4th ITU Green Standards Week Introduction of Government Cloud and Smart Haidian Jianwu He Economy and Informationization Office Haidian District Beijing Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Overall Architecture of Smart Haidian Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Background of Building Administrative Cloud Capable of self-control, and be able to access to resources by lowering the overall cost (compute, storage and network transmission) Enables unified management of computing and storage resources, to achieve the commissions Bureau supplydemand about resources Unified management of data storage, to dig deeply and to analyze quickly and intelligence of large amounts of data from different departments Enable to achieve high fault-tolerant computing and storage capacity, and effectively improve the security of computing and data storage Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Background of Building Administrative Cloud Based on distributed computing and storage (Hadoop architecture) big data platform to support the future development direction of important and intelligent analysis of large data storage, and has three major advantages: High availability, can provide outstanding fault tolerance ability High scalability, through the PC server and storage can realize resource linear expansion Low cost, does not require the use of expensive high-end servers and memory, greatly reduce the construction cost of the data center Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Architecture of Government Cloud Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week The Construction of Network Infrastructure TD-LTE建设 光纤到户 To lay a solid foundation for cloud computing network of egovernment and other kinds of applications Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week The Comprehensive Administrative Service Management System FULL PENETRATION THREE LEVEL LINKAGE • Simplify items of administrativ e • The approval process optimization • Enhance administrativ e efficiency • Decentralizat ion of approval authority • Administrati ve cost reduction • Transparent the administrativ e process 全程贯通 • 审批项目精 简 • 审批流程优 化 • 行政效能提 升 WHOLE DISTRICT TRANSACTION COMBINATION OF FORMAL • Local Service • Reduce the cost of public service • Improve the public service efficiency • Personalized closed-loop service Committed to connecting the world AND REAL International Telecommunication Union 4th ITU Green Standards Week The Approval Process Management System The whole district transact three linkage approval Investment in fixed assets of collaborative approval Establishment of enterprise collaborative approval Enterprise single matter approval Online administrative approval The other application systems Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week The Approval Management System Query Statistics Monitor MATTERS EDITOR MANAGEMENT AUDIT RELEASED MATTERS Individuals’:48 Enterprises’:75 To provide basic information on matters, legal basis, the application materials, the post responsibility, classification, subject matters of module management; Each item has a unique code, easy to query and management Matters need in the center office, the Legislative Affairs Office and other relevant department s to audit and release Ensure matters of standard, egality and uniqueness MATTERS RELATED MATTERS ENABLED Associate issues with the user, different users to view different matters; Associate matters and process; Associate issues with the theme odules Matters can be enabled after the audit ; Items can be deactivated, closure matters still can query the management information Committed to connecting the world The whole district transact three linkage approval Investment in fixed assets of collaborative approval Establishment of enterprise collaborative approval Enterprise single matter approval Online administrative approval The other application systems International Telecommunication Union 4th ITU Green Standards Week The Approval Process Management System Provide support and management for 48 individual events, 75 enterprise approval process and 4 stages of the approval process; Provides a unified workflow engine, process scheduling and approval of business support system; Provides visual process design, implementation and business process alignment, easy to review and revise; To realize the dynamic real-time monitoring of each process node, provides overtime warning function. Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Multilevel Linkage Approval Function The district administrati ve service center channel hall public Selfservice Street street Linkage service Gover unified nment government Servic service Open Social Public e government management service platform hall … … … … efficiency monitor Service object Unified government affairs service platform is a network type … … Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week User management & Authentication Internal users External users • 468 user in the platform management(4 appoint bureaus, 4 pilot towns, 91 community / Villages); • Increasing the mass user 2 times, small batch and modification of 20 times; • To realize the classification management of user rights. • The ongoing docking with the government of Haidian District, the public can be registered through the Haidian District site. The third party system user • Complete user butt and the people's livelihood platform, realize the unified user login • Assign permissions and authentication implementation of pilot town / community of users can log on to the smart of government service platform Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Grid Service Management Integrated Information Network Letters for the grid community service information platform Acquisition of Basic Data Sharing, exchange, application of database Has been basically completed the construction of grid database system integrated data center, integration of the information resources, the realization of Haidian District ", matter, thing, organization" scientific, precise, intelligent management. Construct the District Public Security Bureau special database, the District Family Planning Commission special database, Human Social Security special database, the District Comprehensive Management special database, special database, the District Board of Education special database, the District Civil Affairs Bureau, the District CDPF special database, the District Health Bureau special database. Establish the data maintenance and updating mechanism, ensure the timeliness and accuracy of data; the data to ensure the legal department to maintain the authority and accuracy of data. Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Grid Service Management Integrated Information Network Community Service Management Non emergency system and social management system, Informational City Management System, Video System And Social Management System The integration of information acquisition method Finish the three level mesh and data storage layer, and set up user accounts according to the three level name of the grids, each grid division for the scope of authority Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Acquisition Of Basic Data Construction of the actual population base •Complete the District Public Security Bureau, Actual Population Office, Family Planning Commission three departments of population data storage Unified population attribute description •Significantly improve the quality of population data, and lay a solid foundation Comparison of floating population information •On the public security and practical to do information •Get rid of the obvious mistakes Comparison of housing management information • Complete the District Public Security Bureau and the Actual Information Office of information storage, and complete alignment Establish relationship International • Carry out “Looking for apartment by picture, Determine the household by apartment" Telecommunication create conditions Committed to connecting the world Union 4th ITU Green Standards Week Acquisition Of Basic Data Bidirectional Update with Municipal Vertical System Regular Grid Power Collection Data Update Mechanism Grid Event Driven Feedback Regular Exchange Of Documents Establish the data maintenance and updating mechanism, ensure the timeliness and accuracy of data; the data to ensure the legal department to maintain the authority International Telecommunication and accuracy of Committed data. to connecting the world Union 4th ITU Green Standards Week Community Service Management Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Community Service Management •Realize the Internet Letters Data access (1)Non emergency system and social management system •Through the handheld terminal acquisition community service to manage the problem (2)Informational City Management System, Video (3)The System And Social integration of Management information System acquisition method •Include the Urban Management Supervisors team International into the grid work of Social Service Management Committed to connecting the world information platform Telecommunication Union 4th ITU Green Standards Week Nansha River Basins Flood Prevention System Real-time Collection and Display • Rainfall, project operation, water gate, hydrology information real-time monitoring Intelligent Model & Optimal Operation • Provide river flood-forecast model, gate optimal operation model Flood-forecast、Early-warning Issued Immediately • Torrent disasters early-warning level divide, send warning messages in several ways Provide Decision Support • Historical data analysis, rainstorm and flood simulation, flood scientific regulates International Telecommunication Committed to connecting the world Union 4th ITU Green Standards Week Nansha River Basins Flood Prevention System Nansha River Basins Flood Prevention System mainly include: 1 basic application subsystem :Integrated Information Service System; 4 professional application subsystem:Small watershed floodforecast, flood-control dispatching system, torrent disasters warning and water quality monitoring. Business Application ProfessionalApplication Small watershed flood-forecast Torrent disasters warning Flood-control dispatching system Water quality monitoring Basic Application Integrated Information Service System Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Nansha River Basins Flood Prevention System Water Affairs Information Acquisition The main monitoring targets are water gates, dam, watercourse, drains and so on, and the system can collect, upload and share the water regimen, rainfall ,real image information automatically. Then do the data processing at fastest speed and show the results with visualize image so that provide decision support. There are 37 water affairs information gathering points: 11 video monitor points , 10 water level monitor points, 4 water quality monitor points, 5 flows monitor points (return flow and water level values), 7 rainfall monitor points. Water Affairs Integrated Information Service Provide the direct-viewing results of spatial database and related attribute information inquiry, retrieval, analysis and dissemination. Flood control and drainage dispatching simulation system In real-time scheduling, the system will generate a set of plans to one object for decision maker’s reference. Scheduling plans management system is mainly for all sectors of scheduling plans information management. International Committed to connecting the world Telecommunication Union 4th ITU Green Standards Week Flood control and drainage dispatching simulation system Situation Analysis Comprehensive information service subsystem helps schedulers to clear the goals and the major problems of flood control by rainfall analysis, disaster analysis, project operation analysis and Plan Generation so on. Plan Simulation Plan Comparison Plan Management Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Flood control and drainage dispatching simulation system Situation Analysis The system can achieve the function of flood pre-discharge dispatching of reservoir and real-time management by integrating the weather, real-time water regimen and flood forecast Plan Generation information, combining the water gate real time running status information and the intelligence scheduling model. Plan Simulation Plan Comparison Plan Management Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Flood control and drainage dispatching simulation system Situation Analysis Plan Simulation visualization shows results with presentation of concise, simple and visualize information. System adopts conceptual diagram and 3D electronic sand to show the Plan Generation Plan Management Committed to connecting the world Conceptual Diagram Simulation Plan Comparison 3D Electronic Sand Simulation Plan Simulation simulation results: International Telecommunication Union 4th ITU Green Standards Week Flood control and drainage dispatching simulation system Situation Analysis Plan comparison system mainly does the comparison of engineering application, application effects etc. from sets of plans, which for decision maker’s reference. Plan Generation Industry Loss Comparison Community Economy Loss Comparison Plan Simulation Important Organizations Flooded Condition Thematic Map Comparison Plan Comparison Plan Management Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Flood control and drainage dispatching simulation system Situation Analysis In real-time scheduling, the system will generate a set of plans to one object for decision maker’s reference. Scheduling plans management system is mainly for all sectors of scheduling plans Plan Generation information management Plan Simulation Plan Comparison Plan Management Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Flood control and drainage dispatching simulation system Small Watershed Flood Forecast The goals of the system are the improvement of both the timeliness and accuracy of flood control decision making, providing the technical support for flood control and reducing the loss, according to the functions that real-time flood warning, flood submergence analysis, loss assessment, flood control regulation simulation etc. Flash Flood Warning Judge the warning situation according to status of monitoring Judge the warning sending objects Adopt both automatically and manually sending ways to post warning messages The relevant departments should launch the appropriate response plan according to the warning results and information release conditions. The system will trace all towns' implementation till the response action is end. Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Flood control and drainage dispatching simulation system Water Quality Monitoring Mainly realized the function of real-time water quality information monitoring. System evaluates water quality data in terms of national Evaluation Criteria. If the water is detected has exceed, then send message to crews, which provides support for watershed management. Committed to connecting the world International Telecommunication Union 4th ITU Green Standards Week Thank you Committed to connecting the world International Telecommunication Union