UM1729 TENDER FOR FRAMELESS GLASS DOORS AND STAINLESS STEEL AND GLASS HANDRAIL/GRABRAIL, AT THE VALLETTA CAMPUS -UNIVERSITY OF MALTA. Date Published: 19th July 2013 Closing Date: 2nd August 2013 at 10:00am CET Cost of the Tender Document: €20.00 IMPORTANT: No Bid Bond is requested for this tender Clarifications shall be uploaded and will be available to view/download from www.um.edu.mt/procurement University of Malta, Procurement Directorate, Administration Building Msida MSD 2080, Malta. Tel: (356) 2340 2212/3/5. Fax: (356) 21314307 Email: tenders.procurement@um.edu.mt Page 1 TABLE OF CONTENTS Table of Contents ........................................................................................... 2 VOLUME 1 SECTION 1 – INSTRUCTIONS TO TENDERERS .............................................. 4 A. GENERAL PART ........................................................................................... 4 1. General Instructions ........................................................................................................................... 4 2. Timetable ............................................................................................................................................. 4 3. Lots........................................................................................................................................................ 5 4. Financing .............................................................................................................................................. 5 5. Eligibility .............................................................................................................................................. 5 6. Selection Criteria................................................................................................................................ 5 7. Multiple Tenders ................................................................................................................................. 6 8. Tender Expenses ................................................................................................................................. 6 9. Site Inspection..................................................................................................................................... 6 B. TENDER DOCUMENTS.................................................................................... 7 10. Content of Tender Document ......................................................................................................... 7 11. Explanations/Clarification Notes Concerning Tender Documents ........................................... 7 12. Labour Law ........................................................................................................................................ 8 13. Law ...................................................................................................................................................... 8 C. TENDER PREPARATION ................................................................................. 8 14. Language of Tenders ........................................................................................................................ 8 15. Presentation of Tenders .................................................................................................................. 8 16. Content of Tender (Single-Envelope System) .............................................................................. 8 17. Tender Prices .................................................................................................................................... 9 18. Currencies of Tender and Payments ........................................................................................... 10 19. Period of Validity of Tenders ....................................................................................................... 10 20. Tender Guarantee (Bid Bond) ...................................................................................................... 10 21. Variant Solutions............................................................................................................................. 10 22. Preparation and Signing of Tenders ............................................................................................ 10 D. SUBMISSION OF TENDERS ............................................................................ 11 23. Sealing and Marking of Tenders ................................................................................................... 11 24. Extension of Deadline for Submission of Tenders ..................................................................... 11 25. Late Tenders ................................................................................................................................... 11 26. Alterations and Withdrawal of Tenders ..................................................................................... 11 E. OPENING AND EVALUATION OF OFFERS ........................................................... 12 27. Opening of Tenders ........................................................................................................................ 12 28. Secrecy of the Procedure .............................................................................................................. 13 29. Clarification of Tenders ................................................................................................................ 13 30. Tender Evaluation Process ............................................................................................................ 13 31. Correction of Arithmetical Errors ................................................................................................ 14 F. CONTRACT AWARD .................................................................................... 14 32. Criteria for Award .......................................................................................................................... 14 33. Right Of The University of Malta To Accept Or Reject Any Tender ...................................... 14 34. Notification of Award, Contract Clarifications ......................................................................... 15 35. Contract Signing and Performance Guarantee .......................................................................... 15 36. Commencement of Works (Order To Start Works) ................................................................... 16 G. MISCELLANEOUS ....................................................................................... 16 37. Ethics Clauses .................................................................................................................................. 16 38. Data Protection and Freedom of Information ........................................................................... 17 39. Gender Equality .............................................................................................................................. 17 VOLUME 1 SECTION 2 – TENDER FORM ................................................................ 18 Page 2 VOLUME 1 SECTION 3 – TENDER GUARANTEE FORM – Not Applicable for this tender........ 22 Annex To Tender Guarantee Form – Not Applicable for this tender............................................ 23 VOLUME 1 SECTION 4 - TENDERER’S STATEMENTS ................................................. 24 1. Statement on Conditions of Employment .................................................................................... 24 2. Experience as Contractor ................................................................................................................ 25 3. Literature/List of Samples/Designs............................................................................................... 27 VOLUME 1 SECTION 5 – GLOSSARY ..................................................................... 29 VOLUME 1 SECTION 6 – EXTRACTS FROM THE PUBLIC PROCUREMENT REGULATIONS ....... 31 VOLUME 2 SECTION 1 – DRAFT LETTER OF ACCEPTANCE.......................................... 32 VOLUME 2 SECTION 2 – GENERAL CONDITIONS ...................................................... 33 VOLUME 2 SECTION 3 – SPECIAL CONDITIONS........................................................ 34 VOLUME 2 SECTION 4 – SPECIMEN PERFORMANCE GUARANTEE .................................. 44 VOLUME 3 – Technical Specifications ................................................................. 45 VOLUME 4 – FinANCIAL BID .............................................................................. 60 VOLUME 5 - Drawings .................................................................................... 72 List of drawings attached .................................................................................................................... 72 ~~~~~~~~~~~~~~~ Page 3 VOLUME 1 SECTION 1 – INSTRUCTIONS TO TENDERERS A. GENERAL PART 1. General Instructions 1.1 In submitting a tender, the tenderer accepts in full and in its entirety, the content of this tender document, including subsequent Clarifications issued by the University of Malta, whatever his own corresponding conditions may be, which he hereby waives. Tenderers are expected to examine carefully and comply with all instructions, forms, contract provisions and specifications contained in this tender document. No account can be taken of any reservation in the tender as regards the tender document; any disagreement, contradiction, alteration or deviation shall lead to the tender offer not being considered any further. The Evaluation Committee shall, after having obtained approval by the Departmental Contracts Committee, request rectifications in respect of incomplete/non-submitted information pertinent to the documentation as outlined in sub-Clause 16.1(a), 16.1(b), and 16.1(c) of these Instructions to Tenderers. Such rectification/s must be submitted within two (2) working days from notification, and will be subject to a non-refundable administrative penalty of €50: failure to comply shall result in the tender offer not being considered any further. No rectification shall be allowed in respect of the documentation as outlined in sub-Clause 16.1(d), 16.1(e) and 16.1(f) of these Instructions to Tenderers. Only clarifications on the submitted information in respect of the latter may be eventually requested. 1.2 This is a call for tenders for frameless glass doors and stainless steel and glass handrail-grabrail, at the Valletta campus – University of Malta. 1.3 This is a unit-price (Bill of Quantities) contract. 1.4 The tenderer will bear all costs associated with the preparation and submission of the tender. The University of Malta will in no case be responsible or liable for such costs, whatever the conduct or outcome of the procedure. 1.5 The University of Malta retains ownership of all tenders received under this tender procedure. Consequently, tenderers have no right to have their tenders returned to them. 2. Timetable DATE Clarification Meeting/Site Visit (Refer to Clause 9.2) TIME* Not Applicable ====== Deadline for request for any additional information from the Contracting Authority Friday, 26th July 2013 12.00pm Last date on which additional information are issued by the University of Malta Wednesday, 31st July 2013 12.00pm Page 4 Deadline for submission of tenders / Tender Opening Session Friday, 2nd August 2013 10:00am (unless otherwise modified in terms of Clause 11.3) * All times Central European Time (CET) 3. Lots 3.1 This tender is not divided into lots, and tenders must be for the whole of quantities indicated. Tenders will not be accepted for incomplete quantities. 4. Financing 4.1 The project is financed from local budget funds. 4.2 The beneficiary of the financing is the University of Malta. 5. Eligibility 5.1 Participation in tendering is open on equal terms to all natural and legal persons of the Member States of the European Union, the beneficiary country, any other country in accordance with Regulation 76 of the Public Procurement Regulations. 5.2 Natural persons, companies or undertakings who fall under any of the conditions set out in Regulation 50 of the Public Procurement Regulations, 2010 (Legal Notice 296 of 2010) may be excluded from participation in and the award of contracts. Tenderers or candidates who have been guilty of making false declarations will also incur financial penalties representing 10% of the total value of the contract being awarded. 5.3 Tenders submitted by companies forming a joint venture/consortium must also fulfil the following requirements: One partner must be appointed lead partner and that appointment confirmed by submission of powers of attorney signed by legally empowered signatories representing all the individual partners. The tender must include a preliminary agreement or letter of intent stating that all partners assume joint and several liability for the execution of the contract, that the lead partner is authorised to bind, and receive instructions for and on behalf of, all partners, individually and collectively. All partners in the joint venture/consortium are bound to remain in the joint venture/consortium until the conclusion of the contracting procedure. The consortium/joint venture winning this contract must include the same partners for the whole performance period of the contract other than as may be permitted or required by law. 5.4 All materials, equipment and services to be supplied under the contract must originate in an eligible country. For these purposes, "origin" means the place where the materials and/or equipment are mined, grown, produced or manufactured and/or from which services are provided. 6. Selection Criteria 6.1 In order to be considered eligible for the award of the contract, tenderers must provide evidence that they meet or exceed certain minimum qualification criteria described hereunder. In the case of a joint venture, the joint venture as a whole must satisfy the minimum qualifications required below. 6.1.1 No evidence of economic and financial standing is required. Page 5 6.1.2 Information about the tenderer's technical capacity. (An economic operator may, where appropriate and for a particular contract, rely on the capacities of other entities, regardless of the legal nature of the links which it has with them. It must in that case prove to the contracting authority that it will have at its disposal the resources necessary for the execution of the contract, for example, by producing an undertaking by those entities to place the necessary resources at the disposal of the economic operator) This information must follow the forms in Volume 1, Section 4 of the tender documents and include: evidence of relevant experience in execution of works of a similar nature over the past one (1) year, including the nature and value of the relevant contracts, as well as works in hand and contractually committed. The minimum value of projects of a similar nature completed shall be not less than €10,000.00 per annum. The minimum number of projects of a similar scope/nature completed in the year must be at least (1) in number. last one (1) In so listing the end clients, the tenderer is giving his consent to the Evaluation Committee, so that the latter may, if it deems necessary, contact the relevant clients, with a view to obtain from them an opinion on the works provided to them, by the tenderer. Data concerning sub-contractors and the percentage of works to be sub-contracted: The maximum amount of sub-contracting must not exceed 50% of the total contract value. The main contractor must have the ability to carry out at least 50% of the contract works by his own means. 7. Multiple Tenders 7.1 A tenderer may submit multiple tender offers. 7.2 A company may not tender for a given contract both individually and as a partner in a joint venture/consortium. 7.3 A company may not tender for a given contract both individually/partner in a joint venture/consortium, and at the same time be nominated as a sub-contractor by any another tenderer, or joint venture/consortium. 7.4 A company may act as a sub-contractor for any number of tenderers, and joint ventures/consortia, provided that it does not participate individually or as part of a joint venture/consortium, and that the nominations do not lead to a conflict of interest, collusion, or improper practice. 8. Tender Expenses 8.1 The tenderer will bear all costs associated with the preparation and submission of the tender. 8.2 The University of Malta will neither be responsible for, nor cover, any expenses or losses incurred by the tenderer through site visits and inspections or any other aspect of his tender. 9. Site Inspection 9.1 A tenderer may visit the site of the works and its surroundings for the purpose of assessing, at his own responsibility, expense and risk, factors necessary for the preparation of his tender and the signing of the contract for the works. Page 6 B. TENDER DOCUMENTS 10. Content of Tender Document 10.1 The set of tender documents comprises the following documents and should be read in conjunction with any clarification notes issued in accordance with Clause 24: Volume 1 Volume 2 Volume 3 Volume 4 Volume 5 Instructions to Tenderers Draft Letter of Acceptance General Conditions (available online www.contracts.gov.mt/conditions) Special Conditions Technical Specifications Model Financial Bid/Bill of Quantities Drawings from 10.2 Tenderers bear sole liability for examining with appropriate care the tender documents, including those design documents available for inspection, and any clarification notes to the tender documents issued during the tendering period, and for obtaining reliable information with respect to conditions and obligations that may in any way affect the amount or nature of the tender or the execution of the works. In the event that the tenderer is successful, no claim for alteration of the tender amount will be entertained on the grounds of errors or omissions in the obligations of the tenderer described above. 