Public Notice – Passenger Facility Charge Application No. 5 Charlotte Douglas International Airport Effective: May 29, 2014 Pursuant to CFR 158.24, the city of Charlotte (“City”), owner and operator of the Charlotte Douglas International Airport (“Airport”), hereby provides public notice of the City’s intention to file an application to impose and use Passenger Facility Charges (“PFCs”) of $3.00 per enplaned passenger at the Airport (“PFC Application No. 5”) to fund, in whole or in part, certain PFC eligible Airport improvements. This Public Notice is effective May 29, 2014. Public comments, if any, are required to be submitted to the Airport no later than June 30, 2014. The City proposes to undertake this program of capital improvements and to fund them with PFCs on a PAYGO basis. The City is applying to the Federal Aviation Administration (“FAA”) for the authority to impose and use PFC revenue to pay the PFC eligible cost of the proposed project work elements (“PWEs”). The City proposes to impose a $3.00 PFC to pay the PFC eligible costs of the PWEs. The proposed charge effective date for PFC Application Number 5 will be concurrent with the Charge Expiration Date of PFC Application Number 4 (August 1, 2023). Accordingly, the Charge Effective Date for PFC Application Number 5 is estimated to be August 1, 2023. Based on the forecast of enplanements at the Airport, the estimated Charge Expiration Date is April 1, 2024. In summary, the City estimates using $115,369,901 in PFC revenue to pay on a PAYGO basis the PFC eligible costs of twenty nine (29) PWEs to be included in PFC Application Number 5. Combined with the estimated PFC revenues to be collected pursuant to approved PFC Applications Number 1, Number 2, Number 3 and Number 4 ($1,036,775,656), the total amount of Impose and Use authority for the City’s PFC program would be $1,152,145,557. The following sets forth the PWEs included in PFC Application No. 5, including a description of the projects, justification for the projects and the estimated total PFC revenue the City will use for each project. Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 1 I. PROJECT TITLES, DESCRIPTIONS, JUSTIFICATIONS AND FUNDING PLANS PROJECT TITLE: P.W.E. 5.1 High Speed Taxiway PROJECT DESCRIPTION: The project will include the design and construction of a new high speed taxiway off Runway 18L to Taxiway C. PROJECT OBJECTIVE: The project will enhance capacity by constructing a new high speed taxiway off Runway 18L which will increase the efficiency of Runway 18L by decreasing runway occupancy times. PROJECT JUSTIFICATION: The new high speed taxiway connecting Runway 18L with Taxiway C will allow more efficient use of the runway as aircraft are able to exit the runway quicker and reduce arrival separation. Constructing the high speed taxiway in conjunction with the rehabilitation of Runway 18L and taxiways will reduce possible closures of the runway and minimize costs associated with mobilizing construction on two separate dates. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 2 FINANCING PLAN: Project Cost FAA AIP (Future Entitlement) State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ 2,855,435 2,141,576 0 713,859 $ $ $ $ $ 713,859 0 0 0 713,859 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: July 2014 Project End Date: July 2015 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: Under review by FAA Airspace Finding: 4.3.14 Environmental Review: Categorical Exclusion under FAA review Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 3 PROJECT TITLE: P.W.E. 5.2 Runway 18L Rehabilitation Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 4 PROJECT DESCRIPTION: This project is a selective mill and replacement of Runway 18L/36R of pavements below a PCI of 65. Approximately 7,400 square yards of asphalt will be replaced which will revitalize the structural integrity of the runway by reconstructing the pavement that has degraded over time. The project will rehabilitate the asphalt/concrete transverse joint failure at the south end of the runway, remove and replace surface asphalt shoving in three areas on the west side of centerline, remove portions of exit TWY C5 and C6 centerline lighting infrastructure in runway surface and replace asphalt, remove and replace failing in-pavement runway centerline light can extensions and reseal, replace aging/rough pavement at west exit to TWY R, and crack seal portions of remaining asphalt pavement. PROJECT OBJECTIVE: This project will preserve capacity by extending the useful life of Runway 18L providing for continued compliance with 14 CFR 139 and the Airport’s Pavement Management Plan. The project will eliminate potential FOD hazards where pavement failure has begun. PROJECT JUSTIFICATION: The pavement on certain areas of Runway 18L is showing deterioration due to age and use. The Airport’s Pavement Management Study concluded that the rehabilitation areas identified as part of this project are over 30 years old and/or below a 65 PCI. Completion of this project is necessary to avoid loss of the runway and the vital airfield capacity it provides. Failure to rehabilitate the selected areas will result in severe flight delays and non-compliance with 14 CFR 139. TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Project Cost FAA AIP (Future Entitlement) State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ 845,695 634,271 0 211,424 $ $ $ $ $ 211,424 0 0 0 211,424 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: July 2014 Project End Date: July 2015 ALP/AIRSPACE/ENVIRONMENTAL: Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 5 ALP Date: Airspace Finding: Environmental Review: February 13, 2013 February 13, 2013 Categorical Exclusion February 14, 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 6 PROJECT TITLE: P.W.E. 5.3 Taxiway A Rehabilitation PROJECT DESCRIPTION: This project is a selective mill and replacement of Taxiway A of pavements below a PCI of 65. The project will replace approximately 16,125 square yards of asphalt from TWY A4 to A6 including connector A5, repair aged asphalt at the bypass connector taxiway to Runway 5/23, and crack seal and replace aged asphalt pavement as needed between RWY 18L/36R and RWY 5/23 which will revitalize the structural integrity of the taxiway by reconstructing the pavement that has degraded over time. PROJECT OBJECTIVE: This project will preserve capacity by extending the useful life of Taxiway A providing for continued compliance with 14 CFR 139 and the Airport’s Pavement Management Plan. The project will eliminate potential FOD hazards where pavement failure has begun. PROJECT JUSTIFICATION: The pavement on certain areas of the Taxiway A is showing deterioration due to age and use. The Airport’s Pavement Management Study concluded that the rehabilitation areas identified as part of this project are over 30 years old and/or below a 65 PCI. Completion of this project is necessary to avoid loss of the taxiway and the vital airfield capacity it provides. Failure to rehabilitate the selected areas will result in severe flight delays and non-compliance with 14 CFR 139. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 7 FINANCING PLAN: Project Cost FAA AIP (Future Entitlement) State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ 785,244 588,933 0 196,311 $ $ $ $ $ 196,311 0 0 0 196,311 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: July 2014 Project End Date: July 2015 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion February 14, 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 8 PROJECT TITLE: P.W.E. 5.4 Taxiway D Rehabilitation PROJECT DESCRIPTION: This project is a selective mill and replacement of Taxiway D of pavements below a PCI of 65. The project will replace approximately 48,670 square yards of asphalt which will revitalize the structural integrity of the runway and its associated taxiways by reconstructing the pavement that has degraded over time. Failed asphalt in the keel section of Taxiway D from Taxiway D2 to Taxiway A including adjoining connector taxiways will be removed and replaced and the entire width of the taxiway will be resurfaced. Failed asphalt pavement in the adjoining area of the FBO ramp and from TWY D to entrance of the ARFF Station 17 will be removed and replaced with concrete pavement. PROJECT OBJECTIVE: This project will preserve capacity by extending the useful life of Taxiway D providing for continued compliance with 14 CFR 139 and the Airport’s Pavement Management Plan. The project will eliminate potential FOD hazards where pavement failure has begun. PROJECT JUSTIFICATION: The pavement on certain areas of the taxiway is showing deterioration due to age and use. The Airport’s Pavement Management Study concluded that the rehabilitation areas identified as part of this project are over 30 years old and/or below a 65 PCI. Completion of this project is necessary to avoid loss of the taxiway and the vital airfield capacity it provides. Failure to rehabilitate the selected areas will result in severe flight delays and non-compliance with 14 CFR 139. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 9 FINANCING PLAN: Project Cost FAA AIP (Future Entitlement) State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ 1,495,660 1,121,745 0 373,915 $ $ $ $ $ 373,915 0 0 0 373,915 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: July 2014 Project End Date: July 2015 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion February 14, 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 10 PROJECT TITLE: P.W.E. 5.5 Taxiway M North Rehabilitation PROJECT DESCRIPTION: This project is a selective mill and replacement of Taxiway M of pavements below a PCI of 65. The project will replace approximately 6,900 square yards of asphalt as needed between RWY 18L/36R and RWY 5/23, resurfacing remaining sections which will revitalize the structural integrity of the taxiway by reconstructing the pavement that has degraded over time. PROJECT OBJECTIVE: This project will preserve capacity by extending the useful life of Taxiway M providing for continued compliance with 14 CFR 139 and the Airport’s Pavement Management Plan. The project will eliminate potential FOD hazards where pavement failure has begun. PROJECT JUSTIFICATION: The pavement on certain areas of the taxiway is showing deterioration due to age and use. The Airport’s Pavement Management Study concluded that the rehabilitation areas identified as part of this project are over 30 years old and/or below a 65 PCI. Completion of this project is necessary to avoid loss of the taxiway and the vital airfield capacity it provides. Failure to rehabilitate the selected areas will result in severe flight delays and non-compliance with 14 CFR 139. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 11 FINANCING PLAN: Project Cost FAA AIP (Future Entitlement) State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ 336,011 252,008 0 84,003 $ $ $ $ $ 84,003 0 0 0 84,003 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: July 2014 Project End Date: July 2015 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion February 14, 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 12 PROJECT TITLE: P.W.E. 5.6 Runway 5/23 Rehabilitation PROJECT DESCRIPTION: This project is a selective mill and replacement of Runway 18L/36R of pavements below a PCI of 65. The project will replace approximately 14,000 square yards of asphalt including the keel section at Runway 18L from Taxiway R north to the existing concrete end of the runway and repair the centerline lights on Runway 5/23 which will revitalize the structural integrity of the runway and its associated taxiways by reconstructing the pavement that has degraded over time. PROJECT OBJECTIVE: This project will preserve capacity by extending the useful life of Runway 18L providing for continued compliance with 14 CFR 139 and the Airport’s Pavement Management Plan. The project will eliminate potential FOD hazards where pavement failure has begun. PROJECT JUSTIFICATION: The pavement on certain areas of Runway 18L is showing deterioration due to age and use. The Airport’s Pavement Management Study concluded that the rehabilitation areas identified as part of this project are over 30 years old and/or below a 65 PCI. Completion of this project is necessary to avoid loss of the runway and the vital airfield capacity it provides. Failure to rehabilitate the selected areas will result in severe flight delays and non-compliance with 14 CFR 139. TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 13 Project Cost FAA AIP (Future Entitlement) State Funding Local Share Requirement $ $ $ $ 631,680 473,760 0 157,920 PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ $ 157,920 0 0 0 157,920 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: July 2014 Project End Date: July 2015 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion February 14, 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 14 PROJECT TITLE: P.W.E. 5.7 Taxiway D South Extension Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 15 PROJECT DESCRIPTION: This project will construct the extension of Taxiway D South and will provide full length taxi for Runway 36R on the east side of the runway during northbound aircraft operations. The extension will add approximately 2,900 linear feet of taxiway on the south end of Taxiway D. PROJECT OBJECTIVE: The primary objective of this project is to enhance safety of aircraft operating on Runway 36R by reducing the number of runway crossings and eliminating the need for intersecting departures. This project will also enhance capacity of the Airport by providing the ability of departure aircraft to queue on each side of the runway. PROJECT JUSTIFICATION: This project was identified in the 1997 Master Plan Update to enhance safety and provide additional capacity for general aviation and North Carolina Air National Guard operations. The north and south extensions of Taxiway D were recommended in response to a near miss incident between a regional and general aviation aircraft on Runway 18L/36R. The extension of Taxiway D will allow aircraft from the general aviation and North Carolina Air National Guard ramps to taxi the full length of Runway 18L/36R to prevent future incidents involving intersecting departures. From September 1, 2012 to September 1, 2013 the FAA ATCT