Appendix 6

advertisement
Appendix 6
Worksheet 3-11. Form to calculate Bank Erosion Hazard Index (BEHI) variables and an overall BEHI rating. Use
Figure 3-7 with BEHI variables to determine BEHI score.
Stream:
Reedy Creek
Location: Reach 3
Station:
200 feet upstream
Date:
5/10/2010
Observers: Will Wilhelm
Valley Type:
Stream Type:
Study Bank Height / Bankfull Height ( C )
Study
Bank
Height (ft) =
8.70
Bankfull
Height
(A)
(A)/(B)=
1.60
5.44
(C)
(B)
(ft) =
BEHI Score
(Fig. 3-7)
10.0
Root Depth / Study Bank Height ( E )
Root
Depth
(ft) =
Study
Bank
3.00
(D) Height (ft) =
8.70
(D)/(A)=
0.34
(E)
(A)
5.0
Weighted Root Density ( G )
Root
Density
as
(F)x(E) =
50%
4.35
7.5
(G)
(F)
%=
Bank Angle ( H )
Bank
Angle
110
9.0
(H)
as Degrees =
Surface Protection ( I )
Surface
Protection
as
Bank Material Adjustment:
Bedrock (Overall Very Low BEHI)
Boulders (Overall Low BEHI)
Cobble (Subtract 10 points if uniform medium to large cobble)
of bank material that is composed of sand)
Moderate
High
(I)
Very High
7.1
10
Stratification Adjustment
Add 5–10 points, depending on
position of unstable layers in
relation to bankfull stage
Sand (Add 10 points)
Silt/Clay (no adjustment)
Low
20%
=
Bank Material
Adjustment
Gravel or Composite Matrix (Add 5–10 points depending on percentage
Very Low
%
Adjective Rating
Extreme
5
Extreme
and
5 – 9.5
10 – 19.5
20 – 29.5
30 – 39.5
40 – 45
Total Score
46 – 50
53.6
Bank Sketch
BANKFULL
Height (B)
Bankfull
Root
Depth
(D)
Bank
Angle
(H)
Surface
Protection (I)
STUDY BANK Height
(A)
Vertical distance (ft)
1
Start
of
Bank
0
0
1
Horizontal distance (ft)
Copyright © 2008 Wildland Hydrology
River Stability Field Guide page 3-54
Worksheet 3-11. Form to calculate Bank Erosion Hazard Index (BEHI) variables and an overall BEHI rating. Use
Figure 3-7 with BEHI variables to determine BEHI score.
Stream:
Reedy Creek
Location: Reach 3
Station:
400 feet upstream (Right)
Date:
5/10/2010
Observers: Will Wilhelm
Stream Type:
Valley Type:
Study Bank Height / Bankfull Height ( C )
Study
Bank
Height (ft) =
7.20
Bankfull
Height
(A)
(A)/(B)=
2.00
3.60
(C)
(B)
(ft) =
BEHI Score
(Fig. 3-7)
10.0
Root Depth / Study Bank Height ( E )
Root
Depth
(ft) =
Study
Bank
4.50
(D) Height (ft) =
7.20
(D)/(A)=
0.63
(E)
(A)
3.0
Weighted Root Density ( G )
Root
Density
as
(F)x(E) =
30%
2.16
7.5
(G)
(F)
%=
Bank Angle ( H )
Bank
Angle
50
3.2
(H)
as Degrees =
Surface Protection ( I )
Surface
Protection
as
Bank Material Adjustment:
Bedrock (Overall Very Low BEHI)
Boulders (Overall Low BEHI)
Cobble (Subtract 10 points if uniform medium to large cobble)
%
75%
(I)
=
Bank Material
Adjustment
Gravel or Composite Matrix (Add 5–10 points depending on percentage
of bank material that is composed of sand)
Very Low
Low
Moderate
High
Very High
Extreme
5 – 9.5
10 – 19.5
20 – 29.5
30 – 39.5
40 – 45
46 – 50
8
Stratification Adjustment
Add 5–10 points, depending on
position of unstable layers in
relation to bankfull stage
Sand (Add 10 points)
Silt/Clay (no adjustment)
2.1
7
Adjective Rating Very High
and
Total Score
40.8
Bank Sketch
BANKFULL
Height (B)
Bankfull
Root
Depth
(D)
Bank
Angle
(H)
Surface
Protection (I)
STUDY BANK Height
(A)
Vertical distance (ft)
1
Start
of
Bank
0
0
1
Horizontal distance (ft)
Copyright © 2008 Wildland Hydrology
River Stability Field Guide page 3-54
Worksheet 3-11. Form to calculate Bank Erosion Hazard Index (BEHI) variables and an overall BEHI rating. Use
Figure 3-7 with BEHI variables to determine BEHI score.
Stream:
Reedy Creek
Location: Reach 3
Station:
200 feet upstream
Date:
5/10/2010
Observers: Will Wilhelm
Stream Type:
Valley Type:
Study Bank Height / Bankfull Height ( C )
Study
Bank
Height (ft) =
6.50
Bankfull
Height
(A)
(A)/(B)=
2.50
2.60
(C)
(B)
(ft) =
BEHI Score
(Fig. 3-7)
8.8
Root Depth / Study Bank Height ( E )
Root
Depth
(ft) =
Study
Bank
1.50
(D) Height (ft) =
6.50
(D)/(A)=
0.23
(E)
(A)
6.2
Weighted Root Density ( G )
Root
Density
as
(F)x(E) =
75%
4.875
7.7
(G)
(F)
%=
Bank Angle ( H )
Bank
Angle
90
7.9
(H)
as Degrees =
Surface Protection ( I )
Surface
Protection
as
Bank Material Adjustment:
Bedrock (Overall Very Low BEHI)
Boulders (Overall Low BEHI)
Cobble (Subtract 10 points if uniform medium to large cobble)
of bank material that is composed of sand)
Moderate
High
(I)
Very High
10.0
5
Stratification Adjustment
Add 5–10 points, depending on
position of unstable layers in
relation to bankfull stage
Sand (Add 10 points)
Silt/Clay (no adjustment)
Low
5%
=
Bank Material
Adjustment
Gravel or Composite Matrix (Add 5–10 points depending on percentage
Very Low
%
Adjective Rating
Extreme
5
Extreme
and
5 – 9.5
10 – 19.5
20 – 29.5
30 – 39.5
40 – 45
Total Score
46 – 50
50.6
Bank Sketch
BANKFULL
Height (B)
Bankfull
Root
Depth
(D)
Bank
Angle
(H)
Surface
Protection (I)
STUDY BANK Height
(A)
Vertical distance (ft)
1
Start
of
Bank
0
0
1
Horizontal distance (ft)
Copyright © 2008 Wildland Hydrology
River Stability Field Guide page 3-54
Worksheet 3-11. Form to calculate Bank Erosion Hazard Index (BEHI) variables and an overall BEHI rating. Use
Figure 3-7 with BEHI variables to determine BEHI score.
