Changes after review meeting
1- Change power off FUV and EUV slit
position from occultation to lo_res.
2 - Divide IPM/ISW activity into three
sub-activities: 2 hours at hi_res, 2 hours
at occultation, 18 hours at lo_res for both
the FUV and the EUV channel.
3 - Correct nomenclature and headings.
Add tests results
Add final C-15 sequence information
1
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
1 VENUS ACTIVITY...............................................................................3
1.1 PREDICTED TIME ORIENTED LISTING ..............................................3
1.2 ACTIVITY CONSTRAINTS...............................................................4
1.3 INSTRUMENT SETUP.....................................................................4
1.3.1 VENUS AIRGLOW ACTIVITY......................................................4
1.4 INSTRUMENT STATE AT TURN OFF.................................................4
1.5 PLANNED REAL-TIME AND CONTINGENCY COMMANDS.....................4
1.6 FLIGHT SOFTWARE VERSION AND PATCHES....................................5
1.7 MAPPING OF ACTIVITIES TO DISTRIBUTED SEQUENCES.....................5
1.8 EXPECTED SCIENCE DATA RETURN ................................................5
1.9 DEVELOPMENT AND TEST PROCEDURES..........................................5
1.10 SEQUENCE VALIDATION ..............................................................5
1.11 SASF SUBMITTED TO JPL..............................................................5
1.12 TEST NOTES...............................................................................6
2 PRE-EARTH, MOON AND POST-EARTH ACTIVITIES..................................7
2.1 PREDICTED TIME ORIENTED LISTING ..............................................7
2.2 ACTIVITY CONSTRAINTS...............................................................9
2.3 INSTRUMENT SETUP.....................................................................9
2.3.1 HDAC IN PHOTOMETER MODE...................................................9
2.3.2 HDAC SPECIAL TEST...............................................................10
2.3.3 MOON OBSERVATION .............................................................11
2.3.4 GEOTAIL OBSERVATION..........................................................12
2.3.5 IPM/ISW OBSERVATION...........................................................13
2.4 INSTRUMENT STATE AT TURN OFF................................................14
2.5 PLANNED REAL-TIME AND CONTINGENCY COMMANDS....................14
2.6 FLIGHT SOFTWARE VERSION AND PATCHES...................................14
2.7 MAPPING OF ACTIVITIES TO DISTRIBUTED SEQUENCES....................14
2.8 EXPECTED SCIENCE DATA RETURN ...............................................15
2.9 DEVELOPMENT AND TEST PROCEDURES.........................................15
2.10 SEQUENCE VALIDATION .............................................................15
2.11 SASF SUBMITTED TO JPL.............................................................16
2.12 TEST NOTES..............................................................................16
2
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
1 VENUS ACTIVITY
1.1 PREDICTED TIME ORIENTED LISTING
DATE
6/24/1999
6/24/1999
6/24/1999
6/24/1999
6/24/1999
6/24/1999
DOY
175
175
175
175
175
175
UTC
20:07:05
20:11:05
20:20:03
20:30:05
20:32:10
20:41:05
ACTIVITY
TURN ON
AIRGLOW
FOV ON VENUS
CLOSEST APPROACH
FOV OFF VENUS
TURN OFF
DURATION
000-00:03:00
000-00:30:00
000-00:01:00
The UVIS sequence is part of a V2 mini-sequence that groups all the instruments. The
UVIS IEBs are loaded from the mini-sequence.
3
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
1.2 ACTIVITY CONSTRAINTS
SSR loading is the main constraint. UVIS has been allocated around 4.2 Mbits of data for
the Venus activity.
1.3 INSTRUMENT SETUP
1.3.1 VENUS AIRGLOW ACTIVITY
CHANNEL
HDAC
HSP
FUV
EUV
CHANNEL SETUP
Integrating: No
Hvps: Off
Integrating: No
Hvps: Off
Integrating: Yes
Hvps: Level_1
Pulse: Off
Slit: Hi_Res
Integration: 32 Seconds
Compression: Sqrt_9
Number Of Window:1
Window 1 Description:
Coord: (0,0) (1023, 63)
Xbin: 1, Ybin: 16
Integrating: Yes
Hvps: Level_1
Pulse: Off
Slit: Hi_Res
Occ: Close
Integration: 32 Seconds
Compression: Sqrt_9
Number Of Window:1
Window 1 Description :
Coord: (0,0) (1023, 63)
Xbin: 1, Ybin: 16
RATE (pps)
0.0
0.0
0.136
0.136
1.4 INSTRUMENT STATE AT TURN OFF
The instrument will be turned off in the following state:
FUV SLIT
EUV SLIT
EUV OCC
LO_RES
LO_RES
CLOSE
1.5 PLANNED REAL-TIME AND CONTINGENCY COMMANDS
There are no planned real-time commands.
