Appendix J Cost Estimates Summary of Cost Estimates for Remedial Alternatives on Page J-2 Cost Estimates for Remedial Alternatives on Pages J-3 to J-14 Cost Estimates Assumptions on Pages J-15 to J-36 DMM Backup Sheets on Pages J-37 to J-110 Draft Contractor Document: Subject to Continuing Agency Review Summary of Cost Estimates for Remedial Alternatives Focused Feasibility Study Lower Passaic River Restoration Project 1 Alternative Alternative 1: Dredging Alternative 2: Capping 5 Alternative 3: NCC - Authorized Channel Alternative 4: NCC - Current Use Channel Alternative 5: NCC - Future Use Channel Alternative 6: NCC - Future Use Channel + Dredging Primary Erosional and Primary Inventory Zones DMM Scenario Total Capital Costs Total DMM Costs 2 Total O&M Costs TOTAL COST A 3 $1,092,000,000 $763,000,000 $91,000,000 $1,947,000,000 B 4 $1,092,000,000 $1,085,000,000 $95,000,000 $2,272,000,000 A $537,000,000 $230,000,000 $96,000,000 $863,000,000 B $537,000,000 $477,000,000 $97,000,000 $1,111,000,000 A $901,000,000 $522,000,000 $94,000,000 $1,518,000,000 B $901,000,000 $847,000,000 $97,000,000 $1,845,000,000 A $754,000,000 $418,000,000 $95,000,000 $1,267,000,000 B $754,000,000 $744,000,000 $97,000,000 $1,596,000,000 A $839,000,000 $489,000,000 $93,000,000 $1,421,000,000 B $839,000,000 $814,000,000 $96,000,000 $1,749,000,000 A $879,000,000 $524,000,000 $93,000,000 $1,496,000,000 B $879,000,000 $849,000,000 $96,000,000 $1,824,000,000 Notes: DMM = Dredged Material Management 2 O&M = Operation and Maintenance 3 DMM Scenario A: Nearshore Confined Disposal 4 DMM Scenario B: Nearshore Confined Disposal, Storage, Thermal Treatment, and Beneficial Use 5 NCC = Navigationally Constrained Capping 1 Values are rounded to the nearest million. Cost Estimates Lower Passaic River Restoration Project J-2 June 2007 Alternative 1: Dredging DMM Scenario A Focused Feasibility Study Lower Passaic River Restoration Project Component Unit Unit Cost Percentage Core Core Boring Day Day Month LS Percentage 8% $26,241 $5,741 $8,470 $6,500 $6,500 $50,000 $300,000 2% 663,170,900 4,874 1,219 64 16 16 12 1 663,170,900 $53,053,672 $127,899,259 $6,998,435 $542,080 $104,000 $104,000 $600,000 $300,000 $13,263,418 $202,864,864 Mobilization/Demobilization Dredge Equipment Mobilization/Demobilization Capping Equipment Mobilization Monitoring Equipment Mobilization Debris Removal Equipment Mobilization/Demobilization Shoreline Protection Equipment Mobilization/Demobilization New Season Restart Total Mobilization/Demobilization LS LS LS LS LS LS $200,000 $200,000 $16,700 $50,000 $200,000 $266,675 3 1 1 1 1 9 $600,000 $200,000 $16,700 $50,000 $200,000 $2,400,075 $3,466,775 Dredging Dredging Debris removal/transport/off-loading/disposal Testing & Monitoring Utility Protection Bridge/Abutment/Bulkhead Protection Barge transport of dredged material Dredged material off-loading Total Dredging CY Ton EA LF LF CY CY $25 $300 $4,881,105 $50 $610 $5 $7 10,960,000 8,000 9 280,000 44,000 13,700,000 13,700,000 $274,000,000 $2,400,000 $43,929,945 $14,000,000 $26,840,000 $68,500,000 $95,900,000 $525,569,945 Backfilling or Capping Material purchase and delivery Material placement Confirmation coring Armor Layer Purchase and Placement Mudflat reconstruction material purchase and delivery Mudflat reconstruction material placement Natural Shoreline Biostabilization Total Backfill and/or Sand Cap CY CY Core CY CY CY LF $30 $20 $8,941 $150 $60 $40 $215 2,100,453 2,100,453 400 0 208,265 208,265 21,900 $63,013,596 $42,009,064 $3,576,500 0 $12,495,912 $8,330,608 $4,708,500 $134,134,180 CAPITAL COSTS A. Pre-Construction Activities Design Pre-Design Investigation - Chemical Pre-Design Investigation - Geological Pre-Design Investigation - Geotechnical Subbottom Geophysics and Bathymetric Survey Video Survey for Debris Identification Pre-Construction Oversight Contractor Work Plans and Submittals Permitting (Equivalency) and Legal Total Pre-Construction Activities B. C. D. # of Units Cost Subtotal Capital Costs $866,035,764 E. Construction Management Percentage 8% 663,170,900 $53,053,672 F. Contingency Percentage 20% 866,035,764 $173,207,153 TOTAL CAPITAL COSTS $1,092,296,588 DMM COSTS 1 Dredged Material Management G. TOTAL DMM COSTS $763,000,000 O&M COSTS H. Annual O&M Mobilization/Demobilization - Monitoring Equipment Mobilization/Demobilization - Capping Equipment Bathymetric Surveys Surface Sediment Sampling and Analysis Biological Monitoring Water column sampling & analysis Habitat recolonization using SPI Groundwater Monitoring (Well Sampling and Testing) Cap maintenance Monitoring reports (including lab reporting) Community Outreach EA EA Day Sample LS Sample Location Sample CY EA LS $16,900 $40,000 $6,500 $3,011 $2,688,390 $1,051 $2,000 $1,500 $30 $450,000 $80,000 1 0 16 400 1 35 80 144 0 1 1 Subtotal Annual O&M $16,900 $0 $104,000 $1,204,300 $2,688,390 $36,986 $160,000 $216,000 $0 $450,000 $80,000 $4,956,576 Contingency Percentage 20% 4,956,576 $991,315 $5,947,892 $91,433,674 TOTAL ANNUAL O&M COSTS PRESENT WORTH ANNUAL O&M (5% Rate over 30 Years) TOTAL PRESENT WORTH COSTS $1,946,730,262 Notes: 1 See Scenario 1A DMM Backup Sheets for details. Cost Estimates Lower Passaic River Restoration Project Alternative 1 - DMM Scenario A J-3 June 2007 Alternative 1: Dredging DMM Scenario B Focused Feasibility Study Lower Passaic River Restoration Project Component Unit Unit Cost Percentage Core Core Boring Day Day Month LS Percentage 8% $26,241 $5,741 $8,470 $6,500 $6,500 $50,000 $300,000 2% 663,170,900 4,874 1,219 64 16 16 12 1 663,170,900 $53,053,672 $127,899,259 $6,998,435 $542,080 $104,000 $104,000 $600,000 $300,000 $13,263,418 $202,864,864 Mobilization/Demobilization Dredge Equipment Mobilization/Demobilization Capping Equipment Mobilization Monitoring Equipment Mobilization Debris Removal Equipment Mobilization/Demobilization Shoreline Protection Equipment Mobilization/Demobilization New Season Restart Total Mobilization/Demobilization LS LS LS LS LS LS $200,000 $200,000 $16,700 $50,000 $200,000 $266,675 3 1 1 1 1 9 $600,000 $200,000 $16,700 $50,000 $200,000 $2,400,075 $3,466,775 Dredging Dredging Debris removal/transport/off-loading/disposal Testing & Monitoring Utility Protection Bridge/Abutment/Bulkhead Protection Barge transport of dredged material Dredged material off-loading Total Dredging CY Ton EA LF LF CY CY $25 $300 $4,881,105 $50 $610 $5 $7 10,960,000 8,000 9 280,000 44,000 13,700,000 13,700,000 $274,000,000 $2,400,000 $43,929,945 $14,000,000 $26,840,000 $68,500,000 $95,900,000 $525,569,945 Backfilling or Capping Material purchase and delivery Material placement Confirmation coring Armor Layer Purchase and Placement Mudflat reconstruction material purchase and delivery Mudflat reconstruction material placement Natural Shoreline Biostabilization Total Backfill and/or Sand Cap CY CY Core CY CY CY LF $30 $20 $8,941 $150 $60 $40 $215 2,100,453 2,100,453 400 0 208,265 208,265 21,900 $63,013,596 $42,009,064 $3,576,500 $0 $12,495,912 $8,330,608 $4,708,500 $134,134,180 CAPITAL COSTS A. Pre-Construction Activities Design Pre-Design Investigation - Chemical Pre-Design Investigation - Geological Pre-Design Investigation - Geotechnical Subbottom Geophysics and Bathymetric Survey Video Survey for Debris Identification Pre-Construction Oversight Contractor Work Plans and Submittals Permitting (Equivalency) and Legal Total Pre-Construction Activities B. C. D. # of Units Cost Subtotal Capital Costs $866,035,764 E. Construction Management Percentage 8% 663,170,900 $53,053,672 F. Contingency Percentage 20% 866,035,764 $173,207,153 TOTAL CAPITAL COSTS $1,092,296,588 DMM COSTS 1 Dredged Material Management G. TOTAL DMM COSTS $1,085,000,000 O&M COSTS H. Annual O&M Mobilization/Demobilization - Monitoring Equipment Mobilization/Demobilization - Capping Equipment Bathymetric Surveys Surface Sediment Sampling and Analysis Biological Monitoring Water column sampling & analysis Habitat recolonization using SPI Groundwater Monitoring (Well Sampling and Testing) Cap maintenance Monitoring reports (including lab reporting) Community Outreach EA EA Day Sample LS Sample Location Sample CY EA LS $16,900 $40,000 $6,500 $3,011 $2,688,390 $1,051 $2,000 $1,500 $30 $450,000 $80,000 1 1 16 420 1 40 100 144 1,084 1 1 Subtotal Annual O&M $16,900 $40,000 $104,000 $1,264,515 $2,688,390 $41,610 $200,000 $216,000 $32,525 $450,000 $80,000 $5,133,940 Contingency Percentage 20% 5,133,940 $1,026,788 $6,160,727 $94,705,480 TOTAL ANNUAL O&M COSTS PRESENT WORTH ANNUAL O&M (5% Rate over 30 Years) TOTAL PRESENT WORTH COSTS $2,272,002,069 Notes: 1 See Scenario 1B DMM Backup Sheets for details. Cost Estimates Lower Passaic River Restoration Project Alternative 1 - DMM Scenario B J-4 June 2007 Alternative 2: Capping DMM Scenario A Focused Feasibility Study Lower Passaic River Restoration Project Component Unit Unit Cost Percentage Core Core Core Boring Day Day Month LS Percentage 8% $7,041 $9,441 $5,741 $8,470 $6,500 $6,500 $50,000 $300,000 2% 360,993,269 1,219 979 1,219 64 16 16 12 1 360,993,269 $28,879,462 $8,583,135 $9,242,864 $6,998,435 $542,080 $104,000 $104,000 $600,000 $300,000 $7,219,865 $62,573,842 Mobilization/Demobilization Dredge Equipment Mobilization/Demobilization Capping Equipment Mobilization/Demobilization Monitoring Equipment Mobilization Debris Removal Equipment Mobilization/Demobilization New Season Restart Total Mobilization/Demobilization LS LS LS LS LS $200,000 $200,000 $16,700 $50,000 $166,675 1 2 1 1 4 $200,000 $400,000 $16,700 $50,000 $666,700 $1,333,400 Dredging Dredging Debris removal/transport/off-loading/disposal Utility protection Bridge/Abutment/Bulkhead Protection Barge transport of dredged material Dredged material off-loading Total Dredging CY Ton LF LF CY CY $25 $200 $50 $610 $5 $7 1,142,000 2,000 280,000 0 1,427,500 1,427,500 $28,550,000 $400,000 $14,000,000 $0 $7,137,500 $9,992,500 $60,080,000 Backfilling or Capping Material purchase and delivery Material placement Testing & monitoring during placement Confirmation coring Armor Layer Purchase and Placement Mudflat reconstruction purchase and delivery Mudflat reconstruction placement Natural Shoreline Biostabilization Total Backfill and/or Sand Cap CY CY EA Core CY CY CY LF $30 $20 $4,881,105 $8,941 $150 $60 $40 $215 3,150,680 3,150,680 4 400 622,733 208,265 208,265 21,900 $94,520,394 $63,013,596 $19,524,420 $3,576,500 $93,409,939 $12,495,912 $8,330,608 $4,708,500 $299,579,869 CAPITAL COSTS A. Pre-Construction Activities Design Pre-Design Investigation - Chemical Pre- Design Investigation - Chemical (Pre-Dredging Areas) Pre-Design Investigation - Geological Pre-Design Investigation - Geotechnical Subbottom Geophysics and Bathymetric Survey Video Survey for Debris Identification Pre-Construction Oversight Contractor Work Plans and Submittals Permitting (Equivalency) and Legal Total Pre-Construction Activities B. C. D. # of Units Cost Subtotal Capital Costs $423,567,111 E. Construction Management Percentage 8% 360,993,269 $28,879,462 F. Contingency Percentage 20% 423,567,111 $84,713,422 $537,159,994 TOTAL CAPITAL COSTS DMM COSTS 1 Dredged Material Management G. TOTAL DMM COSTS $230,000,000 O&M COSTS H. Annual O&M Mobilization/Demobilization - Monitoring Equipment Mobilization/Demobilization - Capping Equipment Bathymetric Surveys Surface Sediment Sampling and Analysis Biological Monitoring Water column sampling & analysis Habitat recolonization using SPI Groundwater Monitoring (Well Sampling and Testing) Cap maintenance Monitoring reports (including lab reporting) Community Outreach EA EA Day Sample LS Sample Location Sample CY EA LS $16,900 $40,000 $6,500 $3,011 $2,688,390 $1,051 $2,000 $1,500 $30 $450,000 $80,000 1 1 16 420 1 35 80 144 4,433 1 1 Subtotal Annual O&M $5,219,786 Contingency Percentage 20% 5,219,786 $1,043,957 $6,263,743 $96,289,090 TOTAL ANNUAL O&M COSTS PRESENT WORTH ANNUAL O&M (5% Rate over 30 Years) TOTAL PRESENT WORTH COSTS Notes: 1 See Scenario 2A DMM Backup Sheets for details. Cost Estimates Lower Passaic River Restoration Project $16,900 $40,000 $114,000 $1,264,515 $2,688,390 $46,986 $170,000 $216,000 $132,995 $450,000 $80,000 $863,449,084 Alternative 2 - DMM Scenario A J-5 June 2007 Alternative 2: Capping DMM Scenario B Focused Feasibility Study Lower Passaic River Restoration Project Component Unit Unit Cost Percentage Core Core Core Boring Day Day Month LS Percentage 8% $7,041 $9,441 $5,741 $8,470 $6,500 $6,500 $50,000 $300,000 2% 360,993,269 1,219 979 1,219 64 16 16 12 1 360,993,269 $28,879,462 $8,583,135 $9,242,864 $6,998,435 $542,080 $104,000 $104,000 $600,000 $300,000 $7,219,865 $62,573,842 Mobilization/Demobilization Dredge Equipment Mobilization/Demobilization Capping Equipment Mobilization/Demobilization Monitoring Equipment Mobilization Debris Removal Equipment Mobilization/Demobilization New Season Restart Total Mobilization/Demobilization LS LS LS LS LS $200,000 $200,000 $16,700 $50,000 $166,675 1 2 1 1 4 $200,000 $400,000 $16,700 $50,000 $666,700 $1,333,400 Dredging Dredging Debris removal/transport/off-loading/disposal Utility protection Bridge/Abutment/Bulkhead Protection Barge transport of dredged material Dredged material off-loading Total Dredging CY Ton LF LF CY CY $25 $200 $50 $610 $5 $7 1,142,000 2,000 280,000 0 1,427,500 1,427,500 $28,550,000 $400,000 $14,000,000 $0 $7,137,500 $9,992,500 $60,080,000 Backfilling or Capping Material purchase and delivery Material placement Testing & monitoring during placement Confirmation coring Armor Layer Purchase and Placement Mudflat reconstruction purchase and delivery Mudflat reconstruction placement Natural Shoreline Biostabilization Total Backfill and/or Sand Cap CY CY EA Core CY CY CY LF $30 $20 $4,881,105 $8,941 $150 $60 $40 $215 3,150,680 3,150,680 4 400 622,733 208,265 208,265 21,900 $94,520,394 $63,013,596 $19,524,420 $3,576,500 $93,409,939 $12,495,912 $8,330,608 $4,708,500 $299,579,869 CAPITAL COSTS A. Pre-Construction Activities Design Pre-Design Investigation - Chemical Pre- Design Investigation - Chemical (Pre-Dredging Areas) Pre-Design Investigation - Geological Pre-Design Investigation - Geotechnical Subbottom Geophysics and Bathymetric Survey Video Survey for Debris Identification Pre-Construction Oversight Contractor Work Plans and Submittals Permitting (Equivalency) and Legal Total Pre-Construction Activities B. C. D. # of Units Cost Subtotal Capital Costs $423,567,111 E. Construction Management Percentage 8% 360,993,269 $28,879,462 F. Contingency Percentage 20% 423,567,111 $84,713,422 $537,159,994 TOTAL CAPITAL COSTS DMM COSTS 1 Dredged Material Management G. TOTAL DMM COSTS $477,000,000 O&M COSTS H. Annual O&M Mobilization/Demobilization - Monitoring Equipment Mobilization/Demobilization - Capping Equipment Bathymetric Surveys Surface Sediment Sampling and Analysis Biological Monitoring Water column sampling & analysis Habitat recolonization using SPI Groundwater Monitoring (Well Sampling and Testing) Cap maintenance Monitoring reports (including lab reporting) Community Outreach EA EA Day Sample LS Sample Location Sample CY EA LS $16,900 $40,000 $6,500 $3,011 $2,688,390 $1,051 $2,000 $1,500 $30 $450,000 $80,000 1 1 16 400 1 40 100 144 5,517 1 1 Subtotal Annual O&M $5,236,719 Contingency Percentage 20% 5,236,719 $1,047,344 $6,284,063 $96,601,454 TOTAL ANNUAL O&M COSTS PRESENT WORTH ANNUAL O&M (5% Rate over 30 Years) TOTAL PRESENT WORTH COSTS Notes: 1 See Scenario 2B DMM Backup Sheets for details. Cost Estimates Lower Passaic River Restoration Project $16,900 $40,000 $114,000 $1,204,300 $2,688,390 $51,610 $210,000 $216,000 $165,520 $450,000 $80,000 $1,110,761,448 Alternative 2 - DMM Scenario B J-6 June 2007 Alternative 3: NCC - Authorized Channel DMM Scenario A Focused Feasibility Study Lower Passaic River Restoration Project Component Unit Unit Cost Percentage Core Core Boring Day Day Month LS Percentage 8% $26,241 $5,741 $8,470 $6,500 $6,500 $50,000 $300,000 2% 526,884,662 4,874 1,219 64 16 16 12 1 526,884,662 $42,150,773 $127,899,259 $6,998,435 $542,080 $104,000 $104,000 $600,000 $300,000 $10,537,693 $189,236,240 LS LS LS LS LS LS $200,000 $200,000 $16,700 $50,000 $200,000 $316,675 3 2 1 1 1 6 $600,000 $400,000 $16,700 $50,000 $200,000 $1,900,050 $3,166,750 Dredging Dredging Debris removal/transport/off-loading/disposal Utility protection Bridge/Abutment/Bulkhead Protection Barge transport of dredged material Dredged material off-loading Total Dredging CY Ton Per LF Per LF CY CY $25 $300 $50 $610 $5 $7 6,979,000 8,000 280,000 44,000 8,723,750 8,723,750 $174,475,000 $2,400,000 $14,000,000 $26,840,000 $43,618,750 $61,066,250 $322,400,000 Backfilling or Capping Material purchase and delivery Material placement Testing & monitoring during placement Confirmation coring Armor Purchase and Placement Mudflat reconstruction purchase and delivery Mudflat reconstruction placement Natural Shoreline Biostabilization Total Backfill and/or Sand Cap CY CY EA Core CY CY CY LF $30 $20 $4,881,105 $8,941 $150 $60 $40 $215 2,701,743 2,701,743 6 400 52,218 208,265 208,265 21,900 $81,052,276 $54,034,851 $29,286,630 $3,576,500 $7,832,636 $12,495,912 $8,330,608 $4,708,500 $201,317,912 CAPITAL COSTS A. Pre-Construction Activities Design Pre-Design Investigation - Chemical Pre-Design Investigation - Geological Pre-Design Investigation - Geotechnical Subbottom Geophysics and Bathymetric Survey Video Survey for Debris Identification Pre-Construction Oversight Contractor Work Plans and Submittals Permitting (Equivalency) and Legal Total Pre-Construction Activities B. C. D. Mobilization/Demobilization Dredge Equipment Mobilization/Demobilization Capping Equipment Mobilization/Demobilization Monitoring Equipment Mobilization Debris Removal Equipment Mobilization/Demobilization Shoreline Protection Equipment Mobilization/Demobilization New Season Restart Total Mobilization/Demobilization # of Units Cost Subtotal Capital Costs $716,120,902 E. Construction Management Percentage 8% 526,884,662 $42,150,773 F. Contingency Percentage 20% 716,120,902 $143,224,180 $901,495,856 TOTAL CAPITAL COSTS DMM COSTS Dredged Material Management 1 G. TOTAL DMM COSTS $522,000,000 O&M COSTS H. Annual O&M Mobilization/Demobilization - Monitoring Equipment Mobilization/Demobilization - Capping Equipment Bathymetric Surveys Surface Sediment Sampling and Analysis Biological Monitoring Water column sampling & analysis Habitat recolonization using SPI Groundwater Monitoring (Well Sampling and Testing) Cap maintenance Monitoring reports (including lab reporting) Community Outreach EA EA Day Sample LS Sample Location Sample CY EA LS $16,900 $40,000 $6,500 $3,011 $2,688,390 $1,051 $2,000 $1,500 $30 $450,000 $80,000 1 1 16 400 1 35 80 144 3,451 1 1 Subtotal Annual O&M $16,900 $40,000 $104,000 $1,204,300 $2,688,390 $36,986 $160,000 $216,000 $103,532 $450,000 $80,000 $5,100,109 Contingency Percentage 20% 5,100,109 $1,020,022 $6,120,131 $94,081,409 TOTAL ANNUAL O&M COSTS PRESENT WORTH ANNUAL O&M (5% Rate over 30 Years) $1,517,577,265 TOTAL PRESENT WORTH COSTS Notes: 1 See Scenario 3A DMM Backup Sheets for details. Cost Estimates Lower Passaic River Restoration Project Alternative 3 - DMM Scenario A J-7 June 2007 Alternative 3: NCC - Authorized Channel DMM Scenario B Focused Feasibility Study Lower Passaic River Restoration Project Component Unit Unit Cost Percentage Core Core Boring Day Day Month LS Percentage 8% $26,241 $5,741 $8,470 $6,500 $6,500 $50,000 $300,000 2% 526,884,662 4,874 1,219 64 16 16 12 1 526,884,662 $42,150,773 $127,899,259 $6,998,435 $542,080 $104,000 $104,000 $600,000 $300,000 $10,537,693 $189,236,240 Mobilization/Demobilization Dredge Equipment Mobilization/Demobilization Capping Equipment Mobilization/Demobilization Monitoring Equipment Mobilization Debris Removal Equipment Mobilization/Demobilization Shoreline Protection Equipment Mobilization/Demobilization New Season Restart Total Mobilization/Demobilization LS LS LS LS LS LS $200,000 $200,000 $16,700 $50,000 $200,000 $316,675 3 2 1 1 1 6 $600,000 $400,000 $16,700 $50,000 $200,000 $1,900,050 $3,166,750 Dredging Dredging Debris removal/transport/off-loading/disposal Utility protection Bridge/Abutment/Bulkhead Protection Barge transport of dredged material Dredged material off-loading Total Dredging CY Ton LF LF CY CY $25 $300 $50 $610 $5 $7 6,979,000 8,000 280,000 44,000 8,723,750 8,723,750 $174,475,000 $2,400,000 $14,000,000 $26,840,000 $43,618,750 $61,066,250 $322,400,000 Backfilling or Capping Material purchase and delivery Material placement Testing & monitoring during placement Confirmation coring Armor Purchase and Placement Mudflat reconstruction purchase and delivery Mudflat reconstruction placement Natural Shoreline Biostabilization Total Backfill and/or Sand Cap CY CY EA Core CY CY CY LF $30 $20 $4,881,105 $8,941 $150 $60 $40 $215 2,701,743 2,701,743 6 400 52,218 208,265 208,265 21,900 $81,052,276 $54,034,851 $29,286,630 $3,576,500 $7,832,636 $12,495,912 $8,330,608 $4,708,500 $201,317,912 CAPITAL COSTS A. Pre-Construction Activities Design Pre-Design Investigation - Chemical Pre-Design Investigation - Geological Pre-Design Investigation - Geotechnical Subbottom Geophysics and Bathymetric Survey Video Survey for Debris Identification Pre-Construction Oversight Contractor Work Plans and Submittals Permitting (Equivalency) and Legal Total Pre-Construction Activities B. C. D. # of Units Cost Subtotal Capital Costs $716,120,902 E. Construction Management Percentage 8% 526,884,662 $42,150,773 F. Contingency Percentage 20% 716,120,902 $143,224,180 $901,495,856 TOTAL CAPITAL COSTS DMM COSTS Dredged Material Management 1 G. TOTAL DMM COSTS $847,000,000 