UNIVERSITY Campus Facilities Agenda Item Description Form

advertisement
UNIVERSITY OF HOUSTON
Campus Facilities Planning Committee
Agenda Item Description Form
1. ITEM:
Roy G. Cullen Fire Safety Renovations
2. REQUESTING DEPARTMENT:
Minor and Planned Projects (MPP)
3. CONTACT NAMES &
PHONE NUMBERS:
Barry Simmons (713-743-9073)
4. PRESENTER:
Barry Simmons
5. RECOMMENDATION/
ACTION REQUESTED:
It is recommended to enclose stairwells and create
new exit to the exterior to address the State Fire
Marshall Violation for the Life Safety of the
occupants of the building.
6. SUMMARY:
The State Fire Marshal issued a Life Safety and Code Violation on 1/22/13 for the Roy G.
Cullen Building. The Fire Protection Violation states that the 1st and 2nd Floors are
unprotected vertical opening and lack of separation from remainder of building and
discharge to the exterior at the level of discharge. The recommended remedy is to provide
separation by adding walls and doors to create exit enclosures. Renovations of the building
must be completed by 9/30/13.
The open stairs in this building does not meet the current Life Safety Code requirements for
smoke compartments. This project scope includes building rated walls and doors to enclose
the stairs to meet this requirement. A new exit from the west stair will be created to exit
directly to the exterior on the first floor. Openings between the 1st and 2nd floors will also
be enclosed to create separation between floors.
7. PROPOSED START DATE:
8. SUPPORTING DOCUMENTATION:
9/30/13 or TBD
 State Fire Marshall Violation from 2/6/13.
 Conceptual Plans showing scope of
renovations.
 Photograph/rendering of exterior of building
that will be affected by creating new exit to
the exterior.
ROY G. CULLEN BUILDING PHOTO OF EXISTING NORTHWEST SIDE OF BUILDING
ROY G. CULLEN BUILDING PROPOSED NEW EXIT DOORS
PROPOSED NEW STAIRS
PROPOSED NEW SIDEWALK
PROPOSED LOCATION OF NEW EXIT AT NORTHWEST SIDE OF BUILDING
Roy G Cullen Building (Building # 501)
Life/Safety Renovations – Type 3
July 20, 2012
FINAL REPORT
TABLE OF CONTENTS –
1 – Overview and Scope of Work
2 – Scope of Work Documents (SHW Group)
3 – Statement of Probable Cost
Appendix A – Existing Condition Photos and Drawings
0
Overview and Scope of Work –
1
PROJECT DESCRIPTION
This project is to address Life Safety and Code Violations identified by the State Fire Marshal
Life Safety Violations Identified:
1.
2.
Item # 1 - Means of Egress Violation: Third floor common path of travel exceeds the 75 feet maximum
limitation per Life Safety Code and has access to only one stair
Item # 2 - Means of Egress/Protection Violation: Open stairs between first and second floor create an
unprotected vertical opening and lack required separation from remainder of building
Proposed Remedy:
1.
2.
Item # 1 - Third floor stair is to be separated from the remainder of the building (third floor classroom) by
the construction of a 2-hour rated enclosure/walls including fire rated door, frame and hardware
Item # 2 - Stairs are to be separated from remainder of building by the provision (construction) of 2-hour
rated enclosures/walls including fire rated doors, frame and hardware. Includes providing a protected
means of egress (new hallway) to exterior.
Third Floor Stairs (to be enclosed)
BUILDING INFORMATION
The Roy G. Cullen building is a 45,729 square foot stone and glass building originally constructed in 1939. The
primary functions of the building include classroom and administrative spaces for the College of Liberal Arts. The
building has a below-grade basement and three upper floors. The third level is unoccupied other than one
classroom, and is considered attic space by campus and occupants. The upper floor appears to have been
abandoned some years ago and is in very poor condition, with convenience lighting and a fire alarm system.
According to all available documentation, and meetings with UH staff, the building underwent an addition shortly
after construction, which added the western part of the building. Subsequent renovations have included MEP
modifications and finish replacements. In 1992, the windows were replaced and at the same time exterior façade
was sealed. In 2008, the building had an interior renovation on the first floor which included ceilings, floors, walls,
lights and technology.