4
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
Available contingency command files: s1117b.cpf (turn off UVIS library command file).
1.6 FLIGHT SOFTWARE VERSION AND PATCHES
Flight software version 1.1 will be used, patched by crn 42 (see crn42_patch.prc). The
patch will be applied from the V2 mini-sequence after the RAM code has been loaded (as
implemented during ICO 1)
1.7 MAPPING OF ACTIVITIES TO DISTRIBUTED SEQUENCES
The last allocated ODC ID is 24.
ACTIVITY
AIRGLOW
SET UP FOR
SHUT DOWN
ALLOCATED DS
0
1
ALLOCATED ODC ID
25
N/A
START
MINI-SEQU.
MINI-SEQU.
END
MINI-SEQU
INTERNAL
1.8 EXPECTED SCIENCE DATA RETURN
ACTIVITY
ODC_ID
AIRGLOW
25
EXPECTED NUMBER OF OBJECTS
HDAC
HSP
FUV
EUV
0
0
55
55
1.9 DEVELOPMENT AND TEST PROCEDURES
The following CSTOL procedures are used in the development and testing of the Venus
sequence and IEB.
AIRGLOW ACTIVITY
SET UP FOR SHUT DOWN
IEB CREATION
SEQUENCE/IEB TEST
venus2_obs.prc
term_obs.prc
venus.prc
venus_test.prc
1.10 SEQUENCE VALIDATION
Done 3/22/99.The files recorded during the sequence validation are:
Messages log files: f99_mar_22_19_00_24.evemt_messages
Telemetry log files: f99_mar_22_19_00_24.telemetry
1.11 SASF SUBMITTED TO JPL
uvis_m0141c_in.sasf (later on merged in ors_m0141c_in.sasf by the science preintegrator).
5
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
1.12 TEST NOTES
In the UVIS OASIS-CC application, the decomposition of the slits positions in the science
header in incorrect.
In the RAM code the "rejected command count" is cleared after a housekeeping packet has
been acquired by CSD. It should work like the "accepted command count" (roll over at
256).
6
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
2 PRE-EARTH, MOON AND POST-EARTH ACTIVITIES
2.1 PREDICTED TIME ORIENTED LISTING
DATE
8/16/1999
8/17/1999
8/17/1999
8/17/1999
8/17/1999
8/18/1999
8/18/1999
DOY
228
229
229
229
229
230
230
UTC
02:11:07
02:11:07
03:11:07
15:11:07
16:11:07
01:51:59
01:56:59
8/18/1999
8/18/1999
230
230
02:11:07
02:25:50
8/18/1999
8/18/1999
8/18/1999
8/18/1999
8/31/1999
9/01/1999
9/01/1999
9/14/1999
230
230
230
230
243
244
244
257
02:26:59
02:26:59
03:28:10
20:27:59
02:20:00
03:20:00
03:20:00
21:30:00
ACTIVITY
TURN ON & HDAC-PHOTO
HDAC- SPECIAL
HDAC-PHOTO
HDAC-SPECIAL
HDAC-PHOTO
MOON OBSERVATION STARTS
LEADING EDGE OF FOV INTERSECTS
BRIGHT LIMB
MOON AT CENTER
TRAILING EDGE OF FOV LEAVES
DARK LIMB
MOON OBSERVATION ENDS
GEO TAIL OBS.
EARTH C/A
IPM/ISW OBS.
SLEEP FOR TCM 13
OFF SLEEP
IPM/ISW OBS.
TURN OFF
DURATION
001-00:00:00
000-01:00:00
000-12:00:00
000-01:00:00
000-09:41:12
000-00:35:00
000-18:01:00
012-05:52:00
001-01:00:00
013-18:10:00
The UVIS Earth sequence is part of two C15 mini-sequences and will also be in a minisequence sequence in C16. The UVIS IEBs are loaded from the first C15 mini-sequence.
The first mini-sequence in C15 will cover from turn on until approximately doy 237 (end of
the continuous DSN coverage). The second C15 mini-sequence with cover from doy 237
until the end of the C15 sequence. The C16 mini-sequence covers the start of the C16
sequence until instrument power off
7
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
ORS Instrument FOV vs MOON
8
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
2.2 ACTIVITY CONSTRAINTS
The post-Earth activity is constrained by a limited downlink capability during the period
ranging from the end of the 14.22 kbps period to the HGA-to-Earth period. UVIS has been
allocated an average of 242 bps for all the post-Earth activity.
