Subcontractor and Material Supplier Declaration Suite 101 Harbourt Hall • 615 Loop Road • P.O. Box 5190 • Kent, Ohio 44242-0001 v: 330-672-3880 • f: 330-672-2648 • web site: www.kent.edu/universityarchitect OFFICE OF THE UNIVERSITY ARCHITECT The intent of this form is to confirm the companies submitted have been reviewed, appear to be Responsible, and are proposing to provide the services/material goods listed in compliance with the Contract Documents. If the Project is administered using OAKS CI, use this form to gather information, and then enter it into the OAKS CI “Subcontractor Supplier Declaration” business process in lieu of this paper form. Instructions M. Complete “EDGE Status” section. See the EDGE Web site for any questions at www.EDGE.ohio.gov: Attach to this form their EDGE Certificate and completed EDGE Affidavit. Certified = EDGE-certified by Equal Opportunity Division (EOD). Pending = EDGE application submitted to EOD and waiting for response. Mentor = Special category of participation within the EDGE program. Protégé = Special category of participation within the EDGE program. N. Certify form by signing in the space provided and e-mail or fax to the A/E, and KSU-OUA for review. 1. Kent State University (KSU-OUA) Initial Responsibilities: A. B. C. Complete Contractor Information section at top of the form. Complete Project Information section at top of the form. Issue to the Contractor via CD-ROM mailing. 2. Contractor Responsibilities: A. B. C. Use the form provided by KSU-OUA as a master for the project. Creation of additional pages electronically or by photocopying is permitted. (Put cursor over each grey block and then type to fill in your information). Complete all required information for each Subcontractor and Material Supplier. (Attach additional sheets as necessary.) Lower tier Subcontractors who may provide on-site labor must be identified as Subcontractors. Check company type as a Subcontractor, Material Supplier or Consultant. D. Enter company name, address, phone number, fax number, Federal Tax I.D. Number and e-mail address. E. F. Indicate the primary company officer (President, Owner) and contact person. Attach the completed “State of Ohio Subcontract Form” with Exhibits for each Subcontractor and Material Supplier. Enter the date and amount of the Subcontract and/or Purchase Order. Enter a brief description of the type of work to be performed by the Subcontractor. Enter a brief description of the services/material brands being supplied by the company. Attach additional sheets as necessary. Enter the Subcontractor’s Skilled Trades License Number and attach a copy of their unexpired Skilled Trades License. Attach Subcontractor’s completed “Payroll Schedule” form. Complete “DFSP Enrolled” section. Contractors, Subcontractors and Material Suppliers providing labor on a state construction project site must be enrolled in the OBWC Drug-Free Safety Program (DFSP) or BWC-approved DFSP prior to performing work on the site. Submit supporting documentation demonstrating approval status for an OBWC-approved DFSP. Attach to this form proof of enrollment of all Subcontractors and Material Suppliers providing labor on the project. Print out results via the OBWC Web site: G. H. I. J. K. 3. A/E Review: A. B. 4. CM Review, if applicable: A. B. C. A. B. Enter the OBWC-approved DFSP policy number. SAO-F310-01v0112 1 Attach additional sheets as necessary. Review form in collaboration with the A/E and KSU-OUA. When consensus is reached, receive the form from the A/E, sign in the space provided, and e-mail or fax the form to KSU-OUA. The CM must sign the same form the A/E has signed. 5. KSU-OUA Approval: https://www.ohiobwc.com/employer/services/StateContract/nlbwc/StateContract1.asp L. Review form in collaboration with CM if applicable, and KSU-OUA. When consensus is reached, sign in the space provided and e-mail or fax the form to KSU-OUA or CM if applicable. 2 Check all that apply. Verify all supporting documentation has been provided and is accurate. Complete “For KSU-OUA Use Only” section in the order indicated below 1. Determine status of companies listed on each sheet received. a. When one or more companies require “Extended Review”: mark company status for each, and then go to C2. b. When one or more companies are rejected: mark company status for each, and then go to C3. c. When all companies are approved: mark company status for each, and then go to C4. 2. Forward a copy of the annotated form to the Contractor as its notice of the Extended Review; then, proceed to perform and complete the Extended Review. When completed, mark form as appropriate, and process per C1b or C1c. 3. Prepare written documentation of basis for rejection and insert it into the project file, and if appropriate, insert a copy into the “responsibility review file” for the particular company; and then go to C4. 4. Forward a copy of the annotated form to the A/E, Contractor, and CM if applicable. Insert the original form into the “Project file.” Page 1 of 2 Subcontractor and Material Supplier Declaration Suite 101 Harbourt Hall • 615 Loop Road • P.O. Box 5190 • Kent, Ohio 44242-0001 OFFICE OF THE UNIVERSITY ARCHITECT v: 330-672-3880 • f: 330-672-2648 • web site: www.kent.edu/universityarchitect Contractor Information Company Name Address City, State, Zip Federal Tax I.D. No. ; Phone: ( ) - Subcontractor Company Name Street Address City/State/Zip Telephone No. Fax No. Federal Tax I.D. No. E-mail Address Primary Officer ( ( Contact Person Subcontractor/Supplier + attach SoO Subcontract Form/Exhibits Date of Subcontract or Date of Purchase Order Amount of the Subcontract or PO Value $ Services/Material Brands1 Subcontractor Skilled Trades License No. + attach State License Payroll Schedule attached? + attach Payroll Schedule OBWC-approved DFSP in Good Standing + with OBWC proof OBWC-approved DFSP Policy No. EDGE Status2- + attach EDGE Certificate and EDGE Affidavit For KSU-OUA Use Only Sheet1 Project Information Project No. KSUProject Location Kent State University Project Name Type of Contract General Contract - 01 ) ) Material Supplier (check one) Yes Campus Consultant - Subcontractor or Supplier to this Company? Declare Third-Tier Company information below: ( ( No ) ) - Yes $ of No $ Yes No (when supplying labor on site) Yes No Yes No (when supplying labor on site) Yes No (when supplying labor on site) Certified Approved Pending Mentor Extended Review Protégé Certified Rejected Approved (when supplying labor on site) Pending Mentor Extended Review Protégé Rejected Contractor Certification Project Architect/Engineer Review KSU-OUA Project Manager Review Associate Director KSU-OUA Approval Prime Contractor certifies that the information above is true and complete. Project A/E has reviewed the information above and finds it in compliance with the Contract Documents as shown or as noted. - KSU-OUA Project Manager has reviewed the information above and finds it in compliance with the Contract Documents as shown or as noted. - Subcontractors and Material Suppliers are accepted, as shown or as noted, for use on this project subject to revocation for cause. - Signature Signature Signature - Signature Date - Date Date Date If the Project is being administered using OAKS CI, then use this form to gather all required information first, and then enter it into the OAKS CI “Subcontractor Supplier Declaration” business process in lieu of this paper form. Kent State University Office of the University Architect Subcontractor and Material Supplier Declaration 1 Attach additional sheets as necessary. 2 Check all that apply. Page 2 of 2