O&M COSTS H. Annual O&M Mobilization/Demobilization - Monitoring Equipment Mobilization/Demobilization - Capping Equipment Bathymetric Surveys Surface Sediment Sampling and Analysis Biological Monitoring Water column sampling & analysis Habitat recolonization using SPI Groundwater Monitoring (Well Sampling and Testing) Cap maintenance Monitoring reports (including lab reporting) Community Outreach EA EA Day Sample LS Sample Location Sample CY EA LS $16,900 $40,000 $6,500 $3,011 $2,688,390 $1,051 $2,000 $1,500 $30 $450,000 $80,000 1 1 16 420 1 40 100 144 4,535 1 1 Subtotal Annual O&M $16,900 $40,000 $104,000 $1,264,515 $2,688,390 $41,610 $200,000 $216,000 $136,057 $450,000 $80,000 $5,237,472 Contingency Percentage 20% 5,237,472 $1,047,494 $6,284,966 $96,615,338 TOTAL ANNUAL O&M COSTS PRESENT WORTH ANNUAL O&M (5% Rate over 30 Years) $1,845,111,194 TOTAL PRESENT WORTH COSTS Notes: 1 See Scenario 3B DMM Backup Sheets for details. Cost Estimates Lower Passaic River Restoration Project Alternative 3 - DMM Scenario B J-8 June 2007 Alternative 4: NCC - Current Use Channel DMM Scenario A Focused Feasibility Study Lower Passaic River Restoration Project Component Unit Unit Cost Percentage Core Core Core Boring Day Day Month LS Percentage 8% $26,241 $9,441 $5,741 $8,470 $6,500 $6,500 $50,000 $300,000 2% 473,959,988 2,198 991 1,219 64 16 16 12 1 473,959,988 $37,916,799 $57,678,000 $9,356,158 $6,998,435 $542,080 $104,000 $104,000 $600,000 $300,000 $9,479,200 $123,078,672 Mobilization/Demobilization Dredge Equipment Mobilization/Demobilization Capping Equipment Mobilization/Demobilization Monitoring Equipment Mobilization Debris Removal Equipment Mobilization/Demobilization Shoreline Protection Equipment Mobilization/Demobilization New Season Restart Total Mobilization/Demobilization LS LS LS LS LS LS $200,000 $200,000 $16,700 $50,000 $200,000 $316,675 3 2 1 1 1 4 $600,000 $400,000 $16,700 $50,000 $200,000 $1,266,700 $2,533,400 Dredging Dredging Debris removal/transport/off-loading/disposal Utility protection Bridge/Abutment/Bulkhead Protection Barge transport of dredged material Dredged material off-loading Total Dredging CY Ton LF LF CY CY $25 $300 $50 $610 $5 $7 4,432,000 3,500 280,000 19,800 5,540,000 5,540,000 $110,800,000 $1,050,000 $14,000,000 $12,078,000 $27,700,000 $38,780,000 $204,408,000 Backfilling or Capping Material purchase and delivery Material placement Testing & monitoring during placement Confirmation coring Armor Purchase and Placement Mudflat reconstruction purchase and delivery Mudflat reconstruction placement Natural Shoreline Biostabilization Total Backfill and/or Sand Cap CY CY EA Core CY CY CY LF $30 $20 $4,881,105 $8,941 $150 $60 $40 $215 3,080,424 3,080,424 4 400 429,076 208,265 208,265 21,900 $92,412,724 $61,608,483 $19,524,420 $3,576,500 $64,361,442 $12,495,912 $8,330,608 $4,708,500 $267,018,588 CAPITAL COSTS A. Pre-Construction Activities Design Pre-Design Investigation - Chemical - RM 0-2.5 Pre-Design Investigation - Chemical - RM 2.5-8.3 Pre-Design Investigation - Geological Pre-Design Investigation - Geotechnical Subbottom Geophysics and Bathymetric Survey Video Survey for Debris Identification Pre-Construction Oversight Contractor Work Plans and Submittals Permitting (Equivalency) and Legal Total Pre-Construction Activities B. C. D. # of Units Cost Subtotal Capital Costs $597,038,660 E. Construction Management Percentage 8% 473,959,988 $37,916,799 F. Contingency Percentage 20% 597,038,660 $119,407,732 $754,363,191 TOTAL CAPITAL COSTS DMM COSTS Dredged Material Management 1 G. TOTAL DMM COSTS $418,000,000 O&M COSTS H. Annual O&M Mobilization/Demobilization - Monitoring Equipment Mobilization/Demobilization - Capping Equipment Bathymetric Surveys Surface Sediment Sampling and Analysis Biological Monitoring Water column sampling & analysis Habitat recolonization using SPI Groundwater Monitoring (Well Sampling and Testing) Cap maintenance Monitoring reports (including lab reporting) Community Outreach EA EA Day Sample LS Sample Location Sample CY EA LS $16,900 $40,000 $6,500 $3,011 $2,688,390 $1,051 $2,000 $1,500 $30 $450,000 $80,000 1 1 16 400 1 35 80 144 4,593 1 1 Subtotal Annual O&M $16,900 $40,000 $104,000 $1,204,300 $2,688,390 $36,986 $160,000 $216,000 $137,778 $450,000 $80,000 $5,134,354 Contingency Percentage 20% 5,134,354 $1,026,871 $6,161,225 $94,713,132 TOTAL ANNUAL O&M COSTS PRESENT WORTH ANNUAL O&M (5% Rate over 30 Years) $1,267,076,323 TOTAL PRESENT WORTH COSTS Notes: See Scenario 4A DMM Backup Sheets for details. 1 Cost Estimates Lower Passaic River Restoration Project Alternative 4 - DMM Scenario A J-9 June 2007 Alternative 4: NCC - Current Use Channel DMM Scenario B Focused Feasibility Study Lower Passaic River Restoration Project Component Unit Unit Cost Percentage Core Core Core Boring Day Day Month LS Percentage 8% $26,241 $9,441 $5,741 $8,470 $6,500 $6,500 $50,000 $300,000 2% 473,959,988 2,198 991 1,219 64 16 16 12 1 473,959,988 $37,916,799 $57,678,000 $9,356,158 $6,998,435 $542,080 $104,000 $104,000 $600,000 $300,000 $9,479,200 $123,078,672 Mobilization/Demobilization Dredge Equipment Mobilization/Demobilization Capping Equipment Mobilization/Demobilization Monitoring Equipment Mobilization Debris Removal Equipment Mobilization/Demobilization Shoreline Protection Equipment Mobilization/Demobilization New Season Restart Total Mobilization/Demobilization LS LS LS LS LS LS $200,000 $200,000 $16,700 $50,000 $200,000 $316,675 3 2 1 1 1 4 $600,000 $400,000 $16,700 $50,000 $200,000 $1,266,700 $2,533,400 Dredging Dredging Debris removal/transport/off-loading/disposal Utility protection Bridge/Abutment/Bulkhead Protection Barge transport of dredged material Dredged material off-loading Total Dredging CY Ton LF LF CY CY $25 $300 $50 $610 $5 $7 4,432,000 3,500 280,000 19,800 5,540,000 5,540,000 $110,800,000 $1,050,000 $14,000,000 $12,078,000 $27,700,000 $38,780,000 $204,408,000 Backfilling or Capping Material purchase and delivery Material placement Testing & monitoring during placement Confirmation coring Armor Purchase and Placement Mudflat reconstruction purchase and delivery Mudflat reconstruction placement Natural Shoreline Biostabilization Total Backfill and/or Sand Cap CY CY EA Core CY CY CY LF $30 $20 $4,881,105 $8,941 $150 $60 $40 $215 3,080,424 3,080,424 4 400 429,076 208,265 208,265 21,900 $92,412,724 $61,608,483 $19,524,420 $3,576,500 $64,361,442 $12,495,912 $8,330,608 $4,708,500 $267,018,588 CAPITAL COSTS A. Pre-Construction Activities Design Pre-Design Investigation - Chemical - RM 0-2.5 Pre-Design Investigation - Chemical - RM 2.5-8.3 Pre-Design Investigation - Geological Pre-Design Investigation - Geotechnical Subbottom Geophysics and Bathymetric Survey Video Survey for Debris Identification Pre-Construction Oversight Contractor Work Plans and Submittals Permitting (Equivalency) and Legal Total Pre-Construction Activities B. C. D. # of Units Cost Subtotal Capital Costs $597,038,660 E. Construction Management Percentage 8% 473,959,988 $37,916,799 F. Contingency Percentage 20% 597,038,660 $119,407,732 $754,363,191 TOTAL CAPITAL COSTS DMM COSTS Dredged Material Management 1 G. TOTAL DMM COSTS $744,000,000 O&M COSTS H. Annual O&M Mobilization/Demobilization - Monitoring Equipment Mobilization/Demobilization - Capping Equipment Bathymetric Surveys Surface Sediment Sampling and Analysis Biological Monitoring Water column sampling & analysis Habitat recolonization using SPI Groundwater Monitoring (Well Sampling and Testing) Cap maintenance Monitoring reports (including lab reporting) Community Outreach EA EA Day Sample LS Sample Location Sample CY EA LS $16,900 $40,000 $6,500 $3,011 $2,688,390 $1,051 $2,000 $1,500 $30 $450,000 $80,000 1 1 16 420 1 40 100 144 5,677 1 1 Subtotal Annual O&M $16,900 $40,000 $104,000 $1,264,515 $2,688,390 $41,610 $200,000 $216,000 $170,303 $450,000 $80,000 $5,271,717 Contingency Percentage 20% 5,271,717 $1,054,343 $6,326,061 $97,247,061 TOTAL ANNUAL O&M COSTS PRESENT WORTH ANNUAL O&M (5% Rate over 30 Years) $1,595,610,252 TOTAL PRESENT WORTH COSTS Notes: See Scenario 4B DMM Backup Sheets for details. 1 Cost Estimates Lower Passaic River Restoration Project Alternative 4 - DMM Scenario B J - 10 June 2007 Alternative 5: NCC - Future Use Channel DMM Scenario A Focused Feasibility Study Lower Passaic River Restoration Project Component Unit Unit Cost Percentage Core Core Boring Day Day Month LS Percentage 8% $26,241 $5,741 $8,470 $6,500 $6,500 $50,000 $300,000 2% 482,354,982 4,874 1,219 64 16 16 12 1 482,354,982 $38,588,399 $127,899,259 $6,998,435 $367,432 $104,000 $104,000 $600,000 $300,000 $9,647,100 $184,608,624 Mobilization/Demobilization Dredge Equipment Mobilization/Demobilization Capping Equipment Mobilization/Demobilization Monitoring Equipment Mobilization Debris Removal Equipment Mobilization/Demobilization Shoreline Protection Equipment Mobilization/Demobilization New Season Restart Total Mobilization/Demobilization LS LS LS LS LS LS $200,000 $200,000 $16,700 $50,000 $200,000 $316,675 3 2 1 1 1 5 $600,000 $400,000 $16,700 $50,000 $200,000 $1,583,375 $2,850,075 Dredging Dredging Debris removal/transport/off-loading/disposal Utility protection Bridge/Abutment/Bulkhead Protection Barge transport of dredged material Dredged material off-loading Total Dredging CY Ton LF LF CY CY $25 $300 $50 $610 $5 $7 6,148,000 8,000 280,000 44,000 7,685,000 7,685,000 $153,700,000 $2,400,000 $14,000,000 $26,840,000 $38,425,000 $53,795,000 $289,160,000 Backfilling or Capping Material purchase and delivery Material placement Testing & monitoring during placement Confirmation coring Armor Purchase and Placement Mudflat reconstruction purchase and delivery Mudflat reconstruction placement Natural Shoreline Biostabilization Total Backfill and/or Sand Cap CY CY EA Core CY CY CY LF $30 $20 $4,881,105 $8,941 $150 $60 $40 $215 2,453,031 2,453,031 5 400 94,509 208,265 208,265 21,900 $73,590,932 $49,060,621 $24,405,525 $3,576,500 $14,176,309 $12,495,912 $8,330,608 $4,708,500 $190,344,907 CAPITAL COSTS A. Pre-Construction Activities Design Pre-Design Investigation - Chemical Pre-Design Investigation - Geological Pre-Design Investigation - Geotechnical Subbottom Geophysics and Bathymetric Survey Video Survey for Debris Identification Pre-Construction Oversight Contractor Work Plans and Submittals Permitting or Permitting Equivalent Total Pre-Construction Activities B. C. D. # of Units Cost Subtotal Capital Costs $666,963,606 E. Construction Management Percentage 8% 482,354,982 $38,588,399 F. Contingency Percentage 20% 666,963,606 $133,392,721 $838,944,726 TOTAL CAPITAL COSTS DMM COSTS Dredged Material Management 1 G. TOTAL DMM COSTS $489,000,000 O&M COSTS H. Annual O&M Mobilization/Demobilization - Monitoring Equipment Mobilization/Demobilization - Capping Equipment Bathymetric Surveys Surface Sediment Sampling and Analysis Biological Monitoring Water column sampling & analysis Habitat recolonization using SPI Groundwater Monitoring (Well Sampling and Testing) Cap maintenance Monitoring reports (including lab reporting) Community Outreach EA EA Day Sample LS Sample Location Sample CY EA LS $16,900 $40,000 $6,500 $3,011 $2,688,390 $1,051 $2,000 $1,500 $30 $450,000 $80,000 1 1 16 400 1 35 80 144 1,832 1 1 Subtotal Annual O&M $16,900 $40,000 $104,000 $1,204,300 $2,688,390 $36,986 $160,000 $216,000 $54,958 $450,000 $80,000 $5,051,535 Contingency Percentage 20% 5,051,535 $1,010,307 $6,061,842 $93,185,362 TOTAL ANNUAL O&M COSTS PRESENT WORTH ANNUAL O&M (5% Rate over 30 Years) $1,421,130,088 TOTAL PRESENT WORTH COSTS Notes: 1 See Scenario 5A DMM Backup Sheets for details. Cost Estimates Lower Passaic River Restoration Project Alternative 5 - DMM Scenario A J - 11 June 2007 Alternative 5: NCC - Future Use Channel DMM Scenario B Focused Feasibility Study Lower Passaic River Restoration Project Component Unit Unit Cost Percentage Core Core Boring Day Day Month LS Percentage 8% $26,241 $5,741 $8,470 $6,500 $6,500 $50,000 $300,000 2% 482,354,982 4,874 1,219 64 16 16 12 1 482,354,982 $38,588,399 $127,899,259 $6,998,435 $367,432 $104,000 $104,000 $600,000 $300,000 $9,647,100 $184,608,624 Mobilization/Demobilization Dredge Equipment Mobilization/Demobilization Capping Equipment Mobilization/Demobilization Monitoring Equipment Mobilization Debris Removal Equipment Mobilization/Demobilization Shoreline Protection Equipment Mobilization/Demobilization New Season Restart Total Mobilization/Demobilization LS LS LS LS LS LS $200,000 $200,000 $16,700 $50,000 $200,000 $316,675 3 2 1 1 1 5 $600,000 $400,000 $16,700 $50,000 $200,000 $1,583,375 $2,850,075 Dredging Dredging Debris removal/transport/off-loading/disposal Utility protection Bridge/Abutment/Bulkhead Protection Barge transport of dredged material Dredged material off-loading Total Dredging CY Ton LF LF CY CY $25 $300 $50 $610 $5 $7 6,148,000 8,000 280,000 44,000 7,685,000 7,685,000 $153,700,000 $2,400,000 $14,000,000 $26,840,000 $38,425,000 $53,795,000 $289,160,000 Backfilling or Capping Material purchase and delivery Material placement Testing & monitoring during placement Confirmation coring Armor Purchase and Placement Mudflat reconstruction purchase and delivery Mudflat reconstruction placement Natural Shoreline Biostabilization Total Backfill and/or Sand Cap CY CY EA Core CY CY CY LF $30 $20 $4,881,105 $8,941 $150 $60 $40 $215 2,453,031 2,453,031 5 400 94,509 208,265 208,265 21,900 $73,590,932 $49,060,621 $24,405,525 $3,576,500 $14,176,309 $12,495,912 $8,330,608 $4,708,500 $190,344,907 CAPITAL COSTS A. Pre-Construction Activities Design Pre-Design Investigation - Chemical Pre-Design Investigation - Geological Pre-Design Investigation - Geotechnical Subbottom Geophysics and Bathymetric Survey Video Survey for Debris Identification Pre-Construction Oversight Contractor Work Plans and Submittals Permitting or Permitting Equivalent Total Pre-Construction Activities B. C. D. # of Units Cost Subtotal Capital Costs $666,963,606 E. Construction Management Percentage 8% 482,354,982 $38,588,399 F. Contingency Percentage 20% 666,963,606 $133,392,721 $838,944,726 TOTAL CAPITAL COSTS DMM COSTS Dredged Material Management 1 G. TOTAL DMM COSTS $814,000,000 O&M COSTS H. Annual O&M Mobilization/Demobilization - Monitoring Equipment Mobilization/Demobilization - Capping Equipment Bathymetric Surveys Surface Sediment Sampling and Analysis Biological Monitoring Water column sampling & analysis Habitat recolonization using SPI Groundwater Monitoring (Well Sampling and Testing) Cap maintenance Monitoring reports (including lab reporting) Community Outreach EA EA Day Sample LS Sample Location Sample CY EA LS $16,900 $40,000 $6,500 $3,011 $2,688,390 $1,051 $2,000 $1,500 $30 $450,000 $80,000 1 1 16 420 1 40 100 144 2,916 1 1 Subtotal Annual O&M $16,900 $40,000 $104,000 $1,264,515 $2,688,390 $41,610 $200,000 $216,000 $87,483 $450,000 $80,000 $5,188,898 Contingency Percentage 20% 5,188,898 $1,037,780 $6,226,677 $95,719,291 TOTAL ANNUAL O&M COSTS PRESENT WORTH ANNUAL O&M (5% Rate over 30 Years) $1,748,664,017 TOTAL PRESENT WORTH COSTS Notes: 1 See Scenario 5B DMM Backup Sheets for details. Cost Estimates Lower Passaic River Restoration Project Alternative 5 - DMM Scenario B J - 12 June 2007 Alternative 6: NCC - Future Use Channel + Dredging Primary Erosional and Primary Inventory Zones DMM Scenario A Focused Feasibility Study Lower Passaic River Restoration Project Component Unit Unit Cost Percentage Core Core Boring Day Day Month LS Percentage 8% $26,241 $5,741 $8,470 $6,500 $6,500 $50,000 $300,000 2% 510,881,545 4,874 1,219 64 16 16 12 1 510,881,545 $40,870,524 $127,899,259 $6,998,435 $542,080 $104,000 $104,000 $600,000 $300,000 $10,217,631 $187,635,928 Mobilization/Demobilization Dredge Equipment Mobilization/Demobilization Capping Equipment Mobilization/Demobilization Monitoring Equipment Mobilization Debris Removal Equipment Mobilization/Demobilization Shoreline Protection Equipment Mobilization/Demobilization New Season Restart Total Mobilization/Demobilization LS LS LS LS LS LS $200,000 $200,000 $16,700 $50,000 $200,000 $316,675 3 2 1 1 1 6 $600,000 $400,000 $16,700 $50,000 $200,000 $1,900,050 $3,166,750 Dredging Dredging Debris removal/transport/off-loading/disposal Utility protection Bridge/Abutment/Bulkhead Protection Barge transport of dredged material Dredged material off-loading Total Dredging CY Ton LF LF CY CY $25 $300 $50 $610 $5 $7 7,010,000 8,000 280,000 44,000 8,762,500 8,762,500 $175,250,000 $2,400,000 $14,000,000 $26,840,000 $43,812,500 $61,337,500 $323,640,000 Backfilling or Capping Material purchase and delivery Material placement Testing & monitoring during placement Confirmation coring Armor Purchase and Placement Mudflat reconstruction purchase and delivery Mudflat reconstruction placement Natural Shoreline Biostabilization Total Backfill and/or Sand Cap CY CY EA Core CY CY CY LF $30 $20 $4,881,105 $8,941 $150 $60 $40 $215 2,367,524 2,367,524 6 400 48,670 208,265 208,265 21,900 $71,025,732 $47,350,488 $29,286,630 $3,576,500 $7,300,425 $12,495,912 $8,330,608 $4,708,500 $184,074,795 CAPITAL COSTS A. Pre-Construction Activities Design Pre-Design Investigation - Chemical Pre-Design Investigation - Geological Pre-Design Investigation - Geotechnical Subbottom Geophysics and Bathymetric Survey Video Survey for Debris Identification Pre-Construction Oversight Contractor Work Plans and Submittals Permitting or Permitting Equivalent Total Pre-Construction Activities B. C. D. # of Units Cost Subtotal Capital Costs $698,517,473 E. Construction Management Percentage 8% 510,881,545 $40,870,524 F. Contingency Percentage 20% 698,517,473 $139,703,495 TOTAL CAPITAL COSTS $879,091,492 DMM COSTS Dredged Material Management 1 G. TOTAL DMM COSTS $524,000,000 O&M COSTS H. Annual O&M Mobilization/Demobilization - Monitoring Equipment Mobilization/Demobilization - Capping Equipment Bathymetric Surveys Surface Sediment Sampling and Analysis Biological Monitoring Water column sampling & analysis Habitat recolonization using SPI Groundwater Monitoring (Well Sampling and Testing) Cap maintenance Monitoring reports (including lab reporting) Community Outreach EA EA Day Sample LS Sample Location Sample CY EA LS Subtotal Annual O&M $16,900 $40,000 $6,500 $3,011 $2,688,390 $1,051 $2,000 $1,500 $30 $450,000 $80,000 1 1 16 400 1 35 80 144 1,456 1 1 EA Contingency Percentage TOTAL ANNUAL O&M COSTS PRESENT WORTH ANNUAL O&M (5% Rate over 30 Years) $16,900 $40,000 $104,000 $1,204,300 $2,688,390 $36,986 $160,000 $216,000 $43,693 $450,000 $80,000 $5,040,269 20% 5,040,269 $1,008,054 $6,048,323 $92,977,545 TOTAL PRESENT WORTH COSTS $1,496,069,037 Notes: 1 See Scenario 6A DMM Backup Sheets for details. Cost Estimates Lower Passaic River Restoration Project Alternative 6 - DMM Scenario A J - 13 June 2007 Alternative 6: NCC - Future Use Channel + Dredging Primary Erosional and Primary Inventory Zones DMM Scenario B Focused Feasibility Study Lower Passaic River Restoration Project Component Unit Unit Cost Percentage Core Core Boring Day Day Month LS Percentage 8% $26,241 $5,741 $8,470 $6,500 $6,500 $50,000 $300,000 2% 510,881,545 4,874 1,219 64 16 16 12 1 510,881,545 $40,870,524 $127,899,259 $6,998,435 $542,080 $104,000 $104,000 $600,000 $300,000 $10,217,631 $187,635,928 Mobilization/Demobilization Dredge Equipment Mobilization/Demobilization Capping Equipment Mobilization/Demobilization Monitoring Equipment Mobilization Debris Removal Equipment Mobilization/Demobilization Shoreline Protection Equipment Mobilization/Demobilization New Season Restart Total Mobilization/Demobilization LS LS LS LS LS LS $200,000 $200,000 $16,700 $50,000 $200,000 $316,675 3 2 1 1 1 6 $600,000 $400,000 $16,700 $50,000 $200,000 $1,900,050 $3,166,750 Dredging Dredging Debris removal/transport/off-loading/disposal Utility protection Bridge/Abutment/Bulkhead Protection Barge transport of dredged material Dredged material off-loading Total Dredging CY Ton LF LF CY CY $25 $300 $50 $610 $5 $7 7,010,000 8,000 280,000 44,000 8,762,500 8,762,500 $175,250,000 $2,400,000 $14,000,000 $26,840,000 $43,812,500 $61,337,500 $323,640,000 Backfilling or Capping Material purchase and delivery Material placement Testing & monitoring during placement Confirmation coring Armor Purchase and Placement Mudflat reconstruction purchase and delivery Mudflat reconstruction placement Natural Shoreline Biostabilization Total Backfill and/or Sand Cap CY CY EA Core CY CY CY LF $30 $20 $4,881,105 $8,941 $150 $60 $40 $215 2,367,524 2,367,524 6 400 48,670 208,265 208,265 21,900 $71,025,732 $47,350,488 $29,286,630 $3,576,500 $7,300,425 $12,495,912 $8,330,608 $4,708,500 $184,074,795 CAPITAL COSTS A. Pre-Construction Activities Design Pre-Design Investigation - Chemical Pre-Design Investigation - Geological Pre-Design Investigation - Geotechnical Subbottom Geophysics and Bathymetric Survey Video Survey for Debris Identification Pre-Construction Oversight Contractor Work Plans and Submittals Permitting or Permitting Equivalent Total Pre-Construction Activities B. C. D. # of Units Cost Subtotal Capital Costs $698,517,473 E. Construction Management Percentage 8% 510,881,545 $40,870,524 F. Contingency Percentage 20% 698,517,473 $139,703,495 TOTAL CAPITAL COSTS $879,091,492 DMM COSTS Dredged Material Management 1 G. TOTAL DMM COSTS $849,000,000 O&M COSTS H. Annual O&M Mobilization/Demobilization - Monitoring Equipment Mobilization/Demobilization - Capping Equipment Bathymetric Surveys Surface Sediment Sampling and Analysis Biological Monitoring Water column sampling & analysis Habitat recolonization using SPI Groundwater Monitoring (Well Sampling and Testing) Cap