2.3 INSTRUMENT SETUP
2.3.1 HDAC IN PHOTOMETER MODE
CHANNEL
HDAC
HSP
FUV
EUV
CHANNEL SETUP
Integrating: Yes
Hvps: On
Photometer Mode
Compression: Sqrt_9
Integrating: No
Hvps: Off
Integrating: No
Hvps: Off
Integrating: No
Hvps: Off
RATE (pps)
0.0085
0.0
0.0
0.0
9
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
2.3.2 HDAC SPECIAL TEST
CHANNEL
HDAC
HSP
FUV
EUV
CHANNEL SETUP
Integrating: Yes
Hvps: On
Dwell Time: 9 Seconds
Selected Filament: 1
Compression: Sqrt_9
Table 1
D cell:0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0
H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0
Table 2
D cell:0,1,0,1,0,1,0,1,0,1,0,1,0,1,0,0
H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0
Table 3
D cell:0,2,0,2,0,2,0,2,0,2,0,2,0,2,0,0
H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0
Table 4
D cell:0,3,0,3,0,3,0,3,0,3,0,3,0,3,0,0
H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0
Table 5
D cell:0,4,0,4,0,4,0,4,0,4,0,4,0,4,0,0
H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0
Table 6
D cell:0,5,0,5,0,5,0,5,0,5,0,5,0,5,0,0
H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0
Table 7
D cell:0,6,0,6,0,6,0,6,0,6,0,6,0,6,0,0
H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0
Table 8
D cell:0,7,0,7,0,7,0,7,0,7,0,7,0,7,0,0
H cell:0,1,0,2,0,3,0,4,0,5,0,6,0,7,0,0
Integrating: No
Hvps: Off
Integrating: No
Hvps: Off
Integrating: No
Hvps: Off
10
RATE (pps)
0.0085
0.0
0.0
0.0
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
2.3.3 MOON OBSERVATION
CHANNEL
HDAC
HSP
FUV
EUV
CHANNEL SETUP
Integrating: Yes
Hvps: On
Photometer Mode
Compression: Sqrt_9
Integrating: No
Hvps: Off
Integrating: Yes
Hvps: Level_1
Pulse: Off
Slit: Lo_Res
Integration: 24 Seconds
Compression: Sqrt_9
Number Of Window:1
Window 1 Description :
Coord: (0,0) (1023, 63)
Xbin: 2, Ybin: 1
Integrating: Yes
Hvps: Level_1
Pulse: Off
Slit: Lo_Res
Occ: Close
Integration: 24 Seconds
Compression: Sqrt_9
Number Of Window:1
Window 1 Description :
Coord: (0,0) (1023,63)
Xbin: 2, Ybin: 1
11
RATE (pps)
0.0085
0.0
1.45
1.45
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
2.3.4 GEOTAIL OBSERVATION
CHANNEL
HDAC
HSP
FUV
EUV
CHANNEL SETUP
Integrating: Yes
Hvps: On
Photometer Mode
Compression: Sqrt_9
Integrating: No
Hvps: Off
Integrating: Yes
Hvps: Level_1
Pulse: Off
Slit: Lo_Res
Integration: 3600 Seconds
Compression: Sqrt_9
Number Of Window:1
Window 1 Description :
Coord: (0,0) (1023, 63)
Xbin: 1, Ybin: 2
Integrating: Yes
Hvps: Level_1
Pulse: Off
Slit: Lo_Res
Occ: Close
Integration: 3600 Seconds
Compression: Sqrt_9
Number Of Window:1
Window 1 Description :
Coord: (0,0) (1023,63)
Xbin: 1, Ybin: 2
12
RATE (pps)
0.0085
0.0
0.0097
0.0097
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
2.3.5 IPM/ISW OBSERVATION
The IPM/ISW activity is divided into three sub-activities that use the same configuration
except for the EUV and the FUV slits. Every 22 hours is divided in 2 hours (i.e., one
integration) using the high resolution slit, 2 hours (i.e., one integration) using the
occultation slit and 18 hours (i.e., 9 integration) using the low resolution slit.
CHANNEL
HDAC
HSP
FUV
EUV
CHANNEL SETUP
Integrating: Yes
Hvps: On
Photometer Mode
Compression: Sqrt_9
Integrating: No
Hvps: Off
Integrating: Yes
Hvps: Level_1
Pulse: Off
Slit: Lo_Res (18 hours out of
22 hours), Hi_Res (2 hours out
of 22 hours), Occultation (2
hours out of 22 hours)
Integration: 7200 Seconds
Compression: Sqrt_9
Number Of Window:1
Window 1 Description :
Coord: (0,0) (1023, 63)
Xbin: 1, Ybin: 1
Integrating: Yes
Hvps: Level_1
Pulse: Off
Slit: Lo_Res (18 hours out of
22 hours), Hi_Res (2 hours out
of 22 hours), Occulation (2
hours out of 22 hours)
Occ: Close
Integration: 7200 Seconds
Compression: Sqrt_9
Number Of Window:1
Window 1 Description :
Coord: (0,0) (1023,63)
Xbin: 1, Ybin: 1
13
RATE (pps)
0.0085
0.0
0.0097
0.0097
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
2.4 INSTRUMENT STATE AT TURN OFF
The instrument will be turned off in the following state:
FUV SLIT
EUV SLIT
EUV OCC
LO_RES
LO_RES
CLOSE
2.5 PLANNED REAL-TIME AND CONTINGENCY COMMANDS
There are no planned real-time commands.
