Area Effectiveness Plan Report - Four Column El Paso Community College Vice President Information Technology - Dr. Jenny Giron Outcomes Planning - Instructional Media Services District-wide Media Support Services for Faculty, Students, and Staff (2010- 2011). To provide increased instructional media services District-wide to meet faculty, students, and District needs. Outcome Types: 2010 - 2011 Outcome Status: In Progress Budget Account Number: 11000-52115 Person(s) Responsible: Nancy Gamez Planning - Instructional Media Services Improve technology for classroom use and special events (2010-2011) - Research and coordinate the implementation of technology-enhanced classrooms with emerging instructional technologies, and functional equipment for classroom or special event use Outcome Types: 2010 - 2011 Means of Assessment & Standards Criterion for Success / Tasks Means of Assessment: Provide District-wide support to IMS Centers Assessment Tool: Department/Area Report Standard - Criteria for Success: Hire appropriate level staff. Baseline: Hire 6 full-time Audiovisual Assistants. Results Recommendation & Follow-Up 11/09/2011 - One part-time employee was hired for the Rio Grande Campus. Result Type: Unsatisfactory Recommendation Status: 1 - Action Plan Needed 11/09/2011 - Ask for funding to add more staff to cover College operation hours. Task Name: Supervision of the IMS Centers District Wide Task Description: District-wide IMS Manager will assist with planning and supervision of IMS Centers; additional Audiovisual Assistants will ensure for increased support to faculty and students. Budget Impact: Additional/New Funding Required Projected Cost: 126426.0000 Funding Justification: Additional staff needed to cover the additional hours of operation, increased number of the equipment for delivery, and events district wide. Means of Assessment: Increase the number of classrooms converted to technology-enhanced classroom, and replace old outdated equipment. Assessment Tool: Department/Area Report Standard - Criteria for Success: Increase the number of classrooms converted to technology-enhanced classroom. Improved and replace old 11/09/2011 - This year we converted 78 classrooms district wide to technology-enhanced classrooms, five of those are designated as ADA compliant classrooms one per campus. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Outcome Status: 01/12/2012 12:00 PM Generated by TracDat a product of Nuventive. Page 1 of 18 Outcomes In Progress Budget Account Number: 11000-52115 Person(s) Responsible: Nancy Gamez Planning - Instructional Media Services Provide training to faculty and staff on technology equipment (2010-2011) Provide ongoing training to faculty and staff utilizing technology to achieve their objectives, and policy and procedures for use of media equipment. Outcome Types: 2010 - 2011 Outcome Status: In Progress Budget Account Number: 11000-52115 Person(s) Responsible: Nancy Gamez 01/12/2012 12:00 PM Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up outdated equipment to support events district wide. Task Name: Improve media equipment tehnology Task Description: Request funding to convert regular classrooms into technology-enhanced classrooms. Request funding to upgrade event equipment to support all the special events district wide. Budget Impact: Additional/New Funding Required Projected Cost: 400.0000 Funding Justification: There is a list of 22 classrooms that need to be converted. With a goal to have all the rooms converted. Means of Assessment: Develop training on the use of media equipment. Assessment Tool: Department/Area Report Standard - Criteria for Success: Develop training on the use of media equipment in technology-enhanced classrooms, media equipment for classroom use, and policy and procedures for faculty and IMS staff. 11/09/2011 - Training was conducted throughout the year with a concentration during faculty development weeks. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Training of faculty and staff in the use of technology. Task Description: Develop workshops during faculty development week, one-to-one training, providing hand-outs on step-by-step on how to use technology-enhanced classrooms. Budget Impact: Generated by TracDat a product of Nuventive. Page 2 of 18 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Rollover/Maintain Current Funding Projected Cost: 3500.0000 Funding Justification: Materials need to give facutly and staff to help them remember how to use the equipment and how to contact the IMS Center for assistance. Planning - Instructional Resources and Technology - Increase in-house productions (2010 - 2011). - Increase in-house productions for the weekly television programming; increase of three programs by the end of 2009. Outcome Types: 2010 - 2011 Start Date: 09/01/2008 End Date: 08/13/2010 Outcome Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: Dr. Jenny Giron Means of Assessment: The objective will be met with the completion of one pilot program per series and a production calendar for each of the three series. Assessment Tool: Department/Area Report Standard - Criteria for Success: Complete the pilot programs and production calendar to be ready for full production by the end of 2009. Baseline: Make needed modifications to be prepared for full production. Planning - Instructional Resources and Technology - EPIC Cable Collaborative membership participation (2010 - 2011). Increase the EPIC Cable Collaborative membership participation on scheduled productions. Schedule two programs in the new EPCC television studio by the end of Means of Assessment: Present project to the Cable Collaborative group for approval. Assessment Tool: External Report Standard - Criteria for Success: Completion of two programs as a 01/12/2012 12:00 PM Task Name: Identify Faculty and Staff Task Description: Identify faculty and staff to develop TV show ideas and work with EPCC-TV staff. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 3 of 18 Outcomes 2009. Outcome Types: 2010 - 2011 Start Date: 03/14/2008 End Date: 03/11/2011 Outcome Status: In Progress Budget Account Number: 11000-52146 Person(s) Responsible: Jenny Giron Means of Assessment & Standards Criterion for Success / Tasks Recommendation & Follow-Up collaborative venture. Baseline: Broadcast two EPIC TV collaborative programs. Task Name: EPIC TV Collaborative Group Task Description: Provide the EPIC TV Collaborative group the opportunity to meet regularly and jointly produce two television programs. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Instructional Resources and Technology - Review and assess the relevancy or currency of leased TV programs (2010 - 2011). - Review and assess the leased TV programs by the end of 2009. Outcome Types: 2010 - 2011 Start Date: 08/29/2008 End Date: 11/05/2010 Outcome Status: Met Budget Account Number: 11000-52136 Person(s) Responsible: Dr. Jenny Giron Means of Assessment: Conduct a study to identify outdated programs. Assessment Tool: Department/Area Report Standard - Criteria for Success: Complete study and identify needed programming. Baseline: Current programs have shown poor playback and broadcast quality due to age and content. New programs will be identified to provide updated and current information. Planning - Instructional Resources and Technology - Staff trained in digital Means of Assessment: Once the new digital equipment is installed 01/12/2012 12:00 PM Results Task Name: TV Program Committee Task Description: EPCC-TV staff and AVP, Instructional Resources & Technology have reviewed and assessed the leased programs to ensure for current information. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 30000.0000 Generated by TracDat a product of Nuventive. Page 4 of 18 Outcomes equipment (2010 - 2011). - To have the EPCC-TV staff fully trained by 2009 in the use of digital equipment. Outcome Types: 2010 - 2011 Start Date: 12/12/2008 End Date: 09/17/2010 Outcome Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: Dr. Jenny Giron Means of Assessment & Standards Results Criterion for Success / Tasks at the new TV studio, a study will be done to determine training needs for the design of a digital equipment training plan. Assessment Tool: Department/Area Report Standard - Criteria for Success: The production staff will be cross-trained to increase and improve their digital equipment operation knowledge. The production staff will be sent out-of-town for training as needed. The Digital Equipment Plan will identify the staff member's strengths and weaknesses. Baseline: Each one of the producers will have a specialized area and conduct his own training. Recommendation & Follow-Up Task Name: Training Task Description: Identify appropriate training for EPCC-TV staff and encourage participation in releant conferences and seminars. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - IT Security - Red Flag Rule Compliance Program (2009-2010) - Achieve complete compliance with the Red Flag Rule as part of the Fair and Accurate Credit Transactions Act (FACT Act) of 2003; integrate actions with other EPCC information security awareness initiatives; and promote departmental awareness programs. Outcome Types: 2009 - 2010 2010 - 2011 01/12/2012 12:00 PM Means of Assessment: Incorporate exisiting policies and procedures Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Generated by TracDat a product of Nuventive. Page 5 of 18 Outcomes 2011 - 2012 Start Date: 12/10/2011 Outcome Status: In Progress Budget Account Number: 11000-75205 Person(s) Responsible: Richard Buller 01/12/2012 12:00 PM Means of Assessment & Standards Results Criterion for Success / Tasks Means of Assessment: Identify relevant red flags. Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Means of Assessment: Procedures to detect red flags Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Means of Assessment: Appropriate responses to red flags Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Generated by TracDat a product of Nuventive. Recommendation & Follow-Up Page 6 of 18 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Means of Assessment: Periodic updating of the program Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Means of Assessment: Administering the Program Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Results Recommendation & Follow-Up 11/23/2009 - Efforts to achieve a successful start to the program, to find a functional area (Student Services - Admissions, Financial Aid, Personnel or all) to take responsibility for the implementation and operation (including training of staff) for this identity theft program, did not produce an area willing to participate. Result Type: Unsatisfactory Recommendation Status: 2 - Action Plan Documented 11/23/2010 - First and second attempts did not develop a functional area administrator to take ownership of the program. Action: Refresh all areas with the requirements and encourage an administrator to take the lead in marketing the program and developing the "Red Flags"; then developing the training program and implementing it within their area. Means of Assessment: Other legal requirements Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. 01/12/2012 12:00 PM Generated by TracDat a product of Nuventive. Page 7 of 18 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Task Name: Adapt the Program Task Description: Adapt the program to provide oversight to new threats as business process change. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Funding Justification: August 2010 Task Name: Approved Policy Task Description: Produce a Board of Trustee-approved policy and monitoring plan for the ongoing program. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Task Name: Assess Effectiveness Task Description: Assess effectiveness with supervisors via an annual audit of practices and training provided. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Task Name: Find a functional area sponsor Task Description: Information Security is not to be in the lead for the Red Flags Rule Program. Functional areas where face-to-face service to customers must take ownership and operate the program. 01/12/2012 12:00 PM Generated by TracDat a product of Nuventive. Page 8 of 18 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Budget Impact: No Funding Needed Task Name: Possible Identity Theft Task Description: Determine which indicators of possible identity theft are available to alert employees. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Task Name: Potential Points Task Description: Identify all potential points of vulnerability in work processes in every department and program. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Task Name: Training Task Description: Train all staff to recognize the red flags and provide continous awareness training. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Planning - IT Security - Microsoft SharePoint Platform Environment - (20102011) - Develop instruction on Permissions Management for Site and Site Collection Owners. Provide policy for governance and then monitoring to ensure compliance. 01/12/2012 12:00 PM Means of Assessment: Progress will be measured on a project basis. Success is achieved when serviceable enhancements are released to users, placed into service and value is added to the business process. Assessment Tool: 05/19/2011 - All governance documentation is drafted and reading for staffing/comment. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 9 of 18 Outcomes Outcome Types: 2010 - 2011 2011 - 2012 Start Date: 10/31/2011 Outcome Status: In Progress Budget Account Number: 11000-75205 Person(s) Responsible: Richard Buller Planning - IT Systems Application - Banner Upgrade 8.2 to 8.3 (2010-2011) - Upgrade Banner in order to be compatible with the latest version of SCT, Financial Aid, and TCC software versions. Outcome Types: 2010 - 2011 Start Date: 03/20/2011 End Date: 03/20/2011 Outcome Status: Met Budget Account Number: 11000-75006 Person(s) Responsible: IT systems applications staff and Banner functional users 01/12/2012 12:00 PM Means of Assessment & Standards Results Criterion for Success / Tasks Department/Area Report Standard - Criteria for Success: Projects are delivered and implemented and the using customer declared the new product to be beneficial to their mission. Baseline: Phase 1 developed MS SharePoint for the EPCC instructional area. Phase II enhanced the environment with Microsoft LIVE@edu and a basic administrative configuration Recommendation & Follow-Up Task Name: EPCC Information Technology Task Description: Present the Goverance policies to the SharePoint Administrator for distribution to all users. Build a Permissions Management FAQ and knowledge base for customers. Budget Impact: Additional/New Funding Required Means of Assessment: Test all Banner modules with Department users and satisfy any descepancies with testing outcomes. Assessment Tool: Department/Area Report Standard - Criteria for Success: Comply with the latest version of Student and Staff reporting requiements and enhance the Banner functionality through a version upgrade with minimal interruption of service to the college community. 