ITUITU-D Regional Development Forums 2010 on NGN and Broadband (ARB, EUR & CIS Regions): “NGN and Broadband, Opportunities and Challenges” Challenges” Session 4 Benefit of using appropriate Planning Tools for Broadband and NGN Ignat Stanev HCTP/ITC, Bulgaria ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 1 Content of presentation Broadband and NGN Top level planning domains for broadband access Modeling of broadband access networks Broadband planning tools of ITU partners ITU validation process for planning tools Benefit of using plannig tools ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 2 1 Broadband as Definition for Next Generation Networks ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 3 Broadband definitions of ITU Recommendation I.113 of the ITU Standardization Sector defines broadband as : Transmission capacity that is faster than primary rate Integrated Services Digital Network (ISDN) at 1.5 or 2.0 Megabits per second (Mbits) Related to transmission speed ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 4 2 Offered broadband connections by speed Offered broadband connection – By speed of by price and speed connection: Low speed (256kbps – 2Mbps) Mediumspeed (2.5Mpbs-10Mbps) High speed (10Mpbs-32Mbps) Very-high speed (above35Mbps) ITU-D Forum Source : OECD, TeleGeography, Point Topic Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 5 Broadband customers (ICT market trends) Internet users Source : ITU Database 2009 ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 6 3 Broadband customers Growth of broadband customers by region ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 7 Broadband customers – download speed Average actual download speed Source : Akamai, Q4 2008 Average actual speed Average advertised speed Source : OECD 2009 ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 8 4 Broadband access technologies - wireline Mbit/s symm. 10 5.0 2.0 1.0 0.5 0.2 Upstream (from subscriber to central office) Loop range SHDSL 1 0.2 0.5 1.0 2.0 5.0 10 20 50 100 VDSL 2 3 HDSL 4 5 6 7 km ADSL FTTx Downstream asymm. (from central office to subscriber) Mbit/s widl/xdsl1m xDSL HFC ITU-D Forum Power line Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 9 Broadband access technologies - wireless Terrestrial Wireless SAT ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 10 5 Top Level Broadband Planning Domains NGN requirements to the planning tools are organised by eight planning domains derived from planner needs and networking problems Fixed FixedSwitching Switching and and routing routingplanning planning Fixed FixedAccess Access Planning Planning Signaling Signalingand and control controlplanning planning Broadband planning Access Accessradio radio planning planning Business BusinessPlanning Planning IT, IT,OSS OSSand and Applications Applicationsplanning planning Core Coreradio radio planning planning Transmission Transmission planning planning Guidelines for Network Planning Tools for Developing Countries and Countries with economies in transition, ITU, Geneva, 2005 ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 11 Fixed Access Planning Inputs From other Modular Functionalities Market Demand Forecasting Planning Tools Outputs To other Planning Tools Access Location/Design From Network To Network Configuration and Assignment From Technology From Data Bases Dimensioning and Performance and OSS To Data Bases Protection and Reliability Optimisation and Sensitivity To Planners From Planners Network and Equipment Costing Requirements for the fixed access planning domain GNPT for Developing Countries and Countries with economies in transition, ITU, Geneva, 2005 ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 12 6 Requirements related to NGN and corresponding new technologies Modeling of future NGN access network equipment, including equipment parameters, technological constraints, costs structures Extending of the forecasting models and methods due to NGN service/customer requirements Adapting of the calculation modules to the NGN access network requirements Modeling of new services and new NGN access technologies ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 13 Radio Access Planning Inputs From other Modular Functionalities User and Traffic Forecasting Planning Tools Outputs To other Planning Tools Radio Access Location/Design From Network To Network and OSS Coverage and Interference From Technology From Data Bases Dimensioning and Performance To Data Bases Protection and Reliability Optimisation and Sensitivity To Planners From Planners Network and Equipment Costing Requirements for the radio access domain GNPT for Developing Countries and Countries with economies in transition, ITU, Geneva, 2005 ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 14 7 Requirements related to NGN and corresponding new technologies Modeling of new NGN services which do not fall in the present service models and specially multimedia service types Modeling of future NGN access network equipment, including equipment parameters, technological constraints, costs structures Extending of the forecasting models and methods due to NGN service/customer requirements Adapting of the calculation modules to the NGN access network requirements Coverage calculation methods related to the new NGN access technologies ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 15 Business Planning Inputs From other Planning Tools From Network Outputs Modular Functionalities Business/Network/Scenario Design To other Planning Tools Market Demand Forecasting Costs, Tariffs and Revenues From Technology From Data Bases Capacity grow and Substitutions To Network and OSS To Data Bases Financial evaluations Backward Cost Assignment To Planners From Planners Scenario’s Sensitivity Requirements for the business planning domain GNPT for Developing Countries