Stream:
Reedy Creek
Location: Reach 4
Station:
400 feet upstream (Right)
Date:
5/13/2011
Observers: Will Wilhelm
Stream Type:
Valley Type:
Study Bank Height / Bankfull Height ( C )
Study
Bank
Height (ft) =
6.00
Bankfull
Height
(A)
(A)/(B)=
1.50
4.00
(C)
(B)
(ft) =
BEHI Score
(Fig. 3-7)
10.0
Root Depth / Study Bank Height ( E )
Root
Depth
(ft) =
Study
Bank
2.00
(D) Height (ft) =
6.00
(D)/(A)=
0.33
(E)
(A)
5.8
Weighted Root Density ( G )
Root
Density
as
(F)x(E) =
50%
3
7.8
(G)
(F)
%=
Bank Angle ( H )
Bank
Angle
80
5.9
(H)
as Degrees =
Surface Protection ( I )
Surface
Protection
as
Bank Material Adjustment:
Bedrock (Overall Very Low BEHI)
Boulders (Overall Low BEHI)
Cobble (Subtract 10 points if uniform medium to large cobble)
of bank material that is composed of sand)
Moderate
High
(I)
Very High
1.9
0
Stratification Adjustment
Add 5–10 points, depending on
position of unstable layers in
relation to bankfull stage
Sand (Add 10 points)
Silt/Clay (no adjustment)
Low
80%
=
Bank Material
Adjustment
Gravel or Composite Matrix (Add 5–10 points depending on percentage
Very Low
%
Adjective Rating
Extreme
0
High
and
5 – 9.5
10 – 19.5
20 – 29.5
30 – 39.5
40 – 45
Total Score
46 – 50
31.4
Bank Sketch
BANKFULL
Height (B)
Bankfull
Root
Depth
(D)
Bank
Angle
(H)
Surface
Protection (I)
STUDY BANK Height
(A)
Vertical distance (ft)
1
Start
of
Bank
0
0
1
Horizontal distance (ft)
Copyright © 2008 Wildland Hydrology
River Stability Field Guide page 3-54
Worksheet 3-11. Form to calculate Bank Erosion Hazard Index (BEHI) variables and an overall BEHI rating. Use
Figure 3-7 with BEHI variables to determine BEHI score.
Stream:
Reedy Creek
Location: Reach 4
Station:
300 feet upstream survey XS-1
Date:
5/13/2011
Observers: Will Wilhelm
Stream Type:
Valley Type:
Study Bank Height / Bankfull Height ( C )
Study
Bank
Height (ft) =
3.90
Bankfull
Height
(A)
(A)/(B)=
1.20
3.25
(C)
(B)
(ft) =
BEHI Score
(Fig. 3-7)
10.0
Root Depth / Study Bank Height ( E )
Root
Depth
(ft) =
Study
Bank
1.00
(D) Height (ft) =
3.90
(D)/(A)=
0.26
(E)
(A)
6.3
Weighted Root Density ( G )
Root
Density
as
(F)x(E) =
25%
0.975
8.8
(G)
(F)
%=
Bank Angle ( H )
Bank
Angle
90
7.9
(H)
as Degrees =
Surface Protection ( I )
Surface
Protection
as
Bank Material Adjustment:
Bedrock (Overall Very Low BEHI)
Boulders (Overall Low BEHI)
Cobble (Subtract 10 points if uniform medium to large cobble)
of bank material that is composed of sand)
Moderate
High
(I)
Very High
10.0
10
Stratification Adjustment
Add 5–10 points, depending on
position of unstable layers in
relation to bankfull stage
Sand (Add 10 points)
Silt/Clay (no adjustment)
Low
5%
=
Bank Material
Adjustment
Gravel or Composite Matrix (Add 5–10 points depending on percentage
Very Low
%
Adjective Rating
Extreme
0
Extreme
and
5 – 9.5
10 – 19.5
20 – 29.5
30 – 39.5
40 – 45
Total Score
46 – 50
53.0
Bank Sketch
BANKFULL
Height (B)
Bankfull
Root
Depth
(D)
Bank
Angle
(H)
Surface
Protection (I)
STUDY BANK Height
(A)
Vertical distance (ft)
1
Start
of
Bank
0
0
1
Horizontal distance (ft)
Copyright © 2008 Wildland Hydrology
River Stability Field Guide page 3-54
Worksheet 3-11. Form to calculate Bank Erosion Hazard Index (BEHI) variables and an overall BEHI rating. Use
Figure 3-7 with BEHI variables to determine BEHI score.