10.3 The tenderer must provide all documents required by the provisions of the tender document. All such documents, without exception, must comply strictly with these conditions and provisions and contain no alterations made by the tenderer. 11. Explanations/Clarification Notes Concerning Tender Documents 11.1 Tenderers may submit questions in writing to the University of Malta through: sending an email to tenders.procurement@um.edu.mt through www.um.edu.mt/procurement/contact fax number +356 21314307 up to 7 calendar days before the deadline for submission of tenders, that is up to Friday 26th July 2013. The University of Malta must reply to all tenderers' questions, and amend the tender documents by publishing clarification notes, up to at least 6 calendar days before the deadline for submission of tenders. 11.2 Questions and answers, and alterations to the tender document will be:published as a clarification note on the website of the University of Malta (www.um.edu.mt/procurement/service/tender) within the respective tender’s page, under the subheading “Tender Document & Clarifications (if any)”. sent to all prospective bidders by e-mail. Tenderers who do not collect a hard copy from the Procurement Directorate are to register their respective contact details at tenders.procurement@um.edu.mt so that any clarifications/communications pertaining to this tender procedure will be communicated to them in due time as per tender document. The University of Malta shall not be held responsible for any misdemeanour if this condition is not adhered to. Clarification notes will constitute an integral part of the tender documentation, and it is the responsibility of tenderers to visit this website and be aware of the latest information published online prior to submitting their Tender. 11.3 The University of Malta may, at its own discretion, as necessary and in accordance with Clause 24, extend the deadline for submission of tenders to give tenderers sufficient time to take clarification notes into account when preparing their tenders. Page 7 12. Labour Law 12.1 Particular attention is drawn to the conditions concerning the employment of labour in Malta and the obligation to comply with all regulations, rules or instructions concerning the conditions of employment of any class of employee. 13. Law 13.1 By submitting their tenders, tenderers are accepting that this procedure is regulated by Maltese Law, and are deemed to know all relevant laws, acts and regulations of Malta that may in any way affect or govern the operations and activities covered by the tender and the resulting contract. C. TENDER PREPARATION 14. Language of Tenders 14.1 The tender and all correspondence and documents related to the tender exchanged by the tenderer and the University of Malta must be written in English. 14.2 Supporting documents and printed literature furnished by the tenderer may be in another language, provided they are accompanied by an accurate translation into English. For the purposes of interpretation of the tender, the English language will prevail. 15. Presentation of Tenders 15.1 Tenders must satisfy the following conditions: (a) All tenders must be submitted in one original. (b) The documents are to be sealed and placed in a sealed envelope/package so that the bid can be identified as one tender submission. (c) All tenders must be received by date and time indicated in the timetable at Clause 2 and deposited in the tender box at Room 323, Procurement Directorate, Administration Building, University of Malta, Msida MSD 2080, Malta. (d) All packages, as per (b) above, must bear only: (i) the above address; (ii) the reference of the invitation to tender concerned; (iii) the number of the lot(s) to which the tender refers (if applicable); (iv) the name of the tenderer. 16. Content of Tender (Single-Envelope System) 16.1 The tender must comprise the following duly completed documents, inserted in a single, sealed envelope (unless their volume requires a separate submission): (a) An original bid-bond for the amount of [€...........], in the form provided in Volume NOT APPLICABLE FOR THIS TENDER 1, Section 3(Note 1) (b) General/Administrative Information(Note 2) (i) (ii) Proof of Purchase of tender document (receipt) – Statement on Conditions of Employment (Volume 1, Section 4) Selection Criteria (c) Financial and Economic Standing(Note 2) Page 8 (Not Applicable) (d) Technical Capacity(Note 3) (i) (e) Evaluation Criteria/Technical Specifications (Note 3) (i) (ii) (f) Experience as Contractor (Volume 1, Section 4) Tenderer’s Technical Offer in response to specifications (Volume 3) Literature/List of Samples Financial Offer/Bill of Quantities(Note 3) (i) (ii) (iii) The Tender Form in accordance with the form provided in Volume 1, Section 2; a separate Tender Form is to be submitted for each option tendered, each form clearly marked ‘Option 1’, ‘Option 2’ etc.; A financial bid calculated on a basis of Delivery Duty Paid (DPP) for the works/supplies tendered including VAT; Breakdown of the overall price, in the form provided in Volume 4 (Bill of Quantities); Notes to Clause 16.1: 1. Tenderers will be requested to clarify/rectify, within two working days from notification, the tender guarantee only in the following two circumstances: either incorrect validity date, and/or incorrect value. 2. Tenderers will be requested to either clarify/rectify any incorrect and/or incomplete documentation, and/or submit any missing documents within two working days from notification. 3. No rectification shall be allowed. Only clarifications on the submitted information may be requested. Tenderers must indicate where the above documentation is to be found in their offer by using an index. All documentation is to be securely bound/filed. Tenderers are NOT required NOR expected to submit, with their offer, any components of the tender document except those specifically mentioned in Clause 16. 17. Tender Prices 17.1 The tender price must cover the whole of the works as described in the tender documents. 17.2 The tenderer must provide a breakdown of the overall price in Euro (€). 17.3 Tenderers must quote all components of the price inclusive of taxes, customs and import duties and any discounts. Tenderers not registered with the VAT authority in Malta, must still include in their financial offer any VAT that the contracting authority may have to pay either in Malta or the country where the tenderer is registered irrespective of the reverse charge mechanism. The financial offer will be considered as the total financial cost to the contracting authority including any VAT that may have to be paid not through the winning tenderer. Except as may otherwise be provided for in the contract, no payment will be made for items which have not been costed. 17.4 Different options are to be clearly identifiable in the technical and financial submission; a separate Tender Form (as per Volume 1, Section 2) marked ‘Option 1’, ‘Option 2’ etc. for each individual option clearly outlining the price of the relative option, is to be submitted. 17.5 If the tenderer offers a discount, the discount must be absorbed in the rates of the Bill of Quantities/Financial Statement. 17.6 The prices for the contract must include all of the works to be provided. The prices quoted are Page 9 fixed and not subject to revision or escalation in costs, unless otherwise provided for in the Special Conditions. 18. Currencies of Tender and Payments 18.1 The currency of the tender is the Euro (€). All sums in the breakdown of the overall price, in the questionnaire and in other documents must be expressed in Euro (€), with the possible exception of originals of bank and annual financial statements. 18.2 Payments will be made upon certification of works by the Contracting Authority, based on the invoice issued by the Contractor, in accordance with the timeframes, terms and conditions of the contract. 18.3 All correspondence relating to payments, including invoices and interim and final statements must be submitted as outlined in the contract. 19. Period of Validity of Tenders 19.1 Tenders must remain valid for a period of 150 days after the deadline for submission of tenders indicated in the contract notice, the tender document or as modified in accordance with Clauses 11.3 and/or 24. Any tenderer who quotes a shorter validity period will be rejected. 19.2 In exceptional circumstances the University of Malta may request that tenderers extend the validity of tenders for a specific period. Such requests and the responses to them must be made in writing. A tenderer may refuse to comply with such a request without forfeiting his tender guarantee (Bid Bond). However, his tender will no longer be considered for award. If the tenderer decides to accede to the extension, he may not modify his tender. 19.3 The successful tenderer must maintain his tender for a further 60 days from the date of notification of award. 20. Tender Guarantee (Bid Bond) 20.1 No tender guarantee (bid bond) is required. 21. Variant Solutions 21.1 No variant solutions will be accepted. Tenderers must submit a tender in accordance with the requirements of the tender document. 22. Preparation and Signing of Tenders 22.1 All tenders must be submitted in one original document. Tenders must comprise the documents specified in Clause 16 above. 22.2 The tenderer’s submission must be typed in, or handwritten in indelible ink. Any pages on which entries or corrections to his submission have been made must be initialled by the person or persons signing the tender. All pages must be numbered consecutively by hand, machine or in any other way acceptable to the University of Malta. 22.3 The tender must contain no changes or alterations, other than those made in accordance with Page 10 instructions issued by the University of Malta (issued as clarification notes) or necessitated by errors on the part of the tenderer. In the latter case, corrections must be initialled by the person signing the tender. 22.4 The tender will be rejected if it contains any alteration, tampering, addition or deletion to the tender documents not specified in a clarification note issued by the University of Malta. D. SUBMISSION OF TENDERS 23. Sealing and Marking of Tenders 23.1 The tenders must be submitted in English and deposited in the Department’s tender box before the deadline specified in Clause 2 or as otherwise specified in accordance with Clause 11.1 and/or 24.1. They must be submitted: EITHER by recorded delivery (official postal/courier service) or hand delivered to: Procurement Directorate, Room 323 2nd Floor, Administration Building University of Malta – Msida MSD 2080 Tel: 23402212/3; Fax: 21314307 Tenders submitted by any other means will not be considered. 23.2 Tenderers must seal the original tender as outlined in Clause 15. 23.3 If the outer envelope is not sealed and marked as required in Sub clause 15.1, the University of Malta will assume no responsibility for the misplacement or premature opening of the tender. 24. Extension of Deadline for Submission of Tenders 24.1 The University of Malta may, at its own discretion, extend the deadline for submission of tenders by issuing a clarification note in accordance with Clause 11. In such cases, all rights and obligations of the University of Malta and the tenderer regarding the original date specified in the contract notice will be subject to the new date. 25. Late Tenders 25.1 All tenders received after the deadline for submission specified in the contract notice or these instructions will be kept by the University of Malta. The associated guarantees will be returned to the tenderers. 25.2 No liability can be accepted for late delivery of tenders. Late tenders will be rejected and will not be evaluated. 26. Alterations and Withdrawal of Tenders 26.1 Tenderers may alter or withdraw their tenders by written notification prior to the above deadline. No tender may be altered after the deadline for submission. 26.2 Any notification of alteration or withdrawal must be prepared, sealed, marked and submitted in accordance with Clause 23, and the envelope must also be marked with "alteration" or "withdrawal". 26.3 The withdrawal of a tender in the period between the deadline for submission and the date of Page 11 expiry of the validity of the tender will result in forfeiture of the tender guarantee provided for in Clause 20. E. OPENING AND EVALUATION OF OFFERS 27. Opening of Tenders 27.1 Tenders will be opened by the University of Malta during a public session on the date and time indicated in the timetable at Clause 2 (or as otherwise specified in accordance with Clause 11.1 and/or 24.1) at the University of Malta A ‘Summary of Tenders Received ‘will be published on the notice board at the University of Malta, Procurement Directorate, Administration Building, 2nd Floor; and shall also be available to view on the University’s website, www.um.edu.mt/procurement/service/tender under the respective tender page. 27.2 At the tender opening, the tenderers' names, the tender prices, variants, written notification of alterations and withdrawals, the presence of the requisite tender guarantee and any other information the University of Malta may consider appropriate will be published. 27.3 Envelopes marked "withdrawal" will be read out first and returned to the tenderer. 27.4 Reductions or alterations to tender prices made by tenderers after submission will not be taken into consideration during the analysis and evaluation of tenders. Page 12 28. Secrecy of the Procedure 28.1 After the opening of the tenders, no information about the examination, clarification, evaluation or comparison of tenders or decisions about the contract award may be disclosed before the notification of award. 28.2 Information concerning checking, explanation, opinions and comparison of tenders and recommendations concerning the award of contract, may not be disclosed to tenderers or any other person not officially involved in the process unless otherwise permitted or required by law. 28.3 Any attempt by a tenderer to approach any member of the Evaluation Committee/University of Malta directly during the evaluation period will be considered legitimate grounds for disqualifying his tender. 29. Clarification of Tenders 29.1 When checking and comparing tenders, the evaluation committee may, after obtaining approval from the Departmental Contracts Committee, ask a tenderer to clarify any aspect of his tender. 29.2 Such requests and the responses to them must be made by e-mail or fax. They may in no circumstances alter or try to change the price or content of the tender, except to correct arithmetical errors discovered by the evaluation committee when analysing tenders, in accordance with Clause 31. 30. Tender Evaluation Process 30.1 The following should be read in conjunction with Clause 27. 30.2 Part 1: Administrative Compliance The Evaluation Committee will check the compliance of tenders with the instructions given in the tender document, and in particular the documentation submitted in respect of Clause 16. The Evaluation Committee shall, after having obtained approval by the Department Contracts Committee, request rectifications in respect of incomplete/non-submitted information pertinent to the documentation as outlined in sub-Clause 16.1(a), 16.1(b), and 16.1(c) of these Instructions to Tenderers. Such rectification/s must be submitted within two (2) working days from notification, and will be subject to a non-refundable administrative penalty of €50: failure to comply shall result in the tender offer not being considered any further. No rectification shall be allowed in respect of the documentation as outlined in sub-Clause 16.1 (d), 16.1(e), and 16.1(f) of these Instructions to Tenderers. Only clarifications on the submitted information in respect of the latter may be eventually requested. 30.3 Part 2: Eligibility and Selection Compliance Tenders which have been considered administratively compliant shall be evaluated for admissibility as outlined below: (i) Eligibility Criteria Tender Form (Volume 1, Section 2) (ii) Selection Criteria Evidence of technical capacity Page 13 30.4 Part 3: Technical Compliance At this step of the evaluation process, the Evaluation Committee will analyse the administrativelycompliant tenders’ technical conformity in relation to the technical specifications and the submission of samples, if applicable, (Volume 3, and the documentation requested by the Contracting Authority as per sub-Clause 16(e)), classifying them technically compliant or noncompliant. 30.5 Part 4. Financial Evaluation The financial offers for tenders which were not eliminated during the technical evaluation (i.e., those found to be technically compliant) will be evaluated. The Evaluation Committee will check that the financial offers contain no arithmetical errors as outlined in Clause 31. [If the tender procedure contains several lots, financial offers are compared for each lot.] The financial evaluation will have to identify the best financial offer [for each lot]. 31. Correction of Arithmetical Errors 31.1 Admissible tenders will be checked for arithmetical errors by the Evaluation Committee. Errors will be corrected as follows: (a) where there is a discrepancy between amounts in figures and in words, the amount in words will prevail; (b) where there is a discrepancy between a unit price and the total amount derived from the multiplication of the unit price and the quantity, the unit price as quoted will prevail. 31.2 The amount stated in the tender will be adjusted by the Evaluation Committee in the event of error, and the tenderer will be bound by that adjusted amount. In this regard, the Evaluation Committee shall seek the prior approval of the Departmental Contracts Committee to communicate the revised price to the tenderer. If the tenderer does not accept the adjustment, his tender will be rejected and his tender guarantee forfeited. 