Charlotte City Council Environment Committee Meeting Summary for March 17, 2008 COMMITTEE AGENDA TOPICS I. II. III. IV. Subject: Focus Area Plan Review Action: The Committee voted unanimously to approve the changes to the Environment Focus Area Plan and recommend approval by City Council. Subject: Stormwater Enterprise Fund Report Action: None. Subject: Information Updates Action: None. Subject: Next Meeting April 21 at 3:30 p.m. in Room 280 COMMITTEE INFORMATION Present: Time: Edwin Peacock, Nancy Carter, Susan Burgess, Warren Cooksey and Andy Dulin 3:30 p.m. to 4:55 p.m. ATTACHMENTS 1. Agenda Package 2. Presentation: Stormwater Enterprise Fund 3. Presentation: Bruce Anderson, Chair of Stormwater Advisory Committee Environment Committee Meeting Summary for March 17, 2008 Page 2 DISCUSSION HIGHLIGHTS Committee Discussion: Committee Chair Edwin Peacock welcomed everyone to the meeting and asked those in attendance to introduce themselves. I. Focus Area Plan Review Julie Burch reminded the Committee of their review of the Focus Area Plan at the last meeting and pointed out the new target that was added related to 95% of rezonings. Carter: Will this be overseen by the Environment Team? Burch: Do you mean the Cabinet? This target is actually related to Planning and Debra Campbell and her staff have a measure within their business plan to track this. Their measure is actually 90% versus 95%, but they are comfortable with the 95% goal. So, this target’s “home” is in Planning, but Ms. Campbell is part of the Environmental Cabinet. Ms. Burch continued that the second item for review is Council member Peacock’s proposed changes to the first page of the Focus Area Plan. Staff was asked to look at this and we have done that and feel that it fundamentally says the same thing. The only thing that gives staff a little heartache is “world” leader in the tagline. That implies a level of resources that we currently do not have. The other thing is the “we believe” statements. The other focus area plans don’t say “we”, they say “the City.” Carter: I am very impressed with this document; it is a very coherent document. Can we do some minor wordsmithing? Peacock: I tried to keep the general content the same, but make this a more userfriendly document for citizens to read about the environment. But, I would welcome input to make this read more clearly. [Committee’s final version with all changes is attached.] Carter: I wonder if world leader versus national leader puts us in a context to succeed. The world principles are more idealistic. National might be more functional. This is an excellent document on all levels. Dulin: So, you’re suggesting we change world to national? Environment Committee Meeting Summary for March 17, 2008 Page 3 Peacock: Because we can go further nationally? Burgess: We are way behind Europe. To supersede them would take enormous effort. Peacock: I thought if we shot for the stars and landed on the moon that would be good, but I am comfortable with the word “national.” Cooksey: Or, we could say “seeking to become …” Burgess: I see two things missing, one being energy conversation. Energy is not mentioned. Peacock: We could include that in the first bullet after promotion. Burgess: I think it needs to be there, something about conserving energy. Also looking at alternative energy for vehicles. But, the other thing I see missing is a reference to the tree canopy. We take great pride in our tree canopy and it should be mentioned. Burch: We could add that at the end of the first bullet. Burgess: We should strongly encourage energy independence; we should do our part to be less dependent. Burch: The bullet could read … the energy we consume … Peacock: I think that is part of a larger national debate, I’m not as concerned with us leading that charge. We can do other things to lead by example. Cooksey: An element I see missing from the original is the interrelationships. It was in the last sentence of the first paragraph and the original first bullet point. I recognize the desire to keep compact statements, but I recommend keeping the first bullet. There is a key reason this focus area exists and it is supported by a Cabinet that is made up of various business units, so I think the interrelated concept is good to keep. Peacock: That is referenced in the first bullet in red, so you’d like to see interrelationships left in? Cooksey: In terms of flow, I think it should be the first or second bullet in the new document. Peacock: Burch: Is this consistently used? We tend to say it in the other Focus Area Plans. It is referenced in the Environment Committee Meeting Summary for March 17, 2008 Page 4 Housing & Neighborhood Development Focus Area