UHS Administration and Finance Briefing for UH SGA Nov. 19, 2014 1 Questions and Answers - Examples and Comparisons What is the status of the stadium? How do the results compare to the plan and goals? Is the stadium finished? How was the stadium financed? How was HEAF used? What is the revenue plan for the stadium? What are the basic operating costs we need to cover? How is the revenue to support operations generated? How are events booked and priced? 2 TDECU Stadium Timeline This is similar to Chancellor Khator’s presentation to the UH Board of Regents on 11/14/14 Opening Fundraising New Stadium Proposed Construction Schedule Construction Inflation New Stadium Announce Project evolution, phasing, results Wilhelmina Robertson End Zone Project 3 Project evolution: Where we started in 2008 Est. price $32-38m 4 Change of plan in 2010 Concrete spalling 5 Stadium Cost Comparisons 2010 Comparisons • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Here are the approximate costs of all of the recent projects we know of. Apogee Stadium $78M BBVA Compass Stadium $80M Bobby Dodd Stadium Expansion $50M Boone Pickens Stadium Expansion $45M (Phase I), $50M (Phase II), $130M (Phase III) Darrell K. Royal Stadium Expansion $110 M (North End Zone) FAU Owls $69m (30k seats) Kinnick Stadium Expansion $86M Spartan Stadium Expansion $64M Ross-Ade Stadium Expansion $55M Here is the detail Apogee Stadium, University of North Texas, Denton, TX Total Project Cost Construction Cost Building Area Capacity Construction Cost/SF Construction Cost/seat $78M $68.7M 184,142 SF 28,891 $373 $2,378 BBVA Compass Stadium, Houston Dynamo, Houston, TX Total Project Cost Construction Cost Building Area Capacity Construction Cost/SF Construction Cost/seat Cougar Stadium Estimating Model Construction Costs: • @$2200 per seat =>$88M, • @$2500 per seat => $100M Plus: • Professional Fees: $10M • Other Costs, Art, Contingency: $10M $80M $63M 340,000 SF 22,100 $185 $2,850 6 Target cost @ 40k seats June 2010 7 New football stadium, upgrade to Hofheinz part of Tier One vision STEVE CAMPBELL, Copyright 2010 Houston Chronicle | June 11, 2010 • The University of Houston placed a hefty bet on its future in college athletics on Thursday, unveiling a $160 million plan to upgrade its football and basketball facilities. • The athletic department made a presentation to the board of regents on Saturday and received the go-ahead to pursue the $120 million construction of a football facility to replace Robertson Stadium and a $40 million renovation of Hofheinz Pavilion Preliminary plan announcement 8 9 New Stadium Proposed Construction Schedule 900 days 19 months actual construction BOR Facilities Construction & Master Planning Committee Approval 1) BOR Finance & Administration Building deCommittee commissioning Approval and Construction Begins 2) THECB Approval December 2012 May 2012 February 2012 Design begins April 2012 Football Season 2013 at Reliant Stadium Construction Complete (Substantial Completion) Summer 2014 Fall 2013 Football Season 2014 Starts September 2014 10 BOR Budget Approvals • Feb 2012 BOR FCMP site presentation: phasing (1) 32,000 seats, (2) 40,000; options for premium seats • March 2012 Special Called BOR meeting site approval. • Aug BOR 2012, BOR F&A, approved first phase financing $85m, 30k seats • May 2013, BOR F&A, approved second phase financing $105m, 40k seats • Aug 2013, BOR F&A, approved third phase financing $120m 11 Capital Project Funding – UH Stadium Sources at Phase 2 BOR Approvals • Feb 2012 BOR FCMP site presentation: phasing (1) 32,000 seats, (2) 40,000; options for premium seats • March 2012 Special Called BOR meeting site approval. • Aug BOR 2012, BOR F&A, approved first phase financing $85m, 30k seats • May 2013, BOR F&A, approved second phase financing $105m, 40k seats • Aug 2013, BOR F&A, approved third phase financing $120m 12 Use of HEAF funds in an Auxiliary Building (Chancellor