ARTICLE 11 NOTIFICATION PROCEDURES FOR BROADCASTING (BS) 1 Importance of notification Bands allocated to Broadcasting Art.11 Flowchart Art.11 non Plan > 28 MHz Art.11 LF/MF assignments Art.11 VHF/UHF assignments (not GE06) Art.11 GE06 assignments 2 ART-11 Importance of notification Inform others of the bringing into use of a frequency assignment. Recording in the MIFR results in rights and obligations for the notifying Administration GE06 MODIFICATION/NOTIFICATION Broadcasting Bands (≠ HF) Band LF MF VHF /UHF Frequency (kHz/MHz) 148.5-283.5 kHz 526.5-1 606.5 kHz 525-1 605 1 605-1 705 47-68 MHz 47-68 87.5-100 87.5-108 162-170 MHz (170 MRC)174-230 230-238, 246-254 470-862 BC/BT Region Geo. zone BC BC BC BC BC, BT BT BT BC BT BC , BT BT BT R1 R1 and R3 R2 R2 EBA ABA EBA R1* MRC R1-MNG+IRN See RR 5.252 R1-MNG+IRN Plan GE75 GE75 RJ81 RJ88 ST61 GE89 ST61 GE84 ST61 GE06 GE89 GE06 * and part of R3 4 FLOWCHART Administration proposes to bring into use an assignment under Article 11 of the RR (11.2) Is RR 11.31 examination favourable? N Y N Is Assigned Frequency covered by a PLAN? Finding: Unfavourable (X/RR11.31) Notice returned to Adm Y Recording in MIFR Y Is RR 11.34 examination favourable? N Finding: Unfavourable (X/RR11.34) Notice returned to Adm 5 Art.11 non Plan > 28 MHz •Publication in BRIFIC Part 1 •Examination w.r.t. 11.31 only •Publication in Parts 2 or 3 •Objections to Publication not receivable •In Case of interference Administrations can apply procedures of Article 15. 6 First complete the Plan modification procedure (Plan Art.4) using proper form. Publication in Part A of a Special Section (SS). Comment period(16 weeks, 100 days, etc) Administration requests publication in Part B. BR publishes the modifications in Part B of SS and the frequency assignments are entered in to the Plan. 7 Art.11 LF/MF (GE75 / RJ81) parameters same as Plan •Form TB7 •Publication in BRIFIC Part 1 •Examination w.r.t. 11.31 and 11.34 •Publication in Parts 2 or 3 8 Art.11 LF/MF (cntd) •Full forms must be used for: •Slight changes to Plan parameters (GE75/RJ81) •Modification of MIFR entry •Notification of RJ88 assignments •Procedure of Article 5 of the Agreements •Site tolerances of Art.4 accepted Plan Form GE75 T03 RJ81/RJ88 T04 9 GE06 MODIFICATION/NOTIFICATION Art.11 VHF/UHF GE89 rev.2006 •Modified in 2006 , Plan now has only the following bands: •- 47 – 68 MHz •- 230 – 238 and 246-254 MHz •Procedure described in Article 5 of the GE89 rev.2006 Final Acts. •***No notifications since 2006*** 10 GE06 MODIFICATION/NOTIFICATION Art.11 VHF/UHF ST61 rev.2006 Modified in 2006 , Plan now has only the following bands: FREQUENCY BANDS 47-68 MHz 87.5-100 MHz 162-174 MHz NOTES FM + TV TV only TV only Procedure described in Article 5 of the ST61 rev.2006 Final Act. ***Very few notifications since 2006*** 11 GE06 MODIFICATION/NOTIFICATION Art.11 VHF/UHF GE84 assignments Notice type Applicable for TB2 Article 5 identical characteristics as in Plan T01 Slight changes to Plan parameters or MIFR mod. •Procedure of Article 5 of the GE84 Final Acts. •Site tolerances of Article 4 are permitted. •Large number of notifications (>1100 in 2008) 12 GE06 MODIFICATION/NOTIFICATION GE06: notice forms used for Art.11 Notice type Applicable for Prov. TB2 Article 5 identical characteristics as in Plan 5.1.2 a) G02 Article 5 analogue within the envelope of a digital 5.1.2 a) broadcasting plan entry GS1 Article 5 T-DAB, Plan remarks 5.1.2 GT1 Article 5 DVB-T, RPC or Plan remarks 5.1.2 GB1 Article 5 Broadcasting (not analogue) within the envelope of a digital broadcasting Plan entry 5.1.3 13 Administration proposes to bring into use an assignment under Article 11 of the RR Is RR 11.31 examination favourable? N Is notification under RR 4.4 ? Y N Recording in MIFR Examination with respect to RR 11.34 5.1.5 5.1.2 a)b) 5.1.2 c)d) 5.1.2 e) 5.1.3 Finding: Unfavourable Notice returned to Adm Flowchart GE06-6 Flowchart GE06-7 Flowchart GE06-8 Flowchart GE06-9 Regular assignment Assignment stemming from allotment Different Characteristics Within T-DAB Or DVB-T Different Characteristics for BC or OPST 14 Full set of flowcharts appear in the document on GE06 Regular assignment - 5.1.2 a) b) (1 of 2) Flowchart GE06-6 5.1.2 a) b) Regular assignment Assignment in Plans ? N Y Conditions of S.2 of A.4 met ? N Y 15 Regular assignment - 5.1.2 a) b) (2 of 2) No remark w.r.t - analogue Plan - other services ? N Y All agreements obtained ? N Y Finding: favourable Recording in MIFR No remark w.r.t digital Plan Y Finding: favourable Recording in MIFR N Adm. States all remark conditions are met ? N Y Finding: unfavourable Notice returned to Adm*. 16 GE06 MODIFICATION/NOTIFICATION Assignment stemming from allotment - 5.1.2 c)d) First part of flowchart same as - 5.1.2 a)b) N No remark w.r.t - analogue Plan - other services ? N All agreements obtained ? Y Y Finding: favourable Recording in MIFR No remark w.r.t digital Plan N Y Finding: favourable Recording in MIFR Adm. States all remark conditions are met ? N Y Finding: unfavourable Notice returned to Adm*. 5.1.5 17 GE06 MODIFICATION/NOTIFICATION Different characteristics within T-DAB/DVB-T - 5.1.2 e) Is the Plan entry within T-DAB Y Is notified assignment for T-DAB ? N Y N When the Plan entry is DVB-T, the notified assignment can be within T-DAB or DVB-T N Conditions of S.2 of A.4 met ? Y Finding: favourable recording in MIFR Finding: unfavourable notice returned to Adm* 18 GE06 MODIFICATION/NOTIFICATION Different characteristics BS or OS - 5.1.3) Is the N digital entry (assignment/allotment) in the digital plan ? Y Is the N peak power spectral density in any 4kHz ≤ digital entry? Y Conditions of S.2 of A.4 are met ? Y N Finding: unfavourable Notice returned to Adm*. Finding: favourable Recording in MIFR 19 GE06 MODIFICATION/NOTIFICATION Resubmission – 5.1.6 Is there a signed commit- N ment w.r.t interference and protection claim ? Notice returned to Adm. Y Is the examination under 5.1.2 or 5.1.3 favorable ? N BR recording of Adm. with which there is still diagreement Y Finding: favourable Recording in MIFR 5.1.6 11.31 finding favourable 11.34 finding unfavourable Recording in MIFR 5.1.7 20 GE06 MODIFICATION/NOTIFICATION Thanks ! 21