Plan. Carter: Mr. Cooksey raises a good point. The environment crosses the boundaries of Public Safety, Transportation and Neighborhood Development. Peacock: That phrase could be added to the end as a closing statement. Carter: Would that be sufficient? Burch: In the original version, it was included intentionally. For example, the Transportation Action Plan supports the Environment. It shows they make connections. Peacock: I think adding that phrase is well pointed out. I was probably too eager to take things out. Can we make that sentence as a final statement? Burch: Yes. And, then if the Committee can take final action and vote. Burgess: I move approval. Carter: Second. Motion passes unanimously (Peacock, Carter, Burgess, Cooksey and Dulin - for) Burch: II. This will be on your agenda Monday night. Stormwater Enterprise Fund Report Ms. Burch advised the Committee that Tim Richards would be making a presentation on the Stormwater Enterprise Fund. Next month there will be a presentation on the Utilities Enterprise Fund. This is for information only. Bruce Anderson, Chair of the Stormwater Advisory Committee is in attendance today and will also make a few remarks. Tim Richards began his presentation [copy attached]. He also provided the Committee with a copy of the Stormwater Services Annual Report. [Types of Work: Collaboration with City Strategic Programs – Slide] Carter: Is this for stormwater conservation? Richards: No, this is capital projects. We do some cost-sharing with best management practices (bmps) for single-family residences. [FY2008 Storm Water Services Program Highlights – Slide] Environment Committee Meeting Summary for March 17, 2008 Page 5 Burgess: What does NPDES stand for? Richards: National Pollutant Discharge Elimination System [FY2009 Storm Water Services Program Highlights – Slide] Peacock: Is the Post Construction Controls Ordinance absorbed now? Is this money for maintenance? Richards: We have been providing the resources from Stormwater Services. Carter: Isn’t maintenance the responsibility of the homeowners association? Richards: Commercial developers maintain their bmps, but we maintain singlefamily residences. The homeowner or homeowners association would take care of routine maintenance, such as grass mowing, trash, etc., but if a dam needed to be rebuilt or a rain garden, we would do that. This was a decision by the stakeholder’s committee. We felt it would be good for us to take this on because most homeowners associations would not have the necessary money to make repairs. [PCCO Transition – Slide] Peacock: We have a representative from REBIC here, how do you all feel about the communication of the Post Construction Controls Ordinance? REBIC: There was great debate during the development of the ordinance and Stormwater Services has prepared a manual for folks to use. There has been great communication. Richards: We also sent notices out regarding training. Peacock: So, you asked the customer what they wanted, they told you and you are giving it to them? Richards: Yes. [FY2009 Storm Water Services Programs – Challenges – Slide] Peacock: Who are your collaborative partners? Richards: CATS, Neighborhood Development, other departments, Economic Development, and developers. We are starting to get estimates from Neighborhood Development early on, which has been extremely helpful. Burgess: When you are increasing culverts and resurfacing roads, whose budget does that come out of? Environment Committee Meeting Summary for March 17, 2008 Page 6 Richards: It depends. If they are making the roadway larger, CDOT would fund. But, if it just needed to be repaired, we would pay. [Requests for Service – Slide] Burgess: Where are the medium priorities on the slide? Richards: High priority incorporates medium priority. [FY2009 – Storm Water Services Program – Program Focus] Dulin: In the first bullet regarding ponds and streams, is that different than studying dams? Richards: It is in the same group. Dulin: Where are we in that process? Richards: We have identified the list of eligible ponds. [Long Term Plan – Slide] Carter: How much does a project cost? Is it more cost effective for a homeowner to achieve their own repairs? Richards: There would be legislative changes needed for people to pay for their own repairs. State law requires a bid process. Property owners can pay a portion to move up their project or pay the difference in a project for upgrades. [Summary – Slide] Burgess: What are the commercial fees? Richards: We did not prepare those specifically, but they are based on the same square footage and are charged by the acre. Hecksher: They are based on the Tier 2 rate. Cooksey: If the monthly fee is per square