C20 Sequence Development – Version 4 04/24/00 C20 SEQUENCE DEVELOPMENT Version 4 04/24/00 03/10/00 03/27/00 04/12/00 04/24/00 Draft for review Added ODC ID, DS #, MAPS_HR set up Final background sequence information Added Contingency Files 1 C20 Sequence Development – Version 4 04/24/00 1 C20 PREDICTED TIME ORIENTED LISTING.......................................................3 2 ACTIVITY CONSTRAINTS.......................................................................................4 3 INSTRUMENT INITIAL STATE.................................................................................5 4 INSTRUMENT SETUP................................................................................................5 4.1 MAPS Low.............................................................................................................5 4.2 MAPS High.............................................................................................................6 4.3 Fomalhaut................................................................................................................7 4.3.1 Step 1..............................................................................................................7 4.3.2 Step 2..............................................................................................................8 4.3.3 Step 3..............................................................................................................9 4.3.4 Step 4............................................................................................................10 4.3.5 Step 5............................................................................................................11 4.3.6 Step 6............................................................................................................12 4.3.7 Step 7............................................................................................................13 4.3.8 Step 8 – HSP characterization.....................................................................14 4.4 HDAC Conditioning.............................................................................................15 5 INSTRUMENT STATE AT END OF SEQUENCE...............................................15 6 PLANNED REAL-TIME AND CONTINGENCY COMMANDS.......................16 6.1 Turn On..................................................................................................................16 6.2 Contingencies.......................................................................................................16 7 FLIGHT SOFTWARE VERSION AND PATCHES.............................................16 8 MAPPING OF ACTIVITIES TO DS AND BACKGROUND..............................17 8.1 Activity in the Background Sequence.................................................................17 8.2 Activity in Distributed Sequence.........................................................................17 9 EXPECTED SCIENCE DATA RETURN...............................................................17 10 DEVELOPMENT AND TEST PROCEDURES..................................................18 11 SEQUENCE VALIDATION...................................................................................18 12 SASF SUBMITTED TO JPL..................................................................................18 13 TEST NOTES...........................................................................................................18 2 C20 Sequence Development – Version 4 04/24/00 1 C20 PREDICTED TIME ORIENTED LISTING START TIME (SCET) 2000-153T08:51:10.000 2000-153T08:51:10.000 2000-153T16:41:10.000 2000-163T21:31:20.000 2000-164T22:21:19.000 2000-165T22:36:18.000 2000-166T02:35:53.000 2000-167T03:21:53.000 2000-167T11:01:17.000 2000-169T22:21:16.000 2000-171T22:21:16.000 2000-172T22:31:16.000 2000-173T13:36:16.000 2000-175T00:46:16.000 2000-175T15:46:16.000 2000-175T22:00:00.000 2000-175T22:00:00.000 2000-175T23:00:00.000 2000-176T00:30:00.000 2000-176T08:30:00.000 2000-176T08:30:00.000 2000-177T00:41:16.000 2000-177T18:06:16.000 2000-178T09:56:17.000 2000-183T20:36:21.000 2000-184T21:54:20.000 2000-185T17:26:23.000 2000-186T20:26:19.000 2000-190T12:46:29.000 ACTIVITY UVIS_Turn_On UVIS_Pim UVIS_Maps UVIS_Maps_HR UVIS_Maps_HR UVIS_Maps_HR UVIS_Sleep UVIS_Maps UVIS_Maps_HR UVIS_Maps_HR UVIS_Maps_HR UVIS_Maps_HR UVIS_Maps_HR UVIS_Maps_HR UVIS_Maps_HR UVIS_HSP_On UVIS_Hdac_Cond UVIS_Maps UVIS_AlphaPsA_1 UVIS_Maps UVIS_HSP_Off UVIS_Maps_HR UVIS_Maps_HR UVIS_Maps_HR UVIS_Maps_HR UVIS_Maps_HR UVIS_Maps_HR UVIS_Maps_HR UVIS_Maps_HR 3 DURATION 7:50:00 0:10:00 012T09:54:43 0:59:31 