October 2013
Construction nears completion for Charlotte-Mecklenburg Storm Water
Services’ Bongaard Pond Restoration Project. The contractor is finishing
the last construction items, including roadway repairs. The project will
preserve and enhance water quality of the streams downstream of the
pond. In addition, flood control improvements were made by replacing
the culvert under Middle Acres Road.
•
•
•
Stream restoration channel is complete.
A 54” and 60” dual pipe system under Middle Acres Road is installed.
The downstream headwall has been poured and backfilled and
construction of dam embankment is complete.
For more information about this project, please visit our website to view
project updates at: http://stormwater.charmeck.org. Click on Storm
Water Projects drop down menu in the green bar, then Active Projects and
Bongaard Pond.
The Bongaard Pond outfall is complete.
If you have any questions, please contact one of the following members:
On-site Construction Inspector:
Gina Hodges: 704-517-7570
Email: vhodges@charlottenc.gov
Construction Supervisor:
Gary Stansbury: 704-704-336-2667
Email: gstansbury@charlottenc.gov
Project Manager:
Chad Nussman: 704-336-5676
E-mail: cnussman@charlottenc.gov
A construction inspector will be on site daily to address any questions or concerns.
Please note efforts are taken to minimize disruption to nearby properties.