Land Use and Environmental Service Agency (Code Enforcement) Plumbing Q & A 2005 Attention: 3 Denotes a new question! z Denotes a revised/revisited question. June 2005 General: 1) 2) (Q) Who is responsible for performing inspections on “jobs” designated REHAB? (A) Rehab inspectors. They perform the plan review and the inspections. Call 704-432-0677for inspection request. (Q) What are the requirements for piping under a new or replacement mobile home? (A) The piping under the mobile home shall be installed per the North Carolina Plumbing Code including drainage test requirements. We allow the installer to fill the piping with water to a point where it shows in the tub shoe or they may elect to install test tees at each stub down of the home and test by an external standpipe with a 3 foot high head. 2nd Quarter 3) 4) (Q) What has to be done to an abandoned septic tank when changing to city sewer? (A) Cap the sewer inlet connection. (Q) How much roughing is required on a residential bathroom installed in a basement “for future”? (A) Future rough piping shall include all piping below the slab, a stub for the vent and a stub for the building drain and water distribution if not accessible later. Should the future bath require a sewage lift to reach the drainage system and the desire is to locate this sewage lift within the structure, then the tank and pump shall be included a part of the future rough piping! Land Use and Environmental Service Agency (Code Enforcement) Plumbing Q & A 2005 Attention: 3 Denotes a new question! z Denotes a revised/revisited question. June 2005 Equipment: 1) 2) 3) (Q) May water heater safety pans be supported by hanging iron? (A) No! Water heater pans shall be placed on flat surface which supports their entire surface. No penetrations (other than the drain) shall be allowed in the bottom or side walls. (Q) May water heaters be hung on a piece of angle iron attached to the wall? (A) Waters may be hung on walls structurally sound and designed to support their weight. They shall be attached by factory designed/provided devices or their bottoms supported on a framework of three sides (triangle) or four sides (square) with angle iron, unistrut, or wood framing (not return ceiling space) of adequate dimensions to support the weight. When in doubt, the inspector may require proof/calculations. (Q) Is a backflow device required to have 5 feet on metallic piping on the inlet and outlet? (A) The metallic piping ir required to support the backflow device (up to 2”). The contractor may elect to support the backflow device by other approved/engineered support means and install plastic on the inlet and outlet. 2nd Quarter Land Use and Environmental Service Agency (Code Enforcement) Plumbing Q & A 2005 Attention: 3 Denotes a new question! z Denotes a revised/revisited question. 2nd Quarter June 2005 Fixtures: 1) 2) 3) 4) 5)3 (Q What are some of the major items required in day care establishments? (A) Here are some of the major items: • Water Closets at 1 per 15 children • Elongated water closets/open front seats • Group restroom only available for a day care with no after school. • Microwave Kitchen = no grease interceptor • After school programs will require male & female restrooms and drinking fountains. (Q) Do pool showers have to go to sanitary sewer? (A) Yes! (Q) How much clearance is required above a water closet? (A) The building code requires 6’ 8” vertical clearance measured from the front of the water closet. (Q) When positioning a handicap kitchen sink in the counter top, what is the minimum distance allowed between the fron edge of the sink and the back wall? (A) 17” min. See section 11.11.3 (4). (Q) How are fixture to be connected to a horizontal circuit system? (A) The fixtures shall be connected to the horizontal circuit vent in the “horizontal plane” only! Land Use and Environmental Service Agency (Code Enforcement) Plumbing Q & A 2005 Attention: 3 Denotes a new question! z Denotes a revised/revisited question. 2nd Quarter June 2005 Drainage: 1) (Q) How shallow may a PVC pipe be placed in a concrete slab? (A) Section 1911.1 of the Building Code states that the minimum coverage shall be 3 ½ inches unless approved by a design professional. Land Use and Environmental Service Agency (Code Enforcement) Plumbing Q & A 2005 Attention: 3 Denotes a new question! z Denotes a revised/revisited question. June 2005 Water Distribution: 1) 2) (Q) is the piping of a circulated hot water distribution system required to be insulated? (A) Systems constructed with metallic piping, whether in whole or part, shall be insulated with pipe insulation having a minimum wall thickness of ½“ and shall cover the entire hot water distribution system from the source to the individual fixture supply stub including thehot water return line. Plastic piping systems meeting the criteria of 504.5 of the NC Energy Code and certified by the manufacturer’s engineer are exempt. (Q) Do backflow assemblies require the installation of a service valve before the assembly? (A) The Code requires a service valve at all plumbing devices. The valve that is provided as part of the assembly would be adequate to meet this requirement. 2nd Quarter