FREEDOM PARK RENOVATIONS design DeVELOPMENT Presentation august 21, 2015 AGENDA A introduction B scope of work 1. Restroom Building 2. Band Shell a. Photos and List of Work Elements b. Input from Lori Saylor and Lorac Productions c. Deferred Items 3. Shelters a. Design for New Shelters b. Shelter 3 Renovation C Budget D E schedule next steps 1. Preliminary Construction Cost Estimate 2. Deferred Maintenance Funds for Restrooms as Separate Projects SCOPE OF WORK B A RESTROOMS B SHELTER #2 C SHELTER #3 D SHELTER #5 E SHELTER #6 F BAND SHELL G CONCESSIONS STAND (UNDER TREE CHARLOTTE CONTRACT) C A G D F E - Install new accessible pathway to the restroom facility from the accessible parking spaces within Mahlon Adams Pavilion parking area. - Demolish and replace existing structure. - Repair and/or replace existing floor slab, as necessary. - Provide maximum of (3) design options for shelter. - Footprint of shelter has potential to be relocated for better ADA access. - New structure shall be fully accessible. - Provide adequate storm drainage and restore areas of erosion. - Relocate grill and trash receptacle areas, as required. - Fix/adjust tripping hazard of high utility man-hole cover in area facing adjacent pedestrian bridge. - Investigate the condition of the existing shelter. - Provide recommendations for renovation to the existing facility. - Provide full design services as necessary to implement approved renovations. - Provide new exterior lighting. - Demolish and replace existing structure. - Repair and/or replace existing floor slab, as necessary. - Provide maximum of (3) design options for shelter. - Footprint of shelter has potential to be relocated for better ADA access. - New structure shall be fully accessible. - Provide adequate storm drainage and restore areas of erosion. - Relocate grill and trash receptacle areas, as required. - Demolish and replace existing structure. - Repair and/or replace existing floor slab, as necessary. - Provide maximum of (3) design options for shelter. - Footprint of shelter has potential to be relocated for better ADA access. - New structure shall be fully accessible. - Provide adequate storm drainage and restore areas of erosion. - Relocate grill and trash receptacle areas, as required. - Install accessible paved path that extends from existing bridge to accessible entrance at band shell structure. - Clean / repaint existing structure and provide new finishes throughout entire facility (all surfaces and structure). - Provide new electrical wiring, panels and lighting. - Replace metal doors in back of band shell. - Clean, repaint/seal concrete floors. - Repair exterior stone veneer retaining walls. - Provide new sound baffles at stage area. - Repair concrete sidewalk around building. - Restore (3) existing plaques. - Provide new landscaping around building. - Provide new flag pole. - Demo existing concessions stand. - Install new ADA pathway - Install new seating area. SCOPE OF WORK C D E S I 1000 West Morehead Street Suite 170 Charlotte, NC 28208 t 704.333.0093 f 704.333.0083 www.cdesigninc.com Freedom Park Renovations 1900 East Blvd. Charlotte, NC Charles G. Snow, (980) 314-2541 1318-e6 central ave. P 704.334.3303 charlotte, nc 28205 F 704.334.3305 urbandesignpartners.com copyright 2015, Plan North 0604-0 08.21.2015 PROJECT NUMBER DATE SCOPE OF WORK ACCESSIBLE PATH TO RESTROOM - Install accessible path to the restroom from the accessible parking at Mahlon Adams. - Maintain existing path to Garden of Love and Forgiveness. - Connect to existing drive. - Path shall move around existing tree. Root bridging may be required. - Path shall be 6’ wide and located directly adjacent to existing curb. SCOPE OF WORK ACCESSIBLE PATH TO RESTROOM SCOPE OF WORK Band Shell - electrical - Remove track lighting. - Replace lights with dimmable LED fixtures. - Conduit and wiring will remain. - Replace receptacles and add weather resistant covers. - Add switching for replaced fixtures. - Existing 200 amp service is more capacity than is needed for lighting. Charles to determine the load required for concerts. This load will determine if we need to install a larger service. SCOPE OF WORK Band Shell - architectural - Clean / repaint existing back and wing walls, and repair exterior stone veneer retaining walls - Clean / repaint existing structure - Clean / paint / seal concrete floor - Provide new sound baffles at stage