Enclosure 4A - Project Summary Form NATIONAL FIRE PLAN COMMUNITY ASSISTANCE AND WILDLAND URBAN INTERFACE PROJECTS Application for Fuels Utilization and Marketing Projects Applicant Applicant/Organization: Southwest Oregon Resource Conservation and Development Council Phone: FAX: Email: 541-476-5906 541-955-9574 sw_oregon@fastmail.fm Address (Street or P. O. Box, City, State, Zip): 576 NE E Street, Grants Pass, OR 97526 Project Coordinator Project Coordinator (Name and Title): Bob Jones, Chair/Amy Wilson, Council Coordinator Organization/Jurisdiction: Southwest Oregon Resource Conservation and Development Council Phone: FAX: Email: 541-476-5906 541-955-9574 sw_oregon@fastmail.fm Project Information Project Title: Southern Oregon Small Diameter Utilization Yard Trial Proposed Project Start Date: April 1, 2004 Proposed Project End Date: March 31, 2005 Federal Funding Request: $ 205,550 Total Project Funding: $ 343,990 Are you submitting multiple projects? If so, please explain and prioritize: Yes. The Clearinghouse is our #1 priority due to the broad scope of its impact; the Utilization Yard is a re-submittal of a project submitted to region 5 in the last cycle, which will provide useful information and support for the clearinghouse project. Brief Project Description: This pilot utilization yard will collect sub-merchantable small diameter material from private and public fuels reduction projects, sort for highest use, and process material through machines colocated at the utilization yard, (to include a small log sorter, an economizer mini-mill, a post and pole machine, and a chipper. This utilization yard trial will be coordinated through the Marketing Clearinghouse. It will build upon the fuels reduction projects of the Medford Area BLM (Boaz 2003) and the Medford Water Commission’s forest health project. The Watershed Research and Training Center of Hayfork, CA will provide machinery, training, and technical assistance. The Forest Products Lab will help with economic analysis. Jefferson Sustainable Development Initiative will help with coordination, logistics and operations management. Markets will include flooring and paneling, posts and poles, fencing, and engineered products like glu-lams and trusses. The product and market information from this long-term trial will help establish the feasibility of similar utilization yards in the southern Oregon area. Projected cost are $25-30/ton for material with 4” tops (min) and 10” butts (max) and projected markets of $350/mbf for lumber and $4.50 average pole. The utilization yard will operate 50 consecutive days with another 10 days for set-up and break down. Project Location (latitude/longitude if applicable): County: Congressional District: White City Jackson 02 If the applicant is an unincorporated area, define the geographic area being represented: Enclosure 4B (Page 1 of 3) - Project Narrative Description Applications for funding must include a narrative response that describes the proposal. Please do not submit responses longer than one page, single space, 12-pitch font. Describe project including, but not limited to: project location Address these project implementation items as anticipated outcomes applicable: measures and reporting interagency partners project relationship to community or natural landscape fire plans. project time frames and income specify types of activities and equipment used amount or extent of actions (acres, number of homes, etc) environmental, cultural and historical resource requirements Response: Project Location: Location criteria include availability of 3phase power, water, zoning, and proximity to planned fuels treatment areas. Four potential sites have been identified with negotiations ongoing. White City is the preferred location due to substantial infrastructure, existing timber–related businesses(BioMass, Pressure-treatment, functional mills, etc.), and industrial-friendly regulations. Fuels treatment plans: Medford Water Commission plans to continue its fuels reduction activities on their watershed outside of Butte Falls; Medford District BLM has fuels reduction projects ongoing/scheduled and the Advisory Committee and the Marketing Clearinghouse will identify other sources from the high level of fuels reduction work planned in Southern Oregon. These project areas have been identified as strategic acres in various fire plans including the Applegate partnership, BLM/Butte Falls Resource Area and the Medford Water Commission Watershed/Forest Management Plan. Implementation, activities, time frames, and equipment: Our approach will build upon this years work by the RC&D. We convened a small diameter working group and have a multi-stakeholder advisory committee. 1) This committee will assist us in our site choice, communication plans and outreach to local businesses, agency, conservation groups, and media. 