foot, do you have a sense of what percentage is less than 2,000? Hecksher: Less than 2,000 is about 10% and greater than 2,000 are about 90%. Cooksey: When we get into the discussion about changing tiers, this will be useful information to know the number affected. Bruce Anderson, Chair of the Stormwater Advisory Committee, was introduced and Environment Committee Meeting Summary for March 17, 2008 Page 7 made a brief presentation [copy attached]. Council member Peacock thanked everyone for the update. III. Information Updates Chatham Olive from the Sierra Club invited the Committee and all those in attendance to the Charlotte Clean & Green event scheduled for Saturday, April 19 at the main quad at Central Piedmont Community College. The US Green Building Council will be holding two workshops (small fee) and ten classes (free) that can be registered for onsite. The event has four tracks: energy, green, stewardship and food. There will be lots of exhibits and great food donated by Earthfare as well as a BBQ lunch. CATS will be providing shuttle service to the Earth Day events at Rays Splash Planet. Peacock: Does Kim McMillan have this information to distribute? Olive: event. Yes. We’ve been working with the City and County to promote this Peacock: We want to make sure they get with our partners in the media. Olive: The Business Journal and WFAE are partnering with us. Julie Burch then introduced Heidi Pruess, the County’s Environmental Policy Coordinator to give a brief update on the upcoming Environmental Summit. Ms. Pruess advised the Committee the Summit would be held on May 2 and all elected officials in our 14 country region have been invited. This is sort of the culmination of all past events and a chance to brainstorm going forward. Ronnie Bryant will make the keynote presentation. Hopefully, the outcome will be to come up with the top two or three items we can agree on as a region. IV. Next Meeting The next meeting is April 21 at 3:30 p.m. in Room 280. The agenda includes a discussion on the Utilities Enterprise Fund. Meeting adjourned. Environment Committee Monday, March 17, 2008 at 3:30 p.m. Charlotte-Mecklenburg Government Center Room 280 Committee Members: Edwin Peacock, Chair Nancy Carter, Vice Chair Susan Burgess Warren Cooksey Andy Dulin Staff Resources: Julie Burch AGENDA I. Focus Area Plan Review Staff Resource: Julie Burch and Cabinet Members The Committee is asked to approve the proposed ’08-’09 Focus Area Plan for the Environment. The attached draft reflects the Committee’s discussion on February 18, including Chair Peacock’s proposed changes to the “Environmental Principles” on page one. Also attached is a marked-up copy to show the changes from the current adopted principles. II. Stormwater Enterprise Fund Report Staff Resource: Tim Richards This report is for the Committee’s information as part of the Council-approved budget process. The Chair of the Stormwater Advisory Committee will also make brief remarks. III. Information Updates Chatham Olive, Sierra Club, will update the Committee on the first annual “Charlotte Clean and Green” events, April 18-21. Staff will update the Committee on plans for the May 2 Regional Environmental Summit for Elected Officials. IV. Next Meeting April 21 at 3:30 p.m. in Room 280 Agenda: Utilities Enterprise Fund Report Distribution: Mayor/City Council Mac McCarley PCCO Stakeholders Curt Walton, City Manager Leadership Team Environmental Cabinet Brenda Freeze Environmental GDP Stakeholders City of Charlotte FY2009 Strategic Focus Area Plan DRAFT “Charlotte will safeguard the environment, balancing environmental health, sound fiscal policy, and growth.” The City of Charlotte recognizes that environmental stewardship is fundamentally important to our quality of life and to a strong economy, both now and in the future. Protecting and improving the environment is a necessary element of the City’s mission to enhance the quality of life for our citizens. The actions associated with the other City Council Focus Areas – Community Safety, Housing and Neighborhood Development, Economic Development, and Transportation - are supported and enhanced by stewardship of our natural resources and the environment. Charlotte is the center of one of the fastest growing regions in the country. While growth contributes to our economic vitality, it also presents challenges for achieving and maintaining a healthy environment and a sustainable regional economy. The City of Charlotte is committed to safeguarding the environment, which is integral to quality of life, in ways that balance environmental health, sound fiscal policy, and growth. Consistent with these values, the City will: • • • • • • • • Recognize the