UNT in partnership with TEA. Copyright ©. All rights reserved. 1 SPREADSHEETS Principles of Architecture and Construction Starter/Bell Ringer Activity 2 Students, please take your jigsaw puzzle pieces and sit at your assigned individual work stations. What’s on YOUR jigsaw puzzle piece? UNT in partnership with TEA. Copyright ©. All rights reserved. GN1 GN2 This is what the Building Materials List will look like 97 1/8 high wall 97 1/8 high wall Siding-6" standard wood frame stud wall + ext. siding Interior-4" standard wood frame stud wall $0.00 451 451 571 84 20 0.00sq ft 0.00sq ft 0.00sq ft 0.00sq ft 0.00sq ft Subtotal: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 451 402 402 0.00sq ft 0lin. ft 0lin. ft Subtotal: $0.00 $0.00 $0.00 $0.00 20 2lin. ft $0.00 1287 24 748 64lin. ft 1each 37sq ft Subtotal: $0.00 $0.00 $0.00 $0.00 Subtotal: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subfloor SF1 3/4" thick SF2 2x12" 16" OC SF3 2x6" 16" OC Hickory2r(30) floor joists ceiling joists Framing F1 4x12" door/window header Siding S1 S2 S3 7" wide 4'x8'x5/8" Siding Tan1 Plywood-hrz house wrap 1x7-36" 1x4-16ft+ 7 in 1x4-16ft+ 1x4-16ft+ 116" wide door threshold ext. door casing ext. door jamb exterior sill ext. window casing between window trim 1 17 17 23 49 16 0each 1lin. ft 1lin. ft 1lin. ft 2lin. ft 1lin. ft gutter: Default Gutter roofing material roof sheathing rafters - fir gable fascia eave fascia metal drip edge downspout ridge cap 47 657 21 596 56 47 103 2 24 2lin. ft 33sq ft 1each 30lin. ft 3lin. ft 2lin. ft 5lin. ft 0each 1lin. ft Roofing R1 R2 R3 R4 R5 R6 R7 R8 R9 4x8' sheets 2x6" 16" OC 2x8" 2x8" Flooring FL1 FL2 13x13x1/4 FL3 Medium-r(80) Sandalwood TV02 Floor-C1(12) Wall Brd WB1 4'x8'x1/2" WB2 4'x8'x1/2" WB3 4'x8'x1/2" Sheetrock Sheetrock 1/2" (wp) - sheetrock Windows W1 36x48 W2 36x48 double hung - medium-r(80) double hung Doors D1 D2 D3 D4 D5 D6 D7 UNT in partnership with TEA. 3 Copyright ©. All rights reserved. $0.00 0lin. ft heated heated heated heated heated Insulatio n IN1 12x16x48" ceiling insulation batts IN2 12x16x48" floor insulation batts IN3 6x16x93" batts wall insulation Notice that prices and “extra” quantities will be added. 0lin. ft 33 GN3 GN4 GN5 GN6 GN7 Ext Trim EX1 EX2 EX3 EX4 EX5 EX6 ceiling area = refer. Sheetrock wall brd. floor area = refer. Flooring wall area = refer. Sheetrock wall brd. glass area = refer. window units door area = refer. door units 83 36x80x1 3/4L 30x80x1 3/8L 36x80 ext. 2 Panel 2 Glass handle: knob handle: lever (ext.) hinge: hidden 2 Panel Door handle: knob bifold-louvered 84 4each $0.00 84 4each $0.00 53 3each 336 46 11 2each 1each 0each 6 1 0each 0each Subtotal: $0.00 $0.00 $0.00 $0.00 Subtotal: $0.00 $0.00 $0.00 $0.00 Subtotal: $0.00 $0.00 $0.00 Subtotal: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subtotal: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0each 0each 0each 0each 0each 0each 0each Int Trim T1 1x4-16ft+ T2 1x4-16ft+ T3 1x4-16ft+ T4 1x4-16ft+ T5 1x4-16ft+ T6 1x4-16ft+ T7 1x116-16ft+ T8 5 in T9 1x4-16ft+ interior casing - medium-r(80) window apron - medium-r(80) sill - medium-r(80) window apron sill interior casing between window trim - medium-r(80) interior jamb - medium-r(80) base molding Fixtures FX1 60W32D Standard Tub [60W] 1 0each FX2 30W26 1/8D Toilet 1 0each FX3 30W19D Free Standing Sink 1 0each 158 20 20 4 4 12 16 52 141 $0.00 $0.00 17sq ft 2each 1sq ft 36 12 2 1 4 1 5 1 3 2 Subtotal: 8lin. 1lin. 1lin. 0lin. 0lin. 1lin. 1lin. 3lin. 7lin. Ft Ft Ft Ft Ft Ft Ft Ft Ft $812.0 0 $189.0 0 $170.0 0 $812.00 $189.00 $170.00 Subtotal: $1,171.00 Total: $1,171.00 Daltile® Refresh your Vocabulary 4 As a Class, let’s refresh our memory on a few key words: Building Materials Estimate Cost Unit of Measurement Percentage Unit Approximate UNT in partnership with TEA. Copyright ©. All rights reserved. Piecing the data together 5 On your own, you will complete the following today: Retrieve your Building Supply List from Chief Architect. Export your Building Materials List to Microsoft Excel. Edit your Building Material costs and quantities. As a group, you will complete the following: Share your data with the class. Save and Print your finalized data spreadsheet. UNT in partnership with TEA. Copyright ©. All rights reserved. End of Class Wrap Up and Summary 6 Does our Spreadsheet have any “holes?” What was the hardest part of the “puzzle?” Besides the Cost of Building Materials, what else can affect the overall cost of the project? What about Equipment? Labor? Weather? Insurance? And more… what else can we think of? UNT in partnership with TEA. Copyright ©. All rights reserved.