The City of Charlotte TRANSPORTATION Action Plan 2012 Annual Report I n May of 2006, the Charlotte City Council adopted the Transportation Action Plan (TAP) — the City’s first comprehensive, multi-modal, long-range transportation plan. This plan was updated and affirmed by City Council in August of 2011. The TAP describes the City’s policies, projects and programs that will be necessary over the next 25 years to accommodate projected growth and reduce existing transportation deficiencies. The TAP Update called for a 25-year investment of $2.6 billion in 2011 dollars to build and maintain a network of local thoroughfares, streets, connectivity projects, traffic signal systems, pedestrian pathways and bicycle facilities. The demands on the City’s transportation system continue to grow. Increases in the various types of transportation capacity defined in the TAP, in conjunction with increases in freeway and expressway capacities, and expanded bus and rapid transit services, will be necessary as Charlotte— one of the nation’s largest cities—is expected to grow to over one million in population by 2035. I am pleased to present the 2012 Annual Report for the Transportation Action Plan. This report describes the achievements and the challenges that occurred in 2012, our seventh year of implementing the goals, strategies and projects recommended in the TAP. I believe an annual report is important not just to highlight our successes, but also to identify possible changes in strategies or investments that we should consider in the upcoming years. Council and staff have been implementing the TAP’s policies and programs since its adoption. In the years ahead, City Council will continue to make difficult decisions about transportation priorities, revenues and growth management so that Charlotte can continue to be one of the most livable and economically attractive large cities in the nation. Ron Carlee, City Manager July 2013 Transportation Action Plan 2012 Annual Report T he Transportation Action Plan (TAP) describes the goals, objectives and policies that are necessary to make Charlotte one of the premier cities in the nation for providing land use and transportation choices. A full copy of the Transportation Action Plan is available at http://cdot.charmeck.org. To achieve the City’s goals, the TAP recommends a variety of transportation investments. The cost of these investments is estimated at $2.6 billion for construction and maintenance during the next 25 years. This level of investment—together with concurrent investments in State-maintained freeways and expressways and rapid transit lines—will be necessary to accommodate the City’s ongoing growth, while protecting the high quality of life in Charlotte. Each year’s Annual Report describes the progress and challenges in implementing the TAP. These annual reviews enable City Council and staff to identify obstacles that must be overcome and determine changes in the resources or actions necessary to achieve the City’s transportation-related goals. Among the highlights in 2012: The City continued to implement transportation projects in excess of $160 million for roadway, signalization, connectivity, traffic calming, bicycle and sidewalk facilities funded by the 2006, 2008, and 2010 Transportation Bond measures. A federal full-funding grant agreement with USDOT was signed in October 2012 for the LYNX Blue Line Extension (BLE). Implementation of the Urban Street Design Guidelines (USDG) continued in Capital Improvement Plan projects, area plans, and through development ordinances. Charlotte DOT continued to work with NCDOT in the implementation of their statewide complete streets policy, adopted in 2009. TAP GOAL 1 Continue implementation of the Centers, Corridors & Wedges Growth Framework Achievements City Council adopted the Centers, Corridors and Wedges Growth Framework in 2010, providing an overarching growth framework for the city. forecasts, with weekday ridership averaging almost 15,000 boardings. Development in the corridor that can be reasonably attributed to the presence of