Myrtle/Morehead your storm water fees at work

advertisement
Myrtle/Morehead
s t o r m
d r a i n a g e
i m p r o v e m e n t
p r o j e c t
your storm water fees at work
Dear Resident:
February 14, 2013
Charlotte-Mecklenburg Storm Water Services held its second
public meeting on January 29 at Covenant Presbyterian Church
to update the neighborhood for the Myrtle/Morehead Storm
Drainage Improvement Project.
Meeting highlights:
• The project team has been developing construction
drawings for the selected improvements.
• Much of the existing drainage system is between homes
and under buildings. Replacing the system in its current
location is impractical. The proposed system is primarily
in the roadway.
• The next phase includes obtaining the necessary permits,
easements, and encroachment agreements needed to
construct the improvements.
• For work proposed on private property, we will need
•
•
For more information or detailed meeting minutes, visit our
website: http://stormwater.charmeck.org. Click on the
Storm Water Projects drop down menu in the green bar, then
Active Projects and Myrtle/Morehead.
If you have any questions, please contact Project Manager
Kate Labadorf at klabadorf@charlottenc.gov or 704-336-3653.
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
Myrtle/Morehead Project Update
HIGHLIGHTS FROM PUBLIC MEETING
to obtain easements. City of Charlotte Real Estate staff
and their consultant, Telics, have begun contacting those
property owners.
Once the construction drawings are finalized and the
required easements, permits, and encroachments
obtained, the project will be bid and then constructed.
Estimated start of construction is the fall of 2014.