FORMS MANUAL INSERT
USDA
Form RD 1924-3
(Rev. 8-93)
FORM RD 1924-03
SERVICE BUILDING SPECIFICATIONS
FORM APPROVED
OMB NO. 0575-0042
This form may be
completed by the
applicant, and architect, or
designer employed by the
applicant, a builder or
contractor, or by the
Engineer in consultant with
the County Supervisor, and
the applicant.
SPECIFICATIONS FOR THE CONSTRUCTION OF
FOR
INSTRUCTIONS. Describe all materials and equipment to be included in the proposed work. Where space is insufficient,
enter “See Misc.” and describe under item 18, or attach additional sheets. All work not so described must be shown on the related
drawings.
GENERAL. Each item of material and equipment shall equal or exceed that described or indicated. All work shall be
performed in a workmanlike manner and in accordance with the best practice.
1. Excavation:
Bearing soil (describe)
Minimum depth below finished grade
2. Foundations:
Footings: Material __________ Mix __________ Strength ________ psi. Size
Reinforcing
Foundation walls: Material ________ Mix ____________ Strength __________ psi.
Reinforcing
Piers: Material and size _______________________________ Mix ___________
Reinforcing
Mortar mix _____________ Waterproofing (describe)
3.
4.
5.
6.
7.
8.
Chimneys:
Material ______________ Flue lining: Size _________________ Thimble _________________ Flashing material
Exterior Walls:
Frame: Sill, plate, or post anchors (describe)
Sills or sole plates: Species and grade ____________________________ Size ___________________ Preservative
Posts: Species and grade _______________________________________ Size ___________________ Preservative
Studs: Species and grade ___________________________________ Size _______ Spacing ____ “ o.c. Type of bracing
Pole type: Poles: Species _______________________________________ Size _______________ Preservative
Masonry: Material _______________________________________ Thickness _______________ Mortar mix
Lintels: Material (describe)
Sill material: Windows ______________________________________________ Doors
Sheathing: Material _________________________ Grade _____________________ Thickness ________________ Width
Diagonal
Horizontal
Solid
Spaced ______ “ o.c.
Siding: Material ___________________ Type ___________________ Grade or gage _____________________ Size
Exterior painting: Material and number of coats
Floor Framing:
Mud-sills: Species and grade _________________________________ Size ________________ Preservative
Girders: Species and grade __________________________________ Size _______________ Preservative
Joists: Species and grade ____________________________________ Size ________________ Spacing _______ “ o.c.
Bridging: Size and type
Flooring: (describe)
Slabs on ground: Mix __________ Strength _____________ Thickness __________ Reinforcing ___________ Finish
Fill under slab: Material _________________________________ Thickness ___________ Waterproofing
Interior Wall Framing:
Posts: Species and grade __________________________________________ Size
Studs: Species and grade __________________________________________ Size _____________________ Spacing __________
Masonry: Material ______________________________________________________________________ Thickness
Ceiling Framing:
Joists: Species and grade __________________________________________ Size _____________________ Spacing __________
Roof Framing:
Rafters: Species and grade _________________________________________ Size _____________________ Spacing _________
Collar Beams: Species and grade ___________________________________ Size _____________________ Spacing _________
Purlins: Species and grade _________________________________________ Size _____________________ Spacing _________
Sheathing: Species and grade
Size and type ________________________________________________________
Solid
Spaced _________
Used by borrowers,
contractors, in connection
with service building
construction to be
performed under the Farm
Ownership and Rural
Housing programs.
Only applicable items will
be completed; items not
applicable to the work
proposed will be left blank.
It is not intended that this
form be used in connection
with every case involving
service building construction. When other suitable
specification are available
which describe adequately
the materials equipment,
and quality of
workmenship, this form
need not be used.
“ o.c.
“ o.c.
“ o.c.
“ o.c.
“ o.c.
“ o.c.
Public reporting burden for collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data
sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of
this collection of information, including suggestions for reducing this burden, to Department of Agriculture, Clearance Officer, OIRM, AG Box 7630, Washington, D.C. 20250; and to
the Office of Management and Budget, Paperwork Reduction Project. (OMB No. 0575-0042), Washington, D.C. 20503, Please DO NOT RETURN this form to either of these
addresses. Forward to FmHA only.
Position 6
Form RD 1924-3 (Rev. 8-93)
(see reverse)
PROCEDURE FOR PREPARATION
:
RD Instruction 1924-A
PREPARED BY
:
Borrower, contractors.
NUMBER OF COPIES
:
Original and two.
SIGNATURES REQUIRED
:
None.
DISTRIBUTION COPIES
:
Original to County Office files; copy to Borrower;
copy to Contractor.
(5-12-87) SPECIAL PN
(Forms Manual Insert-Form RD ) -2-
PAGE 2 OF FORM RD
9. Roofing
Metal: Material and type ________________________________ Gage _______________ Lap: Side ____________ End
Ridge roll: Material, size, and type _________________________________________________________________________
Shingles: Material ______________________________ Weight or thickness _________________________ Grade
Size __________________ Exposure __________________________
Stained
Painted
Built-up: (decribed) ____________________________________ Number of piles __________ Surface material
Ventilators: Material _________________________________ Type ________________ Size _______________ Number
10. Interior Wall and Ceiling Finish:
Material: Size, type, and grade
Painting: Material and number of coats
11. Doors and Gates
Location _________________________ Type __________________ Thickness ____________ Material
Location _________________________ Type __________________ Thickness ____________ Material
Location _________________________ Type __________________ Thickness ____________ Material
Screen doors: Material ______________________________ Size ___________ Wire mesh ____________ Number
12. Windows:
Material ________________________ Make ____________________________ Size ______________ Sash thickness
Double hung
Casement
Other (describe)
Window screeens: (describe)
13. Hardware:
14.Plumbing
Fixture ______________________ No. ____________ Location _____________________ Make
Fixture ______________________ No. ____________ Location _____________________ Make
Fixture ______________________ No. ____________ Location _____________________ Make
Water Piping:
Galvanized steel
Copper tubing
Other _______________________________ Sill cocks: No.
Storage tank: Type _____________________________ Material ______________________ Tank size _________ gals.
Insulated
Drain pipes: Material and size ______________________________ Floor drains: Material and size
Water heater: Type _______________________________________ Make and model
Gas piping
15. Electric Wiring:
Service: Overhead
Underground
Panel:
Fuse box
Circuit breakers
Number of circuits _______________________________________ Size of wires
Interior:
Conduit
Armored cable
Nonmetallic cable
Other
Special purpose outlets:
Water heater
Other
16.Gutters and Downspouts:
Gutters: Material ______________________________________ Gage or weight ____________ Size ___________ Shape
Downspouts: Material __________________________________ Gage or weight ____________ Size ___________ Shape
Paint: Material and number of coats
17. Insulations:
Location, material, and thickness
18. Miscellaneous:
(Describe any materials, equipment, or construction items not described elsewhere herein or indicated on the drawings)
Submitted by:
Applicant
Prepared by:
Approved by:
Contractor
County Supervisor