area - The intent of the sound baffles is to absorb sound. Sound baffles can receive impact from objects below. The baffles also need to be able to withstand pressure washing SCOPE OF WORK Band Shell - architectural - Install accessible path that extends from existing bridge to accessible entrance at band shell - Walls, floor and ceiling within enclosed room are not to be refinished or repainted - Repair to concrete sidewalk around building may be limited to eliminated tripping hazards. SCOPE OF WORK Band Shell - architectural - Band shell doors and frames shall be replaced. The doors should not have lite. SCOPE OF WORK Band Shell - architectural - Two plaques need to be restored. - Replace flag pole SCOPE OF WORK MATCHLINE SEE SHEET C-1.3 Band Shell - civil SCOPE OF WORK Band Shell - deferred expense items - Low roof is currently leaking into room below. Reroofing is not in scope of work but should be a priority item for future project. - Fascia cannot be painted in current state due to water damage. Replacing fascia board and coping may require roof repair. SCOPE OF WORK shelter designs SCOPE OF WORK shelter #2 M LI H C AT E N E SE EE SH T LS .2 -2 MATCHLINE SEE SHEET C-1.5 SCOPE OF WORK shelter #5 MATCHLINE SEE SHEET C-1.3 SCOPE OF WORK shelter #6 SCOPE OF WORK shelter #3 - Clean / repair / repaint existing structure and floor slab - Repair retaining wall and concrete swale, as necessary - Provide new roofing, fascia, drip-edges - Replace existing exterior light fixture - Remove existing stumps adjacent to structure - Remove chain link rail and provide new guardrail and handrail - Provide new perimeter landscaping SCOPE OF WORK shelter #3 renovation BUDGET Preliminary Construction Cost Estimate BUDGET Deferred Maintenance Funds for Restrooms as Separate Project SCHEDULE Mecklenburg County Freedom Park Renovations Project Schedule ID 1 2 3 4 Task Name Predesign / Schematic Design Duration Start Finish 40 days Wed 5/6/15 Tue 6/30/15 Predesign 20 days Wed 5/6/15 Tue 6/2/15 Schematic Design 20 days Wed 6/3/15 Tue 6/30/15 Design Development 38 days Wed 7/1/15 Fri 8/21/15 5 Design Development 38 days Wed 7/1/15 Fri 8/21/15 6 Owner Review 1 day Fri 8/21/15 Fri 8/21/15 36 days Fri 8/21/15 Fri 10/9/15 7 Construction Documents 8 Construction Documents 20 days Fri 8/21/15 Thu 9/17/15 9 Quality Control Review 1 day Thu 9/17/15 Thu 9/17/15 10 Submit Drawings for Owner Review 3 days Fri 9/18/15 Tue 9/22/15 11 Owner Review 10 days Wed 9/23/15 Tue 10/6/15 12 Pick up Review Comments 3 days Wed 10/7/15 Fri 10/9/15 13 Sign/Seal Drawings 1 day Fri 10/9/15 5 days Mon 10/12/15 Fri 10/16/15 5 days Mon 10/12/15 Fri 10/16/15 60 days Mon 10/19/15 Fri 1/8/16 20 days Mon 10/19/15 Fri 11/13/15 14 15 16 Permitting On Schedule Review Bidding 17 Bidding 18 Meck County Review and 40 days Award Contract for Construction Notice To Proceed 3 days Mon 1/11/16 Wed 1/13/16 Contract Administration 140 days Thu 1/14/16 Wed 7/27/16 22 Substantial Completion 0 days Thu 7/28/16 Thu 7/28/16 23 Festival in the Park 2 days Fri 9/23/16 Mon 9/26/16 21 Contract Administration June July August September October November December January February March April May June August 7/28 24 Project: Schedule Date: Fri 8/21/15 July Mon 11/16/15 Fri 1/8/16 Mon 1/11/16 Mon 9/26/16 20 May Fri 10/9/15 186 days? 19 April Task Summary Inactive Milestone Duration-only Start-only External Milestone Split Project Summary Inactive Summary Manual Summary Rollup Finish-only Deadline Milestone Inactive Task Manual Task Manual Summary External Tasks Progress Page 1 Manual Progress September October N NEXT STEPS • Lead Paint Testing at Band Shell • Surveyor to determine extent of SWIM buffer • Charles to determine required electrical load for concerts • Permit Review Date • Upcoming Meetings: - Drawing Pin-Up Review at P&R..........................8/27/2015 @ 10am - P&R - 100% CD Quality Control Review........................TBD @ C DESIGN’s conference room - OnSchedule Permit Review Date........................TBD - Review with Karla Gray...................................... TBD - Review with Disability Rights & Resourses..........9/10/2015 @ 1pm C design Inc. | 1000 West Morehead St. Suite 170 Charlotte, NC 28209 | P: (704) 333-0093 | F: (704) 333-0083 | www.cdesigninc.com Thank You! C design Inc. | 1000 West Morehead St. Suite 170 Charlotte, NC 28209 | P: (704) 333-0093 | F: (704) 333-0083 | www.cdesigninc.com