Scope of Work Documents (SHW Group) –
2
101C
245.53 sf
107
109
111
113
206.26 sf
486.81 sf
469.75 sf
647.66 sf
691.43 sf
103A
218.48 sf
X
175.19 sf
121
135
121A
482.21 sf
232.73 sf
140.89 sf
1.
2
105C
39.97 sf
105D
103
Down
25.17 sf
72.49 sf
13.36 sf
140
349.74 sf
1101.20 sf
131
133
213.21 sf
212.65 sf
151
1443.78 sf
15.34 sf
95.42 sf
80.44 sf
140A
144
141B
139
129
127
3
143
2.
3.
65.84 sf
1358.27 sf
153
173.30 sf
4
1
155
337.03 sf
104A
100A
100B
373.63 sf
377.26 sf
126
3
27.56 sf
102
APPROX.
141
534.75 sf
2080 CFM
TOTAL
152
693.29 sf
84.83 sf
74.61 sf
154
106
108
110
112
114
709.60 sf
519.03 sf
449.93 sf
318.83 sf
363.73 sf
116
104C
104B
60.01 sf
41.52 sf
1
118
264.92 sf
74.61 sf
71.88 sf
116B
116A
120
121.89 sf
120.07 sf
97.33 sf
142A
122
314.25 sf
691.62 sf
1
130
132
134
226.44 sf
225.43 sf
224.61 sf
4.
4
104
1959.78 sf
DEMOLITION KEY NOTES:
RELOCATE ANY LIGHT FIXTURES OR
ELECTRICAL DEVICES THAT MAY INTERFERE
WITH THE CONSTRUCTION OF THE NEW
STAIR WALLS/ ENCLOSURE OR CORRIDOR.
RELOCATE EXISTING THERMOSTAT.
REMOVE EXISTING DIFFUSER AND
ASSOCIATED DUCTWORK BACK TO MAIN
AND CAP. RELOCATE MAIN AS NECESSARY
TO BE OUTSIDE OF NEW STAIRWELL
ENCLOSURE.
PERFORM PRECONSTRUCTION AIR BALANCE
OF AREA INDICATED AND OF ASSOCIATED
AIR HANDLING UNIT PRIOR TO THE START OF
DEMOLITION.
NOT FOR BIDDING
OR CONSTRUCTION
119
142
128.74 sf
DATE:
07/20/12
101B
244.89 sf
706.22 sf
141A
Up
101A
244.70 sf
115B
241.68 sf
164.31 sf
105A
188.49 sf
105
115A
241.52 sf
ROY GUSTAV BUILDING
FIRST FLOOR PLAN
TYPE
ITEM # 3
105B
REFERENCE SHEET:
117
207.20 sf
103B
368.14 sf
MECHANICAL AND ELECTRICAL FIRST FLOOR DEMOLITION PLAN
188.49 sf
105
101B
101C
244.89 sf
245.53 sf
141A
206.26 sf
706.22 sf
103A
218.48 sf
115B
241.68 sf
119
142
175.19 sf
107
109
111
113
486.81 sf
469.75 sf
647.66 sf
691.43 sf
X
6
128.74 sf
121
135
121A
482.21 sf
1.
232.73 sf
140.89 sf
105C
Up
101A
244.70 sf
115A
241.52 sf
39.97 sf
105D
103
Down
25.17 sf
72.49 sf
127
1
139
4
143
13.36 sf
144
141B
140
349.74 sf
1101.20 sf
140A
1443.78 sf
15.34 sf
7
80.44 sf
131
133
213.21 sf
212.65 sf
151
2.
65.84 sf
1358.27 sf
153
173.30 sf
100A
100B
373.63 sf
377.26 sf
102
152
693.29 sf
74.61 sf
104B
APPROX.
2080 CFM
141
534.75 sf
5
154
106
108
110
112
114
709.60 sf
519.03 sf
449.93 sf
318.83 sf
363.73 sf
116
104C
60.01 sf
2
118
264.92 sf
74.61 sf
71.88 sf
116B
116A
120
121.89 sf
120.07 sf
97.33 sf
142A
122
314.25 sf
691.62 sf
3.
155
5
7
104A
27.56 sf
337.03 sf
130
132
134
226.44 sf
225.43 sf
224.61 sf
3
4.
