DOCUMENT #: GSC13-Plenary-60 FOR: Presentation SOURCE: Kohei SATOH (ARIB) AGENDA ITEM: 6.1 CONTACT(S): satoh@arib.or.jp Activities of ARIB on IMT Standards Kohei SATOH Association of Radio Industries and Businesses (ARIB) Submission Date: July 8, 2008 Highlight of Current Activities (1) • Advanced Wireless Communications Study Committee (ADWICS) was established in April 2006, through extending the scope of former IMT-2000 Study Committee • ADWICS constitutes following three subcommittees to perform the technical studies on advanced wireless communication systems in cooperation with other related international/domestic organizations and to contribute to their international standardization activities – IMT Partnership Subcommittee – IMT-Advanced Subcommittee – BWA Subcommittee 2 Highlight of Current Activities (2) • IMT Partnership Subcommittee – Operate 3GPPs as one of an Organizational Partner – Prepare contribution to 3GPPs on national regulatory requirements aspects – Downstream activities of the specification developed by 3GPPs for ARIB Standards • IMT-Advanced Subcommittee – Conduct technical studies on IMT-Advanced – Promote its standardization through contributions to ITU-R and other activities • BWA Subcommittee – Produce national standards for WiMAX, Next Generation PHS and IEEE802.20 referring to relevant international standards. 3 Strategic Direction Reorganization of IMT-Advanced Subcommittee • 3GPPs and other organizations are in a stage to start to develop candidate radio interface specifications for IMT-Advanced • Opinions to shift resources to those specification development activities • Proposal to establish Radio Interface Technology Study Group by Circular Handling WG • Proposed reorganization was approved in May 2008 in the Steering Committee of ADWICS 4 Challenges • Establish “Radio Interface Technology Study Group” – Study Group will prepare draft proposal of radio interface technology for IMT-Advanced – Proposal is supposed to be submitted to ITU-R through Japan’s national process – It is anticipated that Study Group start with discussion on the principle of preparing the proposal • Establish “IMT-Advanced Evaluation Group” – Activities may include self-evaluation, endorsement of others’ evaluation and/or evaluation of other proposed technologies 5 Next Steps/Actions • Radio Interface Technology Group will develop Japanese draft proposal of radio interface technology for IMT-Advanced • IMT-Advanced Evaluation Group will exchange information and views and coordinate with other PSOs through ITU-R WP5D, 3GPPs and other regional activities 6 Proposed Update of Resolution GSC-12/01 • Considering recent activities in ITU-R WP5D, 3GPPs, PSOs and others on IMT-Advanced, Resolution GSC-12/01(Continuing Cooperation on IMT Standardization) should be updated as follows: – To update “Recognizing part” as appropriate – To revise “Resolves 5)” as below 5) To encourage exchanging information and views towards consensus building on radio interface technologies for IMT-Advanced through GSC IMT Task Force’s activities 7 Supplemental Slides 8 Overview of Advanced Wireless Communications Study Committee • Responsibilities – To perform the technical studies on advanced wireless communication systems in cooperation and coordination with other related institutions in Japan and overseas – To contribute to their international standardization activities • Structure of the Study Committee Advanced Wireless Communications Study Committee Steering Committee IMT Partnership Subcommittee IMT-Advanced Subcommittee BWA Subcommittee 9 IMT-Advanced Subcommittee before Reorganization • Scope – Conducts technical studies on IMT-Advanced and promotes its standardization through contributions to ITU and other activities • Organization IMT-Advanced Subcommittee Circular Handling WG Collaboration Group Standardization Study Group WP8FWG Technology Study Group PP-WG SIG-RTT SIG-MSR SIG-HOM SIG-PRM 10 IMT-Advanced Subcommittee after Reorganization IMT-Advanced Subcommittee Circular Handling WG Newly established Dissolved Standardization Study Group WP5D WG Collaboration Group RIT Study Group Evaluation G PP-WG Technology Study Group SIG-RTT SIG-MSR SIG-HOM SIG-PRM 11 Standardization of IMTAdvanced in ITU-R WP5D Schedule for the development of IMT-Advanced radio interface recommendations WP 5D meetings 2008 #1 #2 2009 #3 #4 #5 2010 #6 #7 #8 #9 #10 (1) Cut off for proposal Step 1 and 2 (0) 2011 (2) Cut off for evaluation report (20 months) (3) Decide key characteristics Step 3 (1) (8 months) (4) Develop radio interface specification Step 4 (16 months) (2) Steps 5,6 and 7 (3) (20 months) Steps 8 (12 months) (4) • Steps in Radio interface development process: Step 1: Issuance of the Circular Letter Step 2: Development of candidate RITs Step 3: Reception of the submissions and issuance of an acknowledgement for RIT Step 4: Evaluation of candidate RITs by evaluation groups Step 5: Review and coordination of outside evaluation activities Step 6: Review to assess compliance with minimum requirements Step 7: Consideration of evaluation results, consensus building and decision Step 8: Development of Radio Interface Recommendation(s) 12