Stream:
Reedy Creek
Location: Reach 7
Observers: Will Wilhelm/Jason Diaz
Station:
5/15/2012
Date:
Stream Type:
Valley Type:
Study Bank Height / Bankfull Height ( C )
Study
Bank
Height (ft) =
9.50
Bankfull
Height
(A)
(A)/(B)=
2.00
4.75
(C)
(B)
(ft) =
BEHI Score
(Fig. 3-7)
10.0
Root Depth / Study Bank Height ( E )
Root
Depth
(ft) =
Study
Bank
1.50
(D) Height (ft) =
9.50
(D)/(A)=
0.16
(E)
(A)
7.8
Weighted Root Density ( G )
Root
Density
as
(F)x(E) =
30%
2.85
9.5
(G)
(F)
%=
Bank Angle ( H )
Bank
Angle
50
3.0
(H)
as Degrees =
Surface Protection ( I )
Surface
Protection
as
Bank Material Adjustment:
Bedrock (Overall Very Low BEHI)
Boulders (Overall Low BEHI)
Cobble (Subtract 10 points if uniform medium to large cobble)
of bank material that is composed of sand)
Moderate
High
(I)
Very High
1.0
Stratification Adjustment
Add 5–10 points, depending on
position of unstable layers in
relation to bankfull stage
Sand (Add 10 points)
Silt/Clay (no adjustment)
Low
90%
=
Bank Material
Adjustment
Gravel or Composite Matrix (Add 5–10 points depending on percentage
Very Low
%
Adjective Rating
Extreme
0
High
and
5 – 9.5
10 – 19.5
20 – 29.5
30 – 39.5
40 – 45
Total Score
46 – 50
31.3
Bank Sketch
BANKFULL
Height (B)
Bankfull
Root
Depth
(D)
Bank
Angle
(H)
Surface
Protection (I)
STUDY BANK Height
(A)
Vertical distance (ft)
1
Start
of
Bank
0
0
1
Horizontal distance (ft)
Copyright © 2008 Wildland Hydrology
River Stability Field Guide page 3-54
Worksheet 3-11. Form to calculate Bank Erosion Hazard Index (BEHI) variables and an overall BEHI rating. Use
Figure 3-7 with BEHI variables to determine BEHI score.
Stream:
Reedy Creek
Location: Reach 7
Observers: Will Wilhelm/Jason Diaz
Station:
5/15/2012
Date:
Stream Type:
Valley Type:
Study Bank Height / Bankfull Height ( C )
Study
Bank
Height (ft) =
9.00
Bankfull
Height
(A)
(A)/(B)=
2.00
4.50
(C)
(B)
(ft) =
BEHI Score
(Fig. 3-7)
10.0
Root Depth / Study Bank Height ( E )
Root
Depth
(ft) =
Study
Bank
2.00
(D) Height (ft) =
9.00
(D)/(A)=
0.22
(E)
(A)
6.2
Weighted Root Density ( G )
Root
Density
as
(F)x(E) =
30%
2.7
9.5
(G)
(F)
%=
Bank Angle ( H )
Bank
Angle
45
3.0
(H)
as Degrees =
Surface Protection ( I )
Surface
Protection
as
Bank Material Adjustment:
Bedrock (Overall Very Low BEHI)
Boulders (Overall Low BEHI)
Cobble (Subtract 10 points if uniform medium to large cobble)
of bank material that is composed of sand)
Moderate
High
(I)
Very High
1.0
Stratification Adjustment
Add 5–10 points, depending on
position of unstable layers in
relation to bankfull stage
Sand (Add 10 points)
Silt/Clay (no adjustment)
Low
90%
=
Bank Material
Adjustment
Gravel or Composite Matrix (Add 5–10 points depending on percentage
Very Low
%
Adjective Rating
Extreme
0
Moderate
and
5 – 9.5
10 – 19.5
20 – 29.5
30 – 39.5
40 – 45
Total Score
46 – 50
29.7
Bank Sketch
BANKFULL
Height (B)
Bankfull
Root
Depth
(D)
Bank
Angle
(H)
Surface
Protection (I)
STUDY BANK Height
(A)
Vertical distance (ft)
1
Start
of
Bank
0
0
1
Horizontal distance (ft)
Copyright © 2008 Wildland Hydrology
River Stability Field Guide page 3-54
Worksheet 3-11. Form to calculate Bank Erosion Hazard Index (BEHI) variables and an overall BEHI rating. Use
Figure 3-7 with BEHI variables to determine BEHI score.
Stream:
Reedy Creek
Location: Reach 6
Observers: Will Wilhelm/Jason Diaz
Station:
5/15/2012
Date:
Stream Type:
Valley Type:
Study Bank Height / Bankfull Height ( C )
Study
Bank
Height (ft) =
8.00
Bankfull
Height
(A)
(A)/(B)=
1.50
5.33
(C)
(B)
(ft) =
BEHI Score
(Fig. 3-7)
10.0
Root Depth / Study Bank Height ( E )
Root
Depth
(ft) =
Study
Bank
1.50
(D) Height (ft) =
8.00
(D)/(A)=
0.19
(E)
(A)
7.0
Weighted Root Density ( G )
Root
Density
as
(F)x(E) =
20%
1.6
10.0
(G)
(F)
%=
Bank Angle ( H )
Bank
Angle
75
5.8
(H)
as Degrees =
Surface Protection ( I )
Surface
Protection
as
Bank Material Adjustment:
Bedrock (Overall Very Low BEHI)
Boulders (Overall Low BEHI)
Cobble (Subtract 10 points if uniform medium to large cobble)
of bank material that is composed of sand)
Moderate
High
(I)
Very High
4.0
Stratification Adjustment
Add 5–10 points, depending on
position of unstable layers in
relation to bankfull stage
Sand (Add 10 points)
Silt/Clay (no adjustment)
Low
50%
=
Bank Material
Adjustment
Gravel or Composite Matrix (Add 5–10 points depending on percentage
Very Low
%
Adjective Rating
Extreme
0
High
and
5 – 9.5
10 – 19.5
20 – 29.5
30 – 39.5
40 – 45
Total Score
46 – 50
36.8
Bank Sketch
BANKFULL
Height (B)
Bankfull
Root
Depth
(D)
Bank
Angle
(H)
Surface
Protection (I)
STUDY BANK Height
(A)
Vertical distance (ft)
1
Start
of
Bank
0
0
1
Horizontal distance (ft)
Copyright © 2008 Wildland Hydrology
River Stability Field Guide page 3-54
Worksheet 3-11. Form to calculate Bank Erosion Hazard Index (BEHI) variables and an overall BEHI rating. Use
Figure 3-7 with BEHI variables to determine BEHI score.