31.3 When analysing the tender, the evaluation committee will determine the final tender price after adjusting it on the basis of Clause 31.1 F. CONTRACT AWARD 32. Criteria for Award 32.1 The sole award criterion will be the price. The contract will be awarded to the cheapest priced tender satisfying the administrative and technical criteria. 33. Right Of The University of Malta To Accept Or Reject Any Tender 33.1 The University of Malta reserves the right to accept or reject any tender and/or to cancel the whole tender procedure and reject all tenders. The University of Malta reserves the right to initiate a new invitation to tender. 33.2 The University of Malta reserves the right to conclude the contract with the successful tenderer within the limits of the funds available. It can decide to reduce the scope of works or to ask for a discount from the cheapest compliant tenderer. 33.3 In the event of a tender procedure's cancellation, tenderers will be notified by the University of Page 14 Malta. If the tender procedure is cancelled before the outer envelope of any tender has been opened, the sealed envelopes will be returned, unopened, to the tenderers. 33.4 Cancellation may occur where: (a) the tender procedure has been unsuccessful, namely where no qualitatively or financially worthwhile tender has been received or there has been no response at all; (b) the economic or technical parameters of the project have been fundamentally altered; (c) exceptional circumstances or force majeure render normal performance of the project impossible; (d) all technically compliant tenders exceed the financial resources available; (e) there have been irregularities in the procedure, in particular where these have prevented fair competition. In no circumstances will the University of Malta be liable for damages, whatever their nature (in particular damages for loss of profits) or relationship to the cancellation of a tender, even if the University of Malta has been advised of the possibility of damages. The publication of a contract notice does not commit the University of Malta to implement the programme or project announced. 34. Notification of Award, Contract Clarifications 34.1 Prior to the expiration of the period of validity of tenders, the University of Malta will notify the successful tenderer, in writing, that his tender has been recommended for award by the Departmental Contracts Committee, pending any appeal being lodged in terms of Part XIII of the Public Procurement Regulations (being reproduced in Volume 1, Section 6). 34.2 Unsuccessful bidders shall be notified with the outcome of the evaluation process, and will be provided the following information: (i) the criteria for award; (ii) the name of the successful tenderer; (iii) the recommended price of the successful bidder; (iv) the reasons why the tenderer did not meet the technical specifications/notification that the offer was not the cheapest (if applicable); (v) the deadline for filing a notice of objection (appeal); (vi) the deposit required if lodging an appeal. 34.3 The recommendations of the Evaluation Committee and the Department Contracts Committee shall be published on the Notice Board of the University of Malta, Procurement Directorate, Administration Building, 2nd Floor, and published online on the University of Malta’s website, www.um.edu.mt/procurement/service/tender under the respective tender page. 35. Contract Signing and Performance Guarantee 35.1 After the lapse of the appeals period, and pending that no objections have been received and/or upheld, the successful tenderer may be invited to clarify certain contractual questions raised therein. Such clarification will be confined to issues that had no direct bearing on the choice of the successful tender. The outcome of any such clarifications will be set out in a Memorandum of Understanding, to be signed by both parties and incorporated into the letter of acceptance. 35.2 Within 7 calendar days of receiving the letter of acceptance (against acknowledgment of receipt) from the University of Malta, the successful tenderer will sign a copy of the Letter of Acceptance and date the Letter of Acceptance and return it to the University of Malta with the performance guarantee and the Financial Identification Form (if applicable). 35.3 Before the University of Malta sends the Letter of Acceptance to the successful tenderer, the successful tenderer may be requested to provide the documentary proof or statements required to show that it does not fall into any of the exclusion situations listed in Clause 7 of the Tender Form (Volume 1, Section 2). The above mentioned documents must be submitted by every member of a Joint Venture/Consortium (if applicable). 35.4 If the selected tenderer fails to sign and return the copy of the Letter of Acceptance, other Page 15 required documentation, and any guarantees required within the prescribed 7 calendar days, the University of Malta may consider the acceptance of the tender to be cancelled without prejudice to the University of Malta's right to seize the guarantee, claim compensation or pursue any other remedy in respect of such failure, and the successful tenderer will have no claim whatsoever on the University of Malta. The tenderer whose tender has been evaluated as [second cheapest/second most economically advantageous] may be recommended for award, and so on and so forth. 35.5 Only the signed Letter of Acceptance will constitute an official commitment on the part of the University of Malta, and activities may not begin until the contract has been signed both by the University of Malta and the successful tenderer. 35.6 Tender guarantees (bid bonds) provided by tenderers who have not been selected shall be released within 30 calendar days from the signing of the contract. The tender guarantee of the successful tenderer shall be released on the signing of the contract, and on submission of a valid performance guarantee. 35.7 The performance guarantee referred to in the General Conditions is set at 10% of the amount of the contract and must be presented in the form specified in Volume 2, Section 4, to the tender document the performance guarantee shall be released within 30 days of the signing of the Final Statement of Account (Final Bill), unless the Special Conditions provide otherwise. 36. Commencement of Works (Order To Start Works) 36.1 Following the signing of the contract by both parties, the Supervisor will issue a written notice of commencement of the works in accordance with the General Conditions, as specified by the Special Conditions. 36.2 The Contractor must inform the University of Malta's representative by return that he has received the notice. G. MISCELLANEOUS 37. Ethics Clauses 37.1 Any attempt by a candidate or tenderer to obtain confidential information, enter into unlawful agreements with competitors or influence the committee or the University of Malta during the process of examining, clarifying, evaluating and comparing tenders will lead to the rejection of his candidacy or tender and may result in administrative penalties. 37.2 Without the University of Malta's prior written authorisation, the Contractor and his staff or any other company with which the Contractor is associated or linked may not, even on an ancillary or sub-contracting basis, supply other services, carry out works or supply equipment for the project. This prohibition also applies to any other programmes or projects that could, owing to the nature of the contract, give rise to a conflict of interest on the part of the Contractor. 37.3 When putting forward a candidacy or tender, the candidate or tenderer must declare that he is affected by no potential conflict of interest, and that he has no particular link with other tenderers or parties involved in the project. 37.4 The Contractor must at all time act impartially and as a faithful adviser in accordance with the code of conduct of his profession. He must refrain from making public statements about the project or services without the Contracting Authority's prior approval. He may not commit the Contracting Authority in any way without its prior written consent. 37.5 For the duration of the contract, the Contractor and his staff must respect human rights and Page 16 undertake not to offend the political, cultural and religious morals of Malta. 37.6 The Contractor may accept no payment connected with the contract other than that provided for therein. The Contractor and his staff must not exercise any activity or receive any advantage inconsistent with their obligations to the Contracting Authority. 37.7 The Contractor and his staff are obliged to maintain professional secrecy for the entire duration of the contract and after its completion. All reports and documents drawn up or received by the Contractor are confidential. 37.8 The contract governs the Parties' use of all reports and documents drawn up, received or presented by them during the execution of the contract. 37.9 The Contractor shall refrain from any relationship likely to compromise his independence or that of his staff. If the Contractor ceases to be independent, the University of Malta may, regardless of injury, terminate the contract without further notice and without the Contractor having any claim to compensation. 37.10 The tender(s) concerned will be rejected or the contract terminated if it emerges that the award or execution of a contract has given rise to unusual commercial expenses. Such unusual commercial expenses are commissions not mentioned in the main contract or not stemming from a properly concluded contract referring to the main contract, commissions not paid in return for any actual and legitimate service, commissions remitted to a tax haven, commissions paid to a recipient who is not clearly identified or commissions paid to a company which has every appearance of being a front company. 38. Data Protection and Freedom of Information 38.1 Any personal data submitted in the framework of the procurement procedure and/or subsequently included in the contract shall be processed pursuant to the Data Protection Act (2001). It shall be processed solely for the purposes of the performance, management and follow-up of the procurement procedure and/or subsequent contract by the University of Malta/Contracting Authority without prejudice to possible transmission to the bodies charged with a monitoring or inspection task in conformity with National and/or Community law. 38.2 The provisions of this contract are without prejudice to the obligations of the University of Malta in terms of the Freedom of Information Act (Cap. 496 of the Laws of Malta). The University of Malta, prior to disclosure of any information to a third party in relations to any provisions of this contract which have not yet been made public, shall consult the contractor in accordance with the provisions of the said Act, pertinent subsidiary legislation and the Code of Practice issued pursuant to the Act. Such consultation shall in no way prejudice the obligations of the University of Malta in terms of the Act. 39. Gender Equality 39.1 In carrying out his/her obligations in pursuance of this contract, the tenderer shall ensure the application of the principle of gender equality and shall thus ’inter alia’ refrain from discriminating on the grounds of gender, marital status or family responsibilities. Tenderers are to ensure that these principles are manifest in the organigram of the company where the principles aforementioned, including the selection criteria for access to all jobs or posts, at all levels of the occupation hierarchy are amply proven. In this document words importing one gender shall also include the other gender. Page 17 VOLUME 1 SECTION 2 – TENDER FORM (A separate, distinct Tender Form must be submitted for EACH OPTION – if applicable - submitted) TENDER FOR FRAMELESS GLASS DOORS AND STAINLESS STEEL AND GLASS HANDRAIL/GRABRAIL, AT THE VALLETTA CAMPUS - UNIVERSITY OF MALTA.><UM1729> < A. TENDER SUBMITTED BY: (This will be included in the Summary of Tenders Received) In case of a Joint Venture/Consortium: Name(s) of Leader/Partner(s) Leader 1 Partner Nationality Proportion of Responsibilities2 1 Etc … 1. Add/delete additional lines for partners as appropriate. Note that a sub-contractor is not considered to be a partner for the purposes of this tender procedure. If this tender is being submitted by an individual tenderer, the name of the tenderer should be entered as 'leader' (and all other lines should be deleted) 2. Proposed proportion of responsibilities between partners (in %) with indication of the type of the works to be performed by each partner (the company acting as the lead partner in a joint venture/consortium, they must have the ability to carry out at least 50% of the contract works by its own means. If a company is another partner in a joint venture/consortium (i.e. not the lead partner) it must have the ability to carry out at least 10% of the contract works by its own means). Work intended to be subcontracted Name and details of sub-contractors Value of subcontracting as percentage of the total cost 3 Experience in similar works (details to be specified) 1 2 (.) 3. The maximum amount of sub-contracting must not exceed [50%] of the total contract value. The main contractor must have the ability to carry out at least [50%] of the contract works by his own means. NOTE TO COMPILER: THIS SECTION IS TO BE REMOVED/MARKED NOT APPLICABLE IF NO SUB-CONTRACTING IS ALLOWED. LIAISE WITH DOC B CONTACT PERSON (for this tender) Name Surname Telephone (____) ________________________ Fax (____) ________________________ Address ............................................................................................................... ............................................................................................................... ............................................................................................................... E-mail Page 18 C TENDERER'S DECLARATION(S) To be completed and signed by the tenderer (including each partner in a consortium). In response to your letter of invitation to tender for the above contract, we, the undersigned, hereby declare that: 1 We have examined, and accept in full and in its entirety, the content of this tender document (including subsequent Clarifications Notes issued by the University of Malta) for invitation to tender No [UM1729] of [12/07/2013]. We hereby accept the contents thereto in their entirety, without reservation or restriction. We also understand that any disagreement, contradiction, alteration or deviation shall lead to our tender offer not being considered any further. 2 We offer to execute, in accordance with the terms of the tender document and the conditions and time limits laid down, without reserve or restriction, the following works: Bill A: [Preliminaries] Bill B: [Glazing Works Bill C: [Stainless Steel and Glass Handrail / Grabrails] Bill D: [Dayworks] 3 The Grand Total Price of our tender (inclusive of duties, VAT, other taxes/charges, Eco-Contribution (if any) and any discounts) is: Grand Total: [……………………………………………] (from the Grand Summary on page 69 of this document) 4 This tender is valid for a period of 150 days from the final date for submission of tenders. 5 If our tender is accepted, we undertake to provide a performance guarantee of 10% of the contract value as required by the General Conditions. 6 We are making this application in our own right and [as partner in the consortium led by < name of the leader / ourselves >] for this tender. We confirm that we are not tendering for the same contract in any other form. [We confirm, as a partner in the consortium, that all partners are jointly and severally liable by law for the performance of the contract, that the lead partner is authorised to bind, and receive instructions for and on behalf of, each member, and that all partners in the joint venture/consortium are bound to remain in the joint venture/consortium for the entire period of the contract's performance]. We are fully aware that, in the case of a consortium, the composition of the consortium cannot be modified in the course of the tender procedure. 7 We are not bankrupt or under an administration appointed by the Court, or under proceedings leading to a declaration of bankruptcy. We also declare that we have not been convicted criminally, or found guilty of professional misconduct. Furthermore, we are up-to-date in the payment of social security contributions and other taxes. 8 We accept that we shall be excluded from participation in the award of this tender if compliance certificates in respect of declarations made under Clause 7 of this declaration are not submitted by the indicated dates. 9 We agree to abide by the ethics clauses of the instructions to tenderers and, in particular, have no potential conflict of interests or any relation with other candidates or other parties in the tender procedure at the time of the submission of this application. We have no interest of any nature whatsoever in any other tender in this procedure. We recognise that our tender may be excluded if we propose key experts who have been involved in preparing this project or engage such personnel as advisers in the preparation of our tender. 