5.
6.
41.52 sf
104
1959.78 sf
1
7.
NEW CONSTRUCTION KEY NOTES:
PROVIDE A FIRE ALARM PULL STATION AT
DOORS, ALONG THE PATH OF EGRESS, AND
TIE INTO THE EXISTING FIRE ALARM
SYSTEM.
PROVIDE NEW LIGHTING AND EXIT SIGNAGE
IN EXIT CORRIDOR TO PROVIDE 20FC.
PROVIDE POWER TO MECHANICAL UNIT FOR
EXIT CORRIDOR.
PROVIDE NEW EXIT SIGNAGE.
PROVIDE NEW ELECTRIC CABINET UNIT
HEATER TO SERVE THE STAIR/EGRESS
CORRIDOR.
RELOCATE EXISTING THERMOSTAT TO
INSIDE ROOM 121.
REBALANCE ASSOCIATED AIR HANDLING
UNIT TO PRECONSTRUCTION AIR FLOW
MINUS CFM INDICATED AT KEY NOTE.
MECHANICAL AND ELECTRICAL FIRST FLOOR NEW WORK PLAN
1/32" = 1'-0"
KEYPLAN
PROJ NUMBER:
105B
164.31 sf
105A
PROJECT NAME:
117
207.20 sf
103B
368.14 sf
SCALE:
1/32" = 1'-0"
218B
77.36 sf
219
214
215
216
151.06 sf
109.03 sf
165.69 sf
217
342.45 sf
T
T
160.05 sf
218
191.96 sf
Up
214C
221C
222B
222C
105.92 sf
148.07 sf
140.69 sf
T
16.93 sf 219A 219B
13.44 sf 18.06 sf
237A
103.75 sf
221B
102.81 sf
218A
221A
Down
214A
276.75 sf
E
D
H
223B
113.32 sf
223C
224B
224C
137.06 sf
142.62 sf
116.65 sf
T
221
221D
222A
121.82 sf
122.70 sf
75.14 sf
223
222D
223A
123.79 sf
113.27 sf
T
T
223D
224A
113.27 sf
115.02 sf
77.17 sf
SA FAN #2
SA FAN #1
1
T
283.73 sf
EDH
EDH
EDH
229
229A
T
43.78 sf
32.31 sf
224D
237
3
2
229C
T
156.88 sf
1610.87 sf
240A
250
999.48 sf
321.05 sf
237D
E128.31 sf
D
H
241
T
210
209
208
207
174.79 sf
172.70 sf
168.30 sf
173.51 sf
206
204
134.20 sf
253.47 sf
T
236
236A
235D
121.73 sf
122.39 sf
74.59 sf
235A
122.50 sf
235
75.25 sf
E 234D
120.09 sf
D
H
234
T
234A
233D
112.19 sf
115.15 sf
75.04 sf
109.58 sf
EDH
E
D
H
252
EDH
232D
105.51 sf
236C
236B
235C
235B
147.69 sf
106.08 sf
147.72 sf
139.51 sf
318.38 sf
E 234C
120.44 sf
D
H
T
T
76.10 sf
T
234B
233C
233B
135.11 sf
136.55 sf
112.42 sf
3
3.
251
APPROX.
180 CFM
233A
233
2.
294.94 sf
EDH
389.62 sf
1
2
232
T
232A
231
103.58 sf
131.67 sf
DEMOLITION KEY NOTES:
RELOCATE LIGHT FIXTURES OR ELECTRICAL
DEVICES THAT MAY INTERFERE WITH THE
CONSTRUCTION OF THE NEW STAIR WALLS/
ENCLOSURE.
REMOVE EXISTING DIFFUSERS SERVING
STAIRWELL AREA BACK TO MAIN AND CAP.
PERFORM PRECONSTRUCTION AIR BALANCE OF
AREA INDICATED AND ASSOCIATED AIR
HANDLING UNIT PRIOR TO START OF
DEMOLITION.
239.88 sf
227D
103.54 sf
SA FAN #3
E
D
H
205
962.60 sf
203
84.70 sf
227A
T
114.04 sf
213
314.39 sf
32.27 sf
76.70 sf
224
74.65 sf
T
228
EDH
225A
1.
