Rehearsal Report
Production: Suburbia
Date: 1/31
Rehearsal #: 17
Location: KLT
Stage Manager: Sarah Gumlak/Will Pickeral
Rehearsal Start:
2:00
Rehearsal Break:
5:03
Rehearsal Start:
7:05
Rehearsal Break:
9:00
Total Rehearsal Time:
5:02
Lights:
-They are pretty.
Rehearsal Notes:
-I have a Preset list, I just have to type it, hurray!
-Trashcan, and anything else that moves should be
spiked.
-Jeff, you need to give Buff a little push on pg. 12 after
"Let's go!"
-If Something is spilling out, please pick it up.
-No seriously, if something is spilling, pick it up, don't
just stair at it.
-Its way too late in the process to be stopping the run.
If something is screwed up, fix it.
-If you have a line that gets cut off, don’t stop talking
untill you are actualy cut off.
-Strike all hockey gear between Act I and II
-You can drop the tops of the beer bottles, you don't
need to hang on to them.
-Hey, can we not throw the rice into the store, it
doesn't have a roof, and never will.
-SR trashcan is usable.
-Coffe is hot, act like it.
-Tim, don't actually shot the gun.
-Line notes are attached.
Properties:
-Can we replace the revolver with a more
contemporary gun please?
-Cash Register needs to be plugged in.
-Thanks for having everything ready for today.
Costumes:
-Thanks for taking care of Jeff's Wallet.
Sound:
Schedule:
-Sign up for Res Booth hours please!
-Karen, Eric, and Mike will be in space tomorrow at
9:00. Please come if you are avaible, even if its just for
an hour or 2.
Misc.:
-Hey for anyone new: if a call is given, such as 5
minutes, the proper response is "Thank you 5
minutes". Nothing more, nothing less. Please do not
tell me we actually have 6 minutes.
Set:
-It looks so pretty!
-We need to spike and glow tape where necessary.