maintenance Monitoring reports (including lab reporting) Community Outreach EA EA Day Sample LS Sample Location Sample CY EA LS Subtotal Annual O&M $16,900 $40,000 $6,500 $3,011 $2,688,390 $1,051 $2,000 $1,500 $30 $450,000 $80,000 1 1 16 420 1 40 100 144 2,541 1 1 EA Contingency Percentage TOTAL ANNUAL O&M COSTS PRESENT WORTH ANNUAL O&M (5% Rate over 30 Years) $16,900 $40,000 $104,000 $1,264,515 $2,688,390 $41,610 $200,000 $216,000 $76,217 $450,000 $80,000 $5,177,632 20% 5,177,632 $1,035,526 $6,213,158 $95,511,474 TOTAL PRESENT WORTH COSTS $1,823,602,966 Notes: 1 See Scenario 6B DMM Backup Sheets for details. Cost Estimates Lower Passaic River Restoration Project Alternative 6 - DMM Scenario B J - 14 June 2007 Cost Estimates Assumptions Cost Estimates Lower Passaic River Restoration Project J - 15 June 2007 COST ESTIMATE ASSUMPTIONS FOCUSED FEASIBILITY STUDY LOWER PASSAIC RIVER RESTORATION PROJECT General Assumptions • Costs do not include EPA oversight costs. • Costs are in Calendar Year 2006. A. • • Pre-Construction Activities Design o The cost of the Design is assumed to be 8% of construction phase capital costs (not including Pre-Design Investigation costs). Pre-Design Investigation (Chemical and Geological) o General: Daily rate for coring vessel ($7,100) is scaled by factor of 1.5 to calculate 12 hour daily rate. [Contractor communication.] Assumes four 20-foot cores taken per 12 hour day. Assumes 4 staff working in existing facility to process cores (4 hours per core). Assumes excess sediment will be transported/disposed at cost of $500 per cubic yard [internal database.] Estimates analytical/validation cost of $2,750 per sample ($2,400 chemical and $350 geological). [Internal database.] Estimates shipping cost of $75 per cooler (4 samples per cooler). [Internal database.] o Alternatives 1, 3, 5 and 6: Assumes 20-foot cores are analyzed at 2-foot intervals for geological parameters (grain size, percent moisture, TOC), VOCs, SVOCs, Metals/Cyanide, TCL Pesticides/PCBs, and Dioxins. Assumes approximate 80-foot triangular grid spacing of cores for chemical analysis and 160-foot triangular grid spacing of cores for geological parameters analysis. o Alternative 2: Assumes 20-foot cores are analyzed at 2-foot intervals for geological parameters (grain size, percent moisture, TOC). Assumes approximate 160-foot triangular grid spacing of cores for chemical and geological parameters analysis. Areas without armor: assumes that the first two 2-foot core intervals are analyzed for VOCs, SVOCs, Metals/Cyanide, TCL Pesticides/PCBs, and dioxins. Areas with armor and mudflats: assumes that the first three 2-foot core intervals are analyzed for VOCs, SVOCs, Metals/Cyanide, Cost Estimates Lower Passaic River Restoration Project J - 16 June 2007 TCL Pesticides/PCBs, and dioxins. Also assumes approximate 80foot triangular grid spacing of cores for chemical analysis. o Alternative 4: For RM0 to RM2.5: Assume 20-foot cores are analyzed at 2-foot intervals for geological parameters (grain size, percent moisture, TOC), VOCs, SVOCs, Metals/Cyanide, TCL Pesticides/PCBs, and dioxins. Assumes approximate 80-foot triangular grid spacing of cores for chemical analysis and 160-foot triangular grid spacing of cores for geological parameters analysis. For RM 2.5 to RM8.3: Assumes 20-foot cores are analyzed at 2-foot intervals for geological parameters (grain size, percent moisture, TOC). Assumes approximate 160-foot triangular grid spacing of cores for chemical and geological parameters analysis. Areas without armor: assumes that the first two 2-foot core intervals are analyzed for VOCs, SVOCs, Metals/Cyanide, TCL Pesticides/PCBs, and dioxins. Areas with armor and mudflats: assumes that the first three 2-foot core intervals are analyzed for VOCs, SVOCs, Metals/Cyanide, TCL Pesticides/PCBs, and dioxins. Also assumes approximate 80foot triangular grid spacing of cores for chemical analysis. • Pre-Design Investigation – Geotechnical o Assumes four 80-feet deep borings will be taken at transects placed at 0.5 miles intervals. o Assumes one boring is taken per day. o Estimates 12 hour daily rate of $6,500 for auger drilling and sampling. [Contractor communications.] o Estimates cost of $400 per sample for undisturbed sample collection. o Assumes 3 samples would be taken per boring. • Sub-bottom Geophysics and Bathymetric Survey o Estimates daily rate for geophysical vessel of $6,500. [Contractor communication.] o Assumes one river mile can be surveyed in two days. • Video Survey for Debris Identification o Estimates daily rate for vessel of $6,500. [Contractor communication.] o Assumes one river mile can be surveyed in two days. • Pre-Construction Oversight o Assumes monthly rate of $50,000 for two staff to oversee coring/processing operations. o Assumes pre-design investigation duration of 12 months for all alternatives. Cost Estimates Lower Passaic River Restoration Project J - 17 June 2007 • Contractor Work Plans and Submittals o Assumes lump sum cost of $300,000 for all alternatives. • Permitting (Equivalency) and Legal o The cost is assumed to be 2% of construction phase capital costs (not including Pre-Design Investigation costs). B. Mobilization/Demobilization • Assume a six months period to mobilize and demobilize. • Dredge Equipment Mobilization/Demobilization o Lump sum of $200,000 is estimated per dredge per event. [Contractor communication.] o Equipment would be onsite for either the dredge duration or the capping duration (not including the armor placement duration), whichever is greater. For alternatives that pre-dredge armor areas only, the dredge equipment would be onsite for the dredging duration only. • Capping Equipment Mobilization/Demobilization o Lump sum of $200,000 is estimated per clamshell per event. [Contractor communication.] o Assumes capping equipment would also be use for backfilling. o Equipment would be onsite for either the dredge duration or the capping duration (including the armor placement duration), whichever is greater. • Monitoring Equipment Mobilization/Demobilization o Estimates cost of mobilization of two hydrographic survey vessels ($3,200 each), geophysical vessel ($4,800), and small vibracoring vessel ($5,500). [Contractor communication.] o Equipment would be onsite for the total construction duration. • Debris Removal Equipment Mobilization/Demobilization o Lump sum of approximately $50,000 is assumed per event. o Equipment would be onsite for either the dredge duration or the capping duration (not including the armor placement duration), whichever is greater. For alternatives that pre-dredge armor areas only, the dredge equipment would be onsite for the dredging duration only. • Shoreline Protection Equipment Mobilization/Demobilization o Lump sum of $100,000 is assumed per event [internal database]. o Shoreline protection equipment will also be used to protect utilities, if necessary. Cost Estimates Lower Passaic River Restoration Project J - 18 June 2007 o Equipment would be onsite for either the dredge duration or the capping duration (not including the armor placement duration), whichever is greater. For alternatives that pre-dredge armor areas only, the dredge equipment would be onsite for the dredging duration only. • C. • • New Season Restart o Lump sum of 25 percent of total of equipment mobilization/demobilization costs per season is assumed. Dredging Dredging o Cost of $25 per cubic yard is estimated. [Contractor communication.] o The assumed dredge production rate is 2,000 cubic yards per day per dredge. o Assume that dredging season is 40 weeks per year. o Assume 12 hour days, 5 work days per week. o Removal volumes account for overdredging of 1-foot based on dredge accuracy. o Once design depths are achieved, additional required dredging will be performed in one pass on average. o For Alternative 1, assume that dredging duration is 9 years using three dredges. o For Alternative 2, assume that dredging duration is 4 years using one dredge. o For Alternative 3, assume that dredging duration is 5 years using three dredges. o For Alternative 4, assume that dredging duration is 4 years using two dredge. o For Alternative 5, assume that dredging duration is 5 years using three dredges. o For Alternative 6, assume that dredging duration is 6 years using three dredges. Debris Removal/Off-loading/Transport/Disposal o Debris will be removed, off-loaded, decontaminated, and transported and disposed of at an estimated cost of $200 per ton prior to dredging operations and $400 per ton during dredging operations. [Contractor communication.] o Assumes that 50% of the debris will be removed prior to dredging operations and the other 50% during dredging operations. o Alternatives 1, 3, 5, and 6 assume that 8,000 tons will be removed. o Alternative 2 assumes that 25% of debris removed in Alternatives 1, 3, and 5 will be removed (2,000 tons). Cost Estimates Lower Passaic River Restoration Project J - 19 June 2007 o Alternative 4 assumes that 3,500 tons of debris will be removed (2000 tons from RM0 to RM2.5, where dredging would be implemented, and 1500 tons from RM2.2 to RM8, where capping would be implemented). • Testing and Monitoring (Alternative 1) o Estimates daily rate for two (2) water quality vessels ($3,200) is scaled by factor of 9 to calculate monthly rate and by factor of 1.5 to calculate 12 hour daily rate. [Contractor communication.] o Estimates daily rate for bathymetric vessels ($3,200) is scaled by factor of 9 to calculate monthly rate and by factor of 1.5 to calculate 12 hour daily rate. [Contractor communication.] o Assumes 10 water column samples per day and average 22 days per month (total 220 samples per month). o Two rounds of bathymetric surveys will be performed after dredging is performed to the specified elevation. o Two sampling vessels (one located upstream and one downstream of the dredge) will be collecting water quality (i.e., TSS and limited chemistry) samples continuously during dredging operations. o Estimates analytical/validation cost of $350 per water column sample and $2,750 per sediment sample. [Internal database.] o Assumes two staff working 8 hour days to process/ship samples. Assumes 50 samples processed/shipped per day. o Assume an average of $186,319 would be needed for biological monitoring per year [Internal calculation/database.] Assume biological monitoring includes the following surveys: habitat delineation, terrestrial vegetation, avian community, aquatic community, aquatic vegetation (SAV), fish community, benthic invertebrates, biological tissue-residual, and toxicity testing. o Assumes monitoring would be performed through the duration of construction. o Assumes lump sum lab reporting cost of $50,000 [internal database]. • Utility Protection o Assumes sheetpiling will be driven to 35-foot depth. o Estimates unit cost of $50 per square foot of sheeting. [Internal database.] o Assumes sheeting is removed following dredging operations. o Assumes one utility crossing per river mile and approximate river width of 500-feet. • Bridge/Abutment/Bulkhead Protection o Estimates unit cost of $610 per foot [Internal calculation/database.] o Assumes that 58,700 linear feet of hard shorelines would be protected (84,500 ft of total shoreline minus 25,800 ft of natural shorelines). • Barge Transport of Dredged Material Cost Estimates Lower Passaic River Restoration Project J - 20 June 2007 o Estimates barge transport cost of $5 per cubic yard. [Contractor communications.] o Assumes dredged material will be transported in 1500 – 4000 cubic yard hopper scows and delivered to processing site within the Port. • D. • Dredged Material Offloading o Estimates offloading cost of $7 per cubic yard. [Contractor communications.] o Assumes offloading via clamshell and bobcats. Backfill and/or Sand Cap Backfill/Sand Cap Material Purchase and Delivery o Assumes cost of $30 per cubic yard will be applied to purchase and deliver material to site in hopper scow. • Backfill/Sand Cap Material Placement o General: Estimates cost of $20 per cubic yard will be applied to place material. [Contractor communications.] Estimates material placement production rate of 2,000 cubic yard per day. [Contractor communications.] o Backfill: Assume that backfill layer will only be placed when dredging depth exceeds depth of fine-grained sediments. Assumes that backfill will be used to mitigate for any remaining fine-grained sediment and/or dredging residuals. Dredged area will be backfilled with nominal 2-feet of sand. Assume that there will be no maintenance of the backfill layer. o Sand Cap: Assume that capping will be necessary in areas where remedial alternatives do not remove entire depth of fine-grained sediments (Alternatives 2, 3, 4, 5, and 6). Cap materials will be placed using a clam shell dredge. Assumes minimum sand thickness of 2.5 feet, and average thickness of 3 feet. • Testing and Monitoring (Alternatives 2, 3, 4, 5, and 6) o Estimates daily rate for two water quality vessels ($3,200) is scaled by factor of 9 to calculate monthly rate and by factor of 1.5 to calculate 12 hour daily rate. [Contractor communication.] o Estimates daily rate for bathymetric vessels ($3,200) is scaled by factor of 9 to calculate monthly rate and by factor of 1.5 to calculate 12 hour daily rate. [Contractor communication.] o Assumes 10 water column samples per day and average 22 days per month (total 220 samples per month). Cost Estimates Lower Passaic River Restoration Project J - 21 June 2007 o Estimates analytical/validation cost of $350 per water column sample and $2,750 per sediment sample. [Internal database.] o Assumes two staff working 8 hour days to process/ship samples. Assumes 50 samples processed/shipped per day. o Assume monitoring would be through the duration of construction. o Assume an average of $186,319 would be needed for biological monitoring per year [Internal calculation/database.] Assume biological monitoring includes the following surveys: habitat delineation, terrestrial vegetation, avian community, aquatic community, aquatic vegetation (SAV), fish community, benthic invertebrates, biological tissue-residual, and toxicity testing. o Assumes lump sum lab reporting cost of $50,000. • Confirmation Coring o Assumes 4-feet deep cores placed to verify thickness of backfill layer. o Assumes 5 cores will be taken at transects placed at 0.1 miles intervals. o Assumes 20 cores taken per day. o Estimates 12 hour daily rate of $6,300 for coring vessel. [Contractor communications.] o Assumes 4 staff working in existing facility to process cores (10 cores per day). o Estimates chemical and geological analytical/validation cost of $2,750 per sample, and three samples will be collected per core. [Internal database.] o Estimates shipping cost of $75 per cooler (4 samples per cooler). [Internal database.] • Armor Layer Placement o Assume a stone armor layer 2-feet in thickness for areas identified as erosional by hydrodynamic modeling. o Estimates unit cost for armor material purchase and placement of $150 per cubic yard. [Internal database.] • Mudflat reconstruction o Assumes that a 3-foot thick layer of suitable mudflat construction material will be placed in the area of all disturbed mudflats. o Assumes unit cost of $60 per cubic yard to purchase and deliver mudflat reconstruction material [internal database]. o Assumes unit cost of $40 per cubic yard to place mudflat reconstruction material [internal database]. o Estimates that approximately 43 acres of mudflats would be disturbed, requiring 208,265 cubic yard of mudflat reconstruction material. [Internal calculation/database.] • Natural Shoreline Stabilization o Assumes 20 foot wide area of shoreline will be stabilized. Cost Estimates Lower Passaic River Restoration Project J - 22 June 2007 o Assumes a cost of $25 per linear foot for two coir rolls, wedges, twine, and biodegradable erosion control matting. o Assumes 20 wetland plants per linear foot at $3 per plant ($60 per linear foot). o Assumes 2 hours of labor per linear foot for two laborers to install erosion control matting, coir roll, and plants at $65 per hour. o Estimates that 75% of natural shorelines will be stabilized. o Assumes that approximately 29,192 linear feet of natural shoreline exist (sum of natural shorelines and unknown shorelines). This results in approximately 21,900 linear feet of shoreline to be stabilized (i.e., 75% of 29,192). [Internal calculation/database]. E. F. G. • • • Construction Management Construction Management services are assumed to be 8% of the cost of field activities. Assume multiple prime contracts held by client, not by one prime contractor. Contingency A 20% contingency is assumed. Dredged Material Management Site Characterization o Labor Barge-Auger Mobilization • Lump sum of $10,000 is assumed [internal database.] Auger Drilling and Sampling • Assume a daily rate of $6,500 for drilling and sampling [internal database.] • Assume 80 borings will be drilled (60 borings along sheeting alignment extending to a depth of approximately 80-feet and 20 borings inside CDF footprint area). • Assume one boring will be drilled per day. Undisturbed Sample Collection • Assumes a cost of $400 per sample collected [internal database.] • Assume three samples will be collected per boring. Bathymetric Survey • Estimates daily rate of bathymetric vessel of $6500. [Contractor communication]. • Assumes approximately 30 acres can be surveyed in a day. Field Oversight • Assume three engineers working 8 hour days at $110 per hour for the duration of drilling and surveying. Reporting Cost Estimates Lower Passaic River Restoration Project J - 23 June 2007 • Assumes two engineers working 8 hour days at $125 per hour and one engineer working 8 hour days at $135 per hour. • Assumes reporting period of 4 months. Project Management • Assumes an hourly rate of $200 for 8 hours per week for a period of 26 weeks. Drilling Permits and Work Plans • Lump sum of $50,000 is assumed for permits and workplans. o Disbursements Geotechnical Tests • Assume geotechnical testing [grain size analysis (sieve and hydrometer), Atterberg limits, and cyclic triaxial] cost is 10% of drilling costs. Drillers/Surveyors Sustenance • Assume a cost of $500 per day for 100 field days. • Starter Cell Construction o Pre-Construction Activities Design • The cost is assumed to be 8% of construction phase capital costs (not including Pre-Design Investigation costs). Contractor Work Plans • Assumes lump sum cost of $100,000. Permitting (Equivalency), and Legal • The cost is assumed to be 2% of construction phase capital costs (not including Pre-Design Investigation costs). o Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization • Assumes a lump sum of $100,000 for barge, hammer, and crane to install sheeting [internal database]. Surveying • Assumes a daily rate of $3,000 for sheetpile wall alignment surveys [internal database]. • Assumes surveying is required 25% of the time to install the sheeting. Waterloo Sheet Piles (Material Cost) • Estimates unit cost of $31 per square foot of sheeting [contractor communications]. • Assumes inner wall will be 9600-feet long and 30-feet in height (20-feet will be driven below the mudline) Walers Cost Estimates Lower Passaic River Restoration Project J - 24 June 2007 • Assumes a cost of $50 per linear foot [contractor communications]. Installation Costs • Crane and Crew – with driving head o Estimates a cost of $12 per square foot [internal database]. • Water Side Installation Vessels o Assumes daily rate of $3,500 for two barges, two boats, and one tug boat [internal database]. • Walers Installation o Assumes daily rate of $1,800 for one foreman and three steel workers [internal database]. o Assumes that required walers can be installed to approximately 192 linear feet of sheetpile wall per day. o Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) • Estimates unit cost of $31 per square foot of sheeting [contractor communications]. • Assumes outer wall will be 9700-feet long and 50-feet in height (40-feet will be driven below the mudline). Walers • Assumes a cost of $50 per linear foot [contractor communications]. Deadman Tiebacks and Connectors • Estimates a cost of $2000 per tieback [contractor communications]. • Assumes tieback spacing of 8 feet. Bumpers – Outside of Bulkhead • Assumes a cost of $18 per linear foot [internal database]. Backfill Between inner and outer walls – Material and installation • Estimates a cost of $32 per cubic yard for materials and installation of backfill between inner and outer walls [internal database]. • Assumes that walls are installed 5 ft apart. • Assumes that walls around the shoreline will not be backfilled. Installation Costs – Water Side • Crane and Crew – with driving head o Estimates a cost of $12 per square foot [internal database]. • Water Side Installation Vessels o Assumes daily rate of $3,500 for two barges, two boats, and one tug boat [internal database]. • Walers, Deadman, and Bumpers Installation Cost Estimates Lower Passaic River Restoration Project J - 25 June 2007 o Assumes daily rate of $2,000 for one foreman and three steel workers [internal database]. o Assumes that 70 days would be necessary to attach walers, deadman, and bumpers. o Construction Management Construction Management services are assumed to be 8% of the cost of field activities. • Sub-grade Cell Construction o Pre-Construction Activities Design • The cost is assumed to be 8% of construction phase capital costs (not including Pre-Design Investigation costs). Permitting (Equivalency), and Legal • The cost is assumed to be 2% of construction phase capital costs (not including Pre-Design Investigation costs). o Sediment Veneer Dredging Mobilization/Site Clean-up/Demobilization • Estimates the cost of two dredges ($200,000 per dredge), one debris removal vessel ($50,000), two hydrographic survey vessels ($3,200), and one geophysical vessel ($4,800) [contractor communications]. Debris Removal • Debris will be removed, off-loaded, decontaminated, and transported and disposed of at an estimated cost of $200 per ton prior to dredging operations and $400 per ton during dredging operations. [Contractor communication.] • Assumes that 50% of the debris will be removed prior to dredging operations and the other 50% during dredging operations. • Assumes that 500 tons of debris will be removed from the starter cell footprint area. Environmental Dredging • Cost of $25 per cubic yard is estimated. [Contractor communication.] • The assumed dredge production rate is 2,000 cubic yards per day per dredge. • Assume that approximately 5 ft of material will be removed form 85 acres. • Assumes that Scenarios 2A and 2B do not require any dredging. Barge Transport of Dredged Material • Estimates barge transport cost of $5 per cubic yard. [Contractor communications.] Cost Estimates Lower Passaic River Restoration Project J - 26 June 2007 • • Assume a 25% volume increase due to water entrainment. Assumes dredged material will be transported in 1500 – 4000 cubic yard hopper scows. Dredged Material Off-Loading • Estimates offloading cost of $7 per cubic yard. [Contractor communications.] • Assumes material will be offloaded onto starter cell. Testing and Monitoring • Estimates daily rate for two (2) water quality vessels ($3,200) is scaled by factor of 9 to calculate monthly rate and by factor of 1.5 to calculate 12 hour daily rate. [Contractor communication.] • Estimates daily rate for bathymetric vessels ($3,200) is scaled by factor of 9 to calculate monthly rate and by factor of 1.5 to calculate 12 hour daily rate. [Contractor communication.] • Assumes 10 water column samples per day and average 22 days per month (total 220 samples per month). • Two rounds of bathymetric surveys will be performed after dredging is performed to the specified elevation. • Two sampling vessels (one located upstream and one downstream of the dredge) will be collecting water quality (i.e., TSS and limited chemistry) samples continuously during dredging operations. • Estimates analytical/validation cost of $350 per water column sample and $2,750 per sediment sample. [Internal database.] • Assumes two staff working 8 hour days to process/ship samples. Assumes 50 samples processed/shipped per day. • Assumes monitoring would be performed through the dredging duration. • Assumes lump sum lab reporting cost of $50,000 [internal database]. o Dredging Sub-grade cell Mobilization/Site Clean-up/Demobilization • Assumes four dredges will be mobilized at lump sum cost of $200,000 per dredge. Debris Removal • Debris will be removed, off-loaded, decontaminated, and transported and disposed of at an estimated cost of $200 per ton prior to dredging operations and $400 per ton during dredging operations. [Contractor communication.] • Assumes that 50% of the debris will be removed prior to dredging operations and the other 50% during dredging operations. Cost Estimates Lower Passaic River Restoration Project J - 27 June 2007 • Assumes 1000 tons of debris will be removed. Dredging/Transport/Dump • Estimates a cost of $15 per cubic yard to dredge, transport, and dump clean dredged material into ocean for dredging to depths no greater than 50-feet [internal database]. • Estimates a cost of $20 per cubic yard to dredge, transport, and dump clean dredged material into ocean for dredging to depths greater than 50-feet [internal database]. • Assumes that approximately 11,279,493 cubic yards of material will be dredged for DMM Scenario 1A and 10,800,293 cubic yards for DMM Scenario 1B [internal database]. • Assumes Scenarios 2A and 2B do not require any dredging. • Assumes that approximately 6,701,343 cubic yards of material will be dredged for DMM Scenario 3A and 6,222,143 cubic yards for DMM Scenario 3B [internal database]. • Assumes that approximately 3,772,293 cubic yards of material will be dredged for DMM Scenario 4A and 3,293,093 cubic yards for DMM Scenario 4B [internal database]. • Assumes that approximately 5,745,693 cubic yards of material will be dredged for DMM Scenario 5A and 5,266,493 cubic yards for DMM Scenario 5B [internal database]. • Assumes that approximately 6,736,993 cubic yards of material will be dredged for DMM Scenario 6A and 6,257,793 cubic yards for DMM Scenario 6B [internal database]. • The assumed dredge production rate is 10,000 cubic yards per day per dredge. Testing and Monitoring • Estimates daily rate for two (2) water quality vessels ($3,200) is scaled by factor of 9 to calculate monthly rate and by factor of 1.5 to calculate 12 hour daily rate. [Contractor communication.] • Estimates daily rate for bathymetric vessels ($3,200) is scaled by factor of 9 to calculate monthly rate and by factor of 1.5 to calculate 12 hour daily rate. [Contractor communication.] • Assumes 10 water column samples per day and average 22 days per month (total 220 samples per month). • Two rounds of bathymetric surveys will be performed after dredging is performed to the specified elevation. • Two sampling vessels (one located upstream and one downstream of the dredge) will be collecting water quality Cost Estimates Lower Passaic River Restoration Project J - 28 June 2007 (i.e., TSS and limited chemistry) samples continuously during dredging operations. • Estimates analytical/validation cost of $350 per water column sample and $2,750 per sediment sample. [Internal database.] • Assumes two staff working 8 hour days to process/ship samples. Assumes 50 samples processed/shipped per day. • Assumes monitoring would be performed through the duration of construction. • Assumes lump sum lab reporting cost of $50,000 [internal database]. o Construction Management Construction Management services are assumed to be 8% of the cost of field activities. • CDF Construction o Pre-Construction Activities Design • The cost is assumed to be 8% of construction phase capital costs (not including Pre-Design Investigation costs). Contractor Work Plans • Assumes lump sum cost of $100,000. Permitting (Equivalency), and Legal • The cost is assumed to be 2% of construction phase capital costs (not including Pre-Design Investigation costs). o Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization • Assumes a lump sum of $100,000 [internal database]. Surveying • Assumes a daily rate of $3,000 for sheetpile wall alignment surveys [internal database]. • Assumes surveying is required 25% of the time to install the sheeting. Waterloo Sheet Piles (Material Cost) • Estimates unit cost of $31 per square foot of sheeting [contractor communications]. • Assumes inner wall will be 12,600-feet long and 40-feet in height (30-feet will be driven below the mudline). Walers • Assumes a cost of $50 per linear foot [contractor communications]. Installation Costs • Crane and Crew – with driving head o Estimates a cost of $12 per square foot [internal database]. Cost Estimates Lower Passaic River Restoration Project J - 29 June 2007 • Water Side Installation Vessels o Assumes daily rate of $3,500 for two barges, two boats, and one tug boat [internal database]. • Walers Installation o Assumes daily rate of $1,800 for one foreman and tree steel workers [internal database]. o Assumes that approximately 192 linear feet can be attached per day. o Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) • Estimates unit cost of $31 per square foot of sheeting [contractor communications]. • Assumes outer wall will be 12,700-feet long and 70-feet in height (60-feet will be driven below the mudline). Additional Cost for 70’ Sheet Piles • Assumes an additional cost of $2 per square foot for 60foot sheeting [contractor communications]. Walers • Assumes a cost of $50 per linear foot [contractor communications]. Deadman Tiebacks and Connectors • Estimates a cost of $2000 per tieback [contractor communications]. • Assumes tieback spacing of 8 feet. Bumpers – Outside of Bulkhead • Assumes a cost of $18 per linear foot [internal database]. Backfill Between inner and outer walls – Material and installation • Estimates a cost of $32 per cubic yard for materials and installation of backfill between inner and outer walls [internal database]. • Assumes that walls are installed 5 ft apart. • Assumes that walls around the shoreline will not be backfilled. Installation Costs – Water Side • Crane and Crew – with driving head o Estimates a cost of $12 per square foot [internal database]. • Water Side Installation Vessels o Assumes daily rate of $3,500 for two barges, two boats, and one tug boat [internal database]. • Walers, Deadman, and Bumpers Installation o Assumes daily rate of $2,000 for one foreman and tree steel workers [internal database]. o Assumes that 90 days would be necessary to attach walers, deadman, and bumpers. Cost Estimates Lower Passaic River Restoration Project J - 30 June 2007 Water Barrier • Assumes a cost of $250,000 per boom. • Assumes that CDF will have three interior cells separated by floating booms. o Water Treatment Mobilization/Demobilization • For Alternative 2, lump sum of $120,000 is assumed for mobilization and demobilization of water treatment plant [internal database]. • For Alternative 4, lump sum of $240,000 is assumed for mobilization and demobilization of water treatment plant [internal database]. • For Alternatives 1, 3, 5, and 6 lump sum of $480,000 is assumed for mobilization and demobilization of water treatment plant [internal database]. Treatment Plant • For Alternative 2, assume a lump sum of $500,000 for a 200 gpm water treatment plant [internal database]. • For Alternative 4, assume a lump sum of $1,000,000 for a 400 gpm water treatment plant [internal database]. • For Alternatives1, 3, 5, and 6 assumed a lump sum of $2,000,000 for a 600 gpm water treatment plant [internal database] Piping to plant • Lump sum of $150,000 is assumed (based on 3000-feet of 6” steel pipes at an estimated cost of $50 per linear foot). Treatment – O&M • Assumes O&M costs of $0.04 per gallon of flow [internal database]. Assumes that permit will be obtained for discharge of treated water to Passaic River. • Assumes all water contained within starter cell and CDF will be treated. An additional 20% is added to account for rainfall and passive dewatering of dredged material. Testing • Assumes a cost of $10,000 per week [internal database]. • Assumes water treatment will be performed for 10 years (i.e. the useful life of the CDF). o CDF Operations Monitoring wells • Estimates an installation cost of $750 per well. • Assumes wells are placed at various depths around the CDF’s perimeter (i.e. installed between the CDF’s inner and outer walls) at 150 ft spacing. Spreading Starter Cell Mount into CDF Cost Estimates Lower Passaic River Restoration Project J - 31 June 2007 • Assumes dredged material mount over starter cell will be spread onto CDF for DMM Scenarios 1A, 2A, 3A, 4A, 5A, and 6A • Estimates a cost of $2 per cubic yard using two dozers [internal database]. Operation of CDF (including Starter Cell) • Lump sum based on an estimated cost of $6 per cubic yard and the assumption that dredged material above the mudline will be handled twice using backhoes. o CDF Closing Mobilization/Site Clean-up/Demobilization • Assume a lump sum of $75,000 [internal database]. Sheetpile Removal • Assumes a sand cap will be placed in DMM Scenarios 1B, 2B, 3B, 4B, 5B, and 6B. • Assumes a cost of $150 per linear foot for inner sheetpile removal [internal database]. • Assumed a cost of $14/CY for removal of backfill between the inner and outer sheetpile walls [internal database] • Assumes a cost of $250 per linear foot for removal of outer sheetpile wall [internal database] • Assumes a cost of $90,000 for the construction of a decontamination pad to clean the sheetpile [internal database] • Assumed that the rate for decontamination operations and equipment is $50,000 per month [internal database] • Assumed off-site disposal of soil and steel sheets at $50/ton at a Subtitle D landfill (no salvage value assumed) Geotextile Layer • Estimates a cost of $2 per square foot of geotextile. • Assumes that geotextile will cover 112 acres. • Assumes that 20% additional material will be necessary for quality assurance. Compacted Clay Cover – Fill (Haul, Place, and Compact) • Assumes clay cover will be placed in DMM Scenarios 1A, 2A, 3A, 4A, 5A, and 6A. • Estimates a cost of $15 per cubic yard to place a clay cover over CDF. • Assume a 2 foot cover will be placed over a 112 acre area. Sand Cap (Purchase, Delivery, Placement, Monitoring) • Assumes a sand cap will be placed in DMM Scenarios 1B, 2B, 3B, 4B, 5B, and 6B. Cost Estimates Lower Passaic River Restoration Project J - 32 June 2007 • Estimates a lump sum cost of $200,000 for mobilization/demobilization of capping equipment. • Estimates a cost of $40 to purchase and deliver sand and a cost of $20 to place sand. • Assume a 2 foot cap will be placed over a 112 acre area. • The assumed capping production rate is 2,000 cubic yards per day per dredge [contractor communications]. • Estimates a cost of $220,440 per month for three months for testing and monitoring. o Estimates daily rate for two (2) water quality vessels ($3,200) is scaled by factor of 9 to calculate monthly rate and by factor of 1.5 to calculate 12 hour daily rate. [Contractor communication.] o Estimates daily rate for bathymetric vessels ($3,200) is scaled by factor of 9 to calculate monthly rate and by factor of 1.5 to calculate 12 hour daily rate. [Contractor communication.] o Assumes 10 water column samples per day and average 22 days per month (total 220 samples per month). o Two rounds of bathymetric surveys will be performed after dredging is performed to the specified elevation. o Two sampling vessels (one located upstream and one downstream of the dredge) will be collecting water quality (i.e., TSS and limited chemistry) samples continuously during dredging operations. o Estimates analytical/validation cost of $350 per water column sample and $2,750 per sediment sample. [Internal database.] o Assumes two staff working 8 hour days to process/ship samples. Assumes 50 samples processed/shipped per day. o Assumes monitoring would be performed through the duration of construction. o Assumes lump sum lab reporting cost of $50,000 [internal database]. Vegetation • Assumes vegetation will be required for DMM Scenarios 1A, 2A, 3A, 4A, 5A, and 6A. • Assume a cost of $1 per square yard. • Assume that 112 acres will be vegetated. Shoreline Plantings and other Trees • Assumes planting will be done in DMM Scenarios 1A, 2A, 3A, 4A, 5A, and 6A. • Estimates a lump sum cost of $75,000 for plants and trees. Cost Estimates Lower Passaic River Restoration Project J - 33 June 2007 Surveying • Estimates a cost of $3,000 per day for surveying [internal database]. • Assumes that surveying will be performed in a period of 30 days. o Construction Management Construction Management services are assumed to be 8% of the cost of field activities. • On-Site Thermal Treatment o Assume that material from Starter Cell will be treated for DMM Scenarios 1B, 2B, 3B, 4B, 5B, and 6B. o Pre-Construction Activities Design • The cost is assumed to be 8% of construction phase capital costs (not including Pre-Design Investigation costs). Permitting (Equivalency), and Legal • The cost is assumed to be 2% of construction phase capital costs (not including Pre-Design Investigation costs). o Dredged Material Treatment Assume that all material above the mudline will be treated for DMM Scenarios 1B, 2B, 3B, 4B, 5B, and 6B. Mobilization/Demobilization • Assume a lump sum of $25,000 for mobilization of personnel and equipment [internal database]. Sediment Removal and Loading onto Trucks • Cost of $8 per cubic yard is estimated [internal database]. • Assume sediment will be excavated using 2-1/2 cubic yards backhoes. • Assume sediment will be off-loaded onto dump trucks. Transport to Thermal Treatment Area • Estimates a cost of $4 per cubic yard [internal database]. • Assumes six 12 cubic yards dump truck will make 2 mile roundtrips. Dredged Material Off-Loading to Filter Press • Estimates off-loading cost of $6 per cubic yard [internal database]. Mechanical Sediment Dewatering • Assumes unit cost of $40 per ton to dewater sediment. • Assumes that dewatering of one cubic yard of dredged material from 30% to 60% solids generates approximately 118 gallons of water. • Assumes that dewatering process reduces dredged material weight by 50%. Treatment – O&M Cost Estimates Lower Passaic River Restoration Project J - 34 June 2007 • Assumes O&M costs of $0.04 per gallon of flow [internal database]. Discharge to POTW • Assumes O&M costs of $666.79 per million gallons of flow, $357.34 per thousand pounds of BOD, and $213.04 per thousand pounds of TSS [internal database]. • Assumes typical industrial wastewater effluent limitations of 300 mg BOD/L and 45 mg TSS/L. On-Site Thermal Treatment • Assume a unit cost of $80 per ton [based on GTI cost estimate]. Sediment Processing Site • Estimates a cost of $500,000 per acre [internal database].. • Assumes that processing site will be 20 acres. o Construction Management Construction Management services are assumed to be 8% of the cost of field activities • H. • • • • Contingency o A 20% contingency is assumed. Annual Operations and Maintenance (O&M) Mobilization/Demobilization – Monitoring Equipment o Assumes mobilization/demobilization rate for hydrographic survey vessel ($3,200), small coring vessel ($2,200), and SPI vessel ($11,500). Mobilization/Demobilization – Capping Equipment o Assumes mobilization/demobilization of capping equipment is not necessary for O&M activities associated with Alternative 1 – DMM Scenario 1A. o Assumes a lump sum of $40,000. Assumes that capping equipment for cap maintenance purposes is more conventional and readily available than precision equipment used to construct cap. Bathymetric Survey o Daily rate for vessel ($6,500). Surface Sediment Sampling and Analysis o Assumes daily rate for small coring vessel of $4,200. o Assumes 20 sediment samples taken per day. o Assumes 5 samples will be taken at transects placed at 0.1 miles intervals. o Assumes 20 sediment samples will be taken from CDF footprint area for DMM Scenarios 1B, 2B, 3B, 4B, 5B, and 6B. o Assumes analytical/validation cost of $2,750 per sediment sample. o Assumes shipping cost of $75 per cooler (4 samples per cooler). o Assumes two staff working 8 hour days to process/ship samples. o Assumes 50 samples processed/shipped per day. Cost Estimates Lower Passaic River Restoration Project J - 35 June 2007 • • • • • • • • • Biological Monitoring o Assumes a lump sum cost of $2,688,390 for all alternatives [Internal calculation/database.] Assume the following surveys would be performed: habitat delineation, terrestrial vegetation, avian community, aquatic community, aquatic vegetation (SAV), fish community, benthic invertebrates, biological tissue-residual, and toxicity testing. Water Column Sampling and Analysis o Assumes daily rate for water quality vessel of $6,500. o Assumes 10 water quality samples taken per day. o Assumes two samples taken for two tidal cycles per river mile. o Assumes two samples taken for two tidal cycles from CDF footprint area for DMM Scenarios 1B, 2B, 3B, 4B, 5B, and 6B. o Assume additional sampling of 10% for quality assurance. o Assumes analytical/validation cost of $350 per water column sample. o Assumes two staff working 8 hour days to process/ship samples. Assumes 50 samples processed/shipped per day. Habitat Recolonization using SPI o Assumes $2,000 per SPI location, which covers imaging, processing, and reporting. o SPI survey will be performed annually. o Approximately 10 SPI locations per mile. o Assumes 20 SPI locations in CDF footprint area for DMM Scenarios 1B, 2B, 3B, 4B, 5B, and 6B. Groundwater Monitoring (Well Sampling and Testing) o Estimates a cost of $1,500 per sample [internal database.] o Assumes 12 wells will be sample per month. Cap Maintenance o Assumes that 0.2% of placed cap material would need to be replaced per year at a cost of $30 per cubic yard. o Assumes that no maintenance is required in backfill and armor areas. Monitoring Reports o Assumes lump sum lab reporting cost of $150,000 for all alternatives. o Assumes 3,000 hours at $100 per hour to complete draft and final monitoring reports for all alternatives. Community Outreach o Assumes a lump sum of $80,000 per year [internal database]. Contingency o A 20% contingency is assumed. Present Worth of Annual O&M Costs o The Net Present Worth of O&M costs is calculated using a 5% rate over 30 years. Cost Estimates Lower Passaic River Restoration Project J - 36 June 2007 DMM Backup Sheets Cost Estimates Lower Passaic River Restoration Project J - 37 June 2007 DMM Backup Sheets Comparison of Scenarios Focused Feasibility Study Lower Passaic River Restoration Project Alternative Alternative 1: Dredging Alternative 2: Capping Alternative 3: NCC - Authorized Channel Alternative 4: NCC - Current Use Channel Alternative 5: NCC - Future Use Channel Alternative 6: NCC - Future Use Channel + Dredging Primary Erosional and Primary Inventory Zones Cost Estimates Lower Passaic River Restoration Project Alternative Sediment Estimated Cost per Removal CY of Sediment (CY) ($/CY) 10,960,000 $70 DMM Scenario Total DMM Costs A $763,000,000 B $1,085,000,000 10,960,000 $99 A $230,000,000 1,142,000 $201 B $477,000,000 1,142,000 $418 A $522,000,000 6,979,000 $75 B $847,000,000 6,979,000 $121 A $418,000,000 4,432,000 $94 B $744,000,000 4,432,000 $168 A $489,000,000 6,148,000 $80 B $814,000,000 6,148,000 $132 A $524,000,000 7,010,000 $75 B $849,000,000 7,010,000 $121 J - 38 June 2007 DMM Backup Sheets Scenario 1A: Total DMM Costs Focused Feasibility Study Lower Passaic River Restoration Project Component Cost DMM COSTS 1A-1 1A-2 1A-3 1A-4 1A-5 Site Characterization1 Starter Cell Construction Sub-grade Cell Construction CDF Construction On-Site Thermal Treatment $1,489,800 $56,542,704 $304,861,260 $273,054,347 $0 Subtotal DMM Costs $635,948,111 Contingency (20%) $127,189,622 TOTAL DMM COSTS $763,137,733 Notes: Site Characterization limited to geotechnical investigation of proposed starter cell and CDF areas. 