Stream:
Reedy Creek
Location: Reach 11
Observers: Will Wilhelm/Jason Diaz
Station:
5/15/2012
Date:
Stream Type:
Valley Type:
Study Bank Height / Bankfull Height ( C )
Study
Bank
Height (ft) =
6.00
Bankfull
Height
(A)
(A)/(B)=
2.00
3.00
(C)
(B)
(ft) =
BEHI Score
(Fig. 3-7)
9.5
Root Depth / Study Bank Height ( E )
Root
Depth
(ft) =
Study
Bank
1.50
(D) Height (ft) =
6.00
(D)/(A)=
0.25
(E)
(A)
6.5
Weighted Root Density ( G )
Root
Density
as
(F)x(E) =
10%
0.6
10.0
(G)
(F)
%=
Bank Angle ( H )
Bank
Angle
85
7.0
(H)
as Degrees =
Surface Protection ( I )
Surface
Protection
as
Bank Material Adjustment:
Bedrock (Overall Very Low BEHI)
Boulders (Overall Low BEHI)
Cobble (Subtract 10 points if uniform medium to large cobble)
%
5%
(I)
=
10.0
Bank Material
Adjustment
Gravel or Composite Matrix (Add 5–10 points depending on percentage
of bank material that is composed of sand)
Stratification Adjustment
Add 5–10 points, depending on
position of unstable layers in
relation to bankfull stage
Sand (Add 10 points)
Silt/Clay (no adjustment)
Very Low
Low
Moderate
High
Very High
Extreme
5 – 9.5
10 – 19.5
20 – 29.5
30 – 39.5
40 – 45
46 – 50
0
Adjective Rating Very High
and
Total Score
43.0
Bank Sketch
BANKFULL
Height (B)
Bankfull
Root
Depth
(D)
Bank
Angle
(H)
Surface
Protection (I)
STUDY BANK Height
(A)
Vertical distance (ft)
1
Start
of
Bank
0
0
1
Horizontal distance (ft)
Copyright © 2008 Wildland Hydrology
River Stability Field Guide page 3-54
SEDIMENT LOADING ASSESSMENT
SITE:
LENGTH ASSESSED:
TOTAL TONS/YR:
TOTAL TONS/YR/FT:
LEFT BANK
A
B
BEHI
NBS
Extreme
Extreme
Very High
Very High
Very High
High
Low
Very High
High
Low
RIGHT BANK
A
B
BEHI
NBS
Extreme
Extreme
Extreme
Very High
Very High
Very High
Low
Low
Very High
High
Low
Very High
High
Low
Very High
Low
REACH 1
3,709
2,206
0.59
C
BANK
HEIGHT
(FT)
10
10
10
10
10
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
3.5
1.9
1.1
0.9
0.5
C
BANK
HEIGHT
(FT)
8
8
8
8
8
8
8
8
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
5
3.5
1.9
1.1
0.9
0.5
0.15
0.002
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
116
930
207
152
448
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
4,060
17,670
2,277
1,368
2,240
27,615
1,023
1,330
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
66
136
442
215
146
496
88
267
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
2,640
3,808
6,718
1,892
1,051
1,984
106
4
18,203
674
876
SEDIMENT LOADING ASSESSMENT
SITE:
LENGTH ASSESSED:
TOTAL TONS/YR:
TOTAL TONS/YR/FT:
LEFT BANK
A
B
BEHI
NBS
Extreme
Extreme
Extreme
High
High
High
High
Low
Low
Extreme
High
Low
Extreme
Very High
High
Low
High
Low
RIGHT BANK
A
B
BEHI
NBS
Extreme
Extreme
Extreme
Extreme
High
High
High
High
Extreme
Very High
High
Low
Extreme
Very High
High
Low
REACH 2
3,435
1,093
0.32
C
BANK
HEIGHT
(FT)
6
6
6
6
6
6
6
6
6
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
7
3.5
1.9
0.4
0.22
0.2
0.12
0.004
0.002
C
BANK
HEIGHT
(FT)
6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.5
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
7
5
3.5
1.9
0.4
0.22
0.2
0.12
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
55
105
253
73
165
43
514
97
413
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
2,310
2,205
2,884
175
218
52
370
2
5
8,221
304
396
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
104
102
52
334
28
166
185
746
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
4,732
3,315
1,183
4,125
73
237
241
582
14,487
537
698
SEDIMENT LOADING ASSESSMENT
SITE:
LENGTH ASSESSED:
TOTAL TONS/YR:
TOTAL TONS/YR/FT:
LEFT BANK
A
B
BEHI
NBS
Extreme
Extreme
Very High
Very High
High
High
Low
Extreme
Low
High
Low
High
Low
Low
RIGHT BANK
A
B
BEHI
NBS
Extreme
Extreme
Extreme
Extreme
Very High
Very High
High
High
Extreme
Very High
High
Low
Very High
Low
High
Low
REACH 3
2,834
1,332
0.47
C
BANK
HEIGHT
(FT)
8
8
8
8
8
8
8
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
7
1.9
0.9
0.5
0.2
0.12
0.002
C
BANK
HEIGHT
(FT)
6
6
6
6
6
6
6
6
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
7
5
3.5
1.9
1.1
0.5
0.2
0.12
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
97
247
173
196
133
318
252
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
5,432
3,754
1,246
784
213
305
4
11,738
435
565
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
135
174
33
276
86
22
143
549
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
5,670
5,220
693
3,146
568
66
172
395
15,930
590
767
SEDIMENT LOADING ASSESSMENT
SITE:
LENGTH ASSESSED:
TOTAL TONS/YR:
TOTAL TONS/YR/FT:
LEFT BANK
A
B
BEHI
NBS
Extreme
Extreme
Extreme
Extreme
Very High
Very High
Very High
Very High
High
High
High
Extreme
Very High
High
Low
Extreme
Very High
High
Low
Extreme
High
Low
RIGHT BANK
A
B
BEHI
NBS
Extreme
Extreme
Extreme