2) They will guide the product and market assessment which will be carried out by staff. 3) Staff will work with FPL to capture production rates and costs and recovery information. 4) Staff will work with local businesses for product and market assessments. Actual marketing of processed material will provide some revenue for continued work. 5) Staff will work with the advisory group, FPL and local businesses to draft a final report. 6) Staff and advisory committee will decide if the trial is positive enough to continue as a for-profit entity. If the decision is to move forward, Phase II will move forward with a business plan and financing. 7) Follow-up public meetings and results dissemination including national forums. Time frame depends on grant authorization, but is expected to be completed during the field season of 2004, given fire season and winter operational constraints. The utilization yard will be able to process three logging truck loads of material per day. We anticipate a 60 day trial. We will use a small log loader, a small scale log sorter, the economizer mini-mill, a post and pole processor and a small chipper. Other processing equipment may be identified and co-located on the site as dictated by product and market information revealed through outreach and marketing activities by the Small Diameter Advisory Committee and the Clearinghouse project. Project Income: We anticipate income of up to $220,000 from this trial. However, it could be significantly less, depending upon market development and quality of raw materials. Anticipated outcomes: We expect to be able to establish local markets for small diameter material currently considered sub-merchantable. This small scale approach may lead to larger investments by others. Southern Oregon still has a timber culture, local industrial capacity, and many secondary manufacturers compared to other regions. We believe the availability of this processed material will allow those secondary manufacturers to experiment with these new products and fit them into their supply chains. It will also allow some businesses to develop new products and access new markets. Generating value for this currently negative value material will help defray the cost of fuels reduction projects and stimulate private landowners to complete fuels reduction projects. Measures and reporting: A clear Work Plan will be the first deliverable from the advisory committee. The Work Plan will be posted on a web site that will also be used to track discussions, interim progress reports, pictures and results. Draft and final reports will be prepared and reviewed and public presentations made to discuss results in conjunction with local partners. Interagency partners: The advisory committee is a mix of private representatives and government personnel representing USFS, BLM, ODF, local contractors and industry. The Watershed Center will contribute equipment currently valued at $320,000. FPL research and State and Private Forestry staff will also consult on the project. Enclosure 4B (Page 2 of 3) - Project Evaluation Criteria Applications for funding must include narrative responses that address the following four criteria. Within each criterion, subcriteria are listed in descending order of importance. Limit your responses to the areas provided. 1. Increasing Local Capacity (35 Points) A. How would the proposal improve or lead to the improvement of the local economy in terms of jobs and sustainable economic activity? How many jobs are expected to be created or retained and for how long (please distinguish between essentially year-round and seasonal jobs)? How will this proposal link to other projects (or proposed projects) to create year-round jobs? B. Will biomass or forest fuels be utilized; if so, in what manner and how much? C. Which, if any, private businesses will participate? D. To what extent will this project be offered to serve as a model for other communities or businesses, or natural landscapes? Response: A. This project will create at least five jobs at the utilization yard (seasonal). It will also support other jobs in fuels reduction and trucking. We do not know how many jobs in the value-added sector it will help support. If the yard proves to work economically then year- round jobs will be created. B. We expect to utilize 3 logging truck loads per day of currently sub-merchantable material, for 50 days. (around 3,750 tons). Suppressed fir will be used for flooring and paneling, glu-lam stock and engineered products. Pine and fir will be used for post and poles. Fencing kits will be developed. Plantation pine may be used for finger-joint stock. We expect other products to be developed by local businesses. Residual chips, sawdust, and peelings will either be used for hogged fuel, animal bedding, or composted by mixing with local agricultural wastes. C. Private businesses will participate through being direct consumers of products, both