Prosperity Village CNIP May 2, 2014 Charrette Ballot Responses
Community Identity
Questions
Ballot #
1
Opinion of (3) most Important Projects for
further Analysis
Opinion of the (1) Project of Least Importance
Response
1-2 I-485 Ramp Loop Streetscape Beautification
Greenways, Trails & Open Space
Ballot #
1
Response
G-6 - Mallard Creek Greenway Bridge
Connection to Existing CATS Parking Lot
Pedestrian Circulation
Ballot #
1
Response
C-1 Traffic Signal at Katelyn Drive
Transportation
Ballot #
1
Response
B stop light Hucks
Artistic Bike Rack
G-7 - Jimmy Oehler Multi-use Trail
C-12 - Sidewalk on Browne Rd.
J Bike lane or complete street (hucks)
Mature Trees on roads
C-16 - Sidewalk along Hucks Road
Natural Connection to Nature Preserver
J Bike Lane/Complete Street, Hucks Rd.
1-2 1-485 Ramp Loop Streetscape Beautification
C - Road/Bike for Hucks Rd.
Walk For Hucks
Additional Responses
2
Opinion of (3) most Important Projects for
further Analysis
I-1 - Prosperity Village Gateway on I-485 Exit
Ramp
2
I-3 - Landmarks at Roundabouts
G-1 - Clark's Creek Greenway Trailhead and
Extension
2
Extend all planned greenways
C-7 - Sidewalk on Ridge Road from Prosperity
Church Road to Highland Creek Parkway
2
C-9 - Sidewalk Gaps on Eastfield Drive
C-6 - Sidewalk Gaps from Prosperity Church
Road to Johnston Oehler Road
Alternative transportation mode opportunities
T-2 - Ridge Road Extension
T-3 - Ridge Road Widening
T-6 - Prosperity Ridge Road Southeast Arc
Feel of neighborhood changed with appearance
of new apartments, soften appearance of new
apartments with trees or landscaping
Opinion of the (1) Project of Least Importance
Additional Responses
3
Opinion of (3) most Important Projects for
further Analysis
I-4 - Community Signage Program
I-2 - I-485 Ramp Loop Streetscape Beautification
G-4 - Clark's Creek Tributary #1
G-2 - Clark's Creek Greenway Northern
Extension
I-3 - Landmarks at Roundabouts
G-3 - Southwest Connector Multi-Use Trail
3
3
4
Opinion of (3) most Important Projects for
further Analysis
I-2 - I-485 Ramp Loop Streetscape Beautification
4
Community Signage 1-4
G-7 - Jimmy Oehler Multi-use Trail
G-6 - Mallard Creek Greenway Bridge
Connection to Existing CATS Parking Lot
4
Opinion of the (1) Project of Least Importance
5
Additional Responses
T-2 - Ridge Road Extension
Traffic calming on Prosperity Church Rd. much
needed!
C-12 - Sidewalk on Browne Rd.
B- Stop Light
J - Bike Lane/"Complete" Street Hucks Road
(shoulder)
3 - Crosswalk @ Nature Preserve
Bike Lane / "Complete" Street Browne Road
4
C - Greenway or MultiUse to Carrier
Logo of Community integrated into Bike Racks
throughout the city
Additional Responses
Opinion of the (1) Project of Least Importance
C-1 - Traffic Signal at Katelyn Drive
T-6 - Prosperity Ridge Road Southeast Arc
T-2 - Ridge Road Extension
light @ MCHS
C-11 - Additional Midblock Refuge Islands on
Ridge Road
I-3 - Landmarks at Roundabouts
Opinion of (3) most Important Projects for
further Analysis
3
C-1 - Traffic Signal at Katelyn Drive
I-1 - Prosperity Village Gateway on I-485 Exit
Ramp
Additional Responses
C-6 - Sidewalk Gaps from Prosperity Church
Road to Johnston Oehler Road
C-7 - Sidewalk on Ridge Road from Prosperity
Church Road to Highland Creek Parkway
I-2 - I-485 Ramp Loop Streetscape Beautification
I-1 - Prosperity Village Gateway on I-485 Exit
Ramp
4 Walk for Hucks
5
G-1 - Clark's Creek Greenway Trailhead and
Extension
G-2 - Clark's Creek Greenway Northern
Extension
I-4 - Community Signage Program
G-4 - Clark's Creek Tributary #1
I-3 - Landmarks at Roundabouts
G-7 - Jimmy Oehler Multi-use Trail
5
C-9 - Sidewalk Gaps on Eastfield Drive
5
C-9 - Sidewalk Gaps on Eastfield Drive
C-8 - Sidewalk on Prosperity Church Road
C-10 - Sidewalk Gaps on Eastfield Drive
C-12 - Sidewalk on Browne Rd.
