V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY Version 3 7/22/99 3/09/99 3/15/99 Draft for review V1 4/12/99 7/22/99 V2 V3 Changes after review meeting 1- Change power off FUV and EUV slit position from occultation to lo_res. 2 - Divide IPM/ISW activity into three sub-activities: 2 hours at hi_res, 2 hours at occultation, 18 hours at lo_res for both the FUV and the EUV channel. 3 - Correct nomenclature and headings. Add tests results Add final C-15 sequence information 1 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 1 VENUS ACTIVITY...............................................................................3 1.1 PREDICTED TIME ORIENTED LISTING ..............................................3 1.2 ACTIVITY CONSTRAINTS...............................................................4 1.3 INSTRUMENT SETUP.....................................................................4 1.3.1 VENUS AIRGLOW ACTIVITY......................................................4 1.4 INSTRUMENT STATE AT TURN OFF.................................................4 1.5 PLANNED REAL-TIME AND CONTINGENCY COMMANDS.....................4 1.6 FLIGHT SOFTWARE VERSION AND PATCHES....................................5 1.7 MAPPING OF ACTIVITIES TO DISTRIBUTED SEQUENCES.....................5 1.8 EXPECTED SCIENCE DATA RETURN ................................................5 1.9 DEVELOPMENT AND TEST PROCEDURES..........................................5 1.10 SEQUENCE VALIDATION ..............................................................5 1.11 SASF SUBMITTED TO JPL..............................................................5 1.12 TEST NOTES...............................................................................6 2 PRE-EARTH, MOON AND POST-EARTH ACTIVITIES..................................7 2.1 PREDICTED TIME ORIENTED LISTING ..............................................7 2.2 ACTIVITY CONSTRAINTS...............................................................9 2.3 INSTRUMENT SETUP.....................................................................9 2.3.1 HDAC IN PHOTOMETER MODE...................................................9 2.3.2 HDAC SPECIAL TEST...............................................................10 2.3.3 MOON OBSERVATION .............................................................11 2.3.4 GEOTAIL OBSERVATION..........................................................12 2.3.5 IPM/ISW OBSERVATION...........................................................13 2.4 INSTRUMENT STATE AT TURN OFF................................................14 2.5 PLANNED REAL-TIME AND CONTINGENCY COMMANDS....................14 2.6 FLIGHT SOFTWARE VERSION AND PATCHES...................................14 2.7 MAPPING OF ACTIVITIES TO DISTRIBUTED SEQUENCES....................14 2.8 EXPECTED SCIENCE DATA RETURN ...............................................15 2.9 DEVELOPMENT AND TEST PROCEDURES.........................................15 2.10 SEQUENCE VALIDATION .............................................................15 2.11 SASF SUBMITTED TO JPL.............................................................16 2.12 TEST NOTES..............................................................................16 2 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 1 VENUS ACTIVITY 1.1 PREDICTED TIME ORIENTED LISTING DATE 6/24/1999 6/24/1999 6/24/1999 6/24/1999 6/24/1999 6/24/1999 DOY 175 175 175 175 175 175 UTC 20:07:05 20:11:05 20:20:03 20:30:05 20:32:10 20:41:05 ACTIVITY TURN ON AIRGLOW FOV ON VENUS CLOSEST APPROACH FOV OFF VENUS TURN OFF DURATION 000-00:03:00 000-00:30:00 000-00:01:00 The UVIS sequence is part of a V2 mini-sequence that groups all the instruments. The UVIS IEBs are loaded from the mini-sequence. 