important interrelationships between air quality, water resources, land preservation, and energy and resource conservation; Recognize that we share our environment with our regional neighbors, including other public and private entities, and that we will work cooperatively with them; Incorporate environmental goals and considerations in planning and decision making; Conserve energy and other resources; Protect natural ecosystems and habitats, including the tree canopy; Make wise land use decisions regarding growth and development; Adopt sound environmental practices in City operations; and Support sustainability, which is defined as meeting the needs of our citizens today without compromising the opportunity of future generations to meet their own needs. The City of Charlotte recognizes that conscientious environmental stewardship and concern for the public interest may require more than meeting mandates and minimum standards. The City will evaluate environmental conditions and opportunities in order to determine what approach is best for our community’s optimal environmental sustainability. The choices will include (1) determining that regulatory compliance is sufficient, (2) being proactive and initiating positive action, especially to avoid more costly remedial action later, (3) taking a leadership role and modeling best practices. Successfully meeting environmental challenges is critical to Charlotte’s future. These principles will shape the City’s approach to fulfilling our environmental responsibilities. Page 1 City of Charlotte FY2009 Strategic Focus Area Plan Environment DRAFT Safeguard the Environment ENV.1 ► Focus Area Initiative: Support sustainability by making wise decisions regarding growth and development, recognizing the interrelationships between air quality, water resources, land preservation, and energy and resource conservation Measure: Continue implementing Centers, Corridors, and Wedges Growth Framework Encourage minimum of 40% of new housing unit permits, 70% of new multi-family unit permits, 75% of new office development square footage, and 75% of new employment located within the centers and corridors this Fiscal Year Target: PLANNING ► Measure: Target: PLANNING ► Measure: Target: PLANNING Prior Year: ► ENV.2 ► Implement Post Construction Controls Ordinance on July 1, 2008 Implement the PCCO Transition Plan by June 2008 Post Construction Controls Ordinance adopted November 26, 2007 Focus Area Initiative: Protect natural ecosystems and habitats, including the tree canopy Measure: Target: E&PM Identify and protect environmentally sensitive areas Implement first phase of Environmental Inventory Strategy to include determining needs, cost, and schedule by June 2008 Implement deliverables determined from first phase of the Environmental Inventory Strategy by June 2009 Environmental Inventory Strategy developed December 2007 Prior Year: Measure: Target: E&PM Target: E&PM ► Implement the General Development Policies Phase II - Environment Initiate strategies to address 5 of the 15 General Development Environmental Policies by June 2009 General Development Policies Phase II - Environment adopted November 12, 2007 Measure: Target: E&PM Prior Year: Target: E&PM ► Percent of rezoning decisions consistent with adopted plan recommendations 95% of rezoning decisions consistent with adopted plans and/or staff recommendation Measure: Target: E&PM Maintain a significant and healthy tree canopy Conduct a baseline assessment of City’s tree canopy (Pending project and funding approval in FY2009 budget) Adopt revised Tree Ordinance by June 2008 Protect stream corridors, ponds, and wetlands through public acquisition of additional conservation easements and enhancing existing buffers Conduct a baseline analysis of land protected for environmental purposes, either through easements or other conservation practices by June 2008 Page 2 City of Charlotte FY2009 Strategic Focus Area Plan Environment DRAFT ENV.2 (cont.) ► Measure: Target: UTILITIES Prior Year: ENV.3 Maintain permit compliance with treated wastewater 100% compliance with National Pollutant Discharge Elimination System permit requirements for all five wastewater plants FY2007 - 8 violations Focus Area Initiative: Lead by example, adopting sound environmental practices in City facilities and operations ► Measure: Target: BSS Prior Year: Target: CATS Prior Year: Target: CATS Target: CATS ► Measure: Target: E&PM Target: E&PM Target: BSS Target: E&PM Target: UTILITIES Target: E&PM Implement strategies to reduce City fleet emissions Increase percentages of City fleet using alternative fuel or emission efficient technologies 34 hybrids (+9.7%) 98 (+63%) flex fuel vehicles (excludes