C-11 - Additional Midblock Refuge Islands on
Ridge Road
T-5 - DeArmon Road Farm-to-Market
T-10 - Arbor Creek Drive & Rocky Ford Club Road
Roundabout
Prosperity Village CNIP May 2, 2014 Charrette Ballot Responses
Community Identity
Questions
Ballot #
6
Opinion of (3) most Important Projects for
further Analysis
Response
I-4 - Community Signage Program
I-1 - Prosperity Village Gateway on I-485 Exit
Ramp
Greenways, Trails & Open Space
Ballot #
6
Response
Community Park Expansions
Pedestrian Circulation
Ballot #
6
Response
Sidewalk on Ridge Rd. down to Stoney Creek
Subdivision
C-7 - Sidewalk on Ridge Road from Prosperity
Church Road to Highland Creek Parkway
Transportation
Ballot #
6
T-2 - Ridge Road Extension
T-5 - DeArmon Road Farm-to-Market
Light @ MCHS Bridge Crossing
Opinion of the (1) Project of Least Importance
Response
T-3 - Ridge Road Widening
Artwork
Additional Responses
7
Opinion of (3) most Important Projects for
further Analysis
I-4 - Community Signage Program
7
I-2 - I-485 Ramp Loop Streetscape Beautification
Opinion of the (1) Project of Least Importance
G-4 - Clark's Creek Tributary #1
I-3 - Landmarks at Roundabouts
G-5 - Clark's Creek Tributary #1A
G-2 - Clark's Creek Greenway Northern
Extension
Community Art
G-7 - Jimmy Oehler Multi-use Trail
7
C-7 - Sidewalk on Ridge Road from Prosperity
Church Road to Highland Creek Parkway
C-6 - Sidewalk Gaps from Prosperity Church
Road to Johnston Oehler Road
Light @ MCHS w/crosswalk from backside of
Stoney Creek sub
7
T-5 - DeArmon Road Farm-to-Market
T-2 - Ridge Road Extension
T-2 - Ridge Road Extension
Additional Responses
8
Opinion of (3) most Important Projects for
further Analysis
Opinion of the (1) Project of Least Importance
Gateways
8
Gateway Ext.
8
Sidewalks
8
Roadways
Public Art
Trailheads
Sidewalk Gaps
Roundabouts
Streetscapes
Multi Use Trail
Ped Crossing
On Street Parking
Neighborhood Signage
Additional Responses
9
Opinion of (3) most Important Projects for
further Analysis
Beautification Village Sign at Benfield
G-6 - Mallard Creek Greenway Bridge
Connection to Existing CATS Parking Lot
G-1- Clark's Creek Greenway Trailhead and
Extension
I-4 - Community Signage
G-3 - Southwest Connector Multi-Use Trail
Landscaping, Trees, Benches
G-5 - Clark's Creek Tributary #1A
I-2 - I-485 Ramp Streetscape Beautification
9
9
C-13 - Sidewalk on DeArmon Rd
9
Traffic Light at DeArmon & Browne Rd.
C-12 - Sidewalk on Browne Rd.
T-1 - Prosperity Church Road Widening
C-8 - Sidewalk on Prosperity Church Road
T-2 - Ridge Road Extension
C 9-10 - Sidewalk Gaps on Eastfield Rd.
