Masursky (C18) Sequence Development – Version 2 12/08/99 MASURSKY (C18) SEQUENCE DEVELOPMENT Version 2 12/08/99 10/29/99 11/03/99 12/08/99 Draft for review Version 1 Version 2 Draft review inputs TOL updated, paragraph 9,10,11 and 12 1 Masursky (C18) Sequence Development – Version 2 12/08/99 1 C18 PREDICTED TIME ORIENTED LISTING..............................................3 2 ACTIVITY CONSTRAINTS.....................................................................3 3 INSTRUMENT SETUP..........................................................................3 3.1 MASURSKY .................................................................................3 4 INSTRUMENT STATE A TURN OFF ........................................................4 5 PLANNED REAL-TIME AND CONTINGENCY COMMANDS ..........................4 6 FLIGHT SOFTWARE VERSION AND PATCHES..........................................4 7 MAPPING OF ACTIVITIES TO DISTRIBUTED SEQUENCES..........................4 8 EXPECTED SCIENCE DATA RETURN......................................................4 9 DEVELOPMENT AND TEST PROCEDURES ...............................................5 10 SEQUENCE VALIDATION....................................................................5 11 SASF SUBMITTED TO JPL...................................................................5 12 TEST NOTES.....................................................................................5 2 Masursky (C18) Sequence Development – Version 2 12/08/99 1 C18 PREDICTED TIME ORIENTED LISTING DATE 01/19/2000 01/22/2000 01/22/2000 01/23/2000 01/23/2000 01/23/2000 01/23/2000 02/03/2000 02/04/2000 DOY 19 22 22 23 23 23 23 32 33 UTC 21:38:15 03:30:00 03:30:00 02:45:00 03:00:00 04:40:00 04:40:00 23:06:00 08:00:00 ACTIVITY PIM TURN ON SLEEP S/C SLEW TO MASURSKY MASURSKY OBS TURN OFF S/C SLEW OFF MASURSKY DATA PLAYBACK DATA AVAILABLE DURATION 00:11:00 23:30:00 01:40:00 Notes: (1) The data won’t be played back until the spacecraft is on the High Gain Antenna. (2) The housekeeping data between collected from the turn on until 023T02:35:00 will not be played back. (3) The data from the PIM may be lost because of the short DSN track. 2 ACTIVITY CONSTRAINTS SSR loading is the main constraint. We have specified 2.2 Mbits in the Masursky CAR. 3 INSTRUMENT SETUP 3.1 MASURSKY CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: No Hvps: Off Integration: No Hvps: Off Integration: Yes Hvps: Level_1 Pulse: Off Slit: Occultation Integration: 5820 seconds Compression: SQRT_9 Number Of window:1 Window 1 Description Coord: (0,0) (1023,63) Xbin:1, Ybin: 1 Integration: Yes Hvps: Level_1 3 RATE (pps) 0.0 0.0 0.0122 0.0122 Masursky (C18) Sequence Development – Version 2 12/08/99 Pulse: Off Slit: Occultation Integration:5820 seconds Compression: SQRT_9 Number Of window:1 Window 1 Description Coord: (0,0) (1023,63) Xbin:1, Ybin: 1 Under this configuration the data volume is 1.21 Mbits. The duration of the single integration is 01:37:00. That gives us about 00:02:40 to dump the data to the SSR before the instrument is shut down. The telemetry mode is expected to be S&ER3. The buffer should be dumped in about 35 seconds. 4 INSTRUMENT STATE A TURN OFF FUV SLIT EUV SLIT EUV OCC LO_RES LO_RES CLOSE 5 PLANNED REAL-TIME AND CONTINGENCY COMMANDS There are no planned real-time commands. All of the Masursky associated activities occurred “in the blind”. 6 FLIGHT SOFTWARE VERSION AND PATCHES Flight software version 1.1 will be used, patched for crn 42. The patch will be applied from the background sequence after the RAM code has been loaded (as implemented for ICO 1, V2 and ESB). 7 MAPPING OF ACTIVITIES TO DISTRIBUTED SEQUENCES The latest allocated ODC ID is 31. ACTIVITY MASURKY SETUP FOR SHUTDOWN ALLOCATED DS 1 2 ALLOCATED ODC ID 32 N/A STARTED VIA ENDED VIA BACKGROUND BACKGROUND BACKGROUND INTERNAL 8 EXPECTED SCIENCE DATA RETURN 4 Masursky (C18) Sequence Development – Version 2 12/08/99 ACTIVITY MASURSKY ODC_ID 32 HDAC 0 HSP 0 FUV 1 EUV 1 9 DEVELOPMENT AND TEST PROCEDURES The following CSTOL procedures were used in the development and testing of the Masursky sequence and IEB. MASURSKY ACTIVITY IEB CREATION SEQUENCE/IEB TEST Masursky_obs.prc Masursky.prc Masursky_test.prc 10 SEQUENCE VALIDATION Done 11/9/99. The names of the files recorded during the sequence validation are: Message log file: f99_nov_09_16_25_13.event_messages Telemetry file: f99_nov_16_25_13.tlm 11 SASF SUBMITTED TO JPL The file uvis_b0180c_in.sasf submitted to the OPS CDB, 11/23/99 12 TEST NOTES None 5