr. Kelly Locke attended the Statewide Senate Meeting in San Francisco and that it was a great learning opportunity for her and that she hoped new senators would have an opportunity to attend. PRESIDENT’S REPORT Dr. Helm’s report included: Upcoming Activities: May 20, 5:30 p.m. – Community Conversation, Alisal High June 2, 2 and 4 p.m. – Nursing Pinning Ceremonies, Main Stage June 2, 5:30 p.m. – Board Reception and Dressing, Community Room June 2, 6:45 p.m. – Line up for Commencement, Lawn Area June 2, 7 p.m. – Commencement, Main Gym June 3, 6:30 p.m. – HEP Student Recognition, Main Gym Student Scholarships: 1) The Matsui Foundation donated $20,000 to 2 Hartnell students. Mr. Matsui has obligated himself to more than $3 million in scholarships; and 2) Esmeralda Rodriguez received two scholarships. One from the Karl S. Pister Foundation for $20,000 and one from the Peggy and Jack Baskin Foundation for $20,000. HCCD –REGULAR MEETING – MAY 4, 2010 Page 6 of 9 Partnerships: It’s an exciting time and much discussion is happening in relation to forming partnerships. Dr. Helm stated she recently had dinner with officials from the Naval Post Graduate School (NPS) and with Amory Lovins, Chief Scientist, Rocky Mountain Institute, and she stated that they are interested in the research campus at the Alisal and she looks forward to more conversation about this. Also, the Lewis Center has expressed interest in helping to develop a Charter School and UC Santa Cruz is interested in bringing their energy research (microgrid) to the Alisal. So, the dream of a K-graduate research and education campus that includes public and private partners is possible. In closing, Dr. Helm reported that the Construction Advisory Committee, including the Salinas Builders Exchange and other construction and architectural groups, voted last week to make a clean and clear separation and distinction between their work to support academic programs and the Hartnell College Foundation and any effort to obtain contracts from the college for construction projects. They noted that the Construction Advisory Committees were involved with the academic programs is to ensure that their future workforce is well trained. She plans to meet with representatives of the Business Exchange and the Chamber to discuss conducting a workshop for all local companies on the bidding requirements for community college because those requirements differ from those of the K-12 system and other public organizations. DISTINGUISHED ALUMNUS AWARD On a motion by Trustee Padilla Chavez, seconded by Trustee Taylor, by vote of 70, and by advisory vote of Aye (Taylor), the Board awarded the 2010 Distinguished Alumnus Award to Dr. Juan Oliverez. RESCHEDULE BOARD MEETING DATES On motion by Trustee Healy, seconded by Trustee Padilla Chavez, by vote of 7-0, and by advisory vote of Aye (Taylor), the Board approved to reschedule regular meetings for June, July and August 2010 to June 22, 2010, July 20, 2010 and August 10, 2010. Trustee Montemayor suggested that future meeting dates remain consistent, if at all possible, for the purposes of planning. BOARD COMMUNICATIONS Trustee Taylor thanked presenters this evening; stating that she, too, attended the Spring General Session where she attended breakout sessions and learned that her colleagues have not experienced the same relationship she has with her Superintendent/President and Board members. As a result, she plans to attend and observe other district board meetings, and she plans to attend the CCLC’s Annual Student Trustee Conference in August. Trustee Montemayor stated that he believes its good business for the Board to have a succession plan for the position of Superintendent/President and urged the Board to begin the discussion. In addition, he stated that he wanted to be sure that everyone understood that his request had nothing to do with the current president. Trustee Donohue hopes to have this discussion including the process for the evaluation of the CEO at a future board development session. Trustee DePauw thanked Kent Stephens, his team, and Beverly Grova for the excellent budget presentation, and she thanked Dr. Greg Peterson and his staff for their presentation. She offered her assistance to Trustee Taylor, if she needed it before attending the August conference. HCCD –REGULAR MEETING – MAY 4, 2010 Page 7 of 9 Trustee Gonzalez-Castro expressed her appreciation to each presenter this evening and that she especially appreciated the budget presentation; she thanked the faculty and staff who helped at the Science and Family event – it was successful; she thanked the folks who are putting together the town hall meetings and asked for an opportunity for the board to address the public at this event. Trustee Freeman spoke about his participation in the Tony Teresa dedication; that he attended the Ed Adams Invitational (track and field event) and science fair where he was proud of the nursing students; he announced that the winner of the Big Sur Marathon is a former Hartnell College athlete, of which he is proud of; that the college consider working out payment plans for student fees; that the college meet with Mr. Ausonio to talk about the issues; he shared an agreement that CSUMB has for incoming freshman students and believes Hartnell can do the same; he offered his assistance to Trustee Taylor, and expressed his appreciation to this evening’s presenters. Also, he attended the Globetrotter’s event held on campus and that it brought back memories. Trustee Healy proudly reported that the Sunrise House was a recipient of Hartnell College surplus property; that the next Board of Director’s meeting is Thursday – he is unable to attend, but that his alternate, Trustee Gonzalez-Castro has agreed to attend and he expressed his interest to serve as Chair of this committee, due to a recent resignation. Also, he did a fly-by of the Ledford Iris Garden and that it looked beautiful and he encouraged everyone to go; that, due to work obligations, he will be traveling which will prevent him from attending the CHISPA ground breaking, the next board development, the town hall meeting, and the open house for the diesel program. Also, he reported that he participated in the Tony Teresa dedication and felt honored and proud. He thanked Firehawk and Peter for facilitating the last board development and hopes the board continues to move forward. In closing, he said that he was told the reason why the design-build item was not on the agenda as he requested and asked that going forward all commentaries stated be closely considered on this particular project. Also, he mentioned that he met with Trustee Freeman on his soapbox article and concluded that no further action was needed on the matter. Trustee Padilla Chavez reported that she and other Trustees attended the Annual Dinner for the Monterey County School Boards Association where they honored the Silver Star partners; she spoke about the veteran’s training held on campus and thanked Mary Dominguez for her leadership in this effort; that she and her family attended the Globetrotter’s event a couple of weeks ago and that she is pleased the college uses its facilities in this manner – that her children had a wonderful time; she requested that the Board receive a regular report on South County; that she participated in first planning meeting for the town hall and supports trustees addressing the public at this event. In closing, she expressed concern over the public comments made on the design-build process. She believes the college should have a procedure on this process and she looks forward to more information on the workshop Dr. Helm spoke about earlier. Trustee Donohue reported that she has been traveling to the east coast due to her participation in Soroptimist. Each year, they award the Women’s Opportunity Scholarships, and this year they awarded 116, totaling over one-half million HCCD –REGULAR MEETING – MAY 4, 2010 Page 8 of 9 dollars. Most of these recipients will enter or continue to attend community colleges. Also, she reminded the Board that if they want items on the agenda, to put them in writing to her with a copy to the President’s Office. Items will be added as appropriate. RECONVENED CLOSED SESSION The Board (Absent: Gonzalez-Castro) reconvened closed session at 9:23 p.m. Dr. Phoebe Helm, Superintendent/President, Kent Stephens, Vice President, Support Operations, and Terri Pyer, Associate Vice President joined the Board. The Board came out of closed session at 9:44 p.m. REPORT OUT FROM CLOSED SESSION Trustee Donohue reported out that the Board approved a motion to proceed with a notice of intent to layoff one classified employee (L-39) on a vote of 4-1-1 (No: Freeman; Abstained: Montemayor). The Board will plan to hold a Special Meeting on May 18, 2010, if needed, to consider health insurance for faculty. ADJOURNMENT On a motion by Trustee Montemayor, seconded by Trustee Padilla-Chavez, and unanimously carried, the Board moved to adjourn the meeting at 9:45 p.m. NEXT MEETING June 22, 2010, 5:00 p.m., Governing Board Room (CAB-112), 411 Central Avenue, Salinas. Patricia Donohue Board of Trustees President HCCD –REGULAR MEETING – MAY 4, 2010 Phoebe K. Helm Board Secretary Page 9 of 9 APPENDIX A Hartnell Community College District Budget Workshop May 4, 2010 Workshop Goals Review: y y y y y District Fund Structure State Funding Process 2009-10 (Current Year) Budget Update 2010-11 (Next Year) Budget Outlook Budget Process and Timeline District Fund Structure y General Fund ◦ Unrestricted ◦ Restricted y y y y y Special Revenue Capital Projects Enterprise Internal Services Trust & Agency Student Association Scholarships Athletics State Funding Process Unrestricted General Fund State Apportionment Example Full-time Students (FTES) X Base Funding = Base Revenue 7,000 FTES X $4564.83 = $31,953,810 In addition, every College and Center receives a Basic Allocation $3,321,545 + $276,795 = $3,598,340 $31,953,810 + $3,598,340 = $35,552,150 State Funding Process Unrestricted General Fund State Apportionment How is it funded? 44% 50% y Local Property Taxes y Student Fees 6% y State General Fund State Funding Process Total FTES 9,000 8,000 7,000 6,468 6,501 7,624 7,580* 2008-09 2009-10 541 761 7,083 6,819 6,586 6,000 5,000 4,000 3,000 2,000 1,000 Unfunded Funded 2005-06 2006-07 2007-08 480 5,988 6,501 6,586 State Funding Process Unfunded Total FTES 9,000 8,000 7,000 $3,473,835 6,468 6,501 7,624 7,580* 2008-09 2009-10 541 761 7,083 6,819 6,586 6,000 5,000 4,000 3,000 2,000 1,000 Unfunded Funded 2005-06 2006-07 2007-08 480 5,988 6,501 6,586 2009-10 Budget Update Restricted General Fund (Fund 12) Funds used for the operation of educational programs that are specifically restricted by law, regulations, or donors. The majority of these funds must be expended in the fiscal year or returned to the funding source. Total restricted funds amount to over $20 million. 