Extreme
Very High
Very High
Very High
Low
Low
Extreme
Very High
High
Low
Very High
High
Low
High
Low
REACH 4
3,684
986
0.27
C
BANK
HEIGHT
(FT)
3
3
3
3
3
3
3
3
3
3
3
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
7
5
3.5
1.9
1.6
1.1
0.9
0.5
0.4
0.2
0.12
C
BANK
HEIGHT
(FT)
5
5
5
5
5
5
5
5
5
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
7
5
3.5
1.9
1.1
0.9
0.5
0.004
0.002
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
28
124
4
140
26
146
285
713
13
129
235
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
588
1,860
42
798
125
482
770
1,070
16
77
85
5,911
219
285
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
50
148
175
353
78
299
367
89
282
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
1,750
3,700
3,063
3,354
429
1,346
918
2
3
14,563
539
701
SEDIMENT LOADING ASSESSMENT
SITE:
LENGTH ASSESSED:
TOTAL TONS/YR:
TOTAL TONS/YR/FT:
LEFT BANK
A
B
BEHI
NBS
Extreme
Extreme
Very High
Very High
High
High
Very High
Low
Very High
Low
High
Low
RIGHT BANK
A
B
BEHI
NBS
Extreme
Extreme
Extreme
Very High
Very High
Very High
Low
Low
Extreme
High
Low
Very High
High
Low
High
Low
REACH 5
974
390
0.40
C
BANK
HEIGHT
(FT)
7
7
7
7
7
7
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
5
1.9
1.1
0.5
0.2
0.12
C
BANK
HEIGHT
(FT)
7
7
7
7
7
7
7
7
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
7
3.5
1.9
1.1
0.9
0.5
0.004
0.002
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
30
62
146
70
163
16
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
1,050
825
1,124
245
228
13
3,485
129
168
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
12
76
22
153
90
36
82
16
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
588
1,862
293
1,178
567
126
2
0
4,616
171
222
SEDIMENT LOADING ASSESSMENT
SITE:
LENGTH ASSESSED:
TOTAL TONS/YR:
TOTAL TONS/YR/FT:
BOTH BANKS
A
B
BEHI
NBS
Extreme
Extreme
Extreme
Extreme
High
High
High
High
Moderate
Moderate
Moderate
Moderate
Low
Low
Low
Low
Extreme
Extreme
Low
Low
Extreme
Extreme
Low
Low
Extreme
Extreme
Low
Low
Extreme
Extreme
Low
Low
REACH 6
9,042
860
0.10
C
BANK
HEIGHT
(FT)
8
4
8
4
8
4
8
4
8
4
8
4
8
4
8
4
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
7
7
1.9
1.9
0.4
0.4
0.12
0.12
0.4
0.4
0.03
0.03
0.004
0.004
0.002
0.002
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
92
88
138
134
184
178
276
266
1104
1066
1656
1600
460
444
690
666
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
5,152
2,464
2,098
1,018
589
285
265
128
3,533
1,706
397
192
15
7
11
5
17,864
662
860
SEDIMENT LOADING ASSESSMENT
SITE:
LENGTH ASSESSED:
TOTAL TONS/YR:
TOTAL TONS/YR/FT:
BOTH BANKS
A
B
BEHI
NBS
Extreme
Extreme
High
High
Moderate
Moderate
Low
Low
Extreme
Low
Extreme
Low
Extreme
Low
Extreme
Low
REACH 7
4,014
475
0.12
C
BANK
HEIGHT
(FT)
8
8
8
8
8
8
8
8
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
7
1.9
0.4
0.12
0.4
0.03
0.004
0.002
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
60
140
180
422
904
2108
60
140
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
3,360
2,128
576
405
2,893
506
2
2
9,872
366
475
SEDIMENT LOADING ASSESSMENT
SITE:
LENGTH ASSESSED:
TOTAL TONS/YR:
TOTAL TONS/YR/FT:
BOTH BANKS
A
B
BEHI
NBS
Extreme
Extreme
Extreme
Extreme
Extreme
Extreme
High
High
High
High
High
High
Moderate
Moderate
Moderate
Moderate
Moderate
Moderate
Low
Low
Low
Low
Low
Low
Extreme
Extreme
Extreme
Low
Low
Low
Extreme
Extreme
Extreme
Low
Low
Low
Extreme
Extreme
Extreme
Low
Low
Low
Extreme
Extreme
Extreme
Low
Low
Low
REACH 8
7,672
853
0.11
C
BANK
HEIGHT
(FT)
8
7.5
4
8
7.5
4
8
7.5
4
8
7.5
4
8
7.5
4
8
7.5
4
8
7.5
4
8
7.5
4
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
7
7
7
1.9
1.9
1.9
0.4
0.4
0.4
0.12
0.12
0.12
0.4
0.4
0.4
0.03
0.03
0.03
0.004
0.004
0.004
0.002
0.002
0.002
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
76
52
18
76
120
40
154
104
34
154
242
80
920
622
208
920
1450
484
384
258
86
384
604
202
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
4,256
2,730
504
1,155
1,710
304
493
312
54
148
218
38
2,944
1,866
333
221
326
58
12
8
1
6
9
2
17,709
656
853
SEDIMENT LOADING ASSESSMENT
SITE:
LENGTH ASSESSED:
TOTAL TONS/YR:
TOTAL TONS/YR/FT:
BOTH BANKS
A
B
BEHI
NBS
Moderate
Moderate
Low
Extreme
Low
Low
REACH 9
3,269
51
0.02
C
BANK
HEIGHT
(FT)
6
6
6
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
0.4
0.03
0.002
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
327
1471
1471
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
785
265
18
1,067
40
51
SEDIMENT LOADING ASSESSMENT
SITE:
LENGTH ASSESSED:
TOTAL TONS/YR:
TOTAL TONS/YR/FT:
BOTH BANKS - REACH 10
A
B
BEHI
NBS
Extreme
Extreme
High
High
Moderate
Moderate
Low
Low
Extreme
Low
Extreme
Low
Extreme
Low
Extreme
Low
REACH 10
9,500
595
0.06
C
D
FEET/YEAR
BANK HEIGHT
(from NC Curve Rev.