3 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 1.2 ACTIVITY CONSTRAINTS SSR loading is the main constraint. UVIS has been allocated around 4.2 Mbits of data for the Venus activity. 1.3 INSTRUMENT SETUP 1.3.1 VENUS AIRGLOW ACTIVITY CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: No Hvps: Off Integrating: No Hvps: Off Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Hi_Res Integration: 32 Seconds Compression: Sqrt_9 Number Of Window:1 Window 1 Description: Coord: (0,0) (1023, 63) Xbin: 1, Ybin: 16 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Hi_Res Occ: Close Integration: 32 Seconds Compression: Sqrt_9 Number Of Window:1 Window 1 Description : Coord: (0,0) (1023, 63) Xbin: 1, Ybin: 16 RATE (pps) 0.0 0.0 0.136 0.136 1.4 INSTRUMENT STATE AT TURN OFF The instrument will be turned off in the following state: FUV SLIT EUV SLIT EUV OCC LO_RES LO_RES CLOSE 1.5 PLANNED REAL-TIME AND CONTINGENCY COMMANDS There are no planned real-time commands. 4 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 Available contingency command files: s1117b.cpf (turn off UVIS library command file). 1.6 FLIGHT SOFTWARE VERSION AND PATCHES Flight software version 1.1 will be used, patched by crn 42 (see crn42_patch.prc). The patch will be applied from the V2 mini-sequence after the RAM code has been loaded (as implemented during ICO 1) 1.7 MAPPING OF ACTIVITIES TO DISTRIBUTED SEQUENCES The last allocated ODC ID is 24. ACTIVITY AIRGLOW SET UP FOR SHUT DOWN ALLOCATED DS 0 1 ALLOCATED ODC ID 25 N/A START MINI-SEQU. MINI-SEQU. END MINI-SEQU INTERNAL 1.8 EXPECTED SCIENCE DATA RETURN ACTIVITY ODC_ID AIRGLOW 25 EXPECTED NUMBER OF OBJECTS HDAC HSP FUV EUV 0 0 55 55 1.9 DEVELOPMENT AND TEST PROCEDURES The following CSTOL procedures are used in the development and testing of the Venus sequence and IEB. AIRGLOW ACTIVITY SET UP FOR SHUT DOWN IEB CREATION SEQUENCE/IEB TEST venus2_obs.prc term_obs.prc venus.prc venus_test.prc 1.10 SEQUENCE VALIDATION Done 3/22/99.The files recorded during the sequence validation are: Messages log files: f99_mar_22_19_00_24.evemt_messages Telemetry log files: f99_mar_22_19_00_24.telemetry 1.11 SASF SUBMITTED TO JPL uvis_m0141c_in.sasf (later on merged in ors_m0141c_in.sasf by the science preintegrator). 5 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 1.12 TEST NOTES In the UVIS OASIS-CC application, the decomposition of the slits positions in the science header in incorrect. In the RAM code the "rejected command count" is cleared after a housekeeping packet has been acquired by CSD. It should work like the "accepted command count" (roll over at 256). 6 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 2 PRE-EARTH, MOON AND POST-EARTH ACTIVITIES 2.1 PREDICTED TIME ORIENTED LISTING DATE 8/16/1999 8/17/1999 8/17/1999 8/17/1999 8/17/1999 8/18/1999 8/18/1999 DOY 228 229 229 229 229 230 230 UTC 02:11:07 02:11:07 03:11:07 15:11:07 16:11:07 01:51:59 01:56:59 8/18/1999 8/18/1999 230 230 02:11:07 02:25:50 8/18/1999 8/18/1999 8/18/1999 8/18/1999 8/31/1999 9/01/1999 9/01/1999 9/14/1999 230 230 230 230 243 244 244 257 02:26:59 02:26:59 03:28:10 20:27:59 02:20:00 03:20:00 03:20:00 21:30:00 ACTIVITY TURN ON & HDAC-PHOTO HDAC- SPECIAL HDAC-PHOTO HDAC-SPECIAL HDAC-PHOTO MOON OBSERVATION STARTS LEADING EDGE OF FOV INTERSECTS BRIGHT LIMB MOON AT CENTER TRAILING EDGE OF FOV LEAVES DARK LIMB MOON OBSERVATION ENDS GEO TAIL OBS. EARTH C/A IPM/ISW OBS. SLEEP FOR TCM 13 OFF SLEEP IPM/ISW OBS. TURN OFF DURATION 001-00:00:00 000-01:00:00 000-12:00:00 000-01:00:00 000-09:41:12 000-00:35:00 000-18:01:00 012-05:52:00 001-01:00:00 013-18:10:00 The UVIS Earth sequence is part of two C15 mini-sequences and will also be in a minisequence sequence in C16. The UVIS IEBs are loaded from the first C15 mini-sequence. The first mini-sequence