10 We will inform the University of Malta immediately if there is any change in the above circumstances at any stage during the implementation of the contract. We also fully recognise and accept that any false, inaccurate or incomplete information deliberately provided in this application may result in our exclusion from this and other contracts funded by the Government of Malta and the European Communities. Page 19 11 Our tender submission has been made in conformity with the Instructions to Tenderers, and in this respect we confirm having included in the appropriate packages as required, the following documentation: (a) (b) Tender Guarantee (Note 1) o Bid Bond (not applicable) General Information (Note 2) o Proof of Purchase (Receipt) o Statement on Conditions of Employment (c) (d) (e) Selection Criteria (Note 2) Financial and Economic Standing (Note 2) o Not applicable Technical Capacity (Note 3) ● Experience as Contractor Evaluation Criteria/Technical Specifications (Note 3) ● Tenderer’s Technical Offer ● Literature /List of Samples (f) Tender Form, and Financial Offer/Bill of Quantities (Note 3) Notes: 1. 2. 3. Tenderers will be requested to clarify/rectify, within two working days from notification, the tender guarantee only in the following two circumstances: either incorrect validity date, and/or incorrect value. This is indicated by the symbol ○ Tenderers will be requested to either clarify/rectify any incorrect and/or incomplete documentation, and/or submit any missing documents within two working days from notification. This is indicated by the symbol ○ No rectification shall be allowed. Only clarifications on the submitted information may be requested. This is indicated by the symbol ● 12 I acknowledge that the University of Malta and/or Contracting Authority shall request rectifications in respect of incomplete/non-submitted information pertinent to the documentation listed in Clause 11(a), 11(b), and 11(c) of this Tender Form. We understand that such rectification/s must be submitted within two (2) working days, and will be subject to a non-refundable administrative penalty of €50, and that failure to comply shall result in our offer not being considered any further. 13 We note that the University of Malta is not bound to proceed with this invitation to tender and that it reserves the right to cancel or award only part of the contract. It will incur no liability towards us should it do so. Name and Surname: _________________________________________ I.D. / Passport Number: _________________________________________ Signature of tenderer: _________________________________________ Duly authorised to sign this tender on behalf of: _________________________________________ Company/Lead Partner VAT No: (if applicable) _________________________________________ Stamp of the firm/company: _________________________________________ Page 20 Place and date: _________________________________________ Page 21 VOLUME 1 SECTION 3 – TENDER GUARANTEE FORM – NOT APPLICABLE FOR THIS TENDER [On the headed notepaper of the financial institutions providing the guarantee] Whereas the Director of Contracts has invited tenders for .................................................................................................................................. .... and whereas Messrs .................................................................................... [Name of tenderer] (hereinafter referred to as the Tenderer) is submitting such a tender in accordance with such invitation, we ................................................... [Name of Bank], hereby guarantee to pay you on your first demand in writing a maximum sum of ................................................................. Euro (€...............) in case the Tenderer withdraws his tender before the expiry date or in the case the Tenderer fails to provide the Performance Bond, if called upon to do so in accordance with the Conditions of Contract. The guarantee becomes payable on your first demand and it shall not be incumbent upon us to verify whether such demand is justified. This guarantee is valid for a period of one hundred and fifty (150) days from the closing date of submission of tenders, and expires on the .................................... Unless it is extended by us or returned to us for cancellation before that date, any demand made by you for payment must be received at this office in writing not later than the above-mentioned expiry date. This document should be returned to us for cancellation or utilisation or expiry or in the event of the guarantee being no longer required. After the expiry date and in the absence of a written demand being received by us before such expiry date, this guarantee shall be null and void, whether returned to us for cancellation or not, and our liability hereunder shall terminate. Yours faithfully, .................................. Bank Manager .................................. Date Page 22 Annex To Tender Guarantee Form – Not Applicable for this tender Contact Details of Tenderer Name of Tenderer/Joint Venture/Consortium ...................................................................... ...................................................................... Email Address ...................................................................... Telephone Number ...................................................................... Fax Number ...................................................................... Mobile Number ...................................................................... Name and Surname of Contact Person (Title) ...................................................................... (To be submitted with the Tender Guarantee in case the provisions of Article 1.1 of the Instructions to Tenderer need to be applied) Page 23 VOLUME 1 SECTION 4 - TENDERER’S STATEMENTS 1. Statement on Conditions of Employment Tenderers are to ensure that self-employed personnel are not engaged on this contract. Non-compliance will invalidate the contract. It is hereby declared that all employees engaged on this contract shall enjoy working conditions such as wages, salaries, vacation and sick leave, maternity and parental leave as provided for in the relative Employment Legislation. Furthermore, we shall comply with Chapter 424 of the Laws of Malta (Occupational Health and Safety Authority Act) as well as any other national legislation, regulations, standards and/or codes of practice or any amendment thereto in effect during the execution of the contract. In the event that it is proved otherwise during the execution of the contract it is hereby being consented that the contract is terminated with immediate effect and that no claim for damages or compensation be raised by us. Signature: ............................................................. (the person or persons authorised to sign on behalf of the tenderer) Date: ............................................................. Page 24 2. Experience as Contractor List of contracts of similar nature and extent performed during the past one (1) year: Name of Project/ Kind of works Total value of works the contractor was responsible for Period of Contract Starting Date Percentage of works completed Client/Contracting Authority and place Prime Contractor (P) Or SubContractor (S) Final Acceptance Issued? Yes Not Yet (current contract) No (A) Malta Page 25 Name of Project/ Kind of works Total value of works the contractor was responsible for Period of Contract Starting Date Percentage of works completed Client/ Contracting Authority and place Prime Contractor (P) Or SubContractor (S) Final Acceptance Issued? Yes Not Yet (current contract) No (B) Abroad (not applicable) Signature: .................................................................... (the person or persons authorised to sign on behalf of the tenderer) Date: .................................................................... Page 26 3. Literature/List of Samples/Designs 1. List of technical literature to be submitted with the tender: Item/Description FRAMELESS Glass double leaf doors system in 10mm Toughened glass. Fixed side glass panels, fanlight, floor concealed door closer and all hardware, including stainless steel hinges, handles, closers, locks etc. FRAMELESS Glass single leaf doors in 10mm Toughened glass. Fixed side glass panels, fanlight, floor concealed door closer and all hardware, including stainless steel hinges, handles, closers, locks etc. Stainless Steel Staircase Handrail/Grabrail with stainless steel grab rail, running from ground floor up to first level and including all accessories, fasteners, bolts, nuts, end caps in accordance with Access for All guidelines 2011. Drawings to include details of anchorage to existing stairs/walls including joints and fixtures and fittings to be used. Reference in Technical Specifications Volume 3 – Technical Specifications and Item B1 of the BOQ Volume 3 – Technical Specifications and Item B2 of the BOQ Volume 3 – Technical Specifications and Item C2/C3 of the BOQ 2. List of samples to be submitted with the tender: Item / Description Handle for frameless glass doors Hinges for frameless glass doors Floor concealed door closer for frameless glass doors Lock for frameless glass doors Stainless steel handrail and upright pipe supports including end caps and glass panel supports Reference in Technical Specifications Volume 3 – Technical Item B1/B2 of the BOQ Volume 3 – Technical Item B1/B2 of the BOQ Volume 3 – Technical Item B1/B2 of the BOQ Volume 3 – Technical Item B1/B2 of the BOQ Specifications and Specifications and Specifications and Specifications and Volume 3 – Technical Specifications and Item C2/3 of the BOQ 3. List of Proposed Designs to be submitted with the tender: Item/Description Design of FRAMELESS Glass double leaf doors system in 10mm Toughened glass. Fixed side glass panels, fanlight, door closer and all hardware, including stainless steel hinges, handles, closers, locks etc Design of FRAMELESS Glass single leaf doors in 10mm Toughened glass. Fixed side glass panels, fanlight, door closer and all hardware, including stainless steel hinges, handles, closers, locks etc. Reference in Technical Specifications Volume 3 – Technical Specifications and Item B1 of the BOQ Volume 3 – Technical Specifications and Item B2 of the BOQ Page 27 Preliminary design of Stainless Steel Staircase Handrail/Grabrail with stainless steel grab rail, running from ground floor up to first level and including all accessories, fasteners, bolts, nuts end caps in accordance with Access for All guidelines 2011. Drawings to include details of anchorage to existing stairs/walls including joints and fixtures and fittings to be used Signature: Volume 3 – Technical Specifications and Item C2/3 of the BOQ .................................................................... (the person or persons authorised to sign on behalf of the tenderer) Date: .................................................................... Page 28 VOLUME 1 SECTION 5 – GLOSSARY Definitions Note: the present definitions are given here for convenience only, in the context of the tender procedure. The definitions set out in the contract as concluded are determining for the relations between the parties to the contract. Administrative order: Any instruction or order issued by the Engineer to the Contractor in writing regarding the execution of the works. Breakdown of the overall price: A heading-by-heading list of the rates and costs making up the price for a lump sum contract. University of Malta: means the Department of Contracts Contracting Authority: means the final beneficiary Conflict of interest: Any event influencing the capacity of a candidate, tenderer or supplier to give an objective and impartial professional opinion, or preventing him, at any moment, from giving priority to the interests of the University of Malta and the Contracting Authority. Any consideration relating to possible contracts in the future or conflict with other commitments, past or present, of a candidate, tenderer or supplier, or any conflict with his own interests. These restrictions also apply to sub-contractors and employees of the candidate, tenderer or supplier. Contract value: The total value of the contract to be paid by the Contracting Authority in terms of the agreed terms and conditions. Contractor: The successful tenderer, once all parties have signed the contract. Day: Calendar day. Dayworks: Varied work inputs subject to payment on an hourly basis for the Contractor's employees and plant. Defects Notification Period: The period stated in the contract immediately following the date of provisional acceptance, during which the Contractor is required to complete the works and to remedy defects or faults as instructed by the Engineer. Drawings: Drawings provided by the Contracting Authority and/or the Engineer, and/or drawings provided by the Contractor and approved by the Engineer, for the carrying out of the works. Engineer's representative: Any natural or legal person, designated by the Engineer as such under the contract, and empowered to represent the Engineer in the performance of his functions, and in exercising such rights and/or powers as have been delegated to him. In this case, references to the Engineer will include his representative. Equipment: Machinery, apparatus, components and any other articles intended for use in the works Evaluation committee: a committee made up of an odd number of voting members (at least three) appointed by the University of Malta and possessing the technical, linguistic and administrative capacities necessary to give an informed opinion on tenders. Final acceptance certificate: Certificate(s) issued by the Engineer to the Contractor at the end of the defects notification period stating that the Contractor has completed his obligations to construct, complete, and maintain the works concerned. Page 29 Final Beneficiary: The Department/Entity or other government body on whose behalf the Department of Contracts has issued this tender. Foreign currency: Any currency permissible under the applicable provisions and regulations other than the Euro, which has been indicated in the tender. General conditions: The general contractual provisions setting out the administrative, financial, legal and technical clauses governing the execution of contracts. General damages: The sum not stated beforehand in the contract, which is awarded by a court or an arbitration tribunal, or agreed between the parties, as compensation payable to an injured party for a breach of the contract by the other party. In writing: This includes any hand-written, typed or printed communication, including fax transmissions and electronic mail (e-mail). Liquidated damages: The sum stated in the contract as compensation payable by the Contractor to the Contracting Authority for failure to complete the contract or part thereof within the periods under the contract, or as payable by either party to the other for any specific breach identified in the contract. Modification: An instruction given by the Engineer which modifies the works. National currency: The currency of the country of the Contracting Authority. Period: A period begins the day after the act or event chosen as its starting point. Where the last day of a period is not a working day, the period expires at the end of the next working day. Plant: appliances and other machinery, and, where applicable under the law and/or practice of the state of the Contracting Authority, the temporary structures on the site required to carry out the works but excluding equipment or other items required to form part of the permanent works. Provisional sum: A sum included in the contract and so designated for the execution of works or the supply of goods, materials, plant or services, or for contingencies, which sum may be used in whole or in part, or not at all, as instructed by the Engineer. Site: The places provided by the Contracting Authority where the works are to be carried out and other places stated in the contract as forming part of the site. Special conditions: The special conditions laid down by the Contracting Authority as an integral part of the tender document, amplifying and supplementing the general conditions, clauses specific to the contract and the terms of reference (for a service contract) or technical specifications (for a supply or works contract). Supervisor/Engineer: The legal or natural person responsible for administering the contract on behalf of the Contracting Authority. Tender document/s: The dossier compiled by the Contracting Authority and containing all the documents needed to prepare and submit a tender. Tender price: The sum stated by the tenderer in his tender for carrying out the contract. Works: Works of a permanent or temporary nature executed under the contract. Written communications: Certificates, notices, orders and instructions issued in writing under the contract. Page 30 VOLUME 1 SECTION 6 – EXTRACTS FROM THE PUBLIC PROCUREMENT REGULATIONS Section 21 - Right of Recourse (1) Where the estimated value of the public contract exceeds twelve thousand euro (€12,000) and is issued by an authority listed in Schedule 1, any tenderer or candidate concerned shall have a right to make a complaint to the Review Board in accordance with this regulation. (2) (a) The contracting authority shall be obliged to issue a notice and affix an advertisement, in a prominent place at its premises, indicating the awarded public contract, the financial aspect of the award and the name of the successful tenderer. The contracting authority shall, by electronic means or by fax, inform the tenderer or candidate concerned of the publication of the award. The contracting authority shall be precluded from concluding the contract during the period allowed for the submission of appeals. (b) The award process shall be completely suspended if an appeal is eventually submitted. (3) Any tenderer or candidate concerned who is aggrieved by the award indicated by the contract authority may, within five working days from the publication of the notice, file a letter of objection, together with a deposit, with the contracting authority, clearly setting forth any reason for his complaint. The deposit to be paid in respect of tenders valued at less than forty-seven thousand euro (€47,000) shall