light rail currently totals $1.45 billion. The TAP Update, adopted in 2011, supports the City’s growth framework by identifying transportation policies and infrastructure investments appropriate for Centers, Corridors and Wedges. City Council adopted Area Plans for: • University Research Park •Elizabeth • Independence Boulevard •Midtown-Morehead-Cherry • Steele Creek •Catawba • Center City 2020 • North Tryon The LYNX Blue Line has been in operation for five years, since November 2007. Ridership continues to exceed Current Activities A consultant is performing a general assessment of the City’s Zoning Ordinance and will identify ordinance options for future consideration. Plans are underway for these areas: • Park-Woodlawn • Prosperity Hucks • Blue Line Extension Station Areas Development approvals are now tracked to ensure the City meets land use targets. TRANSPORTATION ACTION PLAN 2 2012 ANNUAL REPORT TAP GOAL 1 The LYNX Blue Line Extension will provide light rail service from Uptown to the University of North Carolina at Charlotte. The Federal Transit Administration (FTA) has approved the project for final design and right-of-way acquisation. Issues & Challenges Adopted land use targets help monitor implementation of the Centers, Corridors and Wedges growth management framework. Policies 1.1.2 and 1.1.3 state that the City will ensure at least 40% of new households, 70% of new multi-family units, 75% of new office development and 75% of new employment will be located within centers and corridors. In FY12, The City met the office, employment and multi-family targets for centers and corridors (Table A). Table A Percentage of Development Locating Within Centers and Corridors TARGET FY 2012 TAP Policy 1.1.2 Total New Households 40% 62.5% New Multi-Family Households 70% 86.0% Total New Office Development 75% 98.4% New Employment 75% 94.2% TAP Policy 1.1.3 The City’s integrated transportation and land use strategy seeks to create more walkable neighborhoods and create “car-light” lifestyle options. A car-light lifestyle can be measured by a community’s level of walkability. Walkability can be measured by tools like Walk Score® which measures the walkability of a neighborhood based on the proximity of different land use categories. While Charlotte has some areas with high walk scores, it has many other areas with poor walk scores. The City is seeking to create more “car-light” housing options like in South End. TRANSPORTATION ACTION PLAN 2012 ANNUAL REPORT 3 TAP GOAL 2 Prioritize, design, construct and maintain convenient and efficient transportation facilities to improve safety and neighborhood livability, foster economic development, promote transportation choices and meet land use objectives. Achievements During FY2012 CDOT designed and/ or implemented: • • • • • 17.5 miles of street projects 6 intersection projects 24.5 miles of sidewalk projects 12 miles of bicycle projects Replacement of 225 obsolete traffic signal controllers • Re-timing of 254 traffic signals Ongoing implementation of the TAP and Urban Street Design Guidelines demonstrates Charlotte’s commitment to creating a multi-modal transportation network with benefits for motorists, pedestrians, bicyclists, transit riders, employers or business owners, and neighborhood residents. For the first time, Charlotte was designated as a bronze-level Walk Friendly Community and was redesignated as a bronze-level Bicycle Friendly Community. CATS utilized ARRA funding to renovate and expand the North Davidson Bus Maintenance Facility. The expansion allowed CATS to consolidate Special Transportation Services (STS) with a portion of the fixed-route fleet into this campus to provide for shared resources and operational savings. Above: North Davidson Bus Maintenance Campus. Photo © JoAnn Sieburg-Baker Left: Clanton Road was converted from a fourlane undivided street to two lanes with bicycle lanes and a center turn lane. TRANSPORTATION ACTION PLAN 4 2012 ANNUAL REPORT TAP GOAL 2 Current Activities In order to create more “complete streets,” the City is continuing to apply the