229D
254.84 sf
227
225
64.59 sf
E
D
H
222
74.42 sf
131.22 sf
84.21 sf
EDH
E
D
H
230A
196.16 sf
74.33 sf
E
D
H
T
232C
232B
231A
136.43 sf
114.49 sf
116.31 sf
230B
401.51 sf
230AB
288.88 sf
APPROX. 2300 CFM
TOTAL FOR ALL
DIFFUSERS
NOT FOR BIDDING
OR CONSTRUCTION
DATE:
07/20/12
E
D
H
227C
133.24 sf
ROY GUSTAV BUILDING
SECOND FLOOR PLAN
TYPE
ITEM # 3
REFERENCE SHEET:
X
T
227B
198.33 sf
MECHANICAL AND ELECTRICAL SECOND FLOOR DEMOLITION PLAN
SCALE:
SCALE: 1/32" = 1'-0"
T
227B
E
D
H 221B
218B
77.36 sf
219
214
215
216
276.75 sf
151.06 sf
109.03 sf
165.69 sf
218
191.96 sf
217
342.45 sf
T
T
Up
E
D
H
205
962.60 sf
203
84.70 sf
T
EDH
210
209
208
207
174.79 sf
172.70 sf
168.30 sf
173.51 sf
206
204
134.20 sf
253.47 sf
222B
222C
148.07 sf
140.69 sf
221
241
223C
224B
224C
137.06 sf
142.62 sf
116.65 sf
221D
222A
121.82 sf
122.70 sf
75.14 sf
223A
113.27 sf
SA FAN #2
76.70 sf
227A
223D
224A
113.27 sf
115.02 sf
77.17 sf
T
229D
239.88 sf
229C
T
156.88 sf
EDH
229A
32.31 sf
EDH
229
T
43.78 sf
224D
114.04 sf
237
1610.87 sf
3
2
240A
251
999.48 sf
294.94 sf
1
250
321.05 sf
2
237D
E128.31 sf
D
H
T
236
236A
235D
121.73 sf
122.39 sf
74.59 sf
235A
235
122.50 sf
75.25 sf
E 234D
120.09 sf
D
H
234
T
234A
233D
112.19 sf
115.15 sf
75.04 sf
E
D
H
109.58 sf
EDH
EDH
232D
236B
235C
235B
147.69 sf
106.08 sf
147.72 sf
139.51 sf
318.38 sf
E 234C
120.44 sf
D
H
T
APPROX.
180 CFM
233A
233
76.10 sf
105.51 sf
236C
2.
3.
283.73 sf
227D
103.54 sf
EDH
T
252
EDH
225A
32.27 sf
224
74.65 sf
T
T
228
254.84 sf
225
223
222D
123.79 sf
T
133.24 sf
227
64.59 sf
E
D
H
222
74.42 sf
131.22 sf
SA FAN #1
389.62 sf
223B
113.32 sf
T
APPROX.
2,300 CFM
1
T
221C
105.92 sf
227C
198.33 sf
SA FAN #3
3
213
221A
E
D
H
84.21 sf
EDH
314.39 sf
T
218A
16.93 sf 219A 219B
13.44 sf 18.06 sf
237A
214C
103.75 sf
102.81 sf
160.05 sf
Down
214A
E
D
H
NEW CONSTRUCTION KEY NOTES:
PROVIDE A FIRE ALARM PULL STATION AT
DOORS, ALONG THE PATH OF EGRESS, AND TIE
INTO THE EXISTING FIRE ALARM SYSTEM.
PROVIDE NEW EXIT SIGNAGE AT DOORS.
REBALANCE ASSOCIATED AIR HANDLING UNIT TO
PRECONSTRUCTION AIRFLOW MINUS
ANTICIPATED AIRFLOW INDICATED AT NOTE.
234B
233C
233B
135.11 sf
136.55 sf
112.42 sf
232
T
T
232A
231
103.58 sf
131.67 sf
230A
196.16 sf
74.33 sf
E
D
H
T
232C
232B
231A
136.43 sf
114.49 sf
116.31 sf
230B
401.51 sf
230AB
288.88 sf
MECHANICAL AND ELECTRICAL SECOND FLOOR NEW WORK PLAN
SCALE: 1/32" = 1'-0"
KEY PLAN
PROJ NUMBER:
1.