0:59:31 0:59:31 001T00:46:00 008T18:38:07 0:59:31 0:59:31 0:59:31 0:59:31 0:59:31 0:59:31 0:59:31 0:00:03 1:00:00 1:30:53 8:00:00 015T15:29:07 0:00:03 0:59:31 0:59:31 0:59:31 0:59:31 0:59:31 0:59:31 0:59:31 0:59:31 C20 Sequence Development – Version 4 04/24/00 UVIS activities during C20 UVIS activities around AlphaPsA observation 2 ACTIVITY CONSTRAINTS The MAPS low rate is limited to 74 bps. The MAPS high rate is limited to 500 bps. The Fomalhaut activity is limited to 240 Mbit. The Hdac conditioning activity is limited to 210 bps. 4 C20 Sequence Development – Version 4 04/24/00 3 INSTRUMENT INITIAL STATE Latest ODC ID IEB Buffer in Use Instrument Configuration 32 N/A Off 4 INSTRUMENT SETUP 4.1 MAPS Low CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Photometer mode: Yes Compression: No Integration: 8 Integrating: No Hvps: N/A Integration: N/A Compression: N/A Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Low_Res Integration: 32sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0) (1023, 63) Xbin: 8, Ybin: 64 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Occultation Integration: 32sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0) (1023, 63) Xbin: 8 , Ybin: 64 RATE (pps, bps ) 0.00023719, 2.06448 0.0, 0.0 0.00424528, 36.9509 0.00424528, 36.9509 Under this configuration the data rate is 75.966 bits/second. 5 C20 Sequence Development – Version 4 04/24/00 4.2 MAPS High CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Photometer mode: Yes Compression: no Integration: 8 Integrating: No Hvps: N/A Integration: N/A Compression: N/A Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Low_Res Integration: 1080 sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0) (1023, 63) Xbin: 2, Ybin: 2 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Low_Res Integration: 1080 sec Compression: Sqrt_9 Number Of window:1 Window 1 Description Coord: (0,0) (1023, 63) Xbin:1, Ybin: 2 Under this configuration the data rate is 420.626 bits/sec. 6 RATE (pps, bps) 0.00023719, 2.06448 0.0, 0.0 0.0161, 140.14 0.0322, 280.28 C20 Sequence Development – Version 4 04/24/00 4.3 Fomalhaut One Fomalhaut activity consists in 7 steps described below. The total duration is 60 minutes. The observation will be repeated 3 times during the 8 hours of observation. For the remaining of the time we will conduct some HSP tests, staying within the SSR allocation. The HSP testing has 5 steps: 600 seconds at 1ms integration time, 600 seconds at 2 ms, 600 seconds at 4 ms, 600 seconds at 8 ms and TBD seconds at 2 ms. 4.3.1 Step 1 The step duration is 10 minutes. CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Photometer mode: Yes Compression: No Integration: 0.125sec Integrating: Yes Hvps: On Integration: 2msec Compression: Sqrt_9 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Occultation Integration: 1sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0), (1023, 63) Xbin: 1024,Ybin: 1 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Occultation Integration: 1sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0) (1023,63) Xbin: 1024, Ybin: 1 RATE (pps, bps) 0.01518, 132.126 0.52875, 4602.24 0.067924, 591.215 0.067924, 591.215 Under this configuration the data rate is 5916.79 bits/second. The data volume is 3.55 Mbit per iteration. 7 C20 Sequence Development – Version 4 04/24/00 4.3.2 Step 2 The step duration is 20 minutes, CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Photometer mode: Yes Compression: No Integration: 0.125sec Integrating: Yes Hvps: On Integration: 2msec Compression: Sqrt_9 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Occultation Integration: 60sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0), (1023, 63) Xbin: 1,Ybin: 1 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Occultation Integration: 60sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0) (1023,63) Xbin: 1, Ybin: 1 RATE (pps, bps) 0.01518, 132.126 0.52875, 4602.24 1.15924, 10090.071 1.15924, 10090.071 Under this configuration the data rate is 24914.5 bits/second. The data volume is 29.90 Mbit per iteration. 8 C20 Sequence Development – Version 4 04/24/00 4.3.3 Step 3 The duration of this step is 10 minutes. CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Photometer mode: Yes Compression: no Integration: 0.125sec Integrating: Yes Hvps: On Integration: 2msec Compression: Sqrt_9 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Occultation Integration: 1sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0), (1023, 63) Xbin: 1,Ybin: 64 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Occultation Integration: 1sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0) (1023,63) Xbin: 1, Ybin: 64 RATE (pps, bps) 0.01518, 132.126 0.52875, 4602.24 1.08679, 9459.44 1.08679, 9459.44 Under this configuration the data rate is 23653.25 bits/second. The data volume is 14.20 Mbit per iteration. 