T-8 - Christenbury Road & Millstream Ridge
Drive Roundabout
Greater Accessibility to Entry Points
Opinion of the (1) Project of Least Importance
Additional Responses
10
Opinion of (3) most Important Projects for
further Analysis
Area Plan Urban Guidelines
Distinct Signage
10
G-4 - Clark's Creek Tributary #1
Pedestrian Greenway Connection to Highland
Creek
Greenway/Amenity Signage
More Signage
More Pedestrian Connections to Clark Creek
Nature Pres.
Library @ DeArmon & Prosperity Church
Greenway Access @ Cats Parking Lot @ Mallard
Creek Rd.
Opinion of the (1) Project of Least Importance
Additional Responses
10
C-2 - Crosswalk at Senior Center on Prosperity
Church Road
Tie together pedestrian greenway connection to
highland creek
Connect Davis Ridge to Clark Creek Nature
Preserve
10
Dot "A" Browne/DeArmon Roundabout
Complete Browne Rd
Highland Creek "Village Rider" Bus
Prosperity Village CNIP May 2, 2014 Charrette Ballot Responses
Community Identity
Questions
Ballot #
Opinion of (3) most Important Projects for
further Analysis
11
Response
Neighborhood Identity (Forest Pond at New 4lane Hwy)
Greenways, Trails & Open Space
Ballot #
Response
Pedestrian Circulation
Ballot #
Response
Transportation
Ballot #
Response
11
More Community Access via CATS parking lot
11
Access to Greenway via CATS parking lot
11
Ultimate four lane of mallard Creek, I-85
alternate relief for traffic
12
G-1 - Clark's Creek Greenway Trailhead and
Extension
12
Sidewalks on Ridge Rd.
12
T-2 - Ridge Road Extension
Derita Town Center
Opinion of the (1) Project of Least Importance
Additional Responses
Opinion of (3) most Important Projects for
further Analysis
12
A #1 - Stop light @ DeArmon/Browne
Opinion of the (1) Project of Least Importance
Additional Responses
Opinion of (3) most Important Projects for
further Analysis
13
13
G-1 - Clark's Creek Greenway Trailhead and
Extension
13
Sidewalks on Ridge Rd.
13
Stop Light 2 DeArmon & Browne
14
Community Garden
14
C-7- Sidewalk on Ridge Road from Prosperity
Church Road to Highland Creek Parkway
14
T-3 - Ridge Road Widening
Opinion of the (1) Project of Least Importance
Additional Responses
14
Opinion of (3) most Important Projects for
further Analysis
Gateways
Public Art
Complete Greenway to Village G1/G3?
C-4 - Traffic Signal at Driwood Court
Roundabouts for Benefield & Prosperity Ch.
Extend Harburn Forest E
Opinion of the (1) Project of Least Importance
Additional Responses
15
Opinion of (3) most Important Projects for
further Analysis
Public Art
15
*I think all the suggested projects have value*
G-1 - Clark's Creek Greenway Trailhead and
Extension; G-2 - Clark's Creek Greenway
Northern Extension; G-3 - Southwest Connector
Connections on the North Side of I-485
connecting to Highland Creek are needed.
15
Signalized Crossing at Katelyn Dr. & Prosperity
Ch. Rd.
C-7- Sidewalk on Ridge Road from Prosperity
Church Road to Highland Creek Parkway
15
T-3 - Ridge Road Widening
E
More bike lanes!
C
Make bio swales a standard for all new road
construction to improve storm water quality.
Bike Lanes wherever possible are really a great
idea. Especially separated bike lanes.
Opinion of the (1) Project of Least Importance
Additional Responses
16
Branding/Identity (signage/logo)
16
Sculptures in Traffic Circles
Landscape/Architecture Pattern Book/Design
Guidelines
*most important category to focus on in the
beginning*
Opinion of (3) most Important Projects for
further Analysis
Connect Greenway into Village Center
16
Create Large Open Public Multi-Use Green Space
Signalized crossing at Katelyn & Prosp. Ch.
16
Signalized crossing @ P.C. & Pinewood
Signalized Intersection w/turn lane @ HC
Parkway & Eastfield
Bike/Walk Paths from NHDS into Village
Widen Eastfield (Turn Lane)
Widen Ridge (Turn Lane)
Widen P.C. Rd.