1 Cost Estimates Lower Passaic River Restoration Project J - 39 June 2007 DMM Backup Sheets Scenario 1A: Site Characterization Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Unit Unit Cost Labor Barge-Auger Mobilization Auger Drilling and Sampling Undisturbed Sample Collection Bathymetric Survey Field Oversight Reporting Project Management Drilling Permits and Work Plans Total Labor LS Day Sample Day Day Day Week LS $10,000 $6,500 $400 $6,500 $2,640 $3,080 $1,600 $50,000 Disbursements Geotechnical Tests Drillers/ Surveyors Sustenance Total Disbursements Percentage Day 10% $500 TOTAL SITE CHARACTERIZATION COSTS Cost Estimates Lower Passaic River Restoration Project # of Units Cost 1 80 240 4 100 120 26 1 $10,000 $520,000 $96,000 $26,000 $264,000 $369,600 $41,600 $50,000 $1,377,200 626,000 100 $62,600 $50,000 $112,600 $1,489,800 1A-1 J - 40 June 2007 DMM Backup Sheets Scenario 1A: Starter Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Pre-Construction Activities Design Contractor Work Plans Permitting (Equivalency), and Legal Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Water Side Installation Vessels Walers Installation Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Water Side Installation Vessels Walers, Deadmen, and Bumpers Installation Total Outer Bulkhead Wall Construction Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 47,832,800 1 47,832,800 $3,826,624 $100,000 $956,656 $4,883,280 LS Day SF LF $100,000 $3,000 $31 $50 1 40 288,000 9,600 $100,000 $120,000 $8,784,000 $480,000 SF Day Day $12 $3,500 $1,800 288,000 137 50 $3,456,000 $480,000 $90,000 $13,510,000 SF LF Tieback LF CY $31 $50 $2,000 $18 $32 485,000 9,700 1,213 4,850 315,250 $14,792,500 $485,000 $2,425,000 $87,300 $10,088,000 SF Day Day $12 $3,500 $2,000 485,000 139 70 $5,820,000 $485,000 $140,000 $34,322,800 $52,716,080 Subtotal Starter Cell Construction D. Construction Management Percentage TOTAL STARTER CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 47,832,800 $3,826,624 $56,542,704 1A-2 J - 41 June 2007 DMM Backup Sheets Scenario 1A: Sub-grade Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Unit Unit Cost # of Units Percentage Percentage 8% 2% $258,357,000 $258,357,000 Sediment Veneer Dredging Mobilization/Site Clean-up/Demobilization Debris Removal Environmental Dredging Barge Transport of Dredge Material Dredged Material Off-Loading Testing and Monitoring Total Sediment Veneer Dredging LS Ton CY CY CY Month $461,200 $300 $25 $5 $7 $220,440 1 500 693,733 867,167 867,167 6 $461,200 $150,000 $17,343,333 $4,335,833 $6,070,167 $1,322,640 $29,683,173 Dredging Sub-grade cell Mobilization/Site Clean-up/Demobilization Debris Removal Dredging/Transport/Dump Testing and Monitoring Total Dredging Sub-grade cell LS Ton CY Month $800,000 $300 $20 $220,440 1 1,000 11,279,493 9 $800,000 $300,000 $225,589,867 $1,983,960 $228,673,827 Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Subtotal Sub-grade Cell Construction D. Construction Management $20,668,560 $5,167,140 $25,835,700 $284,192,700 Percentage TOTAL SUB-GRADE CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% $258,357,000 $20,668,560 $304,861,260 1A-3 J - 42 June 2007 DMM Backup Sheets Scenario 1A: CDF Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. D. E. F. Pre-Construction Activities Design Contractor Work Plans Permits Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying - Assume 1/4 time required Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Additional Cost for 70' Sheet Piles Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers, Deadmen, and Bumpers Water Barrier Total Outer Bulkhead Wall Construction Water Treatment Mobilization/Demobilization Treatment Plant Piping to Plant Water Treatment Testing Subtotal Water Treatment CDF Operations Monitoring Wells Spreading Starter Cell Mount into CDF Operation of CDF (including Starter Cell) Total CDF Operations CDF Closing Mobilization/Site Clean-up/Demobilization Inner Sheetpile Wall Removal Removal of Backfill Between Walls Outer Sheetpile Wall Removal Decontamination Pad Construction Decontamination Operations and Equipment Off-site Disposal of Soil and Steel Sheets Geotextile Layer Compacted Clay Cover - Fill (Haul, Place, and Compact) Sand Cap (Purchase, Delivery, Placement, Monitoring) Vegetation Shoreline Plantings and other Trees Surveying Total CDF Closing Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 231,317,243 1 231,317,243 $18,505,379 $100,000 $4,626,345 $23,231,724 LS Day SF LF $400,000 $3,000 $31 $50 1 68 504,000 12,600 $400,000 $202,500 $15,372,000 $630,000 SF Day Day $12 $6,500 $1,800 504,000 90 80 $6,048,000 $585,000 $144,000 $23,381,500 SF SF LF Tieback LF CY $31 $2 $50 $2,000 $18 $32 889,000 889,000 12,700 1,588 7,250 13,426 $27,114,500 $1,778,000 $635,000 $3,175,000 $130,500 $429,630 SF Day Day Boom $12 $6,500 $2,000 $250,000 889,000 190 90 3 $10,668,000 $1,234,807 $180,000 $750,000 $46,095,436 LS LS LS Gallon Week $360,000 $1,500,000 $150,000 $0.04 $10,000 1 1 1 3,252,305,925 520 $360,000 $1,500,000 $150,000 $130,092,237 $5,200,000 $137,302,237 Well CY LS $750 $2 $17,347,000 85 462,220 1 $63,750 $924,440 $17,347,000 $18,335,190 LS LF CY LF LS Month Ton SY CY CY SY LS Day $75,000 $150 $14 $250 $90,000 $50,000 $50 $2 $15 $64 $1 $75,000 $3,000 1 0 0 0 0 0 0 216,832 361,387 0 216,832 1 30 $75,000 $0 $0 $0 $0 $0 $0 $379,456 $5,420,800 $0 $162,624 $75,000 $90,000 $6,202,880 $254,548,967 Subtotal CDF Construction G. Construction Management Percentage TOTAL CDF CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 231,317,243 $18,505,379 $273,054,347 1A-4 J - 43 June 2007 DMM Backup Sheets Scenario 1A: On-Site Thermal Treatment Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Dredged Material Treatment Mobilization/Demobilization Sediment Removal and Loading onto Trucks Transport to Thermal Treatment Area Dredged Material Off-Loading to Filter Press Mechanical Sediment Dewatering Water Treatment Discharge to POTW On-Site Thermal Treatment Sediment Processing Site Total Dredged Material Treatment Unit Unit Cost # of Units Percentage Percentage 8% 2% $0 $0 LS CY CY CY Ton Gallon Gallon Ton Acre $25,000 $8 $4 $6 $40 $0.04 $0.02 $80 $500,000 Cost $0 $0 $0 0 0 0 0 0 0 0 0 0 $0 Subtotal On-Site Thermal Treatment C. Construction Management Percentage 8% TOTAL ON-SITE THERMAL TREATMENT Cost Estimates Lower Passaic River Restoration Project $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $0 $0 1A-5 J - 44 June 2007 DMM Backup Sheets Scenario 1B: Total DMM Costs Focused Feasibility Study Lower Passaic River Restoration Project Component Cost DMM COSTS 1B-1 1B-2 1B-3 1B-4 1B-5 Site Characterization1 Starter Cell Construction Sub-grade Cell Construction CDF Construction On-Site Thermal Treatment $1,489,800 $56,542,704 $293,552,140 $305,212,040 $247,319,333 Subtotal DMM Costs $904,116,018 Contingency (20%) $180,823,204 TOTAL DMM COSTS $1,084,939,221 Notes: Site Characterization limited to geotechnical investigation of proposed starter cell and CDF areas. 1 Cost Estimates Lower Passaic River Restoration Project J - 45 June 2007 DMM Backup Sheets Scenario 1B: Site Characterization Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Unit Unit Cost Labor Barge-Auger Mobilization Auger Drilling and Sampling Undisturbed Sample Collection Bathymetric Survey Field Oversight Reporting Project Management Drilling Permits and Work Plans Total Labor LS Day Sample Day Day Day Week LS $10,000 $6,500 $400 $6,500 $2,640 $3,080 $1,600 $50,000 Disbursements Geotechnical Tests Drillers/ Surveyors Sustenance Total Disbursements Percentage Day 10% $500 TOTAL SITE CHARACTERIZATION COSTS Cost Estimates Lower Passaic River Restoration Project # of Units Cost 1 80 240 4 100 120 26 1 $10,000 $520,000 $96,000 $26,000 $264,000 $369,600 $41,600 $50,000 $1,377,200 626,000 100 $62,600 $50,000 $112,600 $1,489,800 1B-1 J - 46 June 2007 DMM Backup Sheets Scenario 1B: Starter Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Pre-Construction Activities Design Contractor Work Plans Permitting (Equivalency), and Legal Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Water Side Installation Vessels Walers Installation Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Water Side Installation Vessels Walers, Deadmen, and Bumpers Installation Total Outer Bulkhead Wall Construction Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 47,832,800 1 47,832,800 $3,826,624 $100,000 $956,656 $4,883,280 LS Day SF LF $100,000 $3,000 $31 $50 1 40 288,000 9,600 $100,000 $120,000 $8,784,000 $480,000 SF Day Day $12 $3,500 $1,800 288,000 137 50 $3,456,000 $480,000 $90,000 $13,510,000 SF LF Tieback LF CY $31 $50 $2,000 $18 $32 485,000 9,700 1,213 4,850 315,250 $14,792,500 $485,000 $2,425,000 $87,300 $10,088,000 SF Day Day $12 $3,500 $2,000 485,000 139 70 $5,820,000 $485,000 $140,000 $34,322,800 $52,716,080 Subtotal Starter Cell Construction D. Construction Management Percentage TOTAL STARTER CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 47,832,800 $3,826,624 $56,542,704 1B-2 J - 47 June 2007 DMM Backup Sheets Scenario 1B: Sub-grade Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Unit Unit Cost # of Units Percentage Percentage 8% 2% $248,773,000 $248,773,000 Sediment Veneer Dredging Mobilization/Site Clean-up/Demobilization Debris Removal Environmental Dredging Barge Transport of Dredge Material Dredged Material Off-Loading Testing and Monitoring Total Sediment Veneer Dredging LS Ton CY CY CY Month $461,200 $300 $25 $5 $7 $220,440 1 500 693,733 867,167 867,167 6 $461,200 $150,000 $17,343,333 $4,335,833 $6,070,167 $1,322,640 $29,683,173 Dredging Sub-grade cell Mobilization/Site Clean-up/Demobilization Debris Removal Dredging/Transport/Dump Testing and Monitoring Total Dredging Sub-grade cell LS Ton CY Month $800,000 $300 $20 $220,440 1 1,000 10,800,293 9 $800,000 $300,000 $216,005,867 $1,983,960 $219,089,827 Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Subtotal Sub-grade Cell Construction D. Construction Management $19,901,840 $4,975,460 $24,877,300 $273,650,300 Percentage 8% TOTAL SUB-GRADE CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost $248,773,000 $19,901,840 $293,552,140 1B-3 J - 48 June 2007 DMM Backup Sheets Scenario 1B: CDF Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. D. E. F. Pre-Construction Activities Design Contractor Work Plans Permits Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying - Assume 1/4 time required Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Additional Cost for 70' Sheet Piles Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers, Deadmen, and Bumpers Water Barrier Total Outer Bulkhead Wall Construction Water Treatment Mobilization/Demobilization Treatment Plant Piping to Plant Water Treatment Testing Subtotal Water Treatment CDF Operations Monitoring Wells Spreading Starter Cell Mount into CDF Operation of CDF (including Starter Cell) Total CDF Operations CDF Closing Mobilization/Site Clean-up/Demobilization Inner Sheetpile Wall Removal Removal of Backfill Between Walls Outer Sheetpile Wall Removal Decontamination Pad Construction Decontamination Operations and Equipment Off-site Disposal of Soil and Steel Sheets Geotextile Layer Compacted Clay Cover - Fill (Haul, Place, and Compact) Sand Cap (Purchase, Delivery, Placement, Monitoring) Vegetation Shoreline Plantings and other Trees Surveying Total CDF Closing Unit Unit Cost # of Units Cost Percentage LS Percentage 8% $100,000 2% 258,569,526 1 258,569,526 $20,685,562 $100,000 $5,171,391 $25,956,953 LS Day SF LF $400,000 $3,000 $31 $50 1 68 504,000 12,600 $400,000 $202,500 $15,372,000 $630,000 SF Day Day $12 $6,500 $1,800 504,000 90 80 $6,048,000 $585,000 $144,000 $23,381,500 SF SF LF Tieback LF CY $31 $2 $50 $2,000 $18 $32 889,000 889,000 12,700 1,588 7,250 13,426 $27,114,500 $1,778,000 $635,000 $3,175,000 $130,500 $429,630 SF Day Day Boom $12 $6,500 $2,000 $250,000 889,000 190 90 3 $10,668,000 $1,234,807 $180,000 $750,000 $46,095,436 LS LS LS Gallon Week $360,000 $1,500,000 $150,000 $0.04 $10,000 1 1 1 3,136,162,298 520 $360,000 $1,500,000 $150,000 $125,446,492 $5,200,000 $132,656,492 Well CY LS $750 $2 $22,894,000 85 0 1 $63,750 $0 $22,894,000 $22,957,750 LS LF CY LF LS Month Ton SY CY CY SY LS Day $75,000 $150 $14 $250 $90,000 $50,000 $50 $2 $15 $64 $1 $75,000 $3,000 1 22,200 13,426 22,400 1 3 12,219 216,832 0 361,387 0 0 30 $75,000 $3,330,000 $187,963 $5,600,000 $90,000 $150,000 $610,969 $379,456 $0 $22,964,960 $0 $0 $90,000 $33,478,348 $284,526,478 Subtotal CDF Construction G. Construction Management Percentage TOTAL CDF CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project 8% 258,569,526 $20,685,562 $305,212,040 1B-4 J - 49 June 2007 DMM Backup Sheets Scenario 1B: On-Site Thermal Treatment Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Dredged Material Treatment Mobilization/Demobilization Sediment Removal and Loading onto Trucks Transport to Thermal Treatment Area Dredged Material Off-Loading to Filter Press Mechanical Sediment Dewatering Water Treatment Discharge to POTW On-Site Thermal Treatment Sediment Processing Site Total Dredged Material Treatment Unit Unit Cost # of Units Percentage Percentage 8% 2% $209,592,655 $209,592,655 LS CY CY CY Ton Gallon Gallon Ton Acre $25,000 $8 $4 $6 $40 $0.04 $0.02 $80 $500,000 1 1,907,767 1,907,767 1,907,767 1,907,767 225,116,467 225,116,467 953,883 20 Construction Management Percentage 8% TOTAL ON-SITE THERMAL TREATMENT Cost Estimates Lower Passaic River Restoration Project $16,767,412 $4,191,853 $20,959,266 $25,000 $15,262,133 $7,631,067 $11,446,600 $76,310,667 $9,004,659 $3,601,863 $76,310,667 $10,000,000 $209,592,655 $230,551,921 Subtotal On-Site Thermal Treatment C. Cost 209,592,655 $16,767,412 $247,319,333 1B-5 J - 50 June 2007 DMM Backup Sheets Scenario 2A: Total DMM Costs Focused Feasibility Study Lower Passaic River Restoration Project Component Cost DMM COSTS 2A-1 2A-2 2A-3 2A-4 2A-5 Site Characterization1 Starter Cell Construction Sub-grade Cell Construction CDF Construction On-Site Thermal Treatment $1,489,800 $56,542,704 $0 $133,528,314 $0 Subtotal DMM Costs $191,560,818 Contingency (20%) $38,312,164 TOTAL DMM COSTS $229,872,982 Notes: Site Characterization limited to geotechnical investigation of proposed starter cell and CDF areas. 1 Cost Estimates Lower Passaic River Restoration Project J - 51 June 2007 DMM Backup Sheets Scenario 2A: Site Characterization Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Unit Unit Cost Labor Barge-Auger Mobilization Auger Drilling and Sampling Undisturbed Sample Collection Bathymetric Survey Field Oversight Reporting Project Management Drilling Permits and Work Plans Total Labor LS Day Sample Day Day Day Week LS $10,000 $6,500 $400 $6,500 $2,640 $3,080 $1,600 $50,000 Disbursements Geotechnical Tests Drillers/ Surveyors Sustenance Total Disbursements Percentage Day 10% $500 TOTAL SITE CHARACTERIZATION COSTS Cost Estimates Lower Passaic River Restoration Project # of Units Cost 1 80 240 4 100 120 26 1 $10,000 $520,000 $96,000 $26,000 $264,000 $369,600 $41,600 $50,000 $1,377,200 626,000 100 $62,600 $50,000 $112,600 $1,489,800 2A-1 J - 52 June 2007 DMM Backup Sheets Scenario 2A: Starter Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Pre-Construction Activities Design Contractor Work Plans Permitting (Equivalency), and Legal Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Water Side Installation Vessels Walers Installation Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Water Side Installation Vessels Walers, Deadmen, and Bumpers Installation Total Outer Bulkhead Wall Construction Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 47,832,800 1 47,832,800 $3,826,624 $100,000 $956,656 $4,883,280 LS Day SF LF $100,000 $3,000 $31 $50 1 40 288,000 9,600 $100,000 $120,000 $8,784,000 $480,000 SF Day Day $12 $3,500 $1,800 288,000 137 50 $3,456,000 $480,000 $90,000 $13,510,000 SF LF Tieback LF CY $31 $50 $2,000 $18 $32 485,000 9,700 1,213 4,850 315,250 $14,792,500 $485,000 $2,425,000 $87,300 $10,088,000 SF Day Day $12 $3,500 $2,000 485,000 139 70 $5,820,000 $485,000 $140,000 $34,322,800 $52,716,080 Subtotal Starter Cell Construction D. Construction Management Percentage TOTAL STARTER CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 47,832,800 $3,826,624 $56,542,704 2A-2 J - 53 June 2007 DMM Backup Sheets Scenario 2A: Sub-grade Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Unit Unit Cost # of Units Percentage Percentage 8% 2% $0 $0 Sediment Veneer Dredging Mobilization/Site Clean-up/Demobilization Debris Removal Environmental Dredging Barge Transport of Dredge Material Dredged Material Off-Loading Testing and Monitoring Total Sediment Veneer Dredging LS Ton CY CY CY Month $461,200 $300 $25 $5 $7 $220,440 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 Dredging Sub-grade cell Mobilization/Site Clean-up/Demobilization Debris Removal Dredging/Transport/Dump Testing and Monitoring Total Dredging Sub-grade cell LS Ton CY Month $800,000 $300 $20 $220,440 0 0 0 0 $0 $0 $0 $0 $0 Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Cost $0 $0 $0 Subtotal Sub-grade Cell Construction D. Construction Management $0 Percentage 8% TOTAL SUB-GRADE CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project $0 $0 $0 2A-3 J - 54 June 2007 DMM Backup Sheets Scenario 2A: CDF Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. D. E. F. Pre-Construction Activities Design Contractor Work Plans Permits Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying - Assume 1/4 time required Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Additional Cost for 70' Sheet Piles Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers, Deadmen, and Bumpers Water Barrier Total Outer Bulkhead Wall Construction Water Treatment Mobilization/Demobilization Treatment Plant Piping to Plant Water Treatment Testing Subtotal Water Treatment CDF Operations Monitoring Wells Spreading Starter Cell Mount into CDF Operation of CDF (including Starter Cell) Total CDF Operations CDF Closing Mobilization/Site Clean-up/Demobilization Inner Sheetpile Wall Removal Removal of Backfill Between Walls Outer Sheetpile Wall Removal Decontamination Pad Construction Decontamination Operations and Equipment Off-site Disposal of Soil and Steel Sheets Geotextile Layer Compacted Clay Cover - Fill (Haul, Place, and Compact) Sand Cap (Purchase, Delivery, Placement, Monitoring) Vegetation Shoreline Plantings and other Trees Surveying Total CDF Closing Unit Unit Cost # of Units Cost Percentage LS Percentage 8% $100,000 2% 113,074,843 1 113,074,843 $9,045,987 $100,000 $2,261,497 $11,407,484 LS Day SF LF $400,000 $3,000 $31 $50 1 68 504,000 12,600 $400,000 $202,500 $15,372,000 $630,000 SF Day Day $12 $6,500 $1,800 504,000 90 80 $6,048,000 $585,000 $144,000 $23,381,500 SF SF LF Tieback LF CY $31 $2 $50 $2,000 $18 $32 889,000 889,000 12,700 1,588 7,250 13,426 $27,114,500 $1,778,000 $635,000 $3,175,000 $130,500 $429,630 SF Day Day Boom $12 $6,500 $2,000 $250,000 889,000 190 90 3 $10,668,000 $1,234,807 $180,000 $750,000 $46,095,436 LS LS LS Gallon Week $120,000 $500,000 $150,000 $0.04 $10,000 1 1 1 350,356,912 520 $120,000 $500,000 $150,000 $14,014,276 $5,200,000 $19,984,276 Well CY LS $750 $2 $17,347,000 85 0 1 $63,750 $0 $17,347,000 $17,410,750 LS LF CY LF LS Month Ton SY CY CY SY LS Day $75,000 $150 $14 $250 $90,000 $50,000 $50 $2 $15 $64 $1 $75,000 $3,000 1 0 0 0 0 0 0 216,832 361,387 0 216,832 1 30 $75,000 $0 $0 $0 $0 $0 $0 $379,456 $5,420,800 $0 $162,624 $75,000 $90,000 $6,202,880 $124,482,327 Subtotal CDF Construction G. Construction Management Percentage TOTAL CDF CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project 8% 113,074,843 $9,045,987 $133,528,314 2A-4 J - 55 June 2007 DMM Backup Sheets Scenario 2A: On-Site Thermal Treatment Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Dredged Material Treatment Mobilization/Demobilization Sediment Removal and Loading onto Trucks Transport to Thermal Treatment Area Dredged Material Off-Loading to Filter Press Mechanical Sediment Dewatering Water Treatment Discharge to POTW On-Site Thermal Treatment Sediment Processing Site Total Dredged Material Treatment Unit Unit Cost # of Units Percentage Percentage 8% 2% $0 $0 LS CY CY CY Ton Gallon Gallon Ton Acre $25,000 $8 $4 $6 $40 $0.04 $0.02 $80 $500,000 Cost $0 $0 $0 0 0 0 0 0 0 0 0 0 $0 Subtotal On-Site Thermal Treatment C. Construction Management Percentage 8% TOTAL ON-SITE THERMAL TREATMENT Cost Estimates Lower Passaic River Restoration Project $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $0 $0 2A-5 J - 56 June 2007 DMM Backup Sheets Scenario 2B: Total DMM Costs Focused Feasibility Study Lower Passaic River Restoration Project Component Cost DMM COSTS 2B-1 2B-2 2B-3 2B-4 2B-5 Site Characterization1 Starter Cell Construction Sub-grade Cell Construction CDF Construction On-Site Thermal Treatment $1,489,800 $56,542,704 $0 $165,906,635 $173,939,890 Subtotal DMM Costs $397,879,028 Contingency (20%) $79,575,806 TOTAL DMM COSTS $477,454,834 Notes: Site Characterization limited to geotechnical investigation of proposed starter cell and CDF areas. 