Urban Street Design Guidlines on all City-sponsored transportation projects and through its development ordinances. With the remaining funds from the 2008-2010 bond cycles, CDOT expects to plan, design and/or construct the following in FY13: • 10 miles of sidewalk projects • 10 miles of bicycle projects • Re-time 300 traffic signals per year A citywide walkability strategy is being developed to ensure that the City continues to improve the pedestrian travel network. Issues and Figure 2 (back cover) shows the road and intersection projects advanced since the TAP was The City is utilizing an FTA urban adopted. The City and County have implemented over 160 miles of bicycle lanes, trails and signed routes in Charlotte. circulator grant to fund the 1.5 mile Streetcar Starter Project between Time Warner Cable Arena and Presbyterian Hospital along Trade St and Elizabeth Ave. The project will use existing streetcar rail on Elizabeth Avenue as well as replica trolleys. CATS constructed a new park and ride lot on Lawyers Rd at Albemarle Rd, with 230 parking spaces available for commuters. The surface parking lot at the I-485 LYNX Station is being expanded by 162 spaces to increase the parking supply to over 1,300 spaces. Challenges While Charlotte has made great strides in creating better streets for all users, there were twelve pedestrian fatalities and one bicyclist fatality in FY 2012. Charlotte has many streets in need of sidewalks, such as this section of Nations Ford Road. TRANSPORTATION ACTION PLAN 2012 ANNUAL REPORT 5 TAP GOAL 3 Collaborate with local and regional partners on land use, transportation and air quality to enhance environmental quality and promote long-term regional sustainability. Achievements The City supports regional transportation, air quality and sustainability objectives through participation in the Mecklenburg Union Metropolitan Planning Organization (MUMPO). In 2012, City staff worked with MUMPO staff to begin the 2040 Long Range Transportation Plan. The City assisted Charlotte Center City Partners with the implementation of a 20-station “B-Cycle” bike share system, launched in the Summer of 2012. The Blue Line Extension received full funding grant agreements from the USDOT and the State of North Carolina. The agreements guarantee the federal government’s participation for up to 50% of the total cost and State funding for 25% of the total cost. The City worked with NCDOT to re-design the South Tryon Street bridge over I-277 to provide better pedestrian and bicycle connectivity between Uptown and South End. Current Activities The City and NCDOT are working to identify projects that will ultimately form a network of High Occupancy Toll (HOT) or Express Toll lanes along I-77, I-485 South, and US-74 East. Construction of the Charlotte Gateway Station, a multi-modal transportation center in Uptown that will provide access and connectivity to travelers from across the region, is a collaborative effort between the City and the State of North Carolina. NCDOT issued a Request for Qualifications for a mas- TRANSPORTATION ACTION PLAN 6 2012 ANNUAL REPORT ter developer and selected a preferred partner in Novermber of 2012. Charlotte’s B-Cycle bike share system includes 200 bicycles. TAP GOAL 3 The North Corridor Commuter Rail Project (the Red Line) would be a new commuter rail service along the existing Norfolk-Southern O-Line between Charlotte and Mooresville — a distance of 25 miles. NCDOT’s consultants prepared a draft Business/Finance Plan including a refined funding strategy. A railroad infrastructure and operations study is now underway to identify any construc- Issues and tion of tracks and siding along this corridor of the Norfolk-Southern Railroad. The City is coordinating with the NCDOT Rail Division on 20 railroad projects in order to modernize track infrastructure and to help implement the Southeast High Speed passenger rail service. Challenges The successful integration of NCDOT’s Complete Streets Policy into ongoing practice will be important to ensure that NCDOT’s project designs reflect urban