raw products and those processed to various degrees. There will be potential to use some local equipment such as a peeler on a contract or subcontract basis to increase the opportunities to add value on site. The project will create work for logging contractors, haulers and others. The Small Woodland Owners Association will help us identify more supply through outreach to private landowners who may be planning forest management activities including fuels reduction and small diameter materials. D. This project is easily replicable in other communities. This project will take the technology and the economics beyond the scale of a short term demonstration. These are relatively inexpensive, portable, small scale processors and they are designed for noncommodity production. This project will help provide real numbers on a scale that will be useful to industry in helping them assess the value of merchandizing small diameter material. 2. Reducing fire risk. (30 points) Describe how the proposal promotes reduction of risk in high hazard areas and communities or natural landscapes. Describe how the proposed project benefits resources on federal land or adjacent non-federal land, or how it protects the safety of communities. C. To what extent does the project implement or create a cooperative (1) fuels treatment plan or (2)community fire strategy (include evidence of the plan if it already exists)? D. Explain how the proposal (1) leads to, enhances or restores a local fire-adapted ecosystem, and/or (2) mitigates or leads to the mitigation of hazardous fuels conditions. A. B. Response: A. This proposal will make more fuels reduction projects economically feasible because it will help put a market value on currently negatively valued material. B. Market value for small diameter means more acres treated for the same amount of money spent. C. This project will be coordinated with fuels treatment planning and implementation projects through the Marketing Clearing house. D. Markets for material removed during hazardous fuels treatments lowers the cost in two ways: it removes material that would otherwise need to be piled and burned, so those costs are reduced, and it provides revenue from small diameter thinnings. Enclosure 4B (Page 3 of 3) - Project Evaluation Criteria 3. Expanding Community Participation. (15 Points) A. To what extent have interested individuals, groups, and communities been provided an opportunity to become informed and involved in this proposal? B. Describe the extent of local support or opposition for the project, including any cost-sharing arrangements C. What are the environmental, social and educational benefits or concerns of the project? Response: A. The Southwest Oregon RC&D Council has been holding small diameter utilization meetings for the last several months and has formed a multi-stakeholder advisory group. These meetings are public meetings and will continue to be public meetings. Public outreach is an important part of this project. We are also coordinating with the Jackson/Josephine County small diameter working group headed by County Commissioner Sue Kupillas. B. Local support/opposition: The Small Diameter Advisory Committee is an example of how much support and interest there is in this topic in southern Oregon. Meetings which began in December have consistently drawn excellent attendance and participation, with representative from all aspects of industry and community development. In addition there are more than 40 supporters who follow the progress through regular updates, e-mail and personal communication with active participants. The BLM Boaz project is specifically designed to help answer some of the questions of public acceptance to thinning and fuels reduction on public lands. Although there is some localized anxiety over the larger material removed there is an overwhelming support for fire prevention work. The project is not anticipated to be constrained by any difficulties. The Medford Water Commission forest management project is not on public lands, but has not been under any protest. C. Clearly this project has the potential to greatly benefit the environment through improving the economics of fuels treatments. It has the potential to create local jobs and enhance local businesses. It also has the potential to create public/private partnerships for the utilization of fuels reduction bio-mass and allow for innovative uses of the material in special composts for the local agricultural community. 