$56 Annual Report Summary

advertisement
$56
Annual Report Summary
4000 Gateway Centre Blvd., Suite 100, Pinellas Park, FL 33782
Phone (727) 570-5151 Suncom 513-5066 FAX (727) 570-5118
www.tbrpc.org
DRI #217 - HARBOUR ISLAND
CITY OF TAMPA
RY 2006-07
On February 18, 1982, the Tampa City Council granted a Development Order (DRI #69) to American
Centennial Insurance Company for the redevelopment of a 178-acre island located immediately south of
Tampa’s Central Business District, at the mouth of the Hillsborough River. On December 18, 1986, the City
Council granted Harbour Island, Inc. an amended Development Order (DRI #133/Harbour Island Phase II).
On October 12, 1989, the City Council granted an amendment to authorize an aquarium land use and
incorporate a land use trade-off mechanism.
On April 18, 1994, Tampa City Council adopted Ordinance No. 94-68 as a Substantial Deviation
Development Order (SDDO) to: incorporate an additional 400 wet boat slips; add a 175-seat attraction
facility; extend the Development Order expiration date to 2005; combine the unbuilt remainder of the
development into one phase with an established build-out date of November 30, 2000; and alter the Master
Plan accordingly. This SDDO is referred to as DRI #217.
The SDDO has been amended twice, most recently on July 22, 1998 (Resolution No. 98-158). The
amendments have: altered the location of boat slips and 175-seat attraction facility; modified development
parameters; and further extended the buildout and Development Order expiration dates. The applicant
has subsequently and additionally taken advantage of the “automatic” three-year extension of the project
buildout (to December 31, 2010) and Development Order expiration dates (to December 31, 2015).
The project is approved to contain:
BUILDOUT
RESIDENTIAL
(Units)
OFFICE
(Sq. Ft.)
HOTEL
(Rooms)
CONF. CTR.
(Rooms)
ATHLETIC FAC.
(Sq. Ft.)
COMMERCIAL
(Sq. Ft.)
BOAT SLIPS
(#)
Dec. 31, 2010
4,650
1,000,000
550
350
30,000
240,000*
500
* - could potentially include square footage associated with a 175-seat attraction facility.
PROJECT STATUS
Development during Reporting Period: completed 336 residential units and 4,472 sq. ft. of Office.
Cumulative Development: 2,360 residential units, 299 hotel rooms, 54,540 sq. ft. of commercial space,
484,044 sq. ft. of office space, 261 boat slips and a 30,000 sq. ft. athletic club.
Projected Development: no anticipated development activities were identified.
SUMMARY OF DEVELOPMENT ORDER CONDITIONS
1.
The developer has expressed their continued compliance with the wetland mitigation requirements
identified in Condition 3.A.1.e.
2.
Condition 3.A.1.f.(I) authorizes the developer to construct only 300 boat slips during Phase I (the
100 originally approved plus 200 additional slips). Approval of the Phase II boat slip expansion
(beyond 300 slips) will be contingent upon further approval by the FDEP.
3.
In accordance with Condition 3.A.1.j.(iii), the developer is required to provide TBRPC with all
future dredge & fill and boat slip construction permits.
4.
The developer is required to provide a copy of the “slip lease agreement,” standard deed restrictions,
hurricane evacuation procedures, a hurricane damage probability statement, wetland mitigation
progress reports and sanitation device procedures with the first annual report following any
occupancy in the boat slip expansion area (i.e. beyond 300 slips), consistent with Condition 3.A.1.m.
(of Ordinance No. 94-68).
5.
In accordance with Condition 3.A. (of Ordinance No. 9464-A), the developer has the results of the
traffic monitoring conducted on April 12, 2006. The results indicated that the project is currently
generating 1,943 of the approved 4,324 p.m. peak hour trips (i.e. 44.9%) and 21,913 of the approved
34,670 daily trips (i.e. 63.2%). Results of the annual traffic monitoring shall continue to be provided
within all future Annual Reports.
6.
Condition 4.B. of the Development Order requires submittal of an Annual Report on “on the
anniversary of the effective date [i.e. February 18th] until and including such time as all terms and
conditions of this Development Order are satisfied.” It is hereby stated the Annual Report, which
was due on February 18, 2007, was not received until August 3, 2007.
DEVELOPER OF RECORD
Harbour Island, Inc., 800 S. Harbour Island Boulevard, Tampa, FL 33602 is the firm responsible for
adhering to the conditions of the Development Order.
DEVELOPMENT ORDER COMPLIANCE
The project appears to be proceeding in a manner consistent with the Development Order with the exception
of the issue identified as Summary of Development Order Condition #6, above. The City of Tampa is
responsible for ensuring compliance with the terms and conditions of the Development Order.
Download