transportation goals in Charlotte and other cities in North Carolina. The Centralina Council of Governments, which includes Charlotte as a member, received a Regional Planning Grant Award from the US Department of Housing and Urban Development (HUD) to develop a Regional Plan for Sustainable Development. The goal of this three-year effort will be to create a Regional Development Framework. Do you believe Charlotte’s air quality is: Mecklenburg County is part of an eight-county ozone attainment area. Air quality has been improving in the region, even though the 2012 survey reveals that this issue is not well understood. TRANSPORTATION ACTION PLAN 2012 ANNUAL REPORT 7 TAP GOAL 4 Communicate land use and transportation objectives and services to key stakeholders. Achievements Through the update of the TAP in 2011, the City re-emphasized its comprehensive set of transportation-related strategies. The TAP Policy Document and Technical Document can be found online at http://www.cdot.charmeck.org. The City’s transportation priorities are updated annually in the 5-year Capital Investment Program and 10-year Capital Needs Assessment. CDOT sponsors a bi-annual survey to assess the community’s opinions on transportation issues and concerns. Current Activities The City is tracking land development permits monthly and annually to monitor the Centers, Corridors and Wedges growth targets. That information is available to elected officials, staff and citizens to determine how well the City is meeting specific land use targets. TRANSPORTATION ACTION PLAN 8 2012 ANNUAL REPORT The City is participating in the Centralina Council of Governments’ “CONNECT Our Future” regional planning vision. The City is working with the Mecklenburg-Union Metropolitan Planning Organization (MUMPO) to develop its first Comprehensive Transportation Plan (CTP), required by the North Carolina Department of Transportation. TAP GOAL 4 Issues and Challenges Successfully integrating land use and transportation decisions over time requires implementing the City’s long-term vision through continued communication with residents and stakeholders, as well as monthly or quarterly reports to the City Council. Similar to many private companies, the City is facing financial constraints and funding challenges while simultaniously experiencing an increasing demand for public services, including transportation. Implementing the City’s growth framework is increasingly important in order to provide adequate public services. Continued growth in the Charlotte region will create increases in travel on the region’s roadways. Continued implementation and funding of the TAP will help Charlotte address the City’s transportation challenges. TRANSPORTATION ACTION PLAN 2012 ANNUAL REPORT 9 TAP GOAL 5 Seek financial resources, external grants and funding partnerships necessary to implement transportation programs and services. Achievements When City Council updated the TAP in 2011, they acknowledged that the TAP recommended spending $2.6 billion to build, operate and maintain locally funded transportation projects through 2035. The City received a $25 million urban circulator grant from the FTA to fund the 1.5 mile, $37 million Streetcar Starter Project along Trade Street and Elizabeth Avenue. The Fred D. Alexander Boulevard project provides a new circumferential road in northwest Charlotte. CATS received an $18 million competitive grant from the FTA to fund the $22.5 million LYNX Blue Line Capacity Expansion Project (BLCE). The BLCE Project will lengthen the platforms of three existing stations to accomodate three-car trains and upgrade the power supply for extra trains. CATS received nearly $28 million in existing and future federal Congestion Mitigation and Air Quality (CMAQ) funds for various transit investments. They include new light rail services, new park-and-ride lots, technology enhancements, hybrid buses, and bus/van pool vehicle purchases. The City worked closely with NCDOT to secure funding to help advance the widening of I-485 to the south as well as the completion of I-485 to the