Monthly Status Report Project Name: Project Sponsor: Project Owner: Project Manager: Classroom, Event Management, and Resource Scheduling Laura King Laura King Steve Hawrysh Reporting Period: August, 2013 Est. Proj. End Date: October, 2013 Project Description: MnSCU provides public higher education within the state of Minnesota and operates 26.8 million square feet of owned facility space primarily located at 54 campus locations across the state under the leadership of 32 institutions (i.e. some institutions have 1, 2, 3, 4 or 5 campuses). These facility assets can be broken down into two broad categories, academic space supporting programs (21.7 million square feet) and revenue fund sponsored facilities such as residential halls, student unions, parking, wellness centers (5.1 million square feet). The proposed software system needs to be able to accommodate approximately 2,500 classrooms, 2,000 lab spaces across the campuses and approximately 500,000 events on a yearly basis. The proposed software system should make it easy to find and reserve the exact room and resources needed based on size, layout, the equipment required, or other needs. The overall goal of the project is to allow Minnesota State Colleges and Universities to schedule its space more effectively and efficiently, by assuring consistent and accurate data and measures across the system. Through consistent data integrity this project will define a more objective process that will allow each school and the system to tell the full story of its’ space utilization and improve the quality of space management decisions. Executive Summary Status Description Reason for Deviation Schedule Pilot implementation (June group) December 2012, November group implementation February 2013, February group implementation May 2013 and May group September 2013. Scope Systemwide implementation of EMS Campus software including training, and support. Budget Covers software license, hardware costs, and management consulting for implementation. It also covers maintenance, through FY17including a 5 year college/university loan payback period. Budget Budget Status as of 08/31/2013 Cost Center #: 038510 Initial Funding (received) $1,550,000.00 College University Loan Payback (through FY17) $1,050,000.00 Total Funding through FY17 $3,600,000.00 Dollars Spent as of 08/31/2013 $1,504,162.46 Unspent Budget through FY17 $2,095,837.54 Dollars encumbered effective 08/31/2013 $1,735,994.70 DRAFT: 09/05/2013 Monthly Status Report Page 1 of 3 Classroom, Event Management, and Resource Scheduling Minnesota State Colleges and Universities Accomplishments Complete for Last Month • • • • • • Continue work on systemwide reporting. Continue May group configuration, training sessions, and production cutover. Prepare for move of MSU Moorhead into production including their Master Calendars. Date set: October 10. Started transition for end of project to operational system. Planning all day project celebration: October 29 at Quarry Center in Waite Park. Support production and testing systems. Upcoming Accomplishments for Next Month • • • • • • • Continue work on systemwide reporting. Complete May group configuration, training sessions, and production cutover. Prepare for move of MSU Moorhead into production including their Master Calendars. Continue transition for end of project to operational system. Continue planning all day project celebration: October 29 at Quarry Center in Waite Park. MnSCU contingent to attend EMS conference. Support production and testing systems. High-Level Schedule Milestones/Deliverable Project approved Product evaluation Project task force kickoff Contract finalized and approved Pilot schools system configuration, acceptance, and testing June group implementation November group implementation February group implementation May group implementation Post implementation Estimated Completion Date Actual Completion Date Status (On Schedule, Complete, At Risk) 12/13/2011 2/3/2012 2/10/2012 3/30/2012 12/13/2011 2/3/2012 2/10/2012 3/30/2012 Complete Complete Complete Complete 12/10/2012 12/10/2012 Complete 1/15/2013 3/31/2013 10/10/2013 9/30/2013 1/15/2013 3/31/2013 Complete Complete On schedule On schedule 10/30/2013 On schedule Open Change Requests Change Request Accelerated implementation – DEA provides training Change request approved Date Submitted Effects (Schedule, Scope, Budget) 10-19-2012 Schedule Open Issues Issue DRAFT: 09/05/2013 Monthly Status Report Assigned To Page 2 of 3 Date Resolution Classroom, Event Management, and Resource Scheduling Minnesota State Colleges and Universities Required Personnel change – key system office training position open. Issue resolved: Tom Warren hired in the position. Current scheduling software license expires. Issue resolved: Accelerated implementation schedule having DEA do all of the training. Steve Hawrysh, Tiffni Deeb October, 2012 Steve Hawrysh, Nathan Sorensen October, 2012 Risks Risk Project budget may not support DEA consulting needs. Risk mitigated through accelerated implementation. Chance (High, Medium, Low) Impact (High, Medium, Low) Priority (High, Medium, Low) Medium Medium High Legend Scope Baseline Scope unchanged Schedule On-Schedule Cost On-Budget DRAFT: 09/05/2013 Monthly Status Report Major change requests are pending, but approved scope is relatively stable and achievable. Activity or sub-milestone missed or likely to be missed but won’t affect project end date. Unable to accommodate approved scope without adjusting schedule or budget. Scope is unstable. Major milestone and/or installation date likely to be missed. Over budget 5% or less Over budget >5% Page 3 of 3 Classroom, Event Management, and Resource Scheduling Minnesota State Colleges and Universities