recorded 25,269 military and general aviation operations. TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Project Cost FAA AIP (Existing Entitlement) State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ 6,980,071 5,235,053 0 1,745,018 $ $ $ $ $ 1,745,018 0 0 0 1,745,018 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: October 2012 Project End Date: December 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 16 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: August 30, 2012 Environmental Review: August 2006 (Environmental Impact Statement) Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 17 PROJECT TITLE: P.W.E. 5.8 Snow Removal Vehicles PROJECT DESCRIPTION: This project will purchase three (3) used 2001 Vammas PSB 5500 multi-function snow removal vehicles. These vehicles are multi-functional high speed plow, broom, blower vehicles used for snow removal on airfield ground surfaces during snow and ice conditions that will allow the Airport to clear one runway in 15-20 minutes, a 75 percent reduction in the amount of time that the Airport is currently capable of clearing a single runway. The vehicles are also capable of removing rubber buildup on runway pavement surfaces. Previously, these vehicles were in service at Calgary International Airport performing reliably and satisfactorily since placed into service in 2001. The supplier will provide a one-year warranty. Prior to delivery the supplier will inspect each vehicle, perform all manufacturer recommended preventative maintenance service, repaint each vehicle with the color of the Airport’s choosing, provide a new P8400 plow for each vehicle, and provide a new set of broom cassettes. PROJECT OBJECTIVE: This project will preserve safety by maintaining clear airfield pavements during winter weather events and will also help to keep the airfield clean by removing rubber remnants from the runway, a significant source of foreign object debris (FOD). This project will also enhance capacity by reducing aircraft operating delay costs by decreasing the amount of runway closure Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 18 time during snow and ice removal events. PROJECT JUSTIFICATION: The use of these new multi-purpose units are consistent with the Airport’s Snow Removal Plan and will preserve safety on the Airport by maintaining clear runway and taxiway surfaces during snow and ice events and will also enhance capacity by reducing the snow removal time per runway by an estimated 75 percent, significantly reducing aircraft operating delay during snow and ice events. The purchase of these pre-owned vehicles will be at a cost approximately one third of the cost of new units. TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ 1,087,500 0 0 1,087,500 $ $ $ $ $ 1,087,500 0 0 0 1,087,500 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: November 2013 Project End Date: December 2013 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: N/A Airspace Finding: N/A Environmental Review: N/A Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 19 PROJECT TITLE: P.W.E. 5.9 Terminal Ramp Rehabilitation PROJECT DESCRIPTION: The Terminal Ramp Rehabilitation project includes repairs to approximately 95 concrete slabs on the terminal ramp. The scope of work for this project includes items related to removal and replacement of approximately 6,600 square yards of 15” concrete for each specified slab, cementtreat base course repair, recycled concrete aggregated base course and minimal undercut excavation of wet subgrade material. Incidental work includes joint sawing and joint sealing. PROJECT OBJECTIVE: This project will preserve capacity at the airport by extending the useful life of the terminal ramp and replacing the slabs to eliminate FOD on the terminal ramp. PROJECT JUSTIFICATION: The Airport’s Pavement Maintenance Program identified approximately 95 concrete slabs on the commercial terminal ramp which are experiencing structural failure. The replacement of these slabs is necessary to facilitate the safe movement of aircraft and to remain in compliance with the Airport Certification Manual and 14 CFR 139. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 20 FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ 1,276,426 $ 0 $ 0 $ 1,276,426 $ 1,276,426 $ 0 $ 0 $ 0 $ 1,276,426 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: October 2013 Project End Date: December 2013 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2014 Environmental Review: Categorical Exclusion February 14, 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 21 PROJECT TITLE: P.W.E. 5.10 Taxiway B Rehabilitation PROJECT DESCRIPTION: The Taxiway B Rehabilitation project includes repairs to two concrete slabs on the taxiway. The scope of work for this project includes items related to removal and replacement of approximately 138 square yards of 15” concrete for each specified slab, cement-treat base course repair, recycled concrete aggregated base course and minimal undercut excavation of wet subgrade material. Incidental work includes joint sawing and joint sealing. PROJECT OBJECTIVE: This project will preserve capacity and enhance safety at the airport by extending the useful life of the terminal ramp and replacing the slabs to eliminate FOD. PROJECT JUSTIFICATION: The Airport’s Pavement Maintenance Program identified two concrete slabs on Taxiway B which are experiencing structural failure. The replacement of these slabs is necessary to facilitate the safe movement of aircraft and to remain in compliance with the Airport Certification Manual and 14 CFR 139. TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 $ $ $ $ 26,591 0 0 26,591 22 PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ $ 26,591 0 0 0 26,591 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: October 2013 Project End Date: December 2013 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion February 14, 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 23 PROJECT TITLE: P.W.E. 5.11 Taxiway E Rehabilitation PROJECT DESCRIPTION: The Taxiway E Rehabilitation project includes repairs to five concrete slabs on the taxiway. The scope of work for this project includes items related to removal and replacement of approximately 347 square yards of 15” concrete for each specified slab, cement-treat base course repair, recycled concrete aggregated base course and minimal undercut excavation of wet subgrade material. Incidental work includes joint sawing and joint sealing. PROJECT OBJECTIVE: This project will preserve capacity and enhance safety at the airport by extending the useful life of the terminal ramp and replacing the slabs to eliminate FOD. PROJECT JUSTIFICATION: The Airport’s Pavement Maintenance Program identified five concrete slabs on Taxiway E which are experiencing structural failure. The replacement of these slabs is necessary to facilitate the safe movement of aircraft and to remain in compliance with the Airport Certification Manual and 14 CFR 139. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 24 FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ 66,477 0 0 66,477 $ $ $ $ $ 66,477 0 0 0 66,477 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: October 2013 Project End Date: December 2013 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion February 14, 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 25 PROJECT TITLE: P.W.E. 5.12 Taxiway F Rehabilitation PROJECT DESCRIPTION: The Taxiway F Rehabilitation project includes repairs to seven concrete slabs on the taxiway. The scope of work for this project includes items related to removal and replacement of approximately 486 square yards of 15” concrete for each specified slab, cement-treat base course repair, recycled concrete aggregated base course and minimal undercut excavation of wet subgrade material. Incidental work includes joint sawing and joint sealing. PROJECT OBJECTIVE: This project will preserve capacity and enhance safety at the airport by extending the useful life of the terminal ramp and replacing the slabs to eliminate FOD. PROJECT JUSTIFICATION: The Airport’s Pavement Maintenance Program identified seven concrete slabs on Taxiway F which are experiencing structural failure. The replacement of these slabs is necessary to facilitate the safe movement of aircraft and to remain in compliance with the Airport Certification Manual and 14 CFR 139. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 26 FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ 93,068 0 0 93,068 $ $ $ $ $ 93,068 0 0 0 93,068 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: October 2013 Project End Date: December 2013 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion February 14, 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 27 PROJECT TITLE: P.W.E. 5.13 Taxiway G Rehabilitation PROJECT DESCRIPTION: The Taxiway G Rehabilitation project includes repairs to four concrete slabs on the taxiway. The scope of work for this project includes items related to removal and replacement of approximately 278 square yards of 15” concrete for each specified slab, cement-treat base course repair, recycled concrete aggregated base course and minimal undercut excavation of wet subgrade material. Incidental work includes joint sawing and joint sealing. PROJECT OBJECTIVE: This project will preserve capacity and enhance safety at the airport by extending the useful life of the terminal ramp and replacing the slabs to eliminate FOD. PROJECT JUSTIFICATION: The Airport’s Pavement Maintenance Program identified four concrete slabs on Taxiway G which are experiencing structural failure. The replacement of these slabs is necessary to facilitate the safe movement of aircraft and to remain in compliance with the Airport Certification Manual and 14 CFR 139. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 28 FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ 53,182 0 0 53,182 $ $ $ $ $ 53,182 0 0 0 53,182 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: October 2013 Project End Date: December 2013 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion February 14, 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 29 PROJECT TITLE: P.W.E. 5.14 Taxiway M South Rehabilitation PROJECT DESCRIPTION: The Taxiway M Rehabilitation project includes repairs to 11 concrete slabs on the taxiway. The scope of work for this project includes items related to removal and replacement of approximately 764 square yards of 15” concrete for each specified slab, cement-treat base course repair, recycled concrete aggregated base course and minimal undercut excavation of wet subgrade material. Incidental work includes joint sawing and joint sealing. PROJECT OBJECTIVE: This project will preserve capacity and enhance safety at the airport by extending the useful life of the terminal ramp and replacing the slabs to eliminate FOD. PROJECT JUSTIFICATION: The Airport’s Pavement Maintenance Program identified 11 concrete slabs on Taxiway M which are experiencing structural failure. The replacement of these slabs is necessary to facilitate the safe movement of aircraft and to remain in compliance with the Airport Certification Manual and 14 CFR 139. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 30 FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ 146,250 0 0 146,250 $ $ $ $ $ 146,250 0 0 0 146,250 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: October 2013 Project End Date: December 2013 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion February 14, 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 31 PROJECT TITLE: P.W.E. 5.15 Taxiway R Rehabilitation PROJECT DESCRIPTION: The Taxiway R Rehabilitation project includes repairs to two concrete slabs on the taxiway. The scope of work for this project includes items related to removal and replacement of approximately 138 square yards of 15” concrete for each specified slab, cement-treat base course repair, recycled concrete aggregated base course and minimal undercut excavation of wet subgrade material. Incidental work includes joint sawing and joint sealing. PROJECT OBJECTIVE: This project will preserve capacity and enhance safety at the airport by extending the useful life of the terminal ramp and replacing the slabs to eliminate FOD. PROJECT JUSTIFICATION: The Airport’s Pavement Maintenance Program identified two concrete slabs on Taxiway R which are experiencing structural failure. The replacement of these slabs is necessary to facilitate the safe movement of aircraft and to remain in compliance with the Airport Certification Manual and 14 CFR 139. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 32 FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ $ $ $ 26,591 0 0 26,591 $ $ $ $ $ 26,591 0 0 0 26,591 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: October 2013 Project End Date: December 2013 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion February 14, 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 33 P.W.E. 5.16 PROJECT TITLE: Aircraft Deicing Trucks (8) PROJECT DESCRIPTION: This project includes the purchase eight (8) new deicing trucks which will supplement the Airport’s existing 28 deicing trucks for deicing procedures, available on a common use basis to all aircraft operators. PROJECT OBJECTIVE: This project will enhance capacity at the Airport by decreasing the amount of time required of aircraft operators to complete deicing procedures, thereby reducing aircraft operating delay and ramp congestion. PROJECT JUSTIFICATION: Airlines that use the Airport’s deicing services have requested the purchase of additional trucks to improve the efficiency and throughput of the deicing system during a winter event. Airlines using the common use deicing service have set a throughput rate of 15 minutes per aircraft. In order to meet this rate and accommodate 350 average daily departures during a snow and ice event, a study that shows a need for a total of 36 deicing trucks. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 34 FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ 2,992,536 $ 0 $ 0 $ 2,992,536 $ 2,992,536 $ 0 $ 0 $ 0 $ 2,992,536 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: August 2013 Project End Date: December 2013 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: N/A Airspace Finding: N/A Environmental Review: N/A Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 35 PROJECT TITLE: P.W.E. 5.17 Terminal Curb Front Roadway Commercial Vehicle Lanes Personal Vehicle Lanes Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 36 PROJECT DESCRIPTION: This project will construct a new terminal curb front roadway on the upper and lower levels. Each level will be increased to eight lanes replacing the three currently on the upper level and five lower level lanes. Adding the additional lanes will allow for the separation of commercial and private vehicles which increases the efficiency of the curb front roadway. Commercial vehicles will be moved to the lanes closest to the terminal and private vehicles to the outside lanes resulting in less pedestrian traffic crossing the lanes. The lanes will also be constructed further north to accommodate future terminal lobby expansion. PROJECT OBJECTIVE: This project will enhance capacity at the airport by doubling the public and commercial vehicle ingress and egress at the terminal providing over 800 feet of curbside access. This will allow the curb front to better serve the current passenger numbers and prepare for the anticipated growth in the future. The position of the new roadway will also provide space for the terminal lobby to expand approximately 90 feet. PROJECT JUSTIFICATION: The Airport has experienced significant growth since the initial construction of the terminal loop and curb front roadways 1982 and has exceeded the design capacity. The Airport currently experiences nearly five Million Annual Originating Passengers (MAOP). By 2020 traffic is projected to reach six MAOP and nine MAOP by 2035. This project will enhance roadway access to the Airport to support the growth anticipated through 2035 and prepare for the planned terminal expansion project that also increases passenger capacity for future growth. TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 $ 33,805,435 $ 0 $ 0 $ 33,805,435 $ 33,805,435 $ 0 $ 0 $ 0 $ 33,805,435 37 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: December 2013 Project End Date: July 2017 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion May 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 38 PROJECT TITLE: P.W.E. 5.18 Terminal Expansion Pedestrian Tunnels PROJECT DESCRIPTION: Two pedestrian tunnels will be constructed below grade under the new Terminal Curb Front Roadway. The tunnels will connect passengers from the future Hourly Parking Deck and Rental Car Facility to the Terminal Lobby limiting pedestrian traffic across the vehicle roadway. Each tunnel is 136 feet long and 40 feet wide. PROJECT OBJECTIVE: This project will enhance capacity by relieving pedestrian traffic from crossing the Terminal Curb Front Roadways. The tunnels will provide pedestrian traffic direct access to the terminal lobby from the Hourly Parking Deck and Rental Car Facility. PROJECT JUSTIFICATION: Completion of this project is necessary to provide ingress and egress between the future expanded terminal building and the Hourly Parking Deck and Rental Car Facility currently under construction, keeping the future Terminal Curb Front Roadway free from pedestrian traffic thereby maximizing vehicle traffic flow in front of the terminal. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 39 FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ 6,000,000 $ 0 $ 0 $ 6,000,000 $ 6,000,000 $ 0 $ 0 $ 0 $ 6,000,000 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: March 2015 Project End Date: March 2018 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion May 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 40 PROJECT TITLE: P.W.E. 5.19 Master Plan Update PROJECT DESCRIPTION: This project provides for a new Airfield Capacity Enhancement Plan (ACEP), FAR Part 150 Noise Exposure Map Update, and Terminal Capacity Enhancement Plan (TCEP). The ACEP will identify capacity opportunities for the airfield for the next 20 years and concentrate on outlining the benefits of airfield capacity enhancements and provide supporting documentation for the National Environmental Protection Act (“NEPA”) process. Specific elements of the ACEP include an updated aviation activity forecast to determine operational demand according to fleet mix and markets, an airfield geometry study to establish design characteristics, and a revised Airport Layout Plan developed in accordance with FAA Advisory Circulars. All information gathered for the ACEP will provide sufficient data to complete a benefit-cost analysis for the identified enhancements. The FAR Part 150 Noise Exposure Map Update will update the existing noise exposure maps (“NEMs”) approved by the City of Charlotte and Federal Aviation Administration (FAA) in 1996 as a part of the FAR Part 150 Noise Compatibility Program. Specific elements of the Update include reviewing existing conditions, developing NEMs, determining impacts, and conducting public meetings. The Airport’s terminal facilities are nearing capacity with each airline currently operating at CLT requesting additional gate space. As the ACEP determines potential airfield development to accommodate future demand it is imperative to undertake a TCEP to maintain facilities that will support such growth. PROJECT OBJECTIVE: Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 41 The ACEP will preserve and enhance safety, security and capacity, reduce/mitigate noise impacts and/or enhance competition at the Airport. The updated NEMs will mitigate noise impacts by providing a noise exposure map that depicts current conditions. The TCEP will enhance capacity and competition at the Airport by providing additional space for the airlines serving CLT. PROJECT JUSTIFICATION: On July 25, 2013 the ATCT restricted use of the crosswind runway, Runway 5/23, following a National Transportation Safety Board report highlighting safety concerns with converging operations. The amended operation has reduced airport capacity from 96 to 85 arrivals per hour while the airport is in a south operation which occurs approximately 70 percent of the time. This reduction in capacity has caused operations on the parallel runways to be extended beyond the established noise abatement hours. The ACEP is necessary to identify strategic airfield developments to recapture recently lost capacity and enable potential growth. The altered air traffic patterns have increased the number of flights over certain areas and escalated noise complaints from the community which the NEMs Update will mitigate. TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ 3,578,660 $ 0 $ 0 $ 3,578,660 $ 3,578,660 $ 0 $ 0 $ 0 $ 3,578,660 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: November 2013 Project End Date: June 2015 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: N/A Airspace Finding: N/A Environmental Review: N/A Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 42 PROJECT TITLE: P.W.E. 5.20 Storm Water Facilities PROJECT DESCRIPTION: The Airport’s Storm Water Master Plan, completed in 2013, highlighted several storm water management facilities geared towards peak storm water discharge control and/or water quality treatment for various new or planned development activity on the airport property. This project