Document 13368719

advertisement
EXTERIOR BUILDING MATERIALS
1
1. MASONRY BASE AND PATIO WALLS STANDARD, MODULAR, QUEEN OR
EQUIVALENT SIZE
2. PREFINISHED/COLORED ALUMINUM
RAILINGS AND WINDOWS
4
NOTE: DEVELOPER WILL
COMMIT TO A SCREENING OF
EVERGREEN TREES TO BE
PLANTED AT AN APPROX
HEIGHT OF NO LESS THAN 10'
WITH INTENTIONS TO MATURE
TO 20' OR GREATER
(SINGLE FAMILY)
(BUSINESS)
3. FIBER-CEMENT (HARDIE OR EQ.)
SIDING, PANELING AND TRIM
A R C H I T E C T U R E
1
4. PREFINISHED ALUMINUM OR STEEL
CANOPY/TRELLIS FEATURE ELEMENTS
5. WOOD AND FIBER-CEMENT
BRACKETS AND ACCENT TRIM
4
6. 30 YEAR ARCHITECTURAL ASPHALT
ROOF SHINGLES
1
7. PRECAST CONCRETE DECORATIVE
ELEMENTS
MIN. 6'-0" HIGH
BUFFER/SCREEN FENCING
TRASH AND
RECYCLE
55 CARS SURFACE PARKED
ADDED STACKED FLATS SWAP FROM THIRD FLOOR
EUCLID UNITS
3
2
FIRST ON-STREET PARKING
SPACE TO BE MIN. 20' FROM
BEGINNING OF TYPE II
MODIFIED DRIVE
3
20'-0" MIN.
720.0'
7'-0" WIDE WALK AGAINST PARKING
NOT FOR CONSTRUCTION
RE
T
AI
NI
NG
HC ACCESS
NOTE: PATIO WALLS
WILL BE A MAXIMUM OF
4'-0" IN HEIGHT
1
724.0'
(COMPLETED MULTIFAMILY/MIXED-USE COMMUNITY)
726.2'
727.0'
6'-0"
8'-0"
14'-0"
1
[SETBACK]
MASONRY SITE/ENTRY WALL
8'-0"
6'-0"
725.5'
20'-0"
1
NOTE: PATIO WALLS
WILL BE A MAXIMUM OF
4'-0" IN HEIGHT
60'-0"
[RIGHT-OF-WAY]
TYP. PLANTING STRIP
AND SIDEWALK
NOTE: ALL GROUND LEVEL
UNITS WILL HAVE DIRECT
WALK ACCESS TO PUBLIC
SIDEWALKS ON BOTH
TREMONT AND EUCLID AVE.
1
1
RZ-1
[SETBACK]
726.0'
1
1
LLC
COMMUNITIES,
1
723.0'
GATEWAY
60'-0"
[RIGHT-OF-WAY]
N O R T H
NOTE: THIRD FLOOR TOP
UNITS (3 ALONG EUCLID EDGE)
HAVE BEEN REMOVED AND
RELOCATED TO REAR,
INTERIOR CORNER OF SITE EUCLID EDGE NOW TO BE
2-STORY ALONG STREETSCAPE
COURTYARD
BUFFER/SCREEN FENCING
TREMONT AND EUCLID AVENUES
3
C H A R L O T T E ,
722.0'
C A R O L I N A
722.2'
TREMONT 54 APARTMENTS
north
TIDEWATER PROJECT
(COMPLETED MULTIFAMILY/MIXED-USE COMMUNITY)
TRANSFORMER
SITE PLAN AND SURVEY
1"=20'-0"
FOR PUBLIC HEARING
4
PROJECT A-1259
REZONING PLAN
2
REZONING PETITION
#2013-027
APRIL 18, 2013
REVISION 1 - 2-21-13 (Site Plan
comments)
REVISION 2 - 3-22-13 (Planning
comments)
REVISION 3 - 4-8-13 (Revisions
for HDC and Neighbor concerns)
REVISION 4 - 4-19-13 (Revisions
for Zoning Committee review)
2
RZ-1
TREMONT AVENUE ELEVATION
1/16" = 1'-0"
3
RZ-1
EUCLID AVENUE ELEVATION
1/16" = 1'-0"
RZ-1
Download