2009-10 Budget Update Restricted General Fund (Fund 12) $25,000,000 $20,000,000 $15,000,000 $10,000,000 $5,000,000 $2005-06 2006-07 Financial Aid 2007-08 2008-09 All Other Grants 2009-10 Projected 2009-10 Budget Update Restricted General Fund (Fund 12) Awards Project Title Advanced Technology Total Academic Affairs Total Award Amount 5,323,171 11,482659 Yearly Amount 2009-10 3,541,442 3,903,492 9,907,076 2,112,630 Student Services (formula driven) 1,738,078 1,738,078 Student Services (Grants to Students) 8,352,901 8,352,901 $36,803,885 $19,648,543 Student Services (non- formula driven) Total All Grants 2009-10 Budget Update Unrestricted General Fund (Fund 11) Nearly all day-to-day operating expenses are charged to the unrestricted General Fund. The State apportionment represents 97% of all unrestricted income. This fund is budgeted at $32.8 million or about 47% of the total District budget. 2009-10 Budget Update Unrestricted Hartnell Community College District Unrestricted General Fund Revenue General Fund (Fund 11) 2009-2010 $35,000,000 $30,000,000 $25,000,000 $20,000,000 $15,000,000 $10,000,000 $5,000,000 $0 YTD Projected YTD Actual 2009-10 Budget Update Unrestricted Hartnell Community College District Unrestricted General Fund Expenses General Fund (Fund 11) 2009-2010 $35,000,000 $30,000,000 $25,000,000 $20,000,000 $15,000,000 $10,000,000 $5,000,000 $0 YTD Projected YTD Actual 2009-10 Budget Update Hartnell Community College District Unrestricted General Fund Balance 2009-2010 $8,000,000 $7,000,000 $1,134,955 $6,000,000 $5,000,000 $4,000,000 $3,000,000 $2,000,000 $1,000,000 $0 -$1,000,000 Projected Actual 3% Requirement 2010-11 Budget Outlook Governor’s Budget 2.2% Enrollment Growth ($126 million) $540,000 for Hartnell -0.38% COLA (-$22.9 million) -$99,000 for Hartnell Reduce EOPS and Part-time Faculty Compensation (-$20 million) -$75,000 for Hartnell Increase Career Technical Education ($20 million) Grant Based Funding Maintain $26 per unit MOST OPTIMISTIC SCENARIO 2010-11 Budget Outlook Other Scenarios 1. Current funding level minus 1% 2. Current funding level minus 3% 3. Reduction proportionate with all other state agencies 2010-11 Budget Outlook Governor's Budget (Growth) (Inc. Share of State Budget) Revenue Apportionment Other Total Revenue Expenditures Surplus (Deficit) Current Funding Level (Less 1%) Current Funding Level (Less 3%) Reduction Proportionate with other State Agencies $ 34,737,900 $ 879,004 $ 35,616,904 $ 34,359,344 $ 879,004 $ 35,238,348 $ 33,665,216 $ 879,004 $ 34,544,220 $ 32,450,492 $ 879,004 $ 33,329,496 $ 35,059,000 $ 35,059,000 $ 35,059,000 $ 35,059,000 $557,904 $179,348 ($514,780) ($1,729,504) 2010-11 Budget Outlook Capital Outlay 1% Supplies 1% Services & Operating 21% Academic Salaries 35% Benefits 20% Classified Salaries 22% Budget Timeline May 21, 2010 Tentative Budget document finalized June 1, 2010 Tentative Budget presented to Board June 30, 2010 Last day Tentative Budget may be adopted by Board Tentative Budget authorizes District to spend money through September 15, 2010 Jul-Aug, 2010 Final Budget document prepared and finalized Sept 7, 2010 Final Budget presented to the Board Sept 15, 2010 Last day Final Budget may be adopted Restricted Fund 12: Public Grants and Contracts Project Title Key Personnel Advanced Technology Clean Energy/Green Construction Prog CTE Community Collaborative 1 CTE Community Collaborative 2 CTE Community Collaborative 3 CTE Nursing Enrollment & Retention CTE‐Linking After School Program Department of Social and Employment Services Equipment for Nursing and Allied Health Programs Foster and Kinship Care Education IDRC Food Safety Tech IDRC Sustainable Construction IDRC Sustainable Design Nursing Enrollment and Retention Nursing Remediation Small Business Development Center Grant VTEA Tech Prep Y hE Youth Entreprenuership Program (YEP) hi P (YEP) Ag Mechanic Training (Workforce Investment Board) VTEA Title IC YESS ‐ Independent Living Program Mike Thomas/ MISA Mike Thomas/MISA, Neil Ledford, Mary Young Mike Thomas/MISA, Neil Ledford, Mary Young Mike Thomas/MISA, Neil Ledford, Mary Young Mary Young Mike Thomas/MISA, Neil Ledford, Mary Young Margie Wiebusch Mary Young Margie Wiebusch Neil Ledford Mike Thomas/ MISA Mike Thomas/ MISA Mary Young Mary Young Paulette Bumbalough Neil Ledford, Molly Lewis P l Paulette Bumbalough B b l h Neil Ledford/Ko Cooper Neil Ledford Margie Wiebusch Academic Affairs Basic Skills CCRAA Yr 2‐Math & Science CCRAA‐CSUMB Child Care Access Means Parents in School Child Care Food Program Child Care Permissive Tax Bill Child Development Training Consortium Faculty and Staff Diversity First 5 Monterey County IDRC New Media Entertainment Lottery ‐ Prop 20 Lumina Foundation Grant (through CSUMB) MESA NIH Grant ‐ ACCESS Program NSF STEM Scholarships NSF STEP State Preschool Title V Hartnell/Gavilan Heidi Ramirez Science and Math Faculty, Gary Hughes, Stan Crane Chante Davis Linda Taylor Linda Taylor Linda Taylor Jeannie Hori‐Garcia Terri Pyer Melanie Allison, Linda Taylor Jerri Nemiro, Firehawk Hulin/MISA Al Muñoz Heidi Ramirez/Hetty Yeland Shannon McCann Lawrence Yee Leticia Contreras, Joe Welch, John Sword Shannon McCann Linda Taylor Science and Math Faculty, Gary Hughes, Stan Crane Primary Focus TOTAL Award Amount Yearly Amount Green Construction Ag, Construction, Nursing Ag, Construction, Nursing Ag, Construction, Nursing Nursing Ag, Construction, Nursing Foster Youth Nursing Foster Youth Agriculture Green Construction Green Construction Design Nursing Nursing Workforce Training Advanced Technology Y hE Youth Entrepreneurship hi Agriculture Advanced Technology Foster Youth Advanced Technology Total 999,862 369,700 400,000 310,000 413,871 373,988 404,220 73,906 196,321 179,546 326,249 350,000 179,372 121,450 74,393 67,750 50,000 50 000 147,826 262,217 22,500 5,323,171 499,931 205,239 400,000 310,000 195,764 123,988 404,220 18,871 196,321 59,525 108,161 183,600 89,686 121,450 74,393 67,750 50,000 50 000 147,826 262,217 22,500 3,541,442 Math and Science Science Childcare Student Support Student Support Child Development Staff Development Childcare Media Arts Instruction Math and Writing Math and Science Science Science Math and Science Student Support Science, Math, and Basic Skills 90,000 1,807,449 220,000 36,972 19,093 35,537 10,000 5,118 10,000 205,000 109,538 295,254 50,568 12,000 575,000 902,464 658,666 2,126,000 90,000 943,791 110,000 36,972 7,000 35,537 10,000 5,118 10,000 205,000 109,538 98,418 50,568 12,000 77,500 168,384 658,666 700,000 Restricted Fund 12: Public Grants and Contracts Project Title Title V STEM Key Personnel Science and Math Faculty, Gary Hughes, Stan Crane Student Services Student Services (non‐formula driven) Gear Up East Salinas High School Equivalency Program TRIO Student Support Services Workability Program III/Department of Rehab Augustine Nevarez Carla Johnson Manuel Bersamin Paul Casey Student Services (formula driven) CalWORKs Program CARE DSP&S EOPS Matriculation Student Financial Aid Admin TANF Student Services (grants to students) Cal Grants Federal Work Study Pell Grants Supplemental Educational Opportunity Grant (S.E.O.G) TOTAL Award Primary Focus Amount Science, Math, and Basic Skills 2,875,000 General Ed Total 10,043,659 Yearly Amount 575,000 3,903,492 Outreach Outreach First in Family Disabled Students Student Services (non‐ formula driven) 6,642,984 1,768,726 1,142,750 352,616 9,907,076 1,107,164 400,650 252,200 352,616 2,112,630 Paul Casey Paul Casey Paul Casey Paul Casey Gregory Peterson Mary Dominquez Paul Casey Low Income Students Low Income Students Disabled Students Low Income Students Transfer Students Low Income Students Low Income Students Student Services (formula driven) S d S i (f l di ) 183,213 102,815 352,616 482,407 267,951 279,737 69,339 1,738,078 1 738 078 183,213 102,815 352,616 482,407 267,951 279,737 69,339 1,738,078 1 738 078 Mary Dominquez Mary Dominquez Mary Dominquez Mary Dominquez Low Income Students Low Income Students Low Income Students Low Income Students Student Services (Grants to Students) 436,275 166,898 7,619,555 69,720 8,292,448 436,275 166,898 7,619,555 69,720 8,292,448 Total All Grants 35,304,432 19,588,090 Construction Construction Construction Design Construction Furniture Construction Furniture Design Construction Construction Furniture Construction Furniture Construction Furniture Construction Misc Misc Misc Misc Misc Misc Misc Hartnell College Construction Program Direct Costs Series B & C (June 2006 - March 2010) PROJECT COMPANY LOCATION CALL Building DMC Construction Monterey, CA CALL Building Cal Water Salinas, CA CAT Building Dilbeck & Sons Salinas, CA CAT Building Kasavan Architects Salinas, CA CAT Building Alco Water Salinas, CA CAT Building PBI Salinas, CA Student Center DMC Construction Monterey, CA Student Center PBI Salinas, CA Campus Lighting Aurum Consulting Monterey, CA NE Landscaping MPE Marina, CA PE Renovation Perma Green Gilroy, CA CALL Building PBI Salinas, CA Campus Refresh #1 Gozzi Carmel, CA Campus Refresh #1 PBI Salinas CA Salinas, Campus Refresh #2 Sanchez Hollister, CA Campus Refresh #2 PBI Salinas, CA Marquee DMC Construction Monterey, CA Misc Apex Signs Salinas, CA Misc Wasinger Inspection Prunedale, CA Misc Kleinfelder Salinas, CA Misc Felice Consulting Hollister, CA Misc Valley Blueprint Salinas, CA Misc Scarr Moving Salinas, CA Misc Californian Salinas, CA AMOUNT $15M $35k $20.3M $2.15M $35k $500K $4.2M $150k $27k $1.25M $4.2M $600K $203K $47k $135K $47k $143K $30k $350k $800k $500k $20k $30k $12K TOTAL SPENT LOCALLY Series B, C & State Funds Spent to Date Percentage to Local Firms $50,765,150 $66,450,000 76.40% Series B, C & State Funds- Total $72,340,000 APPENDIX D PERSONNEL ACTIONS ITEMS APPROVED AND/OR RATIFIED AT THE REGULAR MEETING OF MAY 4, 2010 Detail: I. Retirements, resignations, releases, and leave requests A. Ratify retirement of regular personnel: 1. Mary Brown, DSPS Specialist (#CC-90), effective July 16, 2010. B. Ratify resignations of regular personnel: 1. Seetha Chitti, Programmer Analyst (#CC-159), effective May 14, 2010. 2. LeeAnn Emanuel, DSPS Counselor (#F-26), effective June 11, 2010. C. Ratify release of regular personnel: 1. Guadalupe Cabrera, Food Service Worker (#CL-3), Cafeteria, effective July 1, 2010, due to layoff, and placement on 39-month re-employment list in accordance with Education Code §88117. II. Appointments A. Ratify appointment to regular classified positions. These appointments are part of the reorganization of the Student Services area consistent with the Memorandum of Understanding signed between the District and the CSEA in December 2009 and approved by the Board on January 19, 2010: 1. Irene Haneta, full-time, 40 hours per week, 12 months per year, Enrollment Services Lead (#CC-174), Student Services, Step A, effective April 5, 2010. This action reflects a promotion from Admissions and Records Technician (#CC-75), Student Services. 2. Mercedes Quintero, full-time, 40 hours per week, 10 months per year, Student Life Coordinator (#CC-64), Student Services, Step A, effective April 5, 2010. This action reflects a promotion from Administrative Assistant – Title V (#CC125), Educational Technology and Library. 