PROJECT NAME:
X
48x12 EXH
1.
301A
301B
301C
301D
40.92 sf
30.52 sf
24.67 sf
23.58 sf
2.
APPROX. 300 CFM TOTAL
3.
301
352
788.28 sf
62.18 sf
1
DEMOLITION KEY NOTES:
RELOCATE LIGHT FIXTURES OR ELECTRICAL
DEVICES THAT MAY INTERFERE WITH THE
CONSTRUCTION OF THE NEW STAIR WALLS/
ENCLOSURE.
RELOCATE EXISTING DIFFUSERS TO OUTSIDE OF
NEW STAIRWELL AREA.
PERFORM PRECONSTRUCTION AIR BALANCE OF
AREA INDICATED AND ASSOCIATED AIR
HANDLING UNIT PRIOR TO START OF
DEMOLITION.
3
2
NOT FOR BIDDING
OR CONSTRUCTION
X
SA FAN #1
DATE:
07/20/12
302C
254.28 sf
ROY GUSTAV BUILDING
THIRD FLOOR PLAN
TYPE
ITEM # 3
46.72 sf
97.06 sf
REFERENCE SHEET:
302B
302A
MECHANICAL AND ELECTRICAL THIRD FLOOR DEMOLITION PLAN
1.
302C
254.28 sf
SA FAN #1
48x12 EXH
301A
301B
301C
301D
40.92 sf
30.52 sf
24.67 sf
23.58 sf
2.
3.
4.
NEW CONSTRUCTION KEY NOTES:
PROVIDE A FIRE ALARM PULL STATION AT
DOORS, ALONG THE PATH OF EGRESS, AND TIE
INTO THE EXISTING FIRE ALARM SYSTEM.
PROVIDE NEW EXIT SIGNAGE AT DOORS.
REWORK LIGHTING CIRCUITRY FOR THREE
LIGHTS IN NEW STAIRWAY ENCLOSURE.
REBALANCE RELOCATED DIFFUSERS TO
PRECONSTRUCTION AIRFLOW.
APPROX. 300 CFM TOTAL
301
352
788.28 sf
62.18 sf
1
2
3
4
MECHANICAL AND ELECTRICAL THIRD FLOOR NEW WORK PLAN
SCALE: 1/16" = 1'-0"
KEY PLAN
PROJ NUMBER:
46.72 sf
PROJECT NAME:
X
302B
302A
97.06 sf
SCALE:
SCALE: 1/16" = 1'-0"
ROY G CULLEN
FIRST FLOOR PLAN
RESTROOM AREA
TO UPDATE PER ADA
Statement of Probable Cost –
3
COST BREAKDOWN
The outline costs below represent the building modifications/revisions reflected in tab 2 (Scope of Work
Documents), including possible hazardous material abatement and accessibility revisions. As these costs are
conceptual at this time, additional budget information is provided by CCM Construction Services LLC to reflect a
range of costs associated with the anticipated scope of work. Mechanical and Electrical cost detail is also provided.
Item # 1 – Separate Third Floor Stairs
1.
3rd Floor – Enclose Stair, Add Door*
2.
Subtotal
$ 12,960 (approx. 216sf @ 60/sf )
*Includes $6,900 for MEP
$18,144 (includes 40% Mark-Up)
Hazardous Material Abatement:
rd
3.
4.
3 Floor – Enclose Stairs
Subtotal
$1,554 (approx. 259sf @ 6/sf)
$2,331 (includes 50% Contingency)
5.
Total Project Cost (TPC)
$20,475
Item #2 – Separate Stairs at All Floor Levels, Exit to Exterior
st
nd
1.
1 and 2 Floor - Enclose Stairs*
Location A
Location B
2.
Subtotal
$66,420 (approx. 1,107sf @ 60/sf)
$89,550 (approx. 1,194sf @ 75/sf)
*Includes $37,240 for MEP
$218,358 (Includes 40% Mark-Up)
Hazardous Material Abatement:
3.
4.
st
nd
1 and 2
Subtotal
Floor – Enclose Stairs
$16,567 (approx. 2,761sf @ 6/sf)
$24,851(includes 50% Contingency)
Accessibility:
5.