CATS) Retrofit by December 2007, with emission reduction equipment 25% of Charlotte Area Transit System’s fixed route bus fleet Retrofitted 34.7% fixed route bus fleet (119 buses) with emission reduction equipment Procure four hybrid buses for service expansions by June 2009 (Pending project and funding approval in FY2009 budget) Reduce idling by 5% from FY2007 baseline data in Charlotte Area Transit System’s fixed route bus fleet Incorporate environmentally responsible elements in the design, construction, and operations of City facilities Collaborate with all Key Businesses to develop a baseline energy consumption model for facilities by June 2008 Develop Greenhouse Gas Emissions Inventory Action Plan by December 2008 Establish baseline by June 2008, for City-wide purchasing of environmentallyfriendly products Document current waste minimization practices and recycling programs in all City facilities by June, 2008 Achieve the City’s first Leadership in Energy and Environmental Design (LEED) certification at the Utilities Environmental Services Facility from the U.S. Green Building Council Design, construct, and retrofit facilities using sustainable design criteria such as American Society of Heating Refrigerating and Air Conditioning Engineers (ASHRAE), EPA/Energy Star Standards, and LEED, as appropriate Page 3 City of Charlotte FY2009 Strategic Focus Area Plan Environment Develop Collaborative Solutions ENV.4 Focus Area Initiative: ► Measure: Target: CITY MGR ► Measure: Target: CORP COMM Target: UTILITIES ► Measure: Target: UTILITIES DRAFT Collaborate with local and regional public and private partners and neighborhoods to enhance environmental quality and long-term sustainability Continue collaboration and actively participate in public and private sector partnership’s environmental and visioning initiatives Continue collaboration and participation with Sustainable Environment for Quality of Life, Centralina Council of Governments, Regional Visioning Council, and other partners’ current initiatives Increase Charlotte-Mecklenburg citizens’ awareness of the environment as a priority for the community and the organization Develop an external communication strategy and begin communicating the City’s environmental principles, initiatives, and programs to Charlotte-Mecklenburg citizens by June 2008 Continue intensive public relations efforts and elevate the water conservation message with paid advertising from January to April 2008 Continue a leadership role in the Catawba-Wateree Water Management Group to enhance regional water supply planning and collaborative drought response. Lead the group with Utilities staff as chair of the Water Management Group and actively involved in committee work in 2008 ► Measure: Target: SWS Increase single family recycling from 45% to 65% Implement single-stream recycling program by July 2010 ► Measure: Target: SWS Continue implementing the multi-family recycling education program Educate 20 non-participating multi-family property managers on the benefits of recycling by July 2009 ► Measure: Collaboration with NCDENR and public and private partners in the nonattainment area to accelerate the trend toward meeting the current 8hour ozone air quality standard by 2010 Gain approval, through collaboration with NCDENR, of Statewide State Implementation Plan (SIP) by October 2008 Work with regional partners to develop options for air quality initiatives by October 2008, in addition to those required by the SIP, and adopt Charlotte-specific air quality initiatives by October 2008 Target: CDOT Target: CDOT Promote Learning & Growth ENV.5 Focus Area Initiative: ► Measure: Target: CORP COMM Support the enhancement of City employees’ awareness of the environment as a priority Continue implementing the internal communication strategy for the environment focus area Continue communicating the City’s environmental principles, initiatives, and programs to City employees Page 4 DRAFT Chairman Peacock’s Suggestions for Input & Comments For Staff & Committee Members FY 2009 Strategic Focus Area Plan Environment “Charlotte will become a world leader in environmental initiatives to preserve our natural resources while balancing growth with sound fiscal policy.” The City of Charlotte recognizes that the environmental stewardship both now and in the future is fundamentally important to our quality of life and essential to maintaining a vibrant economy. Protecting our natural resources and promoting conservation on all levels enhances our City’s mission to preserve the quality of life for our citizens. Charlotte’s economic vitality presents challenges to maintaining a healthy environment. The City is committed to the following