north. Current Activities The TAP assumes that Charlotte will fund approximately $100 million a year in transportation improvements. This level of funding will require a combination of transportation revenue sources as identified by the Committee of 21. TRANSPORTATION ACTION PLAN 10 2012 ANNUAL REPORT Preliminary project planning is underway to facilitate implementation of a new CIP package beginning in 2014. TAP GOAL 5 In 2008, The Committee of 21 recommended an additional vehicle registration fee to be used for roadway maintenance and an additional halfcent sales tax to be used for construction of state and local roadways in Mecklenburg County. The Committee also recommended charging tolls on freeways and applying a Vehicle Miles of Travel Fee. New local-option revenues have not yet been advanced at the state level. Transportation Revenue Sources Recommended Funding Source Annual Revenues by The Committee Requires Legislative Approval of 21 To Be Used For Vehicle Registration Fee $18 million State Maintenance Half-Cent Sales Tax $81 million Toll Interstates TBD State & Federal State Construction Construction and Maintenance Vehicle Miles of Travel Fee TBD State & Federal Construction and Maintenance Other Revenue Sources Considered by The Committee of 21 Payroll Tax $150 million State Construction and Maintenance 5% Gas Tax $94 million State Construction and Maintenance Road Impact Fees $84 million State Construction Land Transfer Fee $51 million State Construction and Maintenance Source: Derived from http://www.charmeck.org/Committeeof21/home.html Issues and Challenges Federal and state gas taxes continue to diminish as viable transportation funding sources due to more fuel-efficient vehicles. NCDOT continues to experience funding shortfalls, causing some state road projects to be delayed even further. NCDOT’s inability to advance projects, especially regional highway projects, will impact Charlotte’s ability to accommodate its growth. MUMPO’s 2035 Long Range Transportation Plan is severely underfunded, resulting in a very limited list of projects to be built in the next 25 years. The ability of CATS to implement the 2030 Corridor System Plan is being impacted in the short and long term by the reduction of sales tax revenues due to the local and national recession. TRANSPORTATION ACTION PLAN 2012 ANNUAL REPORT 11 Conclusion T he TAP Annual Report provides an opportunity each year for Charlotte’s residents, elected officials and staff to reflect on our transportation achievements, discuss our transportation challenges and identify better or new ways to meet our transportation goals. Charlotte’s City Council took a crucial first step in addressing the City’s transportation challenges by adopting the 25-year Transportation Action Plan in 2006. City Council then re-affirmed its intent to resolve and overcome ongoing challenges with the adoption of the TAP Update in 2011. The TAP calls for a series of policies, projects and programs that are necessary to accommodate ongoing growth, while protecting our quality of life. This report summarizes the achievements, current activities and challenges the City is now facing as Council and staff continue to implement the TAP. There have been many achievements since 2006 but there also are significant challenges to meeting the City’s transportation goals. Charlotte is fortunate to be experiencing continued employment and population growth, yet this growth also will ensure that Charlotte’s transportation challenges will not fade away. Looking ahead, three challenges are facing the City Council: 1. Ensuring that Charlotte grows in a manner consistent with the Centers, Corridors and Wedges growth framework. 2. Identifying and selecting permanent and reliable funding sources for transportation. 