6.
Modifications to Ground Floor Restrooms
Subtotal
$95,590 (approx. 869sf @$110/sf)
$133,826 (Includes 40% Mark-Up)
7.
Total Project Cost (TPC)
$377,035
Note: Mark-Up includes contingency, GC’s overhead/profit, permits and bond
University of Houston
Building #501 ‐ Roy Gustav Cullen Building
Item #3 Scope of Work ‐ Estimated Costs
UniFormat
C1010 Partitions
C1020 Interior Doors
C1020 Interior Doors
C1030 Fittings
C1030 Fittings
C1030 Fittings
C3010 Wall Finishes
C3020 Floor Finishes
D3090 Other HVAC Systems & Equipment
D3090 Other HVAC Systems & Equipment
D3090 Other HVAC Systems & Equipment
D3090 Other HVAC Systems & Equipment
D5020 Lighting and Branch Wiring
D5020 Lighting and Branch Wiring
D5020 Lighting and Branch Wiring
D5020 Lighting and Branch Wiring
D5030c Fire Alarm
G1021a Building Demolition
G1021a Building Demolition
G1021a Building Demolition
G1021a Building Demolition
G1021a Building Demolition
G1021a Building Demolition
G1021a Building Demolition
G1021b Mechanical Demo
FIRST FLOOR
Descripton
New Interior Partition, Rated
Door, 6x7 (PR), Wood, Rated, or Similar
Door, 6x7, AL/GL, or Similar
Handrail, at Ramp
New Ramp, 5'‐6''‐6'‐0'' Wide
Stone Stairs, Platform, Walls, March Existing Finish, 9'‐0'' x 10'‐0''
Rework Wall Finishes, Patch
Rework Floor and Ceiling Finishes for New Layout
Pre‐Construction Air Balance on Area
Provide New Electric Cabinet Heater to Serve Stair/Egress Corridor
Rebalance Associated AHU
Relocate Existing Thermostat
Provide New Exit Signage, Recircuit Lighting
Provide New Lighting in Exit Corridor
Provide Power to Mechanical Unit, at Exit Corridor
Relocate Existing Light Fixtures and Electrical Devices, This Area
Provide Fire Alarm Pull Station at Doors, Tie to Existing System
Demo Ceiling, Lights, Diffusers
Demo Exterior Wall for New Door, 6x7
Demo Furrdown or Similar
Demo Interior Door, say 3x7 or Similar
Demo Interior Partition
Temporary Partitions, Dust Control (Large Area)
Temporary Partitions, Dust Control (Small Area)
Remove Existing Supply Diffuser w/Flex Duct, Cap Ductwork
Total ‐ Direct Cost
Add Mark‐Ups (Contingency, GCs/Overhead/Profit, Permits, Bond)
Total ‐ Cost w/Mark‐Ups
Approximate Area of Work
UniFormat
C1010 Partitions
C1020 Interior Doors
C3010 Wall Finishes
C3020 Floor Finishes
D3090 Other HVAC Systems & Equipment
D3090 Other HVAC Systems & Equipment
D5020 Lighting and Branch Wiring
D5020 Lighting and Branch Wiring
D5030c Fire Alarm
G1021a Building Demolition
G1021a Building Demolition
G1021a Building Demolition
G1021a Building Demolition
G1021a Building Demolition
G1021b Mechanical Demo
SECOND FLOOR
Descripton
New Interior Partition, Rated
Door, 6x7 (PR), Wood, Rated, or Similar
Rework Wall Finishes, Patch
Rework Floor and Ceiling Finishes for New Layout
Pre‐Construction Air Balance on Area
Rebalance Associated AHU
Provide New Exit Signage, Recircuit Lighting
Relocate Existing Light Fixtures and Electrical Devices, This Area
Provide Fire Alarm Pull Station at Doors, Tie to Existing System