beliefs: • • • • We believe in the promotion of conservation best practices and the protection of our natural resources: the air we breathe, the water we drink, and the natural ecosystems we cherish. We believe in making sound land use decisions regarding our future growth and development. We’re aware that to sustain a high level of growth today, we can not jeopardize our future generation of citizens. We believe that to achieve our goals of becoming a world leader in the successful stewardship of our environment, we must maintain a cooperative and open dialogue with Mecklenburg County, our regional neighbors, and the business community. We believe that The City of Charlotte should lead by example and promote sound, cost effective environmental practices in City operations. The City of Charlotte will take a proactive leadership role in modeling best practices for its citizens. We recognize that conscientious environmental stewardship and concern for the public interest requires more than meeting mandates and minimum standards. The City will evaluate in order to determine what approach is best for our community’s optimal environmental sustainability. By always be conscious of the need to meet regulatory compliance standards we will avoid costly remedial action later. DRAFT Chairman Peacock’s Suggestions for Input & Comments For Staff & Committee Members Formatted: Left: 72 pt, Right: 72 pt, Top: 57.6 pt, Bottom: 57.6 pt FY 2000 Strategic Focus Area Plan Environment “Charlotte will become a world leader in environmental initiatives to preserve our natural resources while balancing growth with sound fiscal policy.” The City of Charlotte recognizes that the environmental stewardship both now and in the future is fundamentally important to our quality of life and essential to maintaining to a vibrant strong economy, both now and in the future. Protecting our natural resources and promoting conservation on all levels enhances our City’s and improving the environment is a necessary element of the City’s mission to enhance preserve the quality of life for our citizens. The actions associated with the other City Council Focus Areas – Community Safety, Housing and Neighborhood Development, Economic Development, and Transportation - are supported and enhanced by stewardship of our natural resources and the environment. Charlotte’s is the center of one of the fastest growing regions in the country. While growth contributes to our economic vitality, it also presents challenges to for achieving and maintaining a healthy environment. and a sustainable regional economy. The City of Charlotte is committed to safeguarding the environment, which is integral to quality of life, in ways that balance environmental health, sound fiscal policy, and growth. Consistent with these values, the City will the following beliefs: • Recognize the important interrelationships between air quality, water resources, land preservation, and energy and resource conservation; • Recognize that we share our environment with our regional neighbors, including other public and private entities, and that we will work cooperatively with them; • Incorporate environmental goals and considerations in planning and decision making; • Conserve energy and other resources; • Protect natural ecosystems and habitats, including the tree canopy; • Make wise land use decisions regarding growth and development; • Adopt sound environmental practices in City operations; and • Support sustainability, which is defined as meeting the needs of our citizens today without compromising the opportunity of future generations to meet their own needs. • We believe in the promotion of conservation best practices and the protection of our natural resources: the air we breathe, the water we drink, and the natural ecosystems we cherish. • We believe in making sound land use decisions regarding our future growth and development. We’re aware that to sustain a high level of growth today, we cannot jeopardize our future generation of citizens. • We believe that to achieve our goals of becoming a world leader in the successful stewardship of our environment, we must maintain a cooperative and open dialogue with Mecklenburg County, our regional neighbors, and the business community. • We believe that The City of Charlotte should lead by example and promote sound, cost effective environmental practices in City operations. Formatted: Font: Not Italic Formatted: Font: Not Italic Formatted: Indent: Left: 0 pt, First line: 36 pt, Widow/Orphan control Formatted: Font color: Custom Color(RGB(118,146,60)) Formatted: List Paragraph, Bulleted + Level: 1 + Aligned at: 0 pt + Indent at: 18 pt Formatted: Font: Perpetua, 12 pt, Font