Khator is independently examining this) • Higher Education Assistance Funds - Legislative appropriation for the support of E&G buildings for instruction, research and academic support. • Is the use of HEAF in the stadium appropriate? - The band is a part of our music program and as such qualifies for HEAF support. - Presented to THECB, 9/18/12 – “This project will also provide the School of Music Band program with rehearsal and storage space and additional rehearsal space for other facets of academic music school programs (chamber music, small ensembles, opera rehearsal, etc.).” • Other examples of mixed use (auxiliary and E&G) buildings using HEAF UH Hilton Health and Biomedical Building classrooms 13 Racing against inflation 14 Where we are now…. OPEN (substantial completion) but not finished 15 Recent Football Stadiums Project Summaries Stadium Date Opened Total Seats Project Cost Cost/Seat Apogee Stadium 2011 30,850 $78 million $2,528.36 BBVA Compass 2012 22,039 $80 million $3,629.93 UH 2014 40,000 $120 million $3,000.00 Kyle Field 2014-2015 102,512 $450 million $4,389.73 McClane Stadium 2014 45,000 $250 million $5,555.56 Katy ISD Future 12,000 $58 million $4,833.33 16 17 Next, project close-out What is involved in closing out a project? • • • • • • • • • • • Building testing and balancing (TAB) of systems Building system commissioning Architecture punch list review Unfinished items and inspections must be Warranty inspections/calls Post-occupancy assessment complete before final acceptance of project Operating and maintenance manuals submission Submission of attic stock items As-built drawing submission Lien releases Review outstanding potential change orders (PCO) This is what determines final Final construction audit project cost. NOTE: Project close out is a function of size, complexity and cost. Cougar Village 2 and Cougar Place final close-out approximately one year after opening. Average closeout time on projects greater than one year in duration at Michigan State was reported as 596 days (Michigan State University, 2008) 18 What are UH Auxiliary Facilities? How do they operate? Auxiliary Funds -Self-supporting activities are recognized in the Auxiliary Fund. These activities include income and expenses from activities such as: housing, food service, parking, student activities, special facilities and athletics. 19 How do we fund and budget our Auxiliary facilities? Fee revenues fund the operating budget: – – – – – – Staffing costs Program operating costs Debt service costs Maintenance costs Major repair cost Capital Renewal, Replacement funding Transfers to the capital budget: – Financing, debt service budgeting – Major repairs/renovations project funds – Capital Renewal project funds 20 How do Auxiliaries generate revenue to cover their operating budgets? User fees and hosted events. 21 Requirements for UH Auxiliaries that rent their facilities for income. • UH System Administrative Policy 01.B.06, covers – UHS policies – Auxiliary facilities use – Maintenance costs • UH Manual of Administrative Policies and Procedures 9.03.01, (Being Updated) covers – Reservation and Rental policies – Facility Use Fees – Facilities Use Agreement • UH Manual of Administrative Policies and Procedures 9.04.01, (New) covers – Capital Renewal Requirements – Renewal Funds Set Aside 22 Why MUST we budget for Capital Renewal and How? • New buildings – BOR policy required budget for facility renewal • E&G buildings – Facility condition audit (FCA) – Capital Improvement Program (CIP) – Capital Renewal Deferred Maintenance (CRDM) • Auxiliary buildings – Productive life, carry 20year+ debt load – Self-supporting • Create a “renewal fund” or finance a replacement? 