9 C20 Sequence Development – Version 4 04/24/00 4.3.4 Step 4 The step duration is 5 minutes. CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Photometer mode: Yes Compression: No Integration: 0.125sec Integrating: Yes Hvps: On Integration: 2msec Compression: Sqrt_9 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Low_Res Integration: 1sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0), (1023, 63) Xbin: 1024,Ybin: 1 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Low_Res Integration: 1sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0) (1023,63) Xbin: 1024, Ybin: 1 RATE (pps, bps) 0.01518, 132.126 0.52875, 4602.24 0.067924, 591.215 0.067924, 591.215 Under this configuration the data rate is 5916.79 bits/second. The data volume is 1.775 Mbit per iteration. 10 C20 Sequence Development – Version 4 04/24/00 4.3.5 Step 5 The duration of this step is 5 minutes. CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Photometer mode: Yes Compression: No Integration: 0.125sec Integrating: Yes Hvps: On Integration: 2msec Compression: Sqrt_9 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Low_Res Integration: 1sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0), (1023, 63) Xbin: 1,Ybin: 64 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Low_Res Integration: 1sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0) (1023,63) Xbin: 1, Ybin: 64 RATE (pps, bps) 0.01518, 132.126 0.52875, 4602.24 1.08679, 9459.44 1.08679, 9459.44 Under this configuration the data rate is 23653.25 bits/second. The data volume is 7.096 Mbit per iteration. 11 C20 Sequence Development – Version 4 04/24/00 4.3.6 Step 6 The duration of this step is 5 minutes. CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Photometer mode: Yes Compression: no Integration: 0.125sec Integrating: Yes Hvps: On Integration: 2msec Compression: Sqrt_9 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: High_Res Integration: 1sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0), (1023, 63) Xbin: 1024,Ybin: 1 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: High_Res Integration: 1sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0) (1023,63) Xbin: 1024, Ybin: 1 RATE (pps, bps) 0.01518, 132.126 0.52875, 4602.24 0.067924, 591.215 0.067924, 591.215 Under this configuration the data rate is 5916.79 bits/second. The data volume is 1.775 Mbit per iteration. 12 C20 Sequence Development – Version 4 04/24/00 4.3.7 Step 7 The duration of this step is 5 minutes. CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Photometer mode: Yes Compression: no Integration: 0.125sec Integrating: Yes Hvps: On Integration: 2msec Compression: Sqrt_9 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: High_Res Integration: 1sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0), (1023, 63) Xbin: 1,Ybin: 64 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: High_Res Integration: 1sec Compression: Sqrt_9 Number Of window: 1 Window 1 Description Coord: (0,0) (1023,63) Xbin: 1, Ybin: 64 RATE (pps, bps) 0.01518, 132.126 0.52875, 4602.24 1.08679, 9459.44 1.08679, 9459.44 Under this configuration the data rate is 23653.25 bits/second. The data volume is 7.096 Mbit per iteration. Total data volume for three iterations of the Fomalhaut activity is 197 Mbit. 13 C20 Sequence Development – Version 4 04/24/00 4.3.8 Step 8 – HSP characterization CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: No Integrating: Yes Hvps: On RATE (pps, bps) Step 1 – 600 seconds Integration: 1msec Compression: No 1.88, 16363.52 Step 2 – 600 seconds Integration: 2msec Compression: Sqrt_9 0.52875, 4602.24 Step 3 – 600 seconds Integration: 4msec Compression: Sqrt_9 0.2643, 2301.12 Step 4 – 600 seconds Integration: 8msec Compression: Sqrt_9 0.1322, 1150.50 Step 5 – 6000 seconds Integration: 2msec Compression: Sqrt_9 Integrating: No Integrating: No 0.52975, 4602.24 The total volume for this activity is 43 Mbits. 