and Countries with economies in transition, ITU, Geneva, 2005 ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 16 8 Requirements related to NGN and corresponding new technologies Modeling of service demands characterisation and traffics for VoIP and NGN multi-service flows Network and systems dimensioning with the multiservice NGN criteria Modeling of NGN systems with their corresponding capacities, capital costs, operational costs, lifetimes, etc. Representation of interrelations among NGN network subsystems, nodes and links Pricing of new services and costing of new NGN access technologies ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 17 Modeling of broadband services Combination of Services, e.g. triple play Customer classes - customers using same services – e.g. residential with triple play BB BB BB Service models : Permanent (contention ratio) LBS BB BB BB BB BB Elastic Real -Time CBR BB BB BB / VBR ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 18 9 Modeling of broadband customers Model of geographical location of customers divided in customer classes Digital maps – Geo referenced and scaled zones /areas => => Possibility for interaction with GIS systems ITU-D Forum nodes / sites Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 19 Forecasting of broadband customers Trend methods Logistic model Forecasting of : Y 1 YWV • Customers and penetration, Point of inflection YV (0) • Service utilization, 0 T(0) T(0) + TW V T • Service tariffs Historical data Number of Subscribers Number of Subscribers per Customer Class 250000 200000 150000 100000 50000 0 BB_Bus BB_Res 2009 2010 2011 2012 2013 Time Evolution of BB customers ITU-D Forum Forecasted data Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 20 10 Modeling of broadband access technologies Wireless - WiMAX ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 21 Design and Optimization of Broadband Access Networks Optimization of node Locations : E.g. optimal placement of BS Optimization of Service areas : E.g. optimal service areas of MSAN Combinatorial problem, not possible to check all possible solutions : Heuristic algorithms Genetic algorithms, Simulated annealing algorithms ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 22 11 Modelling of Radio access - coverage Prediction Models : Freespace Propagation Scattering Diffraction Tropospheric Effects Reflection Atmosph. Absorption Loss f>10 GHz Rain Attenuation f>5GHz Non-Terrain Based • Use of "effective antenna height" • Monotonous decline of field strength with increasing distance to transmitter Example: ITU-R P. 370 DTM Based • Diffraction, shading, reflection • Terrain elevation and land use (morphology) • 2D and 3D models Examples: "Epstein-Peterson", "Longley&Rice", "Okumura-Hata" ITU-D Forum Maximum Field Strength Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 23 Costing of Access Networks Optimum Costs Total NODES Exchanges CORE Circuits CAPEX Acquisition Installation OPEX Maintenance Subscribers ACCESS Cost components of telecom network ITU-D Forum Overall economic results – Revenues, Cost, Cash-flow and Net Present Value no. of exchanges nodes Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 24 12 Planning of bradband access networks Critical Re-Optimization OpEx intensive Critical Network planning Demand Forecast Plan New Build CapEx sensitive Purchase / Build Operate & Maintain BUILD PLAN RUN OPEX Intensive CAPEX Sensitive 15% 5% 9% 9% 52% 25% 85% nodes ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 25 Broadband Planning Tools of ITU partners : Planning of wireline BB access network Market Evolution Data Design Parameters/ .Rules DSL Network components Economic factors Customers demand BB services Define and Characterize the Market Data VPIaccessMaker Design DSL Access Network Perform Techno Economic Analysis VPIaccessMaker VPIaccessMaker Target Geography BB market DSL Network Design Economic Analysis of DSL Network • Capturing sophisticated market forecasts • Selecting the best access technology for a geographic region • Designing and dimensioning optimized access networks • Providing detailed economic analysis based on forecasts and infrastructure investments ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 26 13 Broadband Planning Tools of ITU partners : Planning of wireline BB access network Market Evolution Data Design Parameters/ .Rules DSL Network components Economic factors Customers demand BB services Define and Characterize the Market Data Design DSL Access Network Perform Techno Economic Analysis VPIaccessMaker VPIaccessMaker VPIaccessMaker Target Geography BB market DSL Network Design Economic Analysis of DSL Network FTTx access network design for outside plant : • Capturing sophisticated market forecasts • Determining the best locations for fiber splitters, MSANs or DSLAMS • Dimensioning duct and conduit capacities • Providing detailed economic analysis based on forecasts and infrastructure investments ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 27 Planning of wireless BB access network Radio access coverage : • Interactive microwave link engineering • Design of radio access networks • Planning wireless broadband networks • Frequency allocation and coordination ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 28 14 ITU validation process for planning tools Purpose: Validation of Network Planning Tools for Developing Countries and Countries with economies in transition Compliance with the technical requirements specified in the ITU Guidelines for Network Planning Tools Performance of the planning tool in terms of size of the network and time to execute typical planning cases Creating of Set of real data reference networks ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 29 Benefit of using plannig tools ITU-D Forum Chisinau (Moldova), 4-6 May 2010 Session 4_IS - 30 15