3. Jessica Tovar, full-time, 40 hours per week, 12 months per year, Financial Aid Lead (#CC-172), Student Services, Step E, effective April 5, 2010. This action reflects a promotion from Financial Aid Specialist (#CC-93), Student Services. B. Ratify voluntary transfer to regular classified position: 1. Leda Polio, full-time, 40 hours per week, 12 months per year, from Administrative Assistant – SBDC (#CC-153), to Administrative Assistant – Title V (#CC-125), effective April 26, 2010. This action, which has been reviewed and approved by CSEA, will avoid layoff due to the discontinuation of the SBDC program. C. Ratify appointment of part-time instructors for spring semester 2010: 1. Barry Eisenberg, Agriculture Business Technology 2. Steven Hanley, English 3. Cicely McCreight, Psychology 4. Carla Pantoja, Theater. Appointment based on equivalency as follows: B.A. in Theater Arts. Coursework and extensive professional resume of acting, directing, musical direction, design and technical assignments. Certificate in Shakespeare – Royal Academy of Dramatic Art. 5. Joshua Stewman, Construction D. Ratify appointment of substitute positions: 1. Ying Chu, $16.52/hr (20 hrs/week), Division Administrative Assistant, 1 APPENDIX D PERSONNEL ACTIONS ITEMS APPROVED AND/OR RATIFIED AT THE REGULAR MEETING OF MAY 4, 2010 April 7 – May 28, 2010. E. Ratify volunteers: 1. Joseph Calado, assist soccer team, February 24 – June 2, 2010. 2. Gabriel Garcia, assist in student services area, March 20 – 31, 2010. F. Ratify appointment of Professional Experts: a. The Foster Kinship Care Education Program (FKCE) provides advanced training for current and prospective foster, relative, and non-related extended family member caregivers, adoptive parents, and local agency employees; and support for foster home recruitment activities. This grant funded program is a joint effort of the California Community College Chancellor’s Office and the Department of Social and Employment Services (DSES). Assignments include orientation leaders, trainers, childcare and activity providers, and program coordination, and run through June 10, 2011: 1. Emily Molinar, $13/hr, (as needed), child care lead. 2. Emily Molinar, $16/hr, (as needed), childcare. b. Administration of Justice 102 PC 832 Arrest and Firearms is designed to satisfy the curriculum standards of the Commission on Peace Officer Standards and Training (POST) as required by Penal Code 832, for the spring semester, January 25 – June 2, 2010: 3. Ernesto Castro, $47/hr (as needed), range master. 4. Ben Jimenez, $47/hr (as needed), defense tactics instructor. c. Hartnell’s theater arts program/The Western Stage (TWS) provides students the opportunity to learn their craft within a professional context. Assignment runs through June 30, 2010: 5. Leslie Lancaster, $3,250/season, coordination of props and stage management. G. Ratify appointment of student workers for spring semester 2010: 1. Claudia Cerna Bravo, Academic Learning Center, Student Worker II 2. Jessica Geiger, Academic Learning Center, Student Worker II 3. Maricela Mendoza, Academic Learning Center, Student Worker I 4. Masaya Nakamura, Advanced Technology, Student Worker III 5. Phillip Yee, Library, Student Worker I 6. Ernesto Yzquierdo, Advanced Technology, Student Worker III 2 AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Ratify Disbursements of District Accounts Number: Area: Office of Support Operations Supplement OSO-3 Prepared by: Kent Stephens Status: Consent V. B. Recommendation: That the Board of Trustees ratifies disbursements from District accounts. Summary: The attached lists of disbursements from District accounts are presented for ratification. COUNTY WARRANTS Any or all of the following funds: General; Debt Service; Bookstore; Child Development Center; Capital Outlay; Scheduled Maintenance/State-Funded Projects; Property Acquisition; Bond Projects; Cafeteria; Self-Insurance; Retirees’ Health Benefits; Associated Student Body; Scholarship, Loan, and Trust; and Intercollegiate Athletics NO OF DATE WARRANT NUMBER WARRANTS AMOUNT 04/05/10 12778268 12778368 101 $844,758.17 04/14/10 12779713 12779809 97 $1,911,744.58 04/20/10 12780743 12780743 1 $1,852,805.00 04/21/10 12781261 12781345 85 $154,475.99 04/28/10 12782817 12782952 136 $1,944,076.96 Subtotal $6,707,860.70 Note: Legal fees in above summary total $4,612.97 DATE April 10 Subtotal CHECKING ACCOUNTS General Fund Revolving NO OF WARRANT NUMBER WARRANTS 10170 10173 4 Total Budget Implications: None AMOUNT $12,782.96 $12,782.96 $6,720,643.66 AGENDA ITEM FOR BOARD MEETING OF: Title: June 22, 2010 Number: Transfer of Non-Cash Donations from Hartnell College Foundation V. C. Area: Status: Office of Advancement Prepared by: Beverly Grova Consent Recommendation: That the Board of Trustees accepts the non-cash donations from the Hartnell College Foundation each valued, by the donor, at less than $5,000. Summary: A list of non-cash donations received by the Hartnell College Foundation is listed below: Date Received 08/03/09 Donor Donated To Non-Cash Donations Elizabeth Tremewan Atherton Fine Arts Department Painting of the original Hartnell College by Elizabeth Morse 01/26/10 Joseph Zoccali Astronomy Program One telescope Budget Implications: None AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Ratify the Recommendations from the Curriculum Committee Number: Area: Academic Affairs Prepared by: Suzanne Flannigan, Ph.D. Status: V. D. Consent Recommendation: That the Board of Trustees ratifies the recommendations from the Curriculum Committee. Summary: The following actions were reviewed by faculty in the disciplines, approved by the Curriculum Committee which is a standing committee of the Academic Senate: NEW COURSES – 6 Courses CON 52, Advanced Field Practice in Construction (Units: 6, Time Allocation: 2 Lecture Hours, 4 Lab Hours NRN 42.3, Nursing Skills II (Units: 1, Time Allocation: 3 Lab Hours) NRN 50.41, Supervised Nursing Skills Practice I (Units: .03-1, Time Allocation: 3 Lab Hours) NRN 50.42, Supervised Nursing Skills Practice II (Units: .03-1, Time Allocation: 3 Lab Hours) NRN 50.43, Supervised Nursing Skills Practice III (Units: .03-1, Time Allocation: 3 Lab Hours) NRN 50.44, Supervised Nursing Skills Practice IV (Units: .03-1, Time Allocation: 3 Lab Hours) COURSE REVISIONS – 8 Courses ECO 1, Principles of Macroeconomics—added Distance Ed and updated textbook. ECO 5, Principles of Microeconomics—added Distance Ed and updated textbook. EGN 2, Engineering Graphics/CAD—changed course description, updated textbook and outline updated. EGN 12, Engineering Design with SolidWorks—revised advisory, materials and outline updated. HED 7, Women’s Health—added Distance Ed NRN 30, Basics of Pharmacology for Nursing Practice—added Distance Education NRN 50, Registered Nursing Laboratory Practicum—changed course description, units from .03-2 to .03-1 and outline updated. NRN 110, Foundations for Success for Registered Nursing Students—added Distance Education GOVERNING BOARD MEETING JUNE 22, 2010 PAGE 2 INACTIVE - 46 COURSES AUC70, Spot Repair and Refinishing AUC70A, Spot Repair & Refinishing AUC70B, Spot Repair & Refinishing AUC70C, Spot Repair & Refinishing AUC76, Advanced Repair, Replacement AUC145, Special Projects AUC150, Introduction to Auto Collision Repair & Refinishing AUC150A, Introduction to Auto Collision Repair & Refinishing AUC150B, Introduction to Auto Collision Repair & Refinishing AUC150C, Introduction to Auto Collision Repair & Refinishing AUC171, Repair and Refinishing AUC172, Advanced Repair and Refinishing Laboratory AUC173, Auto Body Repair and Replacement AUC173A, Auto Body Repair and Replacement AUC173B, Auto Body Repair and Replacement AUC173C, Auto Body Repair and Replacement AUC174A, Frame and Unibody Repair AUC174B, Frame and Unibody Repair AUC174C, Frame and Unibody Repair HES 10, Introduction to Clinical Labor HES 101, Scientific and Professional Basis of Health Care HES 11, Clinical Laboratory Math HES 110A, Theory in Phlebotomy Techniques HES 110B, Practicum in Phlebotomy Techniques HES 139.002, Legal & Ethical Issues in Health Care HES 20, Clinical Urinalysis HES 20L, Clinical Urinalysis Lab HES 21, Clinical Immunohematology HES 21L, Clinical Immunohematology Lab HES 23, Clinical Immunology/Immunohematology Practicum HES 40, Clinical Chemistry I HES 40L, Clinical Chemistry I Lab HES 41, Clinical Chemistry II HES 41L, Clinical Chemistry II Lab HES 43, Clinical Chemistry Practicum HES 60, Clinical Microbiology HES 60L, Clinical Microbiology Lab HES 63, Clinical Microbiology Practicum HES 70, Clinical Hematology HES 70L, Clinical Hematology Laboratory HES 71, Clinical Coagulation HES 71L, Clinical Coagulation Lab HES 73, Clinical Hematology, Coagulation and Urinalysis Practicum HES 98, Hazardous Materials and Industrial Safety HES 99, Cooperative Work Experience Education HIT 180, Medical Terminology GOVERNING BOARD MEETING JUNE 22, 2010 PAGE 3 DELETED – 10 COURSES ELE52, Electronic Fundamentals ELE54, Electronic Devices and Circuits ELE55, Intro. to Digital Electronics ELE56, Advanced Circuit Analysis ELE57, Instruments and Controls ELE57.15, Instruments and Controls Programming ELE65, Microcontroller Programming and Interfacing ELE145, Special Projects ELE150, Electronic Fabrication Practicum ELE151, D.C. Circuit Analysis DEGREES/CERTIFICATES TO INACTIVE STATUS – 2 Degrees/Certificates Auto Collision Repair Associate of Science Degree Auto Collision Repair Certificate of Achievement AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Ratify Agreement to Accept Sub-award Grant Funds through the University California Santa Cruz from the National Science Foundation (NSF) Number: Area: Office of Academic Affairs and Accreditation/OAA Prepared by: Dr. Suzanne Flannigan Status: V. E Consent Recommendation: That the Board of Trustees ratifies an agreement to accept funds from the University of California, Santa Cruz (UCSC) as a sub recipient of a grant from the National Science Foundation. Background: From time to time, Hartnell College is included as a partner or sub-recipient of a grant submitted by another college, university or organization. Unlike grants that originate with Hartnell, applications such as this one are brought to the Board for approval ounce the grant is funded and the college has been so notified. Summary: Project is in partnership with UCSC with the focus of providing students with an engaging remote laboratory for interactive experiments in renewable energy. We will utilize a photovoltaic test facility at the Advanced Studies Laboratory at NASA Ames Research Center, via the internet, and develop modules for students to learn about solar energy. The goal of this new renewable energy laboratory and the associated learning modules will be to educate students at UCSC, Hartnell, and the surrounding high schools about renewable energy to understand the technological advances necessary to go beyond our current fossil fuel based energy dependent economy. Project Director: Dr. Brooke Haag, Hartnell Faculty Budget Implications: $50,000 increase to restricted general fund. Source of Funds: Federal $50,000 (sub-award) State Local AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Ratify the Contract with DMC Construction for the CAB (Refresh Project, #3) Number: Area: Status: Office of Facilities Consent V. F. Recommendation: That the Board of Trustees ratifies the contract with DMC Construction for the second and third floors of the Classroom and