14 C20 Sequence Development – Version 4 04/24/00 4.4 HDAC Conditioning The HADC conditioning activity consists in executing 8 different modulation tables. The duration of each individual activity is 144 seconds. The activity is repeated 3 time for a total duration of 3456 seconds. CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Dwell Time: 9 Seconds Selected Filament: 1 Compression: No Table 1 D cell:0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 2 D cell:0,1,0,1,0,1,0,1,0,1,0,1,0,1,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 3 D cell:0,2,0,2,0,2,0,2,0,2,0,2,0,2,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 4 D cell:0,3,0,3,0,3,0,3,0,3,0,3,0,3,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 5 D cell:0,4,0,4,0,4,0,4,0,4,0,4,0,4,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 6 D cell:0,5,0,5,0,5,0,5,0,5,0,5,0,5,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 7 D cell:0,6,0,6,0,6,0,6,0,6,0,6,0,6,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 8 D cell:0,7,0,7,0,7,0,7,0,7,0,7,0,7,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Integrating: No Hvps: N/A Integrating: No Hvps: N/A Integrating: No Hvps: N/A RATE (pps, bps) 0.01518, 132.126 0.0, 0.0 0.0, 0.0 0.0, 0.0 Under this configuration the data rate is 132.126 bits/second. 5 INSTRUMENT STATE AT END OF SEQUENCE Latest ODC ID IEB Buffer in Use Instrument Configuration 46 1 MAPS Low rate 15 C20 Sequence Development – Version 4 04/24/00 6 PLANNED REAL-TIME AND CONTINGENCY COMMANDS 6.1 Turn On The turn on will be accomplished from the background sequence. The IEBs will be loaded from the background sequence. 6.2 Contingencies The only contingency identified is a failure to upload the new flight code into the SSR on DOY 152. The diagram below explains how this contingency is handled. The contingency IEB does the following: (1) the MAPS is without HDAC; and (2) the HDAC conditioning starts with one hour of HDAC in photometer mode, continues with one hour of modulation and then goes back to photometer mode until the start of the AlphaPSa activity. HSP is still turned on at the start of the HDAC conditioning activity. C20- UVIS TURN ON - DOY 153 ~153T08:51:10 BACKGROUND SEQUENCE ~153T16:41:00 ~153T12:30:00 - Power on - PIM - Load V1.2 from SSR - Execute RAM code - Load IEBs Contingency Window #1 - Trigger MAPS IEB Contingency Window #2 Contingency: - V1.2 uplink failed on DOY152 Contingency: - V1.1 is used rather than V1.2 R/T activities: - Load V1.1 from SSR and update R/T activities: - Load V1.1-compatible IEBs 7 FLIGHT SOFTWARE VERSION AND PATCHES Flight software version 1.2 will be used. 16 C20 Sequence Development – Version 4 04/24/00 8 MAPPING OF ACTIVITIES TO DS AND BACKGROUND 8.1 Activity in the Background Sequence ACTIVITY TURN ON PIM SLEEP OFF SLEEP NOTES SEE PARAGRAPH 6.2 SEE PARAGRAPH 6.2 8.2 Activity in Distributed Sequence ACTIVITY MAPS MAPS HR HSP ON HDAC COND DS 0 1 2 2 ODC ID 33 34 N/A 17 TO 24 STARTED VIA BACKGROUND OR DS BACKGROUND BACKGROUND N/A ALP[HA PSA FUV/EUV APLHA PSA HSP HSP OFF 3 35 TO 41 BACKGROUND ENDED VIA BACKGROUND BACKGROUND N/A TIMER – CALLS DS 0 TIMER 4 42 TO 46 BACKGROUND TIMER 5 N/A BACKGROUND N/A – CALLS DS 0 HDAC PHO. 2 47 BACKGROUND – CONTIN.GENCY ONLY 9 EXPECTED SCIENCE DATA RETURN ACTIVITY ODC_ID HDAC HSP 17 FUV EUV C20 Sequence Development – Version 4 04/24/00 10 DEVELOPMENT AND TEST PROCEDURES The following CSTOL procedures were used in the development and testing of the C20 sequence and IEB. SCIENCE ACTIVITIES IEB CREATION SEQUENCE/IEB TEST SCIENCE ACTIVITIES – CONTINGENCY IEB CREATION - CONTIGNECY SEQUENCE/IEB TEST CONTINGENCY c20_alpha_psa_1.prc c20_alp[ha_psa_2.prc c20_maps.prc c20_maps_hr.prc c20_hdac_cond.prc c20_hsp_off.prc c20.prc c20_test.prc c20_maps_c.prc c20_maps_hr_c.prcc c20_hdac_cond_c.prc c20_c.prc Manual test 11 SEQUENCE VALIDATION Done 03/30/00 and 04/02/00. The names of the files recorded during the sequence validation are: Message log file: f00_nov_09_21_00_24.event_messages f00_nov_12_02_17_21.event_messages f00_nov_27_00_54_50.event_messages (contingency) f00_nov_27_19_25_28.event_messages (contingency) Telemetry file: f00_nov_09_21_23_02.tlm f00_nov_12_02_17_21.tlm f00_nov_27_00_54_50.tlm (contingency) f00_nov_27_19_26_16.tlm (contingency) Note: the system clock was incorrectly set to 11/00 during the testing. Hence the strange filenames. 12 SASF SUBMITTED TO JPL The file uvis_b0200b_in.sasf (background sequence) submitted to the OPS DOM, on 04/06/00 at 18:01 UTC. The contingency files i1656a_uvisv11load.sasf and i1657a_uvis_v11ieb.sasf submitted to the OPS DOM ON 04/24/00 at 20:40 UTC 13 TEST NOTES 18 C20 Sequence Development – Version 4 04/24/00 (1) To improve the CM of the IEB file, the original file header should be printed in the summary files. (2) Testing the sequence shows that the FUV/EUV set up takes between 10.10 seconds 19.9 seconds (full image). (3) Need to add an “out of memory” check to the seq2ds utility. (4) During the first contingency sequence test, when triggering 0 after execution of 2, noted the creation of 3 FUV and 3 EUV packets. Could not repeat the next day. 19