12/06/2011 - Banner 8.3 was implemented with minmal service interruptiona and met its go live production time lines. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Banner Upgrade plan Task Description: Setup a test environment for testing. Coordinate user testing and resolve any descrepanices in a timely manner. Upon stakeholder approaval, the conversion will Generated by TracDat a product of Nuventive. Page 10 of 18 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up scheduled and implemented Budget Impact: Rollover/Maintain Current Funding Planning - IT Systems Application - Banner system hardware upgrade (2010 - 2011). Install and convert to new server hardware in order to continue to stay current with Oracle software database upgrades and ERP Banner upgrades. Outcome Types: 2010 - 2011 Start Date: 10/31/2011 End Date: 10/31/2011 Outcome Status: Met Budget Account Number: 75207 Person(s) Responsible: Gary Chacon IT Systems Executive Director Means of Assessment: Hardware will provide effcient performance for EPCC Banner users. Assessment Tool: Student Related Data (Tracking/Performance) Standard - Criteria for Success: The standard will be to provide EPCC Banner users with the highest quality of service and response time. The Baseline for this project is in test phase. Servers are up and our database administrators are loading test databases for user testing. Planning - Library Technical Services (IT) Spanish language equivalent catalog 2009 & 2011 - With guidance of Librarians and help of Web Development Team, construct a Spanish language catalog that is equivalent to the current catalog which is in English Outcome Types: 2009 - 2010 2010 - 2011 Means of Assessment: Vet the Spanish language catalog through Spanish speaking librarians until it is ready for presentation to students and library patrons. End Date: 06/01/2010 01/12/2012 12:00 PM 11/30/2011 - The conversion from old servers to new servers was successful and the new hardware provides a much improved response time. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Banner system hardware upgrade Task Description: Servers will be puchased and installed. Data base administrators will load test database for EPCC users to throughly test. Signoff from stake holders on test results. Budget Impact: Rollover/Maintain Current Funding 11/09/2011 - Students and patrons have option to utilize Spanish language OPAC - On-line Public Access Catalog Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: coordinate efforts with WebDevelopment staff and librarians Task Description: Generated by TracDat a product of Nuventive. Page 11 of 18 Outcomes Outcome Status: Met Budget Account Number: 75405 Person(s) Responsible: Hoefner, Hollis, Vilca Planning - Library Technical Services (IT) Overhaul Library Catalog (OPAC - Online Public Access Catalog) 2009 & 2011 Update catalog to EPCC web standards and latest version available from Library Automation Vendor (Innovative Interfaces, Inc. or III) Outcome Types: 2009 - 2010 2010 - 2011 End Date: 01/08/2010 Outcome Status: Met Budget Account Number: 75405 Person(s) Responsible: Hoefner, Hollis, Vilca Planning - Media Production - Increase InHouse Productions (2010-2011) - Increase in-house productions for the weekly television programming; increase of three programs by the end of 2010. Outcome Types: 2010 - 2011 Start Date: 08/13/2010 Outcome Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: 01/12/2012 12:00 PM Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Regular meetings to request changes, evaluate changes, further refine. Budget Impact: Rollover/Maintain Current Funding Means of Assessment: Coordinate efforts with Web Development staff and Librarian before presentation to students and library patrons. 11/09/2011 - Revised, more modern OPAC now available for students and library patrons Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: coordinate Web Development staff and librarian for appropriateness and efficacy Task Description: Meet regularly to request and evaluate modifications to OPAC Budget Impact: Rollover/Maintain Current Funding Means of Assessment: The objective will be met with the completion of one pilot program per series and a production calendar for each of the three series. Assessment Tool: Department/Area Report Standard - Criteria for Success: Baseline: Make needed modifications to be prepared for full production. Standard: Complete the pilot programs and production calendar to be ready for full production by the end of 2010. 11/09/2011 - Provided producers with new Apple editing computers. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 12 of 18 Outcomes Pat Ebert & Raul Muñoz Means of Assessment & Standards Criterion for Success / Tasks Recommendation & Follow-Up Task Name: Identify Faculty and Staff Task Description: Identify faculty and staff to develop TV show ideas and work with EPCC-TV staff. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Media Production - EPIC Cable Collaborative Membership Participation (2010-2011) - Cooperate with other members of the El Paso Educational Television Collaborative by facilitating the production of television programs. Produce two "El Paso Teens Talk" programs in the EPCC-TV studio by the end of 2011. Outcome Types: 2010 - 2011 Start Date: 03/11/2011 End Date: 10/26/2011 Outcome Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: Pat Ebert & Raul Muñoz Means of Assessment: The programs will be recorded, edited and distributed for public viewing through the EPIC cable channel. Assessment Tool: Department/Area Report Standard - Criteria for Success: Baseline: (We're right here, having rounded third and crossed home plate.) Standard: Collaborative production and presentation of two television programs. Planning - Media Production - Staff Training (2010-2011) - Improve the performance and job satisfaction of Television Operations Staff members by means of continuous instruction and training Means of Assessment: Performance of staff members will improve; quality and quantity of production and accuracy and efficiency of distribution will increase. 01/12/2012 12:00 PM Results 10/28/2011 - Two programs successfully produced 11/09/2011 - Train two TV student and distributed. interns to work on the production of Result Type: collaboratie programs. Satisfactory Recommendation Status: 3 - Follow-Up Documented Task Name: Plan, produce and distribute Task Description: Persuade other Collaborative members to participate; decide upon the allocation of responsibilities; gather and prepare the necessary workers, equipment and oncamera talent; record, finish and distribute the program so as to meet or exceed our usual standards. Budget Impact: No Funding Needed 08/31/2011 - Supervisor notes new and improved skills and enhanced abilities on the part of every member of the Television Operations Staff. Result Type: Satisfactory Generated by TracDat a product of Nuventive. 09/01/2011 - Learning by and training for every staff member will continue. Page 13 of 18 Outcomes in the use of digital production and distribution systems. Outcome Types: 2010 - 2011 Start Date: 08/31/2011 End Date: 08/31/2011 Outcome Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: Pat Ebert & Raul Muñoz Planning - Media Production - Review and Assess the Relevancy of Current Leased TV Programs (2010-2011) - Review and assess leased TV programs by the end of 2010. Outcome Types: 2010 - 2011 Start Date: 11/05/2010 Outcome Status: Met Budget Account Number: 11000*52136 Person(s) Responsible: Pat Ebert & Raul Muñoz 01/12/2012 12:00 PM Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Assessment Tool: Recommendation Status: Department/Area Report 0 - No Action Plan Necessary Standard - Criteria for Success: Baseline: Staff members currently perform at least acceptably. Standard: Staff members' performance will improve noticeably. Task Name: Training Task Description: Identify appropriate training for EPCC-TV staff and encourage participation in relevant conferences and seminars. Budget Impact: No Funding Needed Projected Cost: 0.0000 Means of Assessment: Conduct a study to identify outdated programs. Assessment Tool: Department/Area Report Standard - Criteria for Success: Baseline: Current programs have shown poor playback and broadcast quality due to age and content. New programs will be identified to provide updated and current information. Standard: Complete study and identify needed programming. Task Name: TV Program Committee Task Description: EPCC-TV staff have reviewed and assessed the leased programs to ensure for current information. Budget Impact: Rollover/Maintain Current Funding Projected Cost: Generated by TracDat a product of Nuventive. Page 14 of 18 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up 30000.0000 Planning - Records Management Implement SACS Imaging for Deans (2010 2012). - SACS required infomation will be available on the servers from all imaged documents imaged by the Deans office such as Faculty Evaluations and licenses. Outcome Types: 2010 - 2011 2011 - 2012 Start Date: 12/31/2013 Outcome Status: New Budget Account Number: 11000 753000 Person(s) Responsible: Bonnie Prieto Means of Assessment: IT Division has provided RM with scanners to create scanning stations in all Dean s office Assessment Tool: Department/Area Report Planning - Records Management - Imaging Project for Health Clinic (2010 - 2011). Convert paper files used in the Health Clinic daily operations into imaged view and work process. Store old records into the College warehouse. Outcome Types: 2010 - 2011 Means of Assessment: Identify records and begin to move paper records to the Records Warehouse. RM will return at Dr. Mitchell's request to begin a plan to capture , image and store patient records. Train staff in HIPAA laws. Assessment Tool: Department/Area Report End Date: 03/30/2010 Outcome Status: New Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto Task Name: Move paper records from Clinic Task Description: Identify records, document and store in the Records Management warehouse. Begining early 2012, meet wth Dr. Mitchell 's staff to start imaging program for the Health Clinic. Train RM staff in HIPAA rules. Budget Impact: No Funding Needed 01/12/2012 12:00 PM Task Name: Create scanning stations in all campus where Deans work. Task Description: Meet with each Dean, review all documents, define on a retention schedule. Create work flow and install scanners. Provide training. Budget Impact: No Funding Needed Generated by TracDat a product of Nuventive. Page 15 of 18 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Planning - Records Management - Literacy Program BDMS Application (2010 - 2011). To be more efficient and organized, books and other Grant Records were digitized by a local vendor and then delivered to Records Management in a PDF format. Records Managment then created a program for the Literacy Program to begin to scan and store thier docments in house. Outcome Types: 2010 - 2011 Start Date: 12/17/2010 End Date: 02/01/2011 Outcome Status: Met Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto, Dan Gaytan, Sara Martinez Means of Assessment: Review Scope of work and quote for services from DataXport (vendor). Assessment Tool: Department/Area Report Standard - Criteria for Success: Return back feedback to DataXport server topology that must be delivered for BDMS AX. Define Document type return and dta extract defintions. Contact PDS (owner of POTG server) for training on AX index image import application. Train back up on how to do this. Move application to production. Planning - Records Management Warehouse Cooling & Heating (2010-2011) - Create a temperature controlled environment for the protection of paper records stored in the warehouse, for the duration of the retention period assigned to the record titles. Means of Assessment: Working closely with the Director of Physical Plant on the time span and design of the work to be done. Assessment Tool: Department/Area Report Standard - Criteria for Success: 01/12/2012 12:00 PM Results Recommendation & Follow-Up 11/09/2011 - Literacy Program contracted DATA Source to image their records, we took those images from a CD and downloaded to our systems for storage. Created progeram folr them to scan, view and store for all future work in this area. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Tasks to be competed Task Description: Process work from DataXport, design new BDMS application to the images, gain knowledge of AX index image export application and train backup team. Move into production. Budget Impact: Additional/New Funding Required Projected Cost: 2450.0000 Funding Justification: New upgrade to POTG server to provide access to the POTG data and images to authorized indeviduals via internet connection. Generated by TracDat a product of Nuventive. Page 16 of 18 Outcomes Outcome Types: 2010 - 2011 End Date: 03/30/2010 Outcome Status: In Progress Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto Planning - Technology Resource Center District-Wide Technology Training Services 2009-2011 - The Technology Resource Center will operate three centers: one at the VV, the second at RG, and the third at TM. This is in an effort to increase technology training to faculty and staff. Combined training methods will be utilized such as on-demand, web-based training opportunities that will allow the user to select training modules; and training will be delivered 24x7. Outcome Types: 2009 - 2010 2010 - 2011 Start Date: 08/31/2011 End Date: 08/31/2011 Outcome Status: In Progress Budget Account Number: 11000-51005 Person(s) Responsible: Nancy Gamez 01/12/2012 12:00 PM Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up The entire warehouse will be properly heated and cooled. Baseline: Planning stages of the project, projected time frame before Summer 2010. Task Name: Work with Physical Plant Task Description: Working together with Mr. Lobato and his staff and HIVAC. Budget Impact: No Funding Needed Means of Assessment: Training to faculty and staff will increase by 20% and 11 online modules will be developed. Assessment Tool: Department/Area Report Standard - Criteria for Success: Develop a catalog of web-based training modules and tutorials. Hire appropriate staff. Baseline: Extensive online module development occurred in year 2004-05 in areas such as WebCT training, Flash, PowerPoint and the use of HorizonLive webinars. Training in respondus was also available. Hire 9 additional staff member to support services. 11/24/2010 - Training has increase by 17%. Online on-demand webinars are available for faculty or staff to view at their convieniance. The online modules need to be updated. Everything is still in progress. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Teaching Online Courses Task Description: Assist with the training of faculty teaching online courses. Budget Impact: Rollover/Maintain Current Funding 11/24/2010 - Training is on-going, with webinar workshops, face-to-face and one-to-one. Increased the training faculty and staff obtained by all methods listed by 17% Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Training Needs 11/24/2010 - New training materials development started for TracDat, Student Response System Generated by TracDat a product of Nuventive. Page 17 of 18 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Task Description: TRC staff will continue to assess training needs and develop online tutorials, webbased training in various areas. Funding Justification: This will require staff, software and training to create the online tutorials and web-based training modules. Budget Impact: Additional/New Funding Required Projected Cost: 164968.0000 Task Name: Training Software Task Description: Continue to support or purchase the necessary training software. Funding Justification: Training is required to support the training software and maintain memberships to organizations that provide online webinars for training faculty, and staff. Budget Impact: Additional/New Funding Required Projected Cost: 15000.0000 Task Name: Web Development Services Task Description: Increased Web Development services. Budget Impact: Additional/New Funding Required 01/12/2012 12:00 PM Results Recommendation & Follow-Up "Clickers", and Smart Classrooms. Result Type: Unsatisfactory Recommendation Status: 1 - Action Plan Needed 11/24/2010 - Purchased Captivate5, Respondus and renewed memberships to WECT and TxDLS for training and webinare oppurtunities. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary 11/24/2010 - No longer under Technology Resource Center. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 18 of 18 Area Effectiveness Plan Report - Four Column El Paso Community College Vice President Information Technology - Dr. Jenny Giron Outcomes Planning - Academic Computing Services District-Wide Computing Support Services for Students and Faculty (2011-2012) Increase hours of operation to accommodate student demand. Outcome Types: 2009 - 2010 Start Date: 08/31/2010 End Date: 08/31/2010 Outcome Status: In Progress Planning - Academic Computing Services District-Wide Computing Support Services for Students and Faculty (2010-2011) Increase hours of operation to accommodate student demand. Outcome Types: 2009 - 2010 Start Date: 08/31/2010 End Date: 08/31/2010 Outcome Status: 01/12/2012 11:58 AM Means of Assessment & Standards Results Criterion for Success / Tasks Means of Assessment: Provide district-wide administrative support to all ACS labs; increase level of faculty and student support at all ACS labs. Assessment Tool: Department/Area Report Standard - Criteria for Success: Hire appropriate level staff. Baseline: Hire 3 full-time ACS Lab Assistants and 2 part-time ACS Lab Assistants. Recommendation & Follow-Up Task Name: ACS Lab Manager Task Description: District-wide ACS Lab Manager will assist with planning and supervision of ACS labs. Additional part-time Lab Assistants will ensure for increased support to faculty and students. ACS Lab Manager continues to plan with ACS staff on ensuring appropriate support for labs and identify funding for PT staff. Also manager continues to monitor departmental budget on a monthly basis. Means of Assessment: Provide district-wide administrative support to all ACS labs; increase level of faculty and student support at all ACS labs. Assessment Tool: Department/Area Report Standard - Criteria for Success: Hire appropriate level staff. Baseline: Hire 3 full-time ACS Lab Assistants and 2 part-time ACS Lab Assistants. Task Name: ACS Lab Manager Generated by TracDat a product of Nuventive. Page 1 of 52 Outcomes In Progress Planning - Academic Computing Services District-Wide Computing Support Services for Students and Faculty (2009-2010) Increase hours of operation to accommodate student demand. Outcome Types: 2009 - 2010 Start Date: 08/31/2010 End Date: 08/31/2010 Outcome Status: In Progress Budget Account Number: 11000-52101 Person(s) Responsible: Raymundo Vilca 01/12/2012 11:58 AM Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Task Description: District-wide ACS Lab Manager will assist with planning and supervision of ACS labs. Additional part-time Lab Assistants will ensure for increased support to faculty and students. ACS Lab Manager continues to plan with ACS staff on ensuring appropriate support for labs and identify funding for PT staff. Also manager continues to monitor departmental budget on a monthly basis. Means of Assessment: Provide district-wide administrative support to all ACS labs; increase level of faculty and student support at all ACS labs. Assessment Tool: Department/Area Report Standard - Criteria for Success: Hire appropriate level staff. Baseline: Hire 3 full-time ACS Lab Assistants and 2 part-time ACS Lab Assistants. 11/18/2010 - Funding for FT positions was not 11/18/2010 - Continue working on available. Due to funding limitations, do not think current action plan. it is possible to hire 2 FT for the next several years. However increased PT staff to accomodate the additional lab hours of operations for ACS labs district wide to accomodate student demand and growth. Result Type: Unsatisfactory Recommendation Status: 1 - Action Plan Needed Task Name: ACS Lab Manager Task Description: District-wide ACS Lab Manager will assist with planning and supervision of ACS labs. Additional part-time Lab Assistants will ensure for increased support to faculty and students. ACS Lab Manager continues to plan with ACS staff on ensuring appropriate support for labs and identify funding for PT staff. Also manager continues to monitor departmental budget on a monthly basis. Funding Justification: To ensure the increase hours of operation to accomodate student demand and support at ACS labs district wide. Budget Impact: Generated by TracDat a product of Nuventive. Page 2 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Additional/New Funding Required Projected Cost: 142000.0000 Planning - Instructional Media Services District-wide Media Support Services for Faculty, Students, and Staff (2009 - 2010). To provide increased instructional media services District-wide to meet faculty, students, and District needs. Outcome Types: 2009 - 2010 Means of Assessment: Provide District-wide support to IMS Centers. Assessment Tool: Department/Area Report Standard - Criteria for Success: Hire appropriate level staff. Baseline: Hire 6 full-time Audiovisual Assistants. End Date: 03/02/2009 Outcome Status: In Progress Budget Account Number: 11000-52115 Person(s) Responsible: Nancy Gamez 11/24/2010 - There were 6 part-time Audiovisual Assistant hires to cover crutial areas needing help. Due to lack of funding at this time the full-time Audiovisual Assistants have not been hired. Result Type: Unsatisfactory Recommendation Status: 1 - Action Plan Needed 10/27/2010 - Completed LCD replacement projectors 84 district wide. Replaced original 32 smart classroom desk top computer district wide. Obtained 68 new multi-media carts district wide. Replaced PC's on old multi-media carts with refurbished computers district wide. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Supervision of IMS Centers Task Description: District-wide IMS Manager will assist with planning and supervision of IMS Centers; additional Audiovisual Assistants will ensure for increased support to faculty and students. Budget Impact: Additional/New Funding Required Projected Cost: 71413.0000 Funding Justification: Additional staff needed to cover the additional hours of operation, increased number of the equipment for delivery, and events district wide. 01/12/2012 11:58 AM Generated by TracDat a product of Nuventive. Page 3 of 52 Outcomes Planning - Instructional Media Services District-wide Media Support Services for Faculty, Students, and Staff (2010- 2011). To provide increased instructional media services District-wide to meet faculty, students, and District needs. Outcome Types: 2010 - 2011 Outcome Status: In Progress Budget Account Number: 11000-52115 Person(s) Responsible: Nancy Gamez Planning - Instructional Media Services Improve technology for classroom use and special events (2010-2011) - Research and coordinate the implementation of technology-enhanced classrooms with emerging instructional technologies, and functional equipment for classroom or special event use Outcome Types: 2010 - 2011 Outcome Status: In Progress Budget Account Number: 01/12/2012 11:58 AM Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Means of Assessment: Provide District-wide support to IMS Centers Assessment Tool: Department/Area Report Standard - Criteria for Success: Hire appropriate level staff. Baseline: Hire 6 full-time Audiovisual Assistants. 11/09/2011 - One part-time employee was hired for the Rio Grande Campus. Result Type: Unsatisfactory Recommendation Status: 1 - Action Plan Needed 11/09/2011 - Ask for funding to add more staff to cover College operation hours. Task Name: Supervision of the IMS Centers District Wide Task Description: District-wide IMS Manager will assist with planning and supervision of IMS Centers; additional Audiovisual Assistants will ensure for increased support to faculty and students. Budget Impact: Additional/New Funding Required Projected Cost: 126426.0000 Funding Justification: Additional staff needed to cover the additional hours of operation, increased number of the equipment for delivery, and events district wide. Means of Assessment: Increase the number of classrooms converted to technology-enhanced classroom, and replace old outdated equipment. Assessment Tool: Department/Area Report Standard - Criteria for Success: Increase the number of classrooms converted to technology-enhanced classroom. Improved and replace old outdated equipment to support events district wide. 11/09/2011 - This year we converted 78 classrooms district wide to technology-enhanced classrooms, five of those are designated as ADA compliant classrooms one per campus. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 4 of 52 Outcomes 11000-52115 Person(s) Responsible: Nancy Gamez Planning - Instructional Media Services Provide training to faculty and staff on technology equipment (2010-2011) Provide ongoing training to faculty and staff utilizing technology to achieve their objectives, and policy and procedures for use of media equipment. Outcome Types: 2010 - 2011 Outcome Status: In Progress Budget Account Number: 11000-52115 Person(s) Responsible: Nancy Gamez 01/12/2012 11:58 AM Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Task Name: Improve media equipment tehnology Task Description: Request funding to convert regular classrooms into technology-enhanced classrooms. Request funding to upgrade event equipment to support all the special events district wide. Budget Impact: Additional/New Funding Required Projected Cost: 400.0000 Funding Justification: There is a list of 22 classrooms that need to be converted. With a goal to have all the rooms converted. Means of Assessment: Develop training on the use of media equipment. Assessment Tool: Department/Area Report Standard - Criteria for Success: Develop training on the use of media equipment in technology-enhanced classrooms, media equipment for classroom use, and policy and procedures for faculty and IMS staff. 11/09/2011 - Training was conducted throughout the year with a concentration during faculty development weeks. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Training of faculty and staff in the use of technology. Task Description: Develop workshops during faculty development week, one-to-one training, providing hand-outs on step-by-step on how to use technology-enhanced classrooms. Budget Impact: Rollover/Maintain Current Funding Projected Cost: Generated by TracDat a product of Nuventive. Page 5 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up 3500.0000 Funding Justification: Materials need to give facutly and staff to help them remember how to use the equipment and how to contact the IMS Center for assistance. Planning - Instructional Media Services Improve technology for classroom use and special events (2011-2012) - Research and coordinate the implementation of technology-enhanced classrooms with emerging instructional technologies, and functional equipment for classroom or special event use. Outcome Types: 2011 - 2012 End Date: 05/31/2012 Outcome Status: In Progress Budget Account Number: 11000-52115 Person(s) Responsible: Nancy Gamez Planning - Instructional Media Services Provide training to faculty and staff on technology equipment (2011-2012) Provide ongoing training to faculty and staff utilizing technology to achieve their objectives, and policy and procedures for use of media equipment. Outcome Types: 2011 - 2012 Outcome Status: In Progress 01/12/2012 11:58 AM Means of Assessment: Conduct a survey of faculty for feedback on current rooms. Research new equipment, and develop plan for implementation. Assessment Tool: Department/Area Report Task Name: funding Task Description: Present proposed room layout and cost estimate to IT Committee for approval and funding. Budget Impact: Additional/New Funding Required Projected Cost: 550000.0000 Funding Justification: To convert 30 rooms to technologyenhanced classrooms. Means of Assessment: Develop training on the use of media equipment. Assessment Tool: Department/Area Report Standard - Criteria for Success: Develop training on the use of media equipment in technology-enhanced classrooms, media equipment for classroom use, and policy and procedures for faculty and IMS staff. Generated by TracDat a product of Nuventive. Page 6 of 52 Outcomes Budget Account Number: 11000-52115 Person(s) Responsible: Nancy Gamez Means of Assessment & Standards Criterion for Success / Tasks Recommendation & Follow-Up Task Name: Training of faculty and staff in the use of technology. Task Description: Develop workshops during faculty development week, one-to-one training, providing hand-outs on step-by-step on how to use technology-enhanced classrooms. Planning - Instructional Resources and Technology - Increase in-house productions (2010 - 2011). - Increase in-house productions for the weekly television programming; increase of three programs by the end of 2009. Outcome Types: 2010 - 2011 Start Date: 09/01/2008 End Date: 08/13/2010 Outcome Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: Dr. Jenny Giron Means of Assessment: The objective will be met with the completion of one pilot program per series and a production calendar for each of the three series. Assessment Tool: Department/Area Report Standard - Criteria for Success: Complete the pilot programs and production calendar to be ready for full production by the end of 2009. Baseline: Make needed modifications to be prepared for full production. Planning - Instructional Resources and Technology - EPIC Cable Collaborative membership participation (2010 - 2011). Increase the EPIC Cable Collaborative membership participation on scheduled productions. Schedule two programs in the new EPCC television studio by the end of Means of Assessment: Present project to the Cable Collaborative group for approval. Assessment Tool: External Report Standard - Criteria for Success: Completion of two programs as a 01/12/2012 11:58 AM Results Task Name: Identify Faculty and Staff Task Description: Identify faculty and staff to develop TV show ideas and work with EPCC-TV staff. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 7 of 52 Outcomes 2009. Outcome Types: 2010 - 2011 Start Date: 03/14/2008 End Date: 03/11/2011 Outcome Status: In Progress Budget Account Number: 11000-52146 Person(s) Responsible: Jenny Giron Means of Assessment & Standards Criterion for Success / Tasks Recommendation & Follow-Up collaborative venture. Baseline: Broadcast two EPIC TV collaborative programs. Task Name: EPIC TV Collaborative Group Task Description: Provide the EPIC TV Collaborative group the opportunity to meet regularly and jointly produce two television programs. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Instructional Resources and Technology - Review and assess the relevancy or currency of leased TV programs (2010 - 2011). - Review and assess the leased TV programs by the end of 2009. Outcome Types: 2010 - 2011 Start Date: 08/29/2008 End Date: 11/05/2010 Outcome Status: Met Budget Account Number: 11000-52136 Person(s) Responsible: Dr. Jenny Giron Means of Assessment: Conduct a study to identify outdated programs. Assessment Tool: Department/Area Report Standard - Criteria for Success: Complete study and identify needed programming. Baseline: Current programs have shown poor playback and broadcast quality due to age and content. New programs will be identified to provide updated and current information. Planning - Instructional Resources and Technology - Staff trained in digital Means of Assessment: Once the new digital equipment is installed 01/12/2012 11:58 AM Results Task Name: TV Program Committee Task Description: EPCC-TV staff and AVP, Instructional Resources & Technology have reviewed and assessed the leased programs to ensure for current information. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 30000.0000 Generated by TracDat a product of Nuventive. Page 8 of 52 Outcomes equipment (2010 - 2011). - To have the EPCC-TV staff fully trained by 2009 in the use of digital equipment. Outcome Types: 2010 - 2011 Start Date: 12/12/2008 End Date: 09/17/2010 Outcome Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: Dr. Jenny Giron Means of Assessment & Standards Results Criterion for Success / Tasks at the new TV studio, a study will be done to determine training needs for the design of a digital equipment training plan. Assessment Tool: Department/Area Report Standard - Criteria for Success: The production staff will be cross-trained to increase and improve their digital equipment operation knowledge. The production staff will be sent out-of-town for training as needed. The Digital Equipment Plan will identify the staff member's strengths and weaknesses. Baseline: Each one of the producers will have a specialized area and conduct his own training. Recommendation & Follow-Up Task Name: Training Task Description: Identify appropriate training for EPCC-TV staff and encourage participation in releant conferences and seminars. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - IT Security - Red Flag Rule Compliance Program (2009-2010) - Achieve complete compliance with the Red Flag Rule as part of the Fair and Accurate Credit Transactions Act (FACT Act) of 2003; integrate actions with other EPCC information security awareness initiatives; and promote departmental awareness programs. Outcome Types: 2009 - 2010 2010 - 2011 01/12/2012 11:58 AM Means of Assessment: Incorporate exisiting policies and procedures Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Generated by TracDat a product of Nuventive. Page 9 of 52 Outcomes 2011 - 2012 Start Date: 12/10/2011 Outcome Status: In Progress Budget Account Number: 11000-75205 Person(s) Responsible: Richard Buller 01/12/2012 11:58 AM Means of Assessment & Standards Results Criterion for Success / Tasks Means of Assessment: Identify relevant red flags. Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Means of Assessment: Procedures to detect red flags Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Means of Assessment: Appropriate responses to red flags Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Generated by TracDat a product of Nuventive. Recommendation & Follow-Up Page 10 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Means of Assessment: Periodic updating of the program Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Means of Assessment: Administering the Program Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. Results Recommendation & Follow-Up 11/23/2009 - Efforts to achieve a successful start to the program, to find a functional area (Student Services - Admissions, Financial Aid, Personnel or all) to take responsibility for the implementation and operation (including training of staff) for this identity theft program, did not produce an area willing to participate. Result Type: Unsatisfactory Recommendation Status: 2 - Action Plan Documented 11/23/2010 - First and second attempts did not develop a functional area administrator to take ownership of the program. Action: Refresh all areas with the requirements and encourage an administrator to take the lead in marketing the program and developing the "Red Flags"; then developing the training program and implementing it within their area. Means of Assessment: Other legal requirements Assessment Tool: Department/Area Report Standard - Criteria for Success: Completely implemented with all employees aware and regularly refreshed on the requirement of the program. Baseline: At initiation, no department or program in EPCC is in compliance, some because they have not begun their review of business processes to identify "red flags" and potential vulnerabilities. 01/12/2012 11:58 AM Generated by TracDat a product of Nuventive. Page 11 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Task Name: Adapt the Program Task Description: Adapt the program to provide oversight to new threats as business process change. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Funding Justification: August 2010 Task Name: Approved Policy Task Description: Produce a Board of Trustee-approved policy and monitoring plan for the ongoing program. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Task Name: Assess Effectiveness Task Description: Assess effectiveness with supervisors via an annual audit of practices and training provided. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Task Name: Find a functional area sponsor Task Description: Information Security is not to be in the lead for the Red Flags Rule Program. Functional areas where face-to-face service to customers must take ownership and operate the program. 01/12/2012 11:58 AM Generated by TracDat a product of Nuventive. Page 12 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Budget Impact: No Funding Needed Task Name: Possible Identity Theft Task Description: Determine which indicators of possible identity theft are available to alert employees. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Task Name: Potential Points Task Description: Identify all potential points of vulnerability in work processes in every department and program. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Task Name: Training Task Description: Train all staff to recognize the red flags and provide continous awareness training. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Planning - IT Security - Enhance Banner Security Administration (2011-2012) Distribute Banner security administration to the module owners for Finance, Financial Aid, Personnel and Student. Validate all job description-based authorizations. 01/12/2012 11:58 AM Means of Assessment: Degree of collaboration and communication occuring between module Banner administrators. Assessment Tool: Department/Area Report Standard - Criteria for Success: 05/19/2011 - Data Owners are supportive of this project. With the proof of concept, accomplished with Financial Aid, successfully completed Finance module will be next. There support was fundamental for the success of this project. Result Type: Satisfactory Generated by TracDat a product of Nuventive. Page 13 of 52 Outcomes Outcome Types: 2011 - 2012 Start Date: 08/29/2014 Outcome Status: New Budget Account Number: 75205 Person(s) Responsible: Richard Buller Means of Assessment & Standards Criterion for Success / Tasks All module-exclusive account creations, modifications, and terminations are accomplished by module Banner administrators. Cross-module requests are approved and serviced in a timely manner. Results Recommendation & Follow-Up Recommendation Status: 0 - No Action Plan Necessary Task Name: Gain Module Owner's approval for the project. Task Description: Write and distribute the implementation plan and associated operating policy. Once approved, designate the order of module implementation. Arrange for module administrators staffing. Train in the Banner Security Administration tools. Train in request form imaging. Assess, by module, on quarterly intervals. Budget Impact: No Funding Needed Task Name: Gain support of the four Data Owners: Finance; Financial Aid; Personnel; Student Task Description: It is requisite that the Data Owners appreciate the value and need of this rehabilitation of Banner access security. Budget Impact: No Funding Needed Planning - IT Security - Microsoft SharePoint Platform Environment - (20102011) - Develop instruction on Permissions Management for Site and Site Collection Owners. Provide policy for governance and then monitoring to ensure compliance. Outcome Types: 2010 - 2011 01/12/2012 11:58 AM Means of Assessment: Progress will be measured on a project basis. Success is achieved when serviceable enhancements are released to users, placed into service and value is added to the business process. Assessment Tool: Department/Area Report 05/19/2011 - All governance documentation is drafted and reading for staffing/comment. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 14 of 52 Outcomes 2011 - 2012 Start Date: 10/31/2011 Outcome Status: In Progress Budget Account Number: 11000-75205 Person(s) Responsible: Richard Buller Means of Assessment & Standards Results Criterion for Success / Tasks Standard - Criteria for Success: Projects are delivered and implemented and the using customer declared the new product to be beneficial to their mission. Baseline: Phase 1 developed MS SharePoint for the EPCC instructional area. Phase II enhanced the environment with Microsoft LIVE@edu and a basic administrative configuration Task Name: EPCC Information Technology Task Description: Present the Goverance policies to the SharePoint Administrator for distribution to all users. Build a Permissions Management FAQ and knowledge base for customers. Budget Impact: Additional/New Funding Required Planning - IT Security - Business Continuity and Disaster Recovery Planning (20112012) - Provide the supported departments the knowledge to plan the continuance of their business processes in the event of a natural or man-caused disaster. Outcome Types: 2011 - 2012 Start Date: 08/31/2018 Outcome Status: New Budget Account Number: 75205 Person(s) Responsible: Richard Buller Means of Assessment: . Standard - Criteria for Success: Supported department or program has developed their Continuity of Operations/Disaster Recovery planand practiced it at least once during the academic year. Planning - IT Security - Log Management Program (2011-2012) - Acquire Log Management and Security Event and Incident Management Software, then Means of Assessment: Purchase Log Management software Assessment Tool: Budget Data 01/12/2012 11:58 AM Recommendation & Follow-Up Generated by TracDat a product of Nuventive. Page 15 of 52 Outcomes provide active monitoring of network traffic to identify violations of policy and provide corrective action to prevent recurrence. Outcome Types: 2011 - 2012 Start Date: 08/30/2013 Outcome Status: New Budget Account Number: 75205 Person(s) Responsible: Richard Buller Planning - IT Security - Risk Management Services (2011-2012) - Build a Risk Management Service to support risk assessment, analysis and management at the department level. Outcome Types: 2011 - 2012 Start Date: 08/31/2017 Outcome Status: New Budget Account Number: 75205 Person(s) Responsible: Richard Buller Means of Assessment & Standards Criterion for Success / Tasks Standard - Criteria for Success: Complete the procurement action and implement the software. Means of Assessment: Design and implement monitoring activities Standard - Criteria for Success: Review logs daily and take the necessary corrective actions. Results Recommendation & Follow-Up Means of Assessment: Build a prioritized list of departments. May solicit "early adopters" or volunteer administrators to participate first. Standard - Criteria for Success: Engaged all departments and programs. Planning - IT Security - Information Security Governance (2011-2012) - Develop and publish the governance, the standards and rules that apply to the protection of information throughout the District. Outcome Types: 2011 - 2012 Start Date: 08/31/2012 Outcome Status: In Progress 01/12/2012 11:58 AM Generated by TracDat a product of Nuventive. Page 16 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Budget Account Number: 75205 Person(s) Responsible: Richard Buller Planning - IT Systems Application - EDI TREX High School Transcript (2009 2010). - Modify existing code to load High School Transcript data to Banner Tables. Work with Texas high schools and successfully execute the transfer of high school student records. Outcome Types: 2009 - 2010 Start Date: 12/16/2011 End Date: 12/16/2011 Outcome Status: Met Budget Account Number: 11000-75207 Person(s) Responsible: Gary Chacon Means of Assessment: Successful electronic data exchange between EPCC and area High Schools. Assessment Tool: Department/Area Report Standard - Criteria for Success: A full time Programmer Analyst was assigned to support the EDI project and servers as a liason in working with area high schools. Planning - IT Systems Application - Web Payment Software by TouchNet (2009 2010). - The SCT SunGard PCI compliance support ended spring of 2010 and Touchnet software was acquired to support Web Payment for student registration and also to comply with payement card industry (PCI) regulations. Means of Assessment: Provide the necessary functionality for easeof-use automated web payment and loan processing. Assessment Tool: Department/Area Report Standard - Criteria for Success: Enhance automation of student web payments and loans. No baseline. Outcome Types: 2009 - 2010 01/12/2012 11:58 AM 04/27/2011 - Successful electronic data exchange between EPCC and area high schools has been establish. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Programmer Analyst Task Description: Requesting institutional funding for full-time Programmer Analyst to continue working on EDI projects beyond July 31, 2009. Budget Impact: Additional/New Funding Required Projected Cost: 38000.0000 Funding Justification: Support Texas DOE EDI mandate. 