Administration Building (Refresh Project, #3). Summary: The project consists of carpet replacement, expanding the size of certain classrooms by removing walls, replacement of hallway acoustical panels, hallway floor, and ceiling tiles, creation of “smart” classrooms, installation of white boards, and painting. Over the past few years, the District has performed CAB Refresh Projects #1 and #2, which consisted of changing the finishes on a number of classrooms in the CAB Building. The purpose of these projects is to provide a better teaching and learning environment for the students and staff of Hartnell College. On May 13, 2010, Hartnell College issued bids for the project which was advertised in the Salinas Californian and through the Salinas Builders’ Exchange. On May 25th and May 27th, Hartnell College conducted two mandatory job walks in which a total of seven (7) contractors participated. On June 8th, bids were opened. On June 14th, a Notice to Proceed was given to DMC who was the only bidder on this project. The project is scheduled to be completed no later than August 15, 2010. GC DMC Construction Monterey, CA 436,490 Budget Implications: The budget for the above referenced contract is $436,490 and will be paid by Measure H. AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Number: Ratify Contract with Western Water Features for the Pool Renovation Project Area: Status: Office of Facilities Consent V. G. Recommendation: That the Board of Trustees ratify the contract with Western Water Features for the Pool Renovation Project. Background: The District with through a RFP process to select an architect to design this project and BFGC was the firm selected and approved by the Board. The users of the facility met (PE and Athletic Department) a number of times to plan the project. Based on their input, BFGC and their pool consultant developed specifications for the project go out to bid. All specifications meet USA Swimming Standards. Two portable lifeguard stands, four portable step systems, and hand/guard rails on diving board will be added. Existing pool lighting will be replaced with efficient LED lighting. An ADA compliant handicap pool lift will be added as well as other modifications needed. Summary: On May 7, 2010, Hartnell College issued bids which were advertised in the Salinas Californian and through the Salinas Builder’s Exchange. On May 12 and May 19, Hartnell College conducted mandatory job walks. On June 2nd, the two bids received were opened and on June 12th, a notice to proceed was given to Western Water Features. The two bids were as follows: GC GC Western Water Features DMC Construction El Dorado Hills, CA Monterey, CA 545,000 581,439 Budget Implications: The budget for the above referenced contract is $545,000 and will be paid by Measure H. AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Ratify Contract with County of Monterey, Probation Department Number: Area: Status: Office of Advancement Prepared by: Beverly Grova Consent V. H. Recommendation: That the Board of Trustees ratifies the contract between Hartnell Community College District and the County of Monterey, Probation Department for the coordination of trainings for the Seven Challenges Program. Background: The Seven Challenges Program is a substance abuse treatment program that is managed by the County of Monterey Probation Department. Hartnell College has coordinated the trainings for this program for the past six years through the Title IVE training guidelines. Summary: This contract will reimburse the Foster and Kinship Care Education for the coordination of trainings, training supplies, and use of facilities for county social and behavioral health staff. The focus of the training is for the Interview and Interrogation of Sex Offenders for a JSORT grant, funded by the Monterey County Probation Department. Project Manager: Margie Wiebusch Term of Contract: May 1, 2010 to June 30, 2011 Budget Implications: All costs for this program will be paid from funds from the County of Monterey. Source of Funds: Federal: State: Local $31,300 AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Approve and Authorize the Administration to enter into an Agreement with Alpert/McKee Company, Consultant for HIS Title V CCRAA Grant Writing Services Number: Area: Educational Technology and Library Services Prepared by: Gary Hughes Status: Consent V. I. Recommendation: That the Board of Trustees approves and authorizes the administration to enter into an agreement with Alpert/McKee Company for writing a Hispanic Serving Institution (HSI) Title V CCRAA grant. Summary: For the past 18 years, Alpert/McKee Company has been used by the College to provide grant writing and evaluation services. They have long successful history of writing, submitting and evaluating Department of Education Gear-up, Title III, Title V, and CCRAA grants. Approval of this new Agreement will enlist Alpert/McKee Company in the College’s effort to submit a new five year individual Title V CCRAA grant request valued at about $2.5 million. Their services will include reviewing documents and regulations; collecting data; consulting and meeting with college staff about projects and organization of the grant proposal; reviewing and preparing budgets; making recommendations on projects and/or their design; and preparing, assembling the grant proposals for submission and in the formal submission of the grant to the Department of Education. Term: 2010 – 2015 Budget Implications: There is no cost unless grant is funded. If funded, cost will be 6% of awarded funds in years one and two, 5% in year three and 4% in years four and five. By law, Title V grant funds cannot be used to pay these fees. AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Approve and Authorize the Administration to enter into an Agreement with the City of Salinas for a Voluntary Fitness Incentive Program Number: Area: Status: Student Affairs & Athletics Prepared By: Dr. Greg Peterson Consent V. J. Recommendation: That the Board of Trustees approves and authorizes the administration to enter into an agreement with the City of Salinas for a Voluntary Fitness Incentive Program. Summary: The City of Salinas previously entered into an agreement with the College to provide a test assessment program for a Voluntary Fitness Incentive Program for city employees. Hartnell College Physical Education faculty administers the test, provide fitness results and give guidelines for maintaining or improving fitness levels. During the testing process, the participants receive information about physical fitness and wellness. The participants are provided supportive materials and resources with regard to fitness, exercise and health. Many participants return to Hartnell College to enroll in subsequent physical education classes that can help them maintain or improve their fitness levels. Term of Agreement: June 25, 2010 to September 1, 2010 Budget Implications: Revenue increase of approximately $4000 to the unrestricted general fund. Source of Funds: Federal $ State $ Local $4,000 AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Approve and Authorize the Administration to enter into an Agreement with the Monterey County Probation Department for a Voluntary Fitness Incentive Program Number: Area: Student Affairs & Athletics Prepared By: Dr. Greg Peterson Status: Consent V. K. Recommendation: That the Board of Trustees approves and authorizes the administration to enter into an agreement with County of Monterey, Probation Department for a Voluntary Fitness Incentive Program. Summary: Hartnell College previously had an agreement with the County of Monterey to provide a test assessment program for the Voluntary Fitness Incentive Program with the Probation Department. The County of Monterey, Probation Department offers a Voluntary Fitness Incentive Program for its employees. Hartnell College Physical Education faculty administers the test, provide fitness results and give guidelines for maintaining or improving fitness levels. During the testing process, the participants receive information about physical fitness and wellness. The participants are provided supportive materials and resources with regard to fitness, exercise and health. Many participants return to Hartnell College to enroll in subsequent physical education classes that can help them maintain or improve their fitness levels. Term of Agreement: June 1, 2010 to September 1, 2010 Budget Implications: A revenue increase to the unrestricted general fund of approximately $2000. Source of Funds: Federal $ State $ Local $2,000 AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Number: Approve and Authorize the Administration to enter into a Contract with JM Electric, for the Campus Lighting Project Phase II Area: Status: Office of Facilities Consent V. L. Recommendation: That the Board of Trustees approves and authorizes the administration to enter into a contract with JM Electric for the Campus Lighting Phase II project which will install lighting along Central and Cypress St. in front of both the Learning Resource Center (LRC) and the Parking Structure. Background: In 2008, the District implemented phase I of the lighting on campus which replaced 20 existing lights with a total of 88 new lights. This second phase will install a total of 17 new pole lights as well as lighting on the north side of the VoTech Builidng. The design was performed by Aurum Engineering and recommendations were made by Hartnell staff, campus security, and from the Marina Police Department. Summary: Hartnell issued bids on May 13, 2010 and the project was advertised in both the Salinas Californian and through the Salinas Builders Exchange. On May 20 and May 26 contractors participated in two mandatory job walks. The bids were opened on June 10th and a total three bids were received. GC GC GC JM Electric Newton Central Electric Salinas, CA San Luis Salinas, CA $86,250 $97,500 $116,245 Budget Implications: The budget for the above referenced contract is $86,250 and will be paid by Measure H. AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Approval of Use of General Services Administration (GSA) Agreement to Purchase Computer Stations for the CAT Building Number: Area: Status: Office of Facilities Consent V. M. Recommendation: That the Board of Trustees approves the use of the General Services Administration (GSA) Agreement for Computer Comfort computer stations for the CAT Building Project. Summary: GSA Schedules are based on contracts negotiated between vendors and the U.S. General Services Administration, and all Federal Purchasing Agencies can issue purchase orders without further negotiations based on current GSA Schedules. GSA prices must match or be better than a vendor’s pricing to its most favored commercial customer. Budget Implications: The budget for the above referenced contract is $250,000 and will be paid by both Measure H and State Funds. AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Number: V. N. Approve and/or Ratify Personnel Actions Area: Human Resources & Equal Employment Opportunity Status: Consent Recommendation: Approve and/or ratify personnel actions as listed below. Summary: Ratification of: 4 retirements of regular personnel 1 resignation of regular personnel 2 requests for leaves of absence 2 appointments to regular classified positions 1 administrative resignation and re-appointment to faculty 1 part-time instructor for spring semester 2010 3 substitute positions 13 professional expert hires 2 student worker hires for spring semester 2010 Detail: I. Retirements, resignations, releases, and leave requests A. Ratify retirement of regular personnel: 1. Fred Etcheverry, Electronics Technology Instructor (#F-29), effective June 3, 2010. 