Rehearsal Report Production: Suburbia Date: 1/31 Rehearsal #: 17 Location: KLT Stage Manager: Sarah Gumlak/Will Pickeral Rehearsal Start: 2:00 Rehearsal Break: 5:03 Rehearsal Start: 7:05 Rehearsal Break: 9:00 Total Rehearsal Time: 5:02 Lights: -They are pretty. Rehearsal Notes: -I have a Preset list, I just have to type it, hurray! -Trashcan, and anything else that moves should be spiked. -Jeff, you need to give Buff a little push on pg. 12 after "Let's go!" -If Something is spilling out, please pick it up. -No seriously, if something is spilling, pick it up, don't just stair at it. -Its way too late in the process to be stopping the run. If something is screwed up, fix it. -If you have a line that gets cut off, don’t stop talking untill you are actualy cut off. -Strike all hockey gear between Act I and II -You can drop the tops of the beer bottles, you don't need to hang on to them. -Hey, can we not throw the rice into the store, it doesn't have a roof, and never will. -SR trashcan is usable. -Coffe is hot, act like it. -Tim, don't actually shot the gun. -Line notes are attached. Properties: -Can we replace the revolver with a more contemporary gun please? -Cash Register needs to be plugged in. -Thanks for having everything ready for today. Costumes: -Thanks for taking care of Jeff's Wallet. Sound: Schedule: -Sign up for Res Booth hours please! -Karen, Eric, and Mike will be in space tomorrow at 9:00. Please come if you are avaible, even if its just for an hour or 2. Misc.: -Hey for anyone new: if a call is given, such as 5 minutes, the proper response is "Thank you 5 minutes". Nothing more, nothing less. Please do not tell me we actually have 6 minutes. Set: -It looks so pretty! -We need to spike and glow tape where necessary.