MOST IMMEDIATE No.23025/5/2014-CPD Government of India Ministry of Coal

advertisement
MOST IMMEDIATE
No.23025/5/2014-CPD
Government of India
Ministry of Coal
«»
New Delhi, the 23rd April, 2015
Chairman-cum-Managing Director,
Coal India Limited,
10, NS Road, Kolkata
Subject:
Approval of the Competent Authority on the recommendations of the
Standing Linkage Committee (Long-Term) for Power/Cement/Sponge
Iron Sectors held on 23rd December, 2014 — under Agenda Items No.
4 of SLC (LT) for Power -reg.
Sir,
am directed to refer to Ministry of Coal's communication of No, 23014/3/2014CPD(pt-II) dated 11.03.2015 forwarding therewith the minutes of the Standing Linkage
Committee (Long-Term) for Power/Cement/Sponge Iron Sectors held on 23rd
December, 2014 and to say that the proposal of transfer of existing coal linkage of Units
1 to 4 at PTPS, Panipat to the new supercritical unit to be set up at PTPS, Panipat was
deliberated under Agenda Item No. 4 of SLC (LT) for Power held on 23.12.2014. The
recommendation of the SLC (LT) is as under:Agenda Item No
Agenda Item No.4:
PTPS, Panipat:
transfer cf existing coal
linkage of Units 1 to 4 at
PTPS, Panipat to the new
surercritical unit to be set
up at PTPS, Panipat
Recommendation of the SLC(L T)
The Committee recommended that recommendation
of MoP may be accepted. Regarding coal from the
closed Faridabad Unit, it shall be covered as pe.
Agenda item No.2. The additional requirement of coal
consequent upon additional capacity of the new plant
will be covered by the extant policy of scrapping old
units and their replacement by new units.
The above recommendation of the SLC (LT) has been approved by the
2.
Competent Authority.
CIL is requested to take further necessary action in the matter under intimation to
3.
this Ministry.
Yours faithfully,
Kumar))
(Pilli Ravi 9\/
Under Secretary to the Govt. of India
Tele: 23384285
2.
:2:
Copy to:
1.
Ministry of Power (Attn: Shri S. Majumdar, Under Secretary), Shram Shakti Bhawan,
New Delhi w.r.t. MoP's OM No. FU-04/2012-IPC (Vol-III) dated 14/16.10.2014.
2.
Chief Engineer (Planning), Haryana power Generation corporation Limited (HPGCL), C7, Urja Bhawan, Sector-6, Panchkula w.r.t. HPGCL's Memo No. 846/Ch41/CE/PLG/PNP-117 dated 11.11.2014.
10' iM
(Pilli Ravi Kumar)
Under Secretary to the Govt. of India
Tele: 23384285
Copy to: NIC, Ministry of Coal with a request to place it on the Website of this Ministry
for information of all concerned.