2. Patty McEfee, Administrative Assistant (#CF-11), effective June 9, 2010. 3. Philip Adams, Business Instructor (#F-2), effective June 3, 2010. 4. Robert Spier, Counselor (F78), effective June 9, 2010. B. Ratify resignations of regular personnel: 1. Jesse Asiñas, Administrative Assistant (#CC-1), effective August 6, 2010. C. Approve request for leave of absence: 1. Heidi Ramirez, English Instructor, for a one-semester leave of absence, effective August 16 through December 17, 2010, in accordance with the 1 AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Education Code, laws of the State of California and Federal laws which govern pregnancy and family leave. The leave will be without pay for periods of time. 2. Mohammad Hussain, Math Instructor, 33 percent of load for up to two years, unpaid leave of absence for professional development, beginning Fall semester, August 16, 2010. This is in accordance with Article 7 Section K of the Hartnell College Faculty Association (HCFA) contract. II. Appointments A. Ratify appointment to regular classified positions. 1. Yvonne Carreon, 40 hours per week, 12 months per year, Administrative Assistant (#CC-166), Student Services, Step B, effective June 7, 2010. This action reflects a promotion from Clerical Assistant (#CC-104), TRIO. 2. Melissa Romero, 40 hours per week, 12 months per year, Financial Aid Specialist (#CC-93), Student Services, Step A, effective June 1, 2010. This action reflects a promotion from Financial Aid Technician (#CC-100), Student Services. B. Ratify resignation of administrative position and re-appointment to faculty: 1. Jennifer Lagier Fellguth, from Dean of Distance Learning, Evening, Weekend Programs and Adjunct Faculty Support (#A-44) effective June 30, 2010, to fulltime faculty (#F-31). C. Ratify appointment of part-time instructors for spring semester 2010: 1. John Owens, Construction. Appointment based on equivalency as follows: meets core competencies equivalent to AA degree and general education requirements. D. Ratify appointment of substitute positions: 1. Eva Diaz, $14.99/hr, (40 hrs/week), Administrative Assistant, May 7 – 21, 2010. 2. Maria Garepie, $16.52/hr (40 hrs/week), Division Administrative Assistant, April 12 – June 30, 2010. 3. Ying Chu, $14.99/hr (40 hrs/week), Administrative Assistant, April 26 – June 4, 2010. E. Ratify appointment of Professional Experts: a. The Hartnell College Math Academy is a two-week, not-for-credit, nongraded pilot program designed for incoming freshmen whose placement scores on the Accuplacer diagnostic test do not qualify them for pre-algebra or for elementary algebra. Faculty had a retreat to prepare and demonstrate innovative teachings tools to be used in all math courses as well as the Summer and Winter Math Academies. Grant-funded. 2 AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 1. Patricia Garcia, $35/hr, (15hrs), Math Instructor, April 30 – May 1, 2010. b. California Employment Department, Clean Energy Workforce Training Program, provides the creation of a green building pre-apprenticeship training program. With over 330 hours of college training and 300 hours of paid internship, the program is designed for motivated men and women eager to build knowledge and skills so that they can qualify to become part of the next generation of American builders: 2. Michael DeArmond, $5000/month, Internship Coordinator, March 1 – November 30, 2010, grant-funded. c. The High School Equivalency Program (HEP) is funded by the US Department of Education Office of Migrant Education. HEP is a migrant education program designed to assist migrant and seasonal field workers obtain their GED and either employment, military service, apprenticeship, Certificate of Skills Acquisition, Certificate of Achievement, or Associates Degree. 3. Floriberto Garcia, $12.02/hr, (20hrs/week), Instructional Aide. d. Administration of Justice 102 PC 832 Arrest and Firearms is designed to satisfy the curriculum standards of the Commission on Peace Officer Standards and Training (POST) as required by Penal Code 832, for the spring semester, January 25 – June 2, 2010: 4. Anthony Gutierrez, $25/hr (as needed), range safety assistant. 5. John McCormick, $25/hr (as needed), range safety assistant. e. Hartnell’s theater arts program/The Western Stage (TWS) provides students the opportunity to learn their craft within a professional context. TWS’ current season runs through June 30, 2010: 6. John Englehorn, $3000/season, preseason electrical department set up; lighting design. 7. Richard Green, $1000/season, photography for all publicity, productions and events. 8. Diane Kelsey, $1872/season, wardrobe supervision. 9. Jeff Mockus, $1000/season, survey current sound system and recommend improvements. 10. Carla Pantoja, $1500/season, facilitator for the creation of theatre arts program at the Alisal Center. 11. David Parker, $4250/season, scenic designer and actor. 12. Luana Speelman, $2500/season, scenic and property crafts. 3 AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 13. Reina Vasquez, $1500/season, theatrical costume design and coordination. F. Ratify appointment of student workers for spring semester 2010: 1. Eliana Perez, Academic Learning Center, Student Worker I 2. Steven Vuong, Art, Student Worker I 4 ACTION ITEMS AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Ratify Budget Revisions Number: Area: Office of Support Operations Supplement OSO-2 Prepared by: Kent Stephens Status: Action (Roll Call Vote) VI. A. Recommendation: That the Board of Trustees ratifies Budget Revisions for FY 09-10 numbered 8783 to 8860. Summary: The adopted budget each year represents the best estimate of revenue and expenditures. As the year progresses and actual amounts are known, budget changes must be made. Revisions to the adopted budget are subject to approval by the Board of Trustees. Budget revisions consist of transfers between major object expenditures or from the appropriations for contingencies, as well as budgetary increases for the use of funds not included in the original budget. All budget entry numbers are assigned automatically assuring a complete sequence accounting. Numeric breaks on the attached report are due to the exclusion of budget transfers, which do not require Board approval. The accompanying Budget Journal Entry Detail Report was produced directly from the accounting software. Budget Implications: The Unrestricted General Fund budget remains unchanged. The Restricted General Fund increased by $46,808.82 due to increased revenue to program. AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Ratify Quarterly Financial Status Report (CCFS-311Q) for March 31, 2010 Number: Area: Office of Support Operations Prepared by: Kent Stephens Status: Action VI. B. Recommendation: That the Board of Trustees ratifies the Quarterly Financial Status Report (CCFS-311Q) for the period ended March 31, 2010. Summary: AB 2910, Chapter 1486, Statutes of 1986, require California community college districts to report on their financial condition on a quarterly basis. Accordingly, the District must submit the attached Quarterly Financial Status Report (Form CCFS-311Q) to the Chancellor’s Office. The County Superintendent of Schools receives an information copy. In summary, this quarterly report indicates that the District is solvent and that no unusual financial matters arose during the quarter. Budget Implications: None AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Adopt Resolution 10:5, 2009-2010 Budget Revisions Number: Area: Office of Support Operations Supplement OSO-4 Prepared by: Kent Stephens Status: Action (Roll-call) VI. C. Recommendation: That the Board of Trustees adopts Resolution 10:5, 2009-2010 Budget Revisions. Summary: In order to conduct an orderly closing of the books for fiscal year 2009-2010, various intra-fund budget revisions need to be made at or soon after year-end to complete the closing of the District’s general ledger. The Board of Trustees is asked to authorize the President or designee to make these necessary revisions. Budget Implications: None HARTNELL COMMUNITY COLLEGE DISTRICT Budget Revision Resolution No. 10:5 NOW THEREFORE, BE IT RESOLVED, that the Board of Trustees, at the close of the fiscal year 2009-2010, authorizes the Hartnell College President or designee to make budget revisions between major classifications of the District’s 2009-2010 budget as necessary to permit the payment of obligations of the District incurred during the fiscal year. PASSED AND ADOPTED by the Board of Trustees of the Hartnell Community College District on this 22nd day of June, 2010. AYES: NOES: ABSENT: ________________________________ Phoebe K. Helm Governing Board Secretary AGENDA ITEM FOR BOARD MEETING OF: June 22, 2010 Title: Approve Tentative Budget for 20102011, Set Date and Time for Public Hearing and Set Date to Adopt Final Budget for 2010-2011 Number: Area: Office of Support Operations Supplement OSO-5 Prepared by: Kent Stephens Status: Action VI. D. Recommendation: That the Board of Trustees: 1. Approve the attached 2010-2011 tentative budget, required on or before July 1 of each year. 2. Set September 7, 2010 at 5:00 p.m. as the date and time to conduct a public hearing on the 2010-2011 budget. 