3.Coordinating capital investments with private development opportunities in a way that promotes long-term fiscal health for the City. Hu n le Gi t e rsv ille - ad Concord ties Beat Rd INTERSTATE d Bea r d rd Ma lla Rd r R Su ga 29 Hw y US ar d Ma ll Rd d R Ri ve Ha rris Rd Ch ur c Rocky Rive r C hurc h Rd WT E g rr i sb ur Blvd Rd W il son rris Ha ga ret W 1 WT E ar M 218 Rd Rd T n mpso ho INTERSTATE 485 NC Sam 51 Hwy Rd e Ca rm St e y Hw 51 ing t on Pol k t an as Rd Rd Ple 51 dd We y Hw ence Provid Rea Ca rm el Rd NC Tr ad Park Hw y St R Bl v d Co nc ord ity Sh a ro n d Ra m a d R S ha ron Rd Hw y 5 21 NC 74 US y Hw St ild Newell Se R W lw yn Fo rd Am Dr The Eas twa y Dr Kings e en s Rd W A Blv d South ry on St N St Rd Ty vo la W Ha Gr ah a m Statesville St Ave Beatties F ord Rd Rock Toddvil l Little Creek Rd ille Statesv La k d ski ns Ho Rd Ol d Hu l Ho i M rs v Rd Wilso n Sam Rd Qu Nations 5 rs ye Law St Rd Idlew US Rd ll Hi y hn Jo Ford t Hw f Rd vd Rd Natio ns R Rd ie Br non Bl Rd S T ryon rch Chu Rd Rd Arling ton in M eek Rd - a Leb e nc de Colo ny R d d NC Rd n d er exa Rd Al Rea e ac all Sardis Rd r th Rd Rd rus Rd Rd d Cabar ve ro ilg W d en ep Ind e nro Mo nce Rd low Hol ail Qu Rd Rd No l e ar l Rd E e vid Pro Rd Fairview e ov Gr Rd wil Idle n Rd rt m be Al Rd r o ve ity Am Stew a Rd ce Rd Rd Riv er d Hoo Ca mp Rd Rd d en l ony Co n e agles t Rd h Pe n Rd aro Sh e Gl Hickory G rove Rd La wy ers Sardis Shar on Rd West Ex n inso R ob Albemarle ro e Rd Stee le Rd M on Rd Rd r ce lp h do Bl vd s en ue D ixie h ur c Ch Ave n Ra Q Rd Cre ek Ce nt ral en Rd d Blv Creek ck Ba 485 Rd a az Rd Rd Steele Blvd INTERSTATE Plaza a az Pl The Rd NC od gblo Youn ek E In d ep en d d er Por t NC Hwy 51 Blvd cky Ro Rd 277 t S Rd R Rd dla wn Old T Cre 7th Park k ar yb ale Sc W Beam Sandy St Pl ve Arr ow oo d 77 N INTERSTATE E t on m Wo o Ty v ola INTERSTATE y y rsit ive Un St t k Yor Rd n Blv d Rd Ty vo la Rd o Try Ea st R Pkwy ie Dix S S d Cl ant on Rd Westinghouse S ledge on Try Re m nt Rd Shopton Cit Rd n yo Tr S ad he re Mo d Blv ou e Neel Cr v i lion d Blvd Gr ah am c Walla Rd 77 N t Wes INTERSTATE 485 INTERSTATE Rd lkin so n Billy Do wd rr i s 85 Sugar R Wi Ha INTERSTATE d B lv y d 85 Dr Rd WT Rd rr Fe Ol 29 Pa W ek INTERSTATE T Fr uckas ee ee ge do e m Rd y Hw Rd k om ed Fre Rd e Blvd US Cre ek Rd Dr Wilkinson Cre Rd Ln Cindy Rozzelles s eegee Tucka rd d 77 Bl vd 85 ibb on INTERSTATE hi re Rd Mal la C r ee Rd ly R e re ht ac Pe Cox Blvd r ga Su Rd le da Br oo ks Rd k Oa ou nt INTERSTATE Rd ns et G Blvd Hol Harr is rch C hu Rd d en av 485 Mt M Fo rd Blv INTERSTATE e u nt - H Su llh Be lly Ho Rd i ll e id Dav WT Rd ew e vi Rd W Rd Statesville ran es am Re s attie Be Rd da Cr ee k Rd Rd l e Rd rsvil n te - ly Mt ok sh ire Rd Church Hucks Br o e Ridg Rd - ly ld A lexanderan a Rd Asbury Huntersv ille Rd Rd Rd t Rd s Kern M l Ho ie stf Ea Prosperity Rd McCoy Statesville ight Rd Chap el Old br m Rd ille Ha R sv State Ford Rd ck Rd 77 Rd ne lwai McI Ne Rd Centers, Corridors, and Wedges Pla ins Rd Rd INTERSTATE Ln la al ter as C om mo n s y Pkw NC Hwy 16 nc La n t y ne B Rea Hwy vidence Pro Rd t Rd W es Rd ee cK M Elm 485 Growth Corridor Wedge Other Jurisdiction Center City Mixed Use Activity Center Industrial Activity Center N W GIS .m Charlotte ore than ma ... .. .. .. ps Produced by the Charlotte-Mecklenburg Planning Department. 0 2 miles 4 E S Date: July 30, 2009 The Centers, Corridors and Wedges Map (adopted as part of the Transportation Action Plan) helps provide the framework for land use and transportation investment decisions in Charlotte. ¯ Figure 2 - Transportation Projects Programmed or Implemented By the City Since TAP Adoption O ld S Rd Ch ur ch R d s tfi Rd eld Ri dge R d d M t Holl Ea P rosper ity lR A le xa n der an a R d ! re e k Rd a ll ard C St on Tr y N r N d ll R Rd o d Rd Rd isb a rr H hur ch R iv er C ur g Ho d W T Har r is Bl vd d ve R C o Dr nf e ren d R a Rd Ma rg a re tW 8 s r 218 Hi 21 i nt -M tt h ew s Ln on M a N or t h wy en Ne we ll R d c e Rd N. der Rd l lwo Fu !! S am Old Pro l Rd me Ca r P ark Rd Shar o nR d NC s Pk ea t S d rd on co C Rd m it y nA NS har o W ce Av yn d W. Rd Qu een s Rd Park r S ou th D Par k South Blvd am or d Rd ns F Na tio s r ld D r Rd Colony R d Jo h St Rd n o d Ln Rd rm el Nati on k Rd P rovid Pa r hn Jo he ws R Uptown Charlote� ! Rd Ku yk e n d a ll R d d § ¨ ¦! t er Hy 1 unit y H o US 52 YO R K d enc e R W £ ¤ 521 Ar R or r is ll -Ke M 0 Roadway Charlotte Department of Transportation Charlotte-Mecklenburg Government Center 600 East Fourth Street Charlotte, North Carolina 28202 http://cdot.charmeck.org UNION 77 0 Programmed or Implemented Projects Intersecton� ¦ ¨ § Rd 160 r s Rd d 521 ey M R vin £ ¤ dr an y -K Ar dr e ! 