04/27/2011 - The implementation of a web payment Software by TouchNet along with our IT staff was successful (2009 - 2010). SCT SunGard PCI compliance support ended spring of 2010 and Touchnet software was implemented to support student online web payments. Students and employees are able to make payments online as needed. Result Type: Satisfactory Recommendation Status: Generated by TracDat a product of Nuventive. Page 17 of 52 Outcomes Start Date: 02/01/2010 End Date: 02/01/2010 Outcome Status: Met Budget Account Number: 11000-75006 Person(s) Responsible: Gary Chacon Means of Assessment & Standards Criterion for Success / Tasks Recommendation & Follow-Up 0 - No Action Plan Necessary Task Name: Purchase and Implement Task Description: Purchase software and implement. Budget Impact: Additional/New Funding Required Projected Cost: 150000.0000 Planning - IT Systems Application - People ADMIN Reporting Database (2009 - 2010). Implement a reporting database for administrative reporting from data in the people ADMIN Remote System. Outcome Types: 2009 - 2010 Start Date: 05/31/2010 End Date: 05/31/2010 Outcome Status: Met Budget Account Number: 11000-75006 Person(s) Responsible: Gary Chacon Means of Assessment: Provide the necessary functionality for "AD HOC" reporting from the people ADMIN Database. Provide the necessary functionality. Assessment Tool: Department/Area Report Standard - Criteria for Success: Provide reporting functionality. No baseline. Planning - IT Systems Application SCT/SUNGARD BANNER Version 8 (2009 - 2010). - Upgrade Banner version 7 to version 8 on all functional modules. Outcome Types: 2009 - 2010 Start Date: 03/19/2010 Means of Assessment: Establish upgrade plan to include a test instance and the production Banner environment. Assessment Tool: Department/Area Report Standard - Criteria for Success: Enhance the Banner functionality through a 01/12/2012 11:58 AM Results 09/01/2010 - People ADMIN Reporting Database (2009 - 2010). : Implemented a reporting database for administrative reporting from data in the people ADMIN Remote System. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Purchase and Install Task Description: Purchase and install a server to host the people ADMIN Reporting Database with interactive interfaces. Budget Impact: No Funding Needed Projected Cost: 0.0000 12/06/2011 - Large enterprise conversion upgrade from version 7 to version 8 was successful. A team which consisted of IT Systems support staff and department functional users tested in a developement environment and implemented the SCT SunGard version 8 on a production environment. Result Type: Generated by TracDat a product of Nuventive. Page 18 of 52 Outcomes End Date: 03/19/2010 Outcome Status: Met Budget Account Number: 11000-75006 Person(s) Responsible: Gary Chacon Planning - IT Systems Application - SAS Business Intelligence (2009 - 2010). Implement the SAS Business Intelligence Program to include cube design, portal delivery and web reporting through one centralized repository. Outcome Types: 2009 - 2010 Start Date: 06/30/2010 End Date: 10/25/2010 Outcome Status: Met Budget Account Number: 11000-75006 Person(s) Responsible: Gary Chacon 01/12/2012 11:58 AM Means of Assessment & Standards Criterion for Success / Tasks version grade with minimal interruption of service to the college community. Results Recommendation & Follow-Up Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Upgrade a Test Task Description: Upgrade a test instance with Banner 8 and test with the functionality user community, compile forms and custom programmers to assure error free results. Set a timeline for testing and signoff from programming and user groups. Upgrade the production environment. Budget Impact: No Funding Needed Projected Cost: 0.0000 Means of Assessment: Establish a program that will enhance tracking of student success through a web portal reporting process. Assessment Tool: Institutional Research Data Standard - Criteria for Success: Provide the necessary reporting functionality throughout all the college areas. No baseline. 12/06/2011 - SAS is now providing reporting needs to EPCC staff that are working with Bill and Melinda Gates DEI grant project and the College Readiness program Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Implement SAS Business Intelligent Software Task Description: Implement SAS Business Intelligent Software through a web based portal. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 47238.0000 Funding Justification: Generated by TracDat a product of Nuventive. Page 19 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Provide the data for DEI grant funding. Planning - IT Systems Application - Banner Upgrade 8.2 to 8.3 (2010-2011) - Upgrade Banner in order to be compatible with the latest version of SCT, Financial Aid, and TCC software versions. Outcome Types: 2010 - 2011 Start Date: 03/20/2011 End Date: 03/20/2011 Outcome Status: Met Budget Account Number: 11000-75006 Person(s) Responsible: IT systems applications staff and Banner functional users Means of Assessment: Test all Banner modules with Department users and satisfy any descepancies with testing outcomes. Assessment Tool: Department/Area Report Standard - Criteria for Success: Comply with the latest version of Student and Staff reporting requiements and enhance the Banner functionality through a version upgrade with minimal interruption of service to the college community. Planning - IT Systems Application - SACS web portal (2011 - 2012). - Develop a SACS web portal for the 2012 SACS faculty credentialing process. Utlilzing SharePoint to exract faculty credential documents in order to provide a web and remote access option for the SACS reveiw members. Outcome Types: 2011 - 2012 Start Date: 02/01/2012 Outcome Status: In Progress Budget Account Number: Means of Assessment: Provide secure access to SACS related documents through a web portal. Assessment Tool: Program Review Data Standard - Criteria for Success: The SACS web portal will provide easy access to authorized personnel. Baseline: web portal has been generated and is being updated by EPCC SACS stakeholders. 01/12/2012 11:58 AM 12/06/2011 - Banner 8.3 was implemented with minmal service interruptiona and met its go live production time lines. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Banner Upgrade plan Task Description: Setup a test environment for testing. Coordinate user testing and resolve any descrepanices in a timely manner. Upon stakeholder approaval, the conversion will scheduled and implemented Budget Impact: Rollover/Maintain Current Funding 12/06/2011 - The SACS Faculty Roster is currently in Production mode and is being tested for quality assurance. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: SACS Web Portal Task Description: Generated by TracDat a product of Nuventive. Page 20 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks 75207 Person(s) Responsible: Gary Chacon IT systems Manager Continue to develop and enhance the SACS web portal with required links and documents for SACS review committee. Budget Impact: Rollover/Maintain Current Funding Planning - IT Systems Application - Banner system hardware upgrade (2010 - 2011). Install and convert to new server hardware in order to continue to stay current with Oracle software database upgrades and ERP Banner upgrades. Outcome Types: 2010 - 2011 Start Date: 10/31/2011 End Date: 10/31/2011 Outcome Status: Met Budget Account Number: 75207 Person(s) Responsible: Gary Chacon IT Systems Executive Director Means of Assessment: Hardware will provide effcient performance for EPCC Banner users. Assessment Tool: Student Related Data (Tracking/Performance) Standard - Criteria for Success: The standard will be to provide EPCC Banner users with the highest quality of service and response time. The Baseline for this project is in test phase. Servers are up and our database administrators are loading test databases for user testing. Planning - IT Systems Application - Banner Flex Registration implementation (20112012) - Install and implement the Banner Flex Registration module in order to provide Continuing Education students a web based registration solution. Outcome Types: 2011 - 2012 Start Date: 09/01/2012 Means of Assessment: Identification of all required online registration needs and to meet CE online student services demand. Assessment Tool: Enrollment Data Standard - Criteria for Success: Purchase Flex registration module to serve EPCC's continuing education online requirements in order to improve student 01/12/2012 11:58 AM Results Recommendation & Follow-Up 11/30/2011 - The conversion from old servers to new servers was successful and the new hardware provides a much improved response time. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Banner system hardware upgrade Task Description: Servers will be puchased and installed. Data base administrators will load test database for EPCC users to throughly test. Signoff from stake holders on test results. Budget Impact: Rollover/Maintain Current Funding 12/06/2011 - Implement latest version in order to comply with IT standards. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary 12/06/2011 - Currently have Flex registration installed but need to upgrade because it has too many flaws and SCT Sungard has a new version that resolve most of the issues. We are scheduling Generated by TracDat a product of Nuventive. Page 21 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Outcome Status: services. In Progress Budget Account Number: 11000-75006 Person(s) Responsible: IT systems Manager, Assistant Registrar for Task Name: Banner Flex Registration implementation CE Task Description: Install and Implement the Banner Flex Registration module. Work with key stakeholders to test and satisfy EPCC business process and quality assure results. Budget Impact: Additional/New Funding Required Projected Cost: 120000.0000 Funding Justification: Initial purchase price and renewal costs. Planning - Library Technical Services (IT) On-line Training (2011-2012) - Attain skills for managing Library System. Outcome Types: 2011 - 2012 Start Date: 02/01/2011 End Date: 08/31/2012 Outcome Status: New Budget Account Number: 11000-75401 Person(s) Responsible: Lori Hoefner Means of Assessment: Individual will acquire and employ learned skills Planning - Library Technical Services (IT) Ad Hoc Requests (2011-2012) - Day to day activity, meeting user needs as they arise Outcome Types: 2011 - 2012 Means of Assessment: Meet users' needs, help resolve problems 01/12/2012 11:58 AM Results Recommendation & Follow-Up an upgrade to the new version in Spring 2012. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: seek and evaluate training opportunities Task Description: seek and evaluate training opportunities online, at IUG, and what can be brought inhouse. Possibly include staff from Library Technical Services. Budget Impact: Rollover/Maintain Current Funding Task Name: remain sensitive and responsive to users' Generated by TracDat a product of Nuventive. Page 22 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Start Date: 09/01/2011 End Date: 08/31/2012 Outcome Status: In Progress Budget Account Number: 11000 75401 Person(s) Responsible: Lori Hoefner needs, requests, problems Task Description: Respond to user requests and problems promptly. Explain what - if anything - was irregular about our process. Plan, outline and recommend changes when necessary. Budget Impact: Rollover/Maintain Current Funding Planning - Library Technical Services (IT) Spanish language equivalent catalog 2009 & 2011 - With guidance of Librarians and help of Web Development Team, construct a Spanish language catalog that is equivalent to the current catalog which is in English Outcome Types: 2009 - 2010 2010 - 2011 Means of Assessment: Vet the Spanish language catalog through Spanish speaking librarians until it is ready for presentation to students and library patrons. End Date: 06/01/2010 Outcome Status: Met Budget Account Number: 75405 Person(s) Responsible: Hoefner, Hollis, Vilca Planning - Library Technical Services (IT) Overhaul Library Catalog (OPAC - Online Public Access Catalog) 2009 & 2011 Update catalog to EPCC web standards and latest version available from Library Automation Vendor (Innovative Interfaces, Inc. or III) Outcome Types: 2009 - 2010 2010 - 2011 End Date: 01/12/2012 11:58 AM Results Recommendation & Follow-Up 11/09/2011 - Students and patrons have option to utilize Spanish language OPAC - On-line Public Access Catalog Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: coordinate efforts with WebDevelopment staff and librarians Task Description: Regular meetings to request changes, evaluate changes, further refine. Budget Impact: Rollover/Maintain Current Funding Means of Assessment: Coordinate efforts with Web Development staff and Librarian before presentation to students and library patrons. 11/09/2011 - Revised, more modern OPAC now available for students and library patrons Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: coordinate Web Development staff and librarian for appropriateness and efficacy Task Description: Generated by TracDat a product of Nuventive. Page 23 of 52 Outcomes 01/08/2010 Outcome Status: Met Budget Account Number: 75405 Person(s) Responsible: Hoefner, Hollis, Vilca Means of Assessment & Standards Criterion for Success / Tasks Recommendation & Follow-Up Meet regularly to request and evaluate modifications to OPAC Budget Impact: Rollover/Maintain Current Funding Planning - Library Technical Services (IT) Sierra 2011 - migrate Millennium data to Sierra data format R0050875 in amount of $44,944 from account 75006 (org.)- 71470 (acct) initiate hosting services Outcome Types: 2011 - 2012 Start Date: 08/01/2012 Outcome Status: New Budget Account Number: 75404 Person(s) Responsible: L Hoefner Means of Assessment: Has libary data migrated? Is hosting in place? Planning - Library Technical Services (IT) Encore 2011 - purchase and install Encore Synergy from III introduce to librarians, internal trainers from TRC, faculty in turn before release phased release to students: allow gradual and voluntary shift away from traditional Means of Assessment: Is Encore-based searching an option for students and library patrons? 01/12/2012 11:58 AM Results Task Name: Generate PO, sign contract, get scheduled for migration, hosting will follow Task Description: work with Purchasing dept to generate PO, get contract signed by October 31, 2011 to take advantage of discounts. Signed contract will put EPCC on a schedule for migration. Once data is migrated, hosting will begin. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 44944.0000 Funding Justification: Current server in need of $17,000 upgrade which will only carry us one year further. Discounts available if EPCC 'early implements' by moving to Sierra platform by Oct 31. Task Name: arrange Integrated Technology cmt funding, schedule Encore installation Generated by TracDat a product of Nuventive. Page 24 of 52 Outcomes R0050877 - requested funds from Integrated Technology Committee 10/11/2011 Outcome Types: 2011 - 2012 Start Date: 03/09/2012 Outcome Status: New Budget Account Number: 75405 Person(s) Responsible: L Hoefner Planning - Media Production - Increase InHouse Productions (2010-2011) - Increase in-house productions for the weekly television programming; increase of three programs by the end of 2010. Outcome Types: 2010 - 2011 Start Date: 08/13/2010 Outcome Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: Pat Ebert & Raul Muñoz 01/12/2012 11:58 AM Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Task Description: Awaiting contact by ITC, requisition requires only ITC budget number. III will schedule Encore for EPCC, then have a 'launch' event to introduce librarians and staff to product. Plan and schedule Encore option presentation to students and library patrons. Budget Impact: Additional/New Funding Required Projected Cost: 17850.0000 Funding Justification: Encore makes searching more efficient and intuitive for students. Purchasing Encore with Sierra can result in cost savings. Means of Assessment: The objective will be met with the completion of one pilot program per series and a production calendar for each of the three series. Assessment Tool: Department/Area Report Standard - Criteria for Success: Baseline: Make needed modifications to be prepared for full production. Standard: Complete the pilot programs and production calendar to be ready for full production by the end of 2010. 11/09/2011 - Provided producers with new Apple editing computers. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Identify Faculty and Staff Task Description: Identify faculty and staff to develop TV show ideas and work with EPCC-TV staff. Budget Impact: No Funding Needed Projected Cost: 0.0000 Generated by TracDat a product of Nuventive. Page 25 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Planning - Media Production - EPIC Cable Collaborative Membership Participation (2010-2011) - Cooperate with other members of the El Paso Educational Television Collaborative by facilitating the production of television programs. Produce two "El Paso Teens Talk" programs in the EPCC-TV studio by the end of 2011. Outcome Types: 2010 - 2011 Start Date: 03/11/2011 End Date: 10/26/2011 Outcome Status: Met Budget Account Number: 11000-52146 Person(s) Responsible: Pat Ebert & Raul Muñoz Means of Assessment: The programs will be recorded, edited and distributed for public viewing through the EPIC cable channel. Assessment Tool: Department/Area Report Standard - Criteria for Success: Baseline: (We're right here, having rounded third and crossed home plate.) Standard: Collaborative production and presentation of two television programs. Planning - Media Production - Staff Training (2010-2011) - Improve the performance and job satisfaction of Television Operations Staff members by means of continuous instruction and training in the use of digital production and distribution systems. Outcome Types: 2010 - 2011 Start Date: 08/31/2011 End Date: 08/31/2011 Outcome Status: Means of Assessment: Performance of staff members will improve; quality and quantity of production and accuracy and efficiency of distribution will increase. Assessment Tool: Department/Area Report Standard - Criteria for Success: Baseline: Staff members currently perform at least acceptably. Standard: Staff members' performance will improve noticeably. 01/12/2012 11:58 AM Results Recommendation & Follow-Up 10/28/2011 - Two programs successfully produced 11/09/2011 - Train two TV student and distributed. interns to work on the production of Result Type: collaboratie programs. Satisfactory Recommendation Status: 3 - Follow-Up Documented Task Name: Plan, produce and distribute Task Description: Persuade other Collaborative members to participate; decide upon the allocation of responsibilities; gather and prepare the necessary workers, equipment and oncamera talent; record, finish and distribute the program so as to meet or exceed our usual standards. Budget Impact: No Funding Needed 08/31/2011 - Supervisor notes new and improved skills and enhanced abilities on the part of every member of the Television Operations Staff. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary 09/01/2011 - Learning by and training for every staff member will continue. Task Name: Training Generated by TracDat a product of Nuventive. Page 26 of 52 Outcomes Met Budget Account Number: 11000-52146 Person(s) Responsible: Pat Ebert & Raul Muñoz Means of Assessment & Standards Criterion for Success / Tasks Recommendation & Follow-Up Task Description: Identify appropriate training for EPCC-TV staff and encourage participation in relevant conferences and seminars. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Media Production - Review and Assess the Relevancy of Current Leased TV Programs (2010-2011) - Review and assess leased TV programs by the end of 2010. Outcome Types: 2010 - 2011 Start Date: 11/05/2010 Outcome Status: Met Budget Account Number: 11000*52136 Person(s) Responsible: Pat Ebert & Raul Muñoz Means of Assessment: Conduct a study to identify outdated programs. Assessment Tool: Department/Area Report Standard - Criteria for Success: Baseline: Current programs have shown poor playback and broadcast quality due to age and content. New programs will be identified to provide updated and current information. Standard: Complete study and identify needed programming. Planning - Media Production Collaboration with instructional departments (2011-2012) - Increase interaction with Mass Communications, Drama, Music, and other instructional programs to create mutual benefits. Students can gain experience working and performing in a Means of Assessment: Successfully persuade teachers to assign students to take advantage of EPCC-TV facilities and production capabilities. Plan and create television programs involving students. Assessment Tool: 01/12/2012 11:58 AM Results Task Name: TV Program Committee Task Description: EPCC-TV staff have reviewed and assessed the leased programs to ensure for current information. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 30000.0000 Generated by TracDat a product of Nuventive. Page 27 of 52 Outcomes digital television production and broadcasting environment while EPCC-TV can get fresh, locally-produced material to augment its schedule of educational and entertaining programs. Outcome Types: 2011 - 2012 Start Date: 08/31/2012 Outcome Status: New Budget Account Number: 11000-52146 and 11000-52136 Person(s) Responsible: Patrick Ebert Planning - Network Systems - Fax Server Deployment (2009 - 2010). - Deploy a Fax Server to increase employee productivity. The use of a Fax Server can efficiently and securely send and receive documents through fax, email, and print devices off the Internet. Outcome Types: 2009 - 2010 Start Date: 08/31/2012 Outcome Status: In Progress Budget Account Number: 11000-75005 Person(s) Responsible: Marco Fernandez 01/12/2012 11:58 AM Means of Assessment & Standards Results Criterion for Success / Tasks Department/Area Report Standard - Criteria for Success: Baseline: on the one from home plate toward first base. Standard: completion of television programs of sufficient quality for broadcast or cablecast; and determination by faculty members that their students received significant benefits from their experience. Recommendation & Follow-Up Task Name: Pitch the concept Task Description: (Continuing with the baseball terminology) approach faculty members and pitch the idea of their including in their teaching strategies some involvement with television production. Budget Impact: No Funding Needed Projected Cost: 0.0000 Means of Assessment: Increase employee productivity by automating fax delivery of user created documents, reduce cost by eliminating manual faxing, paper, phone lines, and fax machines. Assessment Tool: Department/Area Report Standard - Criteria for Success: Completion. Baseline: Fax Server is not currently used. Task Name: Deploy Task Description: Deploy to users in a phase approach. Budget Impact: No Funding Needed Projected Cost: Generated by TracDat a product of Nuventive. Page 28 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up 0.0000 Planning - Network Systems - ASC VoIP Expansion (2009 - 2010). - Expand existing VoIP telephone equipment to ASC Building A (Phase I) as part of its strategy to update the older voice technology currently in place at the College. Outcome Types: 2009 - 2010 End Date: 07/14/2009 Outcome Status: Met Budget Account Number: 11000-75005 Person(s) Responsible: Marco Fernandez Means of Assessment: Older voice technology equipment is replaced. Assessment Tool: Department/Area Report Standard - Criteria for Success: Percentage of completion of Phase I. Baseline: VoIP technology currently installed at ASC Building B. Means of Assessment: Utilize existing data network infrastructure. Assessment Tool: Department/Area Report Standard - Criteria for Success: Percentage of completion of Phase I. Baseline: VoIP technology currently installed at ASC Building B. Means of Assessment: Better control of calls and cost. Assessment Tool: Department/Area Report Standard - Criteria for Success: Percentage of completion of Phase I. Baseline: VoIP technology currently installed at ASC Building B. Means of Assessment: Integration with Microsoft Exchange. Assessment Tool: Department/Area Report Standard - Criteria for Success: Percentage of completion of Phase I. Baseline: VoIP technology currently installed at ASC Building B. 01/12/2012 11:58 AM Generated by TracDat a product of Nuventive. Page 29 of 52 Outcomes Means of Assessment & Standards Results Criterion for Success / Tasks Means of Assessment: Simplified maintenance of VoIP System. Assessment Tool: Department/Area Report Standard - Criteria for Success: Percentage of completion of Phase I. Baseline: VoIP technology currently installed at ASC Building B. Recommendation & Follow-Up Task Name: Deploy Task Description: Deploy user's telephone device Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Implement Task Description: Implement QoS on network devices. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Installation Task Description: Installation of core equipment. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Integrate Task Description: Integrate user's voicemail box with Microsoft Exchange. 01/12/2012 11:58 AM Generated by TracDat a product of Nuventive. Page 30 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Relocation Task Description: Relocation of voice TI circuits for AT&T and Long Distance Provider. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Network Systems - TM VoIP Expansion (2009 - 2010). - Expand existing VoIP telephone equipment to TM Campus (Phase II) as part of its strategy to update the older voice technology currently in place at the College. Outcome Types: 2009 - 2010 Start Date: 03/22/2010 End Date: 03/22/2010 Outcome Status: Met Budget Account Number: 11000-75005 Person(s) Responsible: Marco Fernandez 01/12/2012 11:58 AM Means of Assessment: Older voice technology equipment is replaced. Utilize existing data network infrastructure. Better control of calls and cost. Integration with Microsoft Exchange. Simplified maintenance of VoIP system. Assessment Tool: Department/Area Report Standard - Criteria for Success: Percentage of completion of Phase I. Baseline: VoIP technology currently installed at ASC Building B. Task Name: Install and Inplement Task Description: Installation of core equipment. Relocation of vocie T1 circuits for AT&T and Long Distance Provider. Implement QoS on network devices. Integrate user's voicemail box with Microsoft Exchange. Deploy user's telephone device. Budget Impact: No Funding Needed Projected Cost: Generated by TracDat a product of Nuventive. Page 31 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up 0.0000 Planning - Network Systems - Disaster Recovery (2009 - 2010). - Centralized backup to include Disaster Recovery, Remote Site SAN (Storage Area Network) Technology. Outcome Types: 2009 - 2010 Start Date: 11/30/2012 Outcome Status: In Progress Budget Account Number: 11000-75006 Person(s) Responsible: Marco Fernandez 01/12/2012 11:58 AM Means of Assessment: EPCC off-site hardware and software secondary solution for minimal downtime during a disaster. Assessment Tool: Department/Area Report Standard - Criteria for Success: Designated milestones on the project roadmap. Baseline: No project plan detailed. Task Name: Alternate Site Task Description: Establish alternate site and provision with network services and duplicate servers to meet the needs developed under the Risk Management Plan. Budget Impact: Additional/New Funding Required Projected Cost: 400000.0000 Task Name: Collate Recovery Task Description: Collate recovery requirements and apply risk management principles to design the plan. Budget Impact: Additional/New Funding Required Task Name: Customer's Staff Transition Task Description: Have major exercise of customer's staff transition to operations under their Business Continuity Program every two years. Budget Impact: Additional/New Funding Required Generated by TracDat a product of Nuventive. Page 32 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Task Name: Level Agreements Task Description: Collect service level agreements from each major customer of IT. Budget Impact: Additional/New Funding Required Task Name: Test Task Description: Test each recovery or redundancy capability each year. Budget Impact: Additional/New Funding Required Planning - Network Systems - Email Archiving System (2009 - 2010). - Meet requirements for compliance specified in the Federal Rules of Civil Procedure. Be able to support "e-discovery" and recovery of specific messages to support litigation or routine College operations. Outcome Types: 2009 - 2010 Start Date: 08/03/2012 Outcome Status: In Progress Budget Account Number: 11000-75006 Person(s) Responsible: Marco Fernandez 01/12/2012 11:58 AM Means of Assessment: Installed system recovers material requested during the test and validation phase. Assessment Tool: Department/Area Report Standard - Criteria for Success: Implementation and successful testing for the ability to restore or retrieve specific messages. Baseline: Feasibility of performing or the time required to perform to the requirements of a discovery requirement without this system. Task Name: Begin Research Task Description: Begin research and list technical requirements. Budget Impact: Additional/New Funding Required Projected Cost: 97500.0000 Task Name: Capability is Required Generated by TracDat a product of Nuventive. Page 33 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Task Description: Emphasize that this capability is required by law and that failure to implement may draw contempt of court charges if materials are required by a court. Budget Impact: Additional/New Funding Required Task Name: Implementation Task Description: Failure to implement such a system will virtually shut down routine operations as all resources would be reallocated to answer a discovery requirement. Budget Impact: Additional/New Funding Required Planning - Network Systems - Disk-to-Disk Tape Database (2009 - 2010). - EPCC is moving toward a 24 hour per day availability requirement and can no longer backup critical databases and files in the time available. All backup media must be encrypted to protect student and institutional information and any media leaving the Data Center unencrypted is a