in C15 will cover from turn on until approximately doy 237 (end of the continuous DSN coverage). The second C15 mini-sequence with cover from doy 237 until the end of the C15 sequence. The C16 mini-sequence covers the start of the C16 sequence until instrument power off 7 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 ORS Instrument FOV vs MOON 8 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 2.2 ACTIVITY CONSTRAINTS The post-Earth activity is constrained by a limited downlink capability during the period ranging from the end of the 14.22 kbps period to the HGA-to-Earth period. UVIS has been allocated an average of 242 bps for all the post-Earth activity. 2.3 INSTRUMENT SETUP 2.3.1 HDAC IN PHOTOMETER MODE CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Photometer Mode Compression: Sqrt_9 Integrating: No Hvps: Off Integrating: No Hvps: Off Integrating: No Hvps: Off RATE (pps) 0.0085 0.0 0.0 0.0 9 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 2.3.2 HDAC SPECIAL TEST CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Dwell Time: 9 Seconds Selected Filament: 1 Compression: Sqrt_9 Table 1 D cell:0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 2 D cell:0,1,0,1,0,1,0,1,0,1,0,1,0,1,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 3 D cell:0,2,0,2,0,2,0,2,0,2,0,2,0,2,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 4 D cell:0,3,0,3,0,3,0,3,0,3,0,3,0,3,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 5 D cell:0,4,0,4,0,4,0,4,0,4,0,4,0,4,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 6 D cell:0,5,0,5,0,5,0,5,0,5,0,5,0,5,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 7 D cell:0,6,0,6,0,6,0,6,0,6,0,6,0,6,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Table 8 D cell:0,7,0,7,0,7,0,7,0,7,0,7,0,7,0,0 H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0 Integrating: No Hvps: Off Integrating: No Hvps: Off Integrating: No Hvps: Off 10 RATE (pps) 0.0085 0.0 0.0 0.0 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 2.3.3 MOON OBSERVATION CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Photometer Mode Compression: Sqrt_9 Integrating: No Hvps: Off Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Lo_Res Integration: 24 Seconds Compression: Sqrt_9 Number Of Window:1 Window 1 Description : Coord: (0,0) (1023, 63) Xbin: 2, Ybin: 1 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Lo_Res Occ: Close Integration: 24 Seconds Compression: Sqrt_9 Number Of Window:1 Window 1 Description : Coord: (0,0) (1023,63) Xbin: 2, Ybin: 1 11 RATE (pps) 0.0085 0.0 1.45 1.45 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 2.3.4 GEOTAIL OBSERVATION CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Photometer Mode Compression: Sqrt_9 Integrating: No Hvps: Off Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Lo_Res Integration: 3600 Seconds Compression: Sqrt_9 Number Of Window:1 Window 1 Description : Coord: (0,0) (1023, 63) Xbin: 1, Ybin: 2 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Lo_Res Occ: Close Integration: 3600 Seconds Compression: Sqrt_9 Number Of Window:1 Window 1 Description : Coord: (0,0) (1023,63) Xbin: 1, Ybin: 2 12 RATE (pps) 0.0085 0.0 0.0097 0.0097 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 2.3.5 IPM/ISW OBSERVATION The IPM/ISW activity is divided into three sub-activities that use the same configuration except for the EUV and the FUV slits. Every 22 hours is divided in 2 hours (i.e., one integration) using the high resolution slit, 2 hours (i.e., one integration) using the occultation slit and 18 hours (i.e., 9 integration) using the low resolution slit. CHANNEL HDAC HSP FUV EUV CHANNEL SETUP Integrating: Yes Hvps: On Photometer Mode Compression: Sqrt_9 Integrating: No Hvps: Off Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Lo_Res (18 hours out of 22 hours), Hi_Res (2 hours out of 22 hours), Occultation (2 hours out of 22 hours) Integration: 7200 Seconds Compression: Sqrt_9 Number Of Window:1 Window 1 Description : Coord: (0,0) (1023, 63) Xbin: 1, Ybin: 1 Integrating: Yes Hvps: Level_1 Pulse: Off Slit: Lo_Res (18 hours out of 22 hours), Hi_Res (2 hours out of 22 hours), Occulation (2 hours out of 22 hours) Occ: Close Integration: 7200 Seconds Compression: Sqrt_9 Number Of Window:1 Window 1 Description : Coord: (0,0) (1023,63) Xbin: 1, Ybin: 1 13 RATE (pps) 0.0085 0.0 0.0097 0.0097 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 2.4 INSTRUMENT STATE AT TURN OFF The instrument will be turned off in the following state: FUV SLIT EUV SLIT EUV OCC LO_RES LO_RES CLOSE 2.5 PLANNED REAL-TIME AND CONTINGENCY COMMANDS There are no planned real-time commands. Available contingency commands: s1117b.cpf (turn off UVIS library command file). 2.6 FLIGHT SOFTWARE VERSION AND PATCHES Flight software version 1.1 will be used, patched by crn 42 (see crn42_patch.prc). The patch will be applied from the ESB mini-sequence after the RAM code has been loaded (as implemented during ICO 1). 2.7 MAPPING OF ACTIVITIES TO DISTRIBUTED SEQUENCES The last allocated ODC ID is 25. However we are re-using the ODC ID allocated to the HDAC special test during ICO. ACTIVITY HDAC PHOT. HDAC SP 1 HDAC SP 2 HDAC SP 3 HDAC SP 4 HDAC SP 5 HDAC SP 6 HDAC SP 7 HDAC SP 8 MOON OBS GEO TAIL ALLOCATED DS 0 0 0 0 0 0 0 0 0 1 2 ALLOCATED ODC ID 26 17 18 19 20 21 22 23 24 27 28 IPM/ISW 3 29 (low res) 30 (high res) 31 (occultation) SET UP FOR SHUT DOWN 4 N/A 14 START VIA END VIA MINI-SEQU. MINI-SEQU. MINI-SEQU. MINI-SEQU. MINI-SEQU. INTERNAL (jump to ds #3 after 18 hours) MINI-SEQU. (C15) and MINI-SEQU (C16). Note: this is a looping ds. Each loop is 22 hours. INTERNAL INTERNAL (jump from ds 2) and MINISEQU. (after TCM-13) MINI-SEQU (C16) V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 2.8 EXPECTED SCIENCE DATA RETURN ACTIVITY HDAC PHOT HDAC SP 1 HDAC SP 2 HDAC SP 3 HDAC SP 4 HDAC SP 5 HDAC SP 6 HDAC SP 7 HDAC SP 8 MOON OBS GEO TAIL IPM/ISW IPM/ISW IPM/ISW ODC_ID 26 17 18 19 20 21 22 23 24 27 28 29 30 31 EXPECTED NUMBER OF OBJECTS HDAC HSP FUV EUV 2/1/1 0 0 0 3/3 0 0 0 3/3 0 0 0 3/3 0 0 0 3/3 0 0 0 3/3 0 0 0 3/3 0 0 0 3/3 0 0 0 3/3 0 0 0 1 0 86 86 1 0 18 18 TBD 0 TBD TBD TBD 0 TBD TBD TBD 0 TBD TBD Note: It is difficult to predict the amount of data that will be returned for the IPM/ISW activity as data losses are expected because of SSR management and telemetry mode issues. 2.9 DEVELOPMENT AND TEST PROCEDURES The following CSTOL procedures are used in the development and testing of the ESB sequence and IEB. HDAC CONDITIONNING ACTIVITY MOON ACTIVITY GEO TAIL ACTIVITY IPM ACTIVITY SET UP FOR SHUT DOWN IEB CREATION SEQUENCE/IEB TEST esb_hdac_cond.prc earth_moon_obs.prc earth_geo_obs.prc earth_ipm_obs.prc term_obs.prc earth.prc earth_test.prc 2.10 SEQUENCE VALIDATION Done from 3/22/99 to 3/29/99. The names of the files recorded during the sequence validation are: Message log files: f99_mar_22_21_57_14.event_messages Telemetry log files: f99_mar_22_21_57_14.telemetry, f99_mar_25_16_34_05.telemetry, f99_mar_26_17_08_03.telemetry and F99_mar_27_16_33_22.telemetry Note: the TCP/IP connection between the EGSE and the RTIU was lost several times during the 7-day test, resulting in loss of science data and the creation of several telemetry files. 15 V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99 2.11 SASF SUBMITTED TO JPL First C-15 mini sequence: uvis_m0151b_in.sasf (later on merged in m0151_fnp_in_rev_a.sasf by the science pre-integrator). Second C-15 mini sequence: uvis_m0156a_in.sasf C-16 mini sequence: uvis_m0161a_in.sasf 2.12 TEST NOTES None. 16