3. Set September 7, 2010 as the date to adopt the 2010-2011 budget. Summary: California Code of Regulations, Title 5, Section 58305, requires the District develop a tentative budget and forward an information copy to the Monterey County Office of Education on or before July 1 of each year. Further budget action required and included in the budget calendar is: September 1, 2010 September 7, 2010 2010-2011 budget available for public inspection Board of Trustees conducts a public hearing and adopts the 20102011 budget September 15, 2010 Per California Code of Regulations, Title 5, Section 58305, the governing board of each district shall adopt a final budget. September 30, 2010 2010-2011 final budget is considered a public record pursuant to Section 6250 et seq. of the Government Code. October 10, 2010 District shall submit a copy of adopted budget report to the California Community Colleges Chancellor’s Office and file with appropriate county officers for information and review. The attached 2010-2011 tentative budget is presented to the Board of Trustees for approval. Budget Implications: Approval of the tentative budget is necessary to provide a mechanism for expenditure of funds starting July 1 until the final budget is adopted. Hartnell Community College Tentative Budget Fiscal Year 2010‐2011 June 22, 2010 Hartnell Community College Tentative Budget Fiscal Year 2010‐2011 Executive Summary Table of Contents Contents Introduction General Fund Unrestricted Restricted Other Funds Special Revenue Fund Capital Projects Fund Enterprise Fund Internal Service Fund Trust and Agency Fund All Funds 3‐Year Summary Page 1‐2 3 4‐5 6 7 8 8 9 10‐11 Fiscal Year 2010‐11 Tentative Budget Executive Summary 2010‐11 Tentative Budget Introduction Each year the Board of Trustees is required to adopt a Tentative Budget which is the District’s spending plan from July 1 through September 15. Prior to September 16, the Board is required to hold a public hearing and adopt a final budget for the remainder of the fiscal year. Below is a summary of all District funds. It includes projected beginning fund balances, as of July 1, 2010, tentative revenues and expenditures, and estimated ending fund balances for each separate fund. Funds General Unrestricted Restricted Total Special Revenue Bookstore Child Development Total Capital Projects Capital Outlay Scheduled Maintenance Property Acquisition Bond Projects Total Enterprise Cafeteria Total Internal Service Self Insured Retiree Health Benefits Total Trust and Agency Associated Student Body Scholarships, Loan & Trust Intercollegiate Athletics Total All Funds Total Tentative Budget Beginning Fund Balance July 1, 2010 Budgets 2010‐2011 Revenue Expense Ending Fund Balance June 30, 2011 $ 3,799,725 $ 34,544,220 $ 34,904,220 $ 3,439,725 ‐ 19,666,641 19,666,641 ‐ $ 3,799,725 $ 54,210,861 $ 54,570,861 $ 3,439,725 1,151,683 180,000 115,000 1,216,683 151,000 701,273 701,273 151,000 $ 1,302,683 $ 881,273 $ 816,273 $ 1,367,683 1,810,445 ‐ 3,080,346 63,815,971 $ 68,706,762 26,000 2,500,000 270,000 320,000 $ 3,116,000 250,000 2,500,000 110,000 14,000,000 $ 16,860,000 1,586,445 ‐ 3,240,346 50,135,971 $ 54,962,762 362,288 509,000 522,600 348,688 $ 362,288 $ 509,000 $ 522,600 $ 348,688 1,117,273 5,000 90,000 1,032,273 2,325,012 412,000 350,000 2,387,012 $ 3,442,285 $ 417,000 $ 440,000 $ 3,419,285 595,004 119,675 73,079 $ 787,758 97,700 4,000 22,000 $ 123,700 82,500 4,000 45,000 $ 131,500 610,204 119,675 50,079 $ 779,958 $ 78,401,501 $ 59,257,834 $ 73,341,234 $ 64,318,101 Page 1 Fiscal Year 2010‐11 Tentative Budget Each District fund is projected to have a positive balance at the beginning and end of the fiscal year. State revenue for the tentative budget is based on the most recent forecasts from state education and legislative officials. The District projects a three percent decrease in state funding levels from the current fiscal year. Revenue figures will be adjusted as more information is released by the state Chancellor’s Office. Due to the continued economic downturn, state fiscal officers indicate that apportionment payment deferrals will continue into fiscal year 2010‐11. Late payments create cash management challenges that may once again require the District to borrow short‐term funds to meet obligations. State revenue forecasts do not currently include any cost of living adjustment or funds to accommodate student growth. Consequently, the District must absorb all normal inflationary increases and costs of additional students by making reductions to current service levels. The budget is built to be flexible. The District will prioritize program restoration and new initiatives if additional resources become available. Additional revenue reductions will be discussed by campus stakeholders and shared governance committees with recommendations being made to the President and Board of Trustees. Hartnell College Apportionment History $40,000,000 $35,000,000 $30,000,000 $31,810,232 $33,526,858 $35,471,168 $34,784,280 $33,665,216 $29,184,161 $25,000,000 $20,000,000 $15,000,000 $10,000,000 $5,000,000 $‐ 2005‐06 2006‐07 2007‐08 2008‐09 2009‐10* 2010‐11** * P‐2 Estimate **Advanced Estimate Tentative Budget Page 2 Fiscal Year 2010‐11 Tentative Budget General Fund $54,570,861 Requirement The General Fund is the primary operating fund of the District. It includes resources that are unrestricted as well as funds with restricted spending requirements. Unrestricted Funds Nearly all day‐to‐day operating expenses are charged to the unrestricted General Fund. Unrestricted revenue is budgeted at $34,544,220, with a beginning balance of $3.8 million (based on June 2010 forecasts). Beginning reserves are one‐ time resources and may be used strategically to fund one‐ time investments and requirements. Other 1% Student Fees 6% State General Fund 41% Property Tax 50% Other State 2% General Fund Unrestricted Resources State apportionment, funded by local property tax, student fees and the state general fund, is the largest source of revenue and represents 97% of all unrestricted income. The principal apportionment or “entitlement” is calculated by the state Chancellor’s office and is based on in‐state enrollments referred to as full time equivalent students (FTES) at the District. The Tentative Budget uses the same FTES amount received in the 2009‐10 school year (6,818). No new state funds are available to accommodate enrollment growth. Capital 1% Operating The largest expenditure portion of the 21% Academic budget is allocated for employee Salaries salaries, associated payroll costs, and 36% benefits (77%). The remaining budget Supplies (23%) is appropriated for operating 1% costs, facility maintenance, supplies, contracted services, and equipment. Benefits Classified 21% Salaries 20% Tentative Budget Page 3 Fiscal Year 2010‐11 Tentative Budget General Fund Unrestricted Requirements Restricted Funds Funds used for the operation of educational programs that are specifically restricted by law, regulations, or donors are recorded separately in the Restricted General Fund. The majority of these funds must be expended in the fiscal year or be returned to the funding source. Budgets for state funded programs are based on current state projections. Total restricted funds amount to approximately $16 million. 2007‐08 2008‐09 2009‐10 2010‐11 Restricted Funds Actual Actual Forecast June 30, 2011 Federal VTEA Title II Tech Prep BAR Tech Prep Consortium SEOG Foster and Kin Care Education National Institute of Health Child Develop. Training Future Teacher Transfer Program Workability III NASA/CIPA II Grant NSF TULE Student Support Services Gear Up Soledad Gear Up Salinas HS Equivalance Program Child Care Access First 5 Contract Pipeline to Success in Agriculture America Reads Child Care Food Program TANF Teacher Quality Program Pell Grants Pell Administrative Cost Title V Gavilan/Hartnell CCRAA‐Math and Science Federal Work Study CCRAA‐CSUMB Title V STEM SBDC UC Merced NSF Student Success Nat'l Serv Awards Scholars Dept. of Social & Empl. Services Probation CSUMB Seamless Agri. Mgmt NSF‐STEM NSF Women/Latino STEP NSF CCLI Academic Competiveness Grant VTEA Workforce Investment Grant Agri. Tech Training (WIB) Clean Energy ARRA Allocation Forest Reserve TOTAL FEDERAL Tentative Budget $ 76,648 25,000 102,774 158,029 8,722 8,465 34,391 139,673 113,418 ‐ 211,709 332,481 984,387 660,270 ‐ ‐ 20,514 52,340 6,815 42,539 9,988 3,516,012 8,075 384,293 ‐ 91,968 ‐ ‐ 71,262 27,524 59,976 350,283 ‐ 11,983 ‐ 101,096 ‐ 17,625 217,705 ‐ ‐ ‐ ‐ $ 7,845,965 $ 81,405 ‐ 130,830 140,341 11,811 10,000 134,918 137,716 ‐ 10,970 224,535 130,997 912,248 400,909 34,087 ‐ ‐ 11,130 8,126 45,010 ‐ 5,516,418 9,790 794,565 737,649 116,571 18,259 ‐ 30,427 5,025 82,272 325,260 ‐ 30,699 ‐ 224,136 ‐ 37,650 272,927 48,345 ‐ ‐ ‐ 3,839 $ 10,678,865 $ 67,750 ‐ 141,448 147,240 12,000 11,250 ‐ 201,347 ‐ ‐ 245,000 ‐ 750,000 370,000 22,500 10,000 ‐ ‐ 9,500 69,339 ‐ 7,772,909 10,185 807,192 924,800 155,000 95,000 385,000 ‐ ‐ 45,000 397,211 57,000 ‐ 31,200 210,000 5,000 90,545 262,000 5,655 147,826 750,000 218,747 4,000 $ 14,431,644 $ 69,708 ‐ 125,000 147,173 12,000 10,000 ‐ 201,347 ‐ ‐ 48,439 ‐ 1,107,164 457,790 36,972 ‐ ‐ ‐ 8,000 54,339 ‐ 6,000,000 9,250 713,000 145,000 120,000 106,741 575,000 ‐ ‐ 50,000 404,220 30,000 ‐ 62,500 67,000 45,000 50,000 294,932 ‐ ‐ 249,862 ‐ 4,000 $ 11,204,437 Page 4 Fiscal Year 2010‐11 Restricted Funds State Matriculation Program EOPS Financial Aid Administration CARE Cal Grants DSP&S Foster and Kin Care Education Independent Living Program RHORC ‐ Economic Develop. CA Articulation Number (CAN) Lottery Prop 20 TTIP Telecommunications MESA CTE Nursing Equipment CTE Nursing Enrollment CTE Nursing Remediation CTE Linking After School IDRC Sustainable Construction IDRC Food Safety Tech CTE Community Collaborative #1 CTE Community Collaborative #2 CTE Community Collaborative #3 IDRC Sustainable Design IDRC Media & Entertainment CALWORKS Small Business Development EWD Career Pathways MLT Distance Ed Grant Coding Specialist Grant YESS‐ILP Faculty/Staff Development Faculty/Staff Diversity Block Grant Basic Skills Ag Tech Training TOTAL STATE Local Health Occupations Donations SVMHCS Lumina Planetarium Foundation SBDC Greenfield RDA Agri. Tech Foundation Parking Lot Improvement TOTAL LOCAL Tentative Budget 2007‐08 Actual 2008‐09 Actual $ 534,515 808,980 248,334 180,265 451,517 678,600 52,676 10,079 189,339 5,000 151,348 9,671 80,517 1,218 22,476 32,512 ‐ ‐ $ 543,579 737,390 290,520 163,772 439,661 576,978 46,780 ‐ ‐ 3,481 69,704 64,547 73,033 53,817 195,631 40,333 69,809 147,935 78,026 164,461 38,910 ‐ ‐ ‐ 280,298 116,056 232 ‐ 70,083 ‐ 5,591 4,868 108,164 138,311 ‐ ‐ ‐ ‐ ‐ 407,331 181,204 ‐ 111,529 214,208 ‐ 12,102 9,485 320,027 59,608 $ 4,772,541 24,760 ‐ ‐ ‐ 1,365 Tentative Budget 2009‐10 Forecast $ 267,951 482,407 279,737 102,815 439,559 359,132 49,080 ‐ ‐ 519 225,000 7,000 50,568 18,871 74,548 121,215 304,179 118,313 101,520 205,239 105,000 ‐ ‐ ‐ 183,213 74,393 49,768 ‐ ‐ 22,500 4,100 5,817 539,278 55,000 110,775 $ 4,521,970 $ 4,357,497 ‐ ‐ ‐ ‐ 185,559 149,559 160,415 $ 175,684 $ 345,974 400,000 25,000 7,500 ‐ 245,000 200,000 $ 877,500 2010‐11 June 30, 2011 $ 270,704 405,463 275,000 97,674 450,000 350,000 49,057 ‐ ‐ ‐ 150,000 ‐ 50,568 ‐ 89,686 ‐ ‐ 60,001 ‐ 256,090 310,000 183,600 205,000 183,213 ‐ ‐ ‐ ‐ 22,500 ‐ 5,000 ‐ 90,000 ‐ $ 3,503,556 400,000 39,796 ‐ ‐ 653,585 150,000 $ 1,243,381 Page 5 Fiscal Year 2010‐11 Tentative Budget Other Funds Special Revenue Fund $816,273 Requirement Special Revenue Funds are used to account for the proceeds of specific revenue sources whose expenditures are legally restricted. Activities in these funds may or may not be self‐supporting and are generally not related to direct educational services. The College operates a full‐service child development center on campus. The Child Development Fund is designated to account for child care and development services, including revenue generated by student fees and direct cost expenses. The Bookstore Fund is used to account for the lease of the college bookstore. The District contracts with a third‐party vendor, Follett Higher Education Group, to manage the day‐to‐day operations of the store. The vendor pays all operational expenses but shares revenue with the College. The District is projecting approximately $180,000 in shared revenue. A total of $115,000 will then be transferred to the General Fund and Associated Student Body Fund. $800,000 $701,273 $701,273 Revenue Expense $700,000 $600,000 $500,000 $400,000 $300,000 $200,000 $180,000 $115,000 $100,000 $‐ Revenue Expense Bookstore Child Development