4. Increasing interagency and intergovernmental coordination. (20 Points) A. Explain the level of cooperation, coordination or strategic planning through a “Local Coordination Group” for wildland fire activities, or among federal, state, tribal, local government and community organizations in developing this proposal. List the cooperators (a detailed list of cooperators will be required for projects that are funded). B. Describe how this project implements a local intergovernmental strategy or plan, or creates such a plan. Describe the plan if it already exists. Response: A. The utilization yard project is very responsive to the issues being raised in local discussions about small diameter utilization. This project will benefit from the cooperation and coordination of the Small Diameter Advisory Committee. Active participants in the Advisory Committee include: Medford District BLM, Rogue/Siskiyou National Forest, Oregon Department of Forestry, OSU Extension Forester, Jackson Small Woodland Owners, Jackson County, Josephine County Economic Development, Southern Oregon Regional Economic Development, Watershed Center Hayfork, Josephine County, Collaborative Learning Circle, Southern Oregon Timber Industries Association,, Medford Water Commission, Applegate Partnership, Oregon Economic Development Department, Summit Wood Products, Jefferson Sustainable Development Institute, Rogue Valley Fuel, NW Forest Resources Inc, Small Woodland Services Inc, Green Mountain Woodworks and other consulting foresters. Local agencies are very interested in a project that helps demonstrate the value of the value added concept in small diameter utilization. Most existing governmental strategies and plans address community planning and outreach to landowners about the importance of removing fuels. This project will address critical market factors that will make forest management activities more cost-effective and less dependent on cost-sharing strategies. This will provide a longer term solution by adding value to the by-products of management practices. B. This project is anticipated in various community development plans around the region. Local action plans for communities in Jackson and Josephine Counties include utilization of small diameter material and underutilized species. Enclosure 4C - Project Work Form Tasks Time Frame Responsible Party 1. Complete work plan, site selection, equipment alternative reviews, product reviews, and identify other potential supply through clearinghouse. 90 days Southwest Oregon RC&D, JSDI, WRTC and advisory committee. 2. Complete outreach and communication plan and implement. Create web page, link to existing sites. 150 days JSDI and WRTC staff, Southwest Oregon RC&D and advisory committee guidance 3. Complete site lay-out, equipment move, safety plan, project assessments and cost and production rate studies design 60 days JSDI and WRTC staff with guidance from FPL and Southwest Oregon RC&D and advisory committee 4. Secure supply. Negotiate costs (preliminary assessment predicts our cost at $30/ton delivered) On-going JSDI staff 5. Run trial, complete project assessments and cost and production rates. Capture market information. Sell processed material Conduct outreach through tours for businesses, agencies and the media. 80-90 production days WRTC staff and local hires 6. Run R&D experiments with some material. Develop fencing kits, test market high grade fir for glu-lam and engineered products 210 days JSDI staff, WRTC staff and businesses from the area 7. Complete draft report, submit for review, and incorporate comments 280 days JSDI Staff, WRTC Staff, Southwest Oregon RC&D staff, advisory committee, 8. Complete final report, make two public presentations in the area and disseminate results to local businesses and the media. 90 days Southwest Oregon RC&D staff and JSDI staff and WRTC staff. Enclosure 4D - Project Budget Cost Category Description Personnel Organization, coordination, logistics And outreach 1200hrs@ $25/hr Subtotal Fringe Benefits @25% Federal Agency Partner 2: Sm. Applicant: Sw Or Diam Advisory RC&D Partner 1: WRTC Cte Total 30,000 30,000 7,500 7,500 6,000 9,600 6,000 9,600 Subtotal Travel Equipment move in/out Crew travel +per diem for 2 Subtotal Equipment Economizer, sorter, peeler, forklift Small chipper and loader $198/hr Subtotal Supplies Fuel, electricity and r&m 50 days x $400/day Subtotal Contractual WRTC crews and local hires (5) $17.20/hr av. plus benefits Subtotal 45,000 48,440 93,440 24,000 20,000 56,050 56,050 Other Raw Materials 150loads@$750 Site lease 2000/mo Subtotal 22,500 6,000 90,000 from Project income 112,500 6,000 Total Costs 205,550 48,440+90,000 343,990 Project income is a soft figure Cash flow is an issue 220,000 Project (Program) Income1 1 Program income is the gross revenue generated by a grant or cooperative agreement supported activity during the life of the grant. Program income can be made by recipients from fees charged for conference or workshop attendance, from rental fees earned from renting out real property or equipment acquired with grant or cooperative agreement funds, or from the sale of commodities or items developed under the grant or cooperative agreement. The use of Program Income during the project period may require prior approval by the granting agency.