be four hundred euro (€400), while those between forty-seven thousand euro (€47,000) and one hundred and twenty thousand euro (€120,000) shall be 0.5% of the estimated value of the tender, with a minimum deposit of four hundred euro (€400). The letter by the complaining tenderer shall be affixed on the notice board of the contracting authority and shall be brought to the attention of the recommended tenderer. (4) After the expiry of the period allowed for the submission of a complaint, the contracting authority shall deliver the letter of complaint, the deposit receipt and all documents relating to the public contract in question to the Review Board who shall examine the matter in a fair and equitable manner. In its deliberation the Review Board shall have the authority to obtain, in any manner it deems appropriate, any other information not already provided by the contracting authority. The Review Board shall determine the complaint by upholding or rejecting it. The written decision of the Review Board shall be affixed on the notice board of the contracting authority and copies thereof shall be forwarded to the Director of Contracts and all the parties involved. (5) The tenderer or candidate concerned who is not satisfied with the decision granted by the Review Board may refer the matter to the Court of Appeal (Inferior Jurisdiction) in terms of article 41(6) of the Code of Organization and Civil Procedure within a period of sixty days. Such recourse however may not delay the Head of the contracting authority from implementing the Review Board’s decision. (6) Tender documents issued in terms of this Part shall include a clause informing tenderers that the award of the contract is subject to the right of recourse as provided for in this regulation, a copy of which should be reproduced in the documents. (7) The Minister shall have the authority by order to extend the provisions of this regulation in order that recourse as provided in this regulation be made available also by authorities listed in Schedule 3 and to prescribe the procedure by which such recourse is to be granted. Page 31 VOLUME 2 VOLUME 2 SECTION 1 – DRAFT LETTER OF ACCEPTANCE Our Ref: EB/eb/_______ [……………………………………..] [……………………………………..] [……………………………………..] [……………………………………..] Attn [……………………………………..] [……………………………………..] Dear Sirs, UM 1729 - TENDER FOR FRAMELESS GLASS DOORS AND STAINLESS STEEL AND GLASS HANDRAIL/GRABRAIL, AT THE VALLETTA CAMPUS -UNIVERSITY OF MALTA. This is to inform you that your Tender, dated the [……………………………………..], for the above mentioned goods in caption, made under the abovementioned Call for Tenders, has been accepted by the University of Malta in full compliance with the General Conditions of Contract that were attached to the Tender Documents. As undertaken by your good selves in the tender you are to supply, deliver and install, the detailed furniture as per tender specifications within [……………………………………..] weeks, for a sum of [……………………………………..] and provisional day works valued at [……………………………………..], both inclusive of VAT and all as detailed and further amplified in your tendered offer no: [……………………………………..] dated the [……………………………………..]. As undertaken by you in your tender and as stated in the General Conditions of Contract, you are to ensure full compliance with the scope to affect delivery as detailed in the specifications. In this connection, your attention is hereby being drawn to the relative Clauses of the General Conditions of Contract dealing with your liabilities for failure to comply with the specifications referred to above. Your attention is hereby drawn to Clause 35 of the Instruction to Tenderers, wherein you are required to furnish the University of Malta, within 7 (seven) calendar days from the receipt/signatures of this Letter of Acceptance, with a Bank Guarantee drawn on a local Maltese Bank for the amount of 10 (ten) % of the value of this Contract and with a validity to expire on the __________ 20__. Said Guarantee has to be referenced with the relevant Tender Number. Failure to produce the said guarantee within the prescribed 7 (seven) days period may lead to the Contract being considered as having been abandoned, in which case, you will become liable to the relevant penalties stipulated in the General conditions of Contract. Yours faithfully, Director of Procurement I agree and confirm ------------------------Name of Tenderer & Signature Page 32 VOLUME 2 SECTION 2 – GENERAL CONDITIONS The full set of General Conditions for Works Contracts (Version 1.02 dated 1 December 2011) can be viewed/downloaded from: www.contracts.gov.mt/conditions It is hereby construed that the tenderers have availed themselves of these general conditions, and have read and accepted in full and without reservation the conditions outlined therein, and are therefore waiving any standard terms and conditions which they may have. These general conditions will form an integral part of the contract that will be signed with the successful tenderer/s. Page 33 VOLUME 2 SECTION 3 – SPECIAL CONDITIONS These conditions amplify and supplement, if necessary, the General Conditions governing the contract. Unless the Special Conditions provide otherwise, those General Conditions remain fully applicable. The numbering of the Articles of the Special Conditions is not consecutive but follows the numbering of the Articles of the General Conditions. Other Special Conditions should be indicated afterwards. 38.1.1 Article 2: Law and language of the contract 2.1 The Laws of Malta shall apply in all matters not covered by the provisions of the contract. 2.2 The language used shall be English. 38.1.2 Article 3: Order of precedence of contract documents The contract is made up of the following documents, in order of precedence: (a) the Contract, (b) the Special Conditions, (c) the General Conditions, (d) the Contracting Authority’s technical specifications and design documentation, (e) the Contractor’s technical offer, and the design documentation (drawings), (f) the bill of quantities (after arithmetical corrections)/breakdown, (g) the tender form, (h) any other documents forming part of the contract. Addenda have the order of precedence of the document they are modifying. 38.1.3 Article 4: Communications Director of Procurement Administration Building Tal-Qroqq Msida Malta Telephone: +356 2340 2473 Fax: +356 21314307 Email: tenders.procurement@um.edu.mt 38.1.4 Article 5: Supervisor and Supervisor's representative i) The Supervisor (and/or Architect in Charge) and Supervisor's representative (and/or Project Manager as delegated), shall have the power, during the course of the work, to order the contractor to remove from the site any materials which are considered to be of an inferior quality. He shall also have the power to order the removal and a proper re-execution of any work executed with the rejected materials in a manner contrary to the spirit of the specifications. Such orders shall be carried out by the contractor at his own expense. ii) In case of default on the part of the contractor to carry out such orders, the Supervisor (and/or Architect in Charge) and Supervisor's representative (and/or Project Page 34 Manager as delegated), shall have the power to employ and pay other persons to carry out same at the contractor’s expense; such expenses will be deducted from any monies that may be due to the contractor. iii) The contractor shall, if ordered in writing by the Supervisor (and/or Architect in Charge) and Supervisor's representative (and/or Project Manager as delegated), suspend the works or any part thereof for such periods and at such times as so ordered and shall not, after receiving order, proceed with the work there in order to be suspended until he receives written authority from the Project Manager, to proceed therewith. The contractor shall not be entitled to claim compensation for any loss or damage sustained as aforesaid. iv) Should it appear to the Supervisor (and/or Architect in Charge) and Supervisor's representative (and/or Project Manager as delegated), or any duly authorised member of his staff that any work in progress is being executed in a faulty manner, with unsuitable materials, by unskilled workmen/or by any means or manner not in accordance with the contract documents, then he or they may order immediate suspension of such faulty works by direct order to the contractor’s supervisory staff, foreman or ganger, until such time as the contractor shall adopt remedial measures to the satisfaction of the Supervisor (and/or Architect in Charge) and Supervisor's representative (and/or Project Manager as delegated). Such order shall be complied with immediately the contractor shall not be entitled to any extra payment, compensation or extension of time for the completion on account of such suspension as per (iii) of this Clause. 38.1.5 Article 8: Supply of Documents All drawings and a copy of the specifications shall be furnished to the contractor for his own use. The architects shall furnish to the contractor, at his request, any instructions which, in the opinion of the architect are necessary for the execution of any part of the work, such request to be made only within a reasonable time for it is necessary to execute such a work in order to fulfil the contract. 38.1.6 Article 10: Assistance with Local Regulations The contractor shall comply with and fulfil all obligations imposed by Act 19 of the Police Laws and shall give all notices, obtain all permits, pay all fees that may be lawfully demanded by Public Offices in respect of works and complies with all requirements of the law and lawful authority. The contractor shall be responsible for the satisfactory working of the complete installation to the entire satisfaction of the Engineer as regards workmanship, materials, execution and maintenance within the guarantee periods specified and shall be responsible for compliance with all Statutory and Local Regulations and for compliance with all the tests required by the Engineer and all tests required by Enemalta Corporation. 38.1.7 Article 11: The Contractor’s Obligations The provisions of Legal Notice 281 of 2004 and all relevant regulations and subsequent guidelines pursuant to the Code of Practice for the Construction Industry 2006, shall be adopted throughout the construction phase of the Project. Page 35 Without prejudice to the Contents of Articles Conditions:- 11.1 to 11.10 of the General The Contractor will be responsible for the safety of the works and site (including the materials and plant) until they are taken possession of by the University and shall stand the risk and be responsible for and must with all possible speed make good and any damage caused to the Works and Site (be it by accident, weather, storm or any other causes) must be made good by the contractor at his own expense. The Contractor must cover up and protect from damage from any cause, all new work. He must supply protection from the whole of the works executed and any damage caused must be made good by the contractor at his own expense The work shall be carried out in accordance with the directions and to the satisfaction of the architects, specifications and Schedule of Quantities and such further drawings and directions as may from time to time be given by the architects or supplied by the contractor as part of this contract. If the work shown on any such direction be in the opinion of the contractor, extra to that comprised in the specifications he shall, before proceeding with such work, give notice to this effect to the architects, but if no notice is given to the architects before the execution of the work, the contractor shall have no claim to any extra payment in respect thereof. The tenderers fully understand and agree that if, in the case of a successful bid and in the course of the duration of the contract, the eventual successful tenderer is charged before a court of criminal jurisdiction with an alleged breach of any of the provisions of the Employment and Industrial Relations Act, the Occupational Health and Safety Authority Act, the Employment and Training Services Act or any of the provisions of their subsidiary legislation , (hereinafter referred to as “labour laws”), a) the contract may, at the sole discretion of the contracting authority be suspended or terminated. No action for damages shall lie against the entity issuing the tender with respect to any such suspension; b) where the contract has been suspended in accordance with (i) above, if the judicial decision becomes res judicata and the successful tenderer is found guilty of the charges brought against the person, i. the contract shall be terminated with effect from the date of suspension of the contract, or from the date of the judicial decision, as appropriate, and no action for damages shall lie against the contracting authority with respect to such termination; c) the person in whose favour the contract is awarded shall under all circumstances be responsible to ensure that all his subcontractors and other persons engaged to do work or to render services in terms of the awarded contract are aware of the penalties provided in this clause, which penalties are also applicable to them. Control of Site Work The Contractor shall ensure that all works are carried out in an orderly and professional manner that causes the least disturbance to the surroundings and in particular that create the least possible obstruction to third parties and their activities in all their possible aspects. Entry to the site through the School may be restricted to two hours per day. No noise/vibrations which will effect the adjacent School may be carried out during School hours. The Final Beneficiary reserves the right to change the Contractor’s access point to the site at any time. The Contractor shall be responsible to coordinate his works with other Contractors carrying out other works. At no time shall Page 36 he impede in any way the works of other contractors on site. The Site is to be kept clean and well organised to the satisfaction of the Supervisor/Engineer, who may order any action or steps to be taken, that may have not been included statutory permits granted for the Project in order to ensure abidance with the provisions of this Clause. No extra payments or extensions of completion period shall be considered if these are claimed to arise out of such instructions by the Supervisor / Engineer. In the event that such actions or steps as ordered by the Supervisor / Engineer are not carried out within the specified time required, the Final Beneficiary, without further notice, appoint others to carry out such instructions at the Contractor’s expense. Special Controls (a) Dust Control The Contractor shall, for the duration of the Contract, maintain all roads, plant sites, waste disposal areas and all other work resulting from installation works. Dust shall be controlled by the sprinkling of water. (b) Noise Control The Contractor shall acquaint himself with the recommendations set out in BS5228 or its Local / European equivalent - Noise Control on Installation and Open Sites together with any mandatory specific requirements as may be stipulated by the Supervisor / Engineer. (c) Housekeeping The Contractor shall keep the site orderly, clean and in a safe condition at all times, immediately removing all waste and rubbish. The Contractor shall provide on-site containers for the collection of rubbish or dispose of rubbish off site at frequent and regular intervals during the progress of the works. During the progress of the Works, the Contractor shall keep the Site free from all unnecessary installation material / equipment and shall store or dispose of any equipment, scaffolding and surplus materials and clear away and remove without delay any items no longer required. (d) Clearance of Site on Completion Prior to the date of Substantial Completion, the Contractor shall clear away and remove from Site all equipment, surplus materials, rubbish and temporary works of every kind, and leave the whole of the Site and the works clean and in a condition to the satisfaction of the Supervisor / Engineer. (e) Storage of Materials and Equipment No equipment, materials, vehicles, temporary works or installation equipment of the Contractor shall at any time be placed or stored other than the Site. (f) Access to Site The Contractor shall obtain the approval of the Supervisor / Engineer for the location of entry and exit points for vehicles and equipment to and from the Site. Page 37 (g) Fencing The Contractor shall erect suitable fencing around site of works to provide protection of the works and to ensure that no unauthorised personnel have access to site. (h) Water and Electricity Supply The whole of the water required for the work must be provided by the Contractor and must be clean fresh water. The Contractor must execute any temporary plumbing required at his own expense and pay all fees and charges. All temporary electricity supply required is likewise to be provided by the Contractor at his expense. (i) Sheds and workshops The Contractor shall provide all necessary sheds and sanitary facilities for the use of workmen, and the storage of materials and maintain and keep them in order to the satisfaction of the Supervisor / Engineer and remove them at completion. (j) Other Controls Without prejudice to the above, the successful bidder shall also abide with all the relevant environmental legal and other regulatory local requirements that may be applicable for the scope of these works and / or any other instructions that may be ordered by the University of Malta. 38.1.8 Article 13: Performance Guarantee 13.1 The value of the Performance Guarantee is 10% of the Contract value. 13.3 The performance guarantee shall be in the format given in Volume 2 Section 4 and shall be provided in the form of a bank guarantee. It shall be issued by a bank in accordance with the eligibility criteria applicable for the award of the contract. The guarantee will only be released in accordance with the Conditions of Contract. 