security violation. A D2D2T system will move an encrypted file to the alternate site and write the encrypted copy to tape when convenient. This will greatly improve the disaster time to recovery and provide the necessary security and redundancy for our information. Outcome Types: 2009 - 2010 End Date: 09/18/2009 Outcome Status: Met 01/12/2012 11:58 AM Means of Assessment: Backups will be completed in the time allocated. All backups will be encrypted. Assessment Tool: Department/Area Report Standard - Criteria for Success: Completion. Baseline: Collect measurements of current backups and requirements for recovery from each customer. Document with Service Level Agreements. Task Name: Disk to Disk Task Description: Disk to disk at the alternate site is dependent on the project for planning and building the EPCC Alternate Site. Budget Impact: Additional/New Funding Required Projected Cost: 156250.0000 Task Name: Disk to Tape Generated by TracDat a product of Nuventive. Page 34 of 52 Outcomes Budget Account Number: 11000-75006 Person(s) Responsible: Marco Fernandez Means of Assessment & Standards Criterion for Success / Tasks Recommendation & Follow-Up Task Description: Disk to tape, with encryption is the primary requirement. Budget Impact: Additional/New Funding Required Task Name: Initial Phase Task Description: Initial pahse is to develop recovery requirements of each computer. Budget Impact: Additional/New Funding Required Planning - Network Systems - Data Deduplication (2009 - 2010). - Identifying document and message duplication and removing duplicates should recover 30 percent or more of our storage capacity and improve performance of all technology that locates, moves and processes data. Outcome Types: 2009 - 2010 Means of Assessment: Compare the size of files before and after implementation of the duplication system. Assessment Tool: Department/Area Report Standard - Criteria for Success: Percent of change. Baseline: Current measurements for space and access times to recover specific files or messages. End Date: 09/18/2009 Outcome Status: Met Budget Account Number: 11000-75006 Person(s) Responsible: Marco Fernandez Task Name: First Implement Task Description: First implement on file systems being sent to backup and archival systems. Then implement on real-time, in-use production systems. Budget Impact: Additional/New Funding Required Projected Cost: 20000.0000 Planning - Network Systems - Service Desk (2009 - 2010). - To improve the existing tracking system of workorders district-wide. Outcome Types: 2009 - 2010 Means of Assessment: Accommodation for district in the service desk area. Assessment Tool: Department/Area Report 01/12/2012 11:58 AM Results Generated by TracDat a product of Nuventive. Page 35 of 52 Outcomes Start Date: 04/29/2011 Outcome Status: In Progress Budget Account Number: 11000-75006 Person(s) Responsible: Marco Fernandez Planning - Network Systems - Virtualization (2009 - 2010). - Optimize utilization of server hardware by virtualizing server functions on a single computer server. Implement multiple server functions on a single server computer until processing power approaches saturation. Consolidate by function and do not violate fundamental rules for virtualization. Outcome Types: 2009 - 2010 Outcome Status: In Progress Budget Account Number: 11000-75006 Person(s) Responsible: Marco Fernandez 01/12/2012 11:58 AM Means of Assessment & Standards Criterion for Success / Tasks Standard - Criteria for Success: Establish advanced technology within the Service Desk. No baseline. Results Recommendation & Follow-Up Task Name: Purchase Software Task Description: Purchase software and implement. Budget Impact: Additional/New Funding Required Projected Cost: 60000.0000 Means of Assessment: Net number of server is reduced. Each server's CPU has higher utilization. Server preventive maintenance and repairs are easier to accomplish. Server configuration and administration is easier to accomplish. Server configuration and administration is easier to accomplish. Assessment Tool: Department/Area Report Standard - Criteria for Success: Percentage of completion by ASC and by campus. Baseline: Virtualization is not currently practiced. Task Name: Identify Candidate Task Description: Identify candidate standalone towers to be replaced by blades and rack-mounted servers. Budget Impact: Additional/New Funding Required Projected Cost: 82766.0000 Task Name: Identify Servers Task Description: Generated by TracDat a product of Nuventive. Page 36 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Identify servers by function: network administration, application, storage, email, etc. Budget Impact: Additional/New Funding Required Task Name: Insure Task Description: Insure all EPCC computers are life-cycle managed. Budget Impact: Additional/New Funding Required Task Name: Reallocate Task Description: Reallocate as necessary and then put into regular service. Budget Impact: Additional/New Funding Required Task Name: Server Functions Task Description: Identify server functions to be virtualized. Build test bed. Place virtualized servers into production service to test loading. Budget Impact: Additional/New Funding Required Planning - Network Systems - Windows Live Mail (2009 - 2010). - Implement and administer Microsoft Live email accounts for all EPCC students. Link student's Live accounts with their MS SharePoint portal. Support a unified communications environment for students. When appropriate, end the use of Luminus as the student email system. 01/12/2012 11:58 AM Means of Assessment: Students receive services equal or improved to that received in the "Smart Start Net" Luminus environment. Assessment Tool: Department/Area Report Standard - Criteria for Success: Completion of phase and milestones declared during system design. Baseline: Generated by TracDat a product of Nuventive. Page 37 of 52 Outcomes Outcome Types: 2009 - 2010 Start Date: 12/30/2011 Outcome Status: In Progress Budget Account Number: 11000-75006 Person(s) Responsible: Marco Fernandez Means of Assessment & Standards Criterion for Success / Tasks Begin design and plan of implementation. Results Recommendation & Follow-Up Task Name: Coordination Task Description: Coordination with EPCC Instruction. Budget Impact: Additional/New Funding Required Projected Cost: 50000.0000 Task Name: Identify Technology Task Description: Identify technology infrastructure requirements, including servers, backup, network devices, administration and management hardware and software. Budget Impact: Additional/New Funding Required Task Name: Implement Task Description: Implement in production. Budget Impact: Additional/New Funding Required Task Name: Obtain Advice Task Description: Obtain advice and system design assistance. Budget Impact: Additional/New Funding Required Task Name: Test and Evaluate Task Description: Test and evaluate. Budget Impact: 01/12/2012 11:58 AM Generated by TracDat a product of Nuventive. Page 38 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Additional/New Funding Required Task Name: Test Bed Task Description: Develop the test bed and populate. Budget Impact: Additional/New Funding Required Task Name: Training Needs Customer Task Description: Training needs for each (student) customer. Budget Impact: Additional/New Funding Required Task Name: Training Needs Managing Task Description: Training needs for managing the sytem. Budget Impact: Additional/New Funding Required Planning - Network Systems - Network Equipment (2009 - 2010). - Replace obsolete switches with gigabit-capable, fully manageable switches capale of supporting digital video, voice and data network traffic. Outcome Types: 2009 - 2010 End Date: 12/30/2009 Outcome Status: Met Budget Account Number: 11000-75006 Person(s) Responsible: Marco Fernandez 01/12/2012 11:58 AM Means of Assessment: All user needs are met with capacity for expanded services. Assessment Tool: Department/Area Report Standard - Criteria for Success: Completion. Baseline: Replace all obsolete network switches and provide network expansion capabilities. Task Name: Identification Task Description: Identify all obsolete units. Identify areas requiring more capacity and/or expansion than is currently available. Replace and Generated by TracDat a product of Nuventive. Page 39 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up configure units. Budget Impact: Additional/New Funding Required Projected Cost: 69375.0000 Planning - Records Management Trimming Routines for Retention Period (2011-2012). - This plan will monitor, control and dispose of electronic records in a timely manner for all departments in the College who store records in the SAN server while complying with the laws and regulations relating to the retention periods of those records. Outcome Types: 2011 - 2012 Start Date: 12/16/2011 End Date: 12/16/2011 Outcome Status: New Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto 01/12/2012 11:58 AM Means of Assessment: All eletronic records will be managed in the same manner as hard copy records. Each department manages their records from a control schedule that has been tailored especially for the needs and requirements of that department. Assessment Tool: Department/Area Report Standard - Criteria for Success: 100% Baseline: Gradually work with each department in the College to move from paper documents to working with imaged copy documents in a more efficient manner while acquiring a savings in paper and other office supplies. Task Name: Records Task Description: Each deparment and section that use and store records and have a control schedule in place will gradually move from paper documents to imaged documents on their systems. Their imaged records will be stored on servers and will remain there until they are superseded or they have met their retention period. A trimming system will monitor, control and dispose of the records according to the retention period assigned to each of those records . All parties in the department and sections of those departments will sign-off when records are disposed and the original of the destruction Generated by TracDat a product of Nuventive. Page 40 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up notice will be kept in the office of the Director of Records Management. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Records Management Implement SACS Imaging for Deans (2010 2012). - SACS required infomation will be available on the servers from all imaged documents imaged by the Deans office such as Faculty Evaluations and licenses. Outcome Types: 2010 - 2011 2011 - 2012 Start Date: 12/31/2013 Outcome Status: New Budget Account Number: 11000 753000 Person(s) Responsible: Bonnie Prieto Means of Assessment: IT Division has provided RM with scanners to create scanning stations in all Dean s office Assessment Tool: Department/Area Report Planning - Records Management - Imaging Project for Health Clinic (2010 - 2011). Convert paper files used in the Health Clinic daily operations into imaged view and work process. Store old records into the College warehouse. Outcome Types: 2010 - 2011 Means of Assessment: Identify records and begin to move paper records to the Records Warehouse. RM will return at Dr. Mitchell's request to begin a plan to capture , image and store patient records. Train staff in HIPAA laws. Assessment Tool: Department/Area Report End Date: 03/30/2010 Outcome Status: New Budget Account Number: 11000-75300 Person(s) Responsible: Task Name: Move paper records from Clinic Task Description: Identify records, document and store in the Records Management warehouse. Begining early 2012, meet wth Dr. Mitchell 's staff to 01/12/2012 11:58 AM Task Name: Create scanning stations in all campus where Deans work. Task Description: Meet with each Dean, review all documents, define on a retention schedule. Create work flow and install scanners. Provide training. Budget Impact: No Funding Needed Generated by TracDat a product of Nuventive. Page 41 of 52 Outcomes Bonnie Prieto Means of Assessment & Standards Criterion for Success / Tasks Recommendation & Follow-Up start imaging program for the Health Clinic. Train RM staff in HIPAA rules. Budget Impact: No Funding Needed Planning - Records Management - Bursars Office (2011-2012) - Imaging Conversion for Cashiers Document Types: Audit Records, Accounts Payable and Disbursement, Banking Records, Ledgers, JE, & Entry Documentation and Enrollment of Registration. Outcome Types: 2011 - 2012 Start Date: 12/16/2011 End Date: 12/16/2011 Outcome Status: New Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto Means of Assessment: Identify document types . Assessment Tool: Department/Area Report Standard - Criteria for Success: Create BDMS Aplication to fit specifications and create secuity level access. Planning - Records Management Accounts Payable (2009-2010). Discontinue use of paper. Establish imagng program to view, work and store records. Outcome Types: 2009 - 2010 Start Date: 03/05/2010 End Date: 05/07/2010 Outcome Status: Met Means of Assessment: Collect specs from users. Apply their Control Schedule for proper retention and comply with legislative laws. Create program and index fields. 01/12/2012 11:58 AM Results Task Name: Create workflow, train and test plan. Task Description: Management meeting to understanding the need for BDMS imaging support from Records Management. Budget Impact: Additional/New Funding Required Projected Cost: 3000.0000 Funding Justification: This is a brand new project for the Comptroller /Cashier sections using the technology. No equipment in place. Assessment Tool: Department/Area Report Standard - Criteria for Success: Inactive records are moved to the warehouse, the department will now use digitized system to work, view and store Generated by TracDat a product of Nuventive. Page 42 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up records. Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto Task Name: Develop Task Description: Develop maintenance Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Implement Imaging Task Description: Implement imaging on TSST7 test environment, define document types, assign security, and train. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Outcome Task Description: Outcome - physical paper system diminished and complete use of virtualized records for staff usage. Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Production Task Description: Move to production Budget Impact: No Funding Needed Projected Cost: 01/12/2012 11:58 AM Generated by TracDat a product of Nuventive. Page 43 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up 0.0000 Task Name: Save Task Description: Save on SAN Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Scanning Task Description: Demo on scanning from Faculty Accreditation/HR Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Training Task Description: Scanner training Budget Impact: No Funding Needed Projected Cost: 0.0000 Task Name: Two Week Test Task Description: 2 week test, changes on documents types, index structure Budget Impact: No Funding Needed Projected Cost: 0.0000 01/12/2012 11:58 AM Generated by TracDat a product of Nuventive. Page 44 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up 11/09/2011 - Accounts Payable are now 100% paperless. Using forms on line and storing images on EPCC servers Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Planning - Records Management - Faculty Credentials Records/Continuing Education (2010 - 2011). - To establilsh a shared relationship of all Faculty Credential in the college and store them in one BDMS server. Outcome Types: 2009 - 2010 Start Date: 01/01/2010 End Date: 02/01/2010 Outcome Status: Met Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto Means of Assessment: Identification of all desired characteristis for CE Credential Records use and shared relationship from HR Assessment Tool: Department/Area Report Standard - Criteria for Success: Management meeting to understand there is a need for BDMS imaging support from RM. Re-design system per preliminary review. Programiatic Documenttion (struture, methods, flow, processes, business rules, backup) Define user group, define and impement doc level security for share level access. Planning - Records Management - Literacy Program BDMS Application (2010 - 2011). - Means of Assessment: Review Scope of work and quote for 01/12/2012 11:58 AM 11/09/2011 - H/R and Continuing Education are now storing Faculty Credentials under one BDMS system. H/R has view rights only to CE F/C. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Relationship established between CE Credentials and HR Task Description: Programatic Documentation (Structure, Methods, Flow, Processes, Backup. Load scan drivers, tie software and scanners together and test. Define user group and level security and train users. Call all parties from H/R and CE to review RM plans and approve them to move forward. Budget Impact: No Funding Needed 11/09/2011 - Literacy Program contracted DATA Source to image their records, we took those Generated by TracDat a product of Nuventive. Page 45 of 52 Outcomes To be more efficient and organized, books and other Grant Records were digitized by a local vendor and then delivered to Records Management in a PDF format. Records Managment then created a program for the Literacy Program to begin to scan and store thier docments in house. Outcome Types: 2010 - 2011 Start Date: 12/17/2010 End Date: 02/01/2011 Outcome Status: Met Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto, Dan Gaytan, Sara Martinez Planning - Records Management Academic Forms for Counselors @ TM, NW, RG, VV, MdP (2009-2010). - The purpose of this project is to eliminate the need to fax academic records to the Counselors during the time they are advising the student. Outcome Types: 2009 - 2010 Start Date: 01/12/2012 11:58 AM Means of Assessment & Standards Criterion for Success / Tasks services from DataXport (vendor). Assessment Tool: Department/Area Report Standard - Criteria for Success: Return back feedback to DataXport server topology that must be delivered for BDMS AX. Define Document type return and dta extract defintions. Contact PDS (owner of POTG server) for training on AX index image import application. Train back up on how to do this. Move application to production. Results Recommendation & Follow-Up images from a CD and downloaded to our systems for storage. Created progeram folr them to scan, view and store for all future work in this area. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Tasks to be competed Task Description: Process work from DataXport, design new BDMS application to the images, gain knowledge of AX index image export application and train backup team. Move into production. Budget Impact: Additional/New Funding Required Projected Cost: 2450.0000 Funding Justification: New upgrade to POTG server to provide access to the POTG data and images to authorized indeviduals via internet connection. Means of Assessment: Meet with Registrar office and Deans from each campus so that the counselors can gain access to student records and advise them on the spot on line to Registrar system. Assessment Tool: Department/Area Report Standard - Criteria for Success: Generated by TracDat a product of Nuventive. Page 46 of 52 Outcomes 04/02/2010 End Date: 04/30/2010 Outcome Status: Met Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto Means of Assessment & Standards Criterion for Success / Tasks Means of Assessment: add scanning stations to the counselors office, set up stucture and software. Results Recommendation & Follow-Up 11/09/2011 - Students are now advised on same visit with the counselor, the counselor has viewing access to Reg. records Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Counselor's Offices Task Description: All campus Counselor's Offices will make available CPU and scanner, Assign a workstation to perform work, Provide training, Get sign-off There is need for this technology because there is a two week delay to retrieve forms from the Counselor's office to Registrar, in the mean time the student goes to another Counselor to get the classes they want. Create testing on TST7 testing environment, assign Counselors to security groups, and provide training. Replicate the work stations in all Counselor offices. The final outcome will provide the needed academic advising forms online during the moment the Counselor is advising the student; providing a speedy, efficient and accurate advising service to the student. Budget Impact: No Funding Needed Projected Cost: 0.0000 Planning - Records Management Warehouse Cooling & Heating (2011-2012) - Create a temperature controlled environment for the protection of all types of records stored in the warehouse, for the 01/12/2012 11:58 AM Means of Assessment: Meet with the Director of Physical Plant on the need for climate control for paper records, scope of work, and time span of the work to be done. 11/09/2011 - The warehouse now operates under temperture controled Result Type: Satisfactory Generated by TracDat a product of Nuventive. Page 47 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results duration of the retention period assigned to the record titles. Physical Plant on Aug. 2010 made an assement of cost with local contractors and will inform RM when the work will be done. Outcome Types: 2011 - 2012 Start Date: 12/16/2011 End Date: 12/16/2011 Outcome Status: In Progress Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto Recommendation Status: Assessment Tool: 0 - No Action Plan Necessary Department/Area Report Standard - Criteria for Success: The entire warehouse will be properly heated and cooled. Baseline: Planning stages of the project, projected time frame before Summer 2010. Planning - Records Management - Registrar / Continuing Education (2009 - 2010). - CE Registrar will disconnect from Registrar and Admissions and will establish itself in the Continuing Education area. Outcome Types: 2009 - 2010 Start Date: 02/28/2011 End Date: 05/02/2011 Outcome Status: Met Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto, Dan Gaytan, Yolanda Ahner, Sandy Walker, Daryl Hendry, Hazel Silva, Julie Bustamante Means of Assessment: Transfer and create new infrastructure for the operation of the CE Registra office to the B Building. Assessment Tool: Department/Area Report Standard - Criteria for Success: Create programs, set-up scanning stations, create control schedule, training provided to staff, create training manuls and provide maintenance for continued sucess of project. 01/12/2012 11:58 AM Recommendation & Follow-Up Task Name: Working with Mr. Lobato Task Description: Working with Raymound Vilca on the status of the work in progress. Budget Impact: No Funding Needed Projected Cost: 0.0000 11/01/2010 - The CE Registrar Office has now moved to the ASC B bulding and under the Continuing Education VP. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Move all CE Student Record and establish them under CE area. Task Description: Meet with VP of CE, Director of Registrar and Director of Records Management to establish the new CE Registrar office under the Continuing Education Office. Prepare the new area with infrastructure, equipment and software. Generated by TracDat a product of Nuventive. Page 48 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Budget Impact: No Funding Needed Planning - Records Management - SACS saccredittiion imaging project - Work with the H/R accreditation staff to review high volume scanners, setup scanning station with IT intrastructure, create workflow to image all Faculty, Administrators, Professionals, Liberians, Student Advisors and Counselors. Additionally, VP evaluations. Train H/R staff to scan and index documents. Collect documentation from list provided by Saul Candelas and Mary Beth Hann that are required by SACS. Work with Liz Ryan to include VP evaulations for SACS review. Outcome Types: 2009 - 2010 Start Date: 11/15/2011 Outcome Status: In Progress Budget Account Number: 11000 75300 Person(s) Responsible: Bonnie Prieto Means of Assessment: Work with various IT teams, H/R and SACS committee to define and create workflow to gather all documentation for imaging. Assessment Tool: Committee Recommendation Planning - Records Management Electronic Record Storage/Retention Activate software to store, add retention to college records that are not banner linked. Outcome Types: 2011 - 2012 Means of Assessment: Review best products for electronic records storage. Product must proform various functions for managing records, provide reports, storeage and retention. Assessment Tool: Program Review Data Outcome Status: In Progress Budget Account Number: 11000 75300 Person(s) Responsible: 01/12/2012 11:58 AM Task Name: Meet on a regular bases to set goals for each imaging projects. Task Description: Bi-weekly meeting with VP/CIO and IT staff to go over status on imaging projects. Monthly meetings with SACS team. Select best scanner to image F/C folders, train H/R personal and begin to scan all records required by SACS. Monitor progress with H/R, assure the scan all documentation by dead line of Jan. 2012 Budget Impact: No Funding Needed Task Name: Activate Retention Manager Task Description: Retention Manager is an SCT product that Generated by TracDat a product of Nuventive. Page 49 of 52 Outcomes Bonnie Prieto Planning - Records Management Warehouse Cooling & Heating (2010-2011) - Create a temperature controlled environment for the protection of paper records stored in the warehouse, for the duration of the retention period assigned to the record titles. Outcome Types: 2010 - 2011 End Date: 03/30/2010 Outcome Status: In Progress Budget Account Number: 11000-75300 Person(s) Responsible: Bonnie Prieto Planning - Technology Resource Center District-Wide Technology Training Services 2009-2011 - The Technology Resource Center will operate three centers: one at the VV, the second at RG, and the third at TM. This is in an effort to increase 01/12/2012 11:58 AM Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up will store, manage and apply retention to college records not tied to the banner application used by EPCC. This product will be used to store and manage legacy records from the Registrar Office, Literacy Program and any record not associated to banner. Budget Impact: Rollover/Maintain Current Funding Projected Cost: 11377.0000 Funding Justification: Electronic Records Storage for non-banner records. Means of Assessment: Working closely with the Director of Physical Plant on the time span and design of the work to be done. Assessment Tool: Department/Area Report Standard - Criteria for Success: The entire warehouse will be properly heated and cooled. Baseline: Planning stages of the project, projected time frame before Summer 2010. Task Name: Work with Physical Plant Task Description: Working together with Mr. Lobato and his staff and HIVAC. Budget Impact: No Funding Needed Means of Assessment: Training to faculty and staff will increase by 20% and 11 online modules will be developed. Assessment Tool: Department/Area Report 11/24/2010 - Training has increase by 17%. Online on-demand webinars are available for faculty or staff to view at their convieniance. The online modules need to be updated. Everything is still in progress. Result Type: Generated by TracDat a product of Nuventive. Page 50 of 52 Outcomes technology training to faculty and staff. Combined training methods will be utilized such as on-demand, web-based training opportunities that will allow the user to select training modules; and training will be delivered 24x7. Outcome Types: 2009 - 2010 2010 - 2011 Start Date: 08/31/2011 End Date: 08/31/2011 Outcome Status: In Progress Budget Account Number: 11000-51005 Person(s) Responsible: Nancy Gamez 01/12/2012 11:58 AM Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up Satisfactory Recommendation Status: Standard - Criteria for Success: 0 - No Action Plan Necessary Develop a catalog of web-based training modules and tutorials. Hire appropriate staff. Baseline: Extensive online module development occurred in year 2004-05 in areas such as WebCT training, Flash, PowerPoint and the use of HorizonLive webinars. Training in respondus was also available. Hire 9 additional staff member to support services. Task Name: Teaching Online Courses Task Description: Assist with the training of faculty teaching online courses. Budget Impact: Rollover/Maintain Current Funding 11/24/2010 - Training is on-going, with webinar workshops, face-to-face and one-to-one. Increased the training faculty and staff obtained by all methods listed by 17% Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Task Name: Training Needs Task Description: TRC staff will continue to assess training needs and develop online tutorials, webbased training in various areas. Funding Justification: This will require staff, software and training to create the online tutorials and web-based training modules. Budget Impact: Additional/New Funding Required Projected Cost: 164968.0000 Task Name: Training Software Task Description: Continue to support or purchase the necessary training software. Funding Justification: 11/24/2010 - New training materials development started for TracDat, Student Response System "Clickers", and Smart Classrooms. Result Type: Unsatisfactory Recommendation Status: 1 - Action Plan Needed 11/24/2010 - Purchased Captivate5, Respondus and renewed memberships to WECT and TxDLS for training and webinare oppurtunities. Result Type: Satisfactory Recommendation Status: Generated by TracDat a product of Nuventive. Page 51 of 52 Outcomes Means of Assessment & Standards Criterion for Success / Tasks Results Recommendation & Follow-Up 0 - No Action Plan Necessary Training is required to support the training software and maintain memberships to organizations that provide online webinars for training faculty, and staff. Budget Impact: Additional/New Funding Required Projected Cost: 15000.0000 Task Name: Web Development Services Task Description: Increased Web Development services. Budget Impact: Additional/New Funding Required 01/12/2012 11:58 AM 11/24/2010 - No longer under Technology Resource Center. Result Type: Satisfactory Recommendation Status: 0 - No Action Plan Necessary Generated by TracDat a product of Nuventive. Page 52 of 52