color: Custom Color(RGB(118,146,60)) The City of Charlotte will take a proactive leadership role in modeling best practices for its citizens. We recognizes that conscientious environmental stewardship and concern for the public interest may requires more than meeting mandates and minimum standards. The City will evaluate environmental conditions and opportunities in order to determine what approach is best for environmental conditions and opportunities in order to determine what approach is best for our community’s optimal environmental sustainability. By always being conscious of the need to meet The choices will include (1) determining that regulatory compliance standards we will is sufficient, (2) being proactive and initiating positive action, especially to avoid more costly remedial action later., (3) taking a leadership role and modeling best practices. Successfully meeting environmental challenges is critical to Charlotte’s future. These principles will shape the City’s approach to fulfilling our environmental responsibilities. Formatted: Font: Not Italic Formatted: Indent: First line: 0 pt, No widow/orphan control Formatted: No widow/orphan control Formatted: Justified Storm Water Services Enterprise Fund Update March 17, 2008 History Charlotte-Mecklenburg Storm Water Services • Joint utility • Started in 1993 • Federal permit served as catalyst for program • Flooding solutions looking for funding • Requests for service throughout the City • Older, more urban areas make up the largest backlog • Requests are added as the City annexes, urbanizes and gets older Types of Work Infrastructure • Flood Control • Maintenance and Repairs of Storm Drains • Water Quality • Restoring Streams A’s, B’s and C’s of Storm Water Services • A (High Priority) - Flooding of living space, damage or imminent damage to structure(s) or flooding that poses a threat to the traveling public. • B (Medium Priority) - Crawl space and/or mechanical equipment flooding; severe erosion threatening secondary structures; pipe or drainage structure failure; or erosion adversely affecting water quality • C (Low Priority) - Blocked pipes or channels not otherwise causing “A” or “B” priority problems; Moderate erosion; or standing water from publicly funded projects Examples C A B Types of Work Collaboration with City Strategic Programs • Neighborhood Improvements • Transportation • Transit Corridors • Economic Development FY2008 Storm Water Services Program Highlights Capital - $33.5 million • • • • Neighborhood-wide projects ($17.3 or 51%) Repairs ($9.6 or 29%) Water Quality ($4.0 or 12%) Strategic Collaboration ($2.6 or 8%) Operating - $12.6 million • • • NPDES Work Plan Street Maintenance Mecklenburg County FY2008 Storm Water Services Accomplishments • Post Construction Controls Ordinance (PCCO) adopted in November, 2007. • High priority requests for service are addressed within six months of request and medium priority requests within one year. • Finalized Watershed Ranking procedures and started scoring projects. • Completed four CIPs in FY07 and will complete six in FY08. FY2009 Storm Water Services Program Highlights Capital - $34.5 million • • • • Neighborhood-wide projects ($17.8 or 51%) Repairs ($9.9 or 29%) Water Quality ($4.1 or 12%) Strategic Collaboration ($2.7 or 8%) Operating - $12.6 million • • • • NPDES Workplan Street Maintenance Mecklenburg County Post Construction Controls Ordinance FY2009 Storm Water Services Program Challenges • Implementation of the PCCO in July, 2008. PCCO Transition • Projects submitted after July 1 will be subject to the ordinance • Design Manual in use by County since 2007 • Administrative Manual complete and ready for review • Staff and Public training on May 8 • Flow chart and manuals available on web site • Review staff funded by fees approved in November 2007, Storm Water staff gradually increasing over next few years FY2009 Storm Water Services Program Challenges • Implementation of the PCCO in July, 2008. • Drainage infrastructure issues continue to grow faster than the funding needed to resolve. • Anticipating funding needs with our collaborative partners. FY2009 Storm Water Services Program Program Focus • PCCO • Maintain High Priority backlog at 6 months or less and Medium Priority at 12 months or less. • Develop a plan to increase attention to low priority requests within current budget FY2009 Storm Water Services Program Program Focus • Start two to three new CIP projects and feasibility studies on seven pond projects and 6,000 LF of stream restoration. • Implement a Minor CIP program to address requests that are more than maintenance repairs but less than major CIPs. • Increase PAYG fees supporting Capital projects