(FT)
3-31-09)
7
7
7
1.9
7
0.4
7
0.12
7
0.4
7
0.03
7
0.004
7
0.002
BOTH BANKS - REACH 10a
A
B
BEHI
NBS
High
Low
C
D
FEET/YEAR
BANK HEIGHT
(from NC Curve Rev.
(FT)
3-31-09)
10
0.12
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
32
292
98
878
488
4388
32
292
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
1,568
3,884
274
738
1,366
921
1
4
8,756
324
422
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
3000
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
3,600
3,600
133
173
SEDIMENT LOADING ASSESSMENT
SITE:
LENGTH ASSESSED:
TOTAL TONS/YR:
TOTAL TONS/YR/FT:
BOTH BANKS
A
B
BEHI
NBS
High
High
Moderate
Moderate
Low
Low
Extreme
Low
Extreme
Low
Extreme
Low
REACH 11
1,788
63
0.04
C
BANK
HEIGHT
(FT)
9.5
9.5
9.5
9.5
9.5
9.5
D
FEET/YEAR
(from NC Curve Rev.
3-31-09)
0.4
0.12
0.4
0.03
0.004
0.002
E
F
BANK LENGTH
(FT)
VOLUME/YEAR
(FT3/YEAR)
36
322
126
1126
18
160
TOTAL FT3/YR
TOTAL YD3/YR
TOTAL TONS/YR
137
367
479
321
1
3
1,307
48
63
SEDIMENT LOADING ASSESSMENT
Reach
1
2
3
4
5
6
7
8
9
10
11
TOTAL
Bank Length
(FT)
3,709
3,435
2,834
3,684
974
9,042
4,014
7,672
3,269
9,500
1,788
49,921
TOTAL
TONS/YR
2,206
1,093
1,332
986
390
860
475
853
51
595
63
8,905
TOTAL
TONS/YR/FT
0.59
0.32
0.47
0.27
0.40
0.10
0.12
0.11
0.02
0.06
0.04
0.18
Appendix 7
Technical Memorandum
Date:
March26, 2011
Project: WO#2 – Reedy Creek
Subject:
Reach 5 Assessment (Southwest Reach)
To: William Harris, E.I.
Purpose: For Review
Assessment
Kimley-Horn and Associates, Inc. (KHA) staff Will Wilhelm and Jason Diaz performed a visual assessment of the
subject site on May 13, 2011. The lower 500 feet of stream (reach 5) showed obvious visual signs of impairment
through bed/bank erosion and active headcuts. The stream does not have access to an active floodprone area/bench
because of this down-cutting/incision. This incision is likely caused from historical straightening and historic land
uses. However, upstream of this unstable 500 feet the stream visually appeared to be in a stable condition with
adequate access to a floodprone area. The stream makes this transition from a highly unstable to stable at a large
headcut that has been stopped by a large bedrock outcrop. Upstream of the bedrock the stream and its tributaries
appear to be in equilibrium with little or no signs of instability. These reaches are ideal for reference reaches for the
restoration efforts in the other Reedy Creek reaches.
Mitigation Potential
A majority of the stream (reach 5) and its tributaries (reach 5-A and 5-B) are contained on public property and
approximately 1,200 feet of reach 5-B is located on a private parcel (See Figure 1). Table 1 below lists the parcels
and owner names. All of reach 5 and its jurisdictional tributaries would qualify for mitigation credit ratio assuming
conservation easements were obtained and the Interagency Review Team (IRT) agreed to allow preservation on
within the existing nature preserve. The City may argue that the mitigation plan for this area is a complete watershed
approach and incorporates restoration and preservation to protect the watershed and its assets in perpetuity through
measures such as a conservation easement. Table 2 and Figure 1 below summarize of the estimated mitigation
potential of the reach when combined with the other components (Reach 1-4) of the Reedy Creek project:
Table 1. Parcels
Parcel Identification Number
10509124
10507101
10507106
10511101
10511102
10511105
Owner
WSOC Television Inc.
Mecklenburg County
Mecklenburg County
Mecklenburg County
Mecklenburg County
Mecklenburg County
Table 2. Mitigation Credit Potential
Reach
Mitigation Type
5
5
5-A
5-B
TOTALS
Restoration
Preservation
Preservation
Preservation
--
Length (feet)*
Existing
Design
487
491
4,579
4,579
2,064
2,064
978
978
8,108
8,112
Credit Ratio
Mitigation Credit
1:1
5:1
5:1
5:1
--
491
916
413
196
2,016
*Stream lengths based on Mecklenburg County GIS data layer(s).