38.1.9 Article 14: Insurance a) All risks insurance: The contractor is to insure in the joint names of the Contracting Authority, the works against loss and damage by fire, storm tempest, lightning, floods, earthquake, aircraft or anything dropped there from aerial objects, riot and civil commotion for the full value thereof plus 15% of all the works executed and all unfixed materials intended for, delivered to or placed on or adjacent to the works and shall keep such works, materials so insured until the completion of the works. b) Third party insurance: Without in any way limiting his responsibility under paragraph (a) above, the contractor shall effect a policy of insurance against the risks mentioned therein to cover an amount of not less than €1,200,000 (one million two hundred thousand Euro) for any one occurrence with the number of occurrences Page 38 unlimited. The policy shall be in the joint names of the Contracting Authority and the contractor and shall include cross liabilities clauses 38.1.10 Article 15: Performance Programme (Timetable) Seven calendar days before intended commencement of any works the Contractor shall furnish a, programme of works, as the architect and project manager shall require. Before proceeding with the execution of the work, the contractor shall obtain the architects’ and project manager's approval of the manner in which he proposes to carry out each portion of the work. 38.1.11 Article 17: Contractor’s Drawings Seven calendar days before intended commencement of any works the Contractor shall furnish such working drawings or information, as the architect and project manager shall require. 38.1.12 Article 18: Tender Prices 18.1 The tendered rates shall be inclusive of all work as specified, as well as any other works that are of a contingent or indispensable nature for completing the work in its entirety. The rates shall be inclusive of all materials necessary, profits and payments of Customs Duty and Landing charges on all imported goods, VAT, taxes, ECO contribution, all hire of plant and machinery required as also all transport of materials to the site of works and so on. Tenderers are to give rates as quoted for. No claims arising from lack of ascertaining the site condition shall be entertained. 18.2 The tendered rates shall be fixed rates and no allowance will be made for fluctuations in rates and prices or for any increase or decrease in the cost of labour and/or materials and other costs mentioned under Clause 18.1 Article 22: Interference With Traffic 38.1.13 As per General conditions 38.1.14 Article 25: Demolished Materials 25.1 As per General conditions 25.4 As per General conditions 38.1.15 Article 26: Discoveries 26.2 As per General conditions 26.3 As per General conditions 38.1.16 28.1 Article 28: Soil Studies As per General conditions Page 39 38.1.17 30.1 38.1.18 Article 30: Patents and Licences As per General conditions Article 31: Commencement Date 31.1 Following the signature of Contract, the Contractor will be notified in writing at least 15 calendar days in advance to commence works on site. 31.2 As soon as possession of the site is given to the Contractor, he shall proceed with the works and complete same as soon as possible. The work shall interface with the Mechanical, Electrical and Servicing works and shall be carried in parallel with the aforesaid works whenever possible. It is essential that the whole of this work be completed at the earliest possible, but not later than 4 weeks from the order to start works.) Should there be no queries from the Contractor, the necessary work shall proceed and be completed as soon as possible, respecting the deadlines specified in Article 15 above. 38.1.19 32.1 38.1.20 34.1 38.1.21 Article 32: Period of Performance It is to be made absolutely clear that all works envisaged in this contract are to be carried out in FOUR (4) weeks, from the order to start work which will be issued on final signature of contract. Finishing and mechanical/electrical/low voltage services will be carried out concurrently and the period of performance will take into account works that require to be carried out in succession. Tenderers are to submit the programme of works over a FOUR (4) week period and are warned that their offers may not be accepted if this clause is not acceded to. Article 34: Delays in Execution If the Contractor fails to start the works assigned to him on the specified starting date, a penalty of one thousand two hundred Euros (€1200) per day including Sundays and public holidays shall be imposed until the works have commenced. Subsequently the Contractor shall be subject to a penalty for delay of one thousand two hundred Euros (€ 1200) per day inclusive of Sundays and Public Holidays for any delays over the 4 week period, up to a limit of 20% of the awarded contract. As soon as this figure is reached the Contracting Authority reserves the right to invoke Clause 34.2 (c) of the General Conditions. Article 35: Variations and Modifications 35.7 As per General conditions 35.8 As per General conditions 35.9 Final measurements of all the works carried out shall be prepared within four (4) weeks after the works are completed and paid according to the applicable rates detailed in the Bill of Quantities. 38.1.22 Article 37: Work Register Page 40 37.1 38.1.23 38.1 38.1.24 39.2 38.1.25 40.2 38.1.26 42.2 38.1.27 43.1 As per General conditions Article 38: Origin As per General conditions Article 39: Quality of Works and Materials a) All materials required for the completion of the works specified shall be provided by the contractor. b) The work is to be carried out in the best customary practice and the architect in charge is to be satisfied that the quality of the materials conforms to that specified herein. c) The contractor shall provide without extra charge all labour and equipment required by the architect in charge of testing, measuring or proving the efficiency of any of the materials used or of any portion or portions of the completed works. d) The Contractor shall guarantee the works that he has carried out, for a Minimum period of twelve months after completion, against defective materials and all workmanship Article 40: Inspection and Testing Tests on any materials, causes, etc. may be taken at any time during the course of the works and the contractor shall be bound to provide the architect with all such assistance, instruments, machines, labour and materials as are normally required for examining, measuring and testing any work, and the quality, weight or quantity of any materials used and shall supply samples of materials before incorporation in the works, for testing as may be required by the architects, the Project Manager or Supervisor. Article 42: Ownership of Plants and Materials Article 42 of the General Conditions shall be understood to refer to all equipment, temporary structures, plant and materials brought on site by the Contractor. Article 43: Payments: General Principles (a) Payments shall be made in Euro, up to 95% of the certified works carried out, with 5% being kept as retention money. (b) Payments shall be made by the University of Malta. 43.3 The payment terms referred to under the relative Clause of the General Conditions particular to this tender state that payment shall be effective within a reasonable period time. This should be taken to mean that payment is to be effected within 90days from the date of receipt of the invoice or request for goods delivered, services rendered of work carried out to the satisfaction of the Head of Department or his representative, failing which the provisions of the Late Payments Directive will come into effect (30 days as per General Conditions). Page 41 43.4 38.1.28 44.1 38.1.29 45.2 38.1.30 Whenever the 30-day period is mentioned in this article, it is deemed to be 60 days. Article 44: Pre-financing Not Applicable to this tender Article 45: Retention Monies The balance of 5% of the contract sum retained as per Article 43.1 above, will be retained for the duration of the defects liability period as stipulated in Article 39 (d) above and will only be refunded if defective work, if any, had been made good to the satisfaction of the architects, the Project Manager and/or the Supervisor of the Contracting Authority. Article 46: Price Revision 46.1 No price revisions are allowed 46.3 Prices contained in the Contractor's tender shall be deemed: a) to have been determined on the basis of the conditions in force 30 days prior to the latest date fixed for submission of tenders or, in the case of direct agreement contracts, on the date of the contract; b) to have taken account of the legislation and the relevant tax arrangements applicable at the reference date fixed in Article 46.3(a). 46.4 In the event of changes to, or introduction of, any national or state statute, ordinance, decree or other law, or any regulation or bye-law of any local or other public authority, after the date stated in Article 46.3 which causes a change in the contractual relationship between the parties to the contract, the Contracting Authority and the Contractor shall consult on how best to proceed further under the contract, and may as a result of such consultation decide, with the prior approval of the Central Government Authority: a) to modify the contract; or b) to provide for compensation for any imbalance caused by one Party to the other; or c) to terminate the contract by mutual agreement. 46.5 38.1.31 47.2 38.1.32 48.1 In the event of a delay in the execution of the works for which the Contractor is responsible, or at the end of the period of performance revised as necessary in accordance with the contract, there shall be no further revision of prices within the 30 days before provisional acceptance, except for the application of a new price index, if this is to the benefit of the Contracting Authority. Article 47: Measurement Final measurements of all the works carried out shall be prepared within a reasonable period after the works are completed and paid according to the applicable rates detailed in the Bill of Quantities Article 48: Interim Payments In line with article 48. 1 of the General Conditions, an interim certificate of payment may be issued at intervals of not less than one month and not more than three months intervals against invoices from the Contractor. Page 42 38.1.33 Article 50: Delayed Payments 50.1 The period quoted in Article 50.1 of the General Conditions may be subject to change according to the particular needs of the Department 50.2 Once the deadline laid down in Article 50.1 has expired, the Contractor may, within two months of late payment, claim late-payment interest: [Malta Funds] A contractor would become entitled to the payment of interest at 2% over the rate of interest established by the European Central Bank for that particular period. By way of exception, when the interest calculated in accordance with this provision is lower than or equal to €200, it shall be paid to the Contractor only upon a demand submitted within two months of receiving late payment. 38.1.34 Article 53: End Date Malta Funds Article 53 of the General Conditions is not applicable. 38.1.35 56.3 38.1.36 Article 56: Partial Acceptance Not Applicable. Article 57: Provisional Acceptance As per General Conditions 38.1.37 58.6 38.1.38 Article 58: Maintenance Obligations The Contractor shall replace at his expense any work, which is proven to be defective even after completion, up to a maximum of two (2) years. Article 66: Dispute Settlement by Litigation Any dispute between the Parties that may arise during the performance of this contract and that has not been possible to settle otherwise between the Parties shall be submitted to the arbitration of the Malta Arbitration Centre in accordance with the Arbitration Act (Chapter 387) of the Laws of Malta. This law is based on “Model Law” which is the Model Law on International Commercial Arbitration adopted on June 21, 1985 by the United Nations Commission on International Trade Law reproduced in the First Schedule of the Arbitration Act. Page 43 VOLUME 2 SECTION 4 – SPECIMEN PERFORMANCE GUARANTEE (LETTERHEAD OF THE REGISTERED FINANCIAL INSTITUTION PROVIDING THE GUARANTEE) Director of Procurement Procurement Directorate Administration Building Msida MSD2080 Malta [Date] Dear Sir, Our Guarantee Number .......................... for €...................... Account: [Account Holder’s Name] In connection with the contract entered into between yourself on behalf of the Director of Contracts and [Name and Address of Contractor] hereinafter referred to as “the Contractor” as per the latter’s tender and your acceptance under [UM File Reference], whereby the contractor undertook the [title of contract] in accordance with Article 13 of the Special Conditions the [works/services/supplies] as mentioned, enumerated or referred to in the Specification and/or Bills of Quantities forming part of the contract documents, we hereby guarantee to pay you on demand a maximum sum of €[amount in works and numbers] in case the obligations of the above-mentioned contract are not duly performed by the Contractor. This guarantee will become payable on your first demand and it shall not be incumbent upon us to verify whether such demand is justified. For avoidance of doubt it is hereby declared that although this instrument gives rise to legal relations between the guarantor and the beneficiary, it is hereby specifically declared for all intents and purposes of law that this guarantee does not exempt the abovementioned Contractor from any obligations, acts of performance or undertaking assumed under the tender documents as ratified in the contract. Any payments due to the contractor in respect of the obligations entered into under the contract above referred to shall be made through this Bank. This guarantee expires on the [expiry date] and unless it is extended by us or returned to us for cancellation before that date any demand made by you for payment must be received in writing not later than the aforementioned expiry date. This document should be returned to us on utilization or expiry or in the event of the guarantee being no longer required. After the expiry date and in the absence of a written demand being received by us before such expiry date, this guarantee shall be null and void, whether returned to us or not, and our liability hereunder shall terminate. This guarantee is personal to you, and is not transferable or assignable. Yours Faithfully, ............................................. [Signatory on behalf of Guarantor] Page 44 VOLUME 3 – TECHNICAL SPECIFICATIONS Note: Where in this tender document a standard is quoted, it is to be understood that the Contracting Authority will accept equivalent standards. However, it will be the responsibility of the respective bidders to prove that the standards they quoted are equivalent to the standards requested by the Contracting Authority. 3.1 SPECIFICATIONS FOR FULL GLASS DOORS 3.1.1 (WHERE I. 3.1.2 I. 3.1.3 I. 3.1.4 I. 3.1.5 COMPLIANCE – SAMPLE SIZE AND FREQUENCY OF SAMPLING APPLICABLE) Where applicable, compliance shall be demonstrated through testing and/or certification of products and/or processes as outlined in the ensuing clauses. ON SITE MEASUREMENT For items to be installed within a structure the Contractor shall ascertain the actual dimensions of the part of the structure accommodating the respective item by means of site measurement prior to the manufacture of such item. SAMPLES The Contractor may be required to submit a pre-production assembled sample of the unit/s inclusive of glazing, hinges, locks and any other fixings and fixtures to the Project Manager for approval. TECHNICAL LITERATURE The Contractor may be requested to submit further detailed technical information in addition to that presented with the tender regarding the type of assembly, test performance characteristics, the proposed finish and any other information which may be required to clarify construction details. DESIGN AND DRAWINGS I. The Contractor shall provide shop drawings in A1 hardcopy format (and in electronic format) and detailed schedules for all units when so requested by the Project Manager. II. Prior to the start of the works the Contractor shall submit for the approval of the Project Manager all construction and dimensional details, template designs of mouldings / panelling and details of all fittings. Page 45 3.1.6 I. 3.1.7 TRANSPORT AND INSTALLATION The Contractor is responsible for the safe transport and installation of the units ensuring that all are in good working order and that the locking devices and holding pegs are all in place. WORKMANSHIP I. The frame and hanging arrangement shall be such as to support the weight of the structure without any jamming, excessive sagging, twisting or distortion. II. The Contractor shall comply with any special security provisions and incorporate any such requirements if so instructed by the Project Manager. III. The design shall incorporate air and/or dust seals. 3.1.8 CONSTRUCTION - GENERAL I. The Glass doors shall consist of double leaf doors and Single leaf doors, as specified in the BOQ. II. The Glass shall be 8mm toughened glass throughout the whole construction (sample to be provided). III. Glass doors shall be fixed on stainless steel hinges (sample to be provided). IV. The overall construction may have Brushed stainless steel mullions according to needs and as agreed with Project Manager. V. The Glass doors shall have concealed transom closer (sample to be provided). VI. The Glass doors shall be complete with pull handles and Central patch lock with euro profile cylinder (samples to be provided). 