1 Cost Estimates Lower Passaic River Restoration Project J - 57 June 2007 DMM Backup Sheets Scenario 2B: Site Characterization Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Unit Unit Cost Labor Barge-Auger Mobilization Auger Drilling and Sampling Undisturbed Sample Collection Bathymetric Survey Field Oversight Reporting Project Management Drilling Permits and Work Plans Total Labor LS Day Sample Day Day Day Week LS $10,000 $6,500 $400 $6,500 $2,640 $3,080 $1,600 $50,000 Disbursements Geotechnical Tests Drillers/ Surveyors Sustenance Total Disbursements Percentage Day 10% $500 TOTAL SITE CHARACTERIZATION COSTS Cost Estimates Lower Passaic River Restoration Project # of Units Cost 1 80 240 4 100 120 26 1 $10,000 $520,000 $96,000 $26,000 $264,000 $369,600 $41,600 $50,000 $1,377,200 626,000 100 $62,600 $50,000 $112,600 $1,489,800 2B-1 J - 58 June 2007 DMM Backup Sheets Scenario 2B: Starter Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Pre-Construction Activities Design Contractor Work Plans Permitting (Equivalency), and Legal Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Water Side Installation Vessels Walers Installation Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Water Side Installation Vessels Walers, Deadmen, and Bumpers Installation Total Outer Bulkhead Wall Construction Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 47,832,800 1 47,832,800 $3,826,624 $100,000 $956,656 $4,883,280 LS Day SF LF $100,000 $3,000 $31 $50 1 40 288,000 9,600 $100,000 $120,000 $8,784,000 $480,000 SF Day Day $12 $3,500 $1,800 288,000 137 50 $3,456,000 $480,000 $90,000 $13,510,000 SF LF Tieback LF CY $31 $50 $2,000 $18 $32 485,000 9,700 1,213 4,850 315,250 $14,792,500 $485,000 $2,425,000 $87,300 $10,088,000 SF Day Day $12 $3,500 $2,000 485,000 139 70 $5,820,000 $485,000 $140,000 $34,322,800 $52,716,080 Subtotal Starter Cell Construction D. Construction Management Percentage TOTAL STARTER CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 47,832,800 $3,826,624 $56,542,704 2B-2 J - 59 June 2007 DMM Backup Sheets Scenario 2B: Sub-grade Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Unit Unit Cost # of Units Percentage Percentage 8% 2% $0 $0 Sediment Veneer Dredging Mobilization/Site Clean-up/Demobilization Debris Removal Environmental Dredging Barge Transport of Dredge Material Dredged Material Off-Loading Testing and Monitoring Total Sediment Veneer Dredging LS Ton CY CY CY Month $461,200 $300 $25 $5 $7 $220,440 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 Dredging Sub-grade cell Mobilization/Site Clean-up/Demobilization Debris Removal Dredging/Transport/Dump Testing and Monitoring Total Dredging Sub-grade cell LS Ton CY Month $800,000 $300 $15 $220,440 0 0 0 0 $0 $0 $0 $0 $0 Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Cost $0 $0 $0 Subtotal Sub-grade Cell Construction D. Construction Management $0 Percentage 8% TOTAL SUB-GRADE CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project $0 $0 $0 2B-3 J - 60 June 2007 DMM Backup Sheets Scenario 2B: CDF Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. D. E. F. Pre-Construction Activities Design Contractor Work Plans Permits Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying - Assume 1/4 time required Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Additional Cost for 70' Sheet Piles Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers, Deadmen, and Bumpers Water Barrier Total Outer Bulkhead Wall Construction Water Treatment Mobilization/Demobilization Treatment Plant Piping to Plant Water Treatment Testing Subtotal Water Treatment CDF Operations Monitoring Wells Spreading Starter Cell Mount into CDF Operation of CDF (including Starter Cell) Total CDF Operations CDF Closing Mobilization/Site Clean-up/Demobilization Inner Sheetpile Wall Removal Removal of Backfill Between Walls Outer Sheetpile Wall Removal Decontamination Pad Construction Decontamination Operations and Equipment Off-site Disposal of Soil and Steel Sheets Geotextile Layer Compacted Clay Cover - Fill (Haul, Place, and Compact) Sand Cap (Purchase, Delivery, Placement, Monitoring) Vegetation Shoreline Plantings and other Trees Surveying Total CDF Closing Unit Unit Cost # of Units Cost Percentage LS Percentage 8% $100,000 2% 140,514,097 1 140,514,097 $11,241,128 $100,000 $2,810,282 $14,151,410 LS Day SF LF $400,000 $3,000 $31 $50 1 68 504,000 12,600 $400,000 $202,500 $15,372,000 $630,000 SF Day Day $12 $6,500 $1,800 504,000 90 80 $6,048,000 $585,000 $144,000 $23,381,500 SF SF LF Tieback LF CY $31 $2 $50 $2,000 $18 $32 889,000 889,000 12,700 1,588 7,250 13,426 $27,114,500 $1,778,000 $635,000 $3,175,000 $130,500 $429,630 SF Day Day Boom $12 $6,500 $2,000 $250,000 889,000 190 90 3 $10,668,000 $1,234,807 $180,000 $750,000 $46,095,436 LS LS LS Gallon Week $120,000 $500,000 $150,000 $0.04 $10,000 1 1 1 350,356,912 520 $120,000 $500,000 $150,000 $14,014,276 $5,200,000 $19,984,276 Well CY LS $750 $2 $17,347,000 85 0 1 $63,750 $0 $17,347,000 $17,410,750 LS LF CY LF LS Month Ton SY CY CY SY LS Day $75,000 $150 $14 $250 $90,000 $50,000 $50 $2 $15 $64 $1 $75,000 $3,000 1 22,200 13,426 22,400 1 3 12,219 216,832 0 361,387 0 0 30 $75,000 $3,330,000 $187,963 $5,600,000 $90,000 $150,000 $610,969 $379,456 $0 $23,128,747 $0 $0 $90,000 $33,642,134 $154,665,507 Subtotal CDF Construction G. Construction Management Percentage TOTAL CDF CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project 8% 140,514,097 $11,241,128 $165,906,635 2B-4 J - 61 June 2007 DMM Backup Sheets Scenario 2B: On-Site Thermal Treatment Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Dredged Material Treatment Mobilization/Demobilization Sediment Removal and Loading onto Trucks Transport to Thermal Treatment Area Dredged Material Off-Loading to Filter Press Mechanical Sediment Dewatering Water Treatment Discharge to POTW On-Site Thermal Treatment Sediment Processing Site Total Dredged Material Treatment Unit Unit Cost # of Units Percentage Percentage 8% 2% $147,406,686 $147,406,686 LS CY CY CY Ton Gallon Gallon Ton Acre $25,000 $8 $4 $6 $40 $0.04 $0.02 $80 $500,000 1 1,313,300 1,313,300 1,313,300 1,313,300 154,969,400 154,969,400 656,650 20 Construction Management Percentage 8% TOTAL ON-SITE THERMAL TREATMENT Cost Estimates Lower Passaic River Restoration Project $11,792,535 $2,948,134 $14,740,669 $25,000 $10,506,400 $5,253,200 $7,879,800 $52,532,000 $6,198,776 $2,479,510 $52,532,000 $10,000,000 $147,406,686 $162,147,355 Subtotal On-Site Thermal Treatment C. Cost 147,406,686 $11,792,535 $173,939,890 2B-5 J - 62 June 2007 DMM Backup Sheets Scenario 3A: Total DMM Costs Focused Feasibility Study Lower Passaic River Restoration Project Component Cost DMM COSTS 3A-1 3A-2 3A-3 3A-4 3A-5 Site Characterization1 Starter Cell Construction Sub-grade Cell Construction CDF Construction On-Site Thermal Treatment $1,489,800 $56,542,704 $156,498,637 $220,680,968 $0 Subtotal DMM Costs $435,212,109 Contingency (20%) $87,042,422 TOTAL DMM COSTS $522,254,531 Notes: Site Characterization limited to geotechnical investigation of proposed starter cell and CDF areas. 1 Cost Estimates Lower Passaic River Restoration Project J - 63 June 2007 DMM Backup Sheets Scenario 3A: Site Characterization Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Unit Unit Cost Labor Barge-Auger Mobilization Auger Drilling and Sampling Undisturbed Sample Collection Bathymetric Survey Field Oversight Reporting Project Management Drilling Permits and Work Plans Total Labor LS Day Sample Day Day Day Week LS $10,000 $6,500 $400 $6,500 $2,640 $3,080 $1,600 $50,000 Disbursements Geotechnical Tests Drillers/ Surveyors Sustenance Total Disbursements Percentage Day 10% $500 TOTAL SITE CHARACTERIZATION COSTS Cost Estimates Lower Passaic River Restoration Project # of Units Cost 1 80 240 4 100 120 26 1 $10,000 $520,000 $96,000 $26,000 $264,000 $369,600 $41,600 $50,000 $1,377,200 626,000 100 $62,600 $50,000 $112,600 $1,489,800 3A-1 J - 64 June 2007 DMM Backup Sheets Scenario 3A: Starter Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Pre-Construction Activities Design Contractor Work Plans Permitting (Equivalency), and Legal Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Water Side Installation Vessels Walers Installation Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Water Side Installation Vessels Walers, Deadmen, and Bumpers Installation Total Outer Bulkhead Wall Construction Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 47,832,800 1 47,832,800 $3,826,624 $100,000 $956,656 $4,883,280 LS Day SF LF $100,000 $3,000 $31 $50 1 40 288,000 9,600 $100,000 $120,000 $8,784,000 $480,000 SF Day Day $12 $3,500 $1,800 288,000 137 50 $3,456,000 $480,000 $90,000 $13,510,000 SF LF Tieback LF CY $31 $50 $2,000 $18 $32 485,000 9,700 1,213 4,850 315,250 $14,792,500 $485,000 $2,425,000 $87,300 $10,088,000 SF Day Day $12 $3,500 $2,000 485,000 139 70 $5,820,000 $485,000 $140,000 $34,322,800 $52,716,080 Subtotal Starter Cell Construction D. Construction Management Percentage TOTAL STARTER CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 47,832,800 $3,826,624 $56,542,704 3A-2 J - 65 June 2007 DMM Backup Sheets Scenario 3A: Sub-grade Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Unit Unit Cost # of Units Percentage Percentage 8% 2% $132,625,963 $132,625,963 Sediment Veneer Dredging Mobilization/Site Clean-up/Demobilization Debris Removal Environmental Dredging Barge Transport of Dredge Material Dredged Material Off-Loading Testing and Monitoring Total Sediment Veneer Dredging LS Ton CY CY CY Month $461,200 $300 $25 $5 $7 $220,440 1 500 693,733 867,167 867,167 6 $461,200 $150,000 $17,343,333 $4,335,833 $6,070,167 $1,322,640 $29,683,173 Dredging Sub-grade cell Mobilization/Site Clean-up/Demobilization Debris Removal Dredging/Transport/Dump Testing and Monitoring Total Dredging Sub-grade cell LS Ton CY Month $800,000 $300 $15 $220,440 1 1,000 6,701,343 6 $800,000 $300,000 $100,520,150 $1,322,640 $102,942,790 Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Subtotal Sub-grade Cell Construction D. Construction Management $10,610,077 $2,652,519 $13,262,596 $145,888,560 Percentage TOTAL SUB-GRADE CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% $132,625,963 $10,610,077 $156,498,637 3A-3 J - 66 June 2007 DMM Backup Sheets Scenario 3A: CDF Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. D. E. F. Pre-Construction Activities Design Contractor Work Plans Permits Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying - Assume 1/4 time required Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Additional Cost for 70' Sheet Piles Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers, Deadmen, and Bumpers Water Barrier Total Outer Bulkhead Wall Construction Water Treatment Mobilization/Demobilization Treatment Plant Piping to Plant Water Treatment Testing Subtotal Water Treatment CDF Operations Monitoring Wells Spreading Starter Cell Mount into CDF Operation of CDF (including Starter Cell) Total CDF Operations CDF Closing Mobilization/Site Clean-up/Demobilization Inner Sheetpile Wall Removal Removal of Backfill Between Walls Outer Sheetpile Wall Removal Decontamination Pad Construction Decontamination Operations and Equipment Off-site Disposal of Soil and Steel Sheets Geotextile Layer Compacted Clay Cover - Fill (Haul, Place, and Compact) Sand Cap (Purchase, Delivery, Placement, Monitoring) Vegetation Shoreline Plantings and other Trees Surveying Total CDF Closing Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 186,933,024 1 186,933,024 $14,954,642 $100,000 $3,738,660 $18,793,302 LS Day SF LF $400,000 $3,000 $31 $50 1 68 504,000 12,600 $400,000 $202,500 $15,372,000 $630,000 SF Day Day $12 $6,500 $1,800 504,000 90 80 $6,048,000 $585,000 $144,000 $23,381,500 SF SF LF Tieback LF CY $31 $2 $50 $2,000 $18 $32 889,000 889,000 12,700 1,588 7,250 13,426 $27,114,500 $1,778,000 $635,000 $3,175,000 $130,500 $429,630 SF Day Day Boom $12 $6,500 $2,000 $250,000 889,000 190 90 3 $10,668,000 $1,234,807 $180,000 $750,000 $46,095,436 LS LS LS Gallon Week $360,000 $1,500,000 $150,000 $0.04 $10,000 1 1 1 2,142,700,449 520 $360,000 $1,500,000 $150,000 $85,708,018 $5,200,000 $92,918,018 Well CY LS $750 $2 $17,347,000 85 462,220 1 $63,750 $924,440 $17,347,000 $18,335,190 LS LF CY LF LS Month Ton SY CY CY SY LS Day $75,000 $150 $14 $250 $90,000 $50,000 $50 $2 $15 $64 $1 $75,000 $3,000 1 0 0 0 0 0 0 216,832 361,387 0 216,832 1 30 $75,000 $0 $0 $0 $0 $0 $0 $379,456 $5,420,800 $0 $162,624 $75,000 $90,000 $6,202,880 $205,726,327 Subtotal CDF Construction G. Construction Management Percentage TOTAL CDF CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 186,933,024 $14,954,642 $220,680,968 3A-4 J - 67 June 2007 DMM Backup Sheets Scenario 3A: On-Site Thermal Treatment Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Dredged Material Treatment Mobilization/Demobilization Sediment Removal and Loading onto Trucks Transport to Thermal Treatment Area Dredged Material Off-Loading to Filter Press Mechanical Sediment Dewatering Water Treatment Discharge to POTW On-Site Thermal Treatment Sediment Processing Site Total Dredged Material Treatment Unit Unit Cost # of Units Percentage Percentage 8% 2% $0 $0 LS CY CY CY Ton Gallon Gallon Ton Acre $25,000 $8 $4 $6 $40 $0.04 $0.02 $80 $500,000 Cost $0 $0 $0 0 0 0 0 0 0 0 0 0 $0 Subtotal On-Site Thermal Treatment C. Construction Management Percentage 8% TOTAL ON-SITE THERMAL TREATMENT Cost Estimates Lower Passaic River Restoration Project $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $0 $0 3A-5 J - 68 June 2007 DMM Backup Sheets Scenario 3B: Total DMM Costs Focused Feasibility Study Lower Passaic River Restoration Project Component Cost DMM COSTS 3B-1 3B-2 3B-3 3B-4 3B-5 Site Characterization1 Starter Cell Construction Sub-grade Cell Construction CDF Construction On-Site Thermal Treatment $1,489,800 $56,542,704 $148,016,797 $252,838,662 $247,319,333 Subtotal DMM Costs $706,207,296 Contingency (20%) $141,241,459 TOTAL DMM COSTS $847,448,755 Notes: Site Characterization limited to geotechnical investigation of proposed starter cell and CDF areas. 1 Cost Estimates Lower Passaic River Restoration Project J - 69 June 2007 DMM Backup Sheets Scenario 3B: Site Characterization Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Unit Unit Cost Labor Barge-Auger Mobilization Auger Drilling and Sampling Undisturbed Sample Collection Bathymetric Survey Field Oversight Reporting Project Management Drilling Permits and Work Plans Total Labor LS Day Sample Day Day Day Week LS $10,000 $6,500 $400 $6,500 $2,640 $3,080 $1,600 $50,000 Disbursements Geotechnical Tests Drillers/ Surveyors Sustenance Total Disbursements Percentage Day 10% $500 TOTAL SITE CHARACTERIZATION COSTS Cost Estimates Lower Passaic River Restoration Project # of Units Cost 1 80 240 4 100 120 26 1 $10,000 $520,000 $96,000 $26,000 $264,000 $369,600 $41,600 $50,000 $1,377,200 626,000 100 $62,600 $50,000 $112,600 $1,489,800 3B-1 J - 70 June 2007 DMM Backup Sheets Scenario 3B: Starter Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Pre-Construction Activities Design Contractor Work Plans Permitting (Equivalency), and Legal Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Water Side Installation Vessels Walers Installation Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Water Side Installation Vessels Walers, Deadmen, and Bumpers Installation Total Outer Bulkhead Wall Construction Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 47,832,800 1 47,832,800 $3,826,624 $100,000 $956,656 $4,883,280 LS Day SF LF $100,000 $3,000 $31 $50 1 40 288,000 9,600 $100,000 $120,000 $8,784,000 $480,000 SF Day Day $12 $3,500 $1,800 288,000 137 50 $3,456,000 $480,000 $90,000 $13,510,000 SF LF Tieback LF CY $31 $50 $2,000 $18 $32 485,000 9,700 1,213 4,850 315,250 $14,792,500 $485,000 $2,425,000 $87,300 $10,088,000 SF Day Day $12 $3,500 $2,000 485,000 139 70 $5,820,000 $485,000 $140,000 $34,322,800 $52,716,080 Subtotal Starter Cell Construction D. Construction Management Percentage TOTAL STARTER CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 47,832,800 $3,826,624 $56,542,704 3B-2 J - 71 June 2007 DMM Backup Sheets Scenario 3B: Sub-grade Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Unit Unit Cost # of Units Percentage Percentage 8% 2% $125,437,963 $125,437,963 Sediment Veneer Dredging Mobilization/Site Clean-up/Demobilization Debris Removal Environmental Dredging Barge Transport of Dredge Material Dredged Material Off-Loading Testing and Monitoring Total Sediment Veneer Dredging LS Ton CY CY CY Month $461,200 $300 $25 $5 $7 $220,440 1 500 693,733 867,167 867,167 6 $461,200 $150,000 $17,343,333 $4,335,833 $6,070,167 $1,322,640 $29,683,173 Dredging Sub-grade cell Mobilization/Site Clean-up/Demobilization Debris Removal Dredging/Transport/Dump Testing and Monitoring Total Dredging Sub-grade cell LS Ton CY Month $800,000 $300 $15 $220,440 1 1,000 6,222,143 6 $800,000 $300,000 $93,332,150 $1,322,640 $95,754,790 Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Subtotal Sub-grade Cell Construction D. Construction Management $10,035,037 $2,508,759 $12,543,796 $137,981,760 Percentage TOTAL SUB-GRADE CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% $125,437,963 $10,035,037 $148,016,797 3B-3 J - 72 June 2007 DMM Backup Sheets Scenario 3B: CDF Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. D. E. F. Pre-Construction Activities Design Contractor Work Plans Permits Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying - Assume 1/4 time required Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Additional Cost for 70' Sheet Piles Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers, Deadmen, and Bumpers Water Barrier Total Outer Bulkhead Wall Construction Water Treatment Mobilization/Demobilization Treatment Plant Piping to Plant Water Treatment Testing Subtotal Water Treatment CDF Operations Monitoring Wells Spreading Starter Cell Mount into CDF Operation of CDF (including Starter Cell) Total CDF Operations CDF Closing Mobilization/Site Clean-up/Demobilization Inner Sheetpile Wall Removal Removal of Backfill Between Walls Outer Sheetpile Wall Removal Decontamination Pad Construction Decontamination Operations and Equipment Off-site Disposal of Soil and Steel Sheets Geotextile Layer Compacted Clay Cover - Fill (Haul, Place, and Compact) Sand Cap (Purchase, Delivery, Placement, Monitoring) Vegetation Shoreline Plantings and other Trees Surveying Total CDF Closing Unit Unit Cost # of Units Cost Percentage LS Percentage 8% $100,000 2% 214,185,307 1 214,185,307 $17,134,825 $100,000 $4,283,706 $21,518,531 LS Day SF LF $400,000 $3,000 $31 $50 1 68 504,000 12,600 $400,000 $202,500 $15,372,000 $630,000 SF Day Day $12 $6,500 $1,800 504,000 90 80 $6,048,000 $585,000 $144,000 $23,381,500 SF SF LF Tieback LF CY $31 $2 $50 $2,000 $18 $32 889,000 889,000 12,700 1,588 7,250 13,426 $27,114,500 $1,778,000 $635,000 $3,175,000 $130,500 $429,630 SF Day Day Boom $12 $6,500 $2,000 $250,000 889,000 190 90 3 $10,668,000 $1,234,807 $180,000 $750,000 $46,095,436 LS LS LS Gallon Week $360,000 $1,500,000 $150,000 $0.04 $10,000 1 1 1 2,026,556,822 520 $360,000 $1,500,000 $150,000 $81,062,273 $5,200,000 $88,272,273 Well CY LS $750 $2 $22,894,000 85 0 1 $63,750 $0 $22,894,000 $22,957,750 LS LF CY LF LS Month Ton SY CY CY SY LS Day $75,000 $150 $14 $250 $90,000 $50,000 $50 $2 $15 $64 $1 $75,000 $3,000 1 22,200 13,426 22,400 1 3 12,219 216,832 0 361,387 0 0 30 $75,000 $3,330,000 $187,963 $5,600,000 $90,000 $150,000 $610,969 $379,456 $0 $22,964,960 $0 $0 $90,000 $33,478,348 $235,703,837 Subtotal CDF Construction G. Construction Management Percentage TOTAL CDF CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project 8% 214,185,307 $17,134,825 $252,838,662 3B-4 J - 73 June 2007 DMM Backup Sheets Scenario 3B: On-Site Thermal Treatment Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Dredged Material Treatment Mobilization/Demobilization Sediment Removal and Loading onto Trucks Transport to Thermal Treatment Area Dredged Material Off-Loading to Filter Press Mechanical Sediment Dewatering Water Treatment Discharge to POTW On-Site Thermal Treatment Sediment Processing Site Total Dredged Material Treatment Unit Unit Cost # of Units Percentage Percentage 8% 2% $209,592,655 $209,592,655 LS CY CY CY Ton Gallon Gallon Ton Acre $25,000 $8 $4 $6 $40 $0.04 $0.02 $80 $500,000 1 1,907,767 1,907,767 1,907,767 1,907,767 225,116,467 225,116,467 953,883 20 Construction Management Percentage 8% TOTAL ON-SITE THERMAL TREATMENT Cost Estimates Lower Passaic River Restoration Project $16,767,412 $4,191,853 $20,959,266 $25,000 $15,262,133 $7,631,067 $11,446,600 $76,310,667 $9,004,659 $3,601,863 $76,310,667 $10,000,000 $209,592,655 $230,551,921 Subtotal On-Site Thermal Treatment C. Cost 209,592,655 $16,767,412 $247,319,333 3B-5 J - 74 June 2007 DMM Backup Sheets Scenario 4A: Total DMM Costs Focused Feasibility Study Lower Passaic River Restoration Project Component Cost DMM COSTS 4A-1 4A-2 4A-3 4A-4 4A-5 Site Characterization1 Starter Cell Construction Sub-grade Cell Construction CDF Construction On-Site Thermal Treatment $1,489,800 $56,542,704 $104,134,213 $186,441,457 $0 Subtotal DMM Costs $348,608,174 Contingency (20%) $69,721,635 TOTAL DMM COSTS $418,329,809 Notes: Site Characterization limited to geotechnical investigation of proposed starter cell and CDF areas. 