Project Status:
Charlotte-Mecklenburg Storm Water
Services, along with engineering
consultant US Infrastructure of Carolina,
Inc. (USI), continue to work through the
planning phase. Unfortunately, selecting
improvements has proved to be
challenging due to permitting concerns
and potential downstream impacts.
Next Steps:
City staff will continue to work with
USI to analyze and evaluate additional
alternatives. Once this is complete, a
public meeting will be scheduled to
present the recommended alternative to
residents. Meeting details will be mailed
to residents two weeks in advance.
For more information:
Please contact
Adrian Cardenas, Project Manager
acardenas@charlottenc.gov
704-336-4682
StormWater.CharMeck.org
Yancey Road Storm Drainage Improvement Project
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
Investing in Infrastructure
Charlotte has an aging public storm drainage system, much of which is past its
useful life. The City repairs, replaces and installs new storm drainage infrastructure
when it deteriorates or becomes too small to handle increases in stormwater.
Investing in infrastructure protects public safety, guards private property, improves
water quality and enhances quality of life.
The Yancey Road Storm Drainage Improvement Project goal is to reduce flooding
of streets and structures by improving the storm drainage infrastructure within the
project area, while not causing downstream impacts.