3.1.9 INSTALLATION I. During installation units and frames shall not be twisted nor forced to fit them into openings. II. The selection of the sealant shall be based on its adhesion compatibility with the specified used material and adjacent wall materials. III. All units shall be checked for correct alignment and operation before permanent anchoring. IV. Anchoring shall have countersink anchor heads. All anchors shall be concealed by closed door or, in the case of fixed units, with plugs. 3.1.10DOORS, GATES AND SHUTTERS – GENERAL Page 46 I. Doors, windows, gates and shutters shall comply with EU directive 89/106/EEC as implemented by decision 95/204/EC of 1995. 3.1.11HARDWARE AND IRONMONGERY – GENERAL II. All hardware shall be fixed in accordance with the manufacturer’s instructions. III. Hardware shall be protected prior to and after fixing until completion of the works and damages shall be replaced at the Contractors own expense. IV. Anchor bolts shall be galvanized or stainless steel. V. Doors shall be complete with brushed heavy-duty stainless steel lever handles, top and bottom brushed heavy-duty stainless steel bolt sets for any half leaves and heavy duty brushed stainless steel hinges. VI. Doors shall be complete with three sets of keys. Bolt throw shall be at least 20mm with a single turn of the key. 3.12 HARDWARE – SWING DOORS I. Electrically powered hold-open devices for swing doors shall comply with EN 1155 . 3.1.13 HARDWARE – EMERGENCY EXITS I. Emergency exit devices operated by lever handle or push pad shall comply with EN 179. II. Panic exit devices operated by horizontal bar shall comply with EN 1125. 3.1.14 HARDWARE AND IRONMONGERY – TECHNICAL CHARACTERISTICS I. Technical characteristics of hardware shall comply with the following: i. Corrosion resistance of Hardware EN 1670 ii. Lever handles and Knob furniture EN 1906 iii. Locks and latches EN 12209 iv. Single Axis hinges EN 1935 II. Methods of test for operating forces shall be as per EN 12046-2. 3.1.15GLAZING I. All glass for glazing shall comply with EU Directive 89/106/EEC as implemented by the relevant decision. II. All glazing shall be installed in compliance with the recommendations in BS 6262, Code of Practice for Glazing for Buildings. III. All glass shall be 10mm Toughened Safety Glass(for doors) to BS 6206 class A, the highest grade available, (sometimes called tempered Page 47 glass, tempered safety glass, toughened glass, strengthened glass) and 10mm Hermetically Sealed Laminated safety glass (for Fixed Panels)complying with BS EN ISO 12543-1, 2, 5 and 6. IV. Any pane of glass which is positioned within an area defined as within a critical impact zone or prone to human impact by BS 6206 shall comply with Class 2(B)2 of EN 12600. V. Doors and side panels must be Class 2(B)2 of EN 12600 if the width is greater than 900mm. VI. The impact test method shall comply with EN 12600. VII. All glass shall be free from scratches, bubbles, cracks, ripples, dimples and other defects. VIII. No wired glass shall be used. IX. Where fire resistance of the glass is to be specified it shall be in accordance with the classification in BS EN 357. X. All external glazing shall be designed to resist a pressure of 600Pa in both air (wind) permeability and water- tightness testing. Testing shall be performed in accordance with BS 6375 - Performance of Windows, under all conditions and with full allowance made for deflections and other movements. XI. All glazing shall be accurately sized, with clean undamaged edges. Where applicable, Glazing units shall be set on all four sides of the aluminium framed and sealed with neoprene or equivalent weather gaskets in such a way as not to be disturbed should gaskets need replacing. Proprietary compressible rubber shall be applied at intervals between the profiles and the glass. XII. that The Contractor shall provide certification documentation to show glazing elements comply with the specifications. XIII. The Contractor shall submit the manufacturer's recommendations for cleaning and for on-going maintenance of the glazing units, and upon completion, shall leave all glazing units clean in accordance with these recommendations, and to the satisfaction of the Project Manager. 3.1.16DOOR MASTER KEY SYSTEM I. Doors shall be equipped with a mechanical master key system. The system shall permit the opening of locks by their own individual key and by the master key. II. The locking system shall be patented by a reputable manufacturer. The cylinder aperture shall offer protection from picks and breaking tools with supplementary anti-drill protection. III. The key combinations shall be in compliance with current European Standards. Page 48 IV. V. The system shall allow for future additions and expansions. The cylinders shall comply with BS EN 1303, Building Hardware, and Cylinders for locks, Requirements and test methods. VI. The classification level shall be as follows: a. Digit1 Grade1 b. Digit2 Grade5 c. Digit3 NA d. Digit4 Grade0 e. Digit5 NA f. Digit6 Grade0 g. Digit7 Grade4 VII. The manufacturer shall maintain a key duplication control system whereby authorization for duplication is mandatory. Three copies of the Master Key shall be supplied as part of the works. VIII. On completion, the Contractor shall provide a detailed “MASTER KEYCHART” showing the floor level, location, door number, cylinder type and key marking. 3.1.17CLOSERS I. Controlled door closing devices shall comply with EN 1154. II. Door co-ordinator devices shall comply with EN 1158. III. Door closers shall be of two types: a. Rack and pinion type EN 2-4 overhead in a cast aluminium body with selectable closing force, adjustable closing speed and latching action (requiring a door stop). b. Type EN 2-6 with adjustable back check action (restraining a load carrying users flung-open door) and delayed action (for disabled or). 3.1.18 NAMEPLATES (WHERE SPECIFIED) I. Doors shall have a provision for the attachment of modular interchangeable nameplates. 3.1.19 CLEANING I. After installation is complete and any surrounding work is substantially complete, the Contractor shall clean all units and lubricate all hinges / pivots and locks. 3.1.20 ON COMPLETION Page 49 I. On completion, the Contractor shall supply all documentation related to the manufacturer's recommendations for cleaning and for ongoing maintenance of the units. II. On completion, all protective materials (eg. Peel-offs) shall be removed. All glazed elements shall be cleaned to the satisfaction of the Project Manager. 3.2 SPECIFICATIONS STAINLESS STEEL 3.2.1 COMPLIANCE – SAMPLE SIZE AND FREQUENCY OF SAMPLING (WHERE APPLICABLE) I. 3.2.2 I. 3.2.3 I. 3.2.4 I. 3.2.5 Where applicable, compliance shall be demonstrated through testing and/or certification of products and/or processes as outlined in the ensuing clauses. ON SITE MEASUREMENT For items to be installed within a structure the Contractor shall ascertain the actual dimensions of the part of the structure accommodating the respective item by means of site measurement prior to the manufacture of such item. SAMPLES The Contractor may be required to submit a pre-production assembled sample of the unit/s inclusive of glazing, hinges, locks and any other fixings and fixtures to the Project Manager for approval. TECHNICAL LITERATURE The Contractor may be requested to submit further detailed technical information in addition to that presented with the tender regarding the type of assembly, test performance characteristics, the proposed finish and any other information which may be required to clarify construction details. DESIGN AND DRAWINGS I. The Contractor shall provide shop drawings in A1 hardcopy format (and in electronic format) and detailed schedules for all units when so requested by the Project Manager. II. Prior to the start of the works the Contractor shall submit for the approval of the Project Manager all construction and dimensional details, template designs of mouldings / panelling and details of all fittings. 3.2.6 TRANSPORT AND INSTALLATION Page 50 I. 3.2.7 The Contractor is responsible for the safe transport and installation of the units ensuring that all are in good working order and that the locking devices and holding pegs are all in place. WORKMANSHIP I. The frame and hanging arrangement shall be such as to support the weight of the structure without any jamming, excessive sagging, twisting or distortion. II. The Contractor shall comply with any special security provisions and incorporate any such requirements if so instructed by the Project Manager. 3.1.8 CONSTRUCTION - GENERAL I. The works consist of the Manufacture Supply and Install of Component type, seamless weld stainless steel handrails, guardrails, and railing systems, including connectors, fasteners, and system required accessories, as specified in the BOQ. II. The Glass shall be 8mm toughened glass throughout the whole construction (sample to be provided). 3.2.9 THERMAL ACTION AND CORROSION CONTROL I. Allow for thermal action resulting from the maximum range change in ambient temperature in the design, fabrication and installation of rail systems, to prevent opening of joints, buckling, and other detrimental effects, including over-stressing of connections and components. II. Prevent galvanic action, and other forms of corrosion by isolating dissimilar metals to prevent them from being in direct contact with each other. 3.2.10 INSTALLATION I. During installation units and frames shall not be twisted nor forced to fit. II. The selection of the sealant (Where applicable) shall be based on its adhesion compatibility with the specified used material and adjacent wall materials. III. All units shall be checked for correct alignment before permanent anchoring. 3.2.11 I. MATERIALS Material quality: Type 316 stainless steel shall be resistant to solutions of sulphuric acid, chlorides, bromides, iodides and fatty acids at high temperature. Page 51 II. Handrails: 316 stainless steel shall be used BS EN 10088-2:2005 (sample to be provided). III. Connection fittings: 316 stainless steel with satin (brushed) stainless steel finish(sample to be provided). IV. In-fill Panel (Glass): glass panels, 8mm toughened glass throughout the whole construction (sample to be provided). V. Bolts, Screws & Nuts BS EN ISO 3506: Stainless steel. All visible surfaces must have a polished surface. Do not use metals that will be corrosive and incompatible with materials being fastened (sample to be provided). 3.2.12 CLEANING AND PROTECTION I. Immediately upon completion of installation, clean all railing system surfaces using silicon free stainless steel cleaner. II. Do not use abrasive agents or harsh chemicals. III. Provide plastic sheet protection for all surfaces of completed installations to prevent damage during remainder of construction activities. Page 52 3.3 SPECIFICATIONS FOR METALWORKS 3.3.1 GENERAL REQUIREMENTS I. The material in all stages of transportation, handling and storage shall be kept clean and free from damage and breaking, bending and distortion. II. Site work shall be restricted to fixings and other operations that cannot be undertaken in the workshop. Burrs, sharp edges and angles, coarse file marks, excess weld metal and similar imperfections from all classes of work shall be removed. Work shall not be allowed to rust or otherwise deteriorate between fabrication and final treatment. Fixing and installation shall provide a means that prevents corrosion due to contact with incompatible metals and other materials. III. Holing shall be done in a manner that does not deform or damage the material. Generally, cuts shall be performed by shearing or sawing, form holes by drilling or punching. Cutting by hand-held flame is not permitted. IV. Continuous welds are to be formed in a way that is suited to the type of work. Welded joints are to be neatly made, filed smooth and left clean and adequate means shall be employed for temporarily fastening the parts to be welded together until the joints are welded. Welds shall be finished to match the surface; on surfaces unseen in the finished work the welds may be left as laid. Spot welds are not permitted unless specified or used to assist assembly. All welds are to be cleaned and flux residues removed. V. Machine bending, pressing, cold rolling, forging or shaping shall be executed without weakening or damaging the metal . Complex bending or blending alloys for special purposes shall be undertaken under competent metallurgical supervision. Joint faces are to be formed to fit accurately in full contact. A suitable joint coating shall be used for bolted or screwed connections (e.g. a primer for fabrications which will be painted). 3.3.2 STEEL I. Mild steel shall comply with BS 4, Part 1, BS 1449: Part 1 and BS EN 10210-1. II. Flat bars shall comply with BS EN 10067. III. Hollow sections shall comply with BS EN 10210. IV. Sections shall comply with BS EN 10024. V. Angles shall comply with BS EN 10056. Page 53 VI. 3.3.3 Stainless steel shall be Austhentic steel. MECHANICAL FASTENINGS I. General purpose bolts and screws shall comply with BS 4190 and with BS 3692 when bolts and nuts with a greater degree of precision are required. Unless otherwise stated, the grade of steel shall be Grade 4.6 with matching grade nuts. II. Expanding bolts shall have a proprietary fixing comprising corrosionresistant expanding insert and removable bolt threaded stud to suit the work being fixed. III. Set screws shall comply with BS 4183, BS EN ISO 1580 and BS EN ISO 7045. IV. Self-tapping screws shall be steel thread forming or thread cutting screws to BS 4174. Screws with shall have rust-proofed finish. V. Coating Materials: In addition to specified surface finishes, treat or seal the permanently hidden parts of metalwork from deterioration and corrosion (excluding standard hollow sections). 3.3.4 I. 3.3.5 I. 3.3.6 CORROSION PROTECTION – CATEGORIES OF RISK The categories of atmospheric corrosivity shall be as indicated in EN ISO 12944, Part 2, namely C1 (Low Risk) to C5 (Very High). CORROSION PROTECTION – SURFACE PREPARATION Rust grades shall be defined as indicated in ISO 8501-1, namely Grades A to D (Generalized Pitting). COATING MATERIALS I. Priming shall be applied to the concealed pads of joints (e.g. spigots, sleeved ends, joint faces) as the joints are made. The primer shall be applied by brush, not sprayed as per manufacturer’s instructions. II. Galvanizing shall be applied by the hot dip process to EN ISO 1461, Hot Dip galvanized coatings on fabricated iron and steel articles. The minimum thickness of galvanizing shall depend on the thickness of the base material as indicated in EN ISO 1461. This notion shall also apply to pieces with threads and moulded pieces. III. Unavoidable damage (e.g. post-fabrication welding) is to be recoated by applying at least two coats of zinc-rich primer to BS 4652. The Contractor shall be responsible for the provision of all holes required for the purposes of filling, venting and draining. IV. The Contractor shall propose the location, size and method of plugging, where required, of all such holes which must be approved by the Architect before fabrication commences. Page 54 V. Zinc phosphate paint to BS 4652 Type 2 shall have a dry film thickness of 75 microns and shall be applied over a holding primer 25 microns thick. VI. Finishing paint shall be alkyd, applied as an undercoat and a surface coat to a thickness of 35 microns. 3.3.7 BLAST CLEANING I. Preparation of steel substrates before application of paints and related products shall comply with BS EN ISO 8501-1 and 2. II. Sherardizing shall consist of a zinc coat to all small articles (e.g. bolts etc). associated with galvanised work (and, other small articles described as sherardized or zinc-coated) in accordance with BS 4921, Class 1/Class 2. III. Finished items shall be wrapped, taped or otherwise protected with non-absorbent coverings. IV. Protective finishes shall generally be applied after fabrications. Subject to approval and if an equivalent standard of finish and protection will be attained, pre-finished metal may be used. V. Two coats of bitumen shall be applied to aluminium in contact with mortar, concrete or other alkaline surfaces. As far as possible the fabricated metalwork shall incorporate joints that will permit the work to be dismantled into sections small enough for transport and site handling or small enough for tank immersion or other treatments that impose size limits. Unless such joints are shown on the drawings, the Contractor shall design them to incorporate the following characteristics: VI. VII. a) b) c) d) e) VIII. 3.3.8 Unobtrusive appearance. Strength not to be less than the un-jointed member. Ease of assembly without damage to the surface treatment. Moisture-proof, if exposed to moisture. Weatherproof, if exposed to the weather. Upon completion (or when directed) all protective tapes, casings or other covers shall be removed and the metalwork cleaned and polished. FRAMES TO APERTURES I. All frames shall be manufactured of rolled steel heavy universal sections throughout and rust proofed by the hot-dip galvanising method incorporating the use of zinc in the protecting metallic coat. II. Doors and frames are to be of rolled steel standard sections. Frames are to be electrically welded at corners. All frames are to be fixed in a perfect vertical position, without any twist. They shall open and close easily without any jamming. III. The thickness of pressed steel galvanised sheets shall not be less than 16 gauge, free of laminations or gross slag inclusions. Page 55 IV. Unless otherwise indicated, doors are to be fitted with a lock in addition to handles and supplied complete with three keys. V. All materials used in door fittings and locks shall be made of steel and of robust construction. Locks fitted to single and two leaf doors are to be suitable for a mastering system. The quality of workmanship, performance, strength and durability of such locks shall be in accordance with BS2088 and BS3621. 