DRI #196 - TOWERMARC/WATERS AVENUE
HILLSBOROUGH COUNTY
RY 2003-04
On August 22, 1989, Hillsborough County granted a Development Order (Resolution No. R890203) to Towermarc Corporation for a three-phase, 198.9-acre, multi-use development in
northwest Hillsborough County, generally located north of Waters Avenue and west of Anderson
Road. The project received specific approval for Phase I and conceptual approval of the remaining
two phases. The Development Order was subsequently appealed by the Council on the basis of
transportation analysis. After revising the transportation mitigation provisions of the Order, the
County adopted an amendment (Resolution No. R89-0309) whereby granting the same overall
development approvals at project build-out, but reduced the extent of Phase I approval.
The Development Order has been amended five times, the latest adopted on October 10, 1995
(Resolution R95-232). The amendments have cumulatively: extended the Phase I build-out and
development commencement dates by four years, 11 months and 15 days; recognized that the
County has elected to design and construct the Required Improvement; modified the land use
trade-off mechanism to allow multi-family residential development; and removed land from the
master site plan associated with construction of the Veteran’s Expressway. The Development
Order expires on July 31, 2007.
The applicant previously submitted a correspondence dated July 15, 2003 from Mr. James Hoster
of J. Hoster Mobility. The correspondence essentially documented the conversion of 603,000 sq.
ft. of service center space and 167,000 sq. ft. of office space for an additional allotment of 373,216
sq. ft. of retail space. The trip generation estimates from the resulting conversion do not exceed
the project’s approved 1,913 p.m. peak hour trips.
The revised phasing schedule is as follows:
PHASE(BUILDOUT)
OFFICE
(Sq. Ft.)
RETAIL
(Sq. Ft.)
OFFICE SVC.
CTR. (Sq. Ft.)
COMM. SVC.
CTR. (Sq. Ft.)
HOTEL
(Rooms)
I
(1997-2000)
600,000
403,216
0
0
0
II
(1996-2002)
963,000
40,000
550,550
296,450
250
TOTAL
1,563,000
443,216
550,500
296,450
250
* NOTE: A maximum of 815 multi-family units can be substituted with aforementioned land uses through the adopted land use matrix,
as identified in Resolution No. 95-232.
PROJECT STATUS
Development this Reporting Year: a 108,000 sq. ft. Capital One office facility and a 49,603 sq. ft.
Waccamaw (retail) facility were constructed.
Cumulative Development: it has been reported that 364,832 sq. ft. of retail space and 597,000 sq.
ft. of office space have been constructed.
Projected Development: development will coincide with market demand.
SUMMARY OF DEVELOPMENT ORDER CONDITIONS
1.
The developer did not submit the p.m. peak hour traffic counts at project entrances as
required by Condition 4.B.15. The applicant attributed the lack of submittal to the fact that
no development activity occurred on site during the reporting year. Last year’s traffic
monitoring revealed that the project was generating 1,376 of the approved 1,913 external
p.m. peak hour trips.
2.
The developer previously submitted a “Transportation Systems Management Plan”
(TSMP) with the RYs 1999-2003 Annual Report in accordance with Condition 4.B.16.
The TSMP did not address traffic reduction techniques such as car pooling, van pooling,
telecommuting and/or flex scheduling, which is the primary purpose for the Plan. The
information was limited to the HARTline bus routes and schedules and the site-oriented
pedestrian and bicycle amenities.
3.
The developer has previously submitted a Stormwater Management Plan, as required by
Condition 4.E.1.
4.
The developer submitted only a single installment of the semi-annual surface water quality
monitoring required in accordance with Condition 4.E.2. The monitoring event was
conducted on April 14, 2003. The frequency of water quality monitoring shall resume
semi-annually if the buildout date is extended and development activity continues.
5.
Condition 4.F.4.c. requires the developer to conduct semiannual monitoring of mitigation
areas and littoral shelves for four years with a minimum of 80 percent survival rate.
Confirmation regarding the survival rate of these areas has not been provided within the
Annual Report. However, previous results have indicated an estimated 90 to 100 percent
survival rate.
6.
Condition 4.K. requires the developer to provide an affordable housing analysis prior to
commencement of Phase II.
7.
The buildout dates associated with Phase I and Phase II of development lapsed in 2000 and
2002, respectively. The developer will be required to submit a Notice of Proposed Change
application to request a further extension of the phase buildout date(s). No further permits
shall be issued by Hillsborough County until or unless the Development Order has been
amended to extend the buildout date.
DEVELOPER OF RECORD
Waters Avenue Land Partners, Ltd., 225 Franklin Street, 26th Floor, Boston, MA 02110-2801 is
the entity responsible for fulfilling the requirements of the Development Order.
DEVELOPMENT ORDER COMPLIANCE
The project appears to be proceeding in a manner consistent with the Development Order. However,
if the developer intends to construct further entitlements, an extension of the buildout period will
first be required as identified in Summary of Development Order Condition #7, above. Hillsborough
County is responsible for ensuring compliance with the terms and conditions of the Development
Order.