23 Auxiliary Facilities Condition Assessment (BOR May 2014) A B Bldg. No. C D Bldg Abbr Cat egory Building Name Gros s Area FCNI v (General Def erred Maint enanc e Maint enanc e Projec t Projec t Cos t * (4Q Cos t **(4Q 2013) 2015 $) Spac e Ty pe Condit ion) E Def erred F G Ot her Renov t n $/ SF Per THECB H Tot al Ot her Tot al Projec t Renov at ion Renewal Cos t Cos t *** CATEGORY I -- NEW CONSTRUCTION / REPLACE IN PLACE 1 2 3 4 5 6 0557 0555 0558 0556 0559 BH LH TH SH OB Bates Residence Hall Law Residence Hall 48,462 45,556 54,045 39,933 76,864 835 beds, total Taub Residence Hall Settegast Residence Hall E. E. Oberholtzer Res. Hall TOTAL 140.30% 138.90% 138.60% 125.00% 70.80% 1 Non E&G 1 Non E&G 1 Non E&G 1 Non E&G 1 Non E&G $ $ $ $ $ 5,858,720 5,620,800 6,420,320 6,389,280 16,355,681 $ $ $ $ $ 6,617,213 6,348,491 7,251,520 7,216,462 18,473,153 $ $ $ $ $ 158 158 158 158 158 $ $ $ $ $ 264, 860 7,656,952 7,197,895 8,539,074 6,309,414 12,144,575 TOTAL $ $ $ $ $ 14,274,165 13,546,387 15,790,594 13,525,876 30,617,728 $87, 754, 750 CATEGORY III -- REHABILITATE OR REPAIR 7 8 0562 ADB A. D. Bruce Religion Center 21,503 61.10% 1 Non E&G $ 3,870,540 $ 4,371,636 $ 204 $ 4,386,612 $ 9 10 0525 11 0567 12 HC UCS UH Health Center Renovation 11,789 38,657 43.7% 42.50% 2 Non E&G 2 Non E&G $ 3,241,975 $ $ 4,675,000 $ 3,661,694 $ 5,280,244 $ 438 $ 256 $ 5,163,582 $ 8,825,276 9,896,192 $ 15,176,436 13 14 0584 15 0531 16 0504 17 UC Satellite Renov/Repurposing TOTAL 50, 446 TOTAL 8,758,248 $24, 001, 712 CATEGORY IV -- MAINTENANCE MR HP CCC Moody Towers Res. Halls 1091 beds 314,967 189,804 14,506 Hofheinz Pavilion Child Care Center Renovation TOTAL 36.00% 29.6% 32.50% 3 Non E&G 3 Non E&G 3 Non E&G $ 57,761,485 $ $ 16,080,480 $ $ 2,611,080 $ 65,239,517 $ 18,162,323 $ 2,949,121 158 $ 319 $ $ 519, 277 </=35%: keep as-is, maintain for a ten to fifty year life; >/= 50%: consider replacement; minor repairs only. MayFCIN 6, 2014 49,764,814 $ 107,526,299 60,547,476 $ 78,709,799 $ 2,949,121 TOTAL $189, 185, 219 24 Renewal or Replacement Needed Non E&G Projects Clockwise from Top Right: UH Health Center; Hofheinz Pavilion, ground floor; Child Care Center, exterior; UC Satellite, ground floor UC Example: Budgeting for Renewal Natatorium Capital Renovation We have the authority to do the work, but we have to finance the project (April 2014) Design Phase Financing: FY 2014 Rec/Wellness Ending Balance $0.9M. Construction Financing: Student fees 26 Creating a Public Private Partnership Chancellor Khator is forming a committee to develop policies for managing PPPs Goals: • Engage a private sector partner with a vested interest in UH’s campus, growth and success. • Engage private sector management for all specified aspects of facilities management • Create a profit sharing agreement Desired Qualifications: • • • • Experience with UH Athletics Experience with UH Experience with higher education Experience in Houston Business Plan: • Promote UH facilities as a venue for non-UH events • Develop partnership that anticipates growth of UH venues and athletics program • Use comps from athletics contract data base of 1000 institutional agreements 27 Generating Revenue: FY2015 booking schedule, TO DATE. Cullen Performance Hall (80 Events) Hofheinz Pavilion (2 Events) Examples: • Jason Mraz • MOTH • Celtic Yuletide • A Soul Town Christmas • New Year's Message • IN THE MOOD - 1940's Big Band Musical Revue • Russell Peters • Outback Concert • Jekyll & Hyde • Menopause the Musical • Eureka • World-Class Talent Experience • Chinese New Year • Trailer Park Boys Examples: • Humble/Kingwood Graduations • Goose Creek ISD TDECU Stadium (10 Events) Examples: • Pearland High School vs Deer Park High School • Foster High School vs Ridge Point High School Football • George Ranch High School vs Elkins High School • Galena Park ISD High School Football • Manvel High School Football • Friendswood ISD High School Football • Temple High School Football • Say No To Drugs (Photo Session) • Nitro Circus 28 Sample for Sporting Event Costs at TDECU Stadium 40,000 attendance SAMPLE SPORTING EVENT EXPENSES - Stadium Event & Facility Operating Expenses for 40k