Change Directive (Field Work Order) Form Suite 101 Harbourt Hall • 615 Loop Road • P. O. Box 5190 • Kent, Ohio 44242-0001 v: 330-672-3880 • f: 330-672-2648 • web site: www.kent.edu/universityarchitect OFFICE OF THE UNIVERSITY ARCHITECT Field Work Order No. To Project No. Project Name Basis of Field Work Order Error / Omission Differing Site Condition Project Location Owner Request Field Resolution Contract Price (indicate if zero cost) Value Engineering Add: $ Campus Deduct: $ Cost Basis (check all that apply) Contract Time No Change Kent State University Days Added Days Deducted Time and Material Not to Exceed Fixed Price Allowance (described below) Unit Price Your company is authorized and directed to proceed with the following (attach additional sheets if needed): Justification: Special Notice: This Field Work Order identifies satisfaction of all compensation and time adjustments related to this change to the Work. Construction Manager (CM) Recommendation (if applicable) KENT STATE UNIVERSITY OFFICE OF THE UNIVERSITY ARCHITECT Name Office of the University Architect Project Manager Approval Signature Date Architect / Engineer (A / E) Recommendation Name Name Signature Signature Date Date Contractor Concurrence Name cc: KSU-OUA Director KSU-OUA Accounting Signature KSU-OUA 09/2012 Date CHANGE DIRECTIVE (FORMERLY FIELD WORK ORDER) FORM