1 Cost Estimates Lower Passaic River Restoration Project J - 75 June 2007 DMM Backup Sheets Scenario 4A: Site Characterization Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Unit Unit Cost Labor Barge-Auger Mobilization Auger Drilling and Sampling Undisturbed Sample Collection Bathymetric Survey Field Oversight Reporting Project Management Drilling Permits and Work Plans Total Labor LS Day Sample Day Day Day Week LS $10,000 $6,500 $400 $6,500 $2,640 $3,080 $1,600 $50,000 Disbursements Geotechnical Tests Drillers/ Surveyors Sustenance Total Disbursements Percentage Day 10% $500 TOTAL SITE CHARACTERIZATION COSTS Cost Estimates Lower Passaic River Restoration Project # of Units Cost 1 80 240 4 100 120 26 1 $10,000 $520,000 $96,000 $26,000 $264,000 $369,600 $41,600 $50,000 $1,377,200 626,000 100 $62,600 $50,000 $112,600 $1,489,800 4A-1 J - 76 June 2007 DMM Backup Sheets Scenario 4A: Starter Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Pre-Construction Activities Design Contractor Work Plans Permitting (Equivalency), and Legal Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Water Side Installation Vessels Walers Installation Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Water Side Installation Vessels Walers, Deadmen, and Bumpers Installation Total Outer Bulkhead Wall Construction Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 47,832,800 1 47,832,800 $3,826,624 $100,000 $956,656 $4,883,280 LS Day SF LF $100,000 $3,000 $31 $50 1 40 288,000 9,600 $100,000 $120,000 $8,784,000 $480,000 SF Day Day $12 $3,500 $1,800 288,000 137 50 $3,456,000 $480,000 $90,000 $13,510,000 SF LF Tieback LF CY $31 $50 $2,000 $18 $32 485,000 9,700 1,213 4,850 315,250 $14,792,500 $485,000 $2,425,000 $87,300 $10,088,000 SF Day Day $12 $3,500 $2,000 485,000 139 70 $5,820,000 $485,000 $140,000 $34,322,800 $52,716,080 Subtotal Starter Cell Construction D. Construction Management Percentage TOTAL STARTER CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 47,832,800 $3,826,624 $56,542,704 4A-2 J - 77 June 2007 DMM Backup Sheets Scenario 4A: Sub-grade Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Unit Unit Cost # of Units Percentage Percentage 8% 2% $88,249,333 $88,249,333 Sediment Veneer Dredging Mobilization/Site Clean-up/Demobilization Debris Removal Environmental Dredging Barge Transport of Dredge Material Dredged Material Off-Loading Testing and Monitoring Total Sediment Veneer Dredging LS Ton CY CY CY Month $461,200 $300 $25 $5 $7 $220,440 1 500 693,733 867,167 867,167 6 $461,200 $150,000 $17,343,333 $4,335,833 $6,070,167 $1,322,640 $29,683,173 Dredging Sub-grade cell Mobilization/Site Clean-up/Demobilization Debris Removal Dredging/Transport/Dump Testing and Monitoring Total Dredging Sub-grade cell LS Ton CY Month $800,000 $300 $15 $220,440 1 1,000 3,772,293 4 $800,000 $300,000 $56,584,400 $881,760 $58,566,160 Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Subtotal Sub-grade Cell Construction D. Construction Management $7,059,947 $1,764,987 $8,824,933 $97,074,267 Percentage 8% TOTAL SUB-GRADE CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost $88,249,333 $7,059,947 $104,134,213 4A-3 J - 78 June 2007 DMM Backup Sheets Scenario 4A: CDF Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. D. E. F. Pre-Construction Activities Design Contractor Work Plans Permits Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying - Assume 1/4 time required Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Additional Cost for 70' Sheet Piles Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers, Deadmen, and Bumpers Water Barrier Total Outer Bulkhead Wall Construction Water Treatment Mobilization/Demobilization Treatment Plant Piping to Plant Water Treatment Testing Subtotal Water Treatment CDF Operations Monitoring Wells Spreading Starter Cell Mount into CDF Operation of CDF (including Starter Cell) Total CDF Operations CDF Closing Mobilization/Site Clean-up/Demobilization Inner Sheetpile Wall Removal Removal of Backfill Between Walls Outer Sheetpile Wall Removal Decontamination Pad Construction Decontamination Operations and Equipment Off-site Disposal of Soil and Steel Sheets Geotextile Layer Compacted Clay Cover - Fill (Haul, Place, and Compact) Sand Cap (Purchase, Delivery, Placement, Monitoring) Vegetation Shoreline Plantings and other Trees Surveying Total CDF Closing Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 157,916,489 1 157,916,489 $12,633,319 $100,000 $3,158,330 $15,891,649 LS Day SF LF $400,000 $3,000 $31 $50 1 68 504,000 12,600 $400,000 $202,500 $15,372,000 $630,000 SF Day Day $12 $6,500 $1,800 504,000 90 80 $6,048,000 $585,000 $144,000 $23,381,500 SF SF LF Tieback LF CY $31 $2 $50 $2,000 $18 $32 889,000 889,000 12,700 1,588 7,250 13,426 $27,114,500 $1,778,000 $635,000 $3,175,000 $130,500 $429,630 SF Day Day Boom $12 $6,500 $2,000 $250,000 889,000 190 90 3 $10,668,000 $1,234,807 $180,000 $750,000 $46,095,436 LS LS LS Gallon Week $240,000 $1,000,000 $150,000 $0.04 $10,000 1 1 1 1,432,787,074 520 $240,000 $1,000,000 $150,000 $57,311,483 $5,200,000 $63,901,483 Well CY LS $750 $2 $17,347,000 85 462,220 1 $63,750 $924,440 $17,347,000 $18,335,190 LS LF CY LF LS Month Ton SY CY CY SY LS Day $75,000 $150 $14 $250 $90,000 $50,000 $50 $2 $15 $64 $1 $75,000 $3,000 1 0 0 0 0 0 0 216,832 361,387 0 216,832 1 30 $75,000 $0 $0 $0 $0 $0 $0 $379,456 $5,420,800 $0 $162,624 $75,000 $90,000 $6,202,880 $173,808,138 Subtotal CDF Construction G. Construction Management Percentage TOTAL CDF CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 157,916,489 $12,633,319 $186,441,457 4A-4 J - 79 June 2007 DMM Backup Sheets Scenario 4A: On-Site Thermal Treatment Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Dredged Material Treatment Mobilization/Demobilization Sediment Removal and Loading onto Trucks Transport to Thermal Treatment Area Dredged Material Off-Loading to Filter Press Mechanical Sediment Dewatering Water Treatment Discharge to POTW On-Site Thermal Treatment Sediment Processing Site Total Dredged Material Treatment Unit Unit Cost # of Units Percentage Percentage 8% 2% $0 $0 LS CY CY CY Ton Gallon Gallon Ton Acre $25,000 $8 $4 $6 $40 $0.04 $0.02 $80 $500,000 Cost $0 $0 $0 0 0 0 0 0 0 0 0 0 $0 Subtotal On-Site Thermal Treatment C. Construction Management Percentage 8% TOTAL ON-SITE THERMAL TREATMENT Cost Estimates Lower Passaic River Restoration Project $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $0 $0 4A-5 J - 80 June 2007 DMM Backup Sheets Scenario 4B: Total DMM Costs Focused Feasibility Study Lower Passaic River Restoration Project Component Cost DMM COSTS 4B-1 4B-2 4B-3 4B-4 4B-5 Site Characterization1 Starter Cell Construction Sub-grade Cell Construction CDF Construction On-Site Thermal Treatment $1,489,800 $56,542,704 $95,652,373 $218,599,151 $247,319,333 Subtotal DMM Costs $619,603,361 Contingency (20%) $123,920,672 TOTAL DMM COSTS $743,524,034 Notes: Site Characterization limited to geotechnical investigation of proposed starter cell and CDF areas. 1 Cost Estimates Lower Passaic River Restoration Project J - 81 June 2007 DMM Backup Sheets Scenario 4B: Site Characterization Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Unit Unit Cost Labor Barge-Auger Mobilization Auger Drilling and Sampling Undisturbed Sample Collection Bathymetric Survey Field Oversight Reporting Project Management Drilling Permits and Work Plans Total Labor LS Day Sample Day Day Day Week LS $10,000 $6,500 $400 $6,500 $2,640 $3,080 $1,600 $50,000 Disbursements Geotechnical Tests Drillers/ Surveyors Sustenance Total Disbursements Percentage Day 10% $500 TOTAL SITE CHARACTERIZATION COSTS Cost Estimates Lower Passaic River Restoration Project # of Units Cost 1 80 240 4 100 120 26 1 $10,000 $520,000 $96,000 $26,000 $264,000 $369,600 $41,600 $50,000 $1,377,200 626,000 100 $62,600 $50,000 $112,600 $1,489,800 4B-1 J - 82 June 2007 DMM Backup Sheets Scenario 4B: Starter Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Pre-Construction Activities Design Contractor Work Plans Permitting (Equivalency), and Legal Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Water Side Installation Vessels Walers Installation Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Water Side Installation Vessels Walers, Deadmen, and Bumpers Installation Total Outer Bulkhead Wall Construction Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 47,832,800 1 47,832,800 $3,826,624 $100,000 $956,656 $4,883,280 LS Day SF LF $100,000 $3,000 $31 $50 1 40 288,000 9,600 $100,000 $120,000 $8,784,000 $480,000 SF Day Day $12 $3,500 $1,800 288,000 137 50 $3,456,000 $480,000 $90,000 $13,510,000 SF LF Tieback LF CY $31 $50 $2,000 $18 $32 485,000 9,700 1,213 4,850 315,250 $14,792,500 $485,000 $2,425,000 $87,300 $10,088,000 SF Day Day $12 $3,500 $2,000 485,000 139 70 $5,820,000 $485,000 $140,000 $34,322,800 $52,716,080 Subtotal Starter Cell Construction D. Construction Management Percentage TOTAL STARTER CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 47,832,800 $3,826,624 $56,542,704 4B-2 J - 83 June 2007 DMM Backup Sheets Scenario 4B: Sub-grade Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Unit Unit Cost # of Units Percentage Percentage 8% 2% $81,061,333 $81,061,333 Sediment Veneer Dredging Mobilization/Site Clean-up/Demobilization Debris Removal Environmental Dredging Barge Transport of Dredge Material Dredged Material Off-Loading Testing and Monitoring Total Sediment Veneer Dredging LS Ton CY CY CY Month $461,200 $300 $25 $5 $7 $220,440 1 500 693,733 867,167 867,167 6 $461,200 $150,000 $17,343,333 $4,335,833 $6,070,167 $1,322,640 $29,683,173 Dredging Sub-grade cell Mobilization/Site Clean-up/Demobilization Debris Removal Dredging/Transport/Dump Testing and Monitoring Total Dredging Sub-grade cell LS Ton CY Month $800,000 $300 $15 $220,440 1 1,000 3,293,093 4 $800,000 $300,000 $49,396,400 $881,760 $51,378,160 Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Subtotal Sub-grade Cell Construction D. Construction Management $6,484,907 $1,621,227 $8,106,133 $89,167,467 Percentage TOTAL SUB-GRADE CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% $81,061,333 $6,484,907 $95,652,373 4B-3 J - 84 June 2007 DMM Backup Sheets Scenario 4B: CDF Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. D. E. F. Pre-Construction Activities Design Contractor Work Plans Permits Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying - Assume 1/4 time required Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Additional Cost for 70' Sheet Piles Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers, Deadmen, and Bumpers Water Barrier Total Outer Bulkhead Wall Construction Water Treatment Mobilization/Demobilization Treatment Plant Piping to Plant Water Treatment Testing Subtotal Water Treatment CDF Operations Monitoring Wells Spreading Starter Cell Mount into CDF Operation of CDF (including Starter Cell) Total CDF Operations CDF Closing Mobilization/Site Clean-up/Demobilization Inner Sheetpile Wall Removal Removal of Backfill Between Walls Outer Sheetpile Wall Removal Decontamination Pad Construction Decontamination Operations and Equipment Off-site Disposal of Soil and Steel Sheets Geotextile Layer Compacted Clay Cover - Fill (Haul, Place, and Compact) Sand Cap (Purchase, Delivery, Placement, Monitoring) Vegetation Shoreline Plantings and other Trees Surveying Total CDF Closing Unit Unit Cost # of Units Cost Percentage LS Percentage 8% $100,000 2% 185,168,772 1 185,168,772 $14,813,502 $100,000 $3,703,375 $18,616,877 LS Day SF LF $400,000 $3,000 $31 $50 1 68 504,000 12,600 $400,000 $202,500 $15,372,000 $630,000 SF Day Day $12 $6,500 $1,800 504,000 90 80 $6,048,000 $585,000 $144,000 $23,381,500 SF SF LF Tieback LF CY $31 $2 $50 $2,000 $18 $32 889,000 889,000 12,700 1,588 7,250 13,426 $27,114,500 $1,778,000 $635,000 $3,175,000 $130,500 $429,630 SF Day Day Boom $12 $6,500 $2,000 $250,000 889,000 190 90 3 $10,668,000 $1,234,807 $180,000 $750,000 $46,095,436 LS LS LS Gallon Week $240,000 $1,000,000 $150,000 $0.04 $10,000 1 1 1 1,316,643,447 520 $240,000 $1,000,000 $150,000 $52,665,738 $5,200,000 $59,255,738 Well CY LS $750 $2 $22,894,000 85 0 1 $63,750 $0 $22,894,000 $22,957,750 LS LF CY LF LS Month Ton SY CY CY SY LS Day $75,000 $150 $14 $250 $90,000 $50,000 $50 $2 $15 $64 $1 $75,000 $3,000 1 22,200 13,426 22,400 1 3 12,219 216,832 0 361,387 0 0 30 $75,000 $3,330,000 $187,963 $5,600,000 $90,000 $150,000 $610,969 $379,456 $0 $22,964,960 $0 $0 $90,000 $33,478,348 $203,785,649 Subtotal CDF Construction G. Construction Management Percentage TOTAL CDF CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project 8% 185,168,772 $14,813,502 $218,599,151 4B-4 J - 85 June 2007 DMM Backup Sheets Scenario 4B: On-Site Thermal Treatment Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Dredged Material Treatment Mobilization/Demobilization Sediment Removal and Loading onto Trucks Transport to Thermal Treatment Area Dredged Material Off-Loading to Filter Press Mechanical Sediment Dewatering Water Treatment Discharge to POTW On-Site Thermal Treatment Sediment Processing Site Total Dredged Material Treatment Unit Unit Cost # of Units Percentage Percentage 8% 2% $209,592,655 $209,592,655 LS CY CY CY Ton Gallon Gallon Ton Acre $25,000 $8 $4 $6 $40 $0.04 $0.02 $80 $500,000 1 1,907,767 1,907,767 1,907,767 1,907,767 225,116,467 225,116,467 953,883 20 Construction Management Percentage 8% TOTAL ON-SITE THERMAL TREATMENT Cost Estimates Lower Passaic River Restoration Project $16,767,412 $4,191,853 $20,959,266 $25,000 $15,262,133 $7,631,067 $11,446,600 $76,310,667 $9,004,659 $3,601,863 $76,310,667 $10,000,000 $209,592,655 $230,551,921 Subtotal On-Site Thermal Treatment C. Cost 209,592,655 $16,767,412 $247,319,333 4B-5 J - 86 June 2007 DMM Backup Sheets Scenario 5A: Total DMM Costs Focused Feasibility Study Lower Passaic River Restoration Project Component Cost DMM COSTS 5A-1 5A-2 5A-3 5A-4 5A-5 Site Characterization1 Starter Cell Construction Sub-grade Cell Construction CDF Construction On-Site Thermal Treatment $1,489,800 $56,542,704 $139,323,513 $209,748,470 $0 Subtotal DMM Costs $407,104,486 Contingency (20%) $81,420,897 TOTAL DMM COSTS $488,525,384 Notes: Site Characterization limited to geotechnical investigation of proposed starter cell and CDF areas. 1 Cost Estimates Lower Passaic River Restoration Project J - 87 June 2007 DMM Backup Sheets Scenario 5A: Site Characterization Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Unit Unit Cost Labor Barge-Auger Mobilization Auger Drilling and Sampling Undisturbed Sample Collection Bathymetric Survey Field Oversight Reporting Project Management Drilling Permits and Work Plans Total Labor LS Day Sample Day Day Day Week LS $10,000 $6,500 $400 $6,500 $2,640 $3,080 $1,600 $50,000 Disbursements Geotechnical Tests Drillers/ Surveyors Sustenance Total Disbursements Percentage Day 10% $500 TOTAL SITE CHARACTERIZATION COSTS Cost Estimates Lower Passaic River Restoration Project # of Units Cost 1 80 240 4 100 120 26 1 $10,000 $520,000 $96,000 $26,000 $264,000 $369,600 $41,600 $50,000 $1,377,200 626,000 100 $62,600 $50,000 $112,600 $1,489,800 5A-1 J - 88 June 2007 DMM Backup Sheets Scenario 5A: Starter Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Pre-Construction Activities Design Contractor Work Plans Permitting (Equivalency), and Legal Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Water Side Installation Vessels Walers Installation Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Water Side Installation Vessels Walers, Deadmen, and Bumpers Installation Total Outer Bulkhead Wall Construction Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 47,832,800 1 47,832,800 $3,826,624 $100,000 $956,656 $4,883,280 LS Day SF LF $100,000 $3,000 $31 $50 1 40 288,000 9,600 $100,000 $120,000 $8,784,000 $480,000 SF Day Day $12 $3,500 $1,800 288,000 137 50 $3,456,000 $480,000 $90,000 $13,510,000 SF LF Tieback LF CY $31 $50 $2,000 $18 $32 485,000 9,700 1,213 4,850 315,250 $14,792,500 $485,000 $2,425,000 $87,300 $10,088,000 SF Day Day $12 $3,500 $2,000 485,000 139 70 $5,820,000 $485,000 $140,000 $34,322,800 $52,716,080 Subtotal Starter Cell Construction D. Construction Management Percentage TOTAL STARTER CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 47,832,800 $3,826,624 $56,542,704 5A-2 J - 89 June 2007 DMM Backup Sheets Scenario 5A: Sub-grade Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Unit Unit Cost # of Units Percentage Percentage 8% 2% $118,070,773 $118,070,773 Sediment Veneer Dredging Mobilization/Site Clean-up/Demobilization Debris Removal Environmental Dredging Barge Transport of Dredge Material Dredged Material Off-Loading Testing and Monitoring Total Sediment Veneer Dredging LS Ton CY CY CY Month $461,200 $300 $25 $5 $7 $220,440 1 500 693,733 867,167 867,167 6 $461,200 $150,000 $17,343,333 $4,335,833 $6,070,167 $1,322,640 $29,683,173 Dredging Sub-grade cell Mobilization/Site Clean-up/Demobilization Debris Removal Dredging/Transport/Dump Testing and Monitoring Total Dredging Sub-grade cell LS Ton CY Month $800,000 $300 $15 $220,440 1 1,000 5,745,693 5 $800,000 $300,000 $86,185,400 $1,102,200 $88,387,600 Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Subtotal Sub-grade Cell Construction D. Construction Management $9,445,662 $2,361,415 $11,807,077 $129,877,851 Percentage TOTAL SUB-GRADE CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% $118,070,773 $9,445,662 $139,323,513 5A-3 J - 90 June 2007 DMM Backup Sheets Scenario 5A: CDF Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. D. E. F. Pre-Construction Activities Design Contractor Work Plans Permits Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying - Assume 1/4 time required Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Additional Cost for 70' Sheet Piles Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers, Deadmen, and Bumpers Water Barrier Total Outer Bulkhead Wall Construction Water Treatment Mobilization/Demobilization Treatment Plant Piping to Plant Water Treatment Testing Subtotal Water Treatment CDF Operations Monitoring Wells Spreading Starter Cell Mount into CDF Operation of CDF (including Starter Cell) Total CDF Operations CDF Closing Mobilization/Site Clean-up/Demobilization Inner Sheetpile Wall Removal Removal of Backfill Between Walls Outer Sheetpile Wall Removal Decontamination Pad Construction Decontamination Operations and Equipment Off-site Disposal of Soil and Steel Sheets Geotextile Layer Compacted Clay Cover - Fill (Haul, Place, and Compact) Sand Cap (Purchase, Delivery, Placement, Monitoring) Vegetation Shoreline Plantings and other Trees Surveying Total CDF Closing Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 177,668,195 1 177,668,195 $14,213,456 $100,000 $3,553,364 $17,866,819 LS Day SF LF $400,000 $3,000 $31 $50 1 68 504,000 12,600 $400,000 $202,500 $15,372,000 $630,000 SF Day Day $12 $6,500 $1,800 504,000 90 80 $6,048,000 $585,000 $144,000 $23,381,500 SF SF LF Tieback LF CY $31 $2 $50 $2,000 $18 $32 889,000 889,000 12,700 1,588 7,250 13,426 $27,114,500 $1,778,000 $635,000 $3,175,000 $130,500 $429,630 SF Day Day Boom $12 $6,500 $2,000 $250,000 889,000 190 90 3 $10,668,000 $1,234,807 $180,000 $750,000 $46,095,436 LS LS LS Gallon Week $360,000 $1,500,000 $150,000 $0.04 $10,000 1 1 1 1,911,079,713 520 $360,000 $1,500,000 $150,000 $76,443,189 $5,200,000 $83,653,189 Well CY LS $750 $2 $17,347,000 85 462,220 1 $63,750 $924,440 $17,347,000 $18,335,190 LS LF CY LF LS Month Ton SY CY CY SY LS Day $75,000 $150 $14 $250 $90,000 $50,000 $50 $2 $15 $64 $1 $75,000 $3,000 1 0 0 0 0 0 0 216,832 361,387 0 216,832 1 30 $75,000 $0 $0 $0 $0 $0 $0 $379,456 $5,420,800 $0 $162,624 $75,000 $90,000 $6,202,880 $195,535,014 Subtotal CDF Construction G. Construction Management Percentage TOTAL CDF CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 177,668,195 $14,213,456 $209,748,470 5A-4 J - 91 June 2007 DMM Backup Sheets Scenario 5A: On-Site Thermal Treatment Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Dredged Material Treatment Mobilization/Demobilization Sediment Removal and Loading onto Trucks Transport to Thermal Treatment Area Dredged Material Off-Loading to Filter Press Mechanical Sediment Dewatering Water Treatment Discharge to POTW On-Site Thermal Treatment Sediment Processing Site Total Dredged Material Treatment Unit Unit Cost # of Units Percentage Percentage 8% 2% $0 $0 LS CY CY CY Ton Gallon Gallon Ton Acre $25,000 $8 $4 $6 $40 $0.04 $0.02 $80 $500,000 Cost $0 $0 $0 0 0 0 0 0 0 0 0 0 $0 Subtotal On-Site Thermal Treatment C. Construction Management Percentage 8% TOTAL ON-SITE THERMAL TREATMENT Cost Estimates Lower Passaic River Restoration Project $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 - $0 $0 5A-5 J - 92 June 2007 DMM Backup Sheets Scenario 5B: Total DMM Costs Focused Feasibility Study Lower Passaic River Restoration Project Component Cost DMM COSTS 5B-1 5B-2 5B-3 5B-4 5B-5 Site Characterization1 Starter Cell Construction Sub-grade Cell Construction CDF Construction On-Site Thermal Treatment $1,489,800 $56,542,704 $130,841,673 $241,906,163 $247,319,333 Subtotal DMM Costs $678,099,673 Contingency (20%) $135,619,935 TOTAL DMM COSTS $813,719,608 Notes: Site Characterization limited to geotechnical investigation of proposed starter cell and CDF areas. 