Page 1 of 3
Figure 1. Mitigation Potential for Reach 5
e
10509124
WSOC TEVELVISION INC
za
id g
b le R
la
eP
Th
la m
an
l
i rr e
Sa
qu
dS
tl e a
Re
de
rR
un
Bra m
Cr
os
sv
in e
10509123
10509122 CITY OF CHARLOTTE
ROBERTS
Ma
10511105
MECKLENBURG COUNTY
pp
Da
le
10507106
MECKLENBURG COUNTY
Plaz
a
Plo
tt
Ve rm
il
10511101
MECKLENBURG COUNTY
10507101
MECKLENBURG COUNTY
10511102
MECKLENBURG COUNTY
io n
10511106
MECKLENBURG COUNTY
Title:
Figure 1 - Mitigation Potential
300
Feet
Existing Stream Centerline
600
E
0
Legend:
Concept Stream Restoration
Stream Preservation
Ponds/Impounded Areas
Parcels
Page 2 of 3
Site Photos
Photo1: Restoration Potential/Lower 500 Feet of
Reach 5
Photo 2: Restoration Potential/Lower 500 Feet of
Reach 5
Photo 3: Preservation/Potential Reference Reach 5
Photo 4: Preservation/Potential Reference Reach 5
Photo 5: Preservation/Potential Reference Reach 5
Photo 6: Preservation/Potential Reference Reach 5
Page 3 of 3
Appendix 8
Reach 1 - Cross Section 2 (Riffle)
Ground Points
Bankfull Indicators
Wbkf = 16.9
Water Surface Points
Dbkf = .87
Abkf = 14.7
112
111
110
109
108
Elevation (ft)
107
106
105
104
103
102
101
100
99
98
97
0
5
10
15
20
25
30
Horizontal Distance (ft)
35
40
45
50
55
60
Reach 1 - Cross Section 1 (Pool)
Ground Points
Bankfull Indicators
Wbkf = 13
Water Surface Points
Dbkf = 1.18
Abkf = 15.3
112
111
110
109
108
Elevation (ft)
107
106
105
104
103
102
101
100
99
98
97
0
5
10
15
20
25
30
Horizontal Distance (ft)
35
40
45
50
55
60
104.5
104.0
103.5
Reach 1 - Cross Section 2 (Riffle)
Reach 1 - Cross Section 1 (Pool)
Design
105.0
Reach 1 - Profile
CH
103.0
WS
102.5
102.0
Elevation (ft)
101.5
BKF
101.0
100.5
100.0
P1
99.5
99.0
98.5
P2
98.0
97.5
P3
97.0
96.5
96.0
P4
95.5
95.0
0
20
40
60
80
100
120
140
160
180
200
Distance along stream (ft)
220
240
260
280
300
320
340
360
380
400
Reach 10 - Cross Section 1 (Riffle)
Ground Points
Bankfull Indicators
Wbkf = 12
Water Surface Points
Dbkf = .86
Abkf = 10.3
113
112
111
110
109
Elevation (ft)
108
107
106
105
104
103
102
101
100
99
0
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
Horizontal Distance (ft)
34
36
38
40
42
44
46
48
50
52
54
56
58
60
Reach 10 - Cross Section 2 (Pool)
Ground Points
Bankfull Indicators
Wbkf = 17.7
Water Surface Points
Dbkf = 1.95
Abkf = 34.5
108
107
106
Elevation (ft)
105
104
103
102
101
100
99
98
0
2
4
6
8
10
12
14
16
Horizontal Distance (ft)
18
20
22
24
26
28
30
Reach 10 - Profile
Reach 10 - Cross Section 1 (Riffle)
107
106
105
Elevation (ft)
Reach 10 - Cross Section 2 (Pool)
108
CH
WS
BKF
104
103
LB
102
RB
101
100
P3
99
P4
98
0
20
40
60
80
100
120
140
160
180
200
220
240
Distance along stream (ft)
260
280
300
320
340
360
380
400
420
440
Reach 11 - Cross Section 1 (Pool)
Ground Points
Bankfull Indicators
Wbkf = 16.9
Water Surface Points
Dbkf = 2.55
Abkf = 43.2
108
107
106
Elevation (ft)
105
104
103
102
101
100
99
98
0
2
4
6
8
10
12
14
16
Horizontal Distance (ft)
18
20
22
24
26
28
30
Reach 11 - Cross Section 2 (Riffle)
Ground Points
Wbkf = 12.8
Bankfull Indicators
Dbkf = 2.55
Water Surface Points
Abkf = 32.6
109
108
107
Elevation (ft)
106
105
104
103
102
101
100
99
0
2
4
6
8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80
Horizontal Distance (ft)
Reach 10 - Profile
107
106
Elevation (ft)
105
Reach 11 - Cross Section 2 (Riffle)
Reach 11 - Cross Section 1 (Pool)
108
CH
WS
BKF
104
103
LB
102
RB
101
100
P3
99
P4
98
0
20
40
60
80
100
120
140
160
180
200
220
Distance along stream (ft)
240
260
280
300
320
340
360
380
400
Reach 2 - Cross Section (Riffle)
Ground Points
Bankfull Indicators
Wbkf = 12
Water Surface Points
Dbkf = .99
Abkf = 11.9
104
103
102
101
Elevation (ft)
100
99
98
97
96
95
94
93
92
0
10
20
30
40
50
60
70
80
Horizontal Distance (ft)
90
100
110
120
130
140
150
Reach 2 - Cross Section 2 (Pool)
Ground Points
Bankfull Indicators
Wbkf = 12.9
Water Surface Points
Dbkf = 1.84
Abkf = 23.7
104
103
102
101
Elevation (ft)
100
99
98
97
96
95
94
93
92
0
10
20
30
40
50
60
70
80
Horizontal Distance (ft)
90
100
110
120
130
140
150
Reach 2 - Cross Section (Riffle)
Reach 2 - Cross Section 2 (Pool)
Reach 2 - Profile
105
104
103
102
CH
101
WS
100
99
Elevation (ft)
98
BKF
97
96
95
LB
94
93
92
RB
91
90
P3
89
88
87
P4
86
85
0
20
40
60
80
100
120
140
160
180
200
Distance along stream (ft)
220
240
260
280
300
320
340
360
380
400
Reach 3 - Cross Section 2 (Riffle)
Ground Points
Bankfull Indicators
Wbkf = 11.4
Water Surface Points
Dbkf = .83
Abkf = 9.52
110
109
108
107
106
105
104
103
Elevation (ft)
102
101
100
99
98
97