49 s r s§ r ¦ ¨ 0.5 1 Miles 27 27 74 r s £ ¤ 277 ar LANCASTER y Br t F arm s Rd T il l ey d lR Rd vid us e o Pr 485 ! mm Co ! C o m mons P k wy el L an c as Mc Ke e ntyne To m S hor t R d rm d R l la Ba 29 £ ¤ 277 e e Rd McK Re a E lm Ln Rd an ¦ ¨ § d Weddi ngt on Rd r Zo a C a ro li na y Pl ac e P kw Rd rk il le M att Rd Pa P inev ence d n Rd sto - Pine ville Rock Hill R Ca rd R d Dr d e xan Al Rea s Fo Rd d dR wil a ef Bri 51 a no n Rd Rd ill Rd r s Rd fe re Cr e ek H t in a ce lla ye p ce S te e le Rd M e- H i ll s R d d Dow n s R Sho pto n Rd W . ro v ro s sion Are q d eR en vi o u se Bl v d Do ! d Rd Sardis Rd ea g l e s le n Rd G G ui p n ro Mo Sar dis Rd v id on R Rd ing h r ha S h a ro n V i ew llo w Ho We st d Blv Yo r k R d ! S h aron Rd W. C ar owi nd s 49 nS t on K o Pr H eb r o d a il Qu ! ! Fair vi ew R d d d gh ous e Blv d s r l eD r da Rd oo dR ! R on y R rc h Arr ow rru s R d Leb olph ol A o dy P r s r 16 C rte ar le R em ils W R d ar Sh -G r ie r Rd C aba Alb le Id R and ny m e d e Ln rl e Rd E. Mi ha ron A m ty NS i d ema A lb Pe 27 R un la R 485 r t wa yD Rd eek Br s r Rd Ty vo § ¨ ¦ rov e R d ilg aw n tR Stew ar d Camp R ch R Rd o dl S an We st in lw hur w La k ar yo Tr Wo ive r k Rd W S uga r C re e Ln ne ho r The Pla za Av igle Se Av r Rd o ver end e Rd yb le Rd m Rd S ! Br ow n Se n s on C Roc ky St S tatesvil le Av Gra ha m Id a ho Dr Av K i ngs Dr Qu n s Rd St ea l R d Rd Ne vin Bea tties F or d Rd Sc ot t h c den a Sc B ea Shopt on R d t nS H ic kor y G Rd W mo Ty vo la 24 to n C hurch rth C ia r ovi Pr rk W P ine Oak s D r e Pla za Arling do lp Rd Rd n Ra ee e e nc E Yo ! n t Rd ne D r Centr al A v ! R s r ! t ilw o t l St el hS 7t Ke n aw St l vd H St 5th B St on t h ids av h ow Gri er d nde rB lv D. Ale xa d le R da ak O Rd vi s Ho r B radf o C amp Green e ell S e D d St cD d Ro b i Ea s oll tH M R o ck Rd Li ttle T o d d v i l le R d Dr w ald 6t 3r M St d Blv d ut ev h St d v ar h St re rk wo od A v 4t B St 7t eld t t Kilbor ! C S le ge St Fi St ol e Cr e h C ad rc S d ar ro c Sha m k D r st E a Rd rd Fo t Br hu l St tee le t S on Try all ew ld S am t S on O d R ar St e N eel R d Av ld w Ro ck y R T h e P la z a to n Mil S pl ad he re Mo ac on S t St on Pa Tr dP tR un Cla n ton R W a ll v ids th S a m W i l s on R d Ol 36 s th e int C oo fw Clif Ea st d So Da t Ma M 74 . Rd t Po R em o d Wes t B l v 49 Th S on t St £ ¤ £ ¤ 29 ah Gr S 4th d St kR R d ri Rd rris N ft vd Bl 30 t y Tr Dalton Av Rd Th ley am P kwy B i ll y G rah Mo d o Av 5th Ash Rd Av as e t y Cit hS S ny At an Oa kl a wn e ege Allegh a n B l vd § ¨ ¦ 85 y Rd e rr sF !! Tu c k s r rsity . Ch Ck e ive Un Ca s Rd r k dD Dr ell zz Wilk i ns o Fre ed om w o od G le n Dr ege e Rd kas e T uc d ! r s Gr o e C indy Ln v Rd H os kin ac B 27 ! IB M D ry icko ell-H d New v e R Gro 85 w Rd Grie Ro § ¨ ¦ Do M bo n Rd Bl CABARRUS Rd B l vd e h ion vil Br oo ks hir Rd A ut en Dr s r d Cha pe l R O ld ib d kR re e Rd hu rc Pa rC ga Su rr y ke ea sap s re G vd oo 115 d eR Che R ozzelles F e M re Ma lla r dC re e kC Har r i s B lv d W W ol d ht ac 77 Rd tH Be lme ade Dr Pe d ti es For d R Beat n B lv d d Sta tes vi lle d Rd lhave se tR WT rc h k ry Fer B el Su n d 21 d wR u Ch Oa es ell k ev i e La le R e lom Sa d unter sv i ll e R da un R £ ¤ § ¨ ¦ r s Rd H y- F re ly R m es ! Bl vd ! Mo Rd R ea zz Ro ok sh ire o ! ! r ch V Br o cho d yC hu a n ce R d 16 S ell Od on - O e er i t P ros p Rd H uc k s R d s r G AS TO N J o h n st hler ow n e Br on Ar m De Rd ll R d d e rs v i l l e R y -H u nt Rd t Rd Asbury Chape l d M cC o s vil le y R Beattie s sv il le Rd rd Fo Rd e ta t State Ham b righ 1 2 Miles ! 16 r s Charlotte Department of Transportation Planning & Design - GIS December 7, 2012 Rd