1 Cost Estimates Lower Passaic River Restoration Project J - 93 June 2007 DMM Backup Sheets Scenario 5B: Site Characterization Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Unit Unit Cost Labor Barge-Auger Mobilization Auger Drilling and Sampling Undisturbed Sample Collection Bathymetric Survey Field Oversight Reporting Project Management Drilling Permits and Work Plans Total Labor LS Day Sample Day Day Day Week LS $10,000 $6,500 $400 $6,500 $2,640 $3,080 $1,600 $50,000 Disbursements Geotechnical Tests Drillers/ Surveyors Sustenance Total Disbursements Percentage Day 10% $500 TOTAL SITE CHARACTERIZATION COSTS Cost Estimates Lower Passaic River Restoration Project # of Units Cost 1 80 240 4 100 120 26 1 $10,000 $520,000 $96,000 $26,000 $264,000 $369,600 $41,600 $50,000 $1,377,200 626,000 100 $62,600 $50,000 $112,600 $1,489,800 5B-1 J - 94 June 2007 DMM Backup Sheets Scenario 5B: Starter Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Pre-Construction Activities Design Contractor Work Plans Permitting (Equivalency), and Legal Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Water Side Installation Vessels Walers Installation Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Water Side Installation Vessels Walers, Deadmen, and Bumpers Installation Total Outer Bulkhead Wall Construction Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 47,832,800 1 47,832,800 $3,826,624 $100,000 $956,656 $4,883,280 LS Day SF LF $100,000 $3,000 $31 $50 1 40 288,000 9,600 $100,000 $120,000 $8,784,000 $480,000 SF Day Day $12 $3,500 $1,800 288,000 137 50 $3,456,000 $480,000 $90,000 $13,510,000 SF LF Tieback LF CY $31 $50 $2,000 $18 $32 485,000 9,700 1,213 4,850 315,250 $14,792,500 $485,000 $2,425,000 $87,300 $10,088,000 SF Day Day $12 $3,500 $2,000 485,000 139 70 $5,820,000 $485,000 $140,000 $34,322,800 $52,716,080 Subtotal Starter Cell Construction D. Construction Management Percentage TOTAL STARTER CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 47,832,800 $3,826,624 $56,542,704 5B-2 J - 95 June 2007 DMM Backup Sheets Scenario 5B: Sub-grade Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Unit Unit Cost # of Units Percentage Percentage 8% 2% $110,882,773 $110,882,773 Sediment Veneer Dredging Mobilization/Site Clean-up/Demobilization Debris Removal Environmental Dredging Barge Transport of Dredge Material Dredged Material Off-Loading Testing and Monitoring Total Sediment Veneer Dredging LS Ton CY CY CY Month $461,200 $300 $25 $5 $7 $220,440 1 500 693,733 867,167 867,167 6 $461,200 $150,000 $17,343,333 $4,335,833 $6,070,167 $1,322,640 $29,683,173 Dredging Sub-grade cell Mobilization/Site Clean-up/Demobilization Debris Removal Dredging/Transport/Dump Testing and Monitoring Total Dredging Sub-grade cell LS Ton CY Month $800,000 $300 $15 $220,440 1 1,000 5,266,493 5 $800,000 $300,000 $78,997,400 $1,102,200 $81,199,600 Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Subtotal Sub-grade Cell Construction D. Construction Management $8,870,622 $2,217,655 $11,088,277 $121,971,051 Percentage TOTAL SUB-GRADE CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% $110,882,773 $8,870,622 $130,841,673 5B-3 J - 96 June 2007 DMM Backup Sheets Scenario 5B: CDF Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. D. E. F. Pre-Construction Activities Design Contractor Work Plans Permits Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying - Assume 1/4 time required Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Additional Cost for 70' Sheet Piles Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers, Deadmen, and Bumpers Water Barrier Total Outer Bulkhead Wall Construction Water Treatment Mobilization/Demobilization Treatment Plant Piping to Plant Water Treatment Testing Subtotal Water Treatment CDF Operations Monitoring Wells Spreading Starter Cell Mount into CDF Operation of CDF (including Starter Cell) Total CDF Operations CDF Closing Mobilization/Site Clean-up/Demobilization Inner Sheetpile Wall Removal Removal of Backfill Between Walls Outer Sheetpile Wall Removal Decontamination Pad Construction Decontamination Operations and Equipment Off-site Disposal of Soil and Steel Sheets Geotextile Layer Compacted Clay Cover - Fill (Haul, Place, and Compact) Sand Cap (Purchase, Delivery, Placement, Monitoring) Vegetation Shoreline Plantings and other Trees Surveying Total CDF Closing Unit Unit Cost # of Units Cost Percentage LS Percentage 8% $100,000 2% 204,920,477 1 204,920,477 $16,393,638 $100,000 $4,098,410 $20,592,048 LS Day SF LF $400,000 $3,000 $31 $50 1 68 504,000 12,600 $400,000 $202,500 $15,372,000 $630,000 SF Day Day $12 $6,500 $1,800 504,000 90 80 $6,048,000 $585,000 $144,000 $23,381,500 SF SF LF Tieback LF CY $31 $2 $50 $2,000 $18 $32 889,000 889,000 12,700 1,588 7,250 13,426 $27,114,500 $1,778,000 $635,000 $3,175,000 $130,500 $429,630 SF Day Day Boom $12 $6,500 $2,000 $250,000 889,000 190 90 3 $10,668,000 $1,234,807 $180,000 $750,000 $46,095,436 LS LS LS Gallon Week $360,000 $1,500,000 $150,000 $0.04 $10,000 1 1 1 1,794,936,086 520 $360,000 $1,500,000 $150,000 $71,797,443 $5,200,000 $79,007,443 Well CY LS $750 $2 $22,894,000 85 0 1 $63,750 $0 $22,894,000 $22,957,750 LS LF CY LF LS Month Ton SY CY CY SY LS Day $75,000 $150 $14 $250 $90,000 $50,000 $50 $2 $15 $64 $1 $75,000 $3,000 1 22,200 13,426 22,400 1 3 12,219 216,832 0 361,387 0 0 30 $75,000 $3,330,000 $187,963 $5,600,000 $90,000 $150,000 $610,969 $379,456 $0 $22,964,960 $0 $0 $90,000 $33,478,348 $225,512,525 Subtotal CDF Construction G. Construction Management Percentage TOTAL CDF CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project 8% 204,920,477 $16,393,638 $241,906,163 5B-4 J - 97 June 2007 DMM Backup Sheets Scenario 5B: On-Site Thermal Treatment Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Dredged Material Treatment Mobilization/Demobilization Sediment Removal and Loading onto Trucks Transport to Thermal Treatment Area Dredged Material Off-Loading to Filter Press Mechanical Sediment Dewatering Water Treatment Discharge to POTW On-Site Thermal Treatment Sediment Processing Site Total Dredged Material Treatment Unit Unit Cost # of Units Percentage Percentage 8% 2% $209,592,655 $209,592,655 LS CY CY CY Ton Gallon Gallon Ton Acre $25,000 $8 $4 $6 $40 $0.04 $0.02 $80 $500,000 1 1,907,767 1,907,767 1,907,767 1,907,767 225,116,467 225,116,467 953,883 20 Construction Management Percentage 8% TOTAL ON-SITE THERMAL TREATMENT Cost Estimates Lower Passaic River Restoration Project $16,767,412 $4,191,853 $20,959,266 $25,000 $15,262,133 $7,631,067 $11,446,600 $76,310,667 $9,004,659 $3,601,863 $76,310,667 $10,000,000 $209,592,655 $230,551,921 Subtotal On-Site Thermal Treatment C. Cost 209,592,655 $16,767,412 $247,319,333 5B-5 J - 98 June 2007 DMM Backup Sheets Scenario 6A: Total DMM Costs Focused Feasibility Study Lower Passaic River Restoration Project Component Cost DMM COSTS 6A-1 6A-2 6A-3 6A-4 6A-5 Site Characterization1 Starter Cell Construction Sub-grade Cell Construction CDF Construction On-Site Thermal Treatment $1,489,800 $56,542,704 $157,129,642 $221,088,799 $0 Subtotal DMM Costs $436,250,945 Contingency (20%) $87,250,189 TOTAL DMM COSTS $523,501,134 Notes: Site Characterization limited to geotechnical investigation of proposed starter cell and CDF areas. 1 Cost Estimates Lower Passaic River Restoration Project J - 99 June 2007 DMM Backup Sheets Scenario 6A: Site Characterization Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Unit Unit Cost Labor Barge-Auger Mobilization Auger Drilling and Sampling Undisturbed Sample Collection Bathymetric Survey Field Oversight Reporting Project Management Drilling Permits and Work Plans Total Labor LS Day Sample Day Day Day Week LS $10,000 $6,500 $400 $6,500 $2,640 $3,080 $1,600 $50,000 Disbursements Geotechnical Tests Drillers/ Surveyors Sustenance Total Disbursements Percentage Day 10% $500 TOTAL SITE CHARACTERIZATION COSTS Cost Estimates Lower Passaic River Restoration Project # of Units Cost 1 80 240 4 100 120 26 1 $10,000 $520,000 $96,000 $26,000 $264,000 $369,600 $41,600 $50,000 $1,377,200 626,000 100 $62,600 $50,000 $112,600 $1,489,800 6A-1 J - 100 June 2007 DMM Backup Sheets Scenario 6A: Starter Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Pre-Construction Activities Design Contractor Work Plans Permitting (Equivalency), and Legal Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Water Side Installation Vessels Walers Installation Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Water Side Installation Vessels Walers, Deadmen, and Bumpers Installation Total Outer Bulkhead Wall Construction Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 47,832,800 1 47,832,800 $3,826,624 $100,000 $956,656 $4,883,280 LS Day SF LF $100,000 $3,000 $31 $50 1 40 288,000 9,600 $100,000 $120,000 $8,784,000 $480,000 SF Day Day $12 $3,500 $1,800 288,000 137 50 $3,456,000 $480,000 $90,000 $13,510,000 SF LF Tieback LF CY $31 $50 $2,000 $18 $32 485,000 9,700 1,213 4,850 315,250 $14,792,500 $485,000 $2,425,000 $87,300 $10,088,000 SF Day Day $12 $3,500 $2,000 485,000 139 70 $5,820,000 $485,000 $140,000 $34,322,800 $52,716,080 Subtotal Starter Cell Construction D. Construction Management Percentage TOTAL STARTER CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 47,832,800 $3,826,624 $56,542,704 6A-2 J - 101 June 2007 DMM Backup Sheets Scenario 6A: Sub-grade Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Unit Unit Cost # of Units Percentage Percentage 8% 2% $133,160,713 $133,160,713 Sediment Veneer Dredging Mobilization/Site Clean-up/Demobilization Debris Removal Environmental Dredging Barge Transport of Dredge Material Dredged Material Off-Loading Testing and Monitoring Total Sediment Veneer Dredging LS Ton CY CY CY Month $461,200 $300 $25 $5 $7 $220,440 1 500 693,733 867,167 867,167 6 $461,200 $150,000 $17,343,333 $4,335,833 $6,070,167 $1,322,640 $29,683,173 Dredging Sub-grade cell Mobilization/Site Clean-up/Demobilization Debris Removal Dredging/Transport/Dump Testing and Monitoring Total Dredging Sub-grade cell LS Ton CY Month $800,000 $300 $15 $220,440 1 1,000 6,736,993 6 $800,000 $300,000 $101,054,900 $1,322,640 $103,477,540 Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Subtotal Sub-grade Cell Construction D. Construction Management $10,652,857 $2,663,214 $13,316,071 $146,476,785 Percentage TOTAL SUB-GRADE CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% $133,160,713 $10,652,857 $157,129,642 6A-3 J - 102 June 2007 DMM Backup Sheets Scenario 6A: CDF Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. D. E. F. Pre-Construction Activities Design Contractor Work Plans Permits Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying - Assume 1/4 time required Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Additional Cost for 70' Sheet Piles Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers, Deadmen, and Bumpers Water Barrier Total Outer Bulkhead Wall Construction Water Treatment Mobilization/Demobilization Treatment Plant Piping to Plant Water Treatment Testing Subtotal Water Treatment CDF Operations Monitoring Wells Spreading Starter Cell Mount into CDF Operation of CDF (including Starter Cell) Total CDF Operations CDF Closing Mobilization/Site Clean-up/Demobilization Inner Sheetpile Wall Removal Removal of Backfill Between Walls Outer Sheetpile Wall Removal Decontamination Pad Construction Decontamination Operations and Equipment Off-site Disposal of Soil and Steel Sheets Geotextile Layer Compacted Clay Cover - Fill (Haul, Place, and Compact) Sand Cap (Purchase, Delivery, Placement, Monitoring) Vegetation Shoreline Plantings and other Trees Surveying Total CDF Closing Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 187,278,644 1 187,278,644 $14,982,291 $100,000 $3,745,573 $18,827,864 LS Day SF LF $400,000 $3,000 $31 $50 1 68 504,000 12,600 $400,000 $202,500 $15,372,000 $630,000 SF Day Day $12 $6,500 $1,800 504,000 90 80 $6,048,000 $585,000 $144,000 $23,381,500 SF SF LF Tieback LF CY $31 $2 $50 $2,000 $18 $32 889,000 889,000 12,700 1,588 7,250 13,426 $27,114,500 $1,778,000 $635,000 $3,175,000 $130,500 $429,630 SF Day Day Boom $12 $6,500 $2,000 $250,000 889,000 190 90 3 $10,668,000 $1,234,807 $180,000 $750,000 $46,095,436 LS LS LS Gallon Week $360,000 $1,500,000 $150,000 $0.04 $10,000 1 1 1 2,151,340,934 520 $360,000 $1,500,000 $150,000 $86,053,637 $5,200,000 $93,263,637 Well CY LS $750 $2 $17,347,000 85 462,220 1 $63,750 $924,440 $17,347,000 $18,335,190 LS LF CY LF LS Month Ton SY CY CY SY LS Day $75,000 $150 $14 $250 $90,000 $50,000 $50 $2 $15 $64 $1 $75,000 $3,000 1 0 0 0 0 0 0 216,832 361,387 0 216,832 1 30 $75,000 $0 $0 $0 $0 $0 $0 $379,456 $5,420,800 $0 $162,624 $75,000 $90,000 $6,202,880 $206,106,508 Subtotal CDF Construction G. Construction Management Percentage TOTAL CDF CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 187,278,644 $14,982,291 $221,088,799 6A-4 J - 103 June 2007 DMM Backup Sheets Scenario 6A: On-Site Thermal Treatment Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Dredged Material Treatment Mobilization/Demobilization Sediment Removal and Loading onto Trucks Transport to Thermal Treatment Area Dredged Material Off-Loading to Filter Press Mechanical Sediment Dewatering Water Treatment Discharge to POTW On-Site Thermal Treatment Sediment Processing Site Total Dredged Material Treatment Unit Unit Cost # of Units Percentage Percentage 8% 2% $0 $0 LS CY CY CY Ton Gallon Gallon Ton Acre $25,000 $8 $4 $6 $40 $0.04 $0.02 $80 $500,000 Cost $0 $0 $0 0 0 0 0 0 0 0 0 0 $0 Subtotal On-Site Thermal Treatment C. Construction Management Percentage TOTAL ON-SITE THERMAL TREATMENT Cost Estimates Lower Passaic River Restoration Project $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 8% - $0 $0 6A-5 J - 104 June 2007 DMM Backup Sheets Scenario 6B: Total DMM Costs Focused Feasibility Study Lower Passaic River Restoration Project Component Cost DMM COSTS 6B-1 6B-2 6B-3 6B-4 6B-5 Site Characterization1 Starter Cell Construction Sub-grade Cell Construction CDF Construction On-Site Thermal Treatment $1,489,800 $56,542,704 $148,647,802 $253,246,493 $247,319,333 Subtotal DMM Costs $707,246,132 Contingency (20%) $141,449,226 TOTAL DMM COSTS $848,695,358 Notes: Site Characterization limited to geotechnical investigation of proposed starter cell and CDF areas. 1 Cost Estimates Lower Passaic River Restoration Project J - 105 June 2007 DMM Backup Sheets Scenario 6B: Site Characterization Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Unit Unit Cost Labor Barge-Auger Mobilization Auger Drilling and Sampling Undisturbed Sample Collection Bathymetric Survey Field Oversight Reporting Project Management Drilling Permits and Work Plans Total Labor LS Day Sample Day Day Day Week LS $10,000 $6,500 $400 $6,500 $2,640 $3,080 $1,600 $50,000 Disbursements Geotechnical Tests Drillers/ Surveyors Sustenance Total Disbursements Percentage Day 10% $500 TOTAL SITE CHARACTERIZATION COSTS Cost Estimates Lower Passaic River Restoration Project # of Units Cost 1 80 240 4 100 120 26 1 $10,000 $520,000 $96,000 $26,000 $264,000 $369,600 $41,600 $50,000 $1,377,200 626,000 100 $62,600 $50,000 $112,600 $1,489,800 6B-1 J - 106 June 2007 DMM Backup Sheets Scenario 6B: Starter Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Pre-Construction Activities Design Contractor Work Plans Permitting (Equivalency), and Legal Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Water Side Installation Vessels Walers Installation Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Water Side Installation Vessels Walers, Deadmen, and Bumpers Installation Total Outer Bulkhead Wall Construction Unit Unit Cost # of Units Percentage LS Percentage 8% $100,000 2% 47,832,800 1 47,832,800 $3,826,624 $100,000 $956,656 $4,883,280 LS Day SF LF $100,000 $3,000 $31 $50 1 40 288,000 9,600 $100,000 $120,000 $8,784,000 $480,000 SF Day Day $12 $3,500 $1,800 288,000 137 50 $3,456,000 $480,000 $90,000 $13,510,000 SF LF Tieback LF CY $31 $50 $2,000 $18 $32 485,000 9,700 1,213 4,850 315,250 $14,792,500 $485,000 $2,425,000 $87,300 $10,088,000 SF Day Day $12 $3,500 $2,000 485,000 139 70 $5,820,000 $485,000 $140,000 $34,322,800 $52,716,080 Subtotal Starter Cell Construction D. Construction Management Percentage TOTAL STARTER CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% 47,832,800 $3,826,624 $56,542,704 6B-2 J - 107 June 2007 DMM Backup Sheets Scenario 6B: Sub-grade Cell Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. Unit Unit Cost # of Units Percentage Percentage 8% 2% $125,972,713 $125,972,713 Sediment Veneer Dredging Mobilization/Site Clean-up/Demobilization Debris Removal Environmental Dredging Barge Transport of Dredge Material Dredged Material Off-Loading Testing and Monitoring Total Sediment Veneer Dredging LS Ton CY CY CY Month $461,200 $300 $25 $5 $7 $220,440 1 500 693,733 867,167 867,167 6 $461,200 $150,000 $17,343,333 $4,335,833 $6,070,167 $1,322,640 $29,683,173 Dredging Sub-grade cell Mobilization/Site Clean-up/Demobilization Debris Removal Dredging/Transport/Dump Testing and Monitoring Total Dredging Sub-grade cell LS Ton CY Month $800,000 $300 $15 $220,440 1 1,000 6,257,793 6 $800,000 $300,000 $93,866,900 $1,322,640 $96,289,540 Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Subtotal Sub-grade Cell Construction D. Construction Management $10,077,817 $2,519,454 $12,597,271 $138,569,985 Percentage TOTAL SUB-GRADE CELL CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project Cost 8% $125,972,713 $10,077,817 $148,647,802 6B-3 J - 108 June 2007 DMM Backup Sheets Scenario 6B: CDF Construction Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. C. D. E. F. Pre-Construction Activities Design Contractor Work Plans Permits Total Pre-Construction Activities Inner Sheetpile Wall Construction Mobilization/Site Clean-up/Demobilization Surveying - Assume 1/4 time required Waterloo Sheet Piles (Material Cost) Walers Installation Costs Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers Total Inner Sheetpile Wall Construction Outer Bulkhead Wall Construction Waterloo Sheet Piles (Material Cost) Additional Cost for 70' Sheet Piles Walers Deadman Tiebacks and Connectors Bumpers - Outside of Bulkhead Backfill Between inner and outer walls - Materials and installation Installation Costs - Water Side Crane and Crew - with driving head Four Barges, two boats, tug boat Crew for Attaching Walers, Deadmen, and Bumpers Water Barrier Total Outer Bulkhead Wall Construction Water Treatment Mobilization/Demobilization Treatment Plant Piping to Plant Water Treatment Testing Subtotal Water Treatment CDF Operations Monitoring Wells Spreading Starter Cell Mount into CDF Operation of CDF (including Starter Cell) Total CDF Operations CDF Closing Mobilization/Site Clean-up/Demobilization Inner Sheetpile Wall Removal Removal of Backfill Between Walls Outer Sheetpile Wall Removal Decontamination Pad Construction Decontamination Operations and Equipment Off-site Disposal of Soil and Steel Sheets Geotextile Layer Compacted Clay Cover - Fill (Haul, Place, and Compact) Sand Cap (Purchase, Delivery, Placement, Monitoring) Vegetation Shoreline Plantings and other Trees Surveying Total CDF Closing Unit Unit Cost # of Units Cost Percentage LS Percentage 8% $100,000 2% 214,530,926 1 214,530,926 $17,162,474 $100,000 $4,290,619 $21,553,093 LS Day SF LF $400,000 $3,000 $31 $50 1 68 504,000 12,600 $400,000 $202,500 $15,372,000 $630,000 SF Day Day $12 $6,500 $1,800 504,000 90 80 $6,048,000 $585,000 $144,000 $23,381,500 SF SF LF Tieback LF CY $31 $2 $50 $2,000 $18 $32 889,000 889,000 12,700 1,588 7,250 13,426 $27,114,500 $1,778,000 $635,000 $3,175,000 $130,500 $429,630 SF Day Day Boom $12 $6,500 $2,000 $250,000 889,000 190 90 3 $10,668,000 $1,234,807 $180,000 $750,000 $46,095,436 LS LS LS Gallon Week $360,000 $1,500,000 $150,000 $0.04 $10,000 1 1 1 2,035,197,307 520 $360,000 $1,500,000 $150,000 $81,407,892 $5,200,000 $88,617,892 Well CY LS $750 $2 $22,894,000 85 0 1 $63,750 $0 $22,894,000 $22,957,750 LS LF CY LF LS Month Ton SY CY CY SY LS Day $75,000 $150 $14 $250 $90,000 $50,000 $50 $2 $15 $64 $1 $75,000 $3,000 1 22,200 13,426 22,400 1 3 12,219 216,832 0 361,387 0 0 30 $75,000 $3,330,000 $187,963 $5,600,000 $90,000 $150,000 $610,969 $379,456 $0 $22,964,960 $0 $0 $90,000 $33,478,348 $236,084,019 Subtotal CDF Construction G. Construction Management Percentage TOTAL CDF CONSTRUCTION Cost Estimates Lower Passaic River Restoration Project 8% 214,530,926 $17,162,474 $253,246,493 6B-4 J - 109 June 2007 DMM Backup Sheets Scenario 6B: On-Site Thermal Treatment Focused Feasibility Study Lower Passaic River Restoration Project Component A. B. Pre-Construction Activities Design Permitting (Equivalency), and Legal Total Pre-Construction Activities Dredged Material Treatment Mobilization/Demobilization Sediment Removal and Loading onto Trucks Transport to Thermal Treatment Area Dredged Material Off-Loading to Filter Press Mechanical Sediment Dewatering Water Treatment Discharge to POTW On-Site Thermal Treatment Sediment Processing Site Total Dredged Material Treatment Unit Unit Cost # of Units Percentage Percentage 8% 2% $209,592,655 $209,592,655 LS CY CY CY Ton Gallon Gallon Ton Acre $25,000 $8 $4 $6 $40 $0.04 $0.02 $80 $500,000 1 1,907,767 1,907,767 1,907,767 1,907,767 225,116,467 225,116,467 953,883 20 Construction Management Percentage TOTAL ON-SITE THERMAL TREATMENT Cost Estimates Lower Passaic River Restoration Project $16,767,412 $4,191,853 $20,959,266 $25,000 $15,262,133 $7,631,067 $11,446,600 $76,310,667 $9,004,659 $3,601,863 $76,310,667 $10,000,000 $209,592,655 $230,551,921 Subtotal On-Site Thermal Treatment C. Cost 8% 209,592,655 $16,767,412 $247,319,333 6B-5 J - 110 June 2007