Changes to Water & Land Resources & Evolution of The Mecklenburg County Flood Maps MECKLENBURG COUNTY STORM WATER PERMITTING & COMPLIANCE PROGRAM NCAFPM Conference http://www.ncafpm.org/index.html So… What happened to Bill’s Position…Who is the FPA???? Staff Changes (Bill Tingle’s Replacements) Flood Administrator • Don Ceccarelli PE, CFM (Permitting & Compliance) 704-432-4216 • Salih Iddrisu PE, CFM (Engineering and Flood Mitigation) 704-336-3734 Project Manager for Flood Mitigation FEMA Floodplains: Melonee Brock, CFM 704-336-3728 Melonee.brock@mecklenburgcountync.gov Tim Ruane, CFM 704-336-4237 Tim.ruane@mecklenburgcountync.gov Don Ceccarelli, PE, CFM 704 432-4216 Don.ceccarelli@mecklenburgcountync.gov Also 704-432-RAIN Impervious Area: Brian Sifford (Northern Towns) 704-336-3575 Brian.sifford@mecklenburgcountync.gov Lisa Arnold (Southern Towns) 704-432-4214 Lisa.arnold@mecklenburgcountync.gov SWIM/Water Quality Buffers: Jonathan Beller 704-432-1384 Jonathan.Beller@mecklenburgcountync.gov Ron Eubanks 704-336-5446 Perry.Eubanks@mecklenburgcountync.gov Effective Dates: City of Charlotte – 2/26/82 Towns & Mecklenburg Co. 2/3/93 Effective Date for Entire County, Towns & City of Charlotte 2/4/2004 Based on Data from mid 90’s Effective Date – 3/2/09 FEMA changes numbering system for map panels Based on data from Mid 90’s https://msc.fema.gov/portal http://www.ncfloodmaps.com/ http://meckmap.mecklenburgcountync.gov/3dfz/ Current Effective Dates Phase 1 = 2/19/2014 (based on 2007 LIDAR Data) Phase 1B = 2/24/2015 (LOMR Case #14-04-4804P) Phase 2 = 9/2/2015 (based on 2007 LIDAR Data) Phase 3 Pending (based on 2012 LIDAR Data) Phase 4 Pending (based on 2012 LIDAR Data) Phase 1A Phase 1B Phase 2 Effective 02/19/2014 Effective 02/24/2015 Effective 09/02/2015 Phase 3 • Has been available for review in Draft Status for the past year and can be viewed at http://meckmap.mecklenburgcountync.gov/fmr/ Our goal is to have it go into preliminary status by March 2016. • These lines are subject to change. Phase 4 • Is part of the Catawba River Study being done by the State of NC. Their goal is to have their study in preliminary status by March 2017 Phase 1B LOMR Case #14-04-4804P Little Hope Creek And Little Hope Creek Tributary • Mapping Error Detected after final approval • Involves 2 FIRM’s (panels 4557 & 4558) • LOMR supersedes Effective FIRM http://meckmap.mecklenburgcountync.gov/3dfz/ 3D Floodzone Mapping Site http://meckmap.mecklenburgcountync.gov/3dfz/