Available contingency commands: s1117b.cpf (turn off UVIS library command file).
2.6 FLIGHT SOFTWARE VERSION AND PATCHES
Flight software version 1.1 will be used, patched by crn 42 (see crn42_patch.prc). The
patch will be applied from the ESB mini-sequence after the RAM code has been loaded (as
implemented during ICO 1).
2.7 MAPPING OF ACTIVITIES TO DISTRIBUTED SEQUENCES
The last allocated ODC ID is 25. However we are re-using the ODC ID allocated to the
HDAC special test during ICO.
ACTIVITY
HDAC PHOT.
HDAC SP 1
HDAC SP 2
HDAC SP 3
HDAC SP 4
HDAC SP 5
HDAC SP 6
HDAC SP 7
HDAC SP 8
MOON OBS
GEO TAIL
ALLOCATED
DS
0
0
0
0
0
0
0
0
0
1
2
ALLOCATED
ODC ID
26
17
18
19
20
21
22
23
24
27
28
IPM/ISW
3
29 (low res)
30 (high res)
31 (occultation)
SET UP FOR
SHUT DOWN
4
N/A
14
START VIA
END VIA
MINI-SEQU.
MINI-SEQU.
MINI-SEQU.
MINI-SEQU.
MINI-SEQU.
INTERNAL (jump
to ds #3 after 18
hours)
MINI-SEQU. (C15)
and MINI-SEQU
(C16). Note: this is a
looping ds. Each
loop is 22 hours.
INTERNAL
INTERNAL
(jump from ds 2)
and MINISEQU. (after
TCM-13)
MINI-SEQU
(C16)
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
2.8 EXPECTED SCIENCE DATA RETURN
ACTIVITY
HDAC PHOT
HDAC SP 1
HDAC SP 2
HDAC SP 3
HDAC SP 4
HDAC SP 5
HDAC SP 6
HDAC SP 7
HDAC SP 8
MOON OBS
GEO TAIL
IPM/ISW
IPM/ISW
IPM/ISW
ODC_ID
26
17
18
19
20
21
22
23
24
27
28
29
30
31
EXPECTED NUMBER OF OBJECTS
HDAC
HSP
FUV
EUV
2/1/1
0
0
0
3/3
0
0
0
3/3
0
0
0
3/3
0
0
0
3/3
0
0
0
3/3
0
0
0
3/3
0
0
0
3/3
0
0
0
3/3
0
0
0
1
0
86
86
1
0
18
18
TBD
0
TBD
TBD
TBD
0
TBD
TBD
TBD
0
TBD
TBD
Note: It is difficult to predict the amount of data that will be returned for the IPM/ISW
activity as data losses are expected because of SSR management and telemetry mode
issues.
2.9 DEVELOPMENT AND TEST PROCEDURES
The following CSTOL procedures are used in the development and testing of the ESB
sequence and IEB.
HDAC CONDITIONNING ACTIVITY
MOON ACTIVITY
GEO TAIL ACTIVITY
IPM ACTIVITY
SET UP FOR SHUT DOWN
IEB CREATION
SEQUENCE/IEB TEST
esb_hdac_cond.prc
earth_moon_obs.prc
earth_geo_obs.prc
earth_ipm_obs.prc
term_obs.prc
earth.prc
earth_test.prc
2.10 SEQUENCE VALIDATION
Done from 3/22/99 to 3/29/99. The names of the files recorded during the sequence
validation are:
Message log files: f99_mar_22_21_57_14.event_messages
Telemetry log files: f99_mar_22_21_57_14.telemetry, f99_mar_25_16_34_05.telemetry,
f99_mar_26_17_08_03.telemetry and F99_mar_27_16_33_22.telemetry
Note: the TCP/IP connection between the EGSE and the RTIU was lost several times
during the 7-day test, resulting in loss of science data and the creation of several telemetry
files.
15
V2/ESB (C14/C15) ACTIVITIES DEVELOPMENT STRATEGY - Version 3 7/22/99
2.11 SASF SUBMITTED TO JPL
First C-15 mini sequence: uvis_m0151b_in.sasf (later on merged in
m0151_fnp_in_rev_a.sasf by the science pre-integrator).
Second C-15 mini sequence: uvis_m0156a_in.sasf
C-16 mini sequence: uvis_m0161a_in.sasf
2.12 TEST NOTES
None.