. INSTALLATION INSTRUCTIONS V90287 REV A QUIET CEILING ROUND TRIM METAL HALLIDE QCT908 BASED SERIES Page 1 of 3 Avoid Fire or Electric Shock THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE BY A PERSON FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED. *Installation Instructions for qualified electricians only. *Install per National Electrical Code and local regulations. *Read Installation Instructions completely before installation. *Failure to follow Installation Instructions may void warranties. Fixture Mounting: 8. Butterfly Mounting (Commercial): 1. Fixture comes equipped with Universal Butterfly Mounting brackets and can take common 1 inch or 1-1/2 inch Black Iron or Galvanized Mounting Channels (Supplied By Others). Hanger bars can be used with grid ceilings having T bars and joist installations of wood.Adjustable hanger bars are for use in installations with spacing from 12" to 24", while maintaining minimum 1/2" spacing around fixture Grid Ceiling Installation (Figure 2): 2. Position Fixture so the Mounting Channels lie on top of ceiling runners. Step 1 Extend bar hangers between the T bars and slide the slots in the mounting tabs over the T-bars. 3. Fasten Mounting Channels securely to ceiling runners. 4. Secure Mounting channels to Universal Butterfly Mounting Brackets with wire tire downs. Step 2 Adjust housing platform position by sliding back and forth on bar hangers to desired position. Housing may be locked in the position by tightening bar hanger locking screws on housing platform.See Detail 3A. 5. Adjust elevation of Fixture so Mudding Ring Edge will be flush with surface of finished Ceiling by loosening two (2) 1/4 inch Hex Screws on both Universal Mounting Brackets. See Fig. 1. 6. Tighten two (2) 1/4 inch Hex Screws on both Universal Butterfly Mounting Brackets to secure Fixture. See Fig. 1. Step 1 Extend bar hangers to fit between joist and position mounting tab locater lip tight to bottom of joist or framing member. Bar hangers should be level with bottom of joist or framing member. Step 2 Attach bar hangers to joist or framing member using appropriate hardware for material. Hanger Bar Mounting (Residential): 7. Joist Installation (Figure 3): Adjustable hanger bars are preassembled with mounting bracket and provided with fixture.The preassembled hanger bars must attached to the fixture prior to installation.Align with two screws on end of fixture and tighten .Hanger bars are installed in Fig.1. Step 3 Adjust housing platform position by sliding back and forth on bar hangers to desired position. Housing may be locked into position.See Detail 3B.Nail Supplied in hanger bars will be suitable. Mounting Channel (Supply by Others) Fixture Housing Cover Bracket Optional "T" 1/4" Hex Screw Hanger Bars Universal Butterfly Mounting Bracket Screw Mudding Ring Safety Cable Trim Mechanism Figure 1 Figure 2 INSTALLATION INSTRUCTIONS V90287 REV A QUIET CEILING ROUND TRIM METAL HALLIDE QCT908BASED SERIES Page 2 of 3 Avoid Fire or Electric Shock THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE BY A PERSON FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED. *Installation Instructions for qualified electricians only. *Install per National Electrical Code and local regulations. *Read Installation Instructions completely before installation. *Failure to follow Installation Instructions may void warranties. Detail 3A Detail 3B Figure 3 9. Mudding Ring is sent unmounted from factory. Adjust Mudding Ring to applicable Ceiling thickness by aligning and securing to Fixture using applicable Mounting Hole Pattern as indicated by Ceiling Thickness Indicator Mark imprinted on Mudding Ring. See Detail 5A in Fig.5. 10. Secure Mudding Ring using four (4) #8-32 x 1/2 inch Flat head Screws (for 1/2 inch, 5/8 inch and 3/4 inch Ceiling thickness) or four (4) #8-32 x 3/4 inch Flat head Screws (for 1 inch Ceiling thickness). 11. Install Ceiling drywall up to Mudding Ring on Fixture so that the two (2) Mudding Frame Brackets contact inside of Ceiling. See Fig. 4. 12. Retain Fixture to Ceiling with one (1) Flathead Screw through each of two (2) Mudding Frame Brackets.See Fig. 4 13. Apply Drywall Tape and Mudding Compound to Mudding Ring overlapping Mudding Ring, Flathead Screws, Fixture Gap and surrounding area. Feather out Mudding Compound from Mudding Ring opening to surrounding ceiling area to produce a smooth, flat finish. See Fig. 4. 5/8" Rotational Adjustment Ring Lock Knob #8-32 Flathead Screw Mudding Ring 3/4" 5/8" 1/2" 1" Detail 5A Fixture Mudding Frame Bracket Flathead Screw Ceiling Drywall Tape Fixture Gap Ball Detent Catch Trim Mechanism Mudding Compound Mudding Ring 3/4" Mounting Hole Pattern Figure 5 Figure 4 INSTALLATION INSTRUCTIONS V90287 REV A Avoid Fire or Electric Shock QUIET CEILING ROUND TRIM METAL HALLIDE QCT908 BASED SERIES Page 3 of 3 THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE BY A PERSON FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED. *Installation Instructions for qualified electricians only. *Install per National Electrical Code and local regulations. *Read Installation Instructions completely before installation. *Failure to follow Installation Instructions may void warranties. 360 Rotational Lamp Adjustment Rotational Alignment Ring Tab Alignment Feature Notch IF LOCKING KNOB IS UNLOCKED: 14. Rotate Trim Mechanism to desired lamp bean position by turning Trim Mechanism up to 360 Degrees. 15. To lock positioning, remove Trim Mechanism being careful not to change position. 16. Tighten Lock Knob inside Fixture to lock Rotational adjustment Ring. See Fig.6. 17. Be careful to align Tab Alignment Feature on Trim Mechanism with Tab Alignment feature Notch in Rotational Adjustment Ring while installing trim after rotational adjustment. 18. Connect Safety Cable attached to Trim to Fixture by inserting Safety Cable through opening in Fixture and inserting Snap Hook (See Fig. 1) on end of Safety Cable into hole in Bracket attached to inside of fixture.Install trim mechanism into fixture by pressing firmly to seat Ball Detent Catches. See Fig.4. IF LOCKING KNOB IS LOCKED: 19. Remove Trim Mechanism from Fixture. 20. Loosen Lock Knob inside Fixture. 21. To lock positioning, remove Trim Mechanism being careful not to change position. 22. Tighten Lock Knob inside Fixture to lock Rotational adjustment Ring. See Fig.6. 23. Be careful to align Tab Alignment Feature on Trim Mechanism with Tab Alignment feature Notch in Rotational Adjustment Ring. 24. Connect Safety Cable attached to Trim to Fixture by inserting Safety Cable through opening in Fixture and inserting Snap Hook (See Fig. 1) on end of Safety Cable into hole in Bracket attached to inside of fixture.Install trim mechanism into fixture by pressing firmly to seat Ball detent catches.See Fig.4. Ceiling Joist Locking Knob Fixture Figure 6 (Fixture Cover Removed For Clarity)