Tentative Budget Page 6 Fiscal Year 2010‐11 Tentative Budget Capital Projects Fund $16,860,000 Requirement This group of funds is used to account for financial resources to be used for the acquisition or construction of major capital facilities and other capital outlay projects. This includes land acquisition, scheduled maintenance, significant equipment, and furnishings for new buildings. The Bond Projects Fund, financed with voter‐approved Measure H bond proceeds, is the largest fund in the group. Construction projects at the Alisal campus (CAT Building), Student Center, and the Classroom and Administrative Building (CAB) on the main campus will continue during 2010‐11. A new science building is also being planned, programmed, and designed. $300,000 $270,000 $250,000 $200,000 $150,000 $110,000 $100,000 $56,000 $50,000 $‐ Revenue Expense Revenue Expense Capital Outlay Property $16,000,000 $14,000,000 $14,000,000 $12,000,000 $10,000,000 $8,000,000 $6,000,000 $4,000,000 $2,500,000 $2,500,000 $2,000,000 Tentative Budget $26,000 $320,000 $‐ Revenue Expense Maintenance Revenue Expense Bond Projects Page 7 Fiscal Year 2010‐11 Tentative Budget Enterprise Fund $522,600 Requirement Enterprise Funds are intended to operate as a business and be self‐supporting. Such costs are financed or recovered primarily through user charges. The Cafeteria Fund is currently the only District enterprise fund. It is used to $600,000 account for the sale of $522,600 $509,000 food from café sales $500,000 and vending $400,000 machines. This fund has historically been $300,000 self‐supporting; $200,000 however revenues have not kept pace $100,000 with expenditures in $‐ recent years, causing Revenue Expense a decline in the fund balance reserve. Cafeteria Internal Service Fund $440,000 Requirement Internal Service Funds are used to account for the financing of goods or services provided by one department to other departments on a cost‐reimbursement. The District has a self‐insured fund used to account for workers’ compensation claims which have been outstanding since 2003. It also uses this fund to $450,000 $412,000 pay for property loss $400,000 and liability $350,000 $350,000 deductibles. $300,000 $250,000 A Retiree Health $200,000 Benefits Fund has also $150,000 been established to $90,000 $100,000 account for future benefit liabilities as $50,000 $5,000 required by the $‐ Government Revenue Expense Revenue Expense Accounting Standards Self Insured Retiree Health Board (GASB). Tentative Budget Page 8 Fiscal Year 2010‐11 Tentative Budget Trust and Agency Fund $131,500 Requirement This fund is used to account for assets held by the district in a trustee or agency capacity for individuals, private organizations, or other governmental units. The District has a fiduciary responsibility for such funds, with some degree of discretionary authority. Operations of these funds are measured and reported in the District’s financial statements. Funds in this group include assets held for the Associated Student Body, scholarships, and intercollegiate athletics. $120,000 $97,700 $100,000 $82,500 $80,000 $60,000 $45,000 $40,000 $22,000 $20,000 $‐ Expense Student Body $4,000 Revenue Expense Revenue Tentative Budget $4,000 Scholarships Loan/Trust Revenue Expense Athletics Page 9 Fiscal Year 2010‐11 Fund Type Tentative Budget Hartnell Community College 3‐Year Comparison 2007‐08 Actual 2008‐09 Actual 2009‐10 Revised 2009‐10 Forecast 2010‐11 Tentative 12,464 14,861,596 21,783,916 $ 36,657,976 13,629 15,217,145 22,603,330 $ 37,834,104 12,000 15,167,395 17,627,312 $ 32,806,707 16,243 15,280,768 20,826,167 $ 36,123,178 12,000 15,009,366 19,522,854 $ 34,544,220 13,328,254 7,433,292 7,165,075 495,968 8,001,335 486,930 (498,550) $ 36,412,304 13,700,149 7,249,762 7,328,482 346,252 8,881,502 111,236 (386,093) 37,231,290 12,708,906 7,126,791 6,868,045 495,868 7,676,364 216,636 (513,603) 34,579,007 12,565,214 6,363,588 6,387,282 382,329 6,558,235 213,290 2,589,118 35,059,056 12,224,575 7,465,837 6,648,874 518,500 6,967,985 246,280 (105,000) 33,967,051 7,828,874 4,827,836 174,769 $ 12,831,479 10,695,669 4,742,976 160,991 $ 15,599,636 13,326,993 6,996,545 263,591 $ 20,587,129 14,431,644 4,357,497 877,500 $ 19,666,641 11,204,437 3,503,556 1,243,381 $ 15,951,374 1,591,502 2,027,486 1,139,231 324,118 1,843,383 736,042 266,715 4,889,575 $ 12,818,052 1,765,301 2,066,610 1,083,329 309,608 2,067,820 1,090,986 365,476 6,799,368 $ 15,548,498 2,397,131 2,544,057 1,342,498 731,730 4,589,456 1,128,949 539,772 7,306,257 $ 20,579,850 2,397,131 2,544,057 1,342,498 731,730 4,589,456 1,128,949 539,772 7,306,257 $ 20,579,850 1,858,008 1,971,890 1,040,566 567,162 3,557,272 875,045 418,376 5,663,057 $ 15,951,375 General Fund Unrestricted Resources Federal State Local Total Resources Requirements Academic Salaries Classified Salaries Payroll Costs/Benefits Supplies and Materials Operating Expenses Capital Outlay Transfers Total Requirements Restricted Resources Federal State Local Total Resources Requirements Academic Salaries Classified Salaries Payroll Costs/Benefits Supplies and Materials Operating Expenses Capital Outlay Transfers Financial Aid Outgo Total Requirements Total General Fund Resources Requirements Tentative Budget $ 49,489,455 $ 53,433,740 $ 53,393,836 $ 55,789,819 $ 50,495,594 $ 49,230,356 $ 52,779,788 $ 55,158,857 $ 55,638,906 $ 49,918,426 Page 10 Fiscal Year 2010‐11 Tentative Budget 3‐Year Comparison Continued Fund Type 2007‐08 Actual 2008‐09 Actual 2009‐10 Revised 2009‐10 Forecast 2010‐11 Tentative $ 195,228 $ 115,681 $ 165,523 $ 113,891 $ 178,400 $ 115,000 $ 188,000 $ 115,000 $ 180,000 $ 115,000 $ 782,294 $ 708,678 $ 606,970 $ 589,491 $ 537,437 $ 537,437 $ 537,437 $ 537,437 $ 701,273 $ 701,273 Special Revenue Fund Bookstore Resources Requirements Child Development Resources Requirements Capital Projects Fund Capital Outlay Resources Requirements Maintenance Resources Requirements Property Resources Requirements Bond Projects Resources Requirements $ 44,278 $ 22,677 $ 28,600 $ 1,785,500 $ 26,000 $ 234,240 $ 242,750 $ 71,347 $ 80,000 $ 250,000 $ 8,773,416 $ 10,171,263 $ 3,252,000 $ 3,252,000 $ 2,500,000 $ 8,773,416 $ 10,087,443 $ 3,252,000 $ 3,252,000 $ 2,500,000 $ 450,975 $ 182,406 $ 420,000 $ 420,000 $ 270,000 $ 334,286 $ 29,113 $ 91,000 $ 91,000 $ 110,000 $ 1,702,052 $ 11,761,955 $ 48,744,000 $ 48,744,000 $ 320,000 $ 4,700,502 $ 13,924,767 $ 18,500,000 $ 18,500,000 $ 14,000,000 Enterprise Fund Cafeteria Resources Requirements $ 683,177 $ 678,355 $ 560,000 $ 610,000 $ 509,000 $ 691,303 $ 723,860 $ 615,000 $ 615,000 $ 522,600 Internal Service Fund Self Insured Resources Requirements Retiree Health Benefits Resources Requirements $ 30,299 $ 122,828 $ 6,800 $ 75,000 $ 5,000 $ 79,898 $ 75,353 $ 78,000 $ 80,000 $ 90,000 $ 37,032 $ 8,937 $ 9,300 $ 1,085,000 $ 412,000 $ ‐ $ ‐ $ ‐ $ ‐ $ 350,000 Trust and Agency Fund Associated Students Resources Requirements Scholarships/Loan Trust Resources Requirements Athletics Resources Requirements Tentative Budget $ 123,137 $ 86,681 $ 65,200 $ 65,200 $ 97,700 $ 50,768 $ 24,100 $ 34,500 $ 34,500 $ 82,500 $ 8,538 $ (2,524) $ 3,975 $ 3,975 $ 4,000 $ 3,041,118 $ 61,220 $ 3,000 $ 3,400 $ 4,000 $ 26,443 $ 13,410 $ 35,150 $ 70,000 $ 22,000 $ 38,236 $ 54,453 $ 70,000 $ 50,000 $ 45,000 Page 11 AGENDA ITEM FOR BOARD MEETING OF: Title: June 22, 2010 Number: Approve Discontinuance of the Medical Lab Technician (MLT) Program VI. E. Area: Status: Superintendent/President Prepared by: Dr. Phoebe Helm Action (Roll-call) Recommendation: That the Board of Trustees approves to discontinue the Medical Lab Technician (MLT) Program as recommended by the administration. Summary: In August 2007, the Board approved to suspend enrollment in the Medical Laboratory Technician Program in order to conduct a program review as required by the Discontinuance Process. A Discontinuance Committee was formed to review the program. The MLT professionals, who made up the advisory committee, in working with the college and Discontinuance Committee, determined that the number of clinical sites available could accommodate only 6 students in total. Thus, it was determined that it was not feasible for Hartnell College to operate this program. The eight (8) students who were enrolled completed the program requirements in 2008. Since that time, an area consortia of colleges has been formed to support the development of small allied programs such as MLT. Hartnell’s MLT program should have been withdrawn in August 2008. Failure to do so was an administrative oversight. AGENDA ITEM FOR BOARD MEETING OF: Title: June 22, 2010 Number: Approve Reinstatement of Board Benefits VI. F. Area: Status: Superintendent/President Action (Roll-call) Prepared by: Dr. Phoebe Helm Recommendation: That the Board of Trustees approves to reinstate Board benefits as follows: 1) health benefits; 2) meeting attendance (stipend); and 3) mileage allowance. Background: The Hartnell College Board of Trustees led the effort by approving to waive board benefits to help meet last year’s $1.7 million budget deficit. This approval resulted in a cost-saving of $100,000 to the general fund. Budget Implications: An estimated cost of $100,000 total for 2010-2011 to the general fund. INFORMATION ITEMS AGENDA ITEM FOR BOARD MEETING OF: Title: June 22, 2010 Number: Receive Report on Construction Projects VII. A Area: Status: Office of Facilities Information Recommendation: That the Board of Trustees receives an updated report on construction projects. Summary: Each month, the Board of Trustees receives a verbal and written report on current design, planning, and construction projects as funded by Measure H. CONSTRUCTION UPDATE AS OF 06/15/2010 CURRENT DESIGN, PLANNING AND CONSTRUCTION PROJECTS PLANNING PROJECTS Alisal Campus Master Plan ⇒ The District has begun the planning process for the 142 acres of the Alisal Campus ⇒ The process will include two master plans, (1) for the +/- 42 acre campus and (1) for the remaining +/- 100 acres ⇒ Once a master plan is complete the EIR process will begin with the City of Salinas ⇒ The land swap with the City of Salinas is currently underway. It is anticipated that this will take between 18 and 24 month ⇒ The FDA has approached the College about having a permeant facility on the Alisal Campus for their emergency response trailers. The District is currently working with them to bring a recommendation forward. Main Campus Facilities Master Planning Process ⇒ The 5-year Capital Outlay Plan was completed and submitted to the CCCCO on June 29, 2009. ⇒ The 2009-10 IPP for a new Health Sciences & Nursing Building was completed and submitted to the CCCCO on June 29, 2009. ⇒ The enrollment projections were protested on April 14th and we are awaiting the result. Science Building FPP ⇒ Lionakis, out of Sacramento, is the Architect of Record for this project, which includes the preparation of the FPP. ⇒ The kick-off meeting for the FPP took place on 02/19-20 ⇒ The stakeholders took a trip to Cal Poly on 03/09 to look at their facilities ⇒ At our second meeting a few general layouts were established and we are working from those layouts ⇒ The group took its second field trip to look at both San Mateo and San Jose City College’s new