DESIGN IS HARD…
• Tradeoffs
• Dynamics
• Details
• Time Pressures
• Economics
Friday, August 5, 2011
3
DESIGN IS HARD…
especially for
developing countries
• Tradeoffs
• Knowledge of the user
• Dynamics
• Experience with the need
• Details
• Ethical concerns
• Time Pressures
• Extreme design constraints
• Economics
Friday, August 5, 2011
• $, robustness, usability, mfg & distribution
strategy, transparency
4
DESIGN IS HARD…
and rewarding…especially for
developing countries
• Tradeoffs
• Knowledge of the user
• Dynamics
• Experience with the need
• Details
• Ethical concerns
• Time Pressures
• Extreme design constraints
• Economics
Friday, August 5, 2011
• $, robustness, usability, mfg & distribution
strategy, transparency
5
THE DESIGN PROCESS
Friday, August 5, 2011
6
THE DESIGN PROCESS
• Information Gathering
• Problem Definition
• Design Specifications
• Idea Generation
• Concept Evaluation
• Analysis & Experimentation
• Detail Design
• Fabrication
• Testing & Evaluation
Friday, August 5, 2011
7
THE DESIGN PROCESS
• Planning
• Mission Approval
• Concept Development
• Concept Review
• System-Level Design
• System Spec Review
• Detail Design
• Critical Design Review
• Testing & Refinement
• Production Approval
• Production Ramp-up
Friday, August 5, 2011
8
THE DESIGN PROCESS
• Information Gathering
• Problem Definition
• Design Specifications
• Idea Generation
• Planning
• Mission Approval
• Concept Development
• Concept Review
• Concept Evaluation
• Analysis & Experimentation
• System-Level Design
• System Spec Review
• Detail Design
• Detail Design
• Fabrication
• Testing & Evaluation
• Critical Design Review
• Testing & Refinement
• Production Approval
• Production Ramp-up
Friday, August 5, 2011
9
PUGH CHART
Image removed due to copyright restrictions.
See http://web.mit.edu/2.009/www/labs/lab2picture.jpg
Friday, August 5, 2011
10
GANTT CHART
Image removed due to copyright restrictions.
See http://upload.wikimedia.org/wikipedia/en/7/73/Pert_example_gantt_chart.gif
Friday, August 5, 2011
11
BEST PRACTICES
• timeline
•
are we hitting our dates? what can we do RIGHT NOW?
• goal
•
minder
minder
is what we’re doing getting us closer to our goal?
• community
partner liaison
• documentation (photos & wiki)
• fail
fast
• prototype
early
• identify
your dealbreakers immediately (physical
impossibilities)
Friday, August 5, 2011
12
OUR DESIGN PROCESS
• Planning
• Mission Approval
• Concept Development
• Concept Review
• System-Level Design
• System Spec Review
• Detail Design
• Critical Design Review
• Testing & Refinement
• Production Approval
• Production Ramp-up
Friday, August 5, 2011
Everything until today
today-4/1
4/1-4/8
4/8 project spec. disc.
4/9-4/15
4/15 Design Review
4/16-4/22
4/22 Design Review
4/22-5/6
5/7 Final Presentation
[plans in final report]
13
REMAINING DELIVERABLES
Friday, August 5, 2011
14
NOW
•
finalize problem definitions for D-Lab Energy-relevant projects
•
compare using Pugh chart method
•
•
criteria??
2:30 - 1-minute pitches for each possible final project and 3 minutes
on Pugh chart pros/cons
Friday, August 5, 2011
15
MIT OpenCourseWare
http://ocw.mit.edu
EC.711 D-Lab: Energy
Spring 2011
For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms.
Download