by $1 million. Long Term Plan • 1993 – 2006 – 10% increases to complete high priority maintenance backlog – 7.5% increases to continue aggressive attack on the channels and large projects • 2007 forward – 7% increases thru 2010 to mitigate City cap – Stepping down increases Storm Water Fees City of Charlotte Residents – FY08 Monthly Fees Tier I (less than 2,000 sf) Major $1.27 (County-wide large system) Minor $3.75 (City small system) Administrative $0.85 (Cost for billing) $5.87 Tier II (2,000 sf and greater) Major $1.27 (County-wide large system) Minor $5.51 (City small system) Administrative $0.85 (Cost for billing) $7.63 Monthly Residential Fees City Minor System Fee Only $9.60 $10 FY09 $5.89 $8 $6 Fees $4 $2.12 $2 $0 94 97 00 03 06 09 12 15 18 Fiscal Year 8% Fee Structure Currently less than 2,000* pays $5.87/month** • For 1,500 sf, that is $.0039 / sf • For 1,900 sf, that is $.0031 / sf Currently greater than 2,000* pays $7.63/month** • For 2,500 sf, that is $.0031 / sf • For 3,500 sf, that is $.0022 / sf • For 5,000 sf, that is $.0015 / sf *square feet of impervious area **includes City, County and Fixed fees Monthly Fee per Square Foot 0.004 0.0035 0.003 0.0025 0.002 0.0015 0.001 0.0005 Square Feet 0 6 00 0 4 75 0 25 4 3 75 0 0 3 25 0 50 2 1 50 0 0 Requests for Service FY17 8,480 9000 8000 7000 FY09 6000 5,180 FY17 5,980 High Priority Low Priority Wet Low Priority Dry 5000 4000 3000 2000 1000 239 239 0 93 97 01 05 09 13 17 Summary • Programs focus on meeting permit requirements, mitigating dangerous flooding situations, and contributing to the City’s quality of life. • Minor CIPs and low priority erosion requests that impact water quality will have active discussions to plan, fund, and initiate resolutions. • Explore revised fee structures for FY10 budget discussions Storm Water Advisory Committee Roles and Responsibilities – Policy – Budget – Appeals • Erosion Control • Fees • Post Construction Controls SWAC Chair – Bruce Anderson Questions Fee Comparisons Portland Sacremento Philadelphia Austin Denver Charlotte Charlotte St. Paul Durham Raleigh Cincinnati Los Angelas $0 $3 Source: Black & Veatch 2007 Stormwater Utility Survey $6 $9 $12 $15 $18 STORM WATER ADVISORY COMMITTEE (SWAC) Charlotte City Council Environment Committee March 17, 2008 Committee Representation • SWAC membership – – – – – – – 3 1 1 1 1 1 1 (Actual) residential environmental financial, legal institutional commercial property developer or design professional General contractor (2) (1) (1) (1) (0) (4) (0) A well balanced committee is essential to good decisions. Committee Representation • It requires a minimum of 5 members to make a decision and that is not enough if there is a quasi-judicial hearing. • We have a full complement of members at this time, but delays in filling vacancies have caused deferral of hearings. Long Range Plans • One hot issue is the maintenance of existing and future erosion control structures. • Costs are beyond the ability of most Home Owner Associations. • Storm Water staff and the SWAC continue to discuss options for the most effective way to prevent future failures of these facilities. Budget • • The proposed budget represents the best efforts of the staff to fund the expenditures that are absolutely necessary – given budget limits. It does not address the negative publicity associated with the large backlog of “low priority” requests. Charlotte Observer (8/1/06): 1.Step 1 – File complaint 2.Step 2 – Wait 12 years Budget Shortfall • There are currently over 5000 “low priority” requests in the backlog. • The proposed budget not only does not reduce this backlog, but allows it to double by 2019. • The SWAC has for the past four years reiterated the fact that storm water fees are too low and are subsidized by property taxes. Budget Shortfall • The real problem is not the relatively “low priority” requests, but the impact of delaying a response. Moderate erosion situations frequently turn into severe erosion problems that cost much more to repair. • It is up to you to decide whether to pay now or pay much more later! Storm water fees • Staff is currently evaluating the storm water fee two-tier structure. • Changing to a three- or even four-tier structure would distribute the costs more fairly. • I will point out that a new structure would allow changes to the fees without specifying a percentage. Erosion Control Fine Appeals • In Charlotte, there are few appeals to fines. That is because the city and county provide education, training, and certification so developers can minimize problems at their sites. • You should be very proud of the efforts of Storm Water staff. They set the standard in the region for protection of surface water.