Demo Ceiling, Lights, Diffusers
Demo Interior Handrail
Demo Interior Partition
Temporary Partitions, Dust Control (Large Area)
Temporary Partitions, Dust Control (Small Area)
Remove Supply/Return Diffusers w/Flex Duct, Cap Ductwork, Clean/SFR
Total ‐ Direct Cost
Add Mark‐Ups (Contingency, GCs/Overhead/Profit, Permits, Bond)
Total ‐ Cost w/Mark‐Ups
Approximate Area of Work
Prepared by: CCM Construction Services, LLC
(214‐556‐4510)
Page 7 of 10
Qty
2,520
1
1
67
36
1
3,720
2,331
1,932
1
2
1
2
1
1
1,932
2
824
1
12
4
650
1
1
4
UM
SF
EA
EA
LF
LF
EA
SF
SF
SF
EA
EA
EA
EA
LS
EA
SF
EA
SF
EA
LF
EA
SF
EA
EA
EA
Unit Cost
$5.00
$3,600.00
$6,000.00
$50.00
$75.00
$4,000.00
$2.50
$8.00
$0.75
$2,000.00
$1,500.00
$300.00
$400.00
$1,600.00
$600.00
$4.00
$450.00
$2.00
$750.00
$8.00
$100.00
$3.00
$1,200.00
$600.00
$75.00
50.0%
1,489
SF
Qty
2,025
3
4,845
1,590
1,681
2
2
1,681
2
458
57
710
1
1
1,681
UM
SF
PR
SF
SF
SF
EA
EA
SF
EA
SF
LF
SF
EA
EA
SF
Cost/SF
Unit Cost
$5.00
$3,600.00
$2.00
$8.00
$0.50
$750.00
$400.00
$4.00
$450.00
$2.00
$20.00
$3.00
$1,000.00
$600.00
$0.50
50.0%
1,590
SF
Cost/SF
Extended
$12,600
$3,600
$6,000
$3,350
$2,700
$4,000
$9,300
$18,648
$1,449
$2,000
$3,000
$300
$800
$1,600
$600
$7,728
$900
$1,648
$750
$96
$400
$1,950
$1,200
$600
$300
$85,519
$42,760
$128,279
$86.15
Extended
$10,125
$10,800
$9,690
$12,720
$841
$1,500
$800
$6,724
$900
$916
$1,140
$2,130
$1,000
$600
$841
$60,726
$30,363
$91,089
$57.29
7/23/2012
University of Houston
Building #501 ‐ Roy Gustav Cullen Building
Item #3 Scope of Work ‐ Estimated Costs
UniFormat
C1010 Partitions
C3010 Wall Finishes
C3020 Floor Finishes
D3090 Other HVAC Systems & Equipment
D3090 Other HVAC Systems & Equipment
D5020 Lighting and Branch Wiring
D5020 Lighting and Branch Wiring
D5020 Lighting and Branch Wiring
D5030c Fire Alarm
G1021a Building Demolition
G1021b Mechanical Demo
THIRD FLOOR
Descripton
New Interior Partition, Rated
Rework Wall Finishes, Patch
Rework Floor and Ceiling Finishes for New Layout
Pre‐Construction Air Balance on Area
Rebalance Associated AHU
Provide New Exit Signage, Recircuit Lighting
Relocate Existing Light Fixtures and Electrical Devices, This Area
Rework Lighting Circuitry for Light Fixture
Provide Fire Alarm Pull Station at Doors, Tie to Existing System
Temporary Partitions, Dust Control (Small Area)
Remove Supply/Return Diffusers w/Flex Duct, Cap Ductwork, Clean/SFR
Total ‐ Direct Cost
Add Mark‐Ups (Contingency, GCs/Overhead/Profit, Permits, Bond)
Total ‐ Cost w/Mark‐Ups
Approximate Area of Work
Prepared by: CCM Construction Services, LLC
(214‐556‐4510)
Page 8 of 10
Qty
480
1,215
484
1,173
1
1
1,173
3
1
1
1,173
UM
SF
SF
SF
SF
EA
EA
SF
EA
EA
EA
SF
Unit Cost
$5.00
$2.00
$5.00
$0.50
$500.00
$400.00
$0.75
$275.00
$450.00
$600.00
$0.50
50.0%
484
SF
Cost/SF
Extended
$2,400
$2,430
$2,420
$587
$500
$400
$880
$825
$450
$600
$587
$12,078
$6,039
$18,117
$37.43
7/23/2012
Existing Conditions Photos and Drawings –
A
FIRST FLOOR PLAN
SECOND FLOOR PLAN
Download