96
95
94
93
92
91
90
89
88
87
0
5
10
15
20
25
Horizontal Distance (ft)
30
35
40
45
50
Reach 3 - Cross Section 1 (Pool)
Ground Points
Bankfull Indicators
Wbkf = 10.7
Water Surface Points
Dbkf = 1.22
Abkf = 13
102
101
100
99
98
Elevation (ft)
97
96
95
94
93
92
91
90
89
88
87
0
5
10
15
20
25
Horizontal Distance (ft)
30
35
40
45
50
94
Reach 3 - Cross Section 2 (Riffle)
Reach 3 - Cross Section 1 (Pool)
Design
95
Reach 3 - Profile
CH
93
WS
Elevation (ft)
92
BKF
91
90
P1
89
P2
88
P3
87
86
P4
85
0
10
20
30
40
50
60
70
80
90
100
110
120
130
Distance along stream (ft)
140
150
160
170
180
190
200
210
220
230
240
250
Reach 4 - Cross Section 1 (Riffle)
Ground Points
Bankfull Indicators
Wbkf = 5.84
Water Surface Points
Dbkf = .88
Abkf = 5.14
103
102
101
Elevation (ft)
100
99
98
97
96
95
94
93
0
4
8
12
16
20
Horizontal Distance (ft)
24
28
32
36
40
Reach 4 - Cross Section 2 (Pool)
Ground Points
Bankfull Indicators
Wbkf = 6.34
Water Surface Points
Dbkf = .83
Abkf = 5.26
104
103
102
101
100
Elevation (ft)
99
98
97
96
95
94
93
92
91
90
89
0
4
8
12
16
20
Horizontal Distance (ft)
24
28
32
36
40
Reach 4 - Profile
102
101
CH
100
99
WS
Elevation (ft)
98
BKF
97
96
LB
95
94
RB
93
92
P3
91
90
P4
89
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
Distance along stream (ft)
170
180
190
200
210
220
230
240
250
260
270
280
290
300
Reach 6 - Cross Section 1 (Riffle)
Ground Points
Bankfull Indicators
Wbkf = 9.1
Water Surface Points
Dbkf = 1.07
Abkf = 9.72
102
101
100
Elevation (ft)
99
98
97
96
95
94
93
92
0
2
4
6
8
10
12
14
Horizontal Distance (ft)
16
18
20
22
24
26
Reach 6 - Cross Section 2 (Pool)
Ground Points
Bankfull Indicators
Wbkf = 12.2
Water Surface Points
Dbkf = .88
Abkf = 10.7
102
101
100
Elevation (ft)
99
98
97
96
95
94
93
92
0
2
4
6
8
10
12
14
16
18
20
22
24
26
Horizontal Distance (ft)
28
30
32
34
36
38
40
42
44
46
48
Reach 6 - Profile
Reach 6 - Cross Section 1 (Riffle)
Reach 6 - Cross Section 2 (Pool)
101
100
99
CH
WS
Elevation (ft)
98
BKF
97
96
LB
95
RB
94
93
P3
92
P4
91
0
10
20
30
40
50
60
70
80
90
100
110
120
Distance along stream (ft)
130
140
150
160
170
180
190
200
210
220
Reach 7 - Cross Section 1 (Pool)
Ground Points
Bankfull Indicators
Wbkf = 8.05
Water Surface Points
Dbkf = .82
Abkf = 6.57
105
104
103
102
101
Elevation (ft)
100
99
98
97
96
95
94
93
92
91
90
0
2
4
6
8
10
12
14
16
18
Horizontal Distance (ft)
20
22
24
26
28
30
32
34
Reach 7 - Cross Section 2 (Riffle)
Ground Points
Bankfull Indicators
Wbkf = 7.61
Water Surface Points
Dbkf = 1.02
Abkf = 7.76
105
104
103
102
101
Elevation (ft)
100
99
98
97
96
95
94
93
92
91
90
0
2
4
6
8
10
12
14
16
18
Horizontal Distance (ft)
20
22
24
26
28
30
32
34
Reach 7 - Profile
105
104
103
102
Reach 7 - Cross Section 2 (Riffle)
Reach 7 - Cross Section 1 (Pool)
106
CH
WS
Elevation (ft)
101
BKF
100
99
LB
98
97
RB
96
95
P3
94
93
P4
92
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
Distance along stream (ft)
75
80
85
90
95
100
105
110
115
120
125
Reach 8 - Cross Section 1 (Pool)
Ground Points
Bankfull Indicators
Wbkf = 9.44
Water Surface Points
Dbkf = 1.18
Abkf = 11.2
103
102
101
Elevation (ft)
100
99
98
97
96
95
94
93
0
2
4
6
8
10
12
14
Horizontal Distance (ft)
16
18
20
22
24
26
28
Reach 8 - Cross Section 2 (Riffle)
Ground Points
Bankfull Indicators
Wbkf = 7.52
Water Surface Points
Dbkf = .93
Abkf = 6.99
102
101
100
Elevation (ft)
99
98
97
96
95
94
93
92
0
2
4
6
8
10
12
14
Horizontal Distance (ft)
16
18
20
22
24
26
Reach 8 - Profile
101
100
Reach 8 - Cross Section 2 (Riffle)
Reach 8 - Cross Section 1 (Pool)
102
CH
WS
Elevation (ft)
99
BKF
98
97
LB
96
RB
95
94
P3
93
P4
92
0
10
20
30
40
50
60
70
80
90
100
110
120
Distance along stream (ft)
130
140
150
160
170
180
190
200
210
220
Reach 9 - Cross Section 1 (Pool)
Ground Points
Bankfull Indicators
Wbkf = 12.7
Water Surface Points
Dbkf = 1.09
Abkf = 13.8
103
102
101
Elevation (ft)
100
99
98
97
96
95
94
93
0
2
4
6
8
10
12
14
Horizontal Distance (ft)
16
18
20
22
24
26
28
Reach 9 - Cross Section 2 (Riffle)
Ground Points
Bankfull Indicators
Wbkf = 11.3
Water Surface Points
Dbkf = 1.21
Abkf = 13.6
104
103
102
Elevation (ft)
101
100
99
98
97
96
95
94
0
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
Horizontal Distance (ft)
32
34
36
38
40
42
44
46
48
50
52
54
Reach 9 - Profile
102
101
Reach 9 - Cross Section 2 (Riffle)
Reach 9 - Cross Section 1 (Pool)
103
CH
WS
Elevation (ft)
100
BKF
99
98
LB
97
RB
96
95
P3
94
P4
93
0
10
20
30
40
50
60
70
80
90
100
110
120
Distance along stream (ft)
130
140
150
160
170
180
190
200
210
220
Download