Telecom Cables for Monitoring: Reconciling Differing Objectives Simon Webster NEC simon.webster@emea.nec.com Discussion Points ▐ Telecoms meets Monitoring ▐ Perspectives from Japan’s submarine monitoring networks – an update ▐ Views on the way forward Page 2 © NEC Corporation 2013 Differing Motivations ▐ Telecoms ▐ Dedicated use – reliable global connectivity ▐ Landings determined by projected traffic demand, politics, budgets ▐ High up-front CapEx, low OpEx ▐ Operational life 25+ years ▐ Maximising design capacity within budget ▐ Network availability a priority ▐ Currency – IRUs Page 3 © NEC Corporation 2013 ▐ Disaster Warning (e.g. Seismic/Tsunami) ▐ Dedicated use – civil protection ▐ Locations determined by naturally-occurring geology ▐ High up-front CapEx, moderate OpEx: natural events require repairs to cable ▐ Operational life targeted at approx. 25 years ▐ Fixed bandwidth demand ▐ Non-availability = human risk ▐ Currency – human life, infrastructure, prosperity ▐ Environmental Monitoring (e.g. Ocean Climatology) ▐ Flexibility of use has value scientific objectives may evolve over lifetime of observatory ▐ Project duration ~5 years, hope to extend ▐ Funding released annually ▐ Future bandwidth demand unknown (but probably everhigher) ▐ Data outages may be tolerable ▐ Currency – data Æ knowledge Æ global sustainability Differing Motivations – Marine Impacts ▐ Telecoms ▐ Disaster Warning (e.g. Seismic/Tsunami) ▐ Environmental Monitoring (e.g. Ocean Climatology) ▐ Safest routes ▐ High risk routes ▐ ‘Interesting’ routes ▐ Shortest routes for cost and latency reasons ▐ Meandering routes ▐ Type, location and spacing of sensors can vary ▐ Cable burial or other protection where necessary to ensure availability ▐ Surface laid cable (but selfburial possible) ▐ Expect periodic maintenance in case of seismic activity Page 4 © NEC Corporation 2013 ▐ Marine fouling possible ▐ Annual sensor upgrades or maintenance may be necessary/desirable ▐ Design for minimal maintenance In-line ▐ Wet-mate connectors in scope In-line Nodal In-line system Ocean Bottom Seismometer (OBS) Terminal Equipment Cables & Fibres ① ② ③ ①: Armored Cable ②: Light Weight Cable ③: Light Weight Screen Cable ① ③ OBS ② PG OBS Provided by JAMSTEC Page 5 © NEC Corporation 2013 Node System Terminal Station BU BU TE TE NODE NODE : Wet Mateable Connector Page 6 © NEC Corporation 2013 Sensor Group 2 Sensor Group 1 Sensor Group 2 Sensor Group 1 Existing Observation Networks in Japan ▐ Long history – first system built in 1979 ▐ Early Detection of Earthquakes and Tsunamis ▐ Real-time Data Transmission to On-shore Stations ▐ 24/7 Ocean Bottom Observation ▐ Contribute to Disaster Management through Early Warning to the Public ▐ All dedicated systems: no dual use cables have been built Page 7 © NEC Corporation 2013 New Observation Networks in Japan ▐ Planned and funded by the Japanese Government 5 4 ▐ 3-year plan currently under way ▐ Intended for Real-time Observation of Earthquakes and Tsunamis 3 ▐ Over 5,000km of Submarine Cable ▐ Over 150 Undersea Units with Seismometers and Tsunami Sensors Page 8 © NEC Corporation 2013 2 1 6 NEC Scientific Monitoring System Seismic and Tsunami Monitor Optical Submarine Cable System Extension TMU STM Scientific NODE Unit Economical System TU Scientific Terminal Equipment Environmental Monitor Terminating Unit Flexible System Seismic Monitor Page 9 © NEC Corporation 2013 Wet-Mateable Connector Hybrid Telecoms and Scientific Monitoring System Optical Submarine Cable Non Active Area High Reliable and/or Economical System Terminal Equipment Scientific NODE Unit ST M Geophysical Activity Area Seismic Monitor Terminating Unit Multi-Purpose Monitor Flexible System Geophysical Activity Area Page 10 © NEC Corporation 2013 Conclusions ▐ Japan’s Experience z Submarine cable based monitoring systems have been used for over 30 years in Japan z Those systems have proven effective for real-time monitoring of seismic activities and tsunamis z Built as dedicated monitoring and observation systems, not with commercial telecommunications capabilities ▐ Current Practical Thoughts z Dual use cables are technically feasible z Motivations and practices differ between telecom and monitoring communities z Some measure of separation between telecom and monitoring systems seems to be the most practical approach today z Further discussion and collaboration may advance these arguments Page 11 © NEC Corporation 2013