attendance Facility Rental – TDECU Stadium $ 35,000 5 STAR $ 44,370 UHPD $ 11,400 ADVANTAGE $ 3,200 Equipment Rental $ 16,730 S&E Event Staff $ 1,200 Custodial $ 8,294 Maintenance $ 3,159 Set-up $ 4,213 Supplies $ 1,097 *TOTAL COST: $ 128,663 How do we benchmark rates? COMPARISONS Stadium Rental Costs Reliant $75,000 per game plus $85,000 operating expenses for 30k fans plus $2 ticket over 30k -----------------------------$160,000 per game min Rice Stadium $115,000 per game BBVA Compass $130,000 plus $1.5-$3 per ticket Concessions Comparison TDECU Stadium Minute Maid Park Houston Toyota Center NRG Reliant Staduim Hot Dogs Hot Dogs Hot dogs Hot Dog, Jumbo $ $ 6.00 Hot Dog, Topped $ 6.00 Chicken Proposed Price 2013-2014 Texas Style Dog $ 3/1 Foot Long Hot Dog (all beef) 3/1 Footlong All Beef Hot Dog $ 7.00 6/1 All Beef Hot Dog $ 5.00 6/1 Extreme Dog (topped dog) $ 7.25 Sandwiches/Meals $ Total Hot Dog 7.00 Hot Dog, Southern Dawg Chicken Tender Basket 2014 MLB Pricing $ 7.00 10.00 Sanwiches & Meals Total Entrée Products 8.00 Crispy Chicken Tender Basket - 4 piece Chicken Tender/Fries Basket $ 8.75 Chicken Tender Basker $ 10.00 Nolan Ryan Burger $ 7.25 Nacho Grande $ 9.00 Nolan Ryan Bacon Burger $ 9.00 Rocket Burger $ 9.50 Texas Legends Single Burger $ 8.75 Chicken Sandwich $ 9.00 Nachos (Cheese & Jalapenos) $ 6.50 Nachos Supreme (cheese, chilli, jalapenos, salsa, sour cream) $ 8.50 $ 10.00 Snacks Burger, Htown $ 9.00 Nachos Nacho, Supreme Nachos $ Nacho, Reg $ 6.50 5.25 NA Beverage Soda/N-A Beverages Soda, Reg $ 4.00 Soda, Souv $ 5.50 $ 6.75 Nachos Grande $ 8.75 $ 4.75 $ 7.25 $ 7.25 Total Non ALC Bev. Products 22 oz. Soda $ 5.00 Souvenir Soda $ 6.75 32 oz. Souvenir - refillable $ 7.50 Regular 22 oz. Soda $ 5.25 Bottled Water $ 5.00 Soda/NA Beverage Alcohol Beer, 16oz Dom Nachos 20 oz. BIB Coke cup $ 7.50 32 oz. BIB REFILL Souvenir Soda Total Bottled Beer Products Alcohol Alum. Bottled Beer - 16 oz. $ 8.25 Bottled Beer - 12 oz. Import $ 8.00 Bottled Beer - 24 oz. Import $ 11.25 20 oz. DOM Draft Souvenir Cup 31 SAMPLE Concert Event Costs 40,000 attendance at TDECU SAMPLE CONCERT EVENT 40,000 attendance Building Rent – TDECU Stadium $ Field Cover $ 65,000.00 Barricade $ 4,500.00 Box Office $ 5,000.00 Dressing Room $ Ticket Takers $ Subtotal $ 35,000.00 8,500. 15,000.00 $ 125,000.00 Stage Hands $ 85,000.00 Electrician $ Police $ 15,000.00 Security $ 10,000.00 Ushers $ 20,000.00 Runners (3) $ 600.00 Medical $ 6,500.00 Generator(s) $ 40,000.00 Fuel $ 3,500.00 Chairs $ 28,000.00 Phones/Internet $ 4,200.00 Spotlights $ 8,500.00 Equipment Rental $ 30,000.00 Misc: (visqueen/plywood/signage $ 15,000.00 Pipe & Drape $ 5,000.00 Spotlights $ 8,500.00 20,000.00 $ 14,500.00 Subtotal $ 439,300.00 Clean up $ 8,500.00 Credit Card (3.5%) $ 10,000.00 MISC $ 2,000.00 Subtotal $ NC Field Cover NC Barricade $ Box Office $ 5,000.00 Dressing Room $ 8,500.00 Ticket Takers $ Subtotal $ 133,000. Staging Golf Carts SAMPLE UH CONCERT EVENT 40,000 attendance Building Rent Staging *Does not include promoter costs, advertising, local transportation $ 15,000.00 33,000.00 $ 85,000.00 Stage Hands $ 65,000.00 Electrician $ Police $ 15,000.00 Security $ 10,000.00 Ushers $ 20,000.00 Runners (3) $ 600.00 Medical $ 6,500.00 Generator(s) $ 40,000.00 Fuel $ 3,500.00 Chairs $ 28,000.00 Phones/Internet NC Spotlights $ 8,500.00 Equipment Rental $ 30,000.00 Misc: (visqueen/plywood/signage $ 15,000.00 Pipe & Drape $ 5,000.00 Spotlights $ 8,500.00 Golf Carts $ 14,500.00 20,000.00 Subtotal $ 375,100.00 Clean up $ 8,500.00 Credit Card (3.5%) $ MISC $ Subtotal $ 20,500.00 Estimate Cost of event* Estimate Cost of event* 4,500.00 592,800.00 *Does not include promoter costs, advertising, local transportation $ 10,000.00 2,000.00 20,500.00 428,600.00 Sample Booking – Hofheinz High school graduation 33 Sample Booking – Cullen 34 Sample Booking – TDECU 12,500 seats 35 Sample Booking – Cullen SFAC event 36 Questions? 37 Thank You 38