3.3.9 I. CORROSION RESISTANCE The corrosion resistance of all hardware shall comply with BS EN 1670. Page 56 3.4 SPECIFICATIONS FOR HANDRAILS / GRAB RAILS 3.4.1 COMPLIANCE – SAMPLE SIZE AND FREQUENCY OF SAMPLING (WHERE APPLICABLE) I. 3.4.2 I. 3.4.3 I. 3.4.4 I. 3.4.5 Where applicable, compliance shall be demonstrated through testing and/or certification of products and/or processes as outlined in the ensuing clauses. ON SITE MEASUREMENT For items to be installed within a structure the Contractor shall ascertain the actual dimensions of the part of the structure accommodating the respective item by means of site measurement prior to the manufacture of such item. SAMPLES The Contractor may be required to submit a pre-production assembled sample of the unit/s inclusive of glazing, hinges, locks and any other fixings and fixtures to the Project Manager for approval. TECHNICAL LITERATURE The Contractor may be requested to submit further detailed technical information in addition to that presented with the tender regarding the type of assembly, test performance characteristics, the proposed finish and any other information which may be required to clarify construction details. DESIGN AND DRAWINGS I. The Contractor shall provide shop drawings in A1 hardcopy format (and in electronic format) and detailed schedules for all units when so requested by the Project Manager. II. Prior to the start of the works the Contractor shall submit for the approval of the Project Manager all construction and dimensional details, template designs of mouldings / panelling and details of all fittings. 3.4.6 I. 3.4.7 TRANSPORT AND INSTALLATION The Contractor is responsible for the safe transport and installation of the units ensuring that all are in good working order and that the locking devices and holding pegs are all in place. WORKMANSHIP Page 57 I. The frame and hanging arrangement shall be such as to support the weight of the structure without any jamming, excessive sagging, twisting or distortion. II. The Contractor shall comply with any special security provisions and incorporate any such requirements if so instructed by the Project Manager. III. The design shall incorporate air and/or dust seals. 3.4.8 CONSTRUCTION - GENERAL I. Handrails/Grabrails should have a round or oval profile with a minimum outside diameter of 35mm and a maximum outside diameter of 50mm. Oval profile handrails should be 50mm wide and 40mm deep, with rounded edges having a radius of at least 15mm. II. The Handrail/Grabrail should provide a good grip. III. To avoid impeding finger grip, consideration needs to be given to the spacing of a Handrail/Grabrail away from any adjacent wall. The clear distance between the edge of the handrail and walls should be between 50mm and 60mm. IV. Ramps shall have Handrails/Grabrails on one side only where its width is less than 1500mm and on both sides of the ramp where its width is greater than1500mm. Provided that ramps that are less than 1000mm in length are not required to have a handrail. V. Ramps where crowding or heavy volumes of traffic can be anticipated, shall additionally have a central handrail where the flight is wider than 3m. VI. Handrails/Grabrails shall extend at least 300mm beyond the top of the ramp and at least 300mm beyond the bottom of the ramp. VII. Handrails/Grabrails shall extend at least 300mm from the first and last nosing, and as much as possible should be horizontal. The extension should not intrude into a circular route. VIII. Handrails/Grabrails should be fixed at a height of 900mm above the Page 58 ground level of ramps and 1000mm above landings. IX. Where the overall width of a flight of steps is greater than 3m, an additional Handrails/Grabrails should be provided to divide the flight into separate channels. X. The vertical height to the top of the Handrails/Grabrails should be between 900mm and 1000mm from the pitch line of a flight and between 900mm and 1100mm from the surface of the landing. XI. Accessible lifts should be provided with a Handrails/Grabrails along one side of the passenger car fitted at a height of 900mm above the car lift floor. XII. The overall design and construction of the Handrails/Grabrails, used in these areas, shall cater for persons with disability and shall comply with NCPD “Access for All Guidelines”, Malta, 2011. Page 59 VOLUME 4 – FINANCIAL BID Note: Where in this tender document a quantity is indicated, it is to be understood that such quantities are estimates and it will be the responsibility of the respective bidders to check such quantities. Page 60 Item No. Description Bill A Preliminaries A1 A2 Qty Unit 1 LS 1 LS 1 LS 1 LS Unit Rate Total Cost (including (including VAT, Eco VAT, Eco Contribution Contribution (if any) and (if any) and all other all other charges as charges as may be may be applicable)in applicable)in € € The road cannot be blocked unless a permit is granted by Local Council or competent Authorities. All materials to be used within this contract are to be approved prior to delivery to site. Prepare a risk assessment report outlining all risks involved and measures to be taken to minimise or eliminate potential risks. The report is to be prepared and signed by a competent person and to be submitted within three weeks from commencement of works. Such document has to be updated as maybe requested by the site H & S Supervisor. Allow for carrying out all surveys, setting out of works, arranging levels including the provision and erection of permanent setting out marks of the quantity and quality as required by the Employer's Representative. Delivery of materials and services to the site, and any incurred ancillary / transportation expenses, is the responsibility of the contractor. All works shall be contained or implied for in the contract documents and including all the necessary resources, unless included elsewhere in the Bills of Quantities. A3 Allow for appointing a Health and Safety Coordinator and for complying with the safety precautions and regulations as laid down in the contract documents and Health and Safety Plan. A4 Allow for the provision of all safety personal clothing and equipment for all the workers involved and the provision of an "on call" medical doctor, provision and maintaining of all lifesaving equipment, personnel, warning signage, markings, etc. As per General Conditions Art.20. Carried Forward: Page 61 Item No. Description Qty Unit Unit Rate Total Cost (including (including VAT, Eco VAT, Eco Contribution Contribution (if any) and (if any) and all other all other charges as charges as may be may be applicable)in applicable)in € € Brought Forward: A5 A6 A7 Allow for continuously keeping the site and building clean and in a workman type condition free from debris, surplus materials and any other type of loose matter arising from works (which include variations to contract), which will disturb the proper conditions of any internal and external areas, roads and/or adjoining structures. Site Cleaning is to take place during the whole duration of works, as instructed by the University of Malta and as per General Conditions Art.25. Allow for the protection at all times the whole of the works including the provision of hoarding, scaffolding, screens, fans, planked footways, guardrails and similar items as required and as deemed necessary at all times by the Safety coordinator and Project Supervisor Construction Stage (PSCS Health & Safety). All safeguards must be taken not to damage any other on-going works in the premises and immediate vicinity, and adequate protection must be allowed for in this regard. All damages must be made good by the responsible contractor. The liability period will remain until the satisfactory commissioning and handing over procedures are completed. As per General Conditions Art.14, 21, 58 and 59. Allow for the sweeping and cleaning / washing of all access roads pertaining to the site of works at times deemed appropriate to keep the roads in a clean and dust free environment at all times 1 LS 1 LS 1 LS Carried Forward: Page 62 Item No. Description Qty Unit Unit Rate (including VAT, Eco Contribution (if any) and all other charges as may be applicable)in € Brought Forward: A8 A9 Bill A Provision, maintenance and removal of all necessary temporary services, including fresh water, compressed air, electrical supplies, telephone, etc. Allow for the careful disposal of hazardous waste, debris and spent oils, and other harmful materials as to the requirement specified in the conditions 1 LS 1 LS Total carried forward to Summary on Page 69 Page 63 Total Cost (including VAT, Eco Contribution (if any) and all other charges as may be applicable)in € Item No. Bill B B1 B2 Description Qty Unit 5 No 5 No Unit Rate (including VAT, Eco Contributio n (if any) and all other charges as may be applicable) in € Glazing Works Ref. Drwg: 1, 2 ,3, 3B & 3C Sketchers: 1 & 2 The contractor is required to take measurements on site. All doors inclusive of locks, handles, spring closure system, etc. The handles of the doors are to be of the Stainless Steel type. Handles, locks and accessories must withstand heavy usage and must be adequate to be used in public areas. All doors, except those directly opening onto a toilet cubicle, will have access control locks which locks will be provided under M&E contract (where applicable). Contractor to install these locks and liaise with M&E contractor. Any queries on the required specifications and submitted rates must be clarified at Tender Stage. The existing opening must be inspected by all tenderers since a stainless steel frame may need to be installed for proper fixing of the glass structure to the existing opening. Price to include floor concealed door closers which may require additional strengthening according to each specific site restriction. 3 copies of each set of keys and 3 copies of the master key, for all apertures, must be submitted. Supply and install FRAMELESS Glass double leaf doors system in 10mm Toughened glass measuring approximately W1.80m x H2.10m. Price inclusive of Fixed side glass panels, fanlight, floor concealed door closer and all hardware, including stainless steel hinges, handles, closers, locks etc.. Drwg: 3B Supply and install FRAMELESS Glass single leaf doors in 10mm Toughened glass measuring approximately W0.90m x H2.10m. Price inclusive of Fixed side glass panels, fanlight, floor concealed door closer and all hardware, including stainless steel hinges, handles, closers, locks etc.. Drwg: 3C Carried Forward: Page 64 Total Cost (including VAT, Eco Contributio n (if any) and all other charges as may be applicable) in € Item No. Description Qty Unit Unit Rate (including VAT, Eco Contributio n (if any) and all other charges as may be applicable) in € Brought Forward: B3 B4 Bill B Supply and install Stainless steel framed Glass Partitions in 10mm Hermetically sealed Laminated glass measuring approximately W3.0m x H2.60m. Price inclusive of all hardware, including stainless steel fasteners, bolts, nuts, caps etc. Prepare a design for door and space signage to include for supply, installation and printed material. 150mm x 100mm stainless steel backplate with a front finished in a transparent film, in between, into which printed signage paper can be inserted. 2 No 12 No. Total carried forward to Summary on Page 69 Page 65 Total Cost (including VAT, Eco Contributio n (if any) and all other charges as may be applicable) in € Item No. Bill C C1 C2 C3 Bill C Description Qty Unit 1 LS 25 LM 5 No. Unit Rate (including VAT, Eco Contributio n (if any) and all other charges as may be applicable) in € Stainless Steel and Glass Handrails/Grabrails Ref. Drwg: 2, 3 & 3A Any queries on the required specifications and submitted rates must be clarified at Tender Stage. Provide fully detailed design drawings and calculations showing dimensions for a Stainless Steel Staircase Handrail/Grabrail with stainless steel grab rail, running from ground floor up to first level and including all accessories, fasteners, bolts, nuts, end caps, etc. as per indicative Sketches 01 & 02. All drawings and calculations signed by warranted Perit shall be in conformity with the Access for All Design Guidelines (KNPD 2011), and be submitted for approval prior to installation. Drawings to include details of anchorage to existing stairs/walls including joints and fixtures and fittings to be used. Supply and install a Stainless Steel and Glass (10mm Hermetically sealed Laminated) Staircase Handrail with Stainless steel grab rail, running from Ground floor up to first level and including all accessories, fasteners, bolts, nuts end caps, etc. as per indicative Drwg: 2 Sketches 01 & 02. Supply and install a Stainless Steel and Glass (10mm Hermetically sealed Laminated) Balcony Handrail with Stainless steel grab rail, including all accessories, fasteners, bolts, nuts end caps, etc. as per indicative Drwg: 3A Sketches 01 & 02. Total carried forward to summary on page 69 Page 66 Total Cost (including VAT, Eco Contributio n (if any) and all other charges as may be applicable) in € Item No. Bill D Description Qty Unit Unit Rate (€) (including VAT, Eco Contribution (if any) and all other charges as may be applicable) Total (€) (including VAT, Eco Contribution (if any) and all other charges as may be applicable) Dayworks (Provisional) Preamble Day works will only be payable when expressly ordered in writing by the Architect n Charge. Labour The rates payable in respect of labour shall be in accordance with the Schedule of Rates detailed at Appendix I. Such rates shall include for supervision and provision of small tools. Material The costs payable in respect of materials shall be chargeable at the net price by the Contractor for the materials delivered to site after deduction of all discounts and before applying the percentage addition of 10% (ten percent) for Contractor's services. Plant The rates payable in respect of plant shall be in accordance with the Schedule of rates detailed at Appendix II. However, a reduction of 20% of the schedule rates shall be made for electrically operated plant when the supply of electrical energy is supplied free of charge by the Employer. When the plant used on daywork is authorised as "standing", the schedule as rate shall be reduced by 33% Page 67 Item No. D1 Description Qty Unit Unit Rate (€) (including VAT, Eco Contribution (if any) and all other charges as may be applicable) Total (€) (including VAT, Eco Contribution (if any) and all other charges as may be applicable) 2,540.00 2,540.00 3,960.00 3,960.00 2,500.00 2,500.00 Labour Provide a sum for the cost of labour. These costs shall be charged at the actual hours worked on site. The rate shall cover all other charges of every description, including bonus, incentives, superintendent, foremen, administrative staff, timekeeper, insurance's pensions, holidays with pay, use of small tools (including sharpening), appliances and plant (not included "in plant" below), establishment charges and profit and VAT Materials Provide a sum of €3,600.00 for the net cost of materials expended on daywork. D2 Add to the above cost a percentage of 10% (to be stated and extended) to cover the cost of delivery, unloading, unpacking, storing, protecting, hoisting, distribution on site and for all establishment charges and profit and VAT. Plant Provide a sum for the cost of plant used on daywork. D3 BILL D The rate shall cover all costs including driver/attendant, fuel, establishment charges and profit in connection with the use of plant on daywork, and VAT. Total carried over to Summary on Page 69 9,000.00 Page 68 SCHEDULE OF RATES 1. FOR LABOUR EMPLOYED ON DAYWORK The Contractor shall insert below the category of labour together with the appropriate “all inclusive” rates which he considers may be required for use on Daywork and that will apply up the expiration of the Defects Liability period. LABOUR CATEGORY WORKING DAY HOURLY RATE (€) WORK BEYOND WORKING DAY HOURLY RATE (€) LABOURER GLAZIERS CARPENTERS AND JOINERS SEMI-SKILLED LABOURERS PLASTERS PAINTERS Page 69 SCHEDULE OF RATES 2. FOR PLANT USED ON DAYWORK The Contractor shall insert below the category of labour together with the appropriate “all inclusive” rates which he considers may be required for use on Daywork and that will apply up to the expiration of the Defects Liability period. LABOUR CATEGORY WORKING DAY HOURLY RATE (€) WORK BEYOND WORKING DAY HOURLY RATE (€) LORRY MOUNTED CRANE COMPRESSORS AND OTHER HAND TOOLS Page 70 UM 1729 - TENDER FOR FRAMELESS GLASS DOORS AND STAINLESS STEEL AND GLASS HANDRAIL/GRABRAIL, AT THE OLD UNIVERSITY, VALLETTA CAMPUS - UNIVERSITY OF MALTA Total (€) (including VAT, Eco Contribution (if any) and all other charges as may be applicable) SUMMARY Bill A – PRELIMINARIES Bill B – GLAZING WORKS Bill C – STAINLESS STEEL AND GLASS HANDRAILS/GRABRAILS Bill D – DAYWORKS (Provisional) 9,000.00 Grand Total carried forward to Tender Form on Page 18 The successful bidder shall be bound to conform in all respects with VAT legislation and regulations. Signature: .................................................................... (the person or persons authorised to sign on behalf of the tenderer) Date: .................................................................... Page 71 VOLUME 5 - DRAWINGS Design Documents, including Drawings Section 5.1 List of drawings attached No Name Drawing No Date No 1. Mezzanine Floor Plan (General) RBG/15/05/2013/ 01 15.05.2013 2. Sectional Elevation and Plan of Stairs (Gypsum Partition) RBG/15/05/2013/ 02 15.05.2013 3. Elevations (from the outwards and inwards) RBG/15/05/2013/ 03 15.05.2013 4. Typical Railing and Handrail RBG/15/05/2013/ 03A 15.05.2013 5. Door Detail (Upper Floor) RBG/15/05/2013/ 03B 15.05.2013 6. Door Detail (Ground Floor) RBG/15/05/2013/ 03C 15.05.2013 7. Sketch of Stairway to Mezzanine Floor & Access for All by Chair Lift Sketch 01 17.05.2013 8. Sketch of Elevations Sketch 02 16.05.2013 Page 72 Page 73 Page 74 Page 75 Page 76 Page 77 Page 78 Page 79 Page 80