Opinion of the (1) Project of Least Importance
Additional Responses
Opinion of (3) most Important Projects for
further Analysis
17
Identify Public Schools
17
I love Hucks Rd. Green Space, we need more
17
Sidewalk at Jimmy Oehler Circle
Greenway Connector to MCHS
Opinion of the (1) Project of Least Importance
Additional Responses
17
Sidewalk - Jimmy Oehler Rd.
Intersection Improvement Hucks/Old Statesville
Rd.
Prosperity Village CNIP May 2, 2014 Charrette Ballot Responses
Community Identity
Questions
Ballot #
18
Opinion of (3) most Important Projects for
further Analysis
Response
I-1 - Prosperity Village Gateway on I-485 Exit
Ramp
Greenways, Trails & Open Space
Ballot #
18
I-2 - I-485 Ramp Loop Streetscape Beautification
Response
G-7 - Jimmy Oehler Multi-use Trail
G-6 - Mallard Creek Greenway Bridge
Connection to Existing CATS Parking Lot
Pedestrian Circulation
Ballot #
18
G-3 - Southwest Connector Multi-Use Trail
Opinion of the (1) Project of Least Importance
Response
C-7 - Sidewalk on Ridge Road from Prosperity
Church Road to Highland Creek Parkway
Transportation
Ballot #
18
Response
T-9 - Hucks Road Extension Eastern Segment
C-8 - Sidewalk on Prosperity Church Road
T-6 - Prosperity Ridge Road Southeast Arc
C-13 - Sidewalk on DeArmon Rd
T-3 - Ridge Road Widening
C-14 - Sidewalk Gaps on David Cox Rd
Additional Responses
Opinion of (3) most Important Projects for
further Analysis
19
Library
19
20
Roundabouts
20
19
19
Opinion of the (1) Project of Least Importance
Additional Responses
Opinion of (3) most Important Projects for
further Analysis
Community Signage
G-5 - Clark's Creek Tributary #1A
20
G-4 - Clark's Creek Tributary #1
G-1 - Clark's Creek Greenway Trailhead and
Extension
Streetscape
C-11 - Additional Midblock Refuge Islands on
Ridge Road
C-7 - Sidewalk on Ridge Road from Prosperity
Church Road to Highland Creek Parkway
20
T-4 - Roundabout at Prosperity Church Road and
Prosperity Ridge Road
T-1 - Prosperity Church Road Widening
T-4 - Roundabout at Prosperity Church Road and
Prosperity Ridge Road
C-8 - Sidewalk on Prosperity Church Road
Opinion of the (1) Project of Least Importance
Additional Responses
21
I-1 - Prosperity Village Gateway on I-485 Exit
Ramp
21
Opinion of (3) most Important Projects for
further Analysis
Need Greenway @ Mallard Creek
21
Regional Park to Highland Creek
C-12 - Sidewalk on Browne Rd.
21
C-13 - Sidewalk on DeArmon Rd
T-14 - DeArmon Rd and Browne Road
Signalization and Intersection Improvements
T-5 - DeArmon Road Farm-to-Market
T-6 - Prosperity Ridge Road Southeast Arc
Opinion of the (1) Project of Least Importance
Additional Responses
22
Opinion of (3) most Important Projects for
further Analysis
Streetscape
Central Open Space
C-7 - Sidewalk on Ridge Road from Prosperity
Church Road to Highland Creek Parkway
C-6 - Sidewalk Gaps from Prosperity Church
Road to Johnston Oehler Road
Signage
Multi-Use Trail
C-8 - Sidewalk on Prosperity Church Road
All are important
All are important. Strive to achieve an
integrated bikeway system that connects with
all the neighborhoods to activity center to
Clark/Mallard Greenway
*All sidewalk gaps to connect surrounding
neighborhoods to the activity center
Gateway
22
Greenway Extension - See Area Plan
22
Opinion of the (1) Project of Least Importance
Additional Responses
*Focus on areas in activity & wedge corridors
Prepared by Woolpert, May 13, 2015
22
T-4 - Roundabout at Prosperity Church Road and
Prosperity Ridge Road
T-9 - Hucks Road Extension Eastern Segment
Any roadwork that optimizes connectivity from
outer wedge to the activity center