Capital Renovations Student Center Renovation Several areas completed now with the final project to be complete in winter 2015/2016. • • • • • • • • Periodic Table food venue – done; Mines Bookstore – done; Student Activities; International Studies; Graduate Studies; Registrar; Financial Aid; and Bursar. Student Center Renovation Student Center Renovation Traditional Dormitories Summer 2015 improvements included: • • • • • • Significant infrastructure upgrades; New texture, paint and carpet; New closet space; Bathroom renovation; New door hardware, windows, lighting, window coverings, and mailboxes; and New community kitchen and lounge. Capital Additions Starzer Welcome Center The gateway to campus that will serve and welcome our students, parents, alumni and friends. • • • Undergraduate Admissions; CSM Foundation; and CSM Alumni Association. Starzer Welcome Center Clear Creek Athletic Complex Marv Kay Stadium. Harold and Patricia Korell Athletic Center: • • • • Football; Track and Field; Coaches; and Classrooms. Soccer – to be done November. Concessions. Visitors. Clear Creek Athletic Center General Research Laboratory Annex Flexible laboratory space. Temporary home for Physics teaching and research labs. 21,000 gross square feet. Construction will be complete January 2016. General Research Laboratory Annex CoorsTek Center for Applied Science and Engineering Replaces the existing Meyer Hall – January 2016. Brings together interdisciplinary researchers in biotechnology, materials characterization and nuclear engineering. 95,000 gross square feet. CoorsTek Center for Applied Science and Engineering CoorsTek Center for Applied Science and Engineering CoorsTek Center for Applied Science and Engineering Other Capital Projects Currently Underway Much needed infrastructure improvements to the Edgar Mine funded by Freeport McMoran – to be completed Fall 2015. Renovations to the Mining Computer lab and offices funded by gifts – to be completed Fall 2015. Renovation to our central heating plant – work to begin spring 2016. Capital Projects in the Design Stage In Design • • Library Renovation – re-imagine the 21st century Library. 18th Street Plaza. Capital Projects in the Planning Stage In Planning • • • Green Center Renovation (short term and long term). Campus Space Study. CDOT and City of Golden Highway Project.