will construct five of these facilities. These storm water retention structures are required to comply with the Airport’s National Pollutant Discharge Elimination System (NPDES) permit under the Clean Water Act from the State of North Carolina. PROJECT OBJECTIVE: This project is necessary to comply with the environmental regulations imposed on NPDES permit holders under the Clean Water Act. More narrowly, to reduce the amount of total suspended solids (TSS) present in the runoff before the Storm Water reaches the area waterways. PROJECT JUSTIFICATION: The Airport has experienced significant growth that continues to increase the impervious area resulting in increased storm water runoff. This project reduces the Airport’s storm water fee and meets the requirements of the Airport’s NPDES Permit. The retention basins constructed by this project will retain the storm water long enough to allow the TSS to flocculate protecting area waterways. TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 43 Project Cost FAA AIP State Funding Local Share Requirement $ 4,231,435 $ 0 $ 0 $ 4,231,435 PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost $ 4,231,435 $ 0 $ 0 $ 0 Total PFC Funds $ 4,231,435 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: June 2014 Project End Date: December 2014 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: Submission in Progress Airspace Finding: Submission in Progress Environmental Review: Categorical Exclusion May 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 44 PROJECT TITLE: P.W.E. 5.21 Baggage Makeup Improvements PROJECT DESCRIPTION: This project will replace two baggage make-up units used for sorting and distributing of airline passenger baggage in the terminal building with modern units of like type. It will be installed in conjunction with the new Baggage Screening System approved in PFC Application #4. The current units were installed in 1994 and have undergone one full overhaul. PROJECT OBJECTIVE: This project will preserve capacity at the Airport by improving the efficiency and reliability of airline passenger baggage sorting and distribution operations. The current make-up units are 20 years old with limited useful life remaining. PROJECT JUSTIFICATION: Replacement of the current units preserves capacity and enhances security by providing new make-up belts in conjunction with the installation of a state-of-the-art, common use in-line baggage screening system. Due to the size of operations it is imperative to replace the current units before failure to avoid an interruption in customer service. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 45 FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ 186,375 $ 0 $ 0 $ 186,375 $ 186,375 $ 0 $ 0 $ 0 $ 186,375 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: September 2013 Project End Date: October 2013 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: N/A Airspace Finding: N/A Environmental Review: Categorical Exclusion February 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 46 PROJECT TITLE: P.W.E. 5.22 Concourse B&C Elevators PROJECT DESCRIPTION: This project will include the installation of two passenger and service elevators, one each on Concourse B and C. These elevators will be used for the movement of passengers when necessary and vendor supplies and merchandise from the ramp level to the boarding level on the concourses. Removing vendor traffic from the boarding level will alleviate congestion on the concourses. PROJECT OBJECTIVE: These elevators will enhance capacity and safety by providing alternate access to the concourses and easing congestion. Elevators are necessary for passengers and personnel with luggage and other large items that would make the use of stairs hazardous. PROJECT JUSTIFICATION: Concourses B and C were initially constructed in 1982. Since that time the Airport has experienced significant passenger growth which has resulted in strained passenger circulation and holding capacity on these concourses. These are two of the busiest in the terminal and due to the lack of elevators, tenants are required to move goods through the boarding level of the concourses, which causes additional congestion for passengers. Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 47 This project will enhance capacity and safety by providing vertical circulation for people and goods on Concourses B and C, which are the only concourses in the terminal without elevators from the ramp to boarding levels. Failure to install these elevators will require people to move from the ticket level to the ramp level using stairs, often carrying bags and other bulky materials. TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ 711,375 $ 0 $ 0 $ 711,375 $ 711,375 $ 0 $ 0 $ 0 $ 711,375 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: August 2013 Project End Date: July 2014 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: N/A Airspace Finding: N/A Environmental Review: Categorical Exclusion February 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 48 PROJECT TITLE: P.W.E. 5.23 ARFF Quick Response Vehicles (2) PROJECT DESCRIPTION: This project provided for the acquisition two Aircraft Rescue and Firefighting (ARFF) quick response vehicles to respond to emergencies on the airfield. These smaller, more agile, vehicles provide the capability to ensure the Airport can meet required response times when ground traffic is at peak levels. The two FAA Class 2 ARFF Vehicles carry 450 pounds of Potassium based dry chemical and 300 gallons of water with a commensurate amount of foam and meet all Class 2 vehicle requirements. Both vehicles are new and increase the Airport’s total ARFF fleet set to six. These vehicles make the Airport self-sufficient for front line ARFF service and no longer reliant on the North Carolina Air National Guard to provide vehicles in a front line capacity. PROJECT OBJECTIVE: This project enhanced airfield safety by providing quick response vehicles which meet FAA standards to reach emergencies. Due to the taxiway system design and congestion during peak periods, larger ARFF apparatus struggled to meet the required three minute response time. The Quick Response Vehicles are smaller and more maneuverable allowing easier off pavement movement around aircraft that enable these vehicles to respond to the scene more quickly for assessment. The Airport is an ARFF Index D with the potential to increase to an Index E in the near future. The Class 2 vehicle ensures the required response time is achieved which allows future purchases to focus on larger vehicles capable of increasing the Airport’s ARFF Index, compliance with Department of Defense Standards for C-130’s based at CLT and a redundant package of agent in the event of an Index E aircraft emergency. PROJECT JUSTIFICATION: Due to the size of the airfield, the Airport has two fire stations in order to meet the response time requirements. Each station must maintain the Index D requirements for equipment to ensure that in the event of an emergency on one side of the airfield the Airport can continue to operate. In an emergency, the first vehicle must arrive at the scene within three minutes and an additional two vehicles within four minutes. These quick response vehicles, one assigned to each station, supplement the existing ARFF equipment as well as provide additional firefighting capacity in the event of an emergency. These smaller, more agile, vehicles provide the capability to ensure the Airport can meet required response times when ground traffic is at peak levels. Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 49 TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ 426,488 $ 0 $ 0 $ 426,488 $ 426,488 $ 0 $ 0 $ 0 $ 426,488 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: June 11, 2012 Project End Date: April 9, 2013 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: N/A Airspace Finding: N/A Environmental Review: N/A Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 50 PROJECT TITLE: P.W.E. 5.24 Security Access Improvements PROJECT DESCRIPTION: This project will upgrade the existing security access hardware and software, extend fiber optic cabling to the south end of the airfield, and provide CCTV at certain entry points to the Security Identification Display Area (“SIDA”) and Aircraft Operations Area (“AOA”). The Airport needs to upgrade its video monitoring and access control software and equipment in order to strengthen these access control systems. These systems are integral for managing the risks associated with threat detection, emergency response, and restricted access control. Systems and equipment upgrades will occur in three primary areas. The areas include: South Campus Fiber In order to utilize the IP-based software for access control and to transport video, there will need to be fiber brought from the main terminal complex to the various buildings on the south campus. These fiber runs will be prioritized for properties with access to the airfield such as those along Yorkmont Road and Express Drive. C-Cure 9000 The access control system will be IP-based as opposed to the current modem based system. The CCure 9000 is an upgrade to the industry standard MSSQL database architecture which will allow for more robust backup/fail-over capability. The upgrade will provide a scalable architecture and more features for better centralized management. This upgrade is dependent on the fiber being run on the south campus of the Airport. CCTV The closed circuit television (CCTV) system is being upgraded with new network switches, software (version 4.3), and video storage devices. The storage capacity will be expanded to ensure that the 30 day TSA requirement for evidentiary needs can continue to be met. PROJECT OBJECTIVE: This project will enhance security by updating the existing access control and visual monitoring systems. Much of the existing equipment and software is at the end of its useful life and is becoming less stable. Additionally, the underlying infrastructure is not sufficient to carry data used in the new access control system. These systems are integral for managing the risks associated with threat detection, emergency response, and restricted access control. PROJECT JUSTIFICATION: Upgrading the security access control system will enhance security by providing an up-to-date security system that allows airport personnel to monitor all points of access within the SIDA and AOA. Access to the SIDA and AOA is monitored and controlled by a computer access control system. Many components of the current system have met their useful lives. The risks of the outdated systems are significant and must be actively managed in order to avoid costly delays such as rescreening the passengers in the terminal or breaches to the secured areas. Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 51 TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ 4,505,435 $ 0 $ 0 $ 4,505,435 $ 4,505,435 $ 0 $ 0 $ 0 $ 4,505,435 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: January 2015 Project End Date: January 2016 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: N/A Airspace Finding: N/A Environmental Review: Categorical Exclusion May 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 52 PROJECT TITLE: P.W.E. 5.25 Terminal Ramp Expansion West PROJECT DESCRIPTION: This project will design and construct additional aircraft ramp that will accommodate a future 20gate international concourse adjacent to Concourse A. This ramp will be 265,187 square yards of 18 inch concrete on top of six inches of cement treated base. PROJECT OBJECTIVE: This project will enhance capacity and increase competition by providing additional ramp and terminal space. All six signatory carriers have requested additional gate facilities to accommodate additional service. The new, larger international terminal will replace the current international facilities on Concourse D, making those gates available to all non-hub airlines. PROJECT JUSTIFICATION: Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 53 The 1997 Master Plan recommended additional aircraft parking ramp to accommodate additional aircraft gates in the terminal complex. All airlines that operate at the Airport have increased their activity in recent years and now require additional gates to accommodate their operations. This project will enhance capacity by providing aircraft ramp for parking at the terminal complex. TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Project Cost FAA AIP (Future) State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $40,043,300 $ 0 $ 0 $40,043,300 $40,043,300 $ 0 $ 0 $ 0 $40,043,300 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: July 2015 Project End Date: September 2016 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion in Progress Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 54 PROJECT TITLE: P.W.E. 5.26 Concourse E Jet Bridges (13) PROJECT DESCRIPTION: Concourse E currently comprises 48 gates, 18 of which are currently equipped with jet bridges. This project will procure 13 new jet bridges to be installed on some of the 30 gates currently without jet bridges. After installation of these new jet bridges, 31 out of the current 48 Airportowned gates will be equipped with jet bridges. An electrical upgrade to the concourse will also be required to complete the project. PROJECT OBJECTIVE: This project will enhance safety at the Airport by equipping 13 common use aircraft boarding gates located on Concourse E with jet bridges. Installing jet bridges will protect passengers from inclement weather, eliminate the need for stair boarding, and avoid ramp area hazards. PROJECT JUSTIFICATION: Concourse E currently has 48 gates but only 18 of those gates have jet bridges. Equipping additional gates with jet bridges will enhance safety and security by guiding passengers directly into the terminal, protecting them from inclement weather and ramp equipment operating in the vicinity of the aircraft. The bridges also help deter unauthorized access to the ramp area by passengers. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 55 FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ 7,593,953 $ 0 $ 0 $ 7,593,953 $ 7,593,953 $ 0 $ 0 $ 0 $ 7,593,953 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: July 2014 Project End Date: November 2015 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion February 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 56 PROJECT TITLE: P.W.E. 5.27 Passenger Boarding Units PROJECT DESCRIPTION: Concourse E is currently configured with 48 gates, 18 of those are equipped with jet bridges and 13 new jet bridges are scheduled to be installed by 2015. This project will procure 11 new boarding units to be installed on the remaining gates of Concourse E that are unable to be equipped with jet bridges due to space restrictions. The boarding units are fixed to the terminal ramp designed for a “drive in – pushback” operation. PROJECT OBJECTIVE: This project enhances safety by equipping 11 gates with passenger boarding units that would otherwise require passengers to utilize the aircraft air stairs which present greater hazard for passengers. The boarding units ensure ADA compliance and provide passengers a safe alternative on gates that cannot be installed with jet bridges due to space restrictions. PROJECT JUSTIFICATION: These passenger boarding units will increase passenger safety by providing an ADA compliant alternative to steep, narrow aircraft air stairs. TYPE OF APPROVAL REQUESTED: Impose and Use Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 57 FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ 1,761,375 $ 0 $ 0 $ 1,761,375 $ 1,761,375 $ 0 $ 0 $ 0 $ 1,761,375 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: September 1, 2014 Project End Date: November 1, 2014 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: February 13, 2013 Airspace Finding: February 13, 2013 Environmental Review: Categorical Exclusion February 2014 Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 58 PROJECT TITLE: P.W.E. 5.28 Automated Passport Control Units PROJECT DESCRIPTION: This project will install 18 Automated Passport Control (APC) kiosks in the U.S. Customs and Border Protection (CBP) area. Passengers who are eligible, only U.S. passport holders at this time, can proceed directly to a self-service kiosk where passengers will be prompted to scan their passport, take a photograph using the kiosk and, answer a series of questions verifying biographic and flight information, as well as to fill out their Customs declaration using the touch screen on the kiosk. Passengers will then bring their passport and receipt issued from the kiosk to a CBP officer to finalize their inspection for entry into the U.S. APC does not require pre-registration or membership and maintains the highest levels of protection when it comes to the handling of personal data or information. PROJECT OBJECTIVE: The project will enhance capacity by decreasing the amount of time passengers spend in the CBP inspection process, thereby, increasing the processing capacity of inspection services without major renovation. Passengers using the APC experience shorter wait times, less congestion, and faster processing, as they move quickly through the CBP inspection process by collecting passport and declaration information at the self-service kiosks. Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 59 PROJECT JUSTIFICATION: The Automated Passport Control kiosks allow passengers to move more quickly through the CBP preclearance inspection process through the entry of passport information at a self-service kiosk. CBP Officers can process four times the number of passengers compared to the current inspection process. Passengers spend 89 percent less time in the Primary inspection process reducing the time for all passengers by 33 percent. The APC also reduces the space required per peak hour passenger by 58 percent. TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ 3,100,000 $ 0 $ 0 $ 3,100,000 $ 3,100,000 $ 0 $ 0 $ 0 $ 3,100,000 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: December 2013 Project End Date: April 2014 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: N/A Airspace Finding: N/A Environmental Review: N/A Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 60 PROJECT TITLE: P.W.E. 5.29 PFC Application No. 5 Development PROJECT DESCRIPTION: This project will provide for the development and completion of the PFC application process for PFC Application Number 5. Costs expected to be incurred by the Airport include consulting services covering the preparation of the appropriate documentation including the PFC project detailed financial plan (Attachment A), the air carrier consultation information packages, FAA informal review information packages and the ultimate PFC Application document for submittal to the FAA PROJECT OBJECTIVE: Projects resulting from this project will maintain and/or increase the safety, security and/or capacity and/or will reduce noise impacts resulting from aircraft operations and/or furnish opportunities for enhance competition among air carriers. PROJECT JUSTIFICATION: As defined in 14 CFR Part 158.3, PFC allowable cost includes the reasonable and necessary cost of carrying out an approved project, including costs incurred prior to and subsequent to the approval to impose a PFC. TYPE OF APPROVAL REQUESTED: Impose and Use FINANCING PLAN: Project Cost FAA AIP State Funding Local Share Requirement PFC Funds Pay-As-You-Go Bonds Capital Financing Cost Interest Cost Total PFC Funds $ 175,000 $ 0 $ 0 $ 175,000 $ 175,000 $ 0 $ 0 $ 0 $ 175,000 ESTIMATED IMPLEMENTATION AND COMPLETION: Project Start Date: October 2012 Project End Date: November 2014 ALP/AIRSPACE/ENVIRONMENTAL: ALP Date: N/A Airspace Finding: N/A Environmental Review: N/A Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 61 II. DETAILED FINANCIAL PLAN The City proposes to undertake this program of capital improvements and to fund them with PFCs on a PAYGO basis. The City is applying to the FAA for the authority to impose and use PFC revenue to pay the PFC eligible cost of the proposed project work elements (“PWEs”). The City proposes to impose a $3.00 PFC to pay the PFC eligible costs of the PWEs. The proposed charge effective date for PFC Application Number 5 will be concurrent with the Charge Expiration Date of PFC Application Number 4 (August 1, 2023). Accordingly, for the purpose of this air carrier Consultation Information Package, the Charge Effective Date for PFC Application Number 5 is estimated to be August 1, 2023. Based on the forecast of enplanements at the Airport, the estimated Charge Expiration Date is April 1, 2024. In summary, the City estimates using $115,369,901 in PFC revenue to pay on a PAYGO basis the PFC eligible costs of twenty nine (29) PWEs to be included in PFC Application Number 5. Combined with the estimated PFC revenues to be collected pursuant to approved PFC Applications Number 1, Number 2, Number 3 and Number 4 ($1,036,775,656), the total amount of Impose and Use authority for the City’s PFC program would be $1,152,145,557. The public is invited to provide written comment or request additional information through June 30, 2014 by writing: Brent D. Cagle, Interim Aviation Director Aviation Department Charlotte Douglas International Airport P.O. Box 19066 Charlotte, N.C. 28219 Or by e-mail to dlledbetter@cltairport.com Charlotte Douglas International Airport – Public Notice Passenger Facility Charge Application No. 5 62