science building ⇒ The last programming meeting was May 8 and all the user groups concerns were addressed ⇒ Lionakis completed the FPP and the Board Approved the document on June 8, 2009 and the FPP was submitted to the CCCCO on June 29, 2009. CAB Building Renovation ⇒ The programming for this project has started ⇒ The pre-qualification package for a Design/Build entity was out to prospective teams in December and was due on January 7, 2010. A total of 25 teams submitted. ⇒ The short-list has been created and the letter to those firms have been sent out. Additionally letters were sent to the remaining 20 firms who submitted pre-qual packages. ⇒ Of the 25 DBEs a total of 24 firms met the pre-qual minimum requirements ⇒ The list was shortlisted to the top five scores, which ended up yielding a total of 6 DBE teams: • Rudolph & Sletten - Lionakis • Dilbeck & Sons - HBFL • Kitchell - Smith Group • Blach Construction - BFGC-IBI DESIGN PROJECTS Hartnell College ● Facilities Development Office ● 411 Central Ave., Salinas, CA 93901 Phone (831)770-7041 ● Fax (831)770-7040 1 • • Lusardi Construction Company - Davy Architecture Soltek Pacific Construction Company - Mosher Drew Watson Ferguson City Sidewalk Replacement ⇒ As part of the main campus EIR mitigation Hartnell was to replace the city sidewalk, as needed, around the entire campus. Because of the favorable bid climate the District is working on getting the project design and approved by the CIty and completed in the next 4 - 6 month. ⇒ An RFQ was put out on the street for interested civil engineering firms interested in design the sidewalk, bus turnout and misc infrastructure projects on the campus. ⇒ A total of three firms submitted and all were shortlisted and issues and RFP. ⇒ The anticipated schedule is as follows: • CIty sidewalk design and approval by City - June 1, 2010 • Bid Period - June 1, 2010 - June 24, 2010 • Construction - July - October 2010 ⇒ C3 Engineering was chosen based off of the firms experience and cost proposal. ⇒ The design work will start on May 5th and are still on schedule to complete the work per the above schedule. ⇒ C3 is 90% complete with the design and we will be out to bid with 1 week. Keyless Entry and CCTV System ⇒ Aurum Consulting Engineers will be preparing a campus wide design of a keyless entry and CCTV system for the main campus aThe anticipated schedule is as follows: ⇒ The anticipated schedule is as follows: • Design Period - May 5 - June 18 • Bid Period - May 24 - June 17 June 19 - July 20 • Construction - August - December 2010 ⇒ Aurum has started their survey of the main campus and once finished they will go and complete the King CIty Center. CAB Chiller and Boiler Replacement ⇒ Axiom Engineers will be preparing a design of a new energy efficient chiller and boiler for CAB ⇒ We will also be working with PG&E to investigate a possible rebate for the delta between the existing units and the new units ⇒ The anticipated schedule is as follows: • Design Period - April 7 - May 21 • DSA Review - May 24 - June 24 • Issue RFB for Chiller and Boiler Units - May 24 - June 15 • Bid Period - July 1 - July 30 • Construction - Sept 6 - January 14, 2011 ⇒ Axiom and Skyline Engineering are working on the design of the project ⇒ The District plans on bidding the equipment (chiller & boiler) in the next few weeks so the an order can be placed and the equipment can arrive sooner ⇒ Once the design is completed we will bid the work per the above schedule ⇒ The DIstrict is also working with PG&E to get a rebate for the energy efficient changes which are being made. ⇒ The design is complete and will be submitted to DSA for review and approval. ⇒ We have received bids on both the Chiller and the Boiler and the District has purchased them. Campus Lighting Phase II ⇒ Aurum Consulting Engineers will be modifying the plans they prepared for the phase I project and resubmitting to DSA for approval Hartnell College ● Facilities Development Office ● 411 Central Ave., Salinas, CA 93901 Phone (831)770-7041 ● Fax (831)770-7040 2 ⇒ ⇒ ⇒ ⇒ ⇒ ⇒ ⇒ The new lights will be in front of the LRC and parking structure on Central and Cypress St. The anticipated schedule is as follows: • Design Period - April 7 - May 7 • DSA Review - May 10 - May 31 • Issue RFB for lights - May 10 - June 3 • Bid Period - June 7 - July 8 • Construction - August - October Aurum is continuing to work on the project documents. Once the District has a count of the lights which will be needed for the project, those lights will be ordered and the contractor will be responsible to install those lights. The District has ordered a total of 20 lights for the lighting project. The project bid on June 10, 2010 and JM Electric was the low bidder for the project. The project is anticipated to start the first week of July. CAB Refresh #3 ⇒ During the summer break the District will refresh a number of rooms in CAB north and south ⇒ The project will include new finishes, furniture and infrastructure to make the classes smart classrooms ⇒ The instruction to bidders is being put together and the project will be out to bid in the next few weeks. ⇒ The project bid on June 8, 2010 and DMC COnstruction was the low bidder. ⇒ The project will start on June 22, 2010 and be completed by August 15, 2010. Pool Renovation ⇒ The Hartnell pool, which is a PE classroom, will be remodeled and is anticipated to start on June 5, 2010 and be completed around August 1, 2010. ⇒ An RFP was issued for design services and BFGC was the selected firm for the project ⇒ The anticipated schedule is as follows: • Design Period - April 7 - May 1 • Bid Period - May 3 - May 25 • Construction - June 7 - August 15 ⇒ The design is scheduled to be completed and the project will be out to bid on May 4th which should allow for the above schedule to be met. ⇒ The project bid on June 2, 2010 and Western Water Features was the low bidder on the project. ⇒ The project will start on June 21, 2010 and be completed by August 1, 2010 Technical Training Building ⇒ Hartnell issued a request for qualifications (RFQ) for architectural services related to the design of the Technical Training Building on the Alisal Campus. A total of eight firms submitted an RFQ. A group of faculty and staff(the users of the building) met and shortlisted a total of 5 firms for interviews. The shortlisted firms were: NTD (Salinas), Paul Davis Architecture (Monterey), W, R & D (Monterey), BAG (Salinas) and Kasavan Architects (Salinas). ⇒ The users then interviewed the firms and they selected NTD based off of previous similar project experience and cost. ⇒ The project is anticipated to be between 10 and 15K square feet and will house the auto and diesel mechanics programs as well as part of the construction program. Hartnell College ● Facilities Development Office ● 411 Central Ave., Salinas, CA 93901 Phone (831)770-7041 ● Fax (831)770-7040 3 CONSTRUCTION PROJECTS PE Renovation Project ⇒ Sugimura Finney (SFA) is the Architect of Record for this project ⇒ The plans were submitted to DSA on February 26, 2009 ⇒ The project was out to bid on May 19th and the bid opening was on June 23, 2009. ⇒ There was a total of 5 bidders on the project with Perma-Green Hydroseeding (PGH) being the responsive low bidder at $4,114,400. ⇒ Work started on July 8 and phase I, the new soccer field is scheduled to be completed on August 5, 2009. ⇒ The remainder of the work is scheduled to be completed by February 1, 2010. ⇒ The soccer field has been completed and the first game is scheduled for 09/29/09 ⇒ Both the softball and baseball fields have been used for games ⇒ The area was paved out on March 25 & 26th and minor items are being completed at this time ⇒ The stadium still seats will be onsite on April 19th and will be installed and completed by the beginning of May ⇒ The final item for the project is to pave the turnaround on Alisal St. Once that work is completed minor punch-list and landscaping items will be completed and the project can be closed out. Northeast Landscaping Project ⇒ Bellinger Foster Steinmetz (BFS), out of Monterey, is the Architect of Record for this project ⇒ Monterey Peninsula Engineering is the contractor for the project ($1,223,000) ⇒ They were given notice to proceed on April 20, 2009 ⇒ The demo and site balance work has been completed. ⇒ All hardscape has been poured but a conflict has come up with four areas within the project which we are trying to mitigate. ⇒ The project was completed as of April 27th when all the concrete joints were coaxed. Alisal Campus Center for Applied Technology ⇒ Kasavan Architects is the AOR for the project ⇒ Dilbeck construction is the GC for this project ($19,340,000) ⇒ Construction began on July 14, 2008 ⇒ The project will be completed in 2010 ⇒ All structural steel has been erected ⇒ Interior metal studs and drywall is currently going up ⇒ The roofing and exterior siding is currently going up ⇒ Check out the webcam on the Measure H website, http://webcam.hartnell.edu/popup.html ⇒ Interior finishes are continuing to be placed in the building. ⇒ The welding equipment is scheduled to be ordered on May 5th and all will be installed by August 1st and will be ready for classes to start in fall. ⇒ Permeant power was switched over on June 1 ⇒ Finishes on the interior of the building continues. ⇒ Landscaping will be starting in the next few weeks. Student Center Renovation/Remodel Project ⇒ BFGC is the Architect of Record for this project ⇒ DMC Construction was the low bidder and will be the GC for the project ⇒ Construction started on November 17th and is scheduled to be completed by September 2010 ⇒ The new bookstore in Steinbeck Hall is the first scope of work ⇒ DMC finish the heavy demo work over the break and they are now finishing up the Steinbeck side of the building. ⇒ During spring break the move of the bookstore and the reopening of Steinbeck Hall took place Hartnell College ● Facilities Development Office ● 411 Central Ave., Salinas, CA 93901 Phone (831)770-7041 ● Fax (831)770-7040 4 ⇒ DMC is now working on the remainder of the building and is still on schedule to be completed by September 2010 FDA Site Preparation Project ⇒ As part of the FDAs new home on the Alisal Campus, a 30,000 sq. ft. area will be prepped for their future use. ⇒ The project was bid and Granite Construction was the low bidder on the project ⇒ Because of the rain the project was started on April 26th and should be completed by the beginning of June. ⇒ All that remains on the project is the lighting. All other work has been completed. Hartnell College ● Facilities Development Office ● 411 Central Ave., Salinas, CA 93901 Phone (831)770-7041 ● Fax (831)770-7040 5 AGENDA ITEM FOR BOARD MEETING OF: Title: June 22, 2010 Number: Receive and Accept Financial Statements for Period Ending April 30, 2010 VII. B. Area: Status: Office of Support Operations Supplement OSO-1 Prepared by: Kent Stephens Information Recommendation: That the Board of Trustees receives and accepts the Financial Statements for the period ending April 30, 2010. Summary: Financial Statements of District funds for the period ending April 30, 2010 are attached for information. Budget Implications: None BOARD OF TRUSTEES ADJOURNMENT