Changes to Water & Land Resources & Evolution of

advertisement
Changes to Water & Land Resources
&
Evolution of
The Mecklenburg County Flood Maps
MECKLENBURG COUNTY
STORM WATER
PERMITTING & COMPLIANCE PROGRAM
NCAFPM Conference
http://www.ncafpm.org/index.html
So…
What happened to Bill’s Position…Who is the FPA????
Staff Changes
(Bill Tingle’s Replacements)
Flood Administrator
• Don Ceccarelli PE, CFM (Permitting & Compliance)
704-432-4216
• Salih Iddrisu PE, CFM (Engineering and Flood Mitigation)
704-336-3734
Project Manager for Flood Mitigation
FEMA Floodplains:
Melonee Brock, CFM
704-336-3728
Melonee.brock@mecklenburgcountync.gov
Tim Ruane, CFM
704-336-4237
Tim.ruane@mecklenburgcountync.gov
Don Ceccarelli, PE, CFM
704 432-4216
Don.ceccarelli@mecklenburgcountync.gov
Also 704-432-RAIN
Impervious Area:
Brian Sifford (Northern Towns)
704-336-3575
Brian.sifford@mecklenburgcountync.gov
Lisa Arnold (Southern Towns)
704-432-4214
Lisa.arnold@mecklenburgcountync.gov
SWIM/Water Quality Buffers:
Jonathan Beller
704-432-1384
Jonathan.Beller@mecklenburgcountync.gov
Ron Eubanks
704-336-5446
Perry.Eubanks@mecklenburgcountync.gov
Effective Dates:
City of Charlotte – 2/26/82 Towns & Mecklenburg Co. 2/3/93
Effective Date for Entire County, Towns & City of Charlotte 2/4/2004
Based on Data from mid 90’s
Effective Date – 3/2/09 FEMA changes numbering system for map panels
Based on data from Mid 90’s
https://msc.fema.gov/portal
http://www.ncfloodmaps.com/
http://meckmap.mecklenburgcountync.gov/3dfz/
Current Effective Dates
Phase 1 = 2/19/2014 (based on 2007 LIDAR Data)
Phase 1B = 2/24/2015 (LOMR Case #14-04-4804P)
Phase 2 = 9/2/2015 (based on 2007 LIDAR Data)
Phase 3 Pending (based on 2012 LIDAR Data)
Phase 4 Pending (based on 2012 LIDAR Data)
Phase 1A
Phase 1B
Phase 2
Effective 02/19/2014
Effective 02/24/2015
Effective 09/02/2015
Phase 3
•
Has been available for review in Draft Status for the past year and can be
viewed at http://meckmap.mecklenburgcountync.gov/fmr/ Our goal is to have
it go into preliminary status by March 2016.
•
These lines are subject to change.
Phase 4
• Is part of the Catawba River Study being done by the State of NC. Their
goal is to have their study in preliminary status by March 2017
Phase 1B LOMR Case #14-04-4804P
Little Hope Creek And Little Hope Creek Tributary
• Mapping Error Detected after final approval
• Involves 2 FIRM’s (panels 4557 & 4558)
• LOMR supersedes Effective FIRM
http://meckmap.mecklenburgcountync.gov/3dfz/
3D Floodzone Mapping Site
http://meckmap.mecklenburgcountync.gov/3dfz/
Download