Final Project Reading Project

advertisement
Final Project
Reading
ESW p391-394
Watch Deepwater Horizon video
Project
Revisit assignments 7-13 and revise them based on the feedback you’ve
received and the topics covered throughout this class. Combine the revised
assignments into a comprehensive final report to management, and include
an executive summary and your conclusions/recommendations